Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2022-021182 - 0901a068810eae8d
Department of Environmental Quality Kimberly D. Shelley Executive Director State of Utah SPENCER J. COX Governor DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL DEIDRE HENDERSON lieutenant Governor Douglas J. Hansen Director TO: FROM: DATE: SUBJECT: MEMORANDUM Phil Goble P/2.' Dean Henderson July 29, 2022 Review of the May 3, 2022 1st Quarter 2022 Nitrate Monitoring Report for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. ("EFRI") White Mesa Uranium Mill, near Blanding, Utah The Utah Division of Waste Management and Radiation Control ("Division") has reviewed the EFRI May 3, 2022, 1st Quarter, 2022 White Mesa Uranium Mill Nitrate Monitoring Report ("Report") for the Nitrate Contamination Investigation. For the review of this Report the following regulatory enforcement documents were used: • Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill, Groundwater Discharge Permit No. UGW370004, signed March 19, 2019 ("Permit"). • Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah, May 7, 2012, ("CAP") approved December 12, 2012. • The EFR Quality Assurance Plan ("QAP") August 22, 2019 (Revision. 7.6) REVIEW The CAP requires the 1st quarter Nitrate Monitoring Report for the Nitrate Contamination Investigation to be submitted to Division on or before June 1, of each year. The Report was received by the Division on May 9, 2022 (date of Report May 3, 2022) which meets the CAP requirement. Monitor Wells Sampled and Parameters Analyzed The following monitor wells were sampled and analyzed for inorganic chloride and nitrate + nitrite ( as N), and field data work sheets were filled out for each well as required in the CAP: DRC-20 195 North I 950 West· Salt Lake City, UT Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T.D.D. (801) 536-4284 www.deq.utah.gou Printed on 100% recycled paper DRC-2022-021182 Page2 TWN-1, TWN-2, TWN-3, TWN-4, TWN-7, TWN-18, TNW-20, TWN-21, TW4-22 (pumping well), TW4-24 (pumping well), and TW4-25 (pumping well), and Piezometer 1, Piezometer 2, and Piezometer 3A. Groundwater Head Monitoring For the 1st Quarter, 2022 depth to groundwater was measured in the following wells and/or piezometers as required in Part I.E.3 of the Permit: • The quarterly groundwater compliance monitoring wells. • Existing monitoring well MW-4 and all of the temporary chloroform investigation wells. • Piezometers p,.J, P-2, P-3A, P-4 and P-5. • MW-20, MW-22 and MW-34 • Nitrate monitoring wells. • The DR piezometers which were installed during the Southwest Hydrologic Investigation. In addition to the above, depth to water measurements are routinely observed in conjunction with sampling events for all wells sampled during quarterly and accelerated efforts, regardless of the sampling purpose. All well levels used for groundwater contour mapping were measured and recorded within 5 calendar days of each other. The monitoring wells were purged using the three approved QAP well purging strategies and meet QAP requirements for each strategy: 1. Purging two casing volumes with stable field parameters for specific conductivity, turbidity, pH, redox potential, and water temperature (within 10% RPD): Wells: TWN-1, TWN-4, and TWN-18. 2. Purging a well to dryness and stability of field parameters for pH, specific conductivity, and water temperature only after recovery: Wells: TWN-3, TWN-7, TWN-20, and TWN-21 3. Continuously Pumped Wells that are considered sufficiently evacuated to immediately collect a sample: Wells: TWN-2, TW4-22, TW4-24, and TW4-25. Detection Limits All sample sets were measured and reported to the required QAP reporting limits. Page3 Sample Duplicates One duplicate sample was collected at TWN-18 and identified as TWN-65. The duplicate sample analytical results for this sample/duplicate pair QA/QC were within the 20% acceptance limits as required in the QAP except for nitrate (see Table 2 below). Holding Times The method holding times for each parameter for samples collected at each monitor well were received and analyzed within the required holding times in the QAP. Receipt Temperature All samples were received within the required QAP temperature limit of 6° C. Analytical Methods Chloride and nitrate+ nitrite (as N) were analyzed for methods consistent with the requirements of the QAP. Estimation of Pumped Nitrate Mass Removal An estimated 55 lbs. of nitrate were removed from the chloroform pumping wells (MW-4, MW-26, TW4-1, TW4-2, TW4-4, TW4-l 1, TW4-19, TW4-37, TW4-39 and TW4-41) and the nitrate pumping wells (TWN-2, TW4-22, TW4-24, and TW4-25). Of the 55 lbs. removed, approximately 33 lbs. was removed by the nitrate pumping wells. In the attached Table 3, the Division shows calculations that verify these reported estimates. Reporting The Report included the following information as required in the CAP: a) Introduction b) Sampling and Monitoring Plan: i. Description of monitor wells sampled; ii. Description of sampling methodology, equipment and decontamination procedures; iii. Identification of all quality assurance samples, e.g. equipment blanks duplicate samples, etc. c) Data Interpretation: 1. Interpretation of groundwater levels, gradients, and flow directions. The interpretation will include a discussion on: 1) current site groundwater contour map, 2) hydrographs to show groundwater elevation in each monitor well over time, 3) depth to groundwater measured and groundwater elevation from each monitor well summarized in data table that includes historic groundwater level data for each well, 4) calculations documenting quarterly nitrate mass removed by pumping; 11. Interpretation of all analytical results for each well including a discussion on: 1) a current nitrate isoconcentration map, 2) graphs showing nitrate concentration trends in each well through time and, analytical results for each well summarized in data table that includes historic analytical results for each well; and Page4 iii. An electronic copy of all laboratory results for groundwater quality monitoring conducted during the quarter will be provided to the Executive Secretary. d) Conclusions and Recommendations e) Copies of EFR field reports, laboratory reports, and chain of custody forms. Evaluation of the Nitrate Contaminate Plume and Its Associated Contaminants The groundwater monitoring data appeared to show that the nitrate contaminate plume ("Plume") is bound by up gradient, cross gradient, and down gradient wells that have nitrate concentrations below the Utah IO mg/L GWQS. Based on water level data, groundwater contour, and capture zone maps in the it appears that up-gradient of pumping wells TW4-19, TW4-22, TW4-24, TW4-37, and TW4-39 the nitrate plume appears to being captured. Conclusions on Compliance with the CAP, QAP Per the Division review it appears that the 1st Quarter, 2022 Nitrate Monitoring Report for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. complies with the CAP and QAP. Therefore, a letter will be drafted notifying EFR of the review and closing out of this Report. Page 5 References Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill, Groundwater Discharge Permit No. UGW370004, signed March 19, 2019. Energy Fuels Resources (USA) Inc., June 5, 2019, White Mesa Uranium Mill, Ground Water Monitoring Quality Assurance Plan (Revision 7.5). Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill 1st Quarter, 2022 Nitrate Monitoring Report, May 3, 2022. HYDRO GEO CHEM, INC, May 7, 2012, Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah. Table 1 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-1 Parameter TWN-2 (Pumpin& well starting !n Parameter January2013) Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/17/2010 0.50 17 1st Qtr 3/24/2010 62 2nd Qtr 5/26/2010 0.6 20 2nd Qtr 6/2/2010 69 3rdQtr 9/27/2010 0.6 19 3rd Qtr 9/29/2010 69 4th Qtr 12/7/2010 0.6 14 4th Qtr 12/9/2010 48 1st Qtr 1/26/2011 0.5 17 1st Qtr 2/1/2011 . 43 2nd Qtr 4/20/2011 0.5 19 2nd Qtr 4/28/2011 40 3rdQtr 7/26/2011 0.5 14 3rd Qtr 7/28/2011 33 4th Qtr 10/17/2011 0.5 10 4th Qtr 10/20/2011 33 1st Qtr 1/9/2012 0.6 15 1st Qtr 1/12/2012 31 2nd Qtr 4/18/2012 0.6 17 2nd Qtr 4/20/2012 48 3;-;ioi~---ii24 /201 2 ----------004f ____ 1/: 3rdQtr--l-7 .13iiiiiii ------------54 4th Qtr 10/17/2012 4th Qtr 7/17/2012 22.1 l stQtr --iilB/2013 --------------------lst-Qtr--I-"'iii§'iiiii3 ------------0.68 17.6 2nd Qtr 4/23/2013 0.84 17.4 2nd Qtr 4/24/2013 3rdQtr 8/27/2013 1.24 24.1 3rd Qtr 8/27/2013 4th Qtr 10/16/2013 1.61 26.8 4thQtr 7/16/2013 TWN-65 duplicat ofTWN-1 1.48 27.1 DRC split of TWN-2 ORC split of TWN-1 1.6 30 DRC duplicate of TWN-1 0.22 30 1st Qtr I 1/14/2014 1.47 29.2 lstQtr 1/13/2014 2nd Qtr 5/6/2014 1.63 31.1 2nd Qtr 5/7/2014 3rdQtr 8/5/2014 1.7 28 3rd Qtr 8/6/2014 TWN-65 duplicate of TWN-1 1.4 28 4th Qtr I 10/8/2014 1.46 27.6 4thQtr 10/8/2014 1st Qtr I 2/18/2015 1.37 27.8 lstQtr 2/18/2015 TWN-65 dup of TWN-1 1.41 29.0 2nd Qtr 5/13/2015 0.65 29.2 2nd Qtr 5/12/2015 3rdQtr 8/25/2015 0.624 33.2 3rd Qtr 8/25/2015 4th Qtr 10/13/2015 1.35 27.7 4thQtr 10/14/2015 lstQtr 2/23/2016 1.51 30.3 lstQtr 2/23/2016 2nd Qtr 5/17/2016 1.73 32.1 2nd Qtr 5/17/2016 3rd Qtr 7/20/2016 1.76 29.6 3rd Qtr 7/20/2016 4th Qtr 10/6/2016 1.98 33 4th Qtr 10/11/2016 lstQtr 2/15/2017 2.06 31.2 1st Qtr 2/15/2017 TWN-65 duplicate of TWN-1 1.98 31.5 2nd Qtr I 6/1/2017 1.89 32.7 2nd Qtr I 6/112017 I TWN-65 duplicate ofTWN-1 1.88 31.S 3rd Qtr I 7/19/2017 2.07 31.2 3rd Qtr I 7/19/20171 TWN-65 duplicate ofTWN-1 1.89 31.4 4thQtr I 10/4/2017 1.95 30.8 4th Qtr I 10/4/20171 TWN-65. duplicate of TWN-1 1.99 32.0 .............. ········•·· 1st Qtr 1/18/2018 1.86 30.4 1st Qtr 1/19/2018 2nd Qtr 5/8/2018 1.89 28.4 2nd Qtr 5/9/2018 3rd Qtr 8/8/2018 1.97 34.2 3rd Qtr 8/8/2018 4th_Qtr 11/20/2018 1.98 28.9 4th_Qtr 11/20/2018 ........ ········· 1st Qtr 2/20/2019 2.1 31.4 1st Qtr 2/20/2019 2nd Qtr 5/29/2019 1.93 32.6 2nd Qtr 5/29/2019 3rdQtr 8/14/2019 2.15 30.3 3rd Qtr 8/14/2019 4th Qtr 10/16/2019 2.35 32.0 4th Qtr 10/16/2019 DWMRCsplitofTWN-1 2.1 31.0 DWMRC split of TWN-2 ................. 1st Qtr 1/29/2020 2.24 33.8 1st Qtr 1/29/2020 2nd Qtr 5/20/2020 2.24 33.0 2nd Qtr 5/20/2020 3rd Qtr 7/15/2020 2.36 30.8 3rd Qtr 7/15/2020 4th Qtr 11/12/2020 1.89 29.2 4th Qtr 11/12/2020 1st Qtr 2/17/2021 2.53 34.1 1st Qtr 2/18/2021 2nd Qtr 5/25/2021 3.18 34.7 2nd Qtr 5/25/2021 3rdQtr 8/18/2021 2.47 35.7 3rd Qtr 8/18/2021 4th Qtr 11/23/2021 1.91 37.4 4th Qtr 11/23/2021 ....... lstQtr 2/15/2022 3.01 35.6 lstQtr 2/15/2022 Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I ORC = Utah Division or Radiation Control. OWMRC = Utah Division of Waste Management and Radiation Control Nitrate Pumping System Started in January 2013 As of March 2012 both north and south wild life ponds no longer rece,v,ng water 57.3 57.7 80.0 111 200 42.6 44.7 42 71 48.6 52.8 49.7 45 86.3 45.4 35.3 32.6 27.4 250J 23.9 I 31.9 1 19.6 19.8 18.6 19.6 19.0 45.1 23.2 18.2 16.0 16.S 16.1 17.2 12 15.4 13.8 15.3 12.7 15.3 Chloride (mg/I) NoGWQS 85 97 104 93 93 85 74 76 86 103 ------93 79 -----8Q5 82.1 75.9 70.4 75 72.4 84.9 80 81 87.8 83.6 87.8 74.9 73.9 74.5 68.8 69.8 65.8 61.5 64.2 60.5 57.1 62.3 61.S 56 50.7 102 50.7 53 52 66.1 59.6 55.6 53.S 61.8 61.5 58.9 62.3 59.5 Table 2 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-3 Parameter TWN-4 Sampling Event GWQS Sampling Event Nitrate, Nitrate+ Nitrite Chloride (mg/I) (10 mg/L) NoGWQS lstQtr 3/25/2010 25.3 111 1st Qtr 3/16/2010 2nd Qtr 6/3/2010 26 118 2nd Qtr 5/27/2010 3rdQtr 7/16/2010 27 106 3rd Qtr 9/27/2010 ~.t.hQtr 12/10/2010 24 117 4th_Qtr 12/8/2010 ·········· ...... lstQtr 2/1/2011 24 138 1st Qtr 1/25/2011 2nd Qtr 4/28/2011 26 128 2nd Qtr 4/20/2011 3rd Qtr 7/29/2011 25 134 3rd Qtr 7/26/2011 4th Qtr 10/20/2011 25 129 4th Qtr 10/18/2011 .......... lstQtr 1/12/2012 25 143 1st Qtr 1/9/2012 2nd Qtr 4/20/2012 24 152 2nd Qtr 4/18/2012 -------------------------------TWN-65 duplicate of TWN-4 3rd Qtr 7/31/2012 27 158 3rdQtr I 7/25/2012 TWN-65 duplicate of TWN-4 4th Qtr 10/17/2012 12.1 149 4th Qtr __ t 7/15/2012 1:aot;----'[il<J/201 3 --------------------22.2 157 1st Qtr 2/18/2013 TWN-65 duplicate of TWN-4 2nd Qtr 4/24/2013 27.2 158 2nd Qtr I 4/23/2013 3rd Qtr 8/28/2013 20.9 171 3rd Qtr 8/27/2013 TWN-65 duplicate of TWN-4 4thQtr 10/17/2013 23.5 163 4th Qtr I 7/16/2013 TWN-65 duplicate of TWN-4 lstQtr 1/15/2014 . 19.6 160 lstQtr J 1/14/2014 TWN-65 duplicate of TWN-4 2nd Qtr 5/7/2014 23.6 168 2nd Qtr I 5/6/2014 TWN-65 duplicate of TWN-4 3rd Qtr 8/6/2014 19.5 174 3rd Qtr 8/5/2014 4thQtr 10/9/2014 19.1 153 4thQtr 10/8/2014 lstQtr 2/19/2015 19.4 164 1st Qtr 2/18/2015 2nd Qtr 5/14/2015 17.2 141 2nd Qtr 5/13/2015 3rdQtr 8/26/2015 16.2 156 3rd Qtr 8/25/2015 TWN-65 duplicate ofTWN-4 4thQtr 10/14/2015 16.3 129 4th Qtr I 10/13/2015 TWN-65_ duplicate of TWN-4 lstQtr 2/24/2016 16.8 128 1st Qtr 2/23/2016 2nd Qtr 5/18/2016 13.5 116 2nd Qtr 5/17/2016 3rdQtr 7/20/2016 16.8 110 3rd Qtr 7/20/2016 4thQtr 10/7/2016 15.8 113 ~\h Qtr 10/6/2016 1st Qtr 2/16/2017 17.4 113 1st Qtr 2/15/2or'i 2nd Qtr 6/2/2017 15.9 108 2nd Qtr 6/1/2017 3rd Qtr 7/20/2017 15.9 106 3rd Qtr 7/19/2017 4thQtr 10/4/2017 15.6 111 4th Qtr 10/4/2017 lstQtr 1/19/2018 14.4 107 1st Qtr 1/18/2018 2nd Qtr 5/9/2018 16.4 115 2nd Qtr 5/9/2018 3rd Qtr 8/9/2018 19.4 149 3rd Qtr 8/8/2018 TWN-65 duplicate ofTWN-4 4thQtr 11/21/2018 J 201J 123 4th Qtr I 1112012018 ........ TWN-~~ duplicate of TWN-4 1st Qtr 2/21/2019 20.7 140 1st Qtr 2/20/2019 2nd Qtr 5/30/2019 18.7 137 2nd Qtr 5/29/2019 3rd Qtr 8/15/2019 19.8 133 3rd Qtr 8/14/2019 4th Qtr 10/17/2019 19.6 126 4th Qtr 10/16/2019 DWMRC split ofTWN-3 17.0 130 TWN-65 duplicate of TWN-4 DWMRC split of TWN-4 TW4-40 DWMRC duplicate of TWN 4 1st Qtr I 1/30/20201 19.41 156 1st Qtr I 1/29/2020 2nd Qtr 5/21/2020 24 136 2nd Qtr 5/20/2020 TWN-65 duplicate of TWN-4 3rd Qtr I 7/15/20201 22.21 130 3rdQtr I 7/15/2020 TWN-65 duplicate of TWN-4 4th Qtr '""''"'"!-:: 18 137 4th_Qtr .. .11/12/2020 .......... 1st Qtr 2/18/2021 23.8 145 1st Qtr 2/17/2021 2nd Qtr 5/27/2021 25 156 2nd Qtr 5/25/2021 3rd Qtr 8/19/2021 24.3 146 3rdQtr 8/18/2021 4th Qtr 11/24/2021 17.4 147 4th Qtr 11/23/2021 TWN-65 duplicate of TWN-4 1st Qtr 2/16/2022 25.3 140 1st Qtr 2/16/2021 Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Nitrate Pumping System Started in January 2013 As of March 2012 both north and south wild life ponds no longer receiving water Parameter GWQS Nitrate, Nitrate+ Nitrite (10 mg/L) 0.9 1.0 0.9 1.0 0.9 0.9 1.1 0.9 0.9 1.1 ~-----------1.1 1.4 1.5 1.45 ~-----------1.5 1.5 1.63 1.6 1.57 1.69 0.22 1.41 1.33 1.55 1.54 2.0 1.44 1.48 0.733 0.974 1.160 1.58 1.45 2.02 2.97 3.14 3.09 2.63 2.4 2.35 2.27 2.63 1.9 1.54 1.51 1.48 1.51 1.53 1.5 1.81 2.15 2.15 1.9 1.9 1.89 1.75 1.71 1.75 1.73 1.18 1.64 1.70 1.28 1.18 1.02 1.5 Chloride (mg/I) NoGWQS 22 22 19 21 21 21 35 20 20 24 -------24 25 26 26.4 -------25.3 25.9 24.4 27.2 29.0 29.4 32 28.4 26.4 29.6 26.6 28 30.7 31.5 31.9 35.2 35.2 28.4 25.6 30.7 31.7 28.0 31.3 31.2 28.6 28.0 27.4 31.2 27.7 28 27.6 22.7 23.2 25.3 26.5 23.7 25.4 24.7 26.0 26.0 27.2 25.1 25.4 23.1 23.1 22.8 24.2 23.2 23.7 23.2 23.2 22.7 Table 3 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-5 Parameter TWN-6 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate + Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/16/2010 0.3 43 1st Qtr 3/23/2010 1.5 2nd Qtr 5/26/2010 0.3 44 2nd Qtr 6/1/2010 1.4 3rd Qtr 7/12/2010 0.3 43 3rd Qtr 7/13/2010 1.4 4th Qtr 12/7/2010 0.3 45 4th Qtr 12/7/2010 1.2 1st Qtr 1/25/2011 0.4 47 1st Qtr 1/26/2011 1.1 2nd Qtr 4/20/2011 0.3 44 2nd Qtr 4/20/2011 1.5 3rd Qtr 7/26/2011 0.3 44 3rd Qtr 7/27/2011 1.1 4th Qtr 10/17/2011 0.3 45 4th Qtr 10/18/2011 1.4 1st Qtr 1/9/2012 0.2 45 1st Qtr 1/10/2012 1.2 2nd Qtr 4/18/2012 0.3 39 2nd Qtr 4/18/2012 1.1 3rd Qtr 7/24/2012 0.3 48 3rd Qtr 7/25/2012 1.4 4th Qtr 10/15/2012 <0.1 43.5 4th Qtr 7/15/2012 0.78 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-5 abandoned on July 31, 2013 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 NA 3rd Qtr 2016 NA 4th Qtr 2016 NA 1st Qtr 2017 NA 2nd Qtr 2017 NA 3rd Qtr 2017 NA 4th Qtr 2017 NA 1st Qtr 2018 NA 2nd Qtr 2018 NA 3rd Qtr 2018 NA 4th Qtr 2018 NA 1st Qtr 2019 NA 2nd Qtr 2019 NA 3rd Qtr 2019 NA 4th Qtr 2019 NA 1st Qtr 2020 NA 2nd Qtr 2020 NA 3rd Qtr 2020 NA ... 4th Qtr 2020 NA lstQtr 2021 NA 2nd Qtr 2021 NA 3rd Qtr 2021 NA 4th Qtr 2020 NA 1st Qtr 2022 NA NA= Per the CAP and SCO, not sampled Chloride (mg/I) NoGWQS 19 22 73 21 18 22 17 21 20 22 22 20.4 Table 4 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-7 Parameter TWN-8 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/17/2010 0.8 6 1st Qtr 3/16/2010 <0.1 2nd Qtr 5/28/2010 1.2 6 2nd Qtr 5/26/2010 <0.1 3rd Qtr 7/14/2010 1.8 7 3rd Qtr 7/12/2010 <0.1 l4th.Otr. .......... 12/10/2010 1 4 4th Qtr 12/7/2010 <0.1 1st Qtr 1/27/2011 1.3 6 1st Qtr 1/25/2011 <0.1 2nd Qtr 4/21/2011 1.7 6 2nd Qtr 4/19/2011 <0.1 3rdQtr 7/29/2011 0.7 5 3rd Qtr 7/26/2011 <0.1 4th.Otr 10/19/2011 2.2 6 4th Qtr 10/17/2011 <0.1 1st Qtr 1/11/2012 2.3 5 1st Qtr 1/9/2012 <0.1 2nd Qtr 4/20/2012 1.2 6 2nd Qtr j~~~g <0.1 -ii2G/2 01 2 ----------o0G! 1-----5~~ 3rcfo"ir--~-----------3rdQtr 7/24/2012 <0.1 4th Qtr 10/16/2012 4th Qtr 10/15/2012 <0.1 -iii9/201 3 -----------------------------1------------1st Qtr 0.59 5.68 1st Qtr 2013 NA 2nd Qtr 4/24/2013 1.16 5.88 2nd Qtr I 2013 NA 3rd Qtr 8/28/2013 0.835 6.96 TWN-8 abandoned on July 31, 2013 4th Qtr 10/16/2013 0.986 5.7 1st Qtr 1/15/2014 0.882 5.75 2nd Qtr 5/7/2014 0.564 5.26 3rd Qtr 8/6/2014 0.9 6 4th.Otr ..... 10/9/2014 0.968 5.93 1st Qtr 2/19/2015 1.04 5.58 2nd Qtr 5/14/2015 0.779 6.18 3rd Qtr 8/6/2015 0.348 6.12 4th Qtr 10/14/2015 0.672 5.84 1st Qtr 2/24/2016 0.24 6.06 2nd Qtr 5/18/2016 0.732 6.26 3rd Qtr 7/21/2016 0.81 5.97 4thQtr 10/7/2016 0.698 6.17 .......... 1st Qtr 2/16/2017 1.63 14.0 2nd Qtr 6/2/2017 3.74 29.7 3rdQtr 7/20/2017 2.7 29.0 4th Qtr 10/5/2017 3.58 41.4 1st Qtr 1/19/2018 5.82 69.4 2nd Qtr 5/9/2018 10.2 94.7 3rdQtr 8/9/2018 10.6 105 4thQtr 11/21/2018 11.S 104 1st Qtr 2/21/2019 12.9 107 2nd Qtr 5/30/2019 13.5 122 3rd Qtr 8/15/2019 12.9 120 4th Qtr 10/17/2019 14.5 119 OWMRC split ofTWN-7 12.0 120 lstQtr 1/30/2020 14.2 128 2nd Qtr 5/21/2020 14.6 126 3rdQtr 7/16/2020 15.2 116 ~t~q~r .... 11/13/2020 11.8 121 ...... 1st Qtr 2/18/2021 16.0 129 2nd Qtr 5/27/2021 16.4 129 3rdQtr 8/19/2021 15.1 121 4th Qtr 11/24/2020 7.66 130 1st Qtr 2/17/2022 16.9 120 Shaded= Nitrate, Nitrate+ Nitrite concentrat1ons greater than the Ground Water Quality Standard of 10 mg/I NA= Per the CAP and SCO, not sampled Nitrate Pumping System Started in January 2013 As of March 2012 both north and south wild life ponds no longer rece1v1ng water Chloride (mg/I) NoGWQS 11 11 11 9 13 10 18 10 11 15 -------11 11.1 ------- Table 5 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-9 Parameter TWN-10 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/23/2010 7.6 183 1st Qtr 3/23/2010 1.5 2nd Qtr 6/1/2010 7.7 175 2nd Qtr 6/2/2010 1.0 3rd Qtr 7/15/2010 10.7 210 3rdQtr 7/14/2010 0.2 4th_Qtr 12/9/2010 8.0 172 4th_Qtr .... 12/8/2010 1.3 ....... . ........................................ 1st Qtr 2/1/2011 9.5 217 1st Qtr 1/26/2011 0.3 2nd Qtr 4/28/2011 10.0 192 2nd Qtr 4/21/2011 1.2 3rd Qtr 7/29/2011 110 208 3rd Qtr 7/27/2011 0.1 4th Qtr 10/20/2011 10.9 134 4th Qtr 10/18/2011 0.2 ........ ......... .......... . ................. lstQtr 1/12/2012 12.2 202 1st Qtr 1/10/2012 0.8 TW4-65 dup of TWN-10 0.7 2nd Qtr 4/20/2012 10.6 209 2nd Qtr I 4/19/2012 0.9 3rdQtr 7/31/2012 12.3 215 3rd Qtr 7/25/2012 0.6 4th_Qtr .... 10/17/2012 12.5 194 4th Qtr ..... 7/16/2012 0.12 lstQtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-9 abandoned on July 31, 2013 TWN-10 abandoned on July 31, 2013 TWN-11 Parameter TWN-12 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride {mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) lstQtr 3/17/2010 1.4 73 1st Qtr 3/17/2010 0.7 2nd Qtr I 6/1/2010 1.3 72 2nd Qtr 5/26/2010 0.8 3rdQtr 9/27/2010 1.4 76 3rd Qtr 7/12/2010 0.7 4th_Qtr ..... 12/8/2010 1.4 72 4th Qtr 12/7/2010 0.7 ......................................... .......... 1st Qtr 1/27/2011 1.4 84 1st Qtr 1/26/2011 4.2 2nd Qtr I 4/26/2011 1.4 76 2nd Qtr 4/26/2011 1.0 3rdQtr 7/27/2011 0.1 76 3rd Qtr 7/26/2011 0.6 4th_Qtr 10/17/2011 1.6 76 4th_Qtr ... 10/17/2011 1.2 ....... . 1/10/2012 . 1st Qtr 1/10/2012 1.6 69 1st Qtr 0.9 ate ofTWN-11 1.6 70 2nd Qtr j 4/19/2012 1.6 71 2nd Qtr 4/18/2012 1.2 3rd Qtr 7/25/2012 1.8 77 3rd Qtr 7/25/2012 1.4 4th_Qtr_ .. 10/16/2012 1.84 76.4 4th Qtr 7/16/201? .. 1.41 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-11 abandoned on July 31, 2013 TWN-12 abandoned on Ju ly 31, 2013 Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, not sampled Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Chloride (mg/I) NoGWQS 54 30 21 28 40 28 28 33 44 28 33 30.8 Chloride (mg/I) NoGWQS 113 106 112 103 87 109 102 87 104 106 102 101 Table 6 of 16 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-13 Parameter TWN-14 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate + Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/17/2010 <0.1 47 1st Qtr 3/24/2010 2.9 2nd Qtr 5/26/2010 0.1 49 2nd Qtr 6/2/2010 2.9 3rdQtr 9/27/2010 0.2 53 3rd Qtr 7/15/2010 3.5 4th Qtr 12/7/2010 0.4 57 4th Qtr 12/10/2010 4.2 1st Qtr 1/25/2011 1.6 103 1st Qtr 1/28/2011 3.7 2nd Qtr 4/26/2011 <0.1 49 2nd Qtr 4/27/2011 3.5 3rd Qtr 7/26/2011 0.1 49 3rd Qtr 7/29/2011 3.5 4th Qtr 10/17/2011 <0.1 48 4th Qtr 10/19/2011 3.9 1st Qtr 1/9/2012 <0.1 46 1st Qtr 1/11/2012 3.5 2nd Qtr 4/18/2012 <0.1 53 2nd Qtr 4/20/2012 3.4 3rd Qtr 7/24/2012 0.1 48 3rd Qtr 7/27/2012 3.7 TW4--70 duplicate ofTWN-14 3.8 4th Qtr 10/15/2012 <0.1 47.3 4th Qtr 7/17/2012 4.03 1st Qtr I 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-13 abandoned on July 31, 2013 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA 4th Qtr 2014 NA 1st Qtr 2015 NA .. 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 NA 3rd Qtr 2016 NA 4th Qtr 2016 NA 1st Qtr 2017 NA 2nd Qtr 2017 NA 3rd Qtr 2017 NA 4th Qtr 2017 NA 1st Qtr 2018 NA 2nd Qtr 2018 NA 3rd Qtr 2018 NA 4th Qtr 2018 NA 1st Qtr 2019 NA 2nd Qtr 2019 NA 3rd Qtr 2019 NA 4th Qtr 2019 NA 1st Qtr 2020 NA 2nd Qtr 2020 NA 3rd Qtr 2020 NA 4th Qtr 2020 NA 1st Qtr 2021 NA 2nd Qtr 2021 NA 3rd Qtr 2021 NA 4th Qtr 2021 NA 1st Qtr 2022 NA NA= Per the CAP and SCO, not sampled Chloride (mg/I) NoGWQS 24 30 26 28 24 30 25 27 26 27 27 27 27.4 Table 7 of 16 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-15 Parameter TWN-16 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate + Nitrite {10 mg/L) NoGWQS {10 mg/L) 1st Qtr 3/18/2010 0.7 43 1st Qtr 3/17/2010 1.2 2nd Qtr 5h8/2oio 1.0 39 2nd Qtr 5/27/2010 1.3 3rd Qtr 7/13/2010 I 1.0 36 3rd Qtr 9/27/2010 2.6 4th Qtr 12/9/2010 1.2 38 4th Qtr 12/9/2010 2 1st Qtr 1/27/2011 1.4 43 1st Qtr 1/27/2011 4.6 2nd Qtr 4/27/2011 1.6 49 2nd Qtr 4/27/2011 1.6 3rd Qtr 7/28/2011 1.6 47 3rd Qtr 7/27/2011 2.4 4th Qtr 10/19/2011 1.3 38 4th Qtr 10/18/2011 2.6 1st Qtr 1/11/2012 1.5 38 1st Qtr 1/10/2012 2.8 2nd Qtr 4/20/2012 1.6 46 2nd Qtr 4/19/2012 2.0 TW4-70 duplicate ofTWN-15 1.7 46 3rd Qtr I 7/26/2012 2.1 50 3rd Qtr 7/25/2012 2.4 4th Qtr 10/17/2012 1.79 47 4th Qtr 7/16/2012 2.50 TW4-70 duplicate of TWN-15 2.0 44.4 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-15 abandoned on July 31, 2013 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 NA 3rd Qtr 2016 NA 4th Qtr 2016 NA lstQtr 2017 NA 2nd Qtr 2017 NA 3rd Qtr 2017 NA 4th Qtr 2017 NA 1st Qtr 2018 NA 2nd Qtr 2018 NA 3rd Qtr 2018 NA 4th Qtr 2018 NA .1st Qtr 2019 NA 2nd Qtr 2019 NA 3rd Qtr 2019 NA 4th Qtr 2019 NA 1st Qtr 2020 NA 2nd Qtr 2020 NA 3rd Qtr 2020 NA 4th Qtr 2020 NA 1st Qtr 2021 NA 2nd Qtr 2021 NA 3rdQtr 2021 NA 4th Qtr 2021 NA 1st Qtr 2022 NA NA= Per the CAP and SCO, not sampled Chloride (mg/I) NoGWQS 35 -SHSID->>> 35 35 30 34 39 31 34 33 50 33 32.1 Table 8 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-17 Sampling Event Parameter GWQS TWN-18 Sampling Event Parameter GWQS lstQtr 2nd Qtr 3rdQtr 4thQtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rdQtr 4thQtr lstQtr 2nd Qtr Nitrate, Nitrate+ Nitrite (10 mg/L) Chloride (mg/I) NoGWQS Nitrate, Nitrate + Nitrite (10 mg/L) Chloride (mg/I) NoGWQS 3/24/2010 10.4 78 1st Qtr 3/17/2010 1.6 42 6/3/2010 ~---11 87 2nd Qtr 6/1/2010 1.8 63 7/15/2010 8.9 66 3rd Qtr 9/27/2010 1.8 64 12/10/2010 8 65 4th Qtr 12/9/2010 1.6 59 2/1/2011 8.6 90 1st Qtr 1/27/2011 1.4 61 4/28/2011 9 81 2nd Qtr 4/26/2011 1.8 67 7/29/2011 8.5 74 3rd Qtr 7/28/2011 1.8 65 10/20/2011 8.1 71 4th Qtr 10/18/2011 1.9 60 1/12/2012 8. 7 79 1st Qtr 1/10/2012 1.9 64 4/20/2012 9.1 80 2nd Qtr 4/19/2012 2.1 64 -7/27/2012 ----------9.5,-----85 3rd Qt,--'" 7/26/2012 ----------· B ------67 10/17/2012 9.65 84.8 4th Qtr 7/16/2012 1.95 67.5 ------------------------------i-------------------------2013 NA 1st Qtr 2/18/2013 2.27 68. 7 2013 NA 2nd Qtr 4/23/2013 TW4-65 dup of TWN-18 2.32 2.46 64.3 66.1 , .. 3_r_d_Q_tr_~ ___ 20_1_3~NA ______________ -<3rd Qtr I 8/27/2013 TWN-17 abandoned on July 31, 2013 4th Qtr 10/16/2013 2.04 70.4 2.15 67.3 DRC. split sample....--,--,---t--- lst Qtr 2/14/2014 0.29 2.33 2nd Qtr 5/6/2014 2.18 3rd Qtr 8/5/2014 1.8 4th Qtr 10/8/2014 1.47 TW4-65 dup of TWN-18 1.47 1st Qtr I 2/18/2015 2nd Qtr 5/13/2015 1 1.35 TW4-65 dup ofTWN-18 <0.10 3rd Qtr I 8/25/2015 4th Qtr 10/13/2015 0.35 0.668 TW4-65 dup ofTWN-18 0.645 ····················· 1st Qtr 2/23/2016 0.648 2nd Qtr 5/17/2016 0.497 3rd Qtr 7/21/2016 <0.100 4th Qtr 10/6/20_1_,6 >--------0.501 ............ 1st Qtr 2/15/2017 0.47 2nd Qtr 6/1/2017 0.392 3rd Qtr 7/19/2017 0.419 4th Qtr 10/4/2_0_17-+----------f 1st Qtr 1/18/2018 0.256 .......... 0.332 2nd Qtr 5/8/2018 0.283 3rd Qtr 8/8/2018 0.348 0.16 4th_ Qtr 11/_2~1/~2_0_18-+----------+-- lst Qtr 2/20/2019 0.155 TWN-65 dup of TWN-18 0.174 2nd Qtr I 5/29/2019 0.129 TWN-65 dup ofTWN-18 0.152 3rd Qtr I 8/14/2019 0.181 TWN-65 dup ofTWN-18 0.184 4th Qtr I 10/16/2019 0.162 DWMRC duplicate of TWN-18 0.13 1s1·01; · r 112912020 · 0.224 TWN-65 dup oflWN-18 0.249 2nd Qtr I 5/20/2020 3rd Qtr 7/15/2020 4th Qtr 11/12/2020 0.223 0.232 0.208 TWN-65 dup ofTW....-N_•l~B ~--+----------1--- lst Qtr I 2/17/2021 0.171 0.228 TWN-65 dup ofTWN-18 0.227 2nd Qtr I 5/25/2021 0.22 TWN-65 dup of TWN-18 0.247 3rd Qtr I 8/17/2021 0.199 TWN-65 dup ofTWN-18 0.208 4th Qtr I 11/23/2021 0.245 ...................... 1st Qtr I 2/15/2022 0.199 TWN-65 dup ofTWN-18 <0.1 NA= Per the CAP and SCO, not sampled Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l ORC = Utah Division of Radiation Control Nitrate Pumping System Started in January 2013 _____ _ As of March 2012 both north and south wild life ponds no longer receiving water __ _ 74 68.4 76.5 70 74.8 72.3 73.3 76.6 76.9 81.3 69 68.6 67.6 69.9 52.7 67.4 62.1 63.9 59.0 56.6 53.1 57.8 59.7 48.1 46.4 49.9 50.0 53.3 46.9 47.3 47.1 43.0 51.9 50.6 47.4 44.0 42.3 41.9 46.2 46.1 44.9 44.1 42.9 44.1 46.5 40.9 40.5 Table 9 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TWN-19 Parameter Upper Wildlife Pond Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate + Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/23/2010 7.2 118 1st Qtr 3/18/2010 <0.1 2nd Qtr 6/1/2010 6.2 113 2nd Qtr 6/2/2010 <0.1 3rd Qtr 9/27/2010 7.2 113 3rd Qtr 7/19/2010 <0.1 4th Qtr 12/9/2010 7.0 107 4th Qtr 12/10/2010 <0.1 1st Qtr 2/1/2011 7.0 114 1st Qtr 1/31/2011 0.1 2nd Qtr 4/28/2011 6.9 120 2nd Qtr 4/25/2011 <0.1 3rd Qtr 7/28/2011 7.1 113 3rd Qtr 7/25/2011 <0.1 4th Qtr 10/18/2011 6.5 108 4th Qtr 10/19/2011 <0.1 1st Qtr 1/10/2012 7.0 114 1st Qtr 1/31/2012 0.1 2nd Qtr .. 4/19/2012 6.8 117 Pond no longer in service 3rd Qtr 7/26/2012 7.5 117 4th Qtr 10/16/2012 7.7 118 1st Qtr 2013 NA 2nd Qtr 2013 NA 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA ........ 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 NA 3rd Qtr 2016 NA 4th Qtr 2016 NA 1st Qtr 2017 NA 2nd Qtr 2017 NA 3rd Qtr 2017 NA 4th Qtr 2017 NA 1st Qtr 2018 NA 2nd Qtr 2018 NA 3rd Qtr 2018 NA 4th Qtr 2018 NA 1st Qtr 2019 NA 2nd Qtr 2019 NA 3rd Qtr 2019 NA 4th Qtr 2019 NA 1st Qtr 2020 NA ........ 2nd Qtr 2020 NA 3rd Qtr 2020 NA ..... 4th Qtr 2020 NA 1st Qtr 2021 NA 2nd Qtr 2021 NA 3rd Qtr 2021 NA 4th Qtr 2021 NA 1st Qtr 2022 NA TWN-20 Parameter TWN-21 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate + Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 2nd Qtr 6/3/2021 1.88 50 2nd Qtr 6/3/2021 1.03 8/19/2021 3rd Qtr .. 8/19/2021 1.16 3rd Qtr 0.96 35.3 4th Qtr 11/23/2021 0.286 33.6 4th Qtr 11/23/2021 0.696 1st Qtr 2/16/2022 0.436 31.2 1st Qtr 2/16/2022 1.1 NA= Per the CAP and SCO, not sampled Chloride (mg/I) NoGWQS <1.0 <1.0 <1.0 1 1 <1.0 <1.0 <1.0 1 Chloride (mg/I) NoGWQS 41.9 40.S 42.6 40.4 Table 10 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill Pizometer 1 Parameter Pizometer 2 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 2nd Qtr 6/2/2010 7.2 52 2nd Qtr 6/2/2010 0.6 3rd Qtr 7/19/2010 6.8 52 3rd Qtr 7/19/2010 0.6 4thQtr 12/10/2010 6.5 60 4th_Qtr 12/10/2010 0.2 1/31/2011 ................................. .......... 1st Qtr 7 60 1st Qtr 1/31/2011 0.3 2nd Qtr 4/25/2011 6.8 58 2nd Qtr 4/25/2011 0.3 3rd Qtr 7/25/2011 7 53 3rd Qtr 7/25/2011 0.1 4th Qtr 10/19/2011 6.6 55 4th_Qtr 10/19/2011 0.1 1Ji1ho12. .......... lstQtr 7.1 78 1st Qtr 1/11/2012 0.1 lstQtr 1/10/2012 7.0 114 1st Qtr 1/31/2012 0.1 2nd Qtr 4/20/2012 6.6 58 2nd Qtr 4/20/2012 0.2 3;;iot-;---ii21 /201 2 ----------/6~1-----1~ ~dQtr--'""1nii20ii ------------0.2 4th Qtr 10/17/2012 4th Qtr 7/17/2012 0.19 -----i'h9/201 3 ------------------■ -----'""2ii§i20u -----------■ 1st Qtr 8.11 56.7 1st Qtr 0.22 2nd Qtr 4/24/2013 8.88 53.3 2nd Qtr 4/24/2013 0.172 3rdQtr 8/28/2013 7.83 55.1 3rd Qtr 8/28/2013 0.198 4th Qtr 10/16/2013 6.68 54.1 4th Qtr 10/16/2013 0.36 DRC_split of_Piez-1 1.3 60 DRC split of Piez-2 0.27 1st Qtr 1/13/2014 6.79 56.2 1st Qtr 1/13/2014 . 0.169 2nd Qtr 5/7/2014 7.57 52.1 2nd Qtr 5/7/2014 0.736 3rd Qtr 8/6/2014 5.1 55 3rd Qtr 8/6/2014 0.8 4th_Qtr 10/8/2014 5.75 57.6 4th Qtr 10/8/2014 0.755 ....... 2/18/2015 . 2/18/2015 ... 1st Qtr 6.41 55.9 1st Qtr 0.749 2nd Qtr 5/12/2015 5.95 57.5 2nd Qtr 5/12/2015 0.646 3rd Qtr 8/26/2015 4.96 64.2 3rd Qtr 8/6/2015 0.7 4thQtr 10/14/2015 6.17 54.4 4th Qtr 10/14/2015 0.692 1st Qtr 2/23/2016 8.31 56.5 1st Qtr 2/23/2016 0.615 2nd Qtr 5/12/2016 6.33 59.1 2nd Qtr 5/12/2016 0.665 3rdQtr 7/19/2016 6.78 53.9 3rd Qtr 7/19/2016 0.669 4th Qtr 10/11/2016 6.42 58.1 4th Qtr 10/11/2016 0.732 1st Qtr iJishoii -· 6.75 54.5 lstQtr 2/15/2017 0.696 2nd Qtr 6/1/2017 6.6 54.7 2nd Qtr 6/1/2017 0.345 3rdQtr 7/20/2017 6.8 58 3rd Qtr 7/20/2017 0.555 ~t.~ Qtr 10/4/2017 6.21 54.4 4th Qtr 10/4/2017 0.684 iJiiho1a · ...... .................... lstQtr 6.35 55.3 1st Qtr 1/17/2018 0.716 2nd Qtr 5/9/2018 6.56 58 2nd Qtr 5/9/2018 0.776 3rd Qtr 8/8/2018 6.66 63.5 3rd Qtr 8/8/2018 0.818 ~t.~ Qtr 11/21/2018 6.7 55.5 4th Qtr 11/20/2018 0.648 2/19/2019. ...... 2/19/2019 . .............................................. 1st Qtr 6.72 56.8 1st Qtr 0.599 2nd Qtr 5/30/2019 6.75 59.4 2nd Qtr 5/30/2019 0.702 3rd Qtr 8/14/2019 6.81 61.1 3rd Qtr 8/14/2019 0.606 4thQtr 10/16/2019 7.21 59.3 4th Qtr 10/16/2019 0.573 DWMRC duplicate of P-1 6.4 60 DWMRC duplicate of P-2 0.36 isi Qtr 1/30/2020 . 7.12 68.9 1st Qtr 1/30/2020 0.740 2nd Qtr 5/20/2020 6.95 67.7 2nd Qtr 5/20/2020 0.679 3rd Qtr 7/15/2020 7.36 63.6 3rdQtr 7/15/2020 0.793 ~t.hQtr 11/13/2020 7.51 63.9 4th_Qtr 11/13/2020 0.544 ......................................... .......... ·2Jiaho21 · lstQtr 2/18/2021 7.34 57.S 1st Qtr 0.401 2nd Qtr 5/27/2021 7.89 69.9 2nd Qtr 5/27/2021 <0.1 3rd Qtr 8/19/2021 7.6 70 3rd Qtr 8/19/2021 0.11 ~-t-~ Qtr 11/23/2021 4.69 65.S 4th Qtr 11/23/2021 <0.1 .......... lstQtr 2/16/2022 7.4 68.8 1st Qtr 2/16/2022 0.330 DRC = Utah Division of Radiation Control Nitrate Pumping System Started in January 2013 _____ _ As of March 2012 both north and south wild life ponds no longer receiving water. __ Chloride (mg/I) NoGWQS 8 8 6 9 8 9 8 9 1 8 -------9 9.5 -----9.67 10.3 9.66 9.22 11 11.4 11.4 12 12.2 12.S 13.1 15.S 13.3 13.4 14 12.4 13.4 12.4 13.2 13.4 12.7 13.0 14.0 15.1 12.3 ···················•··••.o••········· 12.9 12.6 13.2 12.6 21 14.2 14.4 12.7 12.9 15.7 13.9 14.6 14.8 14[ Table 11 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill Pizometer 3 Parameter Pizometer 3A Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate + Nitrite (10 mg/L) NoGWQS (10 mg/L) 1st Qtr 3/24/2010 1.7 116 2nd Qtr 6/2/2010 1.6 36 3rdQtr 7/19/2010 1.8 35 4th Qtr 12/9/2010 1.8 25 1st Qtr 1/31/2011 1.8 40 2nd Qtr 4/25/2011 1.7 35 3rd Qtr 7/25/2011 1.8 61 4th Qtr 10/19/2011 1.7 12 1st Qtr 1/11/2012 1.8 20 2nd Qtr 4/20/2012 1.7 53 3;-;io t-;---ii21 /201 2 ----------/;f ____ 21.~ 4th Qtr 10/17/2012 -ih4/2013 ------------------■ 1st Qtr 1.85 21 2nd Qtr 4/24/2013 1.83 21.2 3rdQtr 8/28/2013 1.81 22.4 4th Qtr 10/16/2013 1.8 23.S ORC split sample 0.33 27 1st Qtr . ijijjiiii4 . . 1.7 26 2nd Qtr 5/7/2014 1.79 23.9 3rd Qtr 8/6/2014 1.7 26 4th Qtr 10/8/2014 1.74 28.3 1st Qtr 2/18/2015 1.82 27.3 2nd Qtr 5/12/2015 1.75 30.2 3rd Qtr 8/26/2015 1.87 54.8 Chloride (mg/I) NoGWQS 4th Qtr 10/14/2015 2.24 39.5 New piezometer P-3A to replace piezometer P-3 drilled and installed in 1st Qtr 2/23/2016 1.82 27.3 Pizometer-3 abandonded May 2016 (1)2nd Qtr 5/12/2016 3rd Qtr 7/19/2016 4th Qtr _10/11/2016 1st Qtr 2/15/2017 2nd Qtr 6/1/2017 3rd Qtr 7/20/2017 4th Qtr 10/4/2017 1st Qtr 2/17/2018 2nd Qtr 5/9/2018 3rdQtr 8/8/2018 4th_Qtr 11/20/2018 .......... iJiihoig · lstQtr 2nd Qtr 5/30/2019 3rd Qtr 8/14/2019 4th Qtr 10/16/2019 DWMRC duplicate of P-3a 1st Qtr 1/30/2020 2nd Qtr 5/20/2020 3rd Qtr 7/15/2020 4th_Qtr 11/13/2020 1st Qtr 2/18/2021 2nd Qtr 5/27/2021 3rd Qtr 8/19/2021 4th Qtr 11/23/2021 1st Qtr 2/16/2022 l. New piezometer PIEZ-3A to replace PIEZ-3 drilled and installed in May 2016. First monitoring event. Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I DRC = Utah Division of Radiation Control Nitrate Pumping System Started in January 2013 _____ _ As of March 2012 both north and south wild life ponds no longer receiving water. __ May 2016. 8.33 109 8.83 93.8 8.44 100 10.0 111 10.1 124 9.31 105 9.65 107 8.61 94.3 9.98 100 12.1 122 11.8 105 11.8 102 11.8 104 10.7 96.2 8.97 83.0 6.4 98.0 10.S 99.5 12.4 88.3 12.8 82.7 13 72.8 11.1 85.9 14.4 85.6 11.2 81.5 9.11 84.6 12.1 91.7 Table 12 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TW4-19{Pumping well starting in Parameter TW4-20 (Pumping well stating in Parameter April 2003) August2005) Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) lstQtr 3/16/2005 5.3 NA 2nd Qtr 5/25/2005 5.7 NA 2nd Qtr 5/25/2005 10.10 3rd Qtr 8/31/2005 4.6 NA 3rd Qtr 1~~~':2 2.90 4thQt r--~----------■ ~t.hQtr 12/7/2005 <0.1 81 12/7/2005 1.80 ..... 1st Qtr 3/9/2006 4 86 1st Qtr 3/9/2006 3.80 2nd Qtr 6/14/2006 5.2 116 2nd Qtr 6/14/2006 9.40 3rdQtr 7/20/2006 4.3 123 3rd Qtr 7/20/2006 2.90 4th Qtr 11/8/2006 4.6 134 4th.Qtr 11/8/2006 3.50 .......... ihshooi · 1st Qtr 2/28/2007 4 133 1st Qtr 4.20 2nd Qtr 6/27/2007 not sampled 2nd Qtr 6/27/2007 2.30 3rd Qtr 8/15/2007 4.1 129 3rd Qtr 8/15/2007 2.10 4th.Qtr. 10/10/2007 4 132 4th.Qtr .. 10/10/2007 5.60 .. .. ·3hai2008 1st Qtr 3/28/2008 2.2 131 1st Qtr 0.90 2nd Qtr 6/25/2008 2.8 128 2nd Qtr 6/25/2008 8.00 3rd Qtr 9/10/2008 35.2 113 3rd Qtr 9/10/2008 4.44 4th Qtr 10/15/2008 47.8 124 4th Qtr 10/15/2008 5.51 ....... .......... 1st Qtr 3/4/2009 3.2 127 1st Qtr 3/4/2009 5.10 2nd Qtr 6/23/2009 2.4 132 2nd Qtr 6/23/2009 2.90 3rdQtr 9/14/2009 <0.1 43 3rd Qtr 9/14/2009 3.30 4th Qtr 12/22/2009 26.7 124 4th Qtr 12/22/2009 5.30 ········• .......... 1st Qtr 2/17/2010 2 144 1st Qtr 2/17/2010 2.00 2nd Qtr 6/14/2010 4.4 132 2nd Qtr 6/14/2010 5.60 3rd Qtr 8/16/2010 5.9 142 3rd Qtr 8/16/2010 5.30 4th Qtr 10/15/2010 2.7 146 4th Qtr 10/15/2010 4.60 ····•······ ......... l stQtr 2/17/2011 17.0 135 1st Qtr 2/17/2011 4.40 2nd Qtr 6/7/2011 12.0 148 2nd Qtr 6/7/2011 4.80 3rd Qtr 8/17/2011 3.0 148 3rd Qtr 8/17/2011 6.50 4th Qtr 11/17/2011 5.0 148 4th.Qtr .. 11/17/2011 4.20 ········•·· --------1st Qtr 1/23/2012 0.6 138 1st Qtr 1/23/2012 7.90 2~0.tr--Gir,;201 2 --------------------------6/Giioii ,----------2.4 149 2nd Qtr 11.00 3rd Qtr 9/4/2012 2.5 149 3rd Qtr 9/4/2012 10.80 4th.Qtr 10/3/2012 4.1 150 4th Qtr 10/3/2012 11.00 ....... . ....................... 1st Qtr 2/13/2013 8.0 164 1st Qtr 2/13/2013 9.07 2nd Qtr 6/5/2013 3.0 148 2nd Qtr 6/5/2013 9.80 3rd Qtr 9/3/2013 17.6 179 3rd Qtr 9/3/2013 8.65 4th.Qtr ... 10/29/2013 4.7 134 4th.Qtr .... 10/29/2013 9.64 1st Qtr 1/27/2014 1.6 134 1st Qtr 1/27/2014 . 7.56 2nd Qtr 5/19/2014 1.3 152 2nd Qtr 5/19/2014 5.95 3rd Qtr 8/11/2014 1.6 140 3rd Qtr 8/11/2014 4.30 4thQtr 10/21/2014 4.7 130 4th Qt( .. 10/21/2014 7.67 1st Qtr 3/9/2015 8.56 238 1st Qtr 3/9/2015 9.80 2nd Qtr 6/8/2015 0.916 180 2nd Qtr 6/8/2015 5.76 3rd Qtr 8/31/2015 11.6 326 3rd Qtr 8/31/2015 9.3 4thQtr 10/19/2015 10.6 252 4thQtr 10/19/2015 6.23 1st Qtr 3/9/2016 15.7.Q 276 lstQtr 3/9/2016 10.30 2nd Qtr 5/26/2016 1.27 204 2nd Qtr 5/26/2016 11.2 3rdQtr 7/25/2016 10.5 214 3rd Qtr 7/25/2016 11.3 4th Qtr 10/13/2016 10.0 200 4th Qtr 10/13/2016 11.4 1st Qtr 3/8/2017 11.1 461 1st Qtr 3/8/2017 ,-12.0 2nd Qtr 6/13/2017 0.243 135 2nd Qtr 6/13/2017 9.76 3rd Qtr 7/26/2017 1.120 218 3rd Qtr 7/26/2017 10.8 4th Qtr 10/11/2017 0.377 139 4th Qtr 10/11/2017 8.91 3/iihoia ···· 3/12/2018 .......................................................... 1st Qtr 8.6 193 1st Qtr 9.5 2nd Qtr 6/8/2018 0.494 138 2nd Qtr 6/8/2018 10.4.Q 3rdQtr 8/30/2018 2.55 166 3rd Qtr 8/30/2018 8.14 4th Qtr 11/28/2018 0.233 140 4th Qtr ........ P/28/2018 9.72 ............ 1st Qtr 3/8/2019 6.6 197 1st Qtr 3/8/2019 6.7 2nd Qtr 6/5/2019 6.580 160 2nd Qtr 6/5/2019 9.59 3rd Qtr 9/4/2019 0.33 153 3rd Qtr 9/4/2019 10.2 ~t.~ Qtr 12/10/2019 0.535 147 4th Qtr 12/10/2019 9.75 2/19/2020 .......... 2i19/2020 lstQtr 10.1 205 1st Qtr 9.81 2nd Qtr 5/27/2020 1.140 147 2nd Qtr 5/27/2020 7.23 3rdQtr 9/4/2020 11.6 188 TW4-20 Abandonded October 2020 4th.Qtr ..... 12/10/2020 1.1 104 2/23/2021 ............. 1st Qtr 6.6 167 2nd Qtr 6/9/2021 4.04 115 3rdQtr 8/24/2021 6.68 172 4thQtr 12/1/2021 11.1 184 Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I As of March 2012 both north and south wild life ponds no longer receiving water. __ (2)Pumping well stating in August 2005 Chloride (mg/I) NoGWQS NA NA -------131 120 235 134 124 124 112 117 170 132 191 156 168 164 164 153 187 179 200 196 203 220 177 207 186 207 -------262 289 302 252 250 260 272 254 269 299 292 290 296 365 293 293 318 307 301 290 281 292 293 ........................... 289 258 282 295 ............................ 272 279 286 307 310 301 Table 13 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TW4-21 (Pumping well starting in Parameter TW4-22 {Pumping well stating in Parameter fone201S) August2005) Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) Chloride (mg/I) NoGWQS lstQtr 3/16/2005 was not sampled 1st Qtr 3/16/2005 was not sampled 2nd Qtr 5/25/2005 14.6 NA 2nd Qtr 5/25/2005 18.2 3rd Qtr 8/31/2005 10.1 NA 3rd Qtr 8/31/2005 15.7 4thQtr 12/7/2005 9.6 353 4th Qtr 12/7/2005 15.1 3/9/2006 . ..................................... lstQtr 8.5 347 1st Qtr 3/9/2006 15.3 2nd Qtr 6/14/2006 10.2 318 2nd Qtr 6/14/2006 14.3 3rd Qtr 7/20/2006 8.9 357 3rd Qtr 7/20/2006 14.S '.\.t_hQtr 11/8/2006 ..................................... 8.7 296 4th Qtr 11/8/2006 15.9 . ......... lstQtr 2/28/2007 8.7 306 lstQtr 2/28/2007 20.9 2nd Qtr 6/27/2007 8.6 327 2nd Qtr 6/27/2007 19.3 3rd Qtr 8/15/2007 8.6 300 3rd Qtr 8/15/2007 19.3 4th Qtr 10/10/2007 8.3 288 4th Qtr 10/10/2007 18.8 ........ .......... . ......................... 1st Qtr 3/28/2008 14.3 331 1st Qtr 3/28/2008 39.1 2nd Qtr 6/25/2008 8.8 271 2nd Qtr 6/25/2008 41.9 3rdQtr 9/10/2008 7.57 244 3rd Qtr 9/10/2008 38.7 4th Qtr 10/15/2008 8.0 284 '.1.1~9\( 10/15/2008 36.3 .......... 3/11/2009 . 1st Qtr 3/11/2009 8.3 279 1st Qtr 20.7 2nd Qtr 6/23/2009 8.1 291 2nd Qtr 6/23/2009 20.6 3rd Qtr 9/14/2009 9.2 281 3rd Qtr 9/14/2009 40.3 4th Qtr 12/22/2009 8.4 256 4th Qtr 12/29/2009 17.8 ········· 1st Qtr 2/25/2010 8.4 228 1st Qtr 3/3/2010 36.8 2nd Qtr 6/14/2010 12.0 266 2nd Qtr 6/14/2010 19.0 3rd Qtr 8/13/2010 14.0 278 3rd Qtr 8/24/2010 15.0 4th Qtr 10/15/2010 7.0 210 4th Qtr 10/15/2010 16.0 1st Qtr 2/22/2011 9.0 303 1st Qtr 2/22/2011 18.0 2nd Qtr 6/28/2011 12.0 290 2nd Qtr 6/1/2011 17.0 3rd Qtr 8/17/2011 14.0 287 3rd Qtr 8/17/2011 15.0 4th Qtr 11/16/2011 13.0 287 4th Qtr 11/16/2011 19.0 ....... 1/19/2012 (l)lst Qtr ....... . I/i9/20i2 . . (l)lst Qtr 15.0 228 14.0 2~Qtr-------------------------------------1-■-------6/13/2012 11.0 285 2nd Qtr 6/13/2012 12.8 3rd Qtr 9/13/2012 13.0 142 3rd Qtr 9/12/2012 7.0 4th Qtr 10/4/2012 14.0 270 4th Qtr 10/4/2012 14.0 2/13/2013 ······································· (3)1stQtr-""iii.iiioi'3 ~-----------lstQtr 11.8 221 2nd Qtr 6/18/2013 13.8 243 2nd Qtr 6/5/2013 3rdQtr 9/13/2013 10.3 -207 3rd Qtr 9/3/2013 11/13/2013 10/29/2013 4th_Qtr 9.0 206 4th Qtr .......... lstQtr 2/5/2014 11.4 200 1st Qtr 1/27/2014 2nd Qtr 5/22/2014 11.S 243 2nd Qtr 5/19/2014 3rd Qtr 8/27/2014 7.1 230 3rd Qtr 8/11/2014 4th_Qtr 10/29/2014 10.0 252 4th Qtr 10/29/2014 ········································ ··· 3/iihois· · 1st Qtr 3/12/2015 10.9 255 1st Qtr (2)2nd Qtr 6/8/2015 13.1 494 2nd Qtr 6/8/2015 3~0i;:·--si31 /2015 --------------------8/31/2015 14.7 499 3rd Qtr 4thQtr 10/19/2015 14.3 413 '.'..!~-~r 10/19/2015 lstQtr 3/9/2016 14.6 452 lstQtr 3/9/2016 2nd Qtr 5/23/2016 13.1 425 2nd Qtr 5/23/2016 3rdQtr 7/25/2016 16.S 457 3rd Qtr 7/25/2016 4thQtr 10/12/2016 13.5 439 4th_Qtr 10/12/2016 ......................................... .......... lstQtr 3/8/2017 17.7 452 lstQtr 3/8/2017 2nd Qtr 6/13/2017 9.53 309 2nd Qtr 6/13/2017 3rd Qtr 7/26/2017 18.20 447 3rd Qtr 7/26/2017 4th Qtr 10/11/2017 16.90 378 4th Qtr 10/11/2017 ~~-MRC split 1W4-21 11.0 310 DWMRC split of TW4-22 ......................................... lstQtr 3/12/2018 15.8 447 1st Qtr 3/12/2018 2nd Qtr 6/8/2018 14.1 387 2nd Qtr 6/8/2018 3rd Qtr 8/22/2018 0.236 182 3rd Qtr 8/22/2018 ~.t.~Qtr 10/22/2018 15.2 378 4th Qtr 11/28/2018 lstQtr 3/8/2019 9.0 180 lstQtr ·· 3/iihoig ·· 2nd Qtr 6/5/2019 17.5 456 2nd Qtr 6/5/2019 3rd Qtr 9/4/2019 _ 14.7 478 3rd Qtr 9/4/2019 4thQtr 12/10/2019 5.73 339 4th_Qtr 12/10/2019 2/19/2020 ......................................... .......... 2/19/2020 . lstQtr 8.9 446 lstQtr 2nd Qtr 5/27/2020 15.4 353 2nd Qtr 5/27/2020 3rd Qtr 9/4/2020 12.6 382 3rdQtr 9/4/2020 4th Qtr 10/28/2020 16.30 411 4th Qtr 10/28/2020 2/23/2021 ..................................... ...... 2hiho2i . lstQtr 15.2 454 1st Qtr 2nd Qtr 6/9/2021 21.5 461 2nd Qtr 6/9/2021 3rd Qtr 8/24/2021 12.9 375 3rd Qtr 8/24/2021 4thQtr 12/1/2021 17.2 227 4th Qtr 12/1/2021 lstQtr 3/9)2022 i:2 .. 110 1st Qtr 3/9/2022 NA = not analyzed (1) As of March 2012 both north and south wild hie ponds no longer receiving water. (2) Chloroform pumping well started 6/9/15. (3) Chloroform pumping well started 1/26/13. Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I OWMRC = Utah Division of Waste Management and Radiation Control 58.0 50.2 29.7 45.2 54.6 47.2 41.5 54.9 69.2 47.1 64.7 56.1 31.1 58.4 61.3 61.5 69.8 70.8 66.1 80.1 79.0 62.3 72.5 55.4 75.7 71.9 83.9 72.S 59.9 57.7 60.S 64.8 64.9 69.6 89.3 35.1 68.8 iia:ii NA NA 253 236 221 221 236 347 273 259 238 519 271 524 539 177 177 391 175 427 134 130 134 114 138 120 174 ...... 36 -------35 121 130 -------130 586 487 501 598 614 540 596 675 390 557 567 583 598 619 588 566 572 391 600 610 607 580 613 567 528 662 588 608 606 578 514 523 618 408 410 586 442 Table 14 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TW4-24(Pumping well starting in Parameter TW4-ZS (Pumping well stating in Parameter January2013) January2013) Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQ5 (10 mg/L) 2nd Qtr 6/27/2007 26.1 770 2nd Qtr 6/27/2007 17.1 3rd Qtr 8/15/2007 29 791 3rd Qtr 8/15/2007 29 ~.t.hQtr 10/10/2007 24.7 692 4th Qtr 10/10/2007 17 1st Qtr 3/28/2008 24.4 740 1st Qtr 3/28/2008 .. 18.7 2nd Qtr 6/25/2008 45.3 834 2nd Qtr 6/25/2008 22.1 3rd Qtr 9/10/2008 38.4 1,180 3rd Qtr 9/10/2008 18.8 -i.t.~ Qtr 10/15/2008 44.8 1,130 ~~~ . .9~'. 10/15/2008 21.3 .......... 1st Qtr 3/4/2009 30.S 1,010 1st Qtr 3/4/2009 15.3 2nd Qtr 6/23/2009 30.4 759 2nd Qtr 6/23/2009 ~ 3rd Qtr 9/14/2009 30.7 618 3rd Qtr 9/14/2009 3.3 4th Qtr 12/16/2009 28.3 1,080 4th.Qtr 12/14/2009 14.2 1st Qtr 2/25/2010 33.1 896 1st Qtr 2/23/2010. 14.4 2nd Qtr 6/14/2010 30 639 2nd Qtr 6/14/2010 16 3rd Qtr 8/24/2010 31 587 3rd Qtr 8/10/2010 14 4th.Qtr ....... 10/15/2010 31 522 4th Qtr 10/15/2010 15 2/17/2011 . ......... . 2/16/2011 . 1st Qtr 31 1,100 1st Qtr 15 2nd Qtr 5/26/2011 35 1,110 2nd Qtr 5/25/2011 16 3rd Qtr 8/17/2011 34 967 3rd Qtr 8/16/2011 16 4th.Qtr 11/16/2011 35 608 4th.Qtr 11/15/2011 16 ....... ......................................... ·1/iG/ioii . 16 lstQtr 1/16/2012 37 373 lstQtr 2~0.tr--Gii,/201 2 -------------------------~-----------------37 355 2nd Qtr 5/31/2012 16 3rd Qtr 8/30/2012 37 489 3rd Qtr 9/4/2012 17 4thQtr 10/3/2012 38 405 4th.Qtr .... 10/3/2012 17 1st Qtr ........ ...... 2/11/2013 35.9 ............... 1,260 1st Qtr i/fi/2613 9.04 -----6 /5 /2013 --------------------fii'i'n"Jot;:-,__6/siioi3 ------------2nd Qtr 23.7 916 5.24 3rd Qtr 8/30/2013 33 998 3rd Qtr 9/4/2013 5.69 4th.Qtr ... 10/29/2013 35 ............................ 1,030 4th.Qtr .......... 10/31/2013 6.1 1st Qtr 1/27/2014 31.6 809 1st Qtr 1/27/2014 2.16 2nd Qtr 5/19/2014 35.0 1,020 2nd Qtr 5/19/2014 1.21 3rdQtr 8/11/2014 31.5 1,150 3rd Qtr 8/11/2014 1.6 4thQtr 10/21/2014 35.7 """""""""''''''''''1,050 4th Qtr 10/21/2014 1.03 .......... 3Fih o1s 1st Qtr 3/9/2015 34.6 944 1st Qtr 14.4 2nd Qtr 6/8/2015 31.8 1,290 2nd Qtr 6/8/2015 1.14 3rdQtr 8/31/2015 25.3 788 3rdQtr 8/31/2015 1.63 4th Qtr 10/19/2015 29.6 909 4th Qtr 10/19/2015 1.78 DWMRC split of TW4-25 1.50 1st Qtr 3/9/2016 29.1 989 1st Qtr 3/9/2016 0.837 2nd Qtr 5/23/2016 24.2 771 2nd Qtr 5/23/2016 0.959 3rdQtr 7/25/2016 34.4 1,180 3rd Qtr 7/25/2016 1.78 4th_Qtr ...... 10/12/2016 31.9 ..... ..1,010 4th Qtr 10/12/2016 1.24 3/8/2017 .......... lstQtr 41.3 1,090 1st Qtr 3/8/2017 17.0 2nd Qtr 6/13/2017 39.9 1,080 2nd Qtr 6/13/2017 0.976 3rdQtr 7/26/2017 40.0 1,230 3rd Qtr 7/26/2017 1.23 4thQtr 10/11/2017 31.7 895 4th Qtr 10/11/2017 1.29 DWMRC split ofTW4-24 32.0 J,1.qg ' ........... 3/12/2018 . 1st Qtr 3/16/2018 44.9 1,320 1st Qtr 2.23 2nd Qtr 6/14/2018 33.6 792 2nd Qtr 6/14/2018 1.14 3rdQtr 8/22/2018 33.8 996 3rd Qtr 8/22/2018 0.810 4thQtr 11/28/2018 38.4 },1.qq 4th_Qtr 11/28/2018 0.634 .......... · · 3/sh o19 · lstQtr 3/8/2019 39.3 1,040 1st Qtr 0.639 2nd Qtr 6/5/2019 33.2 1,020 2nd Qtr 6/5/2019 0.821 3rd Qtr 9/4/2019 36.4 1,130 3rd Qtr 9/4/2019 0.548 4thQtr 12/10/2019 33.8 J,q~q 4th Qtr 12/10/2019 0.841 2/19/2020 .......... 2/19/2020 . 1st Qtr 37.1 1,010 1st Qtr 0.607 2nd Qtr 5/27/2020 41.7 1060 2nd Qtr 5/27/2020 0.851 3rd Qtr 9/4/2020 39.1 1100 3rd Qtr 9/4/2020 0.994 4thQtr 10/28/2020 35.90 1050 4th_Qtr 10/28/2020 1.6 ......................................... .......... 2/23/2021 . lstQtr 2/23/2021 41.9 1,170 1st Qtr 3.43 2nd Qtr 6/9/2021 48.0 938 2nd Qtr 6/9/2021 1.57 3rd Qtr 8/24/2021 26.7 1010 3rd Qtr 8/24/2021 0.793 4th_Qtr ..... 12/1/2021 43.60 1140 4th Qtr 12/1/2021 0.978 3/9/2022 ......... 362 ········••·······•··•·•·••·••············ .......... · 3Fih oii · ·· lstQtr 890 1st Qtr 1.8 As of March 2012 both north and south wild life ponds no longer rece1v1ng water Chloroform pumping well started January 2013. Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I DWMRC = Utah Division of Waste Management and Radiation Control Chloride (mg/I) NoGWQ5 395 382 358 374 344 333 366 332 328 328 371 296 306 250 312 315 321 276 294 304 -------287 334 338 190 -------136 119 88.6 85.7 51.1 67 58.1 310 58.3 69.2 93.7 94 62.7 75.5 74.1 59.8 285 69.8 70.1 68.0 70.S 60.3 69.1 59.70 65.0 59.0 58.1 73.10 86.0 76.8 67.3 61.3 100.0 55.1 69.3 93.7 io3 Table 15 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill TW4•37(Pumping well starting in Parameter June2015) Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) (10 mg/L) NoGWQS 2nd Qtr 6/8/2015 35.2 345 3rd Qtr 8/31/2015 32.4 374 4th Qtr 10/19/2015 34.6 399 lstQtr 3/9/2016 28.4 332 2nd Qtr I 5/23/2016 27.9 389 3rdQtr 7/25/2016 33.4 294 4th Qtr 10/12/2016 26.1 304 1st Qtr 3/8/2017 32.3 305 2nd Qtr 6/15/2017 31.2 281 3rd Qtr 7/26/2017 30.5 277 4th_Qtr 10/11/2017 30.6 255 ........ 1st Qtr 3/12/2018 30.0 263 2nd Qtr 6/8/2018 28.6 275 3rd Qtr 8/22/2018 25.3 387 4th Qtr 11/28/2018 27.3 264 ........ 1st Qtr 3/8/2018 30.1 209 2nd Qtr 6/5/2019 31.2 250 3rd Qtr 9/4/2019 25.8 228 4th_Qtr ........ 12/10/2019 25.5 220 1st Qtr 2/19/2020 28.3 236 2nd Qtr 5/27/2020 28.3 321 3rd Qtr 9/4/2020 29.S 273 4th Qtr 10/28/2020 28.7 254 ....... 1st Qtr 2/23/2021 26.9 242 2nd Qtr 6/9/2021 26.6 176 3rdQtr 8/24/2021 25.8 220 4th Qtr 12/1/2021 31.3 410 1st Qtr 3/9/2022 29.8 414 Shaded= Nitrate, Nitrate+ Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l MW-30 Table 16 of 16 Historic Nitrate, Nitrate+ Nitrite and Cloride Concentrations in Monitor Wells Up to the 1st Quarter 2022 Nitrate Contamination Investigation White Mesa Uranium Mill Parameter MW-31 Parameter Sampling Event GWQS Sampling Event GWQS Nitrate, Nitrate+ Nitrite Chloride (mg/I) Nitrate, Nitrate+ Nitrite (10 mg/L) NoGWQS (10 mg/L) 2nd Qtr 6/22/2005 12.4 125 2nd Qtr 6/22/2005 24.2 3rd Qtr 9/22/2005 12.8 125 3rd Qtr 9/22/2005 22.4 4th Qtr 12/14/2005 13.6 128 4th Qtr 12/14/2005 23.8 3/22/2006 . . ......... 3/22/2006 . ......... 1st Qtr 13.8 125 1st Qtr 24.1 2nd Qtr 6/21/2006 14.S 124 2nd Qtr 6/21/2006 25.3 3rd Qtr 9/13/2006 14.1 118 3rd Qtr 9/13/2006 24.6 4th Qtr 10/25/2006 14.6 124 4th Qtr 10/25/2006 25.1 ....... 3/15/2007 . ......... iJishooi · 1st Qtr 14.4 125 1st Qtr 23.2 ~ Chloride (mg/I) NoGWQS 139 136 135 ···························· .... 133 138 131 127 132 2nd Qtr 2007 not sampled 2nd Qtr 2007 not sampled 3rdQtr 8/22/2007 14.6 126 3rd Qtr 8/22/2007 23.3 136 4th_Qtr ... 10/24/2007 14.9 122 4th_Qtr ... 10/24/2007 24.6 122 ....... 1st Qtr 3/19/2008 14.8 118 lstQtr 3/19/2008 25 124 2nd Qtr 6/3/2008 18.7 125 2nd Qtr 6/3/2008 29.3 128 3rdQtr 8/4/2008 17.3 121 3rd Qtr 8/4/2008 28.7 124 4thQtr 11/5/2008 15.6 162 4th_Qtr .... 11/5/2008 29.9 119 ......................................... ... lstQtr 2/3/2009 15.3 113 1st Qtr 2/3/2009 23.4 115 2nd Qtr 5/13/2009 15.1 122 2nd Qtr 5/13/2009 22.4 124 3rd Qtr 8/24/2009 20.9 118 3rd Qtr 8/24/2009 15.4 122 ~t-~ Qtr 10/14/2009 15.0 129 4th Qtr 10/14/2009 22.6 138 ................ .......... . ....... . .................................................................. ......................................... lstQtr 2/9/2010 16.1 127 1st Qtr 2/9/2010 21.7 128 2nd Qtr 4/27/2010 15.8 97 2nd Qtr 5/21/2010 23 128 3rd Qtr 9/14/2010 15.0 111 3rd Qtr 9/13/2010 21 139 4thQtr 12/14/2010 16.0 126 4th Qtr 11/9/2010 20 138 1st Qtr 2Jihoii . 16.0 134 1st Qtr 2/1/2011 21 145 2nd Qtr 6/20/2011 16.0 124 2nd Qtr 6/20/2011 22 145 3rdQtr 9/7/2011 17.0 127 3rd Qtr 9/7/2011 21 148 4th Qtr 12/12/2011 16.0 124 4th Qtr 12/12/2011 21 148 ..... 1st Qtr 3/14/2012 18.0 128 lstQtr 3/13/2012 22 152 2nd Qtr 6/18/2012 15 131 2nd Qtr 6/18/2012 21.6 138 3rd Qtr 9/19/2012 16 130 3rd Qtr 9/18/2012 21 172 4th Qtr 12/26/2012 17.2 122 4th Qtr ... 12/18/2012 22.2 170 ....... 2/19/2013 .. 1st Qtr 2/26/2013 21.4 129 1st Qtr 19.3 174 2nd Qtr 5/15/2013 18.8 119 2nd Qtr 5/13/2013 23.8 169 3rd Qtr 7/10/2013 17.6 130 3rd Qtr 7/9/2013 21.7 182 4th_Qtr 11/20/2013 19.S 124 4th Qtr 11/18/2013 23.9 174 ····· ihshoiii · ............................. 2/17/2014 .. 1st Qtr 18.4 135 1st Qtr 20.6 197 2nd Qtr 6/3/2014 19.S 128 2nd Qtr 6/3/2014 23.1 173 3rdQtr 9/9/2014 16.8 139 3rd Qtr 9/3/2014 18.9 210 4th Qtr 11/10/2014 16.2 154 4th Qtr 11/4/2014 20.9 204 ....... iJiihois · ... 1st Qtr 14.9 136 1st Qtr 2/2/2015 18.7 211 2nd Qtr 4/8/2015 17 142 2nd Qtr 4/7/2015 19 211 3rd Qtr 8/11/2015 17.9 165 3rd Qtr 8/10/2015 19.9 264 4th Qtr ....... 11/11/2015 16.3 140 4th_Qtr .... 11/9/2015 18.4 215 1st Qtr 2/10/2016 20 145 lstQtr 2/10/2016 18.8 246 2nd Qtr 5/4/2016 17.3 139 2nd Qtr 5/3/2016 18.6 243 3rd Qtr 8/18/2016 18 150 3rd Qtr 8/16/2016 19.7 272 4th Qtr 11/3/2016 18 143 4th Qtr 11/1/2016 19.8 267 .............................. ·•······· . ...... 1st Qtr 2/2/2017 17.4 150 1st Qtr 2/7/2017 21.1 266 2nd Qtr 4/5/2017 18.3 146 2nd Qtr 5/1/2017 18.3 263 3rd Qtr 8/14/2017 19.2 173 3rd Qtr 8/14/2017 19.S 310 4th Qtr 11/1/2017 17.4 156 4th_Qtr .... 11/1/2017 19 292 ....... 1st Qtr 2/22/2018 17.6 158 1st Qtr 2/20/2018 18.8 292 2nd Qtr 4/12/2018 17.3 145 2nd Qtr 4/17/2018 19 308 3rdQtr 9/11/2018 18 183 3rd Qtr 9/10/2018 20.1 333 4thQtr 10/22/2018 17.2 140 4th Qtr 10/24/2018 18.3 286 1st Qtr 2/13/2019 18.2 167 1st Qtr 2/12/2019 18.6 296 2nd Qtr 4/10/2019 18.S 138 2nd Qtr 4/10/2019 19.7 294 3rdQtr 7/16/2019 19.3 181 3rd Qtr 7/16/2019 19.8 374 4th_Qtr ... 10/8/2019 18.2 170 ~~~(),~( 10/9/2019 19.8 318 1st Qtr 1/15/2020 16.4 182 1st Qtr 1/15/2026 . 17.S 381 2nd Qtr 4/6/2020 18.1 195 2nd Qtr 4/6/2020 18.8 376 3rdQtr 7/6/2020 18.4 185 3rd Qtr 7/7/2020 19.2 370 4th_Qtr ... 12/8/2020 12 166 4th Qtr 12/7/2020 18.8 311 ... lstQtr 3/8/2021 17 192 1st Qtr 3/9/2021 17.4 388 2nd Qtr 4/14/2021 17.7 162 2nd Qtr 4/13/2021 18.6 377 3rdQtr 7/29/2021 20.6 188 3rd Qtr 7/27/2021 18.7 391 4th_Qtr .... 10/19/2021 14.3 182 4th Qtr 10/19/2021 18.1 371 lstQtr 1/17/2022 14.S 181 1st Qtr 1/19/202-X . 18.0 370 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Table 2 Summary of QA/QC Duplicate Sample 1st Quarter 2022 Parameter GWQS Duplicate of TWN-18 TWN-18 TWN.,65 RPD Nitrate + Nitrite (as N) 10 mg/L 0.99 <0.1 NA Chloride none 40.9 40.5 1.0 NA = Not Analyzed Data Discrlptions MW4 MW-26 TW4-1 TW4-2 Nitrate (mg/L) 4.80 0.300 3.90 3.30 Nitrate _(g/L) 4.80E-03 3.00E-04 3.90E-03 3.30E-03 Nitrate (lbs/L) 1.06E-05 6.63E-07 8.62E-06 7.29E-06 Nitrate (lbs/geil) 4.01E-05 2.51E-06 3.26E-05 2.76E-05 Total gallons pumped 96291.3 29113.3 8251.8 11380.6 lbs of nitrate removed 3.87 0.07 0.27 0.31 Gallons of nitrate removed 0.31 0.01 0.02 0.03 Total lbs nitrate removed from all pumping wells Total lbs nitrate removed from nitrate pumping wells Tabel3 DWMRC Nitrate Mass Removal Calculations Energy Fuels Resorses Inc. White Mesa MIii, Bland, Utah 1st Quarter 2022 Chlorofonn Pumpln11 Wells TW4-4 TW4-11 TW4-19 TW4-21 TW4-37 6.60 7.40 1.70 2.20 29.80 6.60E-03 7.40E-03 1.70E-03 2.20E-03 2.98E-02 1.46E-05 1.63E-05 3.76E-06 4.86E-06 6.58E-05 5.52E-05 6.19E-05 1.42E-05 1.84E-05 2.49E-04 10434.1 1497.2 112209.2 91105.4 42923.5 0.58 0.09 1.60 1.68 10.70 0.05 0.01 0:13 0.14 0.87 55 33 Nitrate Pumping Wells TW4-39 TW4-40 TW4-41 TWN-2 TW4-22 TW4-24 TW4-21l 2.90 2.50 6.20 15.3 40.4 36.2 1.800 2.90E-03 2.50E-03 6.20E-03 1.53E-02 4.04E-02 3.62E-02 1.80E-03 6.41E-06 5.52E-06 1.37E-05 3.38E-05 8.93E-05 8.00E-05 3.98E-06 2.43E-05 2.0'9E-05 5.18E-05 1.28E-04 3.38E-04 3.03E-04 1.51E-05 35550.2 53009.2 12247.8 16,188.7 22083.6 73545.0 92972.1 0.86 1.1 0.64 2.07 7.46 22.26 1.40 0.07 0.09 0,05 0.17 0.61 1.61 0.11