Loading...
HomeMy WebLinkAboutDRC-2010-002061 - 0901a0688016df10[]trUItrU1 f ;" r t 'ld;" ,'1 U L u (r, r* i;d'f t6lf,\ ]R]IOAL ffi]L]LC ', ffecerved. edcfr, #c in *#*n'r-r*J Licensg uT 1900481 Semi-Annual Gr$undwater Stabilify Monitoring Report lnd Half 2009 February 25,201 0 Rio Algom Mining LtC Februory 25,2010 Certified moil Retum Receipf (7001 0100 0002 9977 48201 Mr. Done L. Finerftock, Director Division of Rodiolion Control Utoh Deportment of Environmentof Quolity 1 68 North 1950 West PO Box 144850 Solt Loke City, UT 841l+4850 Re: license UT 190&181 Groundwoler Slobility Monilodng Repo*'znd Holf 2fi19 Deor Mr. Finerfrock, Pleose find otloched Rio Algom Mining LLC's groundwoter stobility moniforing report for the obove referenced license for the 2nd holf of 2009. There wos no exceedonce to reporf for the sompling event. lf you hove ony questions or need odditionol informotion, pleose coll me ot 50$287-8851 ext 15. Regords, st)t'irt\ Chuck Wentz Rodiotion Sofety Officer Environmentol Deportment Supervisor Attochment: As stoted xc: L. Morfon {DRC} DOE-GJO file P.O.Box2l8,Gronts, NM USA B7O2A - Tel: 505.287.8851 - Fox 505.285.5550 Rio Algom Mining LLC – Lisbon site Page 1 2nd Half 2009 Groundwater Monitoring Report RIO ALGOM MINING LLC-LISBON OPERATION Semiannual Groundwater Monitoring Report 2nd Half 2009 Introduction: This report meets the requirements of DRC License # UT 1900481, Condition 53 and presents the monitoring results of the groundwater sampling required by the Long Term Surveillance Monitoring Plan (LTSM) as required by Condition 53 of the License. This report contains the following elements: A discussion and interpretation of the groundwater sampling results and concentration trends, Uranium Compliance limits or Uranium Target Action levels as stated in table 1, license condition 53 B. Appendix 1 contains analytical data for the monitoring wells. Appendix 2 presents the time versus concentration plots for required parameters Appendix 3 contains the depth to water over time for the wells. Appendix 4 contains the hydrographs for the wells. Appendix 5 presents the field data sheets including the field parameter measurements. Appendix 6 presents copies of the laboratory analytical reports for the 2nd half of 2009. Appendix 7 presents the groundwater contour maps. Appendix 8 contains the sampling methodologies used to conduct the sampling. Rio Algom Mining LLC – Lisbon site Page 2 2nd Half 2009 Groundwater Monitoring Report Discussion The data provided in this report represent sampling results from the 2nd half of 2009. The required monitoring wells are listed below: Table 1 Monitoring Well Network Well Identification (s) Purpose EF-3A, OWUT-9 POC wells (Point of Compliance) MW-13, MW-5 Monitor background water quality RL-4, RL-5, RL-6 POE wells (Point of Exposure) EF-6, EF-8, ML-1, RL-1, RL-3, H-63, LW-1 Trend wells The Alternate Concentration Limits (ACLs), granted by the USNRC and accepted by the State of Utah apply to wells EF-3A and OWUT-9, are presented below: Table 2 Alternate Concentration Limits Alternate Concentration Limit for Constituent of Concern Well Identification Aquifer Area U-Nat mg/l As mg/l Mo mg/l Se mg/l EF-3A South 96.87 3.06 23.34 0.93 OWUT-9 North 101.58 2.63 58.43 0.10 Reviewing the results from the current sampling event for POC well EF-3A, none of the concentrations for the ACLs were approached, as demonstrated below. Table 3 Well EF-3A Results U-Nat mg/l As mg/l Mo mg/l Se mg/l 22.9 0.088 1.6 0.021 Rio Algom Mining LLC – Lisbon site Page 3 2nd Half 2009 Groundwater Monitoring Report Reviewing the results from the current sampling event for POC well OWUT-9, none of the concentrations for the COCs were exceeded, as demonstrated below. Table 4 Well OWUT-9 Results In granting ACLs for the Lisbon Site the USNRC maintained the Background groundwater concentrations at the same level established in 1990 and they are as follows: Table 5 Background Concentrations Background Groundwater Concentrations Well Identification Aquifer Area U-Nat mg/l As mg/l Mo mg/l Se Mg/l MW-13 South 0.02 0.066 0.05 0.01 MW-5 North 0.01 0.05 0.07 0.01 Reviewing the results from the current sampling events for POC background wells MW-13 and MW-5, the following concentrations were noted. Table 6 Background Well MW-13 and MW-5 Results U-Nat mg/l As mg/l Mo mg/l Se mg/l MW-13 0.0116 0.027 < 0.1 0.007 MW-5 0.0073 < 0.001 < 0.1 0.059 All of the above reported concentrations, with the exception of Se in MW-5, are below the background concentrations. Review of the trending of the selenium concentration in this well shows a steady concentration of approximately 0.06 mg/l since February 2002. The last report, 1st Half of 2009, stated the past 14 years, this should have been the last 14semi-annual reporting periods. This level does not exceed the class III water standard for this aquifer. The arsenic in MW- 13 is trending higher, but at 0.027 mg/l it is not approaching the background concentration of 0.066 mg/l. Wells RL-4, RL-5, and RL-6, located on the northern LTSM boundary, are used for monitoring Point of Exposure (POE) concentrations. The constituent of concern (COC) for the above POE wells, as stated in Table 2 of license condition 53 B, is U-Nat and the Uranium Compliance Limit is 0.32 mg/L. Table 7 presents U-Nat mg/l As mg/l Mo mg/l Se mg/l 85.4 2.20 49.1 0.024 Rio Algom Mining LLC – Lisbon site Page 4 2nd Half 2009 Groundwater Monitoring Report the observed U-Nat concentration the second half of 2009, verses the Uranium Compliance Limit. All of the POE wells are well below the 0.32 mg/l health based standard. Table 7 Uranium Concentrations – POE Wells POE Well Observed U-Nat Concentration (mg/L) Uranium Compliance Limit (mg/L) RL-4 0.0119 0.32 RL-5 0.0044 0.32 RL-6. 0.0196 0.32 Trend wells EF-6, EF- 8, ML-1, RL-1, RL-3, H-63 and LW-1, located throughout the area to be transferred to the Department of Energy, are used for validation of the transport model prediction and trends. The constituent of concern for these wells is U-Nat as stated in Table 3 of license condition 53 B. The following table shows the comparison of the concentration found in these trend wells with the Uranium Target Action Levels. All uranium concentrations within these wells were below the target action level established within the license. The results for Monitor Well RL-1 are an average of four sample analyses. In August of 2009 the DRC approved RAM’s proposed Uranium Target Action Level of 0.028 mg/L for Monitor Well LW-1. The reported result of 0.0023 is well below the Action Level. The molybdenum concentration in RL-1 is trending higher; however, not Target Action level was set for the well. The original Mo value was 8.02 mg/l in March 2003; the value has increased to 11.1 during the most recent sampling event. Table 8 Uranium Concentrations – Trend Wells Trend Well Observed U-Nat Concentration (mg/L) Uranium Target Action Levels (mg/L) EF-6 0.688 3.9 EF-8 0.122 0.30 ML-1 0.0145 0.26 RL-1 39.7 42.1 Rio Algom Mining LLC – Lisbon site Page 5 2nd Half 2009 Groundwater Monitoring Report RL-3 22.5 37.3 H-63 0.0106 0.06 LW-1 0.0023 0.028 Review of the water level elevations in the monitoring wells showed that RL-6 has a slightly downward trend while most wells indicate no trend. The EF wells (3A, 6, and 8) show a slight upward trend in water elevation. Field sampling observations showed that there were frequent air bubbles in the multi-probe flow cell unit used to obtain the stability parameters prior to sampling the water from the wells. In an effort to reduce the bubbles, noted particularly in the ORP cell (oxidation/reduction potential), the locking nut holding the cell was over-tightened and resulted in cracking the glass probe. For this reason the ORP values should not be considered reliable during this sampling event. The August sampling event included having the sampling procedure monitored by a staff member of the Utah Department of Radiation Control. Potential residual soap solution from the cleaning and rinsing step conducted between collecting the different well samples, positioning of the bladder pump in the correct down-hole location, and the air bubbles in the flow cell unit were concerns noted by the DRC staff member. These issues were reviewed by Rio Algom Mining LLC and their consultant. Rio Algom Mining will make final sampling adjustments based on results obtained from their consultant and final instructions provided by the DRC. Rio Algom Mining LLC – Lisbon site Page 6 2nd Half 2009 Groundwater Monitoring Report Appendix 1 Analytical Data For The Monitoring Wells Rio Algom Mining LLC – Lisbon site Page 7 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC- Lisbon Operation Historical Groundwater Data Monitoring Well EF-3A Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) EF-3A 02-Jan-90 64.23 6515 10.5 2868.6 1543.6 4776.2 13212 EF-3A 26-Apr-90 65.63 6513 9.15 2707 1466.7 4509 12660 EF-3A 19-Jul-90 74.07 6505 8.82 2439 1244 3786 9220 EF-3A 09-Oct-90 77.41 6502 8.82 2290 1160 3708 9892 EF-3A 15-Feb-91 78.85 6500 9.06 2363 1310 4059 11052 EF-3A 06-May-91 80.7 6498 9 2387 1247 3999 10860 EF-3A 30-Jul-91 82.76 6496 9.05 2368 1216 3914 10808 EF-3A 26-Nov-91 85.56 6493 8.82 2263 1157 3627 9335 EF-3A 12-Feb-92 86.93 6492 8.86 2281 1220 3758 10005 EF-3A 24-Apr-92 84.26 6495 9.19 2670 1558 4751 13308 EF-3A 10-Aug-92 82.62 6496 9.17 2894 1610 4902 13375 EF-3A 04-Nov-92 82.6 6496 9.04 2872 1570 4858 13013 EF-3A 14-Mar-93 81.94 6497 9.12 2947 1550 4621 13415 EF-3A 14-Jun-93 80.88 6498 9.02 2916 1529 4726 13240 EF-3A 09-Aug-93 83.48 6496 9.03 2248 1184 3677 9925 1.61 16.52 0.01 43.2 EF-3A 09-Dec-93 84.98 6494 9.1 2122 1184 3579 9564 61.09 EF-3A 18-Mar-94 86.3 6493 9.06 2159 1167 3670 9304 1.95 15.8 2.03 66.35 EF-3A 03-Oct-94 90.56 6488 9.14 3034 1209 3562 9260 2.3 17.4 0.19 40.47 EF-3A 12-Dec-94 144.28 6435 8.8 1901 926 2748 7240 31.02 EF-3A 30-Mar-95 129.8 6449 8.9 1913 876 2713 6894 0.92 7.17 0.077 21.26 EF-3A 17-May-95 92.31 6487 7.83 1881 641 2431 4236 21.25 EF-3A 28-Sep-95 141.66 6437 8.33 1662 728 2430 5636 0.484 5.89 0.057 12.94 EF-3A 03-Nov-95 123.76 6455 8.48 1683 738 2428 5620 28.95 EF-3A 07-Jun-97 112.02 6467 7.73 1071 714 1060 4068 16.25 EF-3A 07-Jun-97 112.02 6467 7.74 1071 719 1037 4024 16.25 EF-3A 05-Sep-97 112.98 6466 7.72 1068 704 1007 4056 0.194 2.54 0.048 14.18 EF-3A 23-Dec-97 110.18 6469 7.52 1098 675 1292 4124 14.77 EF-3A 31-Mar-98 106.56 6472 7.84 1096 665 1282 4020 0.121 2.47 0.055 12.7 EF-3A 17-Jun-98 106.59 6472 8.36 1112 665 1389 4516 13.89 EF-3A 17-Jul-98 107.39 6472 7.66 954 808 1506 2860 0.143 2.58 0.1027 12.85 EF-3A 04-Nov-98 113.8 6465 7.69 1039 646 1467 4144 13 Rio Algom Mining LLC – Lisbon site Page 8 2nd Half 2009 Groundwater Monitoring Report EF-3A 26-Feb-99 102.98 6476 7.74 1794 855 2091 6184 0.226 4.34 0.039 9.31 EF-3A 09-Jun-99 100.04 6479 8.01 1371 842 2158 5684 19.2 EF-3A 28-Jul-99 104.64 6474 7.67 991 644 1256 3784 0.17 2.7 0.031 131.46 EF-3A 10-Nov-99 106.88 6472 7.8 938 635 1282 4084 11.52 EF-3A 27-Mar-00 108.28 6471 7.57 988 602 1236 3436 0.15 2.2 0 11.82 EF-3A 20-Jun-00 109.02 6470 7.52 942 602 1286 2860 12.56 EF-3A 11-Sep-00 109.75 6469 7.52 980 594 1162 3620 0.14 1.9 0.023 11.97 EF-3A 07-Nov-00 110.38 6469 7.98 915 596 1151 3732 11.23 EF-3A 12-Mar-01 113.75 6465 7.56 916 582 1133 3552 0.138 1.91 0.053 12.3 EF-3A 21-May-01 116.43 6463 7.49 854 598 1062 3340 9.1 EF-3A 16-Aug-01 120.96 6458 7.69 871 529 1078 3524 0.141 1.77 0.033 11.56 EF-3A 16-Oct-01 122.85 6456 7.92 802 566 1156 3112 10.04 EF-3A 16-Feb-02 121.96 6457 7.25 811 577 1839 3148 9.6 EF-3A 25-Feb-02 120.28 6459 7.79 893 601 1126 3792 0.12 1.48 0.025 10.9 EF-3A 08-Jun-02 132.9 6446 7.59 701 556 1029 3136 10.3 EF-3A 18-Sep-02 127.984 6451 7.51 832 541 1031 2984 0.166 1.54 0.027 10.8 EF-3A 10-Mar-03 120.9 6458 7.65 1265 795 1801 4480 0.0848 1.47 0.017 16.2 EF-3A 06-May-03 127.65 6451 7.22 1035 756 1937 4920 0.0921 1.64 0.024 16.5 EF-3A 06-May-03 127.65 6451 7.22 1041 756 1938 4764 0.0928 1.65 0.024 16.6 EF-3A 3-Sep-03 132.62 6446 7.35 643 534 1021 3520 0.0968 1.26 0.023 7.63 EF-3A 3-Sep-03 132.6 6446 7.36 599 550 1054 3540 0.0944 1.25 0.023 7.6 EF-3A 17-Nov-03 133.75 6445 7.44 766 526 856 2996 9.24 EF-3A 22-Mar-04 126.21 6453 7.26 1104 654 0.104 1.62 0.028 14.1 EF-3A 1-Jul-04 121.85 6457 7.19 1050 684 798 0.1 1.7 0.02 13.87 EF-3A 16-Sep-04 120.91 6458 6.96 1116 700 1934 0.1 1.9 0.002 14.77 EF-3A 16-Sep-04 120.91 6458 6.96 1119 704 0.1 1.9 0.03 16.25 EF-3A 17-Dec-04 118.37 6461 7.14 1094 697 1997 0.112 1.8 0.017 16.25 EF-3A 3-Mar-05 115.65 6463 7.26 1148 745 2083 0.1/0.128 2.02/2.04 0/0.021 16.7/17.73 EF-3A 23-Jun-05 109.9 6469 7.27 1180 690 2208 0.2 2.2 0.03 19.2 EF-3A 23-Jun-05 109.9 6469 7.27 1180 679 0.2 2.2 0.03 19.2 EF-3A 30-Sep-05 113.45 6466 6.92 906 730 2070 5160 0.011 1.8 0.016 17.2 EF-3A 10-Nov-05 111.7 6467 7.26 1192 675 2106 4940 0.2 2 0.03 13.29 EF-3A 23-Mar-06 108.83 6470 7.06 1074 656 2058 5260 0.1 1.7 0.02 14.77 EF-3A 25-Sep-06 107.63 6471 6.63 1070 691 2100 4950 0.116 1.7 0.02 17.7 EF-3A 14-Dec-06 105.86 6473 5.12 1090 653 2180 5170 0.166 2.09 0.028 19.5 EF-3A 19-Mar-07 101.82 6477 7.14 808 500 1350 3530 0.019 0.9 0.01 10.3 EF-3A 11-Jun-07 100.68 6478 7.1 848 511 1320 3530 0.033 1 0.005 11 EF-3A 20-Aug-07 99.8 6479 7.37 869 522 1450 3510 0.0009 0.1 0.003 10.2 EF-3A 25-Oct-07 97.75 6481 7.83 1180 774 2430 5970 0.093 1.5 0.022 22.9 EF-3A 6-Jun-08 95.55 6483 7.22 1100 799 2610 5990 0.082 1.5 0.02 23.6 Rio Algom Mining LLC – Lisbon site Page 9 2nd Half 2009 Groundwater Monitoring Report EF-3A 16-Oct-08 92.64 6486 7.34 1120 829 2530 5980 0.083 1.6 0.01 24.7 EF-3A 25-Mar-09 92.89 6486 7.25 1130 291 612 1740 0.079 1.4 0.035 23.3 EF-3A 12-Aug-09 91.67 6487 7.13 1100 788 2390 5720 0.088 1.6 0.021 22.9 Rio Algom Mining LLC – Lisbon site Page 10 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well EF-6 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) EF-6 12-Jan-90 53.79 6514 7.06 644 512 1043 2932 EF-6 09-May-90 55.53 6512 6.92 595 491 1566 2648 EF-6 25-Jul-90 58.99 6509 6.81 514 500 954 2832 EF-6 10-Oct-90 61.54 6506 6.78 627 472 1073 2902 EF-6 14-Feb-91 64.53 6503 6.87 603 422 1047 2844 EF-6 24-Apr-91 65.84 6502 6.92 627 421 1052 2874 EF-6 25-Jul-91 67.47 6501 6.87 615 444 1053 3032 EF-6 26-Nov-91 70.17 6498 6.89 632 478 1075 2976 EF-6 13-Feb-92 71.31 6497 6.93 650 480 1089 2990 EF-6 27-Apr-92 71.39 6497 6.92 579 461 998 2634 EF-6 06-Aug-92 70.31 6498 7.02 590 395 1038 2660 EF-6 04-Nov-92 70.1 6498 6.83 587 380 1035 2682 EF-6 07-Mar-93 70.17 6498 6.86 593 410 976 2530 EF-6 14-Jun-93 69.05 6499 6.86 570 420 1014 2584 EF-6 10-Aug-93 68.82 6499 7.05 549 388 1048 2504 0.0124 0.005 0.017 1.87 EF-6 10-Dec-93 69.91 6498 6.93 562 427 954 2600 2.4 EF-6 17-Mar-94 71.22 6497 6.99 577 402 1009 2644 0.008 0.005 0.009 2.29 EF-6 08-Jun-94 72.3 6496 6.9 591 427 1041 2616 2.17 EF-6 28-Sep-94 72.91 6495 6.67 647 437 1030 2628 0.005 0.005 0.012 2.01 EF-6 14-Dec-94 74.1 6494 6.84 615 444 1016 2592 2.22 EF-6 28-Mar-95 78.34 6490 6.79 301 460 1055 2672 0.006 0.005 0.015 2.54 EF-6 18-May-95 76.6 6491 6.73 293 427 988 2596 2.32 EF-6 26-Sep-95 77.8 6490 6.49 561 447 863 2308 0.009 0 0.013 3.96 EF-6 04-Nov-95 6.78 557 427 872 2288 2.93 EF-6 26-Mar-96 79.7 6488 6.71 405 880 0.009 0 0.011 2.66 EF-6 30-Jun-96 81.82 6486 7.67 463 928 2.51 EF-6 11-Sep-96 80.68 6487 6.93 531 113 941 2572 0 0 0 2.07 EF-6 05-Dec-96 80.7 6487 6.93 528 113 936 2440 2.36 EF-6 20-Mar-97 81.22 6487 6.88 501 145 967 2536 0.013 0 0.012 2.07 EF-6 25-Jun-97 81.96 6486 6.97 489 432 751 2140 1.92 EF-6 20-Sep-97 83.96 6484 6.94 471 419 740 2412 0.012 0 0.012 1.92 Rio Algom Mining LLC – Lisbon site Page 11 2nd Half 2009 Groundwater Monitoring Report EF-6 29-Dec-97 84.67 6483 7.32 479 404 739 2140 1.77 EF-6 26-Mar-98 84.6 6483 7.11 315 409 727 2104 0.01 0 0.014 1.62 EF-6 18-Jun-98 85.23 6483 7.18 533 355 726 1852 1.48 EF-6 16-Jul-98 84.08 6484 6.87 440 651 625 2004 0 0 0.01 1.48 EF-6 06-Nov-98 86.23 6482 6.95 439 379 777 2120 1.6 EF-6 01-Mar-99 84.75 6483 7.21 412 350 659 1868 0.017 0 0.013 1.33 EF-6 10-Jun-99 86.32 6482 6.97 210 365 638 2072 1.24 EF-6 30-Jul-99 85.22 6483 6.86 428 374 739 1352 0.013 0.002 0.012 1.32 EF-6 08-Nov-99 83.84 6484 6.92 415 341 698 1212 1.27 EF-6 29-Mar-00 85.39 6483 6.95 405 379 693 1944 0.013 0 0 1.152 EF-6 22-Jun-00 85.5 6483 6.92 387 359 641 2016 1.34 EF-6 22-Sep-00 87.32 6481 6.96 402 362 611 2400 0.011 0 0.011 1.33 EF-6 13-Nov-00 87.37 6481 7.02 393 366 613 2164 1.23 EF-6 14-Mar-01 88.46 6480 7.12 412 359 632 1876 0.0145 0.0038 0.004 1.28 EF-6 22-May-01 88.8 6479 6.92 420 381 630 2030 1.42 EF-6 15-Aug-01 89.65 6478 6.79 423 379 639 2328 0.016 0.003 0.002 1.48 EF-6 18-Oct-01 90.74 6477 7.01 430 409 674 2032 1.65 EF-6 27-Feb-02 93.48 6475 6.82 427 415 683 2056 0.0139 0.0017 0.014 1.31 EF-6 06-Jun-02 95.2 6473 6.88 417 453 684 1996 1.37 EF-6 20-Sep-02 94.91 6473 6.94 433 347 657 1752 0.0136 0.0009 0.014 1.34 EF-6 19-Dec-02 97.37 6471 6.98 414 425 668 1844 1.25 EF-6 11-Mar-03 97.77 6470 6.91 348 345 688 2224 0.0127 0 0.011 1.23 EF-6 08-May-03 97.91 6470 6.9 372 388 645 1720 0.0121 0.0011 0.013 1.08 EF-6 1-Oct-03 99.52 6468 6.69 360 354 525 2308 0.0119 0.005 0.013 0.96 EF-6 19-Nov-03 100.44 6468 6.89 365 344 257 1660 0.296 EF-6 26-Mar-04 102.02 6466 6.95 355 440 0.012 0.0024 0.012 0.783 EF-6 30-Jun-04 103.18 6465 6.97 346 398 0.01 0.002 0.01 0.766 EF-6 16-Sep-04 102.21 6466 7.04 359 304 0.01 0.0006 0.001 0.71 EF-6 17-Dec-04 101.78 6466 6.92 364 296 0.0102 ND 0.009 0.679 EF-6 3-Mar-05 100 6468 6.63 352 306 0.0114/0.0111 0.0011/0.011 0.01/0.013 0.639/0.694 EF-6 22-Jun-05 98.99 6469 6.98 361 288 0.01 0.001 0.01 0.724 EF-6 29-Sep-05 98.95 6469 6.74 294 290 580 1660 0.033 <0.003 0.012 0.989 EF-6 9-Nov-05 96.3 6472 6.88 368 275 598 1636 0.01 0.0009 0.01 0.739 EF-6 23-Mar-06 91.29 6477 6.93 366 273 573 1624 0.01 0.0006 0.01 0.739 EF-6 25-Sep-06 93.14 6475 6.74 345 277 538 1650 0.0093 0.0016 0.009 0.716 EF-6 14-Dec-06 92.16 6476 6.91 350 292 625 1720 0.0106 0.0013 0.012 0.693 EF-6 20-Mar-07 88.85 6479 7.48 327 292 598 1680 0.012 ND 0.011 0.646 EF-6 11-Jun-07 87.77 6480 7.43 311 300 576 1660 0.012 ND 0.012 0.72 EF-6 20-Aug-07 86.85 6481 7.27 343 285 596 1690 0.011 ND 0.013 0.704 EF-6 25-Oct-07 86.02 6482 7.41 374 292 620 1750 0.01 ND 0.013 0.638 Rio Algom Mining LLC – Lisbon site Page 12 2nd Half 2009 Groundwater Monitoring Report EF-6 4-Jun-08 84.4 6484 7.32 350 292 632 1770 0.011 ND 0.01 0.742 EF-6 15-Oct-08 81.37 6487 7.17 363 291 612 1740 0.011 ND 0.011 0.686 EF-6 25-Mar-09 80.37 6488 7.32 374 311 601 1650 0.009 ND 0.018 0.702 EF-6 12-Aug-09 80.35 6488 7.11 362 302 616 1670 0.010 ND 0.010 0.688 Rio Algom Mining LLC – Lisbon site Page 13 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well EF-8 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) EF-8 24-Jan-90 56.73 6516 7.62 256 170 246 934 EF-8 15-May-90 59.15 6514 7.38 266 159 205 778 EF-8 25-Jul-90 64.32 6509 7.24 263 162 188 922 EF-8 10-Oct-90 67.08 6506 7.36 292 184 249 980 EF-8 14-Feb-91 69.34 6504 7.52 275 175 222 876 EF-8 25-Apr-91 70.71 6502 7.49 277 171 228 908 EF-8 24-Jul-91 72.84 6500 7.46 304 187 277 1100 EF-8 26-Dec-91 75.68 6497 7.5 342 191 379 1178 EF-8 13-Feb-92 73.94 6499 7.51 360 180 358 1204 EF-8 27-Apr-92 75.7 6497 7.52 315 201 296 1064 EF-8 06-Aug-92 74.18 6499 7.6 278 174 235 906 EF-8 04-Nov-92 74.06 6499 7.51 278 180 241 850 EF-8 07-Mar-93 74.02 6499 7.45 285 175 238 880 EF-8 14-Jun-93 72.54 6500 7.25 288 185 290 896 EF-8 01-Jun-94 77.62 6495 EF-8 01-Dec-94 79.06 6494 EF-8 01-May-95 80.34 6493 EF-8 01-Oct-95 86.44 6487 EF-8 01-Jun-96 87.94 6485 EF-8 01-Oct-96 87.92 6485 EF-8 01-May-97 90.44 6483 EF-8 01-Dec-97 94.06 6479 EF-8 01-May-98 92.3 6481 EF-8 22-Jul-98 93 6480 7.22 556 570 196 1176 0.025 0.007 0.008 0.069 EF-8 01-Dec-98 96.18 6477 EF-8 01-Apr-99 92.46 6481 EF-8 25-Apr-00 94.15 6479 7.49 230 34 102 728 0.031 0 0.004 0.021 EF-8 01-May-00 94.82 6478 EF-8 01-Dec-00 96.95 6476 EF-8 01-Mar-01 98.68 6474 Rio Algom Mining LLC – Lisbon site Page 14 2nd Half 2009 Groundwater Monitoring Report EF-8 01-Mar-01 104.68 6468 EF-8 01-Oct-01 104.25 6469 EF-8 11-Mar-03 107.07 6466 7.36 224 61 158 672 0.0281 0.0098 0.001 0.02 EF-8 08-May-03 107.68 6465 7.41 217 66 159 244 0.0284 0.0083 0.007 0.016 EF-8 30-Jun-04 110.25 6463 6.93 254 339 0.03 0.009 0.07 0.025 EF-8 16-Sep-04 111.45 6462 7.55 256 79 0.03 0.008 0.008 0.024 EF-8 17-Dec-04 108.82 6464 7.57 268 101 0.0273 0.007 0.007 0.024 EF-8 3-Mar-05 106.96 6466 7.74 264 203 0.0245/0.0263 0.0066/0.0082 0.005/0.008 0.019/0.024 EF-8 22-Jun-05 105.74 6467 7.37 277 205 0.03 0.008 0.008 0.025 EF-8 29-Sep-05 104.81 6468 7.12 222 97 240 720 0.0129 0.0078 0.008 0.0247 EF-8 9-Nov-05 102.46 6471 7.42 275 97 274 684 0.03 0.007 0.008 0.03 EF-8 23-Mar-06 100.6 6472 7.36 255 94 282 784 0.03 0.008 0.008 0.03 EF-8 25-Sep-06 99.05 6474 7.2 267 103 241 742 0.0218 0.0078 0.006 0.0254 EF-8 14-Dec-06 96.48 6477 7.41 262 97 239 748 0.028 0.0081 0.007 0.026 EF-8 20-Mar-07 92.95 6480 7.66 229 95 237 722 0.025 ND 0.008 0.0305 EF-8 11-Jun-07 92.2 6481 7.56 232 102 225 730 0.027 ND 0.008 0.0567 EF-8 20-Aug-07 90.91 6482 7.26 242 96 236 758 0.026 ND 0.008 0.0563 EF-8 25-Oct-07 89.35 6484 7.68 269 89 235 736 0.03 ND 0.008 0.0353 EF-8 6-Jun-08 87.71 6485 7.71 257 101 247 772 0.031 ND 0.008 0.0631 EF-8 15-Oct-08 83.99 6489 7.58 268 108 246 798 0.03 ND 0.009 0.0768 EF-8 25-Mar-09 84.69 6488 7.71 283 116 249 813 0.034 ND 0.009 0.105 EF-8 12-Aug-09 84.50 6489 7.50 283 121 262 835 0.031 ND 0.008 0.122 Rio Algom Mining LLC – Lisbon site Page 15 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well H-63 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) H-63 01-Sep-89 131.1 6554 H-63 01-Jan-90 132.05 6553 H-63 01-Dec-90 132.3 6553 H-63 01-May-91 132.64 6552 H-63 01-Sep-91 132.86 6552 H-63 01-Mar-92 133.16 6552 H-63 01-Sep-92 133.26 6552 H-63 01-Jun-93 132.28 6553 H-63 01-Jun-94 132.22 6553 H-63 01-Dec-94 132.24 6553 H-63 01-May-95 132.3 6553 H-63 01-Oct-95 133.88 6551 H-63 01-Jun-96 134.7 6550 H-63 01-Oct-96 134.2 6551 H-63 01-May-97 133.5 6552 H-63 01-Dec-97 133.96 6551 H-63 01-May-98 142.7 6542 H-63 23-Jul-98 134 6551 6.32 172 660 442 1065 0.025 0.011 0 0.017 H-63 01-Dec-98 134.06 6551 H-63 01-Apr-99 133.96 6551 H-63 01-May-00 134.58 6550 H-63 01-Dec-00 134.8 6550 H-63 01-Mar-01 134.82 6550 H-63 01-Oct-01 135.2 6550 H-63 01-Mar-02 135.3 6550 H-63 12-Mar-03 135.01 6550 6.81 263 51 342 1020 0.0088 0.0224 0.0002 0.11 H-63 09-May-03 135.1 6550 6.54 381 56 673 1368 0.0244 0.001 0.002 0.023 H-63 24-Mar-04 135.64 6549 7.06 258 249 0.0064 0.0078 0.09 0.025 H-63 30-Jun-04 136 6549 7.12 249 100 0.03 0.02 0.01 0.017 H-63 15-Sep-04 138.33 6547 6.89 243 248 0.03 0.01 0.01 0.014 H-64 17-Dec-04 7.99 209 201 0.0376 0.0109 0.008 ND Rio Algom Mining LLC – Lisbon site Page 16 2nd Half 2009 Groundwater Monitoring Report H-63 2-Mar-05 136.02 6549 7.48 258 150 0.0453/0.0411 0.0108/0.0104 0.007/0.009 0.012/ND H-63 22-Jun-05 136.28 6549 7.89 277 127 0.05 0.01 0.009 ND H-63 28-Sep-05 137.06 6548 7.67 217 124 230 890 0.0241 0.01 0.008 0.0121 H-63 9-Nov-05 136.12 6549 7.97 275 115 235 692 0.06 0.01 0.01 0.012 H-63 23-Mar-06 135.55 6549 8.3 257 88 219 824 0.07 0.01 0.01 0.015 H-63 25-Sep-06 136.36 6549 8 266 96 112 704 0.0625 0.0102 0.007 0.0124 H-63 14-Dec-06 136.7 6548 8.25 264 89 205 718 0.0636 0.01 0.007 0.012 H-63 20-Mar-07 133.84 6551 7.64 257 85 213 710 0.069 ND 0.008 0.0133 H-63 12-Jun-07 133.95 6551 8.05 257 89 211 686 0.072 ND 0.008 0.0133 H-63 21-Aug-07 131.88 6553 8.66 264 81 210 698 0.072 ND 0.009 0.0343 H-63 24-Oct-07 133.65 6551 8.28 271 78 212 674 0.068 ND 0.009 0.0165 H-63 4-Jun-08 135.07 6550 8.36 247 74 207 667 0.061 ND 0.008 0.0138 H-63 14-Oct-08 133.24 6552 8.34 254 75 198 662 0.061 ND 0.009 0.0116 H-63 24-Mar-09 136 6549 8.42 253 72 180 614 0.068 ND 0.007 0.0105 H-63 12-Aug-09 136.07 6549 8.15 258 70 184 639 0.062 ND 0.007 0.0106 Rio Algom Mining LLC – Lisbon site Page 17 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well LW-1 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) LW-1 * 25-Sep-06 148.48 6572 7.16 200 11 111 326 0.0015 0.0016 0.002 0.006 LW-1 13-Dec-06 148.38 6572 8.01 468 14 125 402 0.0017 0.012 0.002 0.026 LW-1 19-Mar-07 145.78 6574 7.32 200 14 123 370 ND ND 0.003 0.0024 LW-1 12-Jun-07 145.79 6574 7.75 183 10 120 358 ND ND 0.002 0.0038 LW-1 21-Aug-07 145.75 6574 8.24 205 11 124 360 ND ND 0.003 0.0161 LW-1 23-Oct-07 146.83 6573 7.45 205 9 118 348 ND ND 0.002 0.0063 LW-1 3-Jun-08 146.71 6573 7.54 190 10 116 366 ND ND 0.002 0.0034 LW-1 14-Oct-08 145.44 6575 7.57 192 10 111 352 ND ND 0.003 0.0026 LW-1 24-Mar-09 146.39 6574 7.55 203 8 100 340 ND ND 0.002 0.0019 LW-1 11-Aug-09 146.56 6573 7.35 196 9 112 401 ND ND 0.002 0.0023 * Please note that some of the analyses in this line are different than the last report. Bicarbonate through U-Nat are changed. The previous reports had data from LPD Pond, which was one line above the data field for LW-1. We apologize for any in-convenience. CN Wentz Rio Algom Mining LLC – Lisbon site Page 18 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well ML-1 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) ML-1 05-Nov-98 37.97 6491 7.29 249 145 272 984 0.014 0.005 0.007 0.01 ML-1 05-Nov-98 37.97 6491 7.29 249 145 265 960 0.014 0.007 0.007 0.01 ML-1 03-Mar-03 47.22 6482 6.91 234 188 287 1264 0.019 0.0064 0.01 0.02 ML-1 03-Mar-03 47.22 6482 6.91 237 188 287 1220 0.0194 0.0061 0.01 0.02 ML-1 06-May-03 45.52 6484 7.23 252 172 328 1364 0.0132 0.0073 0.009 0.018 ML-1 29-Sep-03 48.95 6480 7.25 240 185 276 1220 0.0134 0.0072 0.008 0.019 ML-1 17-Nov-03 48.79 6480 7.33 218 325 263 1160 0.02 ML-1 24-Mar-04 51.12 6478 7.19 263 178 0.01 0.0067 0.008 0.016 ML-1 30-Jun-04 49.75 6479 7.3 252 692 0.01 0.006 0.009 0.019 ML-1 15-Sep-04 51.7 6477 6.95 261 178 0.01 0.006 0.008 0.016 ML-1 17-Dec-04 52.35 6477 6.89 274 192 0.0138 0.0045 0.008 0.015 ML-1 3-Mar-05 51.77 6477 7.06 258 205 0.0128/0.0137 0.0049/0.0057 0.007/0.013 0.013/0.015 ML-1 22-Jun-05 50.08 6479 7.23 277 180 0.01 0.006 0.009 0.016 ML-1 29-Sep-05 47 6482 6.96 216 186 360 1060 0.0675 0.0054 0.01 0.0148 ML-1 9-Nov-05 46.85 6482 7.27 262 164 345 852 0.02 0.005 0.01 0.015 ML-1 23-Mar-06 46.67 6482 7.07 258 150 354 1044 0.01 0.006 0.01 0.015 ML-1 25-Sep-06 47.38 6482 6.97 247 163 368 1090 0.0104 0.0059 0.007 0.0142 ML-1 14-Dec-06 48.56 6481 6.94 246 147 379 1050 0.0113 0.0059 0.01 0.014 ML-1 20-Mar-07 46.46 6483 7.58 235 154 332 1010 0.013 ND 0.01 0.0274 ML-1 11-Jun-07 44.94 6484 7.74 238 164 320 1020 0.014 ND 0.009 0.032 ML-1 20-Aug-07 47.52 6482 7.52 252 156 324 1020 0.013 ND 0.01 0.038 ML-1 25-Oct-07 46.63 6482 8.09 253 147 381 1040 0.007 ND 0.011 0.0186 ML-1 6-Jun-08 45.76 6483 7.45 235 146 378 1060 0.007 ND 0.01 0.0162 ML-1 15-Oct-08 44.73 6484 7.45 238 149 365 1030 0.006 ND 0.01 0.0147 ML-1 25-Mar-09 45.97 6483 7.55 248 149 349 990 0.006 ND 0.010 0.0142 ML-1 12-Aug-09 44.90 6484 7.17 240 148 353 962 0.005 ND 0.009 0.0145 Rio Algom Mining LLC – Lisbon site Page 19 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well MW-5 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) MW-5 23-Apr-90 149.84 6592 7.17 322 38.9 249 676 0.001 0.05 0.01 MW-5 17-Jul-90 150.02 6592 7.23 325 41 250 648 0.002 0.05 0.013 MW-5 04-Oct-90 150.76 6591 7.05 327 61 260 708 MW-5 28-Jan-91 149.98 6592 7.22 315 315 283 714 0.001 0.05 0.013 MW-5 16-Apr-91 150 6592 7.13 325 37 295 740 MW-5 16-Jul-91 150.36 6592 7.15 331 27 296 746 0.005 0.05 0.024 0.003 MW-5 24-Nov-91 150.46 6592 6.96 329 29 314 MW-5 06-Feb-92 150.16 6592 7.11 333 15 305 740 0.002 0.001 0.032 MW-5 20-Apr-92 150.19 6592 7.16 321 29 308 784 MW-5 04-Aug-92 150.46 6592 7.17 332 34 324 798 0.001 0.001 0.032 MW-5 28-Oct-92 150.3 6592 7.13 326 24 335 760 MW-5 05-Mar-93 150.67 6591 7.1 324 30 326 788 0.002 0.001 0.023 MW-5 13-Jun-93 150.57 6591 7.08 326 40 306 868 MW-5 07-Aug-93 150.56 6591 7.22 329 40 304 800 0.0021 0.005 0.028 0.002 MW-5 06-Dec-93 150.27 6592 7.16 313 29 367 862 MW-5 15-Mar-94 152.63 6589 7.06 340 29 389 840 0.005 0.005 0.039 0.004 MW-5 07-Jun-94 152.27 6590 7.09 327 25 387 868 MW-5 27-Sep-94 151.59 6590 6.93 333 24 390 840 0.005 0.005 0.036 0.0004 MW-5 13-Dec-94 151.44 6591 6.95 312 24 348 832 0.009 MW-5 27-Mar-95 151.28 6591 6.87 321 29 345 816 0.005 0.005 0.042 0.01 MW-5 18-May-95 150.72 6591 6.94 317 29 348 828 0.01 MW-5 25-Sep-95 151.24 6591 6.84 321 24 345 856 0 0 0.042 0.01 MW-5 04-Nov-95 152.75 6589 6.89 297 19 348 864 0.01 MW-5 23-Mar-96 152.75 6589 6.82 19 340 696 0 0 0.42 0.01 MW-5 26-Jun-96 150.33 6592 7.01 34 433 0.009 MW-5 11-Sep-96 150.53 6591 7.12 316 24 422 932 0.005 0.005 0.001 0.002 MW-5 02-Dec-96 150.76 6591 7 326 30 426 708 0.001 MW-5 19-Mar-97 152.14 6590 7.06 323 29 430 1030 0.005 0.005 0.005 MW-5 19-Mar-97 152.14 6590 7.06 324 34 441 1048 0.005 0.005 0.005 MW-5 25-Jun-97 150.6 6591 7.09 316 19 437 1036 0.01 MW-5 20-Sep-97 150.75 6591 7.04 325 19 406 1236 0.005 0.005 0.001 0.01 MW-5 26-Dec-97 153.87 6588 7.69 308 57 486 1124 0.01 Rio Algom Mining LLC – Lisbon site Page 20 2nd Half 2009 Groundwater Monitoring Report MW-5 26-Mar-98 151.52 6590 7.14 332 57 480 1168 0.005 0.005 0.003 0.03 MW-5 17-Jun-98 150.98 6591 7.01 321 24 532 892 0.013 MW-5 16-Jul-98 154.11 6588 6.88 313 13 498 816 0.005 0.005 0.005 0.01 MW-5 05-Nov-98 151.47 6591 7.07 333 28 517 1008 0.01 MW-5 01-Mar-99 150.63 6591 7.26 314 5 444 1168 0.005 0.005 0.005 0.01 MW-5 09-Jun-99 150.5 6592 7.1 308 28 548 1268 0.03 MW-5 29-Jul-99 150.76 6591 6.95 305 47 542 1376 0.001 0.001 0.005 0.01 MW-5 08-Nov-99 150.88 6591 6.88 315 19 517 556 0.011 MW-5 28-Mar-00 150.52 6591 6.9 318 19 565 1276 0.002 0.005 0.01 0.013 MW-5 21-Jun-00 150.85 6591 7.02 314 19 548 1596 MW-5 13-Sep-00 151.5 6591 6.82 318 23 552 1064 0.005 0.003 0.005 0.022 MW-5 08-Nov-00 151.65 6590 7.2 303 24 536 1476 0.013 MW-5 13-Mar-01 151.72 6590 7.43 309 15 568 1528 0.0001 0.0001 0.001 0.0121 MW-5 21-May-01 151.78 6590 7.11 313 24 559 1234 0.011 MW-5 15-Aug-01 152.13 6590 7.19 332 15 537 1236 0.0009 0.0032 0.012 MW-5 17-Oct-01 152.6 6589 7.54 303 18 583 1308 0.013 MW-5 26-Feb-02 153.78 6588 6.97 294 17 547 1180 0.0011 0.001 0.063 0.009 MW-5 06-Jun-02 151.19 6591 7.06 312 24 602 1452 0.024 MW-5 19-Sep-02 153.14 6589 7 314 15 599 1396 0.001 0.001 0.062 0.011 MW-5 18-Dec-02 152.57 6589 7.12 303 36 631 1064 0.016 MW-5 10-Mar-03 153.02 6589 6.98 308 19 663 1412 0.0008 0.0062 MW-5 06-May-03 152.88 6589 6.91 306 5 631 1520 0.061 0.007 MW-5 30-Sep-03 153.75 6588 6.86 313 10 1006 1524 0.0005 0.0021 0.05 0.015 MW-5 24-Mar-04 153.75 6588 6.83 317 11 ND ND 0.058 0.008 MW-5 29-Jun-04 153.92 6588 6.57 338 20 ND 0.0009 0.06 ND MW-5 15-Sep-04 156.48 6586 6.4 310 11 ND ND 0.06 ND MW-5 16-Dec-04 156.55 6585 6.26 315 25 ND ND 0.051 ND MW-5 2-Mar-05 154.87 6587 6.98 308 11 0/0.0018 0.0004/ND 0.059/0.061 0.007/ND MW-5 22-Jun-05 155.25 6587 7.13 317 10 ND ND 0.07 ND MW-5 28-Sep-05 156.31 6586 6.78 256 12 690 1300 0.0016 <0.0005 0.075 0.0067 MW-5 9-Nov-05 155.21 6587 6.98 310 18 705 1236 <0.0005 <0.00005 0.07 0.006 MW-5 22-Mar-06 153.81 6588 7 308 22 663 1328 ND ND 0.07 0.007 MW-5 25-Sep-06 155.46 6587 6.43 308 11 650 1290 0.0005 0.0005 0.051 0.0074 MW-5 13-Dec-06 155.24 6587 6.91 298 14 735 1330 0.0005 0.0005 0.062 0.008 MW-5 19-Mar-07 154.05 6588 6.55 298 12 744 1380 ND ND 0.066 0.0082 MW-5 12-Jun-07 153.34 6589 8.03 20 11 722 1350 ND ND 0.071 0.0099 MW-5 21-Aug-07 153.37 6589 8.17 315 23 762 1370 ND ND 0.069 0.0458 MW-5 23-Oct-07 154.39 6588 7.37 317 11 732 1360 ND ND 0.07 0.0106 MW-5 3-Jun-08 153.84 6588 7.13 292 12 751 1390 ND ND 0.066 0.009 MW-5 14-Oct-08 153.09 6589 7.21 302 12 732 1390 ND ND 0.064 0.0075 Rio Algom Mining LLC – Lisbon site Page 21 2nd Half 2009 Groundwater Monitoring Report MW-5 24-Mar-09 153.72 6588 7.2 317 10 738 1350 ND ND 0.069 0.0070 MW-5 11-Aug-09 154.00 6588 6.97 304 11 741 1420 ND ND 0.059 0.0073 Rio Algom Mining LLC – Lisbon site Page 22 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well MW-13 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) MW-13 04-Aug-87 89.94 6549 7.37 56 162 662 0.005 0.003 MW-13 18-Aug-87 89.9 6549 7.44 0.005 0.008 MW-13 02-Sep-87 90.07 6549 7.47 0.035 0.019 MW-13 16-Sep-87 90.07 6549 7.43 0.021 0.001 MW-13 30-Sep-87 90.17 6549 7.45 0.023 0.006 MW-13 15-Oct-87 90.25 6549 7.41 92 179 519 0.023 0.01 0.001 MW-13 05-Nov-87 90.11 6549 7.5 0.005 0.001 MW-13 11-Nov-87 90.21 6549 7.3 0.008 0.001 MW-13 25-Nov-87 90.07 6549 7.79 0.008 0.001 MW-13 09-Dec-87 89.96 6549 7.39 0.005 0.001 MW-13 14-Jan-88 89.86 6549 7.78 110 171 515 0.005 0.001 MW-13 25-Jan-88 89.83 6549 7.59 0.005 0.001 MW-13 26-Feb-88 89.71 6549 7.66 0.007 0.001 MW-13 01-Mar-88 88.37 6550 7.43 0.005 0.001 MW-13 01-Apr-88 89.2 6550 7.57 39 151 530 0.013 0.001 MW-13 01-May-88 89.5 6549 7.47 0.005 0.001 MW-13 09-Jun-88 90.25 6549 7.57 0.005 0.1 0.001 MW-13 23-Jun-88 89.36 6549 7.43 0.005 0.1 0.003 MW-13 08-Jul-88 89.44 6549 7.44 0.009 0.1 0.001 MW-13 05-Aug-88 89.42 6549 7.4 0.005 0.1 0.001 MW-13 19-Aug-88 89.52 6549 7.52 0.005 0.2 0.001 MW-13 31-May-89 90.12 6549 7.5 252 57 144 MW-13 01-Aug-89 90.35 6548 7.6 247 42 148 423 MW-13 07-Sep-89 90.28 6549 7.58 248 42 133 449 MW-13 13-Sep-89 90.38 6548 7.34 241 72 162 508 MW-13 12-Oct-89 90.33 6548 7.58 247 15 142 452 MW-13 01-Nov-89 90.48 6548 7.7 239 19 147 502 MW-13 23-Apr-90 90.41 6548 7.44 248 58 140 462 MW-13 17-Jul-90 90.6 6548 7.17 251 36 134 378 MW-13 04-Oct-90 91.12 6548 7.32 250 42 128 454 MW-13 28-Jan-91 90.96 6548 7.43 235 50 128 442 Rio Algom Mining LLC – Lisbon site Page 23 2nd Half 2009 Groundwater Monitoring Report MW-13 16-Apr-91 91.16 6548 7.49 246 29 135 444 MW-13 16-Jul-91 91.35 6547 7.59 253 37 137 452 MW-13 24-Nov-91 91.55 6547 7.4 251 29 146 442 MW-13 06-Feb-92 91.61 6547 7.52 250 20 139 482 MW-13 20-Apr-92 91.75 6547 7.57 252 29 131 444 MW-13 05-Aug-92 91.83 6547 7.64 259 39 133 424 MW-13 28-Oct-92 91.87 6547 7.47 248 33 135 430 MW-13 06-Mar-93 92.13 6547 7.48 248 30 130 450 MW-13 13-Jun-93 91.41 6547 7.51 250 30 126 456 MW-13 09-Aug-93 91.7 6547 7.56 270 35 132 446 0.0157 0.023 0.005 0.01 MW-13 09-Dec-93 91.88 6547 7.58 225 34 134 448 0.01 MW-13 17-Mar-94 92 6547 7.63 238 24 160 476 0.023 0.025 0.006 0.007 MW-13 07-Jun-94 91.74 6547 7.56 226 20 156 496 0.03 MW-13 28-Sep-94 92.07 6547 7.4 257 19 162 512 0.029 0.026 0.005 0.018 MW-13 14-Dec-94 92.17 6547 7.37 243 19 158 508 0.028 MW-13 27-Mar-95 91.74 6547 7.37 242 25 165 512 0.015 0.028 0.005 0.02 MW-13 18-May-95 92.36 6546 7.32 230 24 146 480 0.01 MW-13 25-Sep-95 92.51 6546 7.28 234 19 126 308 0.02 0.017 0.006 0.02 MW-13 04-Nov-95 96.6 6542 7.27 214 15 112 312 0.02 MW-13 23-Mar-96 92.29 6547 7.41 10 106 0.016 0.02 0.005 0.03 MW-13 24-Jun-96 92.65 6546 7.08 63 118 0.019 MW-13 11-Sep-96 91.8 6547 7.66 251 54 106 468 0.017 0.022 0.005 0.021 MW-13 05-Dec-96 92.9 6546 7.61 255 39 123 468 0.022 MW-13 20-Mar-97 92.51 6546 7.49 236 43 113 544 0.023 0.022 0.005 0.02 MW-13 25-Jun-97 92.09 6547 7.52 250 41 124 372 0.01 MW-13 20-Sep-97 92.14 6547 7.49 255 24 116 760 0.02 0.019 0.005 0.02 MW-13 29-Dec-97 90.64 6548 7.9 252 29 133 480 0.02 MW-13 26-Mar-98 92.51 6546 7.66 268 26 127 508 0.023 0.024 0.005 0.02 MW-13 17-Jun-98 92.75 6546 7.58 248 24 126 312 0.024 MW-13 16-Jul-98 92.9 6546 7.48 249 111 452 0.015 0.026 0.005 0.02 MW-13 16-Jul-98 92.9 6546 7.48 246 103 476 0.016 0.027 0.005 0.02 MW-13 05-Nov-98 93.12 6546 7.53 252 23 158 608 0.02 MW-13 10-Jun-99 92.46 6546 7.04 239 37 146 748 0.01 MW-13 30-Jul-99 92.6 6546 7.47 241 23 121 400 0.02 0.031 0.001 0.02 MW-13 30-Jul-99 92.6 6546 7.47 244 23 113 420 0.02 0.03 0 0.02 MW-13 08-Nov-99 92.8 6546 7.16 247 14 119 192 0.072 MW-13 28-Mar-00 93.84 6545 7.44 249 29 150 560 0.023 0.031 0.004 0.024 MW-13 22-Jun-00 93.11 6546 7.51 239 29 142 684 0.019 MW-13 20-Sep-00 93.13 6546 7.42 222 23 121 912 0.022 0.032 0 0.027 MW-13 13-Nov-00 93.32 6545 7.88 238 24 102 804 0.022 Rio Algom Mining LLC – Lisbon site Page 24 2nd Half 2009 Groundwater Monitoring Report MW-13 14-Mar-01 93.8 6545 7.6 255 19 133 628 0.022 0.031 0.002 0.0035 MW-13 22-May-01 93.49 6545 7.47 250 34 97 258 0.026 MW-13 15-Aug-01 95.36 6543 7.4 253 41 109 324 0.023 0.03 0.007 0.03 MW-13 17-Oct-01 93.71 6545 7.43 250 9 124 588 0.049 MW-13 26-Feb-02 93.85 6545 7.4 223 59 135 332 0.0346 0.0237 0.008 0.025 MW-13 06-Jun-02 93.75 6545 7.63 248 34 144 300 0.04 MW-13 19-Sep-02 93.77 6545 7.41 232 15 153 822 0.0207 0.0285 0.004 0.029 MW-13 19-Dec-02 84.66 6554 7.67 252 35 137 644 0.027 MW-13 11-Mar-03 93.83 6545 7.64 250 9 167 760 0.021 0.0276 0.004 0.03 MW-13 06-May-03 94.03 6545 7.41 239 5 120 752 0.0214 0.0267 0.006 0.026 MW-13 29-Sep-03 94.17 6545 7.54 240 19 82 720 0.0211 0.0283 0.005 0.03 MW-13 17-Nov-03 94.04 6545 7.41 241 9 98 n/a 0.038 MW-13 17-Nov-03 94.02 6545 7.41 241 9 105 520 0.04 MW-13 24-Mar-04 94.13 6545 7.27 249 27 0.0214 0.0295 0.05 0.035 MW-13 29-Jun-04 94.41 6544 6.99 260 31 0.02 0.03 0.006 0.023 MW-13 15-Sep-04 95.61 6543 7.05 249 6 0.02 0.03 0.006 0.002 MW-13 15-Sep-04 95.61 6543 7.05 246 4 0.02 0.03 0.004 0.002 MW-13 16-Dec-04 95.61 6543 7.21 250 11 0.0201 0.0243 0.004 0.021/0.021 MW-13 2-Mar-05 92.29 6547 6.99 249 9 0.0187/0.0197 0.0226/0.0248 0.005/0.008 0.019/0.021 MW-13 22-Jun-05 94.38 6544 7.44 240 31 0.02 0.02 0.009 0.015 MW-13 28-Sep-05 96.37 6542 7.1 200 32 160 480 <0.0005 0.0188 0.008 0.0167 MW-13 9-Nov-05 94.22 6545 7.51 248 34 172 344 0.02 0.02 0.01 0.015 MW-13 22-Mar-06 93.65 6545 7.49 250 33 152 504 0.02 0.03 0.008 0.015 MW-13 25-Sep-06 96.1 6543 7.65 237 21 139 416 0.0223 0.0249 0.007 0.0207 MW-13 13-Dec-06 95.1 6544 7.49 237 22 151 462 0.0234 0.0254 0.007 0.02 MW-13 20-Mar-07 91.96 6547 7.68 239 25 157 488 0.022 ND 0.007 0.0216 MW-13 12-Jun-07 92.09 6547 7.63 238 25 150 474 0.023 ND 0.008 0.0232 MW-13 21-Aug-07 92.23 6547 7.96 247 23 159 482 0.023 ND 0.007 0.0362 MW-13 25-Oct-07 91.7 6547 8.02 237 60 167 541 0.027 ND 0.01 0.0116 MW-13 6-Jun-08 93.27 6546 7.53 225 55 165 545 0.026 ND 0.008 0.0142 MW-13 15-Oct-08 91.5 6547 7.62 230 55 167 542 0.026 ND 0.009 0.0124 MW-13 24-Mar-09 94.05 6545 7.51 242 51 158 527 0.028 ND 0.008 0.0154 MW-13 12-Aug-09 94.08 6545 7.27 233 53 165 533 0.027 ND 0.007 0.0116 Rio Algom Mining LLC – Lisbon site Page 25 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well OW-UT-9 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) OW-UT-9 04-May-90 9.43 3986 1690 5317 16240 OW-UT-9 23-Jul-90 9.41 4184 1764 5387 17236 OW-UT-9 17-Oct-90 9.37 4002 1698 5449 17176 OW-UT-9 30-Jan-91 9.54 4032 1708 5375 17208 OW-UT-9 23-Apr-91 9.45 4030 1693 5393 17500 OW-UT-9 15-Jul-91 9.41 4122 1610 5535 18088 OW-UT-9 20-Nov-91 9.47 4338 1669 5632 17744 OW-UT-9 21-Feb-92 9.45 4390 1679 5924 18250 OW-UT-9 01-May-92 9.45 4427 1637 5684 18315 OW-UT-9 12-Aug-92 132.78 6569 9.51 4587 1592 5943 18775 OW-UT-9 26-Oct-92 128.5 6573 9.44 4644 1603 6021 19055 OW-UT-9 07-Apr-93 116.62 6585 9.69 6101 1595 5782 18128 OW-UT-9 11-Jun-93 128.47 6573 9.67 4908 1579 5962 19225 OW-UT-9 06-Aug-93 125.49 6576 9.68 4617 1621 5826 20105 0.75 46.6 0.013 46.6 OW-UT-9 13-Dec-93 132.23 6570 9.58 5181 1548 4811 20528 59.19 OW-UT-9 22-Mar-94 130.54 6571 9.7 4699 1492 5124 20334 0.897 28.4 0.036 61.45 OW-UT-9 09-Jun-94 120.41 6581 9.64 5013 1568 5146 20572 61.78 OW-UT-9 30-Sep-94 128.37 6574 9.83 5190 1544 5206 20360 1.1 29.3 0.05 46.43 OW-UT-9 12-Dec-94 128.6 6573 9.51 5388 1543 5520 20436 62.04 OW-UT-9 30-Mar-95 89.4 6613 9.86 5057 1565 5536 20228 0.93 29.6 0.032 56.57 OW-UT-9 17-May-95 121.35 6581 9.91 5061 1544 5540 19872 53.98 OW-UT-9 28-Sep-95 126.8 6575 9.56 5729 1544 5260 18664 0.319 31.1 0.018 84.05 OW-UT-9 03-Nov-95 125.18 6577 9.96 5814 1535 5284 18620 82.57 OW-UT-9 29-Mar-96 125.39 6577 9.9 1522 5288 1.19 35.4 0.016 70.9 OW-UT-9 30-Jun-96 123.85 6578 9.63 1485 7777 69.42 OW-UT-9 09-Sep-96 132.84 6569 9.57 6268 1487 7716 18100 1.28 37.3 0.037 82.75 OW-UT-9 27-Nov-96 125.96 6576 9.31 6442 1508 7698 20348 65 OW-UT-9 18-Mar-97 132.72 6569 9.54 6300 1491 7627 19260 1.32 29.7 0.05 79.76 OW-UT-9 27-Jun-97 9.46 6843 1593 7809 19028 86.63 OW-UT-9 05-Sep-97 9.52 6571 1649 7754 19168 1.72 35 0.185 85.67 Rio Algom Mining LLC – Lisbon site Page 26 2nd Half 2009 Groundwater Monitoring Report OW-UT-9 05-Sep-97 9.53 6632 1639 7691 19120 1.61 36.7 0.189 87.15 OW-UT-9 23-Dec-97 132.7 6569 9.45 6273 1560 7874 27352 82.72 OW-UT-9 31-Mar-98 9.59 6920 1565 7894 26992 1.67 37.6 0.033 70.9 OW-UT-9 17-Jun-98 129.72 6572 9.49 7335 1511 8969 27744 56.13 OW-UT-9 16-Jul-98 132.5 6569 9.51 6961 1468 7691 25390 1.49 39.1 0(.025) 85.67 OW-UT-9 04-Nov-98 133 6569 9.42 7335 1477 9286 20276 79.76 OW-UT-9 26-Feb-99 9.48 8505 1399 8473 31864 1.86 43.9 0.029 69.43 OW-UT-9 26-Feb-99 9.48 8576 1399 8707 30572 1.9 39.5 0.046 73.86 OW-UT-9 09-Jun-99 131.38 6571 9.6 7740 1441 8875 30904 45.79 OW-UT-9 28-Jul-99 132.5 6569 9.61 7539 1479 9015 29236 2.5 47 0.192 81.24 OW-UT-9 10-Nov-99 132.3 6570 9.59 7495 1471 8967 30144 81.24 OW-UT-9 27-Mar-00 132.65 6569 9.49 7972 1467 8561 34016 1.7 52 0 63.52 OW-UT-9 20-Jun-00 124.61 6577 9.61 7520 1554 9352 34552 84.19 OW-UT-9 11-Sep-00 130 6572 9.54 7625 1495 8863 31868 2 47 0 76.81 OW-UT-9 11-Sep-00 130 6572 9.54 7377 1495 8980 31832 2 47 0 84.2 OW-UT-9 07-Nov-00 132.78 6569 9.61 7993 1543 9359 32252 82.7 OW-UT-9 12-Mar-01 132.72 6569 9.5 7633 1494 9036 31580 1.79 38 0.033 98 OW-UT-9 21-May-01 133.41 6568 9.5 8259 1581 8422 31818 62.04 OW-UT-9 16-Aug-01 132.42 6569 9.72 8286 1263 9008 18420 0.215 51.9 0.04 19.2 OW-UT-9 16-Oct-01 132.75 6569 9.64 8206 1561 10498 32080 98.97 OW-UT-9 25-Feb-02 130.5 6571 9.5 8114 1670 9813 33180 2.02 47.6 0.045 90.25 OW-UT-9 25-Feb-02 130.5 6571 9.52 8145 1623 9805 32712 2.11 48.6 0.039 87.15 OW-UT-9 08-Jun-02 132.45 6569 9.51 7380 1606 16036 33480 96 OW-UT-9 18-Sep-02 133.03 6569 9.41 8553 1523 8753 34580 2.16 52.2 0.023 56.1 OW-UT-9 16-Dec-02 133.75 6568 9.23 7864 1664 9046 34380 66.5 OW-UT-9 10-Mar-03 133.07 6569 9.49 12747 1417 10632 34680 2.06 48.5 0.031 96.01 OW-UT-9 10-May-03 132 6570 9.63 8614 2394 10095 35172 2.19 50.6 0.034 88.1 OW-UT-9 3-Sep-03 OW-UT-9 18-Nov-03 124.85 6577 9.39 9011 1393 10572 35452 87.4 OW-UT-9 22-Mar-04 123.89 6578 9.14 0 1346 1.1 53.9 0.029 29.8 OW-UT-9 1-Jul-04 123.5 6578 9.44 9206 1440 2.6 51.4 0.04 83.01 OW-UT-9 21-Sep-04 124.62 6577 9.79 9245 1408 3.1 60.4 0.02 78.28 OW-UT-9 18-Dec-04 123.62 6578 9.03 8653 1389 2.78 55.8 0.019 87.15 OW-UT-9 17-Feb-05 133 6569 9.6 2.44 47 0.027 84.7 OW-UT-9 17-Feb-05 133 6569 9.6 2.26 44 0.027 81.9 OW-UT-9 17-Feb-05 133 6569 9.6 2.31 49.73 0.015 80.44 OW-UT-9 17-Feb-05 133 6569 9.6 2.28 49.68 0.014 81.33 OW-UT-9 3-Mar-05 122.98 6579 9.8 8966 1410 1.96/2.54 40/52 0/0.09 79/84.20 OW-UT-9 3-Mar-05 122.98 6579 9.8 8730 1416 1.85/2.43 38/48.5 0/0.08 80.9/79.76 OW-UT-9 23-Jun-05 123.66 6578 9.49 9650 1343 3.1 56.2 0.04 90.1 Rio Algom Mining LLC – Lisbon site Page 27 2nd Half 2009 Groundwater Monitoring Report OW-UT-9 30-Sep-05 124.36 6578 9.58 10200 1420 11000 35100 0.007 53.2 0.03 82.3 OW-UT-9 30-Sep-05 124.36 6578 9.58 9810 1390 10600 35700 2.67 54 <1.0 81.6 OW-UT-9 10-Nov-05 123 6579 9.5 8417 1340 11310 37500 2.6 42 0.08 88.63 OW-UT-9 10-Nov-05 123 6579 9.5 8054 1335 11347 37940 2.8 46.6 0.05 88.63 OW-UT-9 24-Mar-06 122.59 6579 9.51 25294 1301 11281 37360 2.3 40.3 0.08 73.86 OW-UT-9 24-Mar-06 122.59 6579 9.51 25879 1292 11297 37920 2.5 41.9 0.06 73.86 OW-UT-9 29-Sep-06 123.98 6578 9.34 2880 1490 11200 35400 1.92 34.1 0.02 56.2 OW-UT-9 14-Dec-06 123.78 6578 9.37 16100 1390 10800 36200 2.09 35.8 0.02 59.2 OW-UT-9 20-Mar-07 122.43 6579 9.7 11500 1250 9550 31600 2.2 43.3 0.05 63.7 OW-UT-9 12-Jun-07 122.55 6579 9.7 4550 1260 9500 31800 2.43 46.8 0.04 77.5 OW-UT-9 21-Aug-07 122.5 6579 9.71 11900 1190 9990 31100 2.22 41.4 0.04 70.9 OW-UT-9 25-Oct-07 122.24 6580 9.99 12200 1420 11400 37000 2.98 51.3 0.04 80.3 OW-UT-9 7-Jun-08 123.57 6578 9.77 14000 1460 11400 36500 2.18 50.5 0.024 92.4 OW-UT-9 16-Oct-08 122.37 6580 9.76 7800 1560 11100 36800 2.31 47.8 -0.01 83.6 OW-UT-9 25-Mar-09 123.36 6579 9.83 8410 1220 9520 34900 2.34 47.9 0.032 82.5 OW-UT-9 13-Aug-09 123.40 6579 9.75 8350 1410 9970 34600 2.20 49.1 0.024 85.4 Rio Algom Mining LLC – Lisbon site Page 28 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well RL-1 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) RL-1 31-Mar-03 116.19 6535 7.1 1111 603 3617 7392 0.005 8.02 0.077 37.1 RL-1 31-Mar-03 116.19 6535 7.1 1111 603 3621 7506 0.0043 8.23 0.075 38 RL-1 31-Mar-03 116.19 6535 7.1 1114 613 3468 7284 0.0023 7.05 0.05 31.4 RL-1 16-Apr-03 115.21 6536 7.17 1279 8104 0.0028 9.59 0.055 37.3 RL-1 16-Apr-03 115.21 6536 7.17 1279 8104 0.004 10.1 0.078 40.2 RL-1 10-May-03 115 6536 7.29 995 725 3712 7272 0.0039 9 0.067 33.4 RL-1 1-Oct-03 115.15 6536 7.04 1030 651 3706 8224 0.0029 8.45 0.058 36.7 RL-1 19-Nov-03 115.37 6536 6.99 1030 576 3842 7652 32.2 RL-1 25-Mar-04 115.1 6536 6.83 1018 331 0.0034 10.2 0.064 40.5 RL-1 1-Jul-04 115.37 6536 7.01 1032 684 0.006 8.9 0.05 24.37 RL-1 21-Sep-04 115.63 6535 8.44 801 578 0.003 6.8 0.06 29.54 RL-1 15-Dec-04 152.62 6498 7.27 851 613 0.0023 8.17 0.045 32.5 RL-1 3-Mar-05 116.23 6535 7.16 865 607 0/0.002 7.81 0 29.54 RL-1 20-Jun-05 116.73 6534 7.61 812 560 0.003 7.4 0.06 33.97 RL-1 30-Sep-05 117.27 6534 6.88 821 640 3890 7530 0.005 8.7 0.057 36.8 RL-1 10-Nov-05 116.15 6535 7.01 1158 646 4269 8080 0.004 9.5 0.07 44.31 RL-1 24-Mar-06 113.61 6537 7.14 912 646 4249 8110 0.004 10.4 0.07 44.31 RL-1 29-Sep-06 117.15 6534 6.5 1030 664 4380 7940 0.002 6.87 0.047 29.1 RL-1 14-Dec-06 116.96 6534 6.47 1010 639 4280 8100 0.003 6.99 0.051 29.8 RL-1 19-Mar-07 115.33 6536 6.92 805 591 3460 6860 0.002 7.4 0.057 30.3 RL-1 11-Jun-07 115.39 6536 7.08 376 641 3960 7740 0.003 8.7 0.067 39.1 RL-1 20-Aug-07 115.37 6536 7.64 883 590 4080 7250 0.002 7 0.056 34.3 RL-1 24-Oct-07 115.47 6536 7.26 1130 667 4300 8300 0.003 9.8 0.07 33.8 RL-1 4-Jun-08 116.34 6535 7.25 1030 660 4510 8580 0.003 10.2 0.062 46.7 RL-1 28-Oct-08 116.54 6534 7.24 1050 655 4240 8240 -0.001 10.8 0.065 41.5 RL-1 25-Mar-09 116.19 6535 7.38 1120 671 4390 8460 0.001 10.7 0.076 41.4 RL-1 13-Aug-09 116.35 6535 7.22 1090 644 4250 8580 0.003 11.1 0.072 39.7 Rio Algom Mining LLC – Lisbon site Page 29 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well RL-3 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) RL-3 31-Mar-03 169.45 6533 7.17 1111 584 3176 6284 0.0027 3.04 0.08 20.8 RL-3 31-Mar-03 169.45 6533 7.17 1114 597 3176 6412 0.0024 3.07 0.08 19.9 RL-3 31-Mar-03 169.45 6533 7.17 1114 584 3200 7092 0.0029 2.53 0.051 17.2 RL-3 16-Apr-03 185.54 6517 7.01 1242 5668 0.0027 2.47 0.054 16.5 RL-3 16-Apr-03 2.59 0.069 17.9 RL-3 16-Apr-03 168.75 6534 6.99 1245 7444 0.0028 3.21 0.059 20 RL-3 16-Apr-03 3.33 0.07 20.3 RL-3 16-Apr-03 168.75 6534 6.99 1245 7232 0.004 3.23 0.058 20.2 RL-3 09-May-03 168.51 6534 7 1017 647 3320 6700 0.0019 2.93 0.066 18.9 RL-3 1-Oct-03 168.95 6534 6.94 1086 641 3456 7872 0.0019 2.93 0.066 18.9 RL-3 19-Nov-03 169 6534 6.95 1135 622 3502 7076 23 RL-3 25-Mar-04 168.9 6534 6.84 1171 549 0.0019 3.884 0.07 27.6 RL-3 1-Jul-04 169.14 6533 6.6 1147 666 0.004 2.5 0.06 35.16 RL-3 21-Sep-04 169.15 6533 8.1 1336 634 0.003 3.8 0.07 25.11 RL-3 18-Dec-04 173.78 6529 6.55 1100 640 0.0032 3.63 0.055 23.63 RL-3 3-Mar-05 170.15 6532 6.76 1903 703 0 3.24 0 22.2 RL-3 23-Jun-05 170.83 6532 7 1132 612 0.004 3.8 0.08 26.59 RL-3 30-Sep-05 171.5 6531 7.17 545 460 2350 5070 0.118 1.5 0.046 12.6 RL-3 10-Nov-05 170.25 6532 7.04 1209 783 3749 7250 0.004 3.7 0.08 29.54 RL-3 24-Mar-06 169.53 6533 7.36 995 626 3772 6300 0.002 2.3 0.07 14.77 RL-3 29-Sep-06 171.4 6531 6.48 1010 629 3550 7040 0.002 3.61 0.0666 23.8 RL-3 14-Dec-06 171.32 6531 6.25 1050 611 3790 7480 0.002 3.6 0.07 24.6 RL-3 19-Mar-07 169.21 6533 5.86 554 408 2130 4350 0.002 0.9 0.042 8.96 RL-3 11-Jun-07 169.24 6533 7.15 224 423 2040 4280 -0.001 0.8 0.044 9.27 RL-3 20-Aug-07 169.7 6533 7.45 654 448 2350 4770 -0.001 1 0.045 11 RL-3 24-Oct-07 169.35 6533 7.2 1100 659 3900 7710 -0.002 3.9 0.065 21.9 RL-3 4-Jun-08 170.7 6532 7.3 875 570 3240 6530 0.003 2.1 0.058 20.9 RL-3 15-Oct-08 169.04 6534 7.3 1050 642 3720 7480 -0.001 3.6 0.059 27 RL-3 25-Mar-09 170.68 6532 7.31 873 536 2880 5740 0.002 1.7 0.059 17.4 RL-3 11-Aug-09 170.80 6532 7.16 1020 589 3330 7180 0.002 3.1 0.062 22.5 Rio Algom Mining LLC – Lisbon site Page 30 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well RL-4 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) RL-4 07-May-03 154.92 6525 7.44 227 37 132 348 0 0.0016 0.005 0.004 RL-4 30-Sep-03 151.02 6529 7.49 228 29 70 1036 ND 0.0007 0.002 0.004 RL-4 18-Nov-03 155.45 6524 7.25 210 37 94 492 0.005 RL-4 25-Mar-04 155.21 6525 7.3 208 42 ND 0.0013 ND 0.004 RL-4 29-Jun-04 155.25 6525 6.84 220 54 0.0006 0.002 0.005 ND RL-4 15-Sep-04 156.75 6523 7.18 216 43 ND 0.002 0.003 ND RL-4 16-Dec-04 156.56 6523 6.93 217 28 0.0008 ND 0.005 ND RL-4 2-Mar-05 156.18 6524 7.21 217 32 0 0.0011 0.004 0.004 RL-4 22-Jun-05 156.84 6523 7.61 219 23 0.0006 0.001 0.006 ND RL-4 22-Jun-05 156.84 6523 7.61 223 35 0.0006 0.001 0.006 ND RL-4 28-Sep-05 157.5 6522 6.99 177 46 160 510 <0.0005 0.0013 0.005 0.0029 RL-4 8-Nov-05 156.7 6523 7.53 216 51 149 296 0.0008 0.001 0.006 0.003 RL-4 8-Nov-05 156.7 6523 7.53 220 51 162 424 0.0009 0.001 0.006 0.003 RL-4 22-Mar-06 155.41 6524 7.47 208 39 124 540 ND 0.001 0.006 0.004 RL-4 25-Sep-06 157.36 6523 7.04 213 44 155 460 0.0005 0.0014 0.005 0.0036 RL-4 13-Dec-06 157.25 6523 7.24 454 43 167 510 0.0005 0.0014 0.005 0.004 RL-4 19-Mar-07 155.41 6524 7.41 210 43 165 520 ND ND 0.005 0.0108 RL-4 11-Jun-07 155.5 6524 7.61 85 45 161 508 ND ND 0.006 0.0106 RL-4 20-Aug-07 155.48 6524 7.92 220 45 173 506 ND ND 0.006 0.067 RL-4 24-Oct-07 155.67 6524 7 219 44 159 487 ND ND 0.005 0.0079 RL-4 3-Jun-08 156.67 6523 7.54 203 45 163 512 ND ND 0.005 0.0045 RL-4 14-Oct-08 155.44 6524 7.58 209 44 156 498 ND ND 0.007 0.0034 RL-4 24-Mar-09 156.81 6523 7.58 219 42 146 506 ND ND 0.005 0.0044 RL-4 12-Aug-09 156.85 6523 7.37 212 43 151 528 ND ND 0.005 0.0119 Rio Algom Mining LLC – Lisbon site Page 31 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well RL-5 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) RL-5 07-May-03 150.52 6534 7.39 233 5 91 344 0 0.001 0.004 0.003 RL-5 30-Sep-03 155.21 6529 7.33 209 49 97 632 0.0009 0.0021 0.003 0.005 RL-5 18-Nov-03 151.09 6534 7.24 239 9 55 472 0.004 RL-5 25-Mar-04 150.09 6535 7.3 243 15 ND 0.0022 ND 0.004 RL-5 16-Dec-04 152.15 6533 6.96 238 15 0.0008 0.0007 0.002 ND RL-5 16-Dec-04 152.15 6533 6.96 238 19 0.0007 0.001 0.001 ND RL-5 2-Mar-05 151.97 6533 7.23 236 21 0/0.0011 0.001 0.003 ND RL-5 2-Mar-05 151.97 6533 7.23 227 23 0 0.0012 0.002 ND RL-5 22-Jun-05 152.02 6533 7.53 236 21 0.0007 0.002 0.003 ND RL-5 27-Sep-05 153.04 6532 7.95 188 17 110 350 <0.0005 0.0007 0.004 0.0021 RL-5 27-Sep-05 153.04 6532 7.95 187 18 110 360 <0.0005 0.0006 0.004 0.0021 RL-5 8-Nov-05 152 6533 7.5 241 24 136 356 0.0009 0.0007 0.005 0.003 RL-5 22-Mar-06 151.43 6533 7.32 233 29 131 384 ND 0.001 0.005 0.006 RL-5 22-Mar-06 151.43 6533 7.32 233 29 134 444 ND 0.002 0.005 0.006 RL-5 25-Sep-06 153.1 6532 7.25 222 22 114 354 0.0005 0.0021 0.003 0.0042 RL-5 13-Dec-06 153.5 6531 7.49 481 17 114 394 0.0018 0.0208 0.003 0.036 RL-5 19-Mar-07 150.96 6534 7.46 205 19 108 370 ND ND 0.004 0.0069 RL-5 11-Jun-07 151.02 6534 7.68 81 17 104 384 ND ND 0.003 0.0229 RL-5 20-Aug-07 151.04 6534 8.12 218 19 112 372 ND ND 0.004 0.184 RL-5 24-Oct-07 151.25 6533 7.7 238 23 117 386 ND ND 0.005 0.0076 RL-5 3-Jun-08 152.03 6533 7.71 223 17 113 408 ND ND 0.003 0.0037 RL-5 14-Oct-08 150.95 6534 7.58 227 16 109 380 ND ND 0.003 0.0027 RL-5 24-Mar-09 152.25 6532 7.67 236 14 98 382 ND ND 0.003 0.0025 RL-5 11-Aug-09 152.25 6532 7.05 230 16 107 404 ND ND 0.003 0.0044 Rio Algom Mining LLC – Lisbon site Page 32 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC - Lisbon Operation Historical Groundwater Data Monitoring Well RL-6 Depth to Water Water Elevation pH Bicarbonate Chloride Sulfate TDS Arsenic Molybdenum Selenium U-Nat Well Date (feet) (MSL) (s.u.) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) RL-6 22-Mar-04 13.24 6447 7.09 342 20 0.003 0.0172 0.013 0.027 RL-6 29-Jun-04 12.66 6447 8.82 5 0 ND 0.004 ND ND RL-6 21-Sep-04 14.31 6446 8.52 349 43 0.002 0.05 0.008 0.004 RL-6 15-Dec-04 13.87 6446 7.59 340 17 0.002 0.0238 0.008 0.028/0.029 RL-6 2-Mar-05 14.22 6446 7.36 330 23 0.0014/0.0016 0.019/0.0239 0.006/0.009 0.023/0.025 RL-6 20-Jun-05 14.54 6445 7.52 318 35 0.002 0.03 0.009 0.025 RL-6 27-Sep-05 16.65 6443 7.69 243 234 490 990 0.0017 0.247 0.0005 0.0174 RL-6 7-Nov-05 6460 7.03 351 49 936 1744 0.002 0.05 0.01 0.03 RL-6 22-Mar-06 12.72 6447 7.65 317 47 941 1736 0.002 0.02 0.01 0.03 RL-6 25-Sep-06 16.96 6443 8.02 326 43 812 1600 0.0022 0.021 0.007 0.0391 RL-6 13-Dec-06 15.9 6444 8.46 312 42 750 1590 0.0017 0.0152 0.006 0.022 RL-6 19-Mar-07 15.5 6445 7.32 307 39 910 1660 0.002 ND 0.009 0.0393 RL-6 11-Jun-07 13.29 6447 7.7 122 37 913 1670 0.002 ND 0.01 0.0264 RL-6 20-Aug-07 14.88 6445 7.91 328 42 996 1750 0.002 ND 0.01 0.0905 RL-6 24-Oct-07 14.65 6445 7.06 335 36 933 1690 0.002 ND 0.01 0.0237 RL-6 3-Jun-08 14.94 6445 6.97 299 37 969 1750 0.002 ND 0.008 0.0222 RL-6 15-Oct-08 15.27 6445 7.35 316 33 916 1720 0.0032 ND 0.009 0.0204 RL-6 24-Mar-09 15.82 6444 7.31 319 31 919 1690 0.001 ND 0.008 0.0189 RL-6 11-Aug-09 17.02 6443 7.22 311 33 943 1680 0.001 ND 0.008 0.0196 Rio Algom Mining LLC – Lisbon site Page 33 2nd Half 2009 Groundwater Monitoring Report Appendix 2 Time Versus Concentration Plots For Required Parameters Rio Algom Mining LLC – Lisbon site Page 34 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 35 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 36 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 37 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 38 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 39 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 40 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 41 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 42 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 43 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 44 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 45 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 46 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 47 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 48 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 49 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 50 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 51 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 52 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 53 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 54 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 55 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 56 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 57 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 58 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 59 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 60 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 61 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 62 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 63 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 64 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 65 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 66 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 67 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 68 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 69 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 70 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 71 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 72 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 73 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 74 2nd Half 2009 Groundwater Monitoring Report Appendix 3 Depth To Water Over Time For The Wells Rio Algom Mining LLC – Lisbon site Page 75 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 76 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 77 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 78 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 79 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 80 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 81 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 82 2nd Half 2009 Groundwater Monitoring Report Appendix 4 Hydrographs For The Wells Rio Algom Mining LLC – Lisbon site Page 83 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 84 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 85 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 86 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 87 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 88 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 89 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 90 2nd Half 2009 Groundwater Monitoring Report Appendix 5 Field Data Sheets Including Field Parameter Measurements Rio Algom Mining LLC – Lisbon site Page 91 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 92 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 93 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 94 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 95 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 96 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 97 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 98 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 99 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 100 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 101 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 102 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 103 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 104 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 105 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 106 2nd Half 2009 Groundwater Monitoring Report Appendix 6 Laboratory Analytical Reports For 2nd Half of 2009 Rio Algom Mining LLC – Lisbon site Page 107 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 108 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 109 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 110 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 111 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 112 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 113 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 114 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 115 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 116 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 117 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 118 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 119 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 120 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 121 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 122 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 123 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 124 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 125 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 126 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 127 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 128 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 129 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 130 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 131 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 132 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 133 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 134 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 135 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 136 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 137 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 138 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 139 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 140 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 141 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 142 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 143 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 144 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 145 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 146 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 147 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 148 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 149 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 150 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 151 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 152 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 153 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 154 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 155 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 156 2nd Half 2009 Groundwater Monitoring Report Appendix 7 Groundwater Contour Maps Rio Algom Mining LLC – Lisbon site Page 157 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 158 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 159 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 160 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 161 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 162 2nd Half 2009 Groundwater Monitoring Report Appendix 8 Sampling Methodologies Used RAM continues to use the ASTM Standard Practice for Low-Flow Purging and Sampling for Wells. Changes in procedures will be incorporated in future sampling events. Rio Algom Mining LLC – Lisbon site Page 163 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 164 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 165 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 166 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 167 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 168 2nd Half 2009 Groundwater Monitoring Report Rio Algom Mining LLC – Lisbon site Page 169 2nd Half 2009 Groundwater Monitoring Report