Loading...
HomeMy WebLinkAboutDRC-2009-004448 - 0901a06880143160\::^c-^•cfi-CXWi? Rio Algom Mining LLC September 30, 2009 CERTIFIED MAIL (7004 0750 OOOO 3427 0687) Dane L. Finerfrock, Director Division of Radiation Control Department of Environmental Quality 168 North 1950 West P.O. Box 144850 Salt Lake City, UT 84114-4850 Dear Mr. Finerfrock: Subject: Request for 30 Day Extension DRC Request for Information Letter from DRC dated August 26, 2009 regarding Rio Algom Mining LLC's 2"" Half 2008 Groundwater Monitoring Report, received by RAM on September 8, 2009. Rio Algom Mining LLC reviewed the document requesting additional information on field sampling protocol and supporting data for low flow purging volumes, pump rates, and pump positioning in well. RAM is requesting a 30 day extension on replying to this Request for Information in order to give our consultant adequate time to review the request and our current sampling procedures. Sincerely, Chuck Wentz Environmental Department Supervisor/RSO Rio Algom Mining LLC cc T. Fletcher P.O. Box 218, Grants, NM USA 87020 - Tel: 505.287.8851 - Fax: 505.285.5550