Loading...
HomeMy WebLinkAboutDRC-2023-003904 - 0901a068811e6ab7April 25, 2023 VIA PDF AND FEDERAL EXPRESS Doug Hansen Director Division of Waste Management and Radiation Control State of Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www .energyfuels.com 'v'l r rr nt uun Cort ol APR 2 (\ 2023 Re: State of Utah Ground Water Discharge Permit No. UGW370004 White Mesa Uranium Mill -Removal of Certain Groundwater Monitoring Parameters from Accelerated Monitoring Status Dear Mr. Hansen: A number of groundwater monitoring constituents have been placed on accelerated monitoring status under Part LG. I of the Energy Fuels Resources (USA) Inc. ("EFRI") Ground Water Discharge Permit No. UGW3 70004 ("GWDP"). Part I.G. I provides that such accelerated monitoring shall continue until compliance status of the facility can be determined by the Director. Based on the accelerated monitoring results to date, EFRI requests the Division of Waste Management and Radiation Control ("DWMRC") make a determination that accelerated monitoring cease at this time for Total Dissolved Solids ("TDS") in MW-25 and selenium and uranium in MW-12 for the reasons stated below: • MW-25 TDS results have been within the Groundwater Compliance Limit ("GWCL") specified in the GWDP for eleven consecutive sampling events starting in May 2022. Per the UDEQ, eight consecutive sample results below the GWCL are needed for the discontinuance of accelerated monitoring. • MW-12 selenium results have been within the GWCL specified in the GWDP for nine consecutive sampling events starting in QI 2021. Per the UDEQ, eight consecutive sample results below the GWCL are needed for the discontinuance of accelerated monitoring. • MW-12 uranium results have been within the GWCL specified in the GWDP for eight consecutive sampling events starting in Q2 2021. Per the UDEQ, eight consecutive sample results below the GWCL are needed for the discontinuance of accelerated monitoring. Once removed from accelerated monitoring status, these constituents, like all other constituents, would be subject to future accelerated monitoring under Part I.G.1 of the GWDP, should circumstances warrant. To assist in your evaluation of the foregoing, we have included a summary of the accelerated sampling results since the initial sample result that triggered accelerated monitoring in Table I. DRC-2023-003904 Letter to Doug Hansen Removal of Parameters from Accelerated Monitoring April 25, 2023 Page 2 The analytical laboratory reports for the foregoing results up to and including December 2022 are included in the Quarterly Groundwater Monitoring Reports, all of which have been provided to DWMRC. Copies of the analytical laboratory reports for the results for January 2023 through March 2023 will be provided in the upcoming 1st Quarter 2023 Groundwater Monitoring Report and are also included with this letter for your convenience. It is important to note that the 1st Quarter 2023 monitoring results included with this letter have been evaluated per the DWMRC approved QAP and the GWDP and all field and laboratory quality control parameters are acceptable. The evaluations of the 1st Quarter data will be included in the 1st Quarter 2023 Groundwater Monitoring Report, due June 1, 2023. If you have any questions or require any further information, please contact the undersigned. Yours truly, l(~Jvµu,f Kathy Weinel Director, Regulatory Compliance cc: David Frydenlund Logan Shumway Garrin Palmer Tanner Holliday Scott Bakken Jordan App Analytical Results and Field Sampling Sheets for the Wells that are the Subject of this Request Table 1 of Accelerated Sam le Results with Ei ht or More Results in Com Hance MW-25 TDS (mg/L) 2976 Q2 2022 3600* Ma 2022 2660 June 2022 2730 Q3 2022 2830 Au ust 2022 2780 Se tember 2022 2750 Q4 2022 2660 November 2022 2690 December 2022 2780 Ql 2023 2750 Febru 2023 2610 March 2023 2600 MW-12 Selenium (ug/L) 39 Q4 2020 52.7* QI 2021 35.1 Q2 2021 28.8 Q3 2021 32.4 Q4 2021 26.4 QI 2022 25.6 Q2 2022 31.3 Q3 2022 29.2 Q4 2022 32.1 Ql 2023 27.0 MW-12 Uranium (ug/L) 23.5 QI 2021 25.0* Q2 2021 22.9 Q3 2021 22.2 4 2021 23.1 QI 2022 22.1 2 2022 20.5 Q3 2022 21.6 Q4 2022 21.2 QI 2023 21.3 *Last sample result outside of GWCL limits. Chemtech-Ford Laboratories 9632 South 500 West Sandy, UT 84070 0 :(801 ) 262-7299 F: (866) 792-0093 www.ChemtechFord.com Serving the lntermountain West Since 1953 CHEMTECH-FORD Energy Fuels Resources, Inc. Tanner Holliday 6425 South Highway 191 Blanding, UT 84511 Sample ID: MW-25_01232023 Matrix: Water Date Sampled: 1/23/23 12:15 Calculations Anions, Total Cation/Anion Balance Cations, Total TDS Ratio TDS, Calculated Inorganic Alkalinity -Bicarbonate (as CaCO3) Alkalinity -Carbonate (as CaCO3) Ammonia as N Chloride Fluoride Nitrate + Nitrite, Total, as N Sulfate Total Dissolved Solids (TDS) Metals, Dissoh ed Arsenic, Dissolved Beryllium, Dissolved Cadmium, Dissolved Calcium, Dissolved Chromium, Dissolved Cobalt, Dissolved Copper, Dissolved Iron, Dissolved Lead, Dissolved Magnesium, Dissolved Manganese, Dissolved Mercury, Dissolved Molybdenum, Dissolved Nickel, Dissolved Potassium, Dissolved Selenium, Dissolved Silver, Dissolved Sodium, Dissolved Thallium, Dissolved Result 42.2 -3 .8 39.2 1.04 2650 335 < 1.0 0.429 32.4 0.284 <0.100 1660 2750 < 0.0050 < 0.0005 0.0014 342 < 0.0250 <0.010 <0.0100 < 0.03 <0.0010 120 1.37 < 0.00050 0.0154 < 0.0200 9.3 < 0.0050 < 0.0 10 276 0.0008 Proiect Name: 1st Quarter Ground Water 2023 www.ChemtechFord.com Certificate of Analysis Units meq/L % meq/L None mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L Minimum Reporting Limit 5 1.0 1.0 0.0500 1.00 0.100 0.100 20.0 20 0.0050 0.0005 0.0005 0.2 0.0250 0.010 0.0100 0.03 0.0010 0.2 0.0100 0.00050 0.0100 0.0200 0.5 0.0050 0.010 0.5 0.0005 PO#: Receipt: 1/27/23 11:00 @ -1 .2 ·c Date Reported: 2/9/2023 Project Name: 1st Quarter Ground Water 2023 Sampled By: Tanner Holliday Method SM 1030 E SM 1030 E SM 1030 E SM 2340 B SM 2540 C SM 2320 B SM 2320 B EPA 350.1 EPA300.0 EPA300.0 EPA353.2 EPA300.0 SM 2540 C EPA 200.8 EPA200.8 EPA200.8 EPA 200.7 EPA 200.8 EPA200.8 EPA 200.8 EPA200.7 EPA200.8 EPA200.7 EPA 200.8 EPA245.1 EPA 200.8 EPA200.8 EPA 200.7 EPA200.8 EPA 200.8 EPA 200.7 EPA 200.8 CtF WO#: 23A 1877 Preparation Date/Time 2/7/23 2/7/23 2/7/23 2/7/23 2/7/23 I /27/23 1/27/23 2/2/23 1/31 /23 1/31 /23 1/31 /23 1/31 /23 1/27/23 1/31/23 1/31 /23 1/31 /23 1/30/23 1/31/23 1/31/23 1/31/23 1/30/23 1/31/23 1/30/23 1/31/23 1/31/23 1/31/23 1/31/23 1/30/23 1/31/23 1/31/23 1/30/23 1/31/23 Lab ID: 23A1877-01 Analysis Date/Time 2/7/23 2/7/23 2/7/23 2/7/23 2/7/23 1/27/23 1/27/23 2/2/23 1/31/23 1/31/23 1/31 /23 1/31 /23 1/27/23 1/31/23 1/31/23 1/31 /23 1/30/23 1/31/23 1/31 /23 1/31 /23 1/30/23 1/31 /23 1/30/23 1/31/23 2/1/23 1/31/23 1/31/23 1/30/23 1/31 /23 1/31 /23 1/30/23 1/31 /23 Page 3 of 34 Chemtech-Ford Laboratories 9632 South 500 West Sandy, UT 84070 0 :(801) 262-7299 F: (866) 792-0093 www. Chem tech Ford. com SeNing the lntermountain West Since 1953 CH EMTECH-FORD • AH C1 :.tA• C) 1(1 I:: S Energy Fuels Resources, Inc. Tanner Holliday 6425 South Highway 191 Blanding, UT 84511 Sample ID: MW-25_02072023 Matrix: Water Date Sampled: 2/7/23 10:45 lnnr~anic Chloride Total Dissolved Solids (TDS) 32.2 2610 Proiect Name: Februarv Ground Water 2023 www.ChemtechFord.com Units mg/L mg/L Certificate of Analysis Minimum Reporting Limit 1.00 20 PO#: Receipt: 2/10/23 11 :00@ 0.4 °C Date Reported: 2/24/2023 Project Name: February Ground Water 2023 Sampled By: Tanner Holliday EPA 300.0 SM 2540 C CtF WO#: 2380901 Preparation Date/Time 2/20/23 2/10/23 Lab ID: 23B0901-02 Analysis Date/Time 2/20/23 2/10/23 Page 4 of 18 Chemtech-Ford Laboratories 9632 South 500 West Sandy, UT 84070 0 :(801) 262-7299 F: (866) 792-0093 www.ChemtechFord.com Serving the lntermountain West Since 1953 CHEMTECH-FORD Energy Fuels Resources, Inc. Tanner Holliday 6425 South Highway 191 Blanding, UT 84511 Sample ID: MW-25_03152023 Matrix: Water Date Sampled: 3/15/23 11 :30 Inorganic Chloride Total Dissolved Solids (TDS) 32.6 2600 Proiect Name: March Ground Water 2023 www.ChemtechFord.com Units mg/L mg/L Certificate of Analysis Minimum Reporting Limit 10.0 20 PO#: Receipt: 3/17/23 11 :14@0.3'C Date Reported: 3/27/2023 Project Name: March Ground Water 2023 Sampled By: Tanner Holliday Method EPA 300.0 SM 2540 C CtF WO#: 23C1353 Preparation Date/Time 3/20/23 3/17/23 Lab ID: 23C1353-02 Analysis Date/Time 3/20/23 3/17/23 .fug{tl Page 4 of 18 Chemtech-Ford Laboratories 9632 South 500 West Sandy, UT 84070 0 :(801) 262-7299 F: (866) 792-0093 www.ChemtechFord.com Serving the lntermountain West Since 1953 CH EMTECH-FORD Energy Fuels Resources, Inc. Tanner Holliday 6425 South Highway 191 Blanding, UT 84511 Sample ID : MW-12_01262023 Matrix: Water Date Sampled: 1/26/23 13:05 l\lctals, Dissoh cd Selenium, Dissolved Uranium, Dissolved Result 0.0270 0.0213 Proiect Name: 1st Quarter Ground Water 2023 www.ChemtechFord.com Units mg/L mg/L Certificate of Analysis PO#: Receipt: 2/2/23 10:40@ -0.8 ·c Date Reported: 2/17/2023 Project Name: 1st Quarter Ground Water 2023 Minimum Reporting Limit 0.0050 0.0003 Sampled By: Tanner Holliday Method EPA200.8 EPA 200.8 CtF WO#: 2380151 Preparation Date/Time 2/9/23 2/9/23 Lab ID: 23B0151-01 Analysis Date/Time 2/9/23 2/9/23 ~ Page 3 of 39