HomeMy WebLinkAboutDRC-2023-003904 - 0901a068811e6ab7April 25, 2023
VIA PDF AND FEDERAL EXPRESS
Doug Hansen
Director
Division of Waste Management and Radiation Control
State of Utah Department of Environmental Quality
195 North 1950 West
Salt Lake City, UT 84116
Energy Fuels Resources (USA) Inc.
225 Union Blvd. Suite 600
Lakewood, CO, US, 80228
303 974 2140
www .energyfuels.com
'v'l r rr nt
uun Cort ol
APR 2 (\ 2023
Re: State of Utah Ground Water Discharge Permit No. UGW370004
White Mesa Uranium Mill -Removal of Certain Groundwater Monitoring Parameters
from Accelerated Monitoring Status
Dear Mr. Hansen:
A number of groundwater monitoring constituents have been placed on accelerated monitoring status
under Part LG. I of the Energy Fuels Resources (USA) Inc. ("EFRI") Ground Water Discharge Permit No.
UGW3 70004 ("GWDP"). Part I.G. I provides that such accelerated monitoring shall continue until
compliance status of the facility can be determined by the Director.
Based on the accelerated monitoring results to date, EFRI requests the Division of Waste Management
and Radiation Control ("DWMRC") make a determination that accelerated monitoring cease at this time
for Total Dissolved Solids ("TDS") in MW-25 and selenium and uranium in MW-12 for the reasons
stated below:
• MW-25 TDS results have been within the Groundwater Compliance Limit ("GWCL") specified
in the GWDP for eleven consecutive sampling events starting in May 2022. Per the UDEQ,
eight consecutive sample results below the GWCL are needed for the discontinuance of
accelerated monitoring.
• MW-12 selenium results have been within the GWCL specified in the GWDP for nine
consecutive sampling events starting in QI 2021. Per the UDEQ, eight consecutive sample
results below the GWCL are needed for the discontinuance of accelerated monitoring.
• MW-12 uranium results have been within the GWCL specified in the GWDP for eight
consecutive sampling events starting in Q2 2021. Per the UDEQ, eight consecutive sample
results below the GWCL are needed for the discontinuance of accelerated monitoring.
Once removed from accelerated monitoring status, these constituents, like all other constituents, would be
subject to future accelerated monitoring under Part I.G.1 of the GWDP, should circumstances warrant.
To assist in your evaluation of the foregoing, we have included a summary of the accelerated sampling
results since the initial sample result that triggered accelerated monitoring in Table I.
DRC-2023-003904
Letter to Doug Hansen
Removal of Parameters from Accelerated Monitoring
April 25, 2023
Page 2
The analytical laboratory reports for the foregoing results up to and including December 2022 are
included in the Quarterly Groundwater Monitoring Reports, all of which have been provided to DWMRC.
Copies of the analytical laboratory reports for the results for January 2023 through March 2023 will be
provided in the upcoming 1st Quarter 2023 Groundwater Monitoring Report and are also included with
this letter for your convenience. It is important to note that the 1st Quarter 2023 monitoring results
included with this letter have been evaluated per the DWMRC approved QAP and the GWDP and all
field and laboratory quality control parameters are acceptable. The evaluations of the 1st Quarter data
will be included in the 1st Quarter 2023 Groundwater Monitoring Report, due June 1, 2023.
If you have any questions or require any further information, please contact the undersigned.
Yours truly,
l(~Jvµu,f
Kathy Weinel
Director, Regulatory Compliance
cc: David Frydenlund
Logan Shumway
Garrin Palmer
Tanner Holliday
Scott Bakken
Jordan App
Analytical Results and Field Sampling Sheets for the Wells that are the Subject of
this Request
Table 1
of Accelerated Sam le Results with Ei ht or More Results in Com Hance
MW-25 TDS (mg/L) 2976 Q2 2022 3600*
Ma 2022 2660
June 2022 2730
Q3 2022 2830
Au ust 2022 2780
Se tember 2022 2750
Q4 2022 2660
November 2022 2690
December 2022 2780
Ql 2023 2750
Febru 2023 2610
March 2023 2600
MW-12 Selenium (ug/L) 39 Q4 2020 52.7*
QI 2021 35.1
Q2 2021 28.8
Q3 2021 32.4
Q4 2021 26.4
QI 2022 25.6
Q2 2022 31.3
Q3 2022 29.2
Q4 2022 32.1
Ql 2023 27.0
MW-12 Uranium (ug/L) 23.5 QI 2021 25.0*
Q2 2021 22.9
Q3 2021 22.2
4 2021 23.1
QI 2022 22.1
2 2022 20.5
Q3 2022 21.6
Q4 2022 21.2
QI 2023 21.3
*Last sample result outside of GWCL limits.
Chemtech-Ford Laboratories 9632 South 500 West
Sandy, UT 84070
0 :(801 ) 262-7299 F: (866) 792-0093
www.ChemtechFord.com
Serving the lntermountain West Since 1953
CHEMTECH-FORD
Energy Fuels Resources, Inc.
Tanner Holliday
6425 South Highway 191
Blanding, UT 84511
Sample ID: MW-25_01232023
Matrix: Water
Date Sampled: 1/23/23 12:15
Calculations
Anions, Total
Cation/Anion Balance
Cations, Total
TDS Ratio
TDS, Calculated
Inorganic
Alkalinity -Bicarbonate (as CaCO3)
Alkalinity -Carbonate (as CaCO3)
Ammonia as N
Chloride
Fluoride
Nitrate + Nitrite, Total, as N
Sulfate
Total Dissolved Solids (TDS)
Metals, Dissoh ed
Arsenic, Dissolved
Beryllium, Dissolved
Cadmium, Dissolved
Calcium, Dissolved
Chromium, Dissolved
Cobalt, Dissolved
Copper, Dissolved
Iron, Dissolved
Lead, Dissolved
Magnesium, Dissolved
Manganese, Dissolved
Mercury, Dissolved
Molybdenum, Dissolved
Nickel, Dissolved
Potassium, Dissolved
Selenium, Dissolved
Silver, Dissolved
Sodium, Dissolved
Thallium, Dissolved
Result
42.2
-3 .8
39.2
1.04
2650
335
< 1.0
0.429
32.4
0.284
<0.100
1660
2750
< 0.0050
< 0.0005
0.0014
342
< 0.0250
<0.010
<0.0100
< 0.03
<0.0010
120
1.37
< 0.00050
0.0154
< 0.0200
9.3
< 0.0050
< 0.0 10
276
0.0008
Proiect Name: 1st Quarter Ground Water 2023
www.ChemtechFord.com
Certificate of Analysis
Units
meq/L
%
meq/L
None
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
Minimum
Reporting
Limit
5
1.0
1.0
0.0500
1.00
0.100
0.100
20.0
20
0.0050
0.0005
0.0005
0.2
0.0250
0.010
0.0100
0.03
0.0010
0.2
0.0100
0.00050
0.0100
0.0200
0.5
0.0050
0.010
0.5
0.0005
PO#:
Receipt: 1/27/23 11:00 @ -1 .2 ·c
Date Reported: 2/9/2023
Project Name: 1st Quarter Ground Water 2023
Sampled By: Tanner Holliday
Method
SM 1030 E
SM 1030 E
SM 1030 E
SM 2340 B
SM 2540 C
SM 2320 B
SM 2320 B
EPA 350.1
EPA300.0
EPA300.0
EPA353.2
EPA300.0
SM 2540 C
EPA 200.8
EPA200.8
EPA200.8
EPA 200.7
EPA 200.8
EPA200.8
EPA 200.8
EPA200.7
EPA200.8
EPA200.7
EPA 200.8
EPA245.1
EPA 200.8
EPA200.8
EPA 200.7
EPA200.8
EPA 200.8
EPA 200.7
EPA 200.8
CtF WO#: 23A 1877
Preparation
Date/Time
2/7/23
2/7/23
2/7/23
2/7/23
2/7/23
I /27/23
1/27/23
2/2/23
1/31 /23
1/31 /23
1/31 /23
1/31 /23
1/27/23
1/31/23
1/31 /23
1/31 /23
1/30/23
1/31/23
1/31/23
1/31/23
1/30/23
1/31/23
1/30/23
1/31/23
1/31/23
1/31/23
1/31/23
1/30/23
1/31/23
1/31/23
1/30/23
1/31/23
Lab ID: 23A1877-01
Analysis
Date/Time
2/7/23
2/7/23
2/7/23
2/7/23
2/7/23
1/27/23
1/27/23
2/2/23
1/31/23
1/31/23
1/31 /23
1/31 /23
1/27/23
1/31/23
1/31/23
1/31 /23
1/30/23
1/31/23
1/31 /23
1/31 /23
1/30/23
1/31 /23
1/30/23
1/31/23
2/1/23
1/31/23
1/31/23
1/30/23
1/31 /23
1/31 /23
1/30/23
1/31 /23
Page 3 of 34
Chemtech-Ford Laboratories 9632 South 500 West
Sandy, UT 84070
0 :(801) 262-7299 F: (866) 792-0093
www. Chem tech Ford. com
SeNing the lntermountain West Since 1953
CH EMTECH-FORD
• AH C1 :.tA• C) 1(1 I:: S
Energy Fuels Resources, Inc.
Tanner Holliday
6425 South Highway 191
Blanding, UT 84511
Sample ID: MW-25_02072023
Matrix: Water
Date Sampled: 2/7/23 10:45
lnnr~anic
Chloride
Total Dissolved Solids (TDS)
32.2
2610
Proiect Name: Februarv Ground Water 2023
www.ChemtechFord.com
Units
mg/L
mg/L
Certificate of Analysis
Minimum
Reporting
Limit
1.00
20
PO#:
Receipt: 2/10/23 11 :00@ 0.4 °C
Date Reported: 2/24/2023
Project Name: February Ground Water 2023
Sampled By: Tanner Holliday
EPA 300.0
SM 2540 C
CtF WO#: 2380901
Preparation
Date/Time
2/20/23
2/10/23
Lab ID: 23B0901-02
Analysis
Date/Time
2/20/23
2/10/23
Page 4 of 18
Chemtech-Ford Laboratories 9632 South 500 West
Sandy, UT 84070
0 :(801) 262-7299 F: (866) 792-0093
www.ChemtechFord.com
Serving the lntermountain West Since 1953
CHEMTECH-FORD
Energy Fuels Resources, Inc.
Tanner Holliday
6425 South Highway 191
Blanding, UT 84511
Sample ID: MW-25_03152023
Matrix: Water
Date Sampled: 3/15/23 11 :30
Inorganic
Chloride
Total Dissolved Solids (TDS)
32.6
2600
Proiect Name: March Ground Water 2023
www.ChemtechFord.com
Units
mg/L
mg/L
Certificate of Analysis
Minimum
Reporting
Limit
10.0
20
PO#:
Receipt: 3/17/23 11 :14@0.3'C
Date Reported: 3/27/2023
Project Name: March Ground Water 2023
Sampled By: Tanner Holliday
Method
EPA 300.0
SM 2540 C
CtF WO#: 23C1353
Preparation
Date/Time
3/20/23
3/17/23
Lab ID: 23C1353-02
Analysis
Date/Time
3/20/23
3/17/23
.fug{tl
Page 4 of 18
Chemtech-Ford Laboratories 9632 South 500 West
Sandy, UT 84070
0 :(801) 262-7299 F: (866) 792-0093
www.ChemtechFord.com
Serving the lntermountain West Since 1953
CH EMTECH-FORD
Energy Fuels Resources, Inc.
Tanner Holliday
6425 South Highway 191
Blanding, UT 84511
Sample ID : MW-12_01262023
Matrix: Water
Date Sampled: 1/26/23 13:05
l\lctals, Dissoh cd
Selenium, Dissolved
Uranium, Dissolved
Result
0.0270
0.0213
Proiect Name: 1st Quarter Ground Water 2023
www.ChemtechFord.com
Units
mg/L
mg/L
Certificate of Analysis
PO#:
Receipt: 2/2/23 10:40@ -0.8 ·c
Date Reported: 2/17/2023
Project Name: 1st Quarter Ground Water 2023
Minimum
Reporting
Limit
0.0050
0.0003
Sampled By: Tanner Holliday
Method
EPA200.8
EPA 200.8
CtF WO#: 2380151
Preparation
Date/Time
2/9/23
2/9/23
Lab ID: 23B0151-01
Analysis
Date/Time
2/9/23
2/9/23
~
Page 3 of 39