Loading...
HomeMy WebLinkAboutDRC-2024-004409 DRC-20 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Douglas J. Hansen Director MEMORANDUM TO: Phil Goble FROM: Chris Leahy DATE: September 12, 2023 SUBJECT: 2023 Annual Tailings System Wastewater Monitoring Event Groundwater Discharge Permit No. UGW370004 for the Energy Fuels Resources (USA) Inc. White Mesa Uranium Mill, near Blanding, Utah This is a Utah Division of Waste Management and Radiation Control (“Division”) staff summary on the inspection of the 2023 Annual Tailings System Wastewater Monitoring event (“2023 Event”) that was completed on August 29, 2023 for the Energy Fuels Resources (USA), Inc. (“EFRI”) White Mesa Uranium Mill, near Blanding, Utah (“Mill”). EFRI is required to submit a written report of this 2023 monitoring event by December 1, 2023. The 2023 Event was inspected against the following enforcement documents: • White Mesa Uranium Mill Ground Water Quality Assurance Plan (“QAP”). Revision 7.7 dated February 15, 2022. • Groundwater Discharge Permit No. UGW370004 (“Permit”). Permit version that was signed on March 8, 2021. • Tailings and Slimes Drain Sampling Program (“Sampling Plan”) Revision 3.0 dated July 8, 2016. Summary of Inspection EFRI informed the Division in a letter dated July 12, 2023, that was received by the Division on July 17, 2023, that EFRI would be sampling the tailings cell wastewater on August 29, 2023. The letter from EFR provided notice prior to sampling as required in Part I.E.10(d)(6) of the Permit. EFRI collected tailings cell wastewater samples from Tailings Cells 1, 4A, and 4B, and Tailings Cell 2 Slimes Drain, and Tailings Cells 4B and 4B Leak Detection Systems (“LDS”). See the photographs in in Attachment 1 below. There was no wastewater in Tailings Cell 3 therefore no wastewater sample was collected. The LDS for Tailings Cells 1, 2, and 3 were dry and not sampled. Division staff Dean SJ Page 2 Henderson and Chris Leahy collected a split sample of Tailings Cell 2 Slimes Drain and witnessed EFRI staff sample all the other wastewater sample locations. EFRI sampled all available tailing cell wastewater sample locations as required in Part I.E.10 of the Permit and Section 2.0 of the Sampling Plan. It appeared that EFRI staff met the field requirements in the Permit, Part I.E.10, in the QAP, Field Sampling Quality Assurance Methodology in Section 4.0, Sample Documentation Tracking and Record Keeping in section 7.0 in the Sampling Plan, and Field Sampling Procedures in section 3.0. After the 2023 Event was completed a close out meeting was held with the following attendees: Division staff: Dean Henderson and Chris Leahy and EFR staff: Deen Lyman, Tanner Holliday and Garin Palmer. In the meeting the Division staff discussed where the samples were collected and that no problems had been observed. Conclusion Based on Division staff observation of EFRI staff performing the sampling and monitoring on August 29, 2023, it appears that EFRI appropriately followed the field requirements in the Permit, QAP and Sampling Plan. As stated above, EFRI will submit a written report of this 2023 Event by December 1, 2023. The Division will also review this report that will include sample analysis for this 2023 Event as part of that review to complete the inspection on the 2023 Annual Tailings System Wastewater Monitoring event. Page 3 References Energy Fuels Resources (USA) Inc., February 15, 2022, White Mesa Uranium Mill Ground Water Monitoring Quality Assurance Plan (QAP), Revision 7.7. Energy Fuels Resources (USA) Inc., July 8, 2016, White Mesa Uranium Mill Sampling and Analysis Plan for Tailings Management System, Leak Detection Systems and Slimes Drain, Revision 3.0. Utah Department of Environmental Quality, March 8, 2021, Modified Utah Ground Water Discharge Permit No. UGW370004 issued for the Energy Fuels Resources (USA) Inc. White Mesa Uranium Mill. Page 4 Attachment 1 Inspection Photos Page 5 Figure 1. EFRI staff collecting a wastewater sample from Tailings Cell 1. Figure 2. EFRI staff collecting a wastewater sample from Tailings Cell 1. Page 6 Figure 3. Division staff collecting a split sample from the Tailings Cell 2 Slimes Drain. Figure 4. View of Tailings Cell 4A looking East. Page 7 Figure 5. ERFI staff collecting a wastewater sample from Tailings Cell 4A Figure 6. EFRI staff collecting wastewater in a stainless steel bucket from Tailings Cell 4A LDS. Page 8 Figure 7. EFRI staff collecting wastewater samples from Tailings Cell 4A LDS from a stainless steel bucket. Figure 8. EFRI staff collecting a wastewater sample from Tailings Cell 4B. Page 9 Figure 9. EFRI staff collecting a wastewater sample from a stainless steel bucket for Tailings Cell 4B LDS. Signature: Email:pgoble@utah.gov