HomeMy WebLinkAboutDERR-2024-005241Testing and Inspection Certificate
Tanknology Inc.
11000 North MoPac Expressway, Suite 500, Austin, TX 78759
800-800-4633 www.tanknology.com Page 1 of 1
Test Date 3/11/2024 Tanknology WO#NW1-2369158
Test Purpose REQUEST Customer PO#69410059
Customer Location
MURPHY OIL USA
P.O. BOX 7300
EL DORADO, AR 71731
Murphy #8807
3853 West Campus View Drive
West Jordan, UT 84084
Attn: BRAD WEINISCHKE Attn:
(870) 875-7610
()
Test / Inspection Description Item Tested Date
Tested Result
Overfill Protection Tank 2 Overfill 1 PREMIUM 3/11/2024 Pass
Overfill Protection Tank 3 Overfill 1 Low Sulfur Diesel 3/11/2024 Fail
Overfill Protection Tank 4CLEAR Overfill 1 REG - CONV(E0) 3/11/2024 Pass
RP 1200 Overfill See test report for details 3/11/2024 P/F
Tanknology Representative: David Edens Technician: David Mathie
Telephone: ()Technician Certification: (See forms)
Wilson, North Carolina 27893
Telephone: 252.243.0150
Web: www.emcoretail.com
A1100 Overfill Prevention Valve Calculation Sheet
This calculation sheet is to document the dimensions needed for proper installation and should be used only with the instructions. This sheet
assumes 95% maximum fill based on NFPA30 guidelines. Length measurements are in inches. Contact the local Authority Having Jurisdiction (AHJ)
to determine all regulatory requirements regarding fill capacity.
TANK: Tank 2 - Overfill PREM PREMIUM Flapper Valve PRIMARY Test Date:
3/11/2024
Company:MURPHY OIL CO Site:
8807 Address:3853 West Campus View
Drive ,West Jordan ,UT
Overfill Valve Height Inspection
1. Tank Diameter is TD 118.38
2. Tank Capacity is TC 7901.00
3. Desired Shutoff Percentage (Note NFPA Guidelines)0.95
4. Shutoff Tank CapacityTC@ shutoff % = TC x 0.95 7505.95
5. Tank Level from Stick Chart for Shutoff Capacity (95%)106.88
6. Tank B DimensionB = TD - TL @ 95%11.50
7. Distance from top seal surface (1) to the top (inside) of the tank (2) is A 50.50
CAUTION: If tank has a manway make sure to account for the manway height.
8. Calculated Minimum Length of OPV top tube to (95% mark) on the A1100 is C
See Picture. Measure C distance from the 95% line on valve and cut top tube 62.00
9. Actual Measured Length of OPV top tube to (95% mark) on the A1100 (measure)62.38
10. Result of Valve height Inspection (if Actual is >= Calculated PASS)Pass
11. Inspect the device for corrosion, damage, and confirm proper operation? P/F Pass
comments:
Drop Tube Tank Bottom Clearance Inspection
1. Distance from the top seal surface to the tank bottom
2. Distance from the top of drop tube to the highest point of bottom tube cut
3. Actual Maximum tube distance from tank bottom 0.00
comments:
"C"
1. The sealing surface refers to the location of the OPV collar sealing point. It may be the riser pipe or the seal surface built in to some spill buckets.
2. If the tank uses a manway, be sure to use the tank top for measurement and not the top of the manway as shown in the diagram.
Riser Pipe with Spill Containment Manhole Manway Style Tank
WO: 2369158
Wilson, North Carolina 27893
Telephone: 252.243.0150
Web: www.emcoretail.com
A1100 Overfill Prevention Valve Calculation Sheet
This calculation sheet is to document the dimensions needed for proper installation and should be used only with the instructions. This sheet
assumes 95% maximum fill based on NFPA30 guidelines. Length measurements are in inches. Contact the local Authority Having Jurisdiction (AHJ)
to determine all regulatory requirements regarding fill capacity.
TANK: Tank 3 - Overfill 3 Low Sulfur Diesel Flapper Valve PRIMARY Test Date:
3/11/2024
Company:MURPHY OIL CO Site:
8807 Address:3853 West Campus View
Drive ,West Jordan ,UT
Overfill Valve Height Inspection
1. Tank Diameter is TD 118.38
2. Tank Capacity is TC 10420.00
3. Desired Shutoff Percentage (Note NFPA Guidelines)0.95
4. Shutoff Tank CapacityTC@ shutoff % = TC x 0.95 9899.00
5. Tank Level from Stick Chart for Shutoff Capacity (95%)105.63
6. Tank B DimensionB = TD - TL @ 95%12.75
7. Distance from top seal surface (1) to the top (inside) of the tank (2) is A 47.88
CAUTION: If tank has a manway make sure to account for the manway height.
8. Calculated Minimum Length of OPV top tube to (95% mark) on the A1100 is C
See Picture. Measure C distance from the 95% line on valve and cut top tube 60.63
9. Actual Measured Length of OPV top tube to (95% mark) on the A1100 (measure)59.63
10. Result of Valve height Inspection (if Actual is >= Calculated PASS)Fail
11. Inspect the device for corrosion, damage, and confirm proper operation? P/F Fail
comments:
Drop Tube Tank Bottom Clearance Inspection
1. Distance from the top seal surface to the tank bottom
2. Distance from the top of drop tube to the highest point of bottom tube cut
3. Actual Maximum tube distance from tank bottom 0.00
comments:
"C"
1. The sealing surface refers to the location of the OPV collar sealing point. It may be the riser pipe or the seal surface built in to some spill buckets.
2. If the tank uses a manway, be sure to use the tank top for measurement and not the top of the manway as shown in the diagram.
Riser Pipe with Spill Containment Manhole Manway Style Tank
WO: 2369158
Wilson, North Carolina 27893
Telephone: 252.243.0150
Web: www.emcoretail.com
A1100 Overfill Prevention Valve Calculation Sheet
This calculation sheet is to document the dimensions needed for proper installation and should be used only with the instructions. This sheet
assumes 95% maximum fill based on NFPA30 guidelines. Length measurements are in inches. Contact the local Authority Having Jurisdiction (AHJ)
to determine all regulatory requirements regarding fill capacity.
TANK: Tank 4 - Overfill 4CLEAR REG - CONV(E0) Flapper Valve PRIMARY Test Date:
3/11/2024
Company:MURPHY OIL CO Site:
8807 Address:3853 West Campus View
Drive ,West Jordan ,UT
Overfill Valve Height Inspection
1. Tank Diameter is TD 118.38
2. Tank Capacity is TC 7901.00
3. Desired Shutoff Percentage (Note NFPA Guidelines)0.95
4. Shutoff Tank CapacityTC@ shutoff % = TC x 0.95 7505.95
5. Tank Level from Stick Chart for Shutoff Capacity (95%)106.88
6. Tank B DimensionB = TD - TL @ 95%11.50
7. Distance from top seal surface (1) to the top (inside) of the tank (2) is A 50.75
CAUTION: If tank has a manway make sure to account for the manway height.
8. Calculated Minimum Length of OPV top tube to (95% mark) on the A1100 is C
See Picture. Measure C distance from the 95% line on valve and cut top tube 62.25
9. Actual Measured Length of OPV top tube to (95% mark) on the A1100 (measure)62.63
10. Result of Valve height Inspection (if Actual is >= Calculated PASS)Pass
11. Inspect the device for corrosion, damage, and confirm proper operation? P/F Pass
comments:
Drop Tube Tank Bottom Clearance Inspection
1. Distance from the top seal surface to the tank bottom
2. Distance from the top of drop tube to the highest point of bottom tube cut
3. Actual Maximum tube distance from tank bottom 0.00
comments:
"C"
1. The sealing surface refers to the location of the OPV collar sealing point. It may be the riser pipe or the seal surface built in to some spill buckets.
2. If the tank uses a manway, be sure to use the tank top for measurement and not the top of the manway as shown in the diagram.
Riser Pipe with Spill Containment Manhole Manway Style Tank
WO: 2369158
Murphy #8807
3853 West Campus View Drive
West Jordan, UT 84084
8807
Tanknology, Inc.
MURPHY OIL USA
870-875-7610
800-800-4633 03/11/2024
RUL
1
25431
118.375
E//WA1100
PREM
2
7901
118.375
E//WA1100
DSL
3
10420
118.375
E//WA1100
EO CLEAR
4
7901
118.375
E//WA1100
UT151 COULD NOT REMOVE RUL SIEZED IN RISER / DSL FAILED 95.5
David Mathie
P.O. BOX 7300
EL DORADO, AR 71731
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:2369158
Site ID / Name:8807 / Murphy #8807
Address:3853 West Campus View Drive
City:West Jordan State:UT Zip:84084
W.O.# NW1-2369158 Cust Ref#: 69410059
OVF
W.O.# NW1-2369158 Cust Ref#: 69410059
RUL
W.O.# NW1-2369158 Cust Ref#: 69410059
W.O.# NW1-2369158 Cust Ref#: 69410059