Loading...
HomeMy WebLinkAboutDERR-2024-005239Utah Department of Environmental Quality UST lnstallation lnspection Ownership of Tanks SHERIK LLC 2674Visla Hill Drive BLUFFDALE UT Tanks lnstalled. Use additional pages as needed. New lnstallation or Upgrade UL Number Material of construction (FRP, Steel, Composite, etc.) Double walled - dry or brine filled Substance to be stored Capacity Date installed Pre-installation pressure test date or vacuum date (dry interstice) Reading of pressure or vacuum for pre-installation test (dry interstice) Type of overfill prevention device (shutoff or alarm) Overfill alarm has sign and is visible and audible to driver (RP100) Type of spill prevention device (single or dw spill bucket, sump, etc) Amount of tank deflection readings (initial) Amount of tank deflection readings (hold down straps) Amount of tank deflection readings (backfill top of tank) Piping lnformation Material of construction (Flex plastic, FRP, etc) Type (Pressure, Suction, Safe Suction, Gravity) Date pre-installation air test passed Pressure for pre-installation air test lnstallation Specifications Do you have a copy of the tank manufacturer's installation manual and PEI RP100 with you Page 1 or -L Location of Tanks 80001 1 I NA NA NA NA NA NA NA NA NA NA NA NA NA NA Delle City Station 1 W Main Street GRANTSVILLE UT Tank No. Tank No. 84029 Tank No. Tank No. vr*&/ ir/) *o.t<- ,n( o,&t/ rt.X P"<z P,''ets,-ft- sA/U zt 9t7//tv1! t/a/zy tu4r 15v,, Certified tank instailer D eu<-- blr4 Certified lnstallation Company Ct A- Cert. #: TL t4 t// Cert. #: lC GNo Exp. Date: 5/l/Z 7 Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Visual inspection of tank(s) reveals it is free from damage Visual inspection reveals no brine on either the inside or outside of the tank(s) (from interstitial space of brine tank) Damaged components have been repaired by the manufacturer Tank and piping excavations are free of debris Depth of backfill bedding for tank(s) (must be at least one foot) Type of backfill material (clean, free flowing, etc.) (Sieve report should match installation manual): Geotextile fabric used along sides of excavation (recommended) Geotextrle fabric separates any secondary backfill (required) Estimated depth to groundwater Tank(s) are placed at sufficient depth for traffic requirements, groundwater conditions (check installation manual) Tanks are outside the shadow of the 45 degree factor of a structure's footing (PEl RP100 Fig 4-2) Distance from tank(s) to nearest property line:Distance from tank(s) to nearest structure: Anchoring method is adequate for groundwater considerations. Note method here: Hold-down straps are in place according to manufacturer's specifications (check installation manual if clamps are used) Tank spacing is at least 18" between tank(s) and excavation wall (stable wall) or 18" between tank(s) and 112 times tank diameter excavation wall (unstable wall) Tank is level or sloped toward interstitial monitor probe Backfill has been adequately compacted for full suport along tank length at 5 and 7 o'clock Date of pressure test after backfilf tontgp of tank (before piping is installed) r(name) /(r.lf lrztl,/'l - ce,certify that I inspected the above-named facility on (date): 5d2; -q%{ffiy Jrtl,::.":i-X';:f"";;WV, Ver. 101512O18 Cert.#: Tt /e/ 3/d21/ P'/,\> **t * tlt Pase 2 9f +-Utah Department of Environmental Quality UST Facility Site Plat NORTH 80001 1 I 7b"- Show locations of all buildings, streets, tanks, piping, and dispenser islands. lndicate the product in each t nt.. S(u!u!A!r?tk* o^n manways and identify each: submersible pump (S), tank fill (F), ATG probe (A), interstitial probe (l), vapor recovery (V), capped plug (C), other (specify). comments: /rf, firrl or,0 ),( " rrf,-f . .,. / ;r', / 77ttt *6- lunl,-,.1 | -a-. / k nr//r.--/ g ' J,/ J,- I [x 7/., /;. )/ u,/ "r* /// /rrh. f r'/ ,+ Lf f or.7*' /*z-o2',n-'4r,- Lb-,)/ k*- &jr ,-)l/ h- ^/oU //i, tf2 t-yl atl ,q.tlq o-- --ft-,'/L Y7 c.// -