Loading...
HomeMy WebLinkAboutDERR-2025-000027VCP/BROWNFIELDS SECTION – SITE VISIT REPORT SITE NAME: Eckman Midgley DATE: December 17, 2024 PROJECT MANAGER: Leigh Anderson PURPOSE OF VISIT: Annual Site inspection and checking the area around the new development work and excavation. Sandy City is building some sediment settling vaults for some vac trucks. FIELD OBSERVATIONS: Site is much as it’s been in previous years. There was an older asphalt patch from some utility line maintenance south of the main building, and the new excavation in the northwest. Some of the concrete blocks had been moved against the area to create a kind of dumping area for soils and some household waste/furniture dumping, but nothing that looks like an environmental concern. The landscaping strip along the road to the east has also been replaced by gravel, though the larger sod area in east of the building but west of the sidewalk will remain until Sandy finalizes their plan to replace it with more naturalized plants and materials. SPLIT SAMPLES COLLECTED? YES NO COMMENTS: IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? YES NO COMMENTS: ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO Please see electronic file.