Loading...
HomeMy WebLinkAboutDDW-2025-000052Division of Drinking Water Checklist for New Public Drinking Water Wells (per Utah Administrative Code, Rule R309-Jl5-O Well Name & Description: 1. Approval to Drill the Well dJroiect Notification Form (PNF) dPreliminary Evaluation Report (PER) concurrence ( .w rtt drilling specifications and plans dV*aSurt Card or authorization to drill letter from the Division of Water Rights 3 Operating Permit to Introduce the Well Water d,Do"r..no,ion of valid water right(s) d Recorded land use agreements, or documentation that the requirements for coverage zunder the City/County source protection ordinance have been met dlesign engineer's certification of conformance with plan approval conditions d Oesisn engineer's certification of rule conformance for any deviation from approved ,plansd}.-brilt o. r.cord drawings d I|uid"n"" of O&M manual delivery to system owner C Satisfactory bacteriological results as evidence ofproper flushing and disinfection DDW-Eng-0o9 Pate I of I Lasr update 4/22120t5 systemName:CaL.fllrfiax \lJc.b 7<Lr- systemNumber, ?51 3 7 2. Approval to Equip the WelI tr PNF (if the well drilling and well equipping are desiped by different consultants) EI Welt location data /Certification of well seal D )Mell driller's report (well log) d Aquifer drawdown test results (step drawdown test & constant-rate test) for well yield .determination C Chemicalanalvses of the well water/-EI Plans gpd specifications for equipping the well d Pump information (e.g., pump specifications, pump curve & operating point, z,motor information, etc.) EI Well head discharge piping tr Well house desigt Utah Division of Drinking Water - Checklist for Issuing Operating Permits Water System Name:il,SysremNumber: pft S7- ilS@a2 Project Description ileNumber: t3Ol0 Items I through 8 below must be submitted to the Division and found to be acceptable prior to operating permil issuance (unless a water line project meets the requirements ofR309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items I and 4 below. {,Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and ifapplicable, changes made during constnrction were in conformance with rules R309-500 through 550 As-built or record drawings incorporating all changes to approved plans and - --. specifications (rnless no changes were made to the previously approved plans during construction) Confirmation that as-built or record drawings have been received by the water system Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: fl ANSVAWWA C65l-14 AWWA Standard for Disinfecting Water Mains Two consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-ofJine, each branch) fl ANSVAWWA C652- I I AWWA Standard for Disinfection of Water-Storage Facilities One or more samples, none positive tr ANSVAWWA C653-13 AWWA Standard for Disinfection of Water Treatrnent Plants {, {, to Two consecutive samples per unit, none positive, no less than 30 minutes apart ANSVAWWA C654-13 AWWA Standard for Disinfection of Wells Two consecutive samples, none positive, no less than 30 minutes apart !6 Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.J Ifapplicable, all other documentation that may have been required during the plan review process If applicable, confirmation that the water system owner has received the O&M manual for the new facility Ifapplicable, location data ofnew storage tank, treatment facility, or source { 5 8 It Chemtech-Ford Laboratories S€rving the lnlemounlain West Since 1953 CHEMTECH.FORD Certificate of Analysis Cedar Hills Attn: TJ A3ton 10246 North Canyon Road Cedar Hill., UT E4062 Itibd( ord6c 24x0{r90 Phono: (8Ol) 420{650 Fex: Email: publlc{ork3@c€darillla.org Semde lD: Hrrycy WaI Sampled: 1111$4 13tili2 Sys,en *j UTAH25137 Pa6nntaa l{ama Colltonn, ToLl E. Coll R@ort to Srate.' No Sarrpred Byi TJ Aston Sampre Source. WS002 Unib ethod Test Str(.d Org/100 mL EPAS223B 11t1312O21 15.30 OrgL/100 mL EPA9223B 1111312021 15i30 Lab #r 24Km9041 Sam ple Type : lnve3ligativs Field Res. Chtorine: tlot Piovidsd Sampre Poirt WS002 To.t Ended FhSs 111142021 11:30 1111,,12021 11:30 Result & Melissa Connolly. P.oject Manager Sandy. Utah 84070 866.792.0093 Fax wwyy. Ch ern tec h F o rd. co m801 262.7299 Main9632 Soulh 500 West SeNing the lntermountain West since 1953 Page 1 ol 2 /'Vt,z-4a2 '<- d.Chemtech-Ford Laboratories SeNing lhe lnlefinountain West Since 1953 CHEMTECH.FORD Certificate of Analysis Cedar Hills Attn: TJ Aston 102146 t{orth Cenyon Road C6dar Hills, UT 84062 Wo* Ord€r: 2ax1l26 Phone: (8Ol) a20{6i) Email: publlcuorks@cod.rhittr.org Sample lD: Harvoy WGll S a m pled : 11 l'l 1t21 12152 Syster, #j UTAH25i37 Colitorm. Total E. Coti Lab *: Sample fype: Field R$. Chlorine: Sampla Poiat: T.3t Ended 11t1512O21 11.00 11115t2O21 11tO0 21K112641 lnvestigative t{ot Provi&d ws002 Flags Rryor, ,o SraG.' No Sarrpred Ayi TJ Arton Sarrpro Source,- WS002 R63ult Unlta Orgfioo mL O.gflm rnL Method EPA 92234 EPA 92238 T.st St rt d 1111t'12O21 15:15 111142024 15:15 */'ll-z-24 Melissa Connolly. Projecr Manager Sandy, Ul,ah 84070 866.792.0093 Fax wwNt - C h e mtec h F otd. com801.262.7299 Main9632 Soulh 500 West SeNing the lnte,mountain West since 1953 Page 1 of 2