HomeMy WebLinkAboutDDW-2024-006781Utah State University Bacteriological Sample Site Plan (Revised Total Coliform Rule-RTCR)
Water system name: Utah State University
PWSID#: UTAH03088
Estimated population served: 9000
Number of required samples per compliance period: 4 in summer, 10 during fall and spring
semesters
Known plan generation: December 1995
Plan last updated: August 2017
Year round system
Name and contact information: Jamie Pearce Hart, Water System Manager
Email: jamie.pearce@usu.edu, Office: (435)797-3729
**12 chlorine residuals required each month year round, even when we take less bacteria
samples in summer**
Sample Sites:
January: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1, Geology
Bldg #18, University Inn Bldg #28A, AGRS Bldg #5, SANT Engineering Innovation Bldg #68E,
Technology Bldg #45, Early Childhood Bldg #10A
February: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22, Ray B West Bldg #13,
Business Bldg #56, Fine Arts Center Bldg #73, Distance Education Bldg #99, JQ Lawson Bldg #36,
Eng Lab Bldg #68B
March: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1, Geology
Bldg #18, University Inn Bldg #28A, AGRS Bldg #5, SANT Engineering Innovation Bldg #68E,
Technology Bldg #45, Early Childhood Bldg #10A
April: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22, Ray B West Bldg #13,
Business Bldg #56, Fine Arts Center Bldg #73, Distance Education Bldg #99, JQ Lawson Bldg #36,
Eng Lab Bldg #68B
May: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1, Geology
Bldg #18, University Inn Bldg #28A, AGRS Bldg #5, SANT Engineering Innovation Bldg #68E,
Technology Bldg #45, Early Childhood Bldg #10A
June: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22
July: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1
August: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22
September: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1,
Geology Bldg #18, University Inn Bldg #28A, AGRS Bldg #5, SANT Engineering Innovation Bldg
#68E, Technology Bldg #45, Early Childhood Bldg #10A
October: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22, Ray B West Bldg #13,
Business Bldg #56, Fine Arts Center Bldg #73, Distance Education Bldg #99, JQ Lawson Bldg #36,
Eng Lab Bldg #68B
November: Facilities Bldg #47, Biotech Bldg #54, Edith Bowen Bldg #11, Old Main Bldg #1,
Geology Bldg #18, University Inn Bldg #28A, AGRS Bldg #5, SANT Engineering Innovation Bldg
#68E, Technology Bldg #45, Early Childhood Bldg #10A
December: BNR Bldg #58, Library Bldg #55, HPER Bldg #15, TSC Bldg #22, Ray B West Bldg #13,
Business Bldg #56, Fine Arts Center Bldg #73, Distance Education Bldg #99, JQ Lawson Bldg #36,
Eng Lab Bldg #68B
I tried to get a good spread of buildings throughout our system, and still allow for samples to be
taken upstream and downstream of sample sites without too much overlap in case of needed
repeat/follow-up sampling. For summer sampling when less bacteria samples are required, I
tried to use the buildings I thought would most likely be in use such as: Facilities, TSC (Student
Center), Old Main, HPER (where we have recreation programs and swimming), and Library.