HomeMy WebLinkAboutDDW-2024-006775March 21, 2024
Craig Christoffersen
Ukon Water Company
270 South Center Street
Fielding, Utah 84311
Subject:Plan Approval, M & J Trailer Park Water Line;
Ukon Water Company, System #02014, File #13029, SRF #3F1848
Dear Craig Christoffersen:The Division of Drinking Water (the Division) received the plans and specifications for the proposed M & J Trailer Park Water Line from you on March 12, 2024.
This project has met the conditions for receiving a plan approval.
Our understanding of the project is the construction of an 8-inch diameter PVC C900 water line, including fire hydrants and other improvements, extending Ukon Water Company’s system
to connect and provide drinking water to the M & J Trailer Home Community (UTAH02078) water system. The water line will be installed along 450 W (4400 W) in Fielding, Utah running north
to 18250 N.
We have completed our review of the plans and specifications, stamped, and signed byBrett Jones, P.E., dated March 12, 2024, and find they basically comply with the applicable portions
of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for M & J Trailer Park Water Line are hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before M & J Trailer Park Water Line may be put in service. A checklist outlining
the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted
to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.SRF FundingThe project, as described
herein, is generally eligible for assistance under the Drinking Water Construction Assistance Program. All change orders will need to be reviewed and approved for compliance with the
Drinking Water Rules and the conditions of this construction approval. The project may now be advertised for bids. But, as a condition of the project funding, you must not award the
contract or proceed with construction until the Division of Drinking Water has authorized you to do so. This is necessary to comply with applicable requirements and to protect you,
as the funding recipient, by ensuring that the contract meets requirements for funded projects. Federal regulations require that a concerted effort must be made to encourage participation
of small and disadvantaged business enterprises (DBE) by providing requisite information, including plans and specifications on the project. In order to provide opportunities to DBE
subcontractors, utilization goals for Minority-owned Business Enterprises (MBE) and Women-owned Business Enterprises (WBE) have been determined to be 4% and 2%, respectively. As outlined
in the contract documents, the prime contractor must submit a list of prepared MBE/WBE subcontractors to be used on this project and documentation of solicitation efforts with the bid.
The prime contractor's efforts to provide opportunity to DBE's must be reviewed and approved by this office before the contract can be awarded.
If you have any questions regarding this approval, please contact Cameron Draney, P.E., of this office, at (385) 271-7039, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
CLD/HP/mrn/mdbEnclosures –Operating Permit Checklistcc:Ben Harker, Bear River Health Department, bharker@brhd.orgShane Taggart, Jones & Associates, shane@jonescivil.comCraig Christoffersen,
Ukon Water Company, lunker1001@gmail.comCameron Draney, P.E., Division of Drinking Water, cdraney@utah.gov
Colt Smith, Division of Drinking Water, acsmith@utah.govHeather Pattee, Division of Drinking Water, hpattee@utah.govCDraney 02014 13029 M & J Trailer Park Water Line
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source