HomeMy WebLinkAboutDERR-2024-005194Terracon Consultants Inc.6949 South Highland Drive Midvale, UT 84047 P 801-545-8500 F 801-545-8600 terracon.com March 18, 2024 Mr. Mark Crim Utah Department of Environmental Quality Division of Environmental Response and Remediation P.O. Box 144840 195 North 1950 West Salt Lake City, Utah 84114-4840 RE: Work Assignment GZQ-58 – Preparation of a Work Plan and Price for Continued Indoor Air Vapor Study with Reporting Brent Redd Property 148 East Center Street, Monticello, Utah Facility Identification No. 5000003, Release ID GZQ Terracon Project No. AL067003 Dear Mr. Crim: Terracon Consultants, Inc. (Terracon) is pleased to submit this Work Plan and Price to continue vapor investigations at the Brent Redd Property (Facility ID 5000003, Release ID GZQ), located at 148 East Center Street, Monticello, Utah. The work plan was prepared in response to the Work Assignment GZQ-58-TER received by Terracon. This work will be conducted under Terracon's contract (Contract Number 216383) with the Division of Environmental Response and Remediation (DERR). OBJECTIVE A program of groundwater monitoring and other remedial actions have occurred at the site since 1996. In an effort to better evaluate impacts, the DERR has requested to continue a study for indoor air vapor threats at the Brent Redd site and the Monticello Inn, a third-party structure overlying the dissolved-phase plume migrating from the Brent Redd release site. One vapor study was completed under Work Assignment GZQ-55. A total of three quarterly vapor sampling events will be conducted at the site. Each sampling event will be conducted concurrently with the quarterly groundwater monitoring events conducted under GZQ-57, and the cost for the Work Plan does not include a separate mobilization for these events. Each stage of the work plan is identified as a specific task or sub-task. Work performed under each task or sub-task shall not commence without prior approval from the DERR. GZQ-58 Work Plan and Price for Vapor Monitoring Facility ID 5000003 Release ID GZQ Monticello, Utah March 18, 2024 Terracon Project No. AL067003 Responsive Resourceful Reliable 2 SCOPE OF WORK 2.1 Task A – Scoping Meeting Prior to the indoor air sampling activities, Terracon will conduct a meeting with DERR to discuss vapor monitoring locations, expectations, access, and site logistics. This meeting took place on March 12, 2024. 2.2 Task B1 – Indoor Air Sampling Prior to each vapor sampling event, chemicals used in the buildings and other possible sources of volatile organic compounds (VOCs) at the site that could introduce the VOCs into air within or around the building will be noted. If chemical items are identified that could present false positive results in air sampling, requests will be made to remove or otherwise control the identified items prior to the indoor air sample collection event. A total of 5 Summa™ canisters will be placed within the Monticello Inn property buildings. Three canisters will be placed in the ground-level section and two will be placed in the crawl space beneath the structure, in approximately the same locations as the first vapor sampling event. An additional Summa™ cannister will be placed outside the office area to be used as a background point. Based on the current use of the property, the indoor air samples will be collected under conditions that are considered typical for residential use. During each sampling event, Terracon will document site conditions to ensure that windows are closed and the building’s heating, ventilating, and air-conditioning (HVAC) system is operational similar to typical conditions when the area is occupied. Terracon will minimize disruption to the motel’s operation during the indoor air sampling activities without compromising representative sampling results. Each air sample will be collected over a 24-hour period using a regulatory flow-control device affixed to an individually certified, 6-liter capacity, Summa™ stainless steel canister supplied by H&P Mobile Geochemistry, Inc. in Carlsbad, California. The canisters will be placed in the selected rooms/areas such that the sample inlets will be located between 3 and 5 feet above the floor in the approximate location of the breathing zone. Once Summa™ canisters are ready for shipment, they will be sent to H&P Mobile Geochemistry under standard chain-of-custody protocol for a standard turnaround of 10 business days. The requested analysis will be EPA TO-15 for VOCs, methyl tertiary-butyl ether, benzene, toluene, ethylbenzene, total xylenes, and naphthalene (MBTEXN). GZQ-58 Work Plan and Price for Vapor Monitoring Facility ID 5000003 Release ID GZQ Monticello, Utah March 18, 2024 Terracon Project No. AL067003 Responsive Resourceful Reliable 3 2.3 Task B2 – Vapor Monitoring Point Sampling A total of 2 flush mount vapor monitoring points (VMPs) were previously installed at the site; one was installed in the basement utility room of the Monticello Inn, and one was installed in the office area of the Brent Redd service station. The VMPs were completed with a Vapor PinTM assembly consisting of a permanent flush-mount brass barb fitting with a silicone sleeve to seal the hole. Each VMP sample will be collected over a 5-minute period using an individually certified, 1-liter capacity, Summa™ stainless steel canister supplied by H&P Mobile Geochemistry, Inc. Care will be taken prior to sample collection to ensure there are no leaks in the installed sample device and the sample train. Leak testing will be conducted for each sample point and sampling train, using helium with a handheld field helium detector. Once Summa™ canisters are ready for shipment, they will be sent to H&P Mobile Geochemistry under standard chain-of-custody protocol for a standard turnaround of 10 business days. The requested analysis will be EPA TO-15 for VOCs and MBTEXN. 2.4 Task B3 – Vapor Study Report Upon completion of site activities and receipt of the laboratory analytical results, a report will be prepared that will include the following. Documentation of field activities Site plan showing pertinent site features Summa canister placement Summary of analytical laboratory results Data evaluation and presentation of findings The services will be performed in a manner consistent with generally accepted practices of the professional undertaken in similar studies in the same geographic area during the same period. Terracon makes no warranties, expressed or implied, regarding its services, findings, conclusions or recommendations. Please note that Terracon does not warrant the work of laboratories, regulatory agencies or other third parties supplying information used in the preparation of the report. These investigation services will be performed in accordance with the scope of work agreed with you, our client, as set forth in this proposal and are not intended to be in strict conformance with ASTM E1903-19. GZQ-58 Work Plan and Price for Vapor Monitoring Facility ID 5000003 Release ID GZQ Monticello, Utah March 18, 2024 Terracon Project No. AL067003 Responsive Resourceful Reliable 4 WORK PLAN BUDGET The proposed cost to perform this work is outlined as a per sampling event cost. Task A: $397.50 Task B: $8,499 per event The proposed cost to perform Task B is per event for 3 events for a total of $25,497. Work Plan Total Cost Estimate: $25,894.50 This cost estimate does not include mileage or travel costs to the site as the vapor sampling events will be conducted concurrently with the groundwater sampling events. If a separate mobilization to conduct the vapor events is required, additional costs will be required. An itemized budget spreadsheet is attached, detailing the cost breakdown associated with each task. The cost estimate was generated using 2024 PST Fund approved labor rates. If conditions are identified that will substantially alter the proposed Scope of Work, Terracon will notify DERR to discuss appropriate actions or modifications to this Work Plan. Terracon will not exceed the estimated costs without prior approval from the DERR Project Manager. ASSUMPTIONS The following assumptions were made during preparation of this Work Plan and Price: Terracon assumes that no site access issues will be encountered during the investigation. In the event Terracon encounters difficulty with access to any of the properties, DERR will be contacted immediately to determine appropriate courses of action. If you have any questions or would like to make any modifications to the approach described in this Work Plan and Price, please contact Amy Austin at (801) 746-5464. Sincerely, Amy Austin Andrew Turner Certified UST Consultant #CC238 Project Manager Attachments: 2023 Cost Estimate Spreadsheet PST Cost Estimate Spreadsheet Project:Brent Redd Property Facility ID:5000003 $78 / hour Release ID:GZQ $62 / hour Work Plan:GZQ-58-TER $ / hour Date:3/18/2024 $ / hour $ / hour $ / hour $ / hour $ / hour Hours By Labor Catagory 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Task A - Scoping Meeting Review of site reports and Scoping call 1.5 1.5 3.0 $397.50 $397.50 Subtotal $397.50 $0.00 $397.50 Task B1 - Indoor Air Sampling 1.0 3.0 4.0 $421.00 $421.00 6.0 6.0 $606.00 $606.00 0.0 $0.00 $25.00 $25.00 0.0 $0.00 $107.00 $107.00 0.0 $0.00 $59.00 $59.00 0.5 0.5 $50.50 $50.50 0.0 $0.00 $2,100.00 $2,100.00 0.0 $0.00 $180.00 $180.00 Subtotal $1,077.50 $2,471.00 $3,548.50 10,645.50 Task B2 - Vapor Monitoring Point Sampling 1.0 1.0 $101.00 $101.00 3.0 3.0 $303.00 $303.00 0.0 $0.00 $462.00 $462.00 0.0 $0.00 $25.00 $25.00 0.5 0.5 $50.50 $50.50 0.0 $0.00 $620.00 $620.00 0.0 $0.00 $90.00 $90.00 Subtotal $454.50 $1,197.00 $1,651.50 $4,954.50 Task B3 - Report and PST Fund Invoice Preparation 12.0 6.0 2.0 20.0 $2,192.00 $2,192.00 1.0 1.0 2.0 1.0 5.0 $677.00 $677.00 0.25 2.0 2.0 4.3 $430.00 $430.00 Subtotal $3,299.00 $0.00 $3,299.00 $9,897.00 TOTAL $5,228.50 $3,668.00 $25,894.50 3 Events Per Event 3 Events 7 P107 Drafter Per Event 3 Events Per Event Labor Catagories (2023 PST Fund Approved Rates) $169 / hour 15 NOT USED 4 P104 Field Scientist 5 P105 Senior Technician 6 P106 Field Technician 0 P100 Principal 8 P108 PST Fund Claim Specialists $101 / hour $73 / hour $90 / hour $85 / hour Total Costs Total Hours Total Labor ODCs 1 P101 Senior Project Manager 2 P102 Professional Engineer/Geologist 12 NOT USED 13 NOT USED 14 NOT USED 9 P109 Administrative Assistant 10 P110 Technical Expert ($/hr) TBD 11 NOT USED $147 / hour $152 / hour $118 / hour3 P103 Project Manager Sample prep and delivery to fedex Schedule, field preparation, equipment collection Field work (1hr/sampling location) Lodging (1 night @ $107 night - GSA 2024 rate) Per diem (1 day @ $59 - GSA 2024 rate) Sampling supplies and disposables (1 day @ $25/day) Scope of Work: Task Description Continued Vapor Sampling - 3 events Report preparation Invoice review, reimbursement request (3 requests) Final document review (includes CIH review) and report Fedex shipping (1 cooler @ $90 each) H&P Laboratory (2 Summa sub slab vapor samples @ $310 each) Fedex shipping (2 coolers @ $90 each) Sample prep and delivery to fedex Helium meter (1 week) Sampling supplies and disposables (1 day @ $25/day) Schedule, field preparation, equipment collection Field work (1.5 hr sampling/location) H&P Laboratory (6 Summa 24-hr indoor air samples @ $350 each) Page 1 of 1