Loading...
HomeMy WebLinkAboutDERR-2024-005177Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name 7-ELEVEN INC Address PO BOX 711 DALLAS, TX 75221 Contact 7-ELEVEN INC Phone Email Marc.Westfall@7-11.com TANK LOCATION Name 7-ELEVEN 1851-26690 Address 4108 S 6400 W WEST VALLEY CITY, UT 84119 A Operator MARC WESTFALL Phone (214) 415-0146 B Operator SAME Phone SAME Facility ID: 4000985 Inspection Date: 03/18/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline Yes Steel Flex in Sump July 14, 1986 None Yes No None None 2 - 3/4 Gasoline Yes Steel Flex in Sump July 14, 1986 None Yes No None None TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 14, 1986 / 10000 / South Substance Stored Gasoline / Regular Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test None LLD Test June 19, 2023 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Veeder Root PLLD Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeMonthlyLineTest CP Tank Test Aug. 29, 2022 CP Pipe Test None Tank ID/Alt ID 2 / 2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 14, 1986 / 10000 / Center Substance Stored Gasoline / Regular Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test June 19, 2023 LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Veeder Root PLLD Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeLineTightness / PipeMonthlyLineTest CP Tank Test Aug. 29, 2022 CP Pipe Test None 2024-03-18 Page 1 of 6 Tank ID/Alt ID 3 / 3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 14, 1986 / 10000 / North Substance Stored Gasoline / Premium Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test June 19, 2023 LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Veeder Root PLLD Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeLineTightness / PipeMonthlyLineTest CP Tank Test Aug. 29, 2022 CP Pipe Test None INSPECTION COMMENTS None 2024-03-18 Page 2 of 6 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?No C Operators trained?Yes Cathodic Protection The results of the last two cathodic protection tests are available (within six months of installation and every three years thereafter)? Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2024-03-18 Page 3 of 6 Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 2 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 2 ATG/IM Does the ATG system have a valid annual test?Yes Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-03-18 Page 4 of 6 Tank 3 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 3 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-03-18 Page 5 of 6 Prepared by fueloperator.com Inspection Information Inspector:Viehweg, Kim Record Created: March 18, 2024, 12:12 p.m. Inspection Date:March 18, 2024 2024-03-18 Page 6 of 6