HomeMy WebLinkAboutDERR-2024-005117
Environmental Incident Report
Date of Report: 01/29/2024
Date of Incident: 12/08/2023
Enviro Care Project Reference Number: SO 9120
Response Contact Information
Enviro Care, Inc Project Manager
505 North Main Street Name: Devin Karadeema
North Salt Lake, Utah 84054 Title: Project Manager
Voice: (801) 299-1900 Cell: 801 807 9553
Facsimile: (801) 299-1473 Email: Devin.karadeema@envirocareusa.com
www.envirocarehazmat.com
Client Contact Information
Client :
Frito Lay Client Representative:
6301 West 4700 south Name Matt Testa
West Valley City, UT 84118 USA Title Sr. Compliance Associate
Cell 1 503 331 6250
Email mtesta@spillcenter.com
Health Department Information
County: Weber Contact
455 23rd Street Susan Riggs
Ogden, UT 84401 801 399 7168
(801) 399-7200
Incident Information
Incident Location Product Released: Diesel
Millers Travel Center Estimated Amount: 10 gallon.
2686 U.S. 89 Hazard Class: Y
Ogden, UT 84404 USA Spill Center Claim #: A23120803
Environmental Incident Report
2
Daily Activities Report:
Date: 12/08/23
900 Crew assigned to ER for fuel spill of unknown amount with storm drain impact.
Devin makes contact with Momentum to assist in storm drain cleaning.
903 Tegan and Avery get 116 and 202 ready for departure.
918 Devin informs site contact that crew is enroute and also informs weber dispatch of
eta.
1000 Crew arrives on site. Spill is obvious and due to the wet parking lot, the diesel has
been spread all over. Devin enters the Chevron to get work authorization signed.
1020 Work auth signed. Crew does initial walk around with Weber Morgan Health Dpt.
It’s determined that no more than 10 gallons of diesel spilled. NW corner drain to
oil separator impacted. NW on site storm drain not impacted. NW street side storm
drain impacted. South drain clogged, standing diesel on puddle. The whole
entrance and west area of parking lot is impacted. South outside pump is the source
of the spill. Area will be blocked off and floor dry scrubbed in. momentum will
spray off the parking lot and the south stall then work on cleaning out the storm
drains.
1022 JSA signed.
1024 Crew to put floor dry around impacted drains to stop any more fuel from entering.
Then start pushing floor dry on the concrete area of the fuel pad after throwing
down pad in the curbed areas.
1105 Momentum on site and crew signs JSA. Momentum to start vac operations in NW
corner.
1126 ECI crew finishes floor dry operations and all soiled materials including the pad are
placed in 55 gal open top metal drum and labeled as NOS diesel impacted floor dry
and pad. ECI crew will tear down the barricade area so that momentum can move
to the entrance to the parking lot and prewash the area around the south pump.
1137 Momentum moves to the south pump. NW corner and lot in front of pumps
cleaned.
1210 South pump area looking much better but will have to continue work due to the
amount of diesel in the cracks. Momentum moves to the South drain to clear the
standing water and clear the drain. This drain is clogged, and no diesel impacted
the water way.
1255 Momentum has cleared the drain after clearing the puddle and removing the floor
dry dam that was placed by ECI.
1301 Momentum now street side to clear the main storm drain that was impacted. After
the cover was removed it was noted that the water line was 5 inches below the
outlet side of the vault. Downstream box inspected to be sure. All diesel that
entered storm drain was contained to the single vault. Momentum begins clearing
the vault
1342 Streetside vault cleared. Momentum returns to the south pump to continue working
Environmental Incident Report
3
the area of the spill. ECI crew to assist with squeegees to prevent diesel from
entering drains again.
1420 Momentum has cleared the spill and on-site contact with foreman do a walk around
to clear crew. ECI and Momentum were thanked for getting the job done and were
cleared to leave site.
1426 All equipment and waste were accounted for. The crew finishes housekeeping and
departs for the shop.
1510 Crew back at shop and vehicle and trailer reset. Waste placed on waste pad and
labeled with SO
1530 Crew cleared and sent home.
Incident Summary
Enviro Care received initial telephone notification at approximately 08:50 hours on 08 December
2023, requesting services for a Diesel release to the ground in Pleasant View, Utah. An Enviro
Care Crew was initiated, loaded needed supplies to minimize and abate the release, then the Enviro
Care Crew was dispatched to the site location. The Enviro Care Crew held a tailgate safety
meeting at the site and discussed operational standards and goals. The release occurred at 2686 N
Hwy 89 Pleasant View, UT. Enviro Care response team began cleanup of diesel fuel on the
parking lot, roadway, and storm drain. ECI response team began applying additional absorbent
material to the southernmost pump and began cleaning up the impacted area. Momentum pressure
washed the lot, roadway, and jetted out the storm drains . Once the assigned work areas were
cleaned, ECI loaded up to demobilize back to ECI shop.
END OF ON-SITE REMEDIATION ACTIVITIES
Waste Disposal Information
Enviro Care transported the waste to US ecology Idaho.
Environmental Incident Report
4
PHOTOGRAPHS
Photo: 1
Description:
Source of
spill
Environmental Incident Report
5
Photo: 2
Description:
. spill site
parking lot 1
Photo: 3
Description:
Spill site
parking lot 2
Environmental Incident Report
6
Photo: 4
Description:
Spill site
roadway
Photo: 5
Description:
Spill site
Parking lot 3
Environmental Incident Report
7
Photo: 6
Description:
Spill site
Storm drain
impact
Photo: 7
Description:
Post clean up
Environmental Incident Report
8
Photo: 8
Description:
Post clean up
Photo: 9
Description:
. Post clean
up
Environmental Incident Report
9
Photo: 10
Description:
Post clean up
Photo: 11
Description:
Post clean up
Environmental Incident Report
10
Photo: 12
Description:
Post clean up
Site Closure
Devin Karadeema, Enviro Care Project Manager, approved all cleanup activities, and no further
action at the site is required.
END OF REPORT
Enviro Care is pleased to have been of service to Frito Lay. Should you have any questions or
require additional information please feel free to contact Devin Karadeema at 801-807-9553. In
addition, you may contact me via email at Devin.karadeema@envirocareusa.com
Respectfully submitted,
Devin Karadeema
Devin Karadeema
Project Manager
Enviro Care, Inc.
Environmental Incident Report
11