Loading...
HomeMy WebLinkAboutDERR-2024-005114Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name GURUDEV PETRO LLC Address 610 NORTH 300 WEST SALT LAKE CITY, UT 84103 Contact GURUDEV PETRO LLC Phone Email bluestarchevron@gmail.com TANK LOCATION Name BLUE STAR CHEVRON Address 610 NORTH 300 WEST SALT LAKE CITY, UT 84103 A Operator HARSHIDABEN C PATEL Phone (801) 310-0012 B Operator SAME Phone SAME Facility ID: 4001505 Inspection Date: 12/21/2023 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline Yes Steel Flex in Sump July 2, 1986 March 1, 2018 Yes No Aug. 5, 2021 None 2 - 3/4 Gas/Diesel Yes Steel Flex in Sump July 2, 1986 March 1, 2018 Yes No Aug. 5, 2021 None 3 - 5/6 Gasoline Yes Steel Flex in Sump July 2, 1986 March 1, 2018 Yes No Aug. 5, 2021 None 4 - 7/8 Gasoline Yes Steel Flex in Sump July 2, 1986 March 1, 2018 Yes No Aug. 5, 2021 None TANK DETAILS Tank ID/Alt ID 3 / 3a E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Feb. 9, 2018 / 14000 / Northwest Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-300 Interstitial Monitor LTT Test None LLD Test Aug. 3, 2023 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None 2024-01-24 Page 1 of 8 Tank ID/Alt ID 4 / 3b E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Feb. 9, 2018 / 6000 / Northeast Substance Stored Gasoline / Non-Ethanol Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Aug. 3, 2023 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None Tank ID/Alt ID 5 / 4a E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Feb. 9, 2018 / 12000 / Southeast Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Aug. 3, 2023 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None Tank ID/Alt ID 6 / 4b E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Feb. 9, 2018 / 8000 / Southwest Substance Stored Gasoline / Premium Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Aug. 3, 2023 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-01-24 Page 2 of 8 FACILITY RESPONSES Financial Responsibility Financial responsibility method is ok?Yes The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes TANK RESPONSES Tank 3a Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Does the Spill Prevention device have a potential to release product into the environment? Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 3a Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 3a Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 3a Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 3b Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes 2024-01-24 Page 3 of 8 Tank 3a ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 3a ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 3b Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Does the Spill Prevention device have a potential to release product into the environment? Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 3b Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 3b Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4a Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 4a Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4a Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4b Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 4b Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2024-01-24 Page 4 of 8 Tank 3b ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 3b ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 4a Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 4b Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-01-24 Page 5 of 8 Tank 4a ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4a ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 4b Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes 2024-01-24 Page 6 of 8 Tank 4b ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4b ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 7/8 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-01-24 Page 7 of 8 Prepared by fueloperator.com MONTHLY LEAK DETECTION MONITORING Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass NON-COMPLIANCE ITEMS All items are in compliance. Inspection Information Inspector:Rasmussen, DeAnn Record Created:Jan. 23, 2024, 8:38 p.m. Inspection Date:Dec. 21, 2023 2024-01-24 Page 8 of 8