Loading...
HomeMy WebLinkAboutDERR-2024-009120 195 North 1950 West Mailing Address: P.O. Box 144840 Salt Lake City, UT 84114-4840 Telephone (801) 536-4100 ) 359-8853 (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION Brent H. Everett Director ERRC-110-24 July 17, 2024 Josie Nusz Remedial Branch U.S. EPA Region 8 1595 Wynkoop 8EPR-SR Denver, Colorado 80202-1129 RE: Sharon Steel Semiannual Site Inspection for November 2023 Dear Ms. Nusz: Enclosed is the report for the Sharon Steel OU-1 Operation and Maintenance Semiannual Site Inspection, which was performed on November 15, 2023. The Site appears to be in good condition and the remedy appears to function as intended. If you should have any questions or comments about this inspection, please contact me at (801) 536-4100. Sincerely, Tony Howes, P.G., Environmental Scientist Division of Environmental Response and Remediation TH/lg Enclosure(s): Site Inspection cc: Billie Smathers, Midvale City Paul Crosbie, Salt Lake County Health Department (letter only) SHARON STEEL OPERABLE UNIT 1 OPERATION & MAINTENANCE SEMIANNUAL SITE INSPECTION REPORT November 2023 MIDVALE, UTAH View of Jordan River and West Slope of Cap Utah Department of Environmental Quality Division of Environmental Response and Remediation INSPECTED BY: Tony Howes, UDEQ-DERR Project Manager TITLE: Env. Scientist DATE: November 15, 2023 NEXT INSPECTION DATE: June 2024 SHARON STEEL OU1 OPERATION & MAINTENANCE Yes No 1. Is redevelopment occurring at the site? 2. Are the access gates and locks free from damage? 3. Is the site and soil cover free from saturation or ponding of surface runoff? 4. Is the slope soil cover free of holes or other signs of burrowing rodents? 5. Have the burrowed or eroded slope areas been filled with clean soil and revegetated as needed? 6. Do the cap slopes appear to be stable and free from erosion? 7. Have the ditches and culverts been inspected for obstructions and debris? 8. Are the interceptor trench and drains accessible and operational? 9. Are the groundwater monitoring wellheads accessible? 10. Is the Jordan River riverbank free from signs of erosion or undercutting? 11. Is riprap and vegetation adequate to prevent intrusion of the river into the site? Additional Comments or Observations: Photos depicted in the attached log were taken on November 15, 2023. Figures related to this inspection are also attached for reference and include Figure 1 – Location Map, Figure 2 – Photo Locations, and Figure – 3 River Bank Inspection Areas. Erosion observed on the cap’s north and west slopes during previous inspections had been repaired by the property owner. The peak water flow recorded at the Jordan River 90th South gauging station on November 15, 2023, was 32.22 cubic feet per second. Current and historic water flows for the Jordan River at the 90th South gauging station can be obtained at http://slco.org/flood-control/real-time-streamflow-totals/. PHOTOGRAPHIC LOG Photo No. 1 Date: 11/15/23 Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Description: View southwest of the Zion Bancorp. Campus from Bingham Junction Boulevard and Park View Apartments. Description: View north of Bingham Junction Boulevard and 7800 South. Photo No. 2 Date: 11/15/23 Photo No. 4 Date: 11/15/23 Description: View of cap's north slope. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Date: 11/15/23 Description: View west of the cap's north slope parallel to 7800 South. Photo No. 3 Photo No. 6 Date: 11/15/23 Description: View of east bank Jordan River inspection area "A". PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 5 Date: 11/15/23 Description: View of monitoring well MW- 3A and cap's north slope. Photo No. 8 Date: 11/15/23 Description: View to the south from the site's northwest corner. Description: View to the east from the site's northwest corner. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 7 Date: 11/15/23 PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 9 Date: 11/15/23 Description: View upstream of Jordan River inspection area "B". Photo No. 10 Date: 11/15/23 Description: View downstream of Jordan River inspection area "B". PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 11 Date: 11/15/23 Description: Interceptor trench manhole one. Photo No. 12 Date: 11/15/23 Description: View of cap's west slope after erosion was repaired. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 13 Date: 11/15/23 Description: View north across cap's surface of Zion Bancorp. campus. Photo No. 14 Date: 11/15/23 Description: View north east across cap's surface. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 15 Date: 11/15/23 Description: View south east across cap's surface. Photo No. 16 Date: 11/15/23 Description: Interceptor trench manhole three. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 17 Date: 11/15/23 Description: View north from the corner of Ivy Drive and Seghini Drive. Photo No. 18 Date: 11/15/23 Description: View south from the corner of Ivy Drive and Seghini Drive. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 19 Date: 11/15/23 Description: View west from the corner of Ivy Drive and Main Street. Photo No. 20 Date: 11/15/23 Description: Monitoring wells MW- 401, MW-403, and MW-404. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 21 Date: 11/15/23 Description: Interceptor trench manhole four. Photo No. 22 Date: 11/15/23 Description: Interceptor trench manhole five. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 23 Date: 11/15/23 Description: View upstream of Jordan River inspection area "C". Photo No. 24 Date: 11/15/23 Description: View downstream of Jordan River from inspection area "C". PHOTOGRAPHIC LOG Photo No. 25 Date: 11/15/23 Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Description: Interceptor trench manhole seven/G. Description: Interceptor trench manhole eight. Photo No. 26 Date: 11/15/23 Photo No. 28 Date: 11/15/23 Description: View upstream of Jordan River from inspection area "D". PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 27 Date: 11/15/23 Description: Interceptor trench clean water discharge pipe. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 29 Date: 11/15/23 Description: View north across cap's surface from the southwest corner. Photo No. 30 Date: 11/15/23 Description: View of cap's southwest corner. Photo No. 32 Date: 11/15/23 Description: View north of cap's west slope. Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 31 Date: 11/15/23 Description: View east of cap's south slope. PHOTOGRAPHIC LOG PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 33 Date: 11/15/23 Description: View east of Jordan River inspection area "E". Photo No. 34 Date: 11/15/23 Description: View east of wetland pond. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 36 Date: 11/15/23 Description: View of wetland pond outfall box culvert (pond side). Photo No. 35 Date: 11/15/23 Description: View to the northeast of cap's east slope. PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 37 Date: 11/15/23 Description: View downstream of Jordan River inspection area "E". Photo No. 38 Date: 11/15/23 Description: View upstream of Jordan River inspection area "E". Photo No. 40 Date: 11/15/23 Description: View downstream of Jordan River inspection area "E". Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 39 Date: 11/15/23 Description: View north of wetland pond. PHOTOGRAPHIC LOG PHOTOGRAPHIC LOG Inspection Date: November 15, 2023 Semiannual Site Inspection Sharon Steel Superfund Site Midvale, UT Photo No. 41 Date: 11/15/23 Description:View north of wetland pond. Photo No. 42 Date: 11/15/23 Description: View upstream of Jordan River inspection area "E". OU1 Midvale West Jordan Midvale, Utah §¨¦80 §¨¦80 §¨¦15 §¨¦15 ¬«36 Salt Lake City Sharon SteelSuperfund Site U 0 0.25 0.5 0.75 10.125 Miles Figure 1: Location Map November 2023Sharon Steel Operable Unit One Midvale, Salt Lake County, Utah !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( 7 8 0 0 S o u t h Lennox S. Holden W. Wasatch Main Street Wetlands Photos 7 & 8 Photos 36, 37, 38, & 39 Photos 1 & 2 Photos 9 & 10 Photos 29, 30, 31, & 32 Photos 33, 34, & 35 J o r d a n R i v e r Photos 40, 41, & 42 Photo 22 Photo 5 Photo 6 E Photo 25 Photo 3 E Photos 23 & 24 Photo 11 E Photos 17 & 18 E E E E E Photo 4 Photo 21 Photo 12 Photo 26 E E Photos 19 and 20 E E Photos 13, 14, & 15 Photo 16 Photo 27 E Photo 28 E E E E E E E E E E E E E E E EE E Explanation !(Photo Location U Figure 2: Ph oto L ocation s No vember 2023 Sharon Ste el Op erable Unit One Mid vale, Salt Lake County, Uta h03757501,125 1,500187.5 Feet Scale:1:7,500 J o r d a n R i v e r Wetland Ma i n S t r e e t W. Wasatch Lennox 7800 South E B C D A e e e e UExplanation e Surface Water Flow Direction Inspection Areas 0 250 500 750 1,000 Feet 1:7,000Scale: Figure 3: Riverbank Inspection Areas November 2023 Sharon Steel Operable Unit One Midvale, Salt Lake County, Utah