HomeMy WebLinkAboutDERR-2024-005074
2410 WEST CALIFORNIA AVENUE SALT LAKE CITY, UTAH 84104
PHONE (801) 972-8400 FAX (801) 972-8459
Website: www.wasatch-environmental.com e-Mail: wei@wasatch-environmental.com
Mr. John Sawyer March 8, 2024
TP Lamplighter, LC Project Number: 2077-001N
1165 East Wilmington Avenue, Suite 275
Salt Lake City, Utah 84106
SUBJECT: Proposed Work Plan and Budget, NFS-12
Monitoring Well Repair
American Food Mart
1605 South Foothill Drive
Salt Lake City, Utah
UST Facility No. 4000803
Release Site NFS
Wasatch Environmental, Inc., has prepared this Work Plan to repair damages to monitoring well MW-9
which is part of the groundwater monitoring network for the above referenced facility. The estimated cost
to complete the proposed scope of work is provided in Table 1. Groundwater monitoring well locations
are shown in Figure 1.
We have included a Petroleum Storage Tank Trust Fund Work Plan Approval Application. Upon your
review and approval of this work plan, please sign the attached application and return it to Wasatch
Environmental. If you have questions or concerns relating to the proposed activities, please contact us at
801-972-8400.
Our services consist of professional opinions and recommendations made in accordance with generally
accepted geotechnical and environmental engineering principles and practices. This warranty is in lieu of
all other warranties either expressed or implied.
Should you have any questions, please do not hesitate to contact us.
Sincerely,
WASATCH ENVIRONMENTAL, INC.
Blake Downey, P.G.
Utah Certified UST Consultant #0268
Copies: (1) Addressee
(1) Mr. Mike Pecorelli, DERR
WASATCH ENVIRONMENTAL, INC.
ENVIRONMENTAL SCIENCE AND ENGINEERING
2410 WEST CALIFORNIA AVENUE
SALT LAKE CITY, UTAH 84104
PHONE (801) 972-8400
FAX (801) 972-8459
e-mail: wei@wasatch-environmental.com
www.wasatch-environmental.com
PROPOSED WORK PLAN AND BUDGET FOR
MONITORING WELL REPAIR
AMERICAN FOOD MART
1605 SOUTH FOOTHILL DRIVE
SALT LAKE CITY, UTAH
FACILITY ID: 4000803
RELEASE SITE: NFS
Work Plan No. NFS-12
March 8, 2024
Prepared for:
Mr. John Sawyer
TP Lamplighter, LC
1165 East Wilmington Avenue, Suite 275
Salt Lake City, Utah 84106
Prepared by:
Wasatch Environmental, Inc.
2410 West California Avenue
Salt Lake City, Utah 84104
Proposed Work Plan – Monitoring Well Repair American Food Mart
Wasatch Environmental, Inc. Table of Contents
Page i
TABLE OF CONTENTS
Section Page No.
1. INTRODUCTION ................................................................................................................................. 2
2. SCOPE OF SERVICES ....................................................................................................................... 2
2.1 Task 1 - Project Management, Work Plan, and PST Claims .............................................. 2
2.2 Task 2 – Groundwater Sampling ........................................................................................ 2
2.3 Task 3 – Report Preparation ............................................................................................... 2
3. DELIVERABLES ................................................................................................................................. 2
5. SUBCONTRACTORS ......................................................................................................................... 3
6. EXCEPTIONS TO WORK PLAN, ANTICIPATED PROBLEMS, OR SPECIAL REQUIREMENTS . 3
7. CONFLICT OF INTEREST .................................................................................................................. 3
8. COST ESTIMATE ............................................................................................................................... 3
TABLE
Table 1 - Proposed Cost Estimate for Monitoring Well Repair
FIGURE
Figure 1 – Proposed Monitoring Well Repair Location Map
WASATCH ENVIRONMENTAL, INC.
ENVIRONMENTAL SCIENCE AND ENGINEERING
PROPOSED WORK PLAN AND BUDGET FOR MONITORING WELL REPAIR
AMERICAN FOOD MART
SALT LAKE CITY, UTAH
1. INTRODUCTION
This Work Plan presents a brief description of the tasks required to complete monitoring well repair
additivities at monitoring well MW-9 at the site. Wasatch was informed by the Salt Lake City Public
Works that this well had been damaged. The pictures of the damage were provided to the PST Fund.
This work plan includes a cost estimate (Table 1) that has been prepared for the following tasks:
• Task 1 – Project Management, Work Plan, and PST Claims
• Task 2 – Monitoring Well Repair Activities
• Task 3 – Report Preparation
2. SCOPE OF SERVICES
The scope of services detailed below provides information regarding tasks required to complete the
monitoring well repair activities. All activities described herein would be completed under the direction
of a Utah Certified Underground Storage Tank (UST) Consultant.
2.1 Task 1 - Project Management, Work Plan, and PST Claims
Preparation of this work plan and budget, Petroleum Storage Tank (PST) claims, obtaining the
required Salt Lake City permits, project coordination, and project management are included in the first
task associated with the proposed work at the American Food Mart release site.
2.2 Task 2 – Monitoring Well Repair Activities
Wasatch will remove the surface completion consisting of concrete and a damaged steel well vault at
the MW-9 location. The demolition debris will be disposed of at a local landfill. A new 12-inch, traffic-
rated, flush-mount, steel well vault will be placed in new concrete to replace the removed surface
completion. Given that MW-9 is located in the roadway of 1700 South, this work will require that we
obtain a Salt Lake City Traffic Control permit and a Public Way permit. Additionally, repairs will require
the closure of the eastbound (southern) lane of 1700 South.
2.3 Task 3 – Report Preparation
Wasatch would prepare a report detailing field activities and procedures, appropriate figures,
summarizing results of the monitoring well repair activities.
3. DELIVERABLES
The anticipated deliverables identified in this proposed Work Plan include the following:
• Payment vouchers with backup documentation.
• One Monitoring Well Report presenting the results of the repair activities.
WASATCH ENVIRONMENTAL, INC.
ENVIRONMENTAL SCIENCE AND ENGINEERING
4. PERSONNEL
The key Wasatch personnel for this proposed Work Plan are as follows:
• Utah Certified UST Consultant and Senior Geologist: Blake Downey, P.G. Christopher
Nolan, P.G., or Michael Cronin, P.G.;
• Utah Certified UST Groundwater and Soil Sampler Staff Geologist: Jake Scott, Anna
Fiorini, Rachel Kubina, Ryan Christiansen, or Jeff Hessburg.
5. SUBCONTRACTORS
The subcontractors for the proposed work are as follows:
• Utah Barricade (traffic control plan and required barriers set up, take down, and rental).
6. EXCEPTIONS TO WORK PLAN, ANTICIPATED PROBLEMS, OR
SPECIAL REQUIREMENTS
Wasatch makes no exceptions to this proposed Work Plan. In the event significant resistance or
problems arise during the completion of the work proposed herein, Wasatch would communicate
with the DERR to evaluate alternative courses of action.
7. CONFLICT OF INTEREST
Based on Wasatch’s present knowledge of the site location and conditions, no personal or
corporate conflict of interest has been identified for the performance of the scope of services
described in this proposed Work Plan. Wasatch would contact the DERR immediately if any
potential conflicts of interest are identified during the performance of this proposed Work Plan.
8. COST ESTIMATE
The estimated cost by Task for completion of the work described in this proposed Work Plan is
presented in Table 1. The proposed budget would require adjustment if the scope of services
identified herein is modified or the assumptions prove incorrect. Wasatch would not perform activities
outside the scope of services described in this proposed Work Plan without prior approval from the
DERR.
TABLE 1
Project:Project No.:BD
Phase:Monitoring Well Repair (MW-9) Date:Check By:MC
Units Cost Units Cost Units Cost
TASK 1 PROJECT MANAGEMENT
Principal Environmental Manager- Senior oversight, review work plan, and cost
estimate hours 0.5 168.00$ 84.00$
Senior Project Geologist - Subcontractor bidding and selection,
communications, meetings (if applicable), project coordination, obtaining
applicable permitts (if required), and project initiation and set up hours 4 148.00$ 592.00$
Senior Project Geologist - Work Plan and Budget hours 5 148.00$ 740.00$
SLC - Traffic Control Permit estimate 1 40.25$ 40.25$
SLC - Public Way Permit estimate 1 230.00$ 230.00$
Site-specific health and safety plan bid 1 200.00$ 200.00$
Drafter II - Draft maps hours 1 82.00$ 82.00$
PST Claims Specialist - Project initiation, setup, and claims hours 2 71.00$ 142.00$
Subtotal for Project Management 2,110.25$
TASK 2 MONITORING WELL REPAIR (Assumes removal and disposal of MW-9 surface competion and restoring surface completion)
Staff Geologist - Mob/Demob, preparation, groundwate monitoring well repair hours 8 103.00$ 824.00$
Traffic Control Subcontractor (Traffic control plan and equiment rental)estimate 1 372.24$ 372.24$
Field Support Truck day 1 75.00$ 75.00$
Chop Saw Rental day 1 99.90$ 99.90$
12-inch Traffic Rated Steel Vault (includes Shipping)each 1 208.44$ 208.44$
Concrete (50 lb. bags - High Strengh Quick Set)bag 8 8.26$ 66.11$
Mileage miles 60 0.80$ 48.00$
PPE - North Full Face Mask day 1 20.00$ 20.00$
PPE (Particulate Filter Cartridge)day 1 15.00$ 15.00$
Subtotal for Monitoring Well Repair 1,728.70$
TASK 3 MONITORING WELL REPAIR REPORT
Senior Project Geologist - Author report and data tables hours 4 148.00$ 592.00$
Principal Environmental Manager - Senior review report hours 0.5 168.00$ 84.00$
Senior Geologist - Peer review report hours 0.5 148.00$ 74.00$
Word Processor - Clerical review report hours 0.5 63.00$ 31.50$
Drafter II - Drafting, maps, logs, and figures hours 1 82.00$ 82.00$
Administrative Assistant - Produce and distribute report hours 0.5 63.00$ 31.50$
Subtotal for Monitoring Well Repair Report 895.00$
Project Total 4,733.95$
Client Authorization Signature:__________________________________________________________________________ Date:_____________________________________
Print Name:_______________________________________________________________________Title:____________________________________________________
Equipment
Work Description
Total CostUnits
Labor Materials
American Food Mart 2077-001N
3/8/2024
Estimated By:
DATE: March 1, 2024PROJECT NO.: 2077-001NEnvironmental Science and Engineering
Scale: 1-inch equals
approximately 144 feet
Monitoring Well Location
1700 South
F
o
o
t
h
i
l
l
D
r
i
v
e
Tex
a
s
S
t
r
e
e
t
Proposed Monitoring Well Repair Location Map
American Food Mart
1605 South Foothill Drive
Salt Lake City, Utah
Approximate Release Site
Property Boundary
MW-1
MW-3
MW-2
FIGURE 1
LEGEND
MW-4MW-5
MW-6
MW-8
MW-7
MW-10
Skyline Drive
Logan Way
Fo
o
t
h
i
l
l
C
i
r
c
l
e
MW-9
Proposed Monitoring Well Repair
Location
EACH TRAVEL LANE
MUST MAINTAIN AT
LEAST11' WIDTH
RO
A
D
WO
R
K
AH
E
A
D
RO
A
D
WO
R
K
AH
E
A
D
KE
EP
RIG
H
T
KE
EP
RIG
H
T
100'100'
100'100'
WORK
AREA
Date:3/1/24 Author:MATT DOWDLE
Comments:
WASATCH ENVIRONMENTAL
1700 SOUTH FOOTHILL DRIVE
SALT LAKE CITY, UTAH
EB-LANE SHIFT LEFT
UTAH BARRICADE -TRAFFIC CONTROL
RO
A
D
WI
D
T
H
ES
T.
3
9
'
www.invarion.com