HomeMy WebLinkAboutDERR-2024-013262Site Visit Report- Redwood Road Dump VCP #121 Date(s): 11/29/2023 Project Manager: Chris Howell. Purpose of Site Visit: non-Impacted Soil Excavation Oversight Observations: DERR arrived on-site and met the SL Excavating foreman. Terracon is checking in daily but could not come out this morning. Work is progressing. Soil with debris has been pushed up on the east side due to trash from the neighboring property. The remaining soil has been stockpiled and tested before hauling onto SLC property west of the site for beneficial reuse. Soil pushed up on the east has been tested and is awaiting results. The soil will need to meet SLC physical requirement (no debris) before leaving the site as well. Water was observed on the northern end in the ditch area. Terracon/SLC are working with UDEQ Water Quality to manage the ground/surface water as per the RAP.