HomeMy WebLinkAboutDERR-2024-013260Site Visit Report- Redwood Road Dump VCP #121 Date(s): 2/1/2024 Project Manager: Chris Howell. Allison Stanley is also on site. Purpose of Site Visit: RAP Oversight Observations: DERR arrived on-site and met the SL Excavating foreman. Terracon is not on site today. Impacted soil is being shipped to the SL County landfill. The last of the piles is pushed up next to the asphalt pad. Removal is almost complete no estimated completion date given. Clean fill that is stockpiled next to the site is being placed on the south end and compacted in lifts. The idea is to push pockets of water on the surface to the north. Terracon is working with DWQ on permitting to manage the water. Through communication with Catherine Terracon will be doing some work next week to assist with the water permitting. No issues were identified during the site visit.