HomeMy WebLinkAboutDERR-2024-005030Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name TAYLOR HARDING
Address 580 S 100 W
SALINA, UT 84654
Contact TAYLOR HARDING
Phone
Email JTAUTOWORKS23@GMAIL.COM
TANK LOCATION
Name JT AUTO WORKS
Address 215 W MAIN ST
SALINA, UT 84654
A Operator None
Phone None
B Operator SAME
Phone SAME
Facility ID: 2000144 Inspection Date: 03/06/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gasoline No June 1,
1990
None No No None None
2 - 3/4 Gasoline No June 1,
1990
None No No None None
3 - 5/6 Gasoline No June 1,
1990
None No No None None
4 - 7/8 Gasoline No June 1,
1990
None No No None None
TANK DETAILS
Tank ID/Alt ID 3 / 3
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 1, 1990 / 10000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Fiberglass Reinforced Plastic
/ None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 4
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 1, 1990 / 10000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Fiberglass Reinforced Plastic
/ None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-03-06 Page 1 of 5
Tank ID/Alt ID 5 / 5
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 1, 1990 / 10000 /
Substance
Stored Gasoline / Premium
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Fiberglass Reinforced Plastic
/ None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 6 / 6
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 1, 1990 / 2000 /
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Fiberglass Reinforced Plastic
/ None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-03-06 Page 2 of 5
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 3 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 4 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 5 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 6 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 3 Spill/Overfill
Tank has a spill prevention device?No
Tank 4 Spill/Overfill
Tank has a spill prevention device?No
Tank 5 Spill/Overfill
Tank has a spill prevention device?No
Tank 6 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Tank 6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
No
DISPENSER RESPONSES
Dispenser 3/4
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 7/8
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-03-06 Page 3 of 5
MONTHLY LEAK DETECTION MONITORING
Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24
Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 4 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 5 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 6 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 3
No Photos
Question:Tank has a spill prevention device?
Comments:None
TANK 4
No Photos
Question:Tank has a spill prevention device?
Comments:None
TANK 5
No Photos
Question:Tank has a spill prevention device?
Comments:None
TANK 6
No Photos
Question:Does the spill bucket have a valid 3-year test, valid monthly monitoring for DW buckets, or the tank is
exempt?
Comments:None
2024-03-06 Page 4 of 5
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record Created:March 6, 2024, 9:22 a.m.
Inspection Date:March 6, 2024
2024-03-06 Page 5 of 5