Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DERR-2024-010058
20201466.001A/SLC23R156681_FINAL Page i of iv July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 FINAL REPORT FOR ADMINISTRATIVE RECORD REMEDIAL ACTION CLOSURE REPORT LARK MONOFILL METALS-IMPACTED SOILS SOUTH VALLEY WATER RECLAMATION PROPERTY NE CORNER HIGHWAY 111 AND 11800 SOUTH SOUTH JORDAN, UTAH KLEINFELDER PROJECT NO. 20201466.001A JULY 31, 2023 Copyright 2023 Kleinfelder All Rights Reserved ONLY THE CLIENT OR ITS DESIGNATED REPRESENTATIVES MAY USE THIS DOCUMENT AND ONLY FOR THE SPECIFIC PROJECT FOR WHICH THIS REPORT WAS PREPARED 20201466.001A/SLC23R156681_FINAL Page ii of iv July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 A Report Prepared for: Mr. Doug Young Executive Director SOJO118, LLC 6150 South Redwood Road, Suite 150 Taylorsville, UT 84123 FINAL REPORT FOR ADMINISTRATIVE RECORD REMEDIAL ACTION CLOSURE REPORT LARK MONOFILL METALS-IMPACTED SOILS SOUTH VALLEY WATER RECLAMATION PROPERTY NE CORNER HIGHWAY 111 AND 11800 SOUTH SOUTH JORDAN, UTAH Prepared by: ________________________________ Dylan Pike, PG Project Manager I ________________________________ Corinne Hillard, PG Senior Project Manager KLEINFELDER 849 West Levoy Drive, Suite 200 Salt Lake City, Utah 84123 Phone: 801.261.3336 July 31, 2023 Kleinfelder Project No.: 20201466.001A 20201466.001A/SLC23R156681_FINAL Page iii of iv July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 TABLE OF CONTENTS ___________________________________________________________________________________ Section Page 1 INTRODUCTION ..................................................................................................................... 1 1.1 BACKGROUND ..................................................................................................................... 1 1.2 SITE DESCRIPTION ............................................................................................................... 1 1.3 REGULATORY HISTORY AND CONTAMINANTS OF CONCERN ............................................. 2 1.4 REGULATORY ACTION LEVELS ............................................................................................. 3 1.5 PRIOR SITE INVESTIGATIONS .............................................................................................. 4 2 SOIL REMOVAL ACTIVITIES ..................................................................................................... 6 2.1 PRE-FIELD ACTIVITIES .......................................................................................................... 6 2.2 SOIL REMOVAL ACTIVITIES .................................................................................................. 6 2.2.1 Soil Removal Activities East Lark – Bastian Ditch Drainages .................................. 7 2.2.2 Soil Removal Activities West Lark – Bastian Ditch Channel ................................... 7 2.3 STOCKPILE SAMPLING AND SOIL DISPOSAL ........................................................................ 8 3 POST-REMOVAL CONFIRMATION SOIL SAMPLING ................................................................. 10 4 POST-REMOVAL SOIL ANALYTICAL RESULTS .......................................................................... 12 4.1 ANALYTICAL RESULTS PER LAND USE ............................................................................... 12 4.2 WEST LARK AND COMPOST FACILITY ANALYTICAL RESULTS ............................................ 13 4.3 EAST LARK AND PARK PARCEL ANALYTICAL RESULTS ....................................................... 14 4.4 COMMERCIAL PARCEL ANALYTICAL RESULTS ................................................................... 15 5 ADDITIONAL SITE CHARACTERIZATION ................................................................................. 16 6 MONITORING WELL CLOSURE............................................................................................... 18 7 DATA QUALITY OBJECTIVES AND QA/QC ............................................................................... 19 7.1 FIELD QUALITY ASSURANCE/QUALITY CONTROL .............................................................. 19 7.2 DATA QUALITY ASSESSMENT REVIEW .............................................................................. 19 8 SUMMARY AND CONCLUSIONS ............................................................................................ 22 9 LIMITATIONS ....................................................................................................................... 23 10 REFERENCES ........................................................................................................................ 24 20201466.001A/SLC23R156681_FINAL Page iv of iv July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 TABLES 1 Bastian Ditch Stockpiles – Soil Profiling Analytical Results 2 “Clean” Overburden Stockpiles – Soil Profiling Analytical Results 3 Bastian Ditch Channel (West Lark Monofill – Post-Removal Sample Analytical Results) 4 Bastian Ditch Drainages (East Lark Monofill – Post-Removal Sample Analytical Results) 5 Additional Site Characterization – Soil Analytical Results 6 Quality Assurance Samples FIGURES 1 Site Vicinity Map 2 Proposed Land Use and Prior Site Characterization Results 3 Soil Excavation Boundaries 3.1 Post-Removal Confirmation Samples - Map Legend 3.2-3.9 Post-Removal Confirmation Sample Details 4 Stockpile Sample Locations 5 Commercial Parcel Footprint 6 Characterization Samples APPENDICES A Prior Investigation Data and Regulatory Approval Letters B Standard Operating Procedures C Trans-Jordan Disposal Summary and Monitoring Well Closure Records D Post-Removal Closure Sample Information Sheets E Laboratory Analytical Reports and Chain-of-Custody Documentation 20201466.001A/SLC23R156681_ FINAL Page 1 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 1 INTRODUCTION ___________________________________________________________________________________ 1.1 BACKGROUND This report documents the metals-impacted soil remediation activities performed on the South Valley Water Reclamation (SVWR) property, (referred herein as the Lark Monofill or Site), located northeast of the intersection of Highway 111 (Bacchus Highway) and 11800 South in South Jordan, Utah (see Figure 1). Kleinfelder conducted the work on behalf of SOJO118, LLC. Portions of the Lark Monofill have been impacted with lead and arsenic-containing sediment originating from mining areas northwest of the Site, which were carried to the Site via the Bastian Ditch. This remedial action addressed metals-impacted soils near the Site’s east and north-east fence lines (adjacent to the Daybreak Bastian Ditch Drainage area) and within the historical Bastian Ditch channel that ran north-south through the west half of the Site. Kleinfelder began the soil remediation activities at the Lark Monofill in May 2021 and completed the field effort in May 2023. The soil remediation was conducted in accordance with the Lark Monofill Bastian Ditch Remedial Action Work Plan (Kleinfelder, 2021b) and the Work Plan Addendum One (Kleinfelder, 2022). Soil remediation was completed for the four-acre substation parcel in the southeastern corner of the Site in 2021. A Post-Removal Sampling Report was prepared documenting the Substation Parcel Remediation (Kleinfelder, 2021c), and a No Further Action (NFA) letter was provided to SOJO118 by the Utah Department of Environmental Quality, Division of Environmental Response and Remediation (DERR 2021c), dated September 9, 2021. The DERR work plan approval letters and Substation NFA are included in Appendix A. This report documents the soil remediation activities conducted on the remainder of the Lark Monofill outside the Substation parcel. 1.2 SITE DESCRIPTION The Lark Monofill is an approximate 187-acre property located northeast of the intersection of Highway 111 (Bacchus Highway) and 11800 South in South Jordan, Utah. The Site contains a composting facility operated by the Trans-Jordan Landfill with an associated maintenance building in the northern portion of the Site and an inactive, permitted sewage disposal landfill (Lark Monofill) on the approximate southern two-thirds of the Site. The entire property is fenced with access allowed only for authorized personnel. The property is bound to the north, west and south by vacant land. The Daybreak residential development is under construction on the property adjacent to the east. Depth to 20201466.001A/SLC23R156681_ FINAL Page 2 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 groundwater at the Site is greater than 350 feet below ground surface (bgs). The Site location is presented on Figure 1. The proposed future Site development will include residential, commercial, and recreational land use. Site soils were remediated based on their future land use in accordance with the established land use standards. The proposed future land uses are described below, and their locations are depicted in Figure 2. Commercial Land Use – The Site’s southwestern corner (eight acres) is slated for commercial use, and the southeastern corner (four acres) will house an electric power substation. Recreational Land Use – The Site’s northeastern corner (approximately 17 acres) is slated for development as a public park. Residential Land Use – The remainder of the Site is intended for possible residential development. The Site’s northern 17-acre triangle is currently operated for commercial use by Trans-Jordan Landfill for their composting operation. A portion of the composting area may eventually be converted to residential land use. Roadway – UDOT is planning to relocate Highway 111 from the west side of the Site to traverse the center of the Lark Monofill property from north to south. The proposed right-of-way would be 170 feet wide and would run along the east side of the compost facility and through the approximate center of the Monofill. 1.3 REGULATORY HISTORY AND CONTAMINANTS OF CONCERN The contaminants of concern (COCs) are lead and arsenic in soil, deposited where the Bastian Ditch waterway and its tributaries crossed the Site. The historical Bastian Ditch (a.k.a. Ditch) traversed the approximate center of the Site from north to south for approximately one mile. Mining-impacted water from Bingham Canyon was gravity fed through the Bastian Ditch from at least 1937 through approximately 1985. The mine water carried tailings and sediment known to have contained elevated levels of lead and arsenic. The Bastian Ditch is a feature of the Kennecott South Zone Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Operable Unit 5 (OU5) Arco Tailings. Based on the source of the metals impacts originating from historical mining operations, the Utah Department of Environmental Quality Division of Waste Management and Radiation Control (DWMRC) issued a concurrence letter (DWMRC, 2020) stating that “soils excavated from the Bastian Ditch are excluded from the hazardous waste regulation according to Utah Administrative Code R135-261-4(b)(7) and 40 CFR 261.4(b)(7), also known as the Bevill Exclusion. This determination would allow the 20201466.001A/SLC23R156681_ FINAL Page 3 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 qualifying waste to be disposed of in a Class I permitted solid waste landfill (e.g., Trans-Jordan Landfill).” A copy of the letter is included in Appendix A. In approximately 1986, the Site was permitted as a sewage disposal facility monofill. Liquid sewage transported from the SVWR wastewater treatment plant was buried in trenches at the Site. The sewage disposal ceased in approximately 1999. Remediation of the sewage trenches is being overseen by the Utah Division of Water Quality (DWQ) and conducted by another consultant. 1.4 REGULATORY ACTION LEVELS A 2015 joint Technical Memorandum prepared by the DERR, and U.S. Environmental Protection Agency (USEPA) Region 8 (the Agencies) established soil cleanup action levels for the Kennecott North and South Zone Operable Units, including the following standards for the Bastian Ditch (OU5): · OU5 Agricultural Standards – 8,500 mg/kg lead and 100 mg/kg arsenic, · OU5 Industrial Standards – 4,414 mg/kg lead and 261 mg/kg arsenic, · OU5 Recreational Standards – 2,207 mg/kg lead and 283 mg/kg arsenic, · Sitewide Unrestricted Standards – 500 mg/kg lead and 50 mg/kg arsenic, · Bastian Ditch Daybreak Residential Standards – 700 mg/kg lead and 100 mg/kg arsenic, and · Bastian Ditch Daybreak Commercial Standards – 2,000 mg/kg lead and 450 mg/kg arsenic. Due to the undeveloped nature of the area at the time the standards were established, commercial and residential land use standards were not established for most of the Kennecott Operable Units, except for the OUs within the Daybreak Development. Due to a lack of an established area-wide commercial standard, SVWR requested the assignment of the same Commercial Land Use Standards for the Bastian Ditch-impacted soil on the Lark property that were established for the Bastian Ditch-impacted soil on the adjacent Daybreak property. The DERR approved the use of the Daybreak Commercial Land Use Standards for the Lark Monofill removal action via email dated August 5, 2021 (DERR, 2021b), which was documented in the final approved Lark Remedial Action Work Plan. The DERR approval letters for the Lark Remedial Action Work Plan and Work Plan Addendum One, as well as the DERR cleanup standards approval email, are included in Appendix A. Rio Tinto remediated metals-impacted soils in the Daybreak Residential Development (located adjacent to the east and north of the Site) in 2015 to the Daybreak Residential Standards. In recognition that the source of the soil impacts was the same (Bastian Ditch tributaries) on both sides of the fence line 20201466.001A/SLC23R156681_ FINAL Page 4 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 between the Lark and Daybreak properties, the DERR approved the use of the Daybreak Residential Land Use Standards (700 mg/kg lead and 100 mg/kg arsenic) for the Bastian Ditch Drainage tributaries that extend east of the main Bastian Ditch channel on the eastern half of the Site (DERR, 2021b, and Appendix A). 1.5 PRIOR SITE INVESTIGATIONS Several Site investigations were conducted by Kleinfelder beginning in 2019 as listed in Section 8, References. These include a Phase I Environmental Site Assessment (ESA) (Kleinfelder, 2020a), Phase II ESA (Kleinfelder, 2020b), and Bastian Ditch Waste Profiling Report (Kleinfelder, 2021a). The findings of those investigations are summarized below and were used as the basis for the Lark Remedial Action Work Plan (Kleinfelder, 2021b). The investigations identified elevated metals concentrations in shallow soils along the historical Bastian Ditch main channel that ran north-south through the approximate center of the Site and along the Bastian Ditch Drainage tributaries/irrigation ditches that ran east of the main Ditch near the east and north-east fence lines (adjacent to the Daybreak Development). In general, the Bastian Ditch impacted soils were observed in a shallow channel extending 4 to 6 feet bgs, with a width of generally 8 to 12 feet. The highest metals impacts were detected in a narrow, yellow-stained band, generally less than one foot thick, near the base of the Ditch channel. Metals-impacted soil in the Bastian Ditch Drainage tributaries, near the northeastern and eastern fence lines, generally contained lower metals concentrations, were minimally stained, and extended to depths of 2 to 4 feet bgs. The Phase II Site Characterization analytical results are illustrated in Figure 2. The 2019-2020 soil investigation results can generally be summarized as follows: · Soil with lead and arsenic concentrations above the Commercial Land Use Standards were identified in portions of the main Bastian Ditch channel. · Soil with lead and arsenic concentrations below the Commercial Land Use Standards, but above the Unrestricted Land Use Standards, were identified along the eastern and northeastern fence lines, at the north end of the Site, and within the main Bastian Ditch channel. · Soil with lead and arsenic concentrations below the Unrestricted Land Use Standards were identified beneath the paved Trans-Jordan Composting Facility and in many areas along the Ditch tributaries near the eastern and northeastern fence lines. 20201466.001A/SLC23R156681_ FINAL Page 5 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 · During RioTinto’s remediation of the Daybreak Bastian Ditch Drainage in 2015, metals-impacted soils were left on Daybreak property along the Site’s eastern and northeastern fence lines adjacent to the Lark Monofill. The Daybreak Post-Removal Sampling Report (Kennecott-Rio Tinto, 2016) indicates where metals-impacted soils remain on Daybreak within approximately five feet of the property line fence. These impacted soils were observed by Kleinfelder during the Lark soil removal activities and were left undisturbed. Figures from the Kennecott-Rio Tinto closure report showing the location of impacted soils remaining on Daybreak property along the Site boundaries are included in Appendix A. 20201466.001A/SLC23R156681_ FINAL Page 6 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 2 SOIL REMOVAL ACTIVITIES ___________________________________________________________________________________ The Lark Monofill soil remediation activities began in May of 2021 and were completed in May 2023. Kleinfelder personnel directed the field activities and Richins General Engineering (Richins) was contracted by SOJO118 to provide the excavation equipment and conduct the earthmoving. Excavation and soil sampling activities were conducted in accordance with the project workplan and following the standard operating procedures (SOPs) included in Appendix B. The remedial excavation and soil sampling methodologies are described below. 2.1 PRE-FIELD ACTIVITIES Prior to the start of field activities, the following tasks were completed: · Blue Stakes of Utah was notified prior to the removal operations to identify and mark the location of buried utilities. · Richins prepared the required plans and secured construction permits prior to beginning the field activities, including: o Land Disturbance permit from the City of South Jordan, o Construction Stormwater Pollution Protection Plan (SWPPP), and o Fugitive Dust Control Plan. · Kleinfelder and Richins held a pre-construction kick-off and health and safety meeting. 2.2 SOIL REMOVAL ACTIVITIES Richins, under Kleinfelder’s direction, used a tracked excavator to excavate soils impacted with lead and arsenic at concentrations above the Site’s designated land use standards. Water trucks were used to control dust during soil loading and transportation on the dirt haul roads. The excavated soil was transported to either the Trans-Jordan Landfill or the Site’s commercial parcel in accordance with the approved work plan. Tasks related to the removal action are described below. 20201466.001A/SLC23R156681_ FINAL Page 7 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 2.2.1 Soil Removal Activities East Lark – Bastian Ditch Drainages Soil excavation began along the south end of the Site’s east fence line and proceeded north, then west following the fence. The metals-impacted soil was removed in approximately six-inch intervals to allow Kleinfelder to screen the in-situ soil with a hand-held x-ray fluorescence (XRF) meter. Readings were taken continuously from the post-removal surfaces, including both the floor and sidewalls of the excavation. XRF readings indicating the metals concentrations were likely to exceed the Daybreak Residential Standards were removed as “impacted.” The impacted soil excavation boundaries are shown on Figure 3. Based on the prior Site characterization and XRF screening during removal, the soils excavated from the Site’s east and northeast fence lines contained lead and arsenic concentrations below the Commercial Land Use Standards and were loaded directly into trucks and hauled to the commercial parcel established in the southwestern corner of the Site, in accordance with the DERR-approved work plan. Soils impacted with lead and arsenic at concentrations above the Daybreak Residential Standards were excavated along the east and northeast fence lines adjacent to the Daybreak property generally to depths of 2 to 5 feet and widths ranging from 4 feet to 25 feet. Approximately 40,000 cubic yards of soil were removed from the East Lark area and placed in the commercial parcel. Upon removal of the impacted soils, post-removal confirmation soil samples were collected from the ground surface and sidewalls of the excavations as described in Section 3. Two areas of impacted soil within East Lark were excavated to approximately 15 feet in depth, referred to as the “KT-8” and “G-26” excavations. These areas align with an apparent former Bastian Ditch tributary that crossed the northeast portion of the Lark Monofill and continued east onto the Daybreak property. Due to the discovery of this apparent historical buried drainage, Kleinfelder conducted additional site characterization to assess the nature and extent of the deeper impacts, as discussed in Section 5. 2.2.2 Soil Removal Activities West Lark – Bastian Ditch Channel Based on the prior Site characterization and in accordance with the work plan, soils excavated from the Bastian Ditch channel were either loaded directly into trucks and transported to the Trans-Jordan Landfill or stockpiled adjacent to the excavation and characterized to assess the appropriate disposal location. As with the East Lark soils, the Bastian Ditch soil excavation was directed by Kleinfelder personnel screening soils using XRF analyzers. XRF readings indicating that metals concentrations were 20201466.001A/SLC23R156681_ FINAL Page 8 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 likely to exceed the Unrestricted Land Use Standards were removed as “impacted.” A small portion of the Bastian Ditch alignment overlapped the commercial parcel in the southwestern corner of the Site. The Ditch soils within the commercial parcel were excavated, stockpiled, and sampled to assess whether they were suitable to remain in the commercial parcel. Metals-impacted soils were excavated along the Bastian Ditch main channel generally to depths of 6 to 10 feet and widths ranging from 20 feet to 50 feet. In two areas, shallow impacted soils (likely from surface overflow) were identified east (topographically downgradient) of the main Bastian Ditch channel. The shallow overflow locations are shown on Figure 3 as wider areas within the Ditch excavation, one area is located just south of the paved compost facility and the other is near the southern property line. These areas appear to have received Bastian Ditch overflow water. The overflow areas were excavated to a depth of approximately three feet. 2.3 STOCKPILE SAMPLING AND SOIL DISPOSAL Soils excavated from the Bastian Ditch channel and overflow areas were stockpiled adjacent to the excavation. The impacted soil stockpiles were characterized to assess their appropriate disposal location. The impacted stockpiles were sampled at a frequency of one composite sample (10 aliquots) per approximate 100 cubic yards of stockpiled soil. The samples were collected in accordance with the project work plan (Kleinfelder, 2021b) and sampling SOPs. All soil aliquots from a given sample were combined into one zip-lock sample bag. The material was homogenized in the bag by shaking and kneading the contents. The impacted stockpile samples were labeled with the prefix “EP” and analyzed at an accredited laboratory for total concentrations of lead and arsenic using USEPA Method 6010B. A total of 310 excavation stockpile samples were submitted for laboratory analysis. The stockpile sample locations are depicted in Figure 4. Some soils with higher metals concentrations, based on the prior Site characterization data and XRF screening, were directly loaded into trucks and hauled to the Trans-Jordan Landfill for disposal. The “EP” stockpile soil analytical results were used to determine the appropriate disposal location for each stockpile. The impacted stockpile analytical results and stockpile disposal locations are presented in Table 1. In accordance with the work plan, stockpiled soils with metals concentrations below the Commercial Land Use Standards were placed in the commercial parcel. Approximately 32,000 cubic yards of stockpiled soils were transported to the commercial parcel. Analytical results of samples collected from the Bastian Ditch excavated stockpiles indicate 82 percent (247) of the stockpiles placed 20201466.001A/SLC23R156681_ FINAL Page 9 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 in the commercial parcel had lead and arsenic concentrations below the Unrestricted Land Use Standards. Upon the additional loading, hauling, and spreading of the stockpiles in the commercial parcel, the final lead concentrations of soil placed in the commercial parcel are likely to be primarily below the Unrestricted Land Use Standards. Stockpiled soils exceeding the commercial standards were hauled to the Trans-Jordan Landfill for disposal. Approximately 1,420 cubic yards of impacted soil were disposed of at the Trans-Jordan Landfill. A summary of the loads disposed of at the Trans-Jordan Landfill, including disposal dates and load weights is provided in Appendix C. Upon removal of the impacted soils, post-removal confirmation soil samples were collected from the ground surface and sidewalls of the excavations and from the impacted stockpile footprints, as described in Section 3. During the course of the soil removal activities, clean overburden was identified in some locations via XRF screening. To reduce the costs associated with hauling and/or disposing of clean soil, Kleinfelder directed Richins to stockpile the “clean” overburden adjacent to the excavations. The overburden stockpiles were sampled at a frequency of one composite sample (10 aliquots) per approximate 100 cubic yards of stockpiled soil. The overburden samples were labeled with an “SP” prefix and analyzed for total concentrations of lead and arsenic using USEPA Method 6010B. A total of 116 overburden stockpile samples were analyzed. Following confirmation that the lead and arsenic concentrations in the soil in each overburden stockpile were below the Unrestricted Land Use Standards, the stockpiles were used to backfill portions of the excavations. The overburden stockpile analytical results are presented in Table 2. 20201466.001A/SLC23R156681_ FINAL Page 10 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 3 POST-REMOVAL CONFIRMATION SOIL SAMPLING ___________________________________________________________________________________ Following excavation of the metals-impacted soils, Kleinfelder collected post-removal composite soil samples from the excavation ground surface and sidewalls to document the lead and arsenic concentrations remaining in Site soils. The post-removal samples were labeled as follows: · East Lark fence line excavation post-removal samples were labeled with the prefix “FG” for ground surface samples and “FS” for excavation sidewall samples. · Post-removal samples from larger excavations in the East Lark area were labeled with the excavation identifier, i.e., KT-8, C-7, and G-26. · Bastian Ditch excavation post-removal samples were labeled with the prefix “DG” for ground surface samples and “DS” for excavation sidewall samples. The “DS” samples are labeled with the sample number, then “W” for west sidewall and “E” for east sidewall. · Post-removal samples followed by an “X” denote locations where the original post-removal sample exceeded the designated land use standard and additional soil was removed. The “X” sample replaces the original closure sample (i.e., DS-9Wx). · Post-removal samples collected from the ground surface after removal of the Bastian Ditch impacted stockpiles were labeled with the prefix “ESG.” · Samples collected from remaining in-situ soils at the property lines were labeled with the prefix “R.” The samples were collected in accordance with the project work plan (Kleinfelder, 2021b) and sampling SOPs. The post-removal composite ground surface samples were collected with 5 aliquots spaced at 50-foot linear intervals representing approximately 200 linear feet of the excavation, with additional aliquots spaced 20 to 30 feet laterally depending on the width of the excavation. All soil aliquots from a given sample were combined into one zip-lock sample bag. The material was homogenized in the bag by shaking and kneading the contents. Post-removal excavation sidewall samples were collected with aliquots spaced at 50-foot intervals, each representing 200 linear feet. The sidewall samples were collected as a six-inch vertical sample from the soil interval that demonstrated the highest metals concentrations prior to removal. In two larger excavations (KT-8 and C-7), multiple post-removal sidewall samples were analyzed as single point samples rather than composites to characterize the remaining soils more thoroughly. A total of 20201466.001A/SLC23R156681_ FINAL Page 11 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 69 post-removal ground and sidewall samples were collected from the East Lark area and 127 post-removal ground and sidewall samples were collected from the West Lark area. The sample locations were surveyed using a hand-held global positioning system (GPS) unit capable of approximately one-meter accuracy. The post-removal sample locations are shown on Figures 3-1 through 3-9. Sample Information Sheets detailing each sample’s composite configuration, sample purpose, location, collection date, southernmost coordinate, and sample photographs are included in Appendix D. The soil samples were submitted to American West Analytical Laboratory (AWAL) or Pace Analytical Laboratory (Pace) for analysis of lead and arsenic by USEPA methods SW846-3050B (sample preparation) and SW846-6010B (sample analysis). Chain-of-custody procedures were followed for the handling of the samples; the chain-of-custody forms are included with the laboratory analytical reports in Appendix E. 20201466.001A/SLC23R156681_ FINAL Page 12 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 4 POST-REMOVAL SOIL ANALYTICAL RESULTS ___________________________________________________________________________________ 4.1 ANALYTICAL RESULTS PER LAND USE The analytical results were compared to the applicable land use standards for each area as illustrated in Figure 2. The remediation goals by removal area are listed below. West Lark (~83 acres) and Compost Facility (~17 acres) · Sitewide Unrestricted Land Use Standards – 500 mg/kg lead and 100 mg/kg arsenic. (The Site’s northern 17-acre triangle is currently operated for commercial use by Trans-Jordan Landfill for their commercial composting operation. A portion of this area may eventually be developed for residential land use west of the Highway 111 corridor.) East Lark (~58 acres) · Bastian Ditch Daybreak Residential Standards – 700 mg/kg lead and 100 mg/kg arsenic. Park Parcel (~17 acres) · OU5 Recreational Standards – 2,207 mg/kg lead and 283 mg/kg arsenic. Commercial Parcel (~8 acres) · Bastian Ditch Daybreak Commercial Standards – 2,000 mg/kg lead and 450 mg/kg arsenic. Highway 111 Roadway · OU5 Industrial Standards – 4,414 mg/kg lead and 261 mg/kg arsenic. (UDOT is planning to relocate Highway 111 to traverse the center of the Lark Monofill property from north to south as depicted on Figure 2.) The laboratory reports indicate lead and arsenic concentrations in all post-removal confirmation soil samples are below the applicable cleanup standards for each designated land use. The analytical results are summarized in Tables 3 and 4, along with sampling information including sample date, sample 20201466.001A/SLC23R156681_ FINAL Page 13 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 interval/depth, sample purpose, sample configuration, associated cleanup action level, and analytical results. The laboratory analytical reports are included in Appendix E. A discussion of the post-removal sample analytical results by land use area is presented below. 4.2 WEST LARK AND COMPOST FACILITY ANALYTICAL RESULTS The historical Bastian Ditch channel ran north-south beneath the Trans-Jordan compost facility and the West Lark property. Both areas are being considered for residential land use and were remediated to the Unrestricted Land Use Standards of 500 mg/kg lead and 50 mg/kg arsenic. None of the post-removal Bastian Ditch ground or sidewall samples contained lead or arsenic concentrations exceeding the Unrestricted Land Use Standards. Additionally, none of the post-removal impacted-stockpile footprint samples contained metals concentrations exceeding the Unrestricted Standards. The West Lark post-removal confirmation sample analytical results are summarized in Table 3. The sample locations are illustrated in Figures 3-2, 3-3, 3-4, 3-5, and 3-6. Prior characterization of the historical Bastian Ditch channel beneath the paved Trans-Jordan Compost Facility identified in-situ metals concentrations below the Unrestricted Land Use Standards under most of the paved portion of the compost facility (see Figure 2). This unimpacted portion of the Bastian Ditch alignment was not excavated during the remedial activities. At the northern extent of the Ditch alignment, sample KP-2C, located west of the compost facility maintenance building and approximately two to three feet deep, had a lead concentration of 799 mg/kg. This exceeds the Unrestricted Standard but is below the Commercial Standard. The area represented by KP-2C was not excavated during the Site remediation due to the presence of multiple utilities crossing the area. The area is located directly adjacent to the proposed Highway 111 right-of-way and is currently used for commercial purposes. Due to its location, it is unlikely to be converted to residential use. If converted to residential use, the demolition of the maintenance building and associated utilities for road construction would facilitate removal of these soils. At the far north end of the compost facility a side drainage of the Bastian Ditch crosses the Site from west to east through a culvert under the facility access road and in open ditch west and east of the road. The Ditch drainage lies completely within the proposed Highway 111 right-of-way. The impacted soils located east of the access road and represented by sample KP-1 (see Figure 2 and Table 5) were excavated during Site remediation. Impacted soils were identified beneath the drainage west of the road at depths of 10 to 13 feet, represented by sample KP-1W. Lead concentrations reported in sample KP-1W exceed the Unrestricted Standard but are below the Commercial Standard. The impacted soils 20201466.001A/SLC23R156681_ FINAL Page 14 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 are overlain by ten feet of “clean” soil. The deep soil impacts are compliant with the proposed land use as a roadway and were not removed during this remediation. The Bastian Ditch impacted soils were excavated up to the Site property lines. The Ditch channel sediments extended off-Site and were not removed at three locations on the southern property line abutting 11800 South Street and one area on the northeastern property line adjacent to the Daybreak Development. Soil samples (labeled R-1 through R-4) were collected at these locations to characterize the metals concentrations remaining at the property lines. The analytical results are presented in Table 3. Lead concentrations detected in soil remaining at the property lines exceeded the Unrestricted and Daybreak Residential Land Use Standards and in one location on the southern property line exceeded the Commercial Land Use Standard. The locations of the “R” samples collected at the property lines are presented in Figures 3-2, 3-5, and 3-6. 4.3 EAST LARK AND PARK PARCEL ANALYTICAL RESULTS The Bastian Ditch drainages traversed the Monofill’s northern and eastern fence lines, impacting the park parcel and East Lark areas. The East Lark area is proposed for residential land use and was remediated to the Daybreak Residential Land Use Standards of 700 mg/kg lead and 100 mg/kg arsenic. Although the park parcel is proposed for recreational land use, the Bastian Ditch Drainage soils in the park parcel were remediated to the more stringent Daybreak Residential Standards because the park boundaries had not been established by the time of the remedial action. None of the post-removal samples collected in either area exceeded the Daybreak Residential Land Use Standards. The post-removal soil confirmation sample analytical results are summarized in Table 4. The confirmation sample locations are illustrated in Figures 3-7, 3-8, and 3-9. Soils impacted with lead and arsenic at concentrations above the Daybreak Residential Standards were excavated to the property lines. Metals impacted soils were left on the Daybreak property along the east and north fence lines as depicted by Rio Tinto in their 2015 remediation report (Appendix A). Kleinfelder did not collect samples of the soils remaining on Daybreak property. 20201466.001A/SLC23R156681_ FINAL Page 15 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 4.4 COMMERCIAL PARCEL ANALYTICAL RESULTS In the southwestern corner of the Site, the Bastian Ditch channel overlapped the Commercial Parcel for approximately 250 feet. The Bastian Ditch soils within the commercial parcel boundaries were excavated, stockpiled, and characterized in the same manner as the Ditch soils within the proposed residential areas. None of the post-removal samples collected in the commercial parcel contained lead or arsenic at concentrations above the Daybreak Commercial Land Use Standards. The commercial parcel post-removal sample analytical results are presented in Table 3. The confirmation sample locations are illustrated in Figure 3-5. 20201466.001A/SLC23R156681_ FINAL Page 16 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 5 ADDITIONAL SITE CHARACTERIZATION ___________________________________________________________________________________ Kleinfelder identified soil with lead concentrations exceeding the Daybreak Residential Standard at depth in the G-26 excavation, located in the northwestern corner of the Park parcel. The G-26 area was excavated to 15 feet bgs, and the soil hauled to the commercial parcel. A narrow band of soil with lead concentrations above the Residential Standard but below the Recreational Standard (at 899 mg/kg lead) was left in-situ at approximately 17 to 18 feet bgs, as represented by sample G-26 17-18 on Table 5. Because the impacted soil remaining beneath the G-26 excavation was overlain by 17 feet of unimpacted soil, and the impacted soil did not exceed the Recreational Land Use Standards that apply to the area, the material was not removed. Additional soil characterization was subsequently conducted to assess the lateral extent of the deeper impacts and whether those impacted soil concentrations were below the Recreational Standards applicable to the area. The additional characterization methods and results are described below. Initially, several test pits were excavated in the vicinity of the G-26 excavation. The impacted soils were identified in a white or light-colored silty sand underlying coarser sands and gravels. The test pits were generally excavated in one- to two-foot lifts and extended laterally until the light-colored silty-sand layer was encountered or to 20 feet below grade. The soil intervals were screened with an XRF. Soil intervals exhibiting the highest apparent lead impacts were selected for laboratory analysis from each test pit. Additional test pits were then excavated further southeast of G-26, following the apparent course of the deep soil impacts. In all, 127 test pits were excavated and 199 soil samples were collected and laboratory-analyzed to characterize this portion of the Site and assess for the presence of impacted soils at depth. The characterization test pit locations are shown on Figure 6. Table 5 presents the analytical results, sample location, proposed land use action level, and final disposition of the sampled soil. The analytical results indicate all samples collected from test pits excavated within the Park Parcel contained lead and arsenic at concentrations below the OU5 Recreational Land Use Standards of 2,207 mg/kg lead and 283 mg/kg arsenic, with a maximum reported lead concentration of 1,090 mg/kg and maximum reported arsenic concentration of 194 mg/kg. This arsenic result was an anomaly, with the next highest arsenic reported at 48.2 mg/kg. In general, soils impacted with lead and arsenic at concentrations above the Daybreak Residential Standards but below the Recreational Standards were identified in an approximate one-foot-thick layer of silty-sand at depths ranging from 15 to 20 feet on the west side of the Park parcel near G-26 and becoming more shallow moving southeast with the impacts identified at depths of six to seven feet in test pit G-49. The approximate dimensions of the 20201466.001A/SLC23R156681_ FINAL Page 17 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 deep soil impacts (above the Daybreak Residential Standards) are 700 feet long, 60 feet wide, and approximately one foot thick. The impacts appear to align with the Bastian Ditch Drainage that extends east onto Daybreak property in the vicinity of the KT-8 excavation, where deeper soil impacts were identified and removed. Figure 6 illustrates the test pit analytical results and the extent of the deeper impacted soils on the Park parcel. All characterization samples collected from test pits within the East Lark residential parcel contained lead and arsenic at concentrations below the Daybreak Residential Land Use Standards, except for samples from test pit C7 near the east fence line. As indicated on Table 5 and Figure 6, soils in the vicinity of test pit C7 were excavated and hauled to the commercial parcel. 20201466.001A/SLC23R156681_ FINAL Page 18 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 6 MONITORING WELL CLOSURE ___________________________________________________________________________________ As part of the reclamation activities, Kleinfelder supervised the abandonment of three of the four groundwater monitoring wells that were present on the Site. The four wells (MW-1 through MW-4) were previously installed at the Site by SVWR as required by the Lark Monofill operating permit. The wells were constructed of four-inch-diameter PVC and extended 160 to 180 feet below ground surface. Two wells were located along the Site’s southeastern fence line (MW-3 and 4), one along the northeast fence line (MW-2) and one in the 11800 South roadway on the far southwest corner of the Site (MW-1). Kleinfelder received permission from the Salt Lake County Health Department to permanently abandon the wells. MW-2, 3, and 4 were abandoned by Zimmerman Well Service in November 2021 by filling the casings with neat cement and bentonite grout using a tremie pipe and grout pump. The surface completions were removed, and the well casings were cut off at five feet bgs. The fourth monitoring well (MW-1), located in the west bound lanes of 11800 South, was not abandoned at the direction of SOJO118 as it did not hinder with the Site soil remediation activities. A well location map and the well closure permit documentation are included in Appendix C. Additionally, a former SVWR water supply well remains on Lark property in a fenced-off triangle located directly south of 11800 South Street. The well previously supplied water for the Lark Monofill operations and was piped to a water holding tank on the west side of the Site. We understand this well is dry and no longer used for a water supply. RioTinto Kennecott owns a triple-nested groundwater monitoring well installed on the Lark property (labeled BSG 1153 A, B, and C), located midway along Lark’s east fence line. The Kennecott wells are not located in an area proposed for soil remediation and were not disturbed during the soil remediation activities. 20201466.001A/SLC23R156681_ FINAL Page 19 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 7 DATA QUALITY OBJECTIVES AND QA/QC ___________________________________________________________________________________ 7.1 FIELD QUALITY ASSURANCE/QUALITY CONTROL Quality Assurance (QA) and quality control (QC) procedures associated with the Lark Monofill soil removal were implemented to produce data that are accurate, credible, and representative of conditions at the Site. Kleinfelder’s QA/QC procedures for this project included: · Careful record keeping and documentation, · Use of appropriate equipment and decontamination procedures, · Split Quality Assurance samples, · Documentation of Chain-of-Custody, and · The samples were submitted to Pace or AWAL, both Utah-certified laboratories, that follow QA/QC procedures consistent with USEPA standards. Laboratory QA/QC samples included method blanks, matrix spikes, duplicates, and calibration check samples. QA statements for the lab samples are included with the laboratory reports in Appendix E. Quality control for the sampling program included the use of standardized sample collection and handling methods, documenting pertinent field information, and keeping chain-of-custody records as prescribed herein. Single-use, disposable sampling tools were used for sample collection, or non-disposable sampling equipment was decontaminated between each sample location. 7.2 DATA QUALITY ASSESSMENT REVIEW The purpose of data quality assessment is to assure that data generated under the QA/QC program is reconciled, accurate, and consistent with program data quality objectives (DQOs). The quality of the data was assessed based on precision, accuracy, completeness, representativeness, and comparability. The collected samples were analyzed for total arsenic and lead. Samples were analyzed at Pace and AWAL. 20201466.001A/SLC23R156681_ FINAL Page 20 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 A review of the laboratory analytical reports indicated all sample analyses were performed within holding times, the samples were analyzed following the correct methods, all instruments and calibration check requirements were met, and concentrations of either lead or arsenic were not reported in the method blanks above the laboratory detection limits. Precision is the degree to which a measurement is reproducible and is quantitatively measured by calculating the Relative Percent Difference (RPD) of two measurements. RPD is defined as: =( 1 − 2) 1 + 2)2 × 100 Where A1 = Analytical result from the original sample A2 = Analytical result from the duplicate Laboratory precision was assessed by calculating the RPD between the original sample and its field duplicate. Field duplicate soil samples were collected at a frequency of approximately 10% of the soil samples submitted to the analytical laboratory. The samples were split with one portion submitted as a standard analytical sample and one portion as a blind duplicate. The data quality objective for the split sample analyses is an RPD of 35% or less. Of the 154 duplicate analyses, 134 (or 87%) met the RPD goal of 35% or less, as presented in Table 6. The samples that did not meet the RPD goal are likely due to the non-homogeneous nature of soil samples. Accuracy is a determination of how close the measurement is to the true value and was assessed by the laboratory as part of their QA/QC procedures by review of the percent recovery in the matrix spike (MS), matrix spike duplicate (MSD), and laboratory control sample (LCS) analyses, and compared to the laboratory’s control limits. Percent Recovery is defined as: % Recovery = [ 100 (measured value/ true value)] For this data set: · The percent recoveries for the LCS analyses were within the established control limits. · The percent recoveries for the MS analyses were within the established control limits. · The percent recoveries for the MSD analyses were within the established control limits. 20201466.001A/SLC23R156681_ FINAL Page 21 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 Percent Completeness was measured as the number of samples that were within the established control limits for all quality control parameters. With 821 soil samples collected, each analyzed for total lead and arsenic, there are 1,642 analytical results. Of the 1,642 analytical results, 4 total arsenic and 22 total lead analytical results were qualified, which represents 1.6% of the sample analyses performed. As such, 98.4% of the sample results were not qualified and are considered valid, which exceeds the DQO of 90% valid data. Representativeness was assessed by verifying the samples were analyzed within their analytical method holding times and that method blanks do not report any contamination. A review of the laboratory analytical reports indicated the sample analyses were performed within holding times and the method blanks did not report concentrations of either lead or arsenic. Comparability was assessed by reviewing the units of measure reported in the analytical results compared to the units of measure established for the action levels and by using analytical methods that are comparable to other similar studies in the same area and under the same regulatory framework. The units of measure reported by the laboratory are the same units of measure for the designated land use standards and the analytical methods employed are consistent with similar studies conducted in the area. Based on our review of the analytical data and associated data quality assessment findings, we believe that the data may be used for the intended purpose of characterizing the Site soils and assessing that the concentrations of lead and arsenic in soils remaining in place in the areas of impacted soil removal are below the designated land use standards. 20201466.001A/SLC23R156681_ FINAL Page 22 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 8 SUMMARY AND CONCLUSIONS ___________________________________________________________________________________ Kleinfelder conducted metals-impacted soil remediation of the Lark Monofill property from May 2021 through May 2023. Metals-impacted soils were excavated and hauled to either the Trans-Jordan Landfill or the Site’s commercial parcel. Post-removal confirmation soil samples were collected within the excavated areas to document the concentrations of lead and arsenic remaining in the Site soils. Based on the laboratory analytical results, all lead and arsenic concentrations reported by the laboratories in the post-removal soil samples were below the designated land use standards for the sample location. One sample location in the northern portion of the compost facility contained lead at concentrations below the Commercial Land Use Standard but above the Unrestricted Land Use Standard. The current land use is commercial; however, if this area is eventually developed for residential land use, the soils exceeding the unrestricted standards should be appropriately addressed. These results demonstrate that soils impacted with lead and arsenic at concentrations above the applicable land use standards identified during Site characterization activities have been removed from the Lark Monofill in compliance with the project work plan. On behalf of SVWR and SOJO118, Kleinfelder requests a no further action/remedial closure finding from the Agencies regarding remediation of metals-impacted soils at the Site. 20201466.001A/SLC23R156681_ FINAL Page 23 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 9 LIMITATIONS ___________________________________________________________________________________ This work was performed in a manner consistent with that level of care and skill ordinarily exercised by other members of Kleinfelder’s profession practicing in the same locality, under similar conditions and at the date the services are provided. Our conclusions, opinions and recommendations are based on a limited number of observations and data. It is possible that conditions could vary between or beyond the data evaluated. Kleinfelder makes no other representation, guarantee or warranty, express or implied, regarding the services, communication (oral or written), report, opinion, or services provided. This corrective action was limited to remediating the metals-impacted soils identified on the Site as detailed in the Lark Remedial Action Work Plan dated April 26, 2021 (Kleinfelder DCN: SLC20R107223_R3) and Addendum #1 dated February 24, 2022. Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss of property value, damage, or injury which results from pre-existing metals-impacted soils and/or hazardous materials being encountered or present on the project site, or from the discovery of such materials outside those areas identified during or previous to this corrective action. Kleinfelder offers various levels of investigative and engineering services to suit the varying needs of different clients. It should be recognized that definition and evaluation of geologic and environmental conditions are a difficult and inexact science. Judgments leading to conclusions and recommendations are generally made with incomplete knowledge of the subsurface conditions present due to the limitations of data from field studies. Although risk can never be eliminated, more detailed and extensive studies yield more information, which may help understand and manage the level of risk. Since detailed study and analysis involves greater expense, our clients participate in determining levels of service that provide adequate information for their purposes at acceptable levels of risk. More extensive studies, including subsurface studies or field tests, should be performed to reduce uncertainties. This report may be used only by the client and only for the purposes stated within a reasonable time from its issuance. land use, site conditions (both on- and off-site), or other factors may change over time, and additional work may be required. Non-compliance with any of these requirements by the client or anyone else, unless specifically agreed to in advance by Kleinfelder in writing will release Kleinfelder from any liability resulting from the use of this report by any unauthorized party. 20201466.001A/SLC23R156681_ FINAL Page 24 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 10 REFERENCES ___________________________________________________________________________________ Kennecott-Rio Tinto, 2016; Daybreak Commerce Park/West Village Soil Characterization and Post-Removal Sampling Report. October 2016. Kennecott GIS Database No. 1167. Kleinfelder, 2020a; Phase I Environmental Site Assessment, South Valley Water Reclamation Property, NE Corner of HWY 111 and 11800 South, South Jordan, Utah. (Document No. SLC19R99955R1), dated August 21, 2019, revised June 2, 2020. Kleinfelder, 2020b; Phase II Environmental Site Assessment, South Valley Water Reclamation Property, NE Corner of Highway 111 and 11800 South, South Jordan, Utah, (Document No. SLC20R105847R2), dated January 16, 2020, revised June 2, 2020. Kleinfelder, 2021a; Bastian Ditch Sediment Waste Profiling Report, South Valley Water Reclamation Property, NE Corner of Highway 111 and 11800 South, South Jordan, Utah, (Document No. SLC21R123035), dated March 18, 2021. Kleinfelder, 2021b; Lark Monofill Bastian Ditch Remedial Action Work Plan, South Valley Water Reclamation Property, NE Corner of Highway 111 and 11800 South, South Jordan, Utah, (Document No. SLC20R107223R3), dated April 26, 2021. Kleinfelder, 2021c; Post-Removal Sampling Report Lark Monofill Substation Parcel, Vicinity 7020 West and 11800 South, South Jordan, Utah. (Document No. SLC21R127561R1), dated July 1, 2021. Kleinfelder, 2022; Addendum #1, Lark Monofill Bastian Ditch Remedial Action Work Plan, South Valley Water Reclamation Property, NE Corner of Highway 111 and 11800 South, South Jordan, Utah, (Document No. SLC22R136048R1), dated January 31, 2022, revised February 24, 2022. Utah Division of Environmental Response and Remediation (DERR), 2006; Letter on adopting a site-specific residential and commercial use standards for arsenic and lead for the soils located in specific undeveloped areas within Daybreak. September 22, 2006. DERR, 2015, Technical Memorandum, Compilation of Soil and Groundwater Action Levels, Kennecott North and South Zones Administrative File. December 29, 2015. DERR, 2021a; Approval Letter for Lark Monofill Remedial Action Work Plan, DERR Document ERRC-057-21, dated April 30, 2021. 20201466.001A/SLC23R156681_ FINAL Page 25 of 25 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 DERR, 2021b; Email from KCrane of DERR – Clarification of Lark Monofill Commercial and Residential Land Use Action Levels, dated August 5, 2021. DERR, 2021c; No Further Action Letter for Lark Monofill Substation Parcel, dated September 9, 2021. DERR, 2022; Approval Letter for Addendum #1 to Lark Monofill Remedial Action Work Plan, DERR Document ERRC-032-22, dated March 3, 2022. Utah Division of Waste Management and Radiation Control, DWMRC, 2020; Letter concurring Bastion Ditch soil within Lark Monofill OU5 excluded from hazardous waste regulation due to Bevill Exclusion, dated September 2, 2020. Ta b l e s Sample ID Date Collected Sample Depth Sample Configuration Sample Type/ Purpose Final Dispostion of Stockpiled Soil Arsenic (mg/kg) Lead (mg/kg) ES-1 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.4 326 ES-2 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.3 216 ES-3 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.6 288 ES-4 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.9 283 ES-5 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.9 278 ES-6 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 23.6 480 ES-7 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.7 283 ES-8 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.2 418 ES-9 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.4 374 ES-10 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.8 293 ES-11 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.8 298 ES-12 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.0 186 ES-13 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 32.7 648 ES-14 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 31.9 677 ES-15 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.1 383 ES-16 09/17/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.8 353 ES-17 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.1 365 ES-18 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.0 613 ES-19 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 27.0 629 ES-20 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 27.1 492 ES-21 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.4 429 ES-22 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.8 619 ES-23 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.1 558 ES-24 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.5 676 ES-25 10/07/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.7 953 ES-26 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.4 234 ES-27 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.9 553 ES-28 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.4 417 ES-29 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.0 517 ES-30 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.4 387 ES-31 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 7.3 225 ES-32 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.5 297 ES-33 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.2 378 ES-34 01/13/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 39.9 1180 ES-35 01/13/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.0 448 ES-36 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 10.3 253 ES-37 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.8 688 ES-38 NA NA Not Sampled Direct hauled stockpile to TransJordan TransJordan Landfill NA NA ES-39 10/12/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.3 320 ES-40 10/14/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.5 331 ES-41 10/14/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.2 304 ES-42 10/14/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.7 330 ES-43 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.4 241 ES-44 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 10.6 175 ES-45 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.0 1030 ES-46 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.1 377 ES-47 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.7 396 ES-48 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.4 431 ES-49 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.1 404 ES-50 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.7 492 ES-51 10/18/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.5 497 ES-52 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.6 280 ES-53 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.9 257 ES-54 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.1 285 ES-55 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.9 224 ES-56 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.1 239 ES-57 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.6 177 ES-58 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.4 267 ES-59 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.1 230 ES-60 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.9 211 ES-61 11/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 41.4 517 ES-62 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.0 134 ES-63 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.2 111 ES-64 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.0 143 ES-65 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.0 106 ES-66 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.7 109 ES-67 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.8 109 ES-68 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.7 102 ES-69 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.1 97 ES-70 11/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 83 ES-71 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.0 88 ES-72 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.6 90 ES-73 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.3 161 ES-74 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 193 ES-75 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.6 164 ES-76 11/09/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.0 101 ES-77 11/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.5 159 ES-78 11/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.4 155 ES-79 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.2 168 Lark Monofill Remedial Action Table 1 Bastian Ditch Stockpiles Soil Profiling Analytical Results 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 4 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Configuration Sample Type/ Purpose Final Dispostion of Stockpiled Soil Arsenic (mg/kg) Lead (mg/kg) Lark Monofill Remedial Action Table 1 Bastian Ditch Stockpiles Soil Profiling Analytical Results ES-80 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.2 157 ES-81 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.4 130 ES-82 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.8 136 ES-83 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.7 120 ES-84 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.2 178 ES-85 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 61.5 211 ES-86 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 33.9 154 ES-87 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.2 157 ES-88 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.8 97 ES-89 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.3 325 ES-90 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.7 127 ES-91 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.0 109 ES-92 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 10.7 112 ES-93 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.8 129 ES-94 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.0 162 ES-95 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 182 ES-96 11/29/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.1 781 ES-97 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.2 329 ES-98 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.2 427 ES-99 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.1 484 ES-100 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.3 282 ES-101 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.1 432 ES-102 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 28.7 604 ES-103 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.0 1180 ES-104 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.5 460 ES-105 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 134.0 3140 ES-106 11/30/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.6 334 ES-107 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.5 818 ES-108 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.2 506 ES-109 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.9 454 ES-110 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.7 404 ES-111 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 9.4 434 ES-112 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 7.5 1160 ES-113 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 9.8 243 ES-114 12/01/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 9.5 151 ES-115 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 10.3 333 ES-116 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 18.9 865 ES-117 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 32.0 872 ES-118 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 32.5 1400 ES-119 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.3 1060 ES-120 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.5 682 ES-121 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 14.9 677 ES-122 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.3 671 ES-123 12/02/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.2 386 ES-124 12/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 13.8 287 ES-125 12/03/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.4 205 ES-126 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.0 878 ES-127 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.5 420 ES-128 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.2 360 ES-129 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.2 536 ES-130 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.9 484 ES-131 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.9 540 ES-132 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 30.3 1020 ES-133 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.7 311 ES-134 12/06/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.6 574 ES-135 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.6 472 ES-136 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.8 485 ES-137 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.7 368 ES-138 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.6 408 ES-139 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.1 379 ES-140 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 399 ES-141 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.1 383 ES-142 12/13/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.3 645 ES-143 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.7 374 ES-144 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.2 467 ES-145 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.9 335 ES-146 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization TransJordan Landfill 45.7 1450 ES-147 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.6 325 ES-148 12/22/2021 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.4 350 ES-149 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 28.7 447 ES-150 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.2 296 ES-151 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.6 295 ES-152 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 36.0 333 ES-153 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.2 604 ES-154 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.7 425 ES-155 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.7 627 ES-156 01/03/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.0 551 ES-157 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.9 552 ES-158 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 23.9 479 ES-159 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 28.6 652 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 4 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Configuration Sample Type/ Purpose Final Dispostion of Stockpiled Soil Arsenic (mg/kg) Lead (mg/kg) Lark Monofill Remedial Action Table 1 Bastian Ditch Stockpiles Soil Profiling Analytical Results ES-160 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 23.4 576 ES-161 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.1 355 ES-162 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.1 341 ES-163 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.1 550 ES-164 01/04/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.3 410 ES-165 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 27.6 593 ES-166 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.5 337 ES-167 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.1 515 ES-168 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 30.2 605 ES-169 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 23.4 376 ES-170 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.1 312 ES-171 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.6 190 ES-172 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.9 150 ES-173 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 225 ES-174 01/05/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.2 220 ES-175 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.5 302 ES-176 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.6 371 ES-177 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.6 313 ES-178 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.4 188 ES-179 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.5 474 ES-180 01/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.2 276 ES-181 01/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.4 373 ES-182 01/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.5 280 ES-183 01/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.3 431 ES-184 01/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.0 289 ES-185 01/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 30.5 328 ES-186 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.4 603 ES-187 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.4 506 ES-188 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.4 544 ES-189 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.7 547 ES-190 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.3 821 ES-191 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.8 597 ES-192 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.8 321 ES-193 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.1 326 ES-194 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.9 207 ES-195 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.6 188 ES-196 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.6 245 ES-197 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 10.5 174 ES-198 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 240 ES-199 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.4 196 ES-200 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.2 178 ES-201 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.8 171 ES-202 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.6 189 ES-203 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.8 184 ES-204 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.4 195 ES-205 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.0 236 ES-206 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.1 171 ES-207 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.5 402 ES-208 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.5 280 ES-209 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.8 262 ES-210 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.1 267 ES-211 01/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.5 255 ES-212 01/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 34.9 925 ES-213 01/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.0 352 ES-214 01/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.5 399 ES-215 01/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 331 ES-216 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.0 428 ES-217 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.0 185 ES-218 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.1 195 ES-219 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.8 293 ES-220 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.6 279 ES-221 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.6 558 ES-222 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.6 629 ES-223 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.5 184 ES-224 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 37.4 219 ES-225 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.4 218 ES-226 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.1 187 ES-227 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.8 205 ES-228 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.1 394 ES-229 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.2 304 ES-230 01/31/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.6 397 ES-231 01/31/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 26.1 480 ES-232 01/31/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 25.7 482 ES-233 01/31/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.4 430 ES-234 01/31/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 26.2 561 ES-235 02/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 27.4 490 ES-236 02/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.6 421 ES-237 02/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 33.2 687 ES-238 02/09/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.3 283 ES-239 02/09/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.2 224 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 3 of 4 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Configuration Sample Type/ Purpose Final Dispostion of Stockpiled Soil Arsenic (mg/kg) Lead (mg/kg) Lark Monofill Remedial Action Table 1 Bastian Ditch Stockpiles Soil Profiling Analytical Results ES-240 02/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.1 244 ES-241 02/10/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 33.8 797 ES-242 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.2 271 ES-243 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.7 328 ES-244 01/24/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.1 335 ES-245 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.5 279 ES-246 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.7 336 ES-247 01/25/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.6 233 ES-248 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.9 213 ES-249 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.2 260 ES-250 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.3 170 ES-251 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.7 229 ES-252 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.7 162 ES-253 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.3 200 ES-254 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.2 209 ES-255 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.2 186 ES-256 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.5 140 ES-257 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.8 152 ES-258 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 24.1 125 ES-259 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 222 ES-260 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.3 121 ES-261 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 12.8 147 ES-262 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.9 145 ES-263 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.3 173 ES-264 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.4 177 ES-265 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 11.5 114 ES-266 02/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.1 182 ES-267 03/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.8 356 ES-268 03/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 30.2 627 ES-269 03/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 28.4 497 ES-270 03/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 26.3 406 ES-271 03/01/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 29.2 400 ES-272 03/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.6 355 ES-273 03/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.4 287 ES-274 03/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.4 273 ES-275 03/21/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.6 288 ES-276 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.8 593 ES-277 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.0 315 ES-278 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 22.9 502 ES-279 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.8 216 ES-280 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.4 188 ES-281 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.1 219 ES-282 03/28/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.1 460 ES-283 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 20.1 300 ES-284 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.2 231 ES-285 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.3 186 ES-286 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 26.5 370 ES-287 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 17.5 192 ES-288 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.5 167 ES-289 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.9 321 ES-290 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.5 260 ES-291 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.2 223 ES-292 06/06/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 14.4 230 ES-293 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 27.1 110 ES-294 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.2 249 ES-295 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.8 217 ES-296 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 18.5 269 ES-297 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 13.4 167 ES-298 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 26.5 362 ES-299 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.7 149 ES-300 06/07/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 23.0 406 ES-301 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 15.8 230 ES-302 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 66.8 365 ES-303 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.8 211 ES-304 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 21.9 260 ES-305 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 16.7 234 ES-306 06/17/2022 0-6 inches 10 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 19.9 206 H-5 11/22/2021 0-6 inches 4 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 34.8 785 H-11 11/22/2021 0-6 inches 4 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 29.2 742 H-12 11/22/2021 0-6 inches 4 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 31.9 467 H-13 11/22/2021 0-6 inches 4 - point composite sample Impacted Stockpile Characterization Lark Commercial Parcel 34.2 827 450 2000 Notes and Abbreviations: mg/kg = milligrams per kilogram Highlighted sample = result exceeds the Commercial Land Use Standard Soil samples analyzed for total concentrations of lead and aresenic by USEPA Method SW6010B 82 Percent (247) of the stockpiles placed in the commercial parcel had soil concentrations below the Unrestricted Land Use Standards of 50 mg/kg Arsenic and 500 mg/kg Lead. Commercial Land Use Standards: 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 4 of 4 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Configuration Sample Purpose Arsenic (mg/kg) Lead (mg/kg) SP-1 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 14.8 135 SP-2 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 14.3 125 SP-3 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 14.8 85 SP-4 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 12.9 64 SP-5 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 13.6 102 SP-6 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 14.7 135 SP-7 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 22.4 202 SP-8 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 18.0 155 SP-9 06/15/2021 10 - point composite sample Overburden Stockpile Characterization 14.1 79 SP-10 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 14.0 140 SP-11 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 12.7 148 SP-12 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 9.9 67 SP-13 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 8.8 69 SP-14 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 12.0 96 SP-15 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 9.0 53 SP-16 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 22.3 133 SP-17 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 11.2 87 SP-18 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 11.3 95 SP-19 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 10.3 102 SP-20 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 11.3 110 SP-21 08/23/2021 10 - point composite sample Overburden Stockpile Characterization 9.0 68 SP-22 08/24/2021 10 - point composite sample Overburden Stockpile Characterization 11.7 79 SP-23 08/24/2021 10 - point composite sample Overburden Stockpile Characterization 10.0 58 SP-24 08/24/2021 10 - point composite sample Overburden Stockpile Characterization 7.9 27 SP-25 08/24/2021 10 - point composite sample Overburden Stockpile Characterization 8.2 43 SP-26 08/24/2021 10 - point composite sample Overburden Stockpile Characterization 11.6 102 SP-27 09/07/2021 10 - point composite sample Overburden Stockpile Characterization 16.7 221 SP-28 09/07/2021 10 - point composite sample Overburden Stockpile Characterization 17.0 221 SP-29 09/07/2021 10 - point composite sample Overburden Stockpile Characterization 17.2 268 SP-30 09/07/2021 10 - point composite sample Overburden Stockpile Characterization 16.9 188 SP-31 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 20.6 268 SP-32 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 17.6 235 SP-33 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 23.2 348 SP-34 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 21.1 260 Table 2 "Clean" Overburden Stockpiles Soil Profiling Analytical Results Lark Monofill Remedial Action 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Configuration Sample Purpose Arsenic (mg/kg) Lead (mg/kg) Table 2 "Clean" Overburden Stockpiles Soil Profiling Analytical Results Lark Monofill Remedial Action SP-35 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 20.0 236 SP-36 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 19.0 244 SP-37 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 15.2 189 SP-38 10/22/2021 10 - point composite sample Overburden Stockpile Characterization 19.7 238 SP-39 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 21.3 362 SP-40 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 24.4 417 SP-41 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 16.3 254 SP-42 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 19.4 294 SP-43 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 14.1 150 SP-44 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 16.5 236 SP-45 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 12.4 159 SP-46 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 17.8 280 SP-47 01/11/2022 10 - point composite sample Overburden Stockpile Characterization 15.0 199 SP-48 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 26.5 328 SP-49 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 19.0 175 SP-50 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 18.9 243 SP-51 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 16.6 285 SP-52 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 16.5 291 SP-53 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 17.3 228 SP-54 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 18.2 365 SP-55 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 16.2 244 SP-56 01/12/2022 10 - point composite sample Overburden Stockpile Characterization 9.7 132 SP-57 01/20/2022 10 - point composite sample Overburden Stockpile Characterization 17.2 306 SP-58 01/20/2022 10 - point composite sample Overburden Stockpile Characterization 13.6 250 SP-59 01/20/2022 10 - point composite sample Overburden Stockpile Characterization 11.2 173 SP-60 01/20/2022 10 - point composite sample Overburden Stockpile Characterization 10.7 76 SP-67 02/09/2022 10 - point composite sample Overburden Stockpile Characterization 13.8 151 SP-68 02/09/2022 10 - point composite sample Overburden Stockpile Characterization 11.1 149 SP-69 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 18.4 221 SP-70 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 11.7 170 SP-71 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.1 177 SP-72 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 15.5 178 SP-73 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.6 145 SP-74 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.0 141 SP-75 03/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.1 128 SP-76 04/04/2022 10 - point composite sample Overburden Stockpile Characterization 12.6 114 SP-77 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 10.2 274 SP-78 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.8 118 SP-79 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.0 183 SP-80 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.1 143 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Configuration Sample Purpose Arsenic (mg/kg) Lead (mg/kg) Table 2 "Clean" Overburden Stockpiles Soil Profiling Analytical Results Lark Monofill Remedial Action SP-81 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.4 113 SP-82 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.1 140 SP-83 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.3 128 SP-84 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 9.1 116 SP-85 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.7 172 SP-86 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.4 113 SP-87 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 11.0 122 SP-88 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 18.8 158 SP-89 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 41.8 340 SP-90 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.0 144 SP-91 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.1 175 SP-92 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.4 156 SP-93 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 16.0 261 SP-94 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 10.7 121 SP-95 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.5 147 SP-96 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.1 138 SP-97 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.5 121 SP-98 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.2 136 SP-99 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.0 148 SP-100 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.5 129 SP-101 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.7 160 SP-102 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 12.5 145 SP-103 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.8 148 SP-104 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.8 165 SP-105 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 11.8 110 SP-106 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 13.4 143 SP-107 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 15.3 131 SP-108 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.3 135 SP-109 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 14.8 198 SP-110 06/01/2022 10 - point composite sample Overburden Stockpile Characterization 10.7 107 SP-111 06/07/2022 10 - point composite sample Overburden Stockpile Characterization 14.8 118 SP-112 06/07/2022 10 - point composite sample Overburden Stockpile Characterization 16.0 119 SP-113 06/15/2022 10 - point composite sample Overburden Stockpile Characterization 17.6 207 SP-114 06/15/2022 10 - point composite sample Overburden Stockpile Characterization 30.9 187 SP-115 06/15/2022 10 - point composite sample Overburden Stockpile Characterization 15.3 154 SP-116 06/15/2022 10 - point composite sample Overburden Stockpile Characterization 14.7 132 50 500 Notes and Abbreviations: mg/kg = milligrams per kilogram Highlighted sample = result exceeds the Unrestricted Land Use Standard Soil samples analyzed for total concentrations of lead and aresenic by USEPA Method SW6010B Unrestricted Land Use Standards: 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 3 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Type/ Purpose Sample Location Sample Configuration Lnad Use Action Level Arsenic (mg/kg) Lead (mg/kg) Bastian Ditch Excavation Post-Removal Ground Surface Samples (1) DG-1* 09/22/2021 0-6 inches Post removal ground surface Bastian Ditch Main Channel Ground Surface 12 - point composite sample with subsamples spaced 50 feet apart Commercial 12.1 124 DG-2* 09/22/2021 0-6 inches Post removal ground surface " " 8 - point composite sample with subsamples spaced 50 feet apart Commercial 16.3 177 DG-4 01/07/2022 0-6 inches Post removal ground surface " " 8 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 18.9 196 DG-5 01/11/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11 104 DG-6 01/11/2022 0-6 inches Post removal ground surface " " 12 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.1 193 DG-7 01/11/2022 0-6 inches Post removal ground surface " " 11 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 8.7 146 DG-8 01/12/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.1 254 DG-9 01/12/2022 0-6 inches Post removal ground surface " "11 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.4 390 DG-9X 04/06/2022 0-6 inches Additional post removal ground surface sampled after overexcavation of DS-9W sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13 233 DG-10 01/12/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.5 311 DG-10X 04/06/2022 0-6 inches Additional post removal ground surface sampled after overexcavation of DS-10W sidewall " " 3 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 18.9 288 DG-11 01/12/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 27.7 285 DG-12 01/12/2022 0-6 inches Post removal ground surface " " 13 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 7.3 89.6 DG-13 01/12/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.2 196 DG-14 01/12/2022 0-6 inches Post removal ground surface " " 7 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.8 253 DG-15 01/12/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.5 85.9 DG-16 01/12/2022 0-6 inches Post removal ground surface " " 7 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.2 325 DG-17 01/13/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 14.4 349 DG-18 01/13/2022 0-6 inches Post removal ground surface " " 9 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.1 89.8 DG-19 01/13/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 17.2 103 DG-20 01/13/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.4 131 DG-21* 03/03/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 40 feet apart Commercial 10.8 94 DG-22* 03/03/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 40 feet apart Commercial 10.7 147 DG-23 03/15/2022 0-6 inches Post removal ground surface " " 7 - point composite sample with subsamples spaced 40 feet apart Unrestricted Land Use 11.9 121 DG-24 03/25/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.1 137 DG-26 04/29/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.6 211 DG-27 04/29/2022 0-6 inches Post removal ground surface " " 16 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.8 138 DG-28 04/09/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 25 feet apart Unrestricted Land Use 15.5 255 DG-29 04/09/2022 0-6 inches Post removal ground surface " " 11 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.6 179 DG-30 04/29/2022 0-6 inches Post removal ground surface " " 13 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.5 105 DG-31 04/29/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 25 feet apart Unrestricted Land Use 12.1 147 DG-32 06/20/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 17.2 200 DG-33 06/20/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.1 202 DG-34 06/20/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.8 176 DG-35 06/20/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 21.8 233 DG-36 06/20/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.9 85.2 DG-37 06/21/2022 0-6 inches Post removal ground surface " " 8 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.9 156 G10F 01/06/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 10 feet apart Unrestricted Land Use 23 428 Table 3 Bastian Ditch Channel West Lark Monofill, Post-Removal Sample Analytical Results Lark Monofill Remedial Action 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Type/ Purpose Sample Location Sample Configuration Lnad Use Action Level Arsenic (mg/kg) Lead (mg/kg) Table 3 Bastian Ditch Channel West Lark Monofill, Post-Removal Sample Analytical Results Lark Monofill Remedial Action Footprint Beneath Impacted Soil Stockpiles - Post-Removal Ground Surface Samples (1) ESG-1 03/15/2022 0-6 inches Post removal ground surface Beneath Removed Stockpile 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.4 108 ESG-2 03/15/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.2 129 ESG-3 05/03/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 14.9 172 ESG-4 05/03/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 18.5 202 ESG-5 05/19/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.8 212 ESG-6 05/24/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 14.7 168 ESG-7 05/24/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.5 155 ESG-8 06/21/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.6 171 ESG-9 06/22/2022 0-6 inches Post removal ground surface " " 13 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 17.2 160 ESG-10 06/22/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.7 138 ESG-11 06/21/2022 0-6 inches Post removal ground surface " " 15 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 20.8 223 ESG-12 06/21/2022 0-6 inches Post removal ground surface " " 9 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.7 166 ESG-13 06/28/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 19.8 258 ESG-14 06/28/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.5 101 ESG-15 07/05/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.5 72.3 ESG-16 07/05/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.4 81.6 ESG-17 07/12/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.3 376 ESG-18X 09/20/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.1 204 ESG-19 07/21/2022 0-6 inches Post removal ground surface " " 10 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.2 169 ESG-20 08/09/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.9 332 ESG-21 08/09/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.5 186 ESG-22 08/09/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.1 237 ESG-23 10/28/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.4 99 H-5X 03/29/2022 0-6 inches Post removal ground surface " " 4 - point composite sample with subsamples spaced 10 feet apart Unrestricted Land Use 14.6 204 H-11X 03/29/2022 0-6 inches Post removal ground surface " " 5 - point composite sample with subsamples spaced 10 feet apart Unrestricted Land Use 17.3 272 H-13X 03/29/2022 0-6 inches Post removal ground surface " " 6 - point composite sample with subsamples spaced 10 feet apart Unrestricted Land Use 20.5 306 Bastian Ditch Excavation Post-Removal Sidewall Samples (2) DS-1* 9/22/2022 3-4 feet Post removal sidewall Bastian Ditch Main Channel Excavation Sidewalls 5 - point composite sample with subsamples spaced 50 feet apart Commercial 19.7 154 DS-2* 9/22/2022 3-4 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 49 feet apart Commercial 26.7 440 DS-3* 9/22/2022 3-4 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Commercial 28 602 DS-4E 01/07/2022 2-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 25 feet apart Unrestricted Land Use 18.3 183 DS-4W 01/07/2022 2-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 25 feet apart Unrestricted Land Use 14.6 101 DS-5E 01/11/2022 1.5-2 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.3 157 DS-5W 01/11/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 7.7 122 DS-6E 01/11/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 14.6 135 DS-6W 01/11/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 9.7 122 DS-7E 01/11/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 9.3 97.9 DS-7W 01/11/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.3 218 DS-8E 01/12/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.3 277 DS-8W 01/12/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.6 157 DS-9E 01/12/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.3 257 DS-9WX 04/06/2022 2-3 feet Post removal sidewall sample collected after overexcavation of DS-9 west sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 19.6 345 DS-10E 01/12/2022 1-1.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 17.2 261 DS-10WX 04/06/2022 2-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 21.3 288 DS-11E 01/12/2022 1-1.5 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 200 feet apart Unrestricted Land Use 14.1 177 DS-11W 01/12/2022 1-1.5 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.7 151 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Type/ Purpose Sample Location Sample Configuration Lnad Use Action Level Arsenic (mg/kg) Lead (mg/kg) Table 3 Bastian Ditch Channel West Lark Monofill, Post-Removal Sample Analytical Results Lark Monofill Remedial Action DS-12E 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 9.2 127 DS-12W 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 10.5 139 DS-13E 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.1 285 DS-13W 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 17.5 218 DS-14E 01/12/2022 1-2 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.9 139 DS-14WX 04/06/2022 2-3 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.8 153 DS-15E 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 16.9 381 DS-15W 01/12/2022 1.5-2.5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.6 139 DS-16W 01/12/2022 1-2 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11 367 DS-17E 01/13/2022 3-5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.6 169 DS-17W 01/13/2022 3-5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.7 186 DS-18E 01/13/2022 4-6 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12 93.8 DS-18W 01/13/2022 4-6 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13 87.2 DS-19E 01/13/2022 3-5 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.7 66.1 DS-19W 01/13/2022 4-6 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 11.8 67 DS-20E 01/13/2022 4.5-6.6 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 5 feet apart Unrestricted Land Use 7.7 44.4 DS-20W 01/13/2022 3-5 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 8.1 52.2 DS-21* 03/03/2022 3-5 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 40 feet apart Commercial 8.45 67.6 DS-22* 03/03/2022 7-9 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 40 feet apart Commercial 26.5 337 DS-23 03/15/2022 3-4 feet Post removal sidewall " " 6 - point composite sample with subsamples spaced 40 feet apart Unrestricted Land Use 9.11 68.4 DS-24 03/25/2022 2-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.6 111 DS-25* 05/04/2022 3-4 feet Post removal sidewall " " 3 - point composite sample with subsamples spaced 50 feet apart Commercial 15.3 315 DS-26* 05/04/2022 3-4 feet Post removal sidewall " " 3 - point composite sample with subsamples spaced 50 feet apart Commercial 18.8 157 DS-27 05/04/2022 1-4 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 25.7 448 DS-28 05/28/2022 1.5-2 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.9 197 DS-29 05/05/2022 1-3 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12 101 DS-30 05/23/2022 1-3 feet Post removal sidewall " " 5 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 13.2 144 DS-31 05/23/2022 1-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 15.3 246 DS-33 06/20/2022 1-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 12.2 150 DS-34 06/20/2022 1-3 feet Post removal sidewall " " 2 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 14.7 208 DS-35 06/20/2022 1-3 feet Post removal sidewall " " 2 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 9.29 29.6 DS-36 06/20/2022 1-3 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 36.8 175 DS-37 06/20/2022 1-3 feet Post removal sidewall " " 3 - point composite sample with subsamples spaced 50 feet apart Unrestricted Land Use 19.4 275 G10S 01/06/2022 3-4 feet Post removal sidewall " " 4 - point composite sample with subsamples spaced 30 feet apart Unrestricted Land Use 25.8 403 R-1 03/03/2022 3-3.5 feet Represents soil remaining in place on the southern property boundary." " Single Point Grab Sample Road Right-of-Way 209 2740 R-2 03/03/2022 5-5.5 feet Represents soil remaining in place on the southern property boundary." " Single Point Grab Sample Road Right-of-Way 32.7 742 R-3 03/15/2022 3-4 feet Represents soil remaining in place on the southern property boundary." " Single Point Grab Sample Road Right-of-Way 29.9 1200 R-4 03/25/2022 1.5-1.7 feet Represents soil remaining in place on the northeast property boundary." " Single Point Grab Sample Daybreak Residential 18.6 1510 50 500 450 2000 Notes and Abbreviations: mg/kg = milligrams per kilogram Highlighted samples indicate metals concentration exceeds the applicable Land Use Standard Soil samples analyzed for total concentrations of lead and aresenic by USEPA Method SW6010B (1) Represents post-removal ground surface remaining after impacted soil removal. (2) Post-removal excavation sidewall samples collected at the depth interval with the highest metals concentrations prior to soil removal. Represents soil remaining in place. * Indicates sample location falls within the Lark commercial parcel. Commercial Land Use Standards apply. Impacted Soil Remaining at Property Boundary Unrestricted Land Use Standards: Commercial Land Use Standards: 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 3 of 3 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Type/ Purpose Sample Location Sample Configuration Action Level (1)Arsenic (mg/kg) Lead (mg/kg) Post-Removal Ground Surface Samples (2) FG-1 05/21/2021 0-6 inches Post removal ground surface East Fence Line - Substation Parcel 11 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 12.0 105 FG-2 05/21/2021 0-6 inches Post removal ground surface East Fence Line - Substation Parcel 10 - point composite sample with subsamples spaced 10 feet apart Daybreak Residential 11.7 95.2 FG-3 07/13/2021 0-6 inches Post removal ground surface East Fence Line 11 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 16.2 162 FG-4 07/15/2021 0-6 inches Post removal ground surface East Fence Line 6 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 15.6 181 FG-5 07/22/2021 0-6 inches Post removal ground surface East Fence Line 7 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 19.6 273 FG-6 07/22/2021 0-6 inches Post removal ground surface East Fence Line 9 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 16.8 278 FG-7 08/05/2021 0-6 inches Post removal ground surface East Fence Line 7 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 16.9 84.2 FG-8 08/05/2021 0-6 inches Post removal ground surface East Fence Line 7 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 15.4 161 FG-9 08/06/2021 0-6 inches Post removal ground surface East Fence Line 7 - point composite sample with subsamples spaced 30 feet apart Daybreak Residential 16.0 159 FG-10 08/06/2021 0-6 inches Post removal ground surface Northeast Fence Line 9 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 19.1 249 FG-11 08/06/2021 0-6 inches Post removal ground surface Northeast Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 11.4 66.4 FG-12 08/06/2021 0-6 inches Post removal ground surface Northeast Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 13.5 54.6 FG-13 08/27/2021 0-6 inches Post removal ground surface Northeast Fence Line 6 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 17.7 121 FG-14 08/27/2021 0-6 inches Post removal ground surface Northeast Fence Line 6 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 16.1 179 FG-15 08/27/2021 0-6 inches Post removal ground surface Northeast Fence Line 10 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 10.6 97.6 FG-16 08/27/2021 0-6 inches Post removal ground surface East Fence Line 16 - point composite sample with subsamples spaced 20 feet apart Daybreak Residential 17.7 231 FG-17 10/12/2021 0-6 inches Post removal ground surface East Fence Line 7 - point composite sample with subsamples spaced 62.5 feet apart Daybreak Residential 14.9 271 FG-18 10/12/2021 0-6 inches Post removal ground surface East Fence Line 9 - point composite sample with subsamples spaced 49 feet apart Daybreak Residential 8.26 67.9 C3F 09/22/2021 0-6 inches Post removal ground surface C3 Excavation East Fence Line 4 - point composite sample with subsamples spaced 8 feet apart Daybreak Residential 24.1 507 C7FG 09/03/2021 0-6 inches Post removal ground surface C7 Excavation East Fence Line 4 - point composite sample with subsamples spaced 15 feet apart Daybreak Residential 21.3 365 KT8F-1 08/11/2021 0-6 inches Post removal ground surface KT-8 Excavation East Fence Line 12 - point composite sample with subsamples spaced 32.5 feet apart Daybreak Residential 15.9 349 G-26G 01/26/2022 0-6 inches Post removal ground surface G-26 Excavation near northeast fenceline 9 - point composite sample with subsamples spaced 30 feet apart Daybreak Residential 40 516 Post-Removal Excavation Sidewall Samples (3) FS-1 05/21/2021 2-2.5 feet Post removal sidewall East Fence Line - Substation Parcel 5 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 15.9 174 FS-2 05/21/2021 2-2.5 feet Post removal sidewall East Fence Line - Substation Parcel 5 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 11.6 84.7 FS-3 07/13/2021 2-3 feet Post removal sidewall East Fence Line 8 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 15.3 101 FS-4 07/15/2021 2-3 feet Post removal sidewall East Fence Line 8 - point composite sample with subsamples spaced 25 feet apart Daybreak Residential 17.1 133 FS-5 07/22/2021 3-3.5 feet Post removal sidewall East Fence Line 5 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 11.1 71.0 FS-6 07/22/2021 3-3.5 feet Post removal sidewall East Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 13.0 104 FS-7 08/05/2021 2-4 feet Post removal sidewall East Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 13.6 109 FS-8 08/05/2021 2-5 feet Post removal sidewall East Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 14.9 148 FS-10 08/06/2021 2-3 feet Post removal sidewall Northeast Fence Line 5 - point composite sample with subsamples spaced 50 feet apart Daybreak Residential 14.8 176 FS-11 08/06/2021 1.5-2 feet Post removal sidewall Northeast Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 13.2 58.7 FS-12 08/06/2021 1-2 feet Post removal sidewall Northeast Fence Line 6 - point composite sample with subsamples spaced 40 feet apart Daybreak Residential 17.1 82 FS-13 08/27/2021 2.5-3 feet Post removal sidewall Northeast Fence Line 6 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 15.6 104 FS-14 08/27/2021 2.5-3 feet Post removal sidewall Northeast Fence Line 6 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 14.8 153 FS-15 08/27/2021 2.5-3 feet Post removal sidewall Northeast Fence Line 9 - point composite sample with subsamples spaced 33 feet apart Daybreak Residential 19.6 176 Table 4 Bastian Ditch Drainages East Lark Monofill, Post-Removal Sample Analytical Results Lark Monofill Remedial Action 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 2 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Date Collected Sample Depth Sample Type/ Purpose Sample Location Sample Configuration Action Level (1)Arsenic (mg/kg) Lead (mg/kg) Table 4 Bastian Ditch Drainages East Lark Monofill, Post-Removal Sample Analytical Results Lark Monofill Remedial Action FS-16 08/27/2021 3-3.5 feet Post removal sidewall East Fence Line 6 - point composite sample with subsamples spaced 20 feet apart Daybreak Residential 12.9 162 FS-17 10/12/2021 2-2.5 feet Post removal sidewall East Fence Line 5 - point composite sample with subsamples spaced 62.5 feet apart Daybreak Residential 10.9 124 FS-18 10/12/2021 2-2.5 feet Post removal sidewall East Fence Line 5 - point composite sample with subsamples spaced 49 feet apart Daybreak Residential 16.4 239 KT-8-1x 09/07/2021 17-17.5 feet Post removal sidewall sample collected after overexcavation of KT-8-1 area KT-8 Excavation East Fence Line Singel grab sample. Unimpacted soil above sample depth. All KT-8 excavation sidewall samples were not composited in order to provide the most conservative confirmation data. Daybreak Residential 20.8 685 KT-8-2 08/10/2021 10.5-11.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 21.6 554 KT-8-3 08/10/2021 11-12 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 23.1 633 KT-8-4 08/10/2021 10-11.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 23.3 662 KT-8-5 08/10/2021 7-8 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 23.9 564 KT-8-6 08/10/2021 9-9.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 22.5 512 KT-8-7 08/10/2021 7-8 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 10.7 221 KT-8-8 08/11/2021 10.5-11 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 11.8 120 KT-8-9 08/11/2021 11-12 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 6.0 156 KT-8-10 08/11/2021 11.5-12.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 11.8 133 KT-8-11 08/11/2021 13-13.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 4.9 58 KT-8-12 08/11/2021 15-16 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 19.1 424 KT-8-13 08/11/2021 14.5-15.5 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 7.0 110 KT-8-14 08/11/2021 12-13 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 20.1 231 KT-8-15 09/07/2021 11.5-12 feet Post removal sidewall KT-8 Excavation East Fence Line Single grab sample. Unimpacted soil above sample depth. Daybreak Residential 20.6 509 C3S 09/22/2021 8-9 feet Post removal sidewall C3 Excavation East Fence Line 4 - point composite sample with subsamples spaced 20 feet apart Daybreak Residential 24.6 533 C7FS-1 09/02/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single Grab Sample. Sidewall samples from C7 excavation were not composited in order to provide the most conservative data. Daybreak Residential 29.0 484 C7FS-2 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 28.9 432 C7FS-3 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 24.6 261 C7FS-4 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 19.8 331 C7FS-5 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 17.4 189 C7FS-6 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 25.1 530 C7FS-7 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 21.4 336 C7FS-8 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 18.8 184 C7FS-9 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 14.7 176 C7FS-10 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 27.3 499 C7FS-11 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 32.1 551 C7FS-12 09/03/2021 6.5-7 feet Post removal sidewall C7 Excavation East Fence Line Single grab sample Daybreak Residential 24.1 382 G-26S South 02/28/2022 13-14 feet Post removal sidewall G-26 Excavation near northeast fenceline 5 - point composite sample with subsamples spaced 30 feet apart Daybreak Residential 32.4 626 G-26S North 01/28/2022 11-14 feet Post removal sidewall G-26 Excavation near northeast fenceline 5 - point composite sample with subsamples spaced 30 feet apart Daybreak Residential 27.3 415 100 700 283 2,207 Notes and Abbreviations: mg/kg = milligrams per kilogram Soil samples analyzed for total concentrations of lead and aresenic by USEPA Method SW6020B Highlighted sample results indicate metals concentration remaining in place exceeds the applicable Land Use Standard (1) While some post-removal confirmation samples were collected in the Recreational Land Use Park Parcel, all post-removal samples met the Daybreak Residential Land Use Standards (2) Represents post-removal ground surface remaining after impacted soil excavation. (3) Post-removal excavation sidewall samples collected at the depth interval with the highest metals concentrations prior to impacted soil removal. Daybreak Residential Land Use Standards: OU5 Bastian Ditch Recreational Standards: 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 2 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) C1 06/28/2021 8-10 feet Single grab sample Characterization sample Within KT-8 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 28.2 675 C2 06/28/2021 9-10 feet Single grab sample Characterization sample Within KT-8 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 22.2 381 C3 06/28/2021 9-11 feet Single grab sample Characterization sample Within C3 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 28.7 699 C3A 8-9 06/28/2021 8-9 feet Single grab sample Characterization sample Within C3 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 14.0 276 C4 06/28/2021 8-10 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 26.0 538 C5 06/28/2021 8-10 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 23.5 328 C6 06/28/2021 8-10 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 24.2 441 C7-1 06/28/2021 6-7 feet Single grab sample Characterization sample C7 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 44.5 913 C7-2 06/28/2021 8-10 feet Single grab sample Characterization sample C7 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 44.0 911 C7A 8-9 08/11/2021 8-9 feet Single grab sample Characterization sample C7 Excavation East Fence Line C7 area excavated. Hauled to Commercial Parcel Daybreak ResidenƟal 14.0 250 C7B 6-7 08/11/2021 6-7 feet Single grab sample Characterization sample C7 Excavation East Fence Line C7 area excavated. Hauled to Commercial Parcel Daybreak ResidenƟal 16.9 318 C8 06/28/2021 7-10 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 24.6 411 C9 07/07/2021 6-8 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 26.6 520 C10 07/07/2021 8-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 11.9 123 C11 07/07/2021 6-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 19.9 266 CTP-1 07/08/2021 12-14 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 11.7 136 CTP-2 07/08/2021 12-14 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 9.4 71 CTP-3 07/09/2021 13-15 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 25.2 91 CTP-5 07/09/2021 14-16 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 5.8 125 CTP-6 07/9/2021 0-14 feet XRF at 2 ft intervals Characterization sample East Fence Line Remains in place Daybreak ResidenƟal <50 <500 CTP-7 07/9/2021 0-16 feet XRF at 2 ft intervals Characterization sample East Fence Line Remains in place Daybreak ResidenƟal <50 <330 CTP-8 07/07/2021 8-14 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 13.0 164 CTP-9 07/07/2021 6-15 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 17.1 312 CTP-10 07/07/2021 4-13 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 17.9 352 CTP-11 07/07/2021 6-13 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 20.1 492 CTP-12 07/08/2021 12-15 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 17.5 329 D-1 07/07/2021 10-14 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 21.0 392 Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action Site Characterization Samples Collected within Proposed Residential Land Use Area 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action D-2 07/07/2021 8-16 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 17.0 326 D-3 07/07/2021 6-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 19.2 238 E-1 07/08/2021 6-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 19.5 390 E-2 07/08/2021 8-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 21.4 439 E-3 07/08/2021 8-12 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 22.1 369 E-4 07/08/2021 8-10 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 24.5 562 E-5 07/08/2021 6-10 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 20.3 286 E-6 07/08/2021 8-13 feet vertical composite sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 20.7 226 F-3 07/14/2021 8-10 feet Single grab sample Characterization sample Within KT-8 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 27.0 681 F-4 07/14/2021 10-12 feet Single grab sample Characterization sample Within KT-8 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 17.8 401 F-6 07/14/2021 10-12 feet Single grab sample Characterization sample East Fence Line Remains in place OU5 Recreational 11.2 45 F-16 08/26/2021 12.5-14 feet Single grab sample Characterization sample Within KT-8 Excavation East Fence Line Hauled to Commercial Parcel Daybreak ResidenƟal 19.5 361 G-13 08/17/2021 7.5-8 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 18.2 165 G-14 08/17/2021 10-11 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 12.1 136 G-15 08/17/2021 9-10.5 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 13.8 152 G-16 08/26/2021 8.5-10 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 18.5 149 G-17 08/26/2021 8.5-10 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 21.3 159 G-18 08/26/2021 8-9.5 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 39.6 182 G-53 3-4 02/07/2022 3-4 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place OU5 Recreational 22.3 525 G-53 9-10 02/07/2022 9-10 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place OU5 Recreational 16.6 296 G-54 4-5 02/07/2022 4-5 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place OU5 Recreational 10.4 110 G-54 9-10 02/07/2022 9-10 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place OU5 Recreational 10.7 126 STP-9 08/17/2021 6-7 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 17.0 159 STP-10 08/17/2021 8.5-10 feet Single grab sample Characterization sample East Fence Line Remains in place Daybreak ResidenƟal 21.5 191 WETP-1a 09/08/2021 5-6 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 19.3 479 WETP-1a 09/08/2021 8-9 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 22.8 639 WETP-2a 09/08/2021 4-5 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 25.7 478 WETP-2a 09/08/2021 10-11 feet Single grab sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 25.6 552 WETP-3 07/6/2021 0-13 feet XRF at 2 ft intervals Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal <50 <500 WETP-4 07/6/2021 0-15 feet XRF at 2 ft intervals Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal <50 <500 WETP-5 07/6/2021 0-12 feet XRF at 2 ft intervals Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal <50 <300 WETP-6 07/07/2021 6-12 feet vertical composite sample Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal 17.5 201 WETP-7 07/7/2021 0-12 feet XRF at 2 ft intervals Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal <50 <200 WETP-8 07/7/2021 0-12 feet XRF at 2 ft intervals Characterization sample East Lark Proposed Residential Area Remains in place Daybreak ResidenƟal <50 <200 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action G1 07/29/2021 0-12 feet XRF at 2 ft intervals Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational <50 <300 G2 07/29/2021 0-12 feet XRF at 2 ft intervals Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational <50 <200 G3 08/4/2021 0-12 feet XRF at 2 ft intervals Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational <50 <200 G4 08/4/2021 0-12 feet XRF at 2 ft intervals Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational <50 <200 G5 4-5.5 08/04/2021 4-5.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 27.7 400 G5 5.5-7 08/04/2021 5.5-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 15.0 189 G5 7-8.5 08/04/2021 7-8.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 18.8 220 G5 8.5-10 08/04/2021 8.5-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 29.0 589 G5 10-11.5 08/04/2021 10-11.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 28.9 512 G5 11.5-13 08/04/2021 11.5-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 24.2 337 G5 13-14.5 08/04/2021 13-14.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 27.3 437 G5 14.5-16 08/04/2021 14.5-16 feet Single grab sample Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational 30.0 515 G5 16-18.5 08/04/2021 16-18.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at >16 ft depth OU5 Recreational 37.9 791 G6 6-8 08/04/2021 6-8 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 27.8 519 G6 8-10 08/04/2021 8-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 32.1 477 G6 10-11 08/04/2021 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 32.0 513 G6 11-12 08/04/2021 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 31.0 526 G6 12-14 08/04/2021 12-14 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 26.3 492 G6 14-15 08/04/2021 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 31.0 504 G7A 0-2 08/16/2021 0-2 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 21.1 250 G7 10-12 08/09/2021 10-12 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 25.5 436 G7A 11-12 08/16/2021 11-12 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 22.2 277 G-8 08/9/2021 0-14 feet XRF at 2 ft intervals Characterization sample HWY 111 ROW Remains in place OU5 Recreational <50 <100 G9 2.5-3 08/09/2021 2.5-3 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 29.2 424 G10 2-4 08/09/2021 2-4 feet Single grab sample Characterization sample HWY 111 ROW G-10 area excavated. Hauled to Commercial Parcel OU5 Recreational 29.6 615 G-11 08/16/2021 11.5-12 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 12.4 99 G-12 08/16/2021 10.5-11 feet Single grab sample Characterization sample HWY 111 ROW Remains in place OU5 Recreational 13.6 255 G-19 09/08/2021 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Removed with G-26 excavation. Hauled to Commercial Parcel OU5 Recreational 34.7 719 G-19A 09/08/2021 17-18 feet Single grab sample Characterization sample Proposed Recreational Parcel Removed with G-26 excavation. Hauled to Commercial Parcel OU5 Recreational 29.1 548 G-20 09/08/2021 4-5 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.8 215 G-21 18-19 11/04/2021 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at >18 ft depth OU5 Recreational 39.3 1090 G-22 18-19 11/04/2021 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 14.1 174 G-22 19.5-20 11/19/2021 19.5-20 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 25.7 235 G-23 13-16 11/04/2021 13-16 feet Vertical composite sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 25.7 309 G-23C 10-11.5 11/19/2021 10-11.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 26.6 634 Site Characterization Samples Collected within Proposed Recreational Land Use Area or Highway 111 Right-of Way 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 3 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action G-23c 16-17 11/19/2021 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at >16 ft depth OU5 Recreational 33.4 874 G-24 16-17 11/04/2021 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 19.5 329 G-25 9-10 11/04/2021 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at >9 ft depth OU5 Recreational 28.8 830 G-25 17-18 11/04/2021 17-18 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 21.9 335 G-26 10-11 11/19/2021 10-11 feet Single grab sample Characterization sample G-26 Excavation Proposed Recreational Parcel Removed with G-26 excavation. Hauled to Commercial Parcel OU5 Recreational 40.6 703 G-26 14-15 11/04/2021 14-15 feet Single grab sample Characterization sample G-26 Excavation Proposed Recreational Parcel Removed with G-26 excavation. Hauled to Commercial Parcel OU5 Recreational 17.5 162 G-26 17-18 11/19/2021 17-18 feet Single grab sample Characterization sample G-26 Excavation Proposed Recreational Parcel G-26 area excavated to 15 ft. Soil represented by this sample remains in place. OU5 Recreational 39.9 899 G-26 19-20 11/04/2021 19-20 feet Single grab sample Characterization sample G-26 Excavation Proposed Recreational Parcel G-26 area excavated to 15 ft OU5 Recreational 20.0 258 G-27 11-13 11/04/2021 11-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 33.7 699 G-27 17-17.5 11/19/2021 17-17.5 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.1 562 G-27 18.5-19 11/19/2021 18.5-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 34.8 562 G-27 19-20 11/04/2021 19-20 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.7 386 G-28 14-15 11/22/2021 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 26.9 552 G-28 19-20 11/22/2021 19-20 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 24.0 367 G-29 11-13 11/22/2021 11-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at >11 ft depth OU5 Recreational 39.7 793 G-29 19-20 11/22/2021 19-20 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.8 335 G-30 6-8 11/23/2021 6-8 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.9 342 G-30 12-13 11/23/2021 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at > 12 ft depth OU5 Recreational 38.2 761 G-31 8-9 11/23/2021 8-9 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at > 8 ft depth OU5 Recreational 34.7 767 G-31 11-12 11/23/2021 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.9 536 G-32 12-13 01/11/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 48.2 567 G-33 9-10 01/11/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.8 133 G-34 10-11 01/13/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.7 301 G-35 01/13/2022 0-15 feet XRF at 2 ft intervals Characterization sample Proposed Recreational Parcel Hauled to Commercial Parcel OU5 Recreational <50 <700 G-36 14-15 01/13/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.1 487 G-37 12-13 01/03/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 17.2 192 G-38 12.5-13 01/13/2022 12.5-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place at > 12 ft depth OU5 Recreational 36.5 708 G-39 13-14 01/28/2022 13-14 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 19.6 359 G-40 10-11 01/28/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 12.0 127 G-41 10-11 01/28/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 6.8 15 G-42 14-15 01/28/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 17.2 144 G-43 10-11 01/28/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 18.5 229 G-44 10-11 02/01/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.4 630 G-44 16-17 01/28/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 20.7 474 G-45 14-15 01/28/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.8 204 G-46 11-12 02/02/2022 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.6 215 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 4 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action G-47 10-12 02/02/2022 10-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 19.6 251 G-48 7-8 02/03/2022 7-8 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 32.3 540 G-48 10-11 02/03/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 27.8 473 G-48 13-14 02/03/2022 13-14 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.5 577 G-48 16-17 02/03/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 25.4 695 G-49 6-7 02/04/2022 6-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.2 817 G-49 14-15 02/04/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 18.0 252 G-50 5-6 02/04/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.4 229 G-50 14-15 02/04/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 11.3 85 G-51 5-6 02/04/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 25.6 611 G-51 14-15 02/04/2022 14-15 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 13.3 179 G-52 6-7 02/07/2022 6-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 20.7 499 G-52 13-14 02/07/2022 13-14 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 14.7 221 G-55 5-6 03/22/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 13.4 151 G-55 10-11 03/22/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.1 221 G-56 6-7 03/22/2022 6-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.5 160 G-56 10-11 03/22/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 19.9 205 G-57 5-6 03/22/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.1 199 G-57 10-11 03/22/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.0 175 G-58 5-6 03/22/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.9 233 G-58 10-11 03/22/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.3 243 G-58 16-17 03/22/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 19.3 183 G-59 5-6 03/22/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.1 146 G-59 11-12 03/23/2022 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 21.2 386 G-59 18-19 03/23/2022 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.3 380 G-60 6-7 03/23/2022 6-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.8 155 G-60 11-12 03/23/2022 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.4 577 G-60 18-19 03/23/2022 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 8.2 171 G-61 5-6 03/23/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 6.3 93 G-61 9-10 03/23/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.9 268 G-61 18-19 03/23/2022 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 10.4 178 G-62 5-6 03/23/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 10.6 140 G-62 11-12 03/23/2022 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 11.4 310 G-63 6-7 03/24/2022 6-7 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 11.2 359 G-63 9-10 03/24/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 9.4 238 G-63 16-17 03/24/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 10.0 297 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 5 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Dated Collected Sample Depth Sample Configuration Sample Type/ Purpose Sample Location Final Dispostion of Sampled Soil Proposed Land Use / Action Level Arsenic (mg/kg) Lead (mg/kg) Table 5 Additional Site Characterization - Soil Analytical Results Lark Monofill Remedial Action G-64 5-6 03/25/2022 5-6 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.1 362 G-64 11-12 03/25/2022 11-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 30.8 685 G-65 8-9 03/25/2022 8-9 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.0 304 G-65 12-13 03/25/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 34.0 715 G-65 16-17 03/25/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.7 266 G-66 9-10 03/25/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.3 262 G-66 16-17 03/25/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 26.6 558 G-66 21-22 03/25/2022 21-22 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 17.1 298 G-67 9-10 03/25/2022 9-10 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 28.4 547 G-67 16-17 03/25/2022 16-17 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 29.6 516 G-67 21-22 03/25/2022 21-22 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 15.4 208 I-1 12-13 02/21/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.4 662 I-1 18-19 02/21/2022 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 194.0 264 I-2 12-13 02/21/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 27.8 641 I-2 18-19 02/21/2022 18-19 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 22.2 291 I-3 12-13 02/21/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.3 247 I-4 10-11 02/21/2022 10-11 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 23.2 487 I-5 12-13 02/21/2022 12-13 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 16.0 181 I-7 4-5 03/07/2022 4-5 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 13.4 176 I-7 10-11 03/07/2022 10-11 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 14.6 126 I-8 4-5 03/07/2022 4-5 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 22.8 423 I-8 10-11 03/07/2022 10-11 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 14.5 158 I-9 4-5 03/07/2022 4-5 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 15.7 124 I-9 10-11 03/07/2022 10-11 feet Single grab sample Characterization sample HWY 111 ROW Hauled to Commercial Parcel Daybreak ResidenƟal 14.2 184 RTP-2 07/13/2021 10-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 11.6 16 RTP-3 07/13/2021 10-12 feet Single grab sample Characterization sample Proposed Recreational Parcel Remains in place OU5 Recreational 12.6 102 KP-1W 10-11 04/06/2022 10-11 feet Single grab sample Characterization sample North of compost facility on E-W oriented Bastian Ditch Drainage Left in place due to depth of imacts at >10 feet HWY 111 alignment 24.3 545 KP-1W 11-12 04/06/2022 11-12 feet Single grab sample Characterization sample North of compost facility on E-W oriented Bastian Ditch Drainage Left in place due to depth of imacts at >10 feet HWY 111 alignment 36.5 827 KP-1W 12-13 04/06/2022 12-13 feet Single grab sample Characterization sample North of compost facility on E-W oriented Bastian Ditch Drainage Left in place due to depth of imacts at >10 feet HWY 111 alignment 41.5 1630 KP-2C 02/04/2021 2-3 feet Single grab sample Characterization sample West of compost facility building along Bastian Ditch channel Left in place due to multiple utilities in vicinity OU5 Commercial- possible future residential 29.5 799 100 700 450 2,000 283 2,207 Notes and Abbreviations: mg/kg = milligrams per kilogram Soil samples were analyzed for total concentrations of lead and aresenic by USEPA Method SW6010B Highlighted sample results indicate metals concentration remaining in place exceeds the applicable Land Use Standard Site Characterization Samples Collected within the Trans-Jordan Composting Facility Commercial Land Use Standards: OU5 Bastian Ditch Recreational Standards: Daybreak Residential Land Use Standards: 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 6 of 6 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Duplicate ID Original Arsenic (mg/kg) DUP Arsenic (mg/kg) Arsenic RPD (%) Original Lead (mg/kg) DUP Lead (mgkg) Lead RPD (%) E-1 DUP-1 07092021 19.5 19.8 1.53 390 430 9.76 E-2 DUP-2 07092021 21.4 22.8 6.33 439 497 12.39 CTP-10 DUP-3 07092021 17.9 18.5 3.30 352 406 14.25 FG-5 DUP-1 08062021 19.6 21.5 9.25 273 367 29.38 FG-12 DUP-2 08062021 13.5 11.1 19.51 54.6 41.3 27.74 G5 10-11.5 DUP-3 08062021 28.9 27.4 5.33 512 536 4.58 G6 12-14 DUP-4 08062021 26.3 23.8 9.98 492 384 24.66 KT-8-5 DUP-1 08102021 23.9 25.5 6.48 564 590 4.51 G-15 DUP-2 08172021 13.8 18.3 28.04 152 136 11.11 Trench - C7-2 DUP-3 08112021 44.0 24.6 56.56 911 509 56.62 SP-10 DUP-1 09102021 14.0 15.4 9.52 140 140 0.00 SP-15 DUP-2 09102021 9.04 11.3 22.22 52.9 68.1 25.12 C7FS-2 DUP-3 09102021 28.9 25.6 12.11 432 420 2.82 C7FS-9 DUP-4 09102021 14.7 19.3 27.06 176 239 30.36 KT-8-1X DUP-5 09102021 20.8 20.5 1.45 685 607 12.07 C3F DUP-1 10082021 24.1 24.4 1.24 507 499 1.59 ES-17 DUP-1 10182021 22.1 19.8 10.98 365 262 32.85 FG-17 DUP-2 10182021 14.9 8.89 50.53 271 143 61.84 DS-1 DUP-3 10182021 19.7 18.1 8.47 154 140 9.52 ES-39 DUP-4 10182021 18.3 20.5 11.34 320 364 12.87 ES-21 DUP-5 10182021 24.4 26.3 7.50 429 480 11.22 FS-18 DUP-6 10182021 16.4 21.7 27.82 239 353 38.51 SP-35 DUP-1 10252021 20.0 18.9 5.66 236 216 8.85 ES-47 DUP-2 11172021 16.7 19.3 14.44 396 428 7.77 ES-52 DUP-3 11172021 16.6 17.7 6.41 280 278 0.72 ES-57 DUP-4 11172021 15.6 14.0 10.81 177 174 1.71 ES-62 DUP-5 11172021 16.0 15.1 5.79 134 131 2.26 ES-78 DUP-1 11302021 15.4 13.3 14.63 155 142 8.75 ES-87 DUP-2 11302021 22.2 21.7 2.28 157 151 3.90 G-26 10-11 DUP-3 11302021 40.6 40.7 0.25 703 841 17.88 G-29 11-13 DUP-4 11302021 39.7 41.8 5.15 793 860 8.11 ES-99 DUP-1 12162021 16.1 24.6 41.77 484 659 30.62 ES-108 DUP-2 12162021 15.2 16.6 8.81 506 457 10.18 ES-117 DUP-3 12162021 32.0 18.9 51.47 872 769 12.55 ES-126 DUP-4 12162021 18.0 17.2 4.55 878 477 59.19 ES-135 DUP-5 12162021 17.6 14.0 22.78 472 364 25.84 ES-143 DUP-1 01062022 15.7 14.0 11.45 374 329 12.80 Table 6 Lark Monofill Remedial Action Quality Assurance Samples 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 1 of 2 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Sample ID Duplicate ID Original Arsenic (mg/kg) DUP Arsenic (mg/kg) Arsenic RPD (%) Original Lead (mg/kg) DUP Lead (mgkg) Lead RPD (%) Table 6 Lark Monofill Remedial Action Quality Assurance Samples ES-153 DUP-2 01062022 17.2 21.1 20.37 604 575 4.92 ES-161 DUP-3 01062022 19.1 19.6 2.58 355 390 9.40 ES-174 DUP-4 01062022 12.2 5.73 72.17 220 121 58.06 DS-4W DUP-1 01102022 14.6 14.1 3.48 101 103 1.96 DG-6 DUP-1 01172022 10.1 10.1 0.00 193 180 6.97 DG-8 DUP-2 01172022 13.1 14.8 12.19 254 266 4.62 DS-12E DUP-3 01172022 9.2 9.8 6.32 127 141 10.45 DS-16W DUP-4 01172022 11 13.6 21.14 367 342 7.05 DS-17W DUP-5 01172022 12.7 14.3 11.85 186 193 3.69 ES-196 DUP-6 01172022 12.6 14.3 12.64 245 243 0.82 ES-187 DUP-7 01172022 16.4 15.9 3.10 506 467 8.02 ES-35 DUP-8 01172022 19 20.4 7.11 448 518 14.49 ES-208 DUP-9 01172022 19.5 19.4 0.51 280 324 14.57 SP-51 DUP-10 01172022 16.6 17.1 2.97 285 278 2.49 SP-48 DUP-11 01172022 26.5 21 23.16 328 305 7.27 ES-227 DUP-1 01252022 13.8 17.1 21.36 205 304 38.90 ES-223 DUP-2 01252022 12.5 11.5 8.33 184 140 27.16 ES-246 DUP-3 01252022 13.7 17.1 22.08 336 373 10.44 G-26S NORTH DUP-1 01272022 27.3 28.8 5.35 415 413 0.48 G-54 9-10 DUP-1 02092022 10.7 9.72 9.60 126 110 13.56 G-49 6-7 DUP-2 02092022 29.2 25.9 11.98 817 594 31.61 G-48 7-8 DUP-3 02092022 32.3 31.6 2.19 540 582 7.49 G-45 17-18 DUP-4 02092022 13.7 10.8 23.67 215 144 39.55 ES-236 DUP-5 02092022 22.6 18.0 22.66 421 282 39.54 ES-235 DUP-6 02092022 27.4 23.5 15.32 490 383 24.51 KP-1W 12-13 DUP-1-041122H-5X 41.5 16.3 87.20 1630 664 84.22 DS-27 DUP-1 052522 25.7 23.3 9.80 448 392 13.33 ESG-3 DUP-2 052522 14.9 17.1 13.75 172 168 2.35 ES-289 DUP-1 060822 16.9 17.4 2.92 321 278 14.36 ES-299 DUP-2 060822 16.7 17.0 1.78 149 186 22.09 SP-83 DUP-3 060822 12.3 16.2 27.37 128 138 7.52 SP-89 DUP-4 060822 41.8 15.4 92.31 340 144 80.99 SP-104 DUP-5 060822 14.8 10.8 31.25 165 135 20.00 ES-283 DUP-6 060822 20.1 20.2 0.50 300 220 30.77 ESG-11 DUP-1 062722 20.8 16.1 25.47 223 244 8.99 ES-302 DUP-2 062722 66.8 18.5 113.25 365 254 35.86 SP-114 DUP-3 062722 30.9 12.5 84.79 187 167 11.30 ESG-14 DUP-1 081022 10.5 9.26 12.55 101 92.2 9.11 Notes: DUP = Duplicate Sample RPD = Relative Percent Difference BOLD samples indicate the RPD exceeds the data quality objective of 35%. Of 154 duplicate analyses, 134 (13%) met the RPD of 35%. Analyte concentrations in milligrams per kilogram (mg/kg) 20201466.001A/SLC23R156681 © 2023 Kleinfelder Page 2 of 2 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 July 31, 2023 www.kleinfelder.com Fi g u r e s SITE VICINITY MAP LARK MONOFILLNORTHEAST CORNER OFHIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH PROJECT NO.: FILE NAME: FIGURE 1DRAWN: CHECKED BY: The information included on this graphic representation has been compiled from a variety ofsources and is subject to change without notice. Kleinfelder makes no representations orwarranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use ofsuch information. This document is not intended for use as a land survey product nor is itdesigned or intended as a construction design document. The use or misuse of the informationcontained on this graphic representation is at the sole risk of the party using or misusing the information. DRAWN BY: 0 1,000 2,000 Feet Explanation Approximate Site Boundary Basemap: USG S The National MapInset: National Geographic W orld M ap m ap service via ESRI Locations are Approximate£ ExcavAll_Fig1.mxd SiteLocation SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_Fig1.mxd PLOTTED: 7/21/2023, KHagan 20201466 JUL 2023 C. HILLARD K. HAGAN TransJordan Landfill B a c c h u s H ig h w a y ¬«111 !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !(!(!( !( !( !( !( !(!(!(!(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( BACCHUS HIGHWAY UV111 11800 SOUTH OU 17 Bastian Sink TransJordan Composting Facility OU 17 Bastian Sink Recreation Parcel Commercial Development Parcel Substation Parcel OU 6 Lark Waste Rockand Tailings OU 6 Lark Waste Rockand Tailings Proposed Highw ay 111 AlignmentProposed Highw ay 111 Alignment East Lark Residential ParcelWest Lark R esidential Parcel Bastian Ditch Drainage Bastian Ditch DrainagesBastian Ditch Drainages KP-1W KE-80 KE-79 KE-78 KE-77 KE-76 KE-75 KE-74 KE-73 KE-72 KE-71 KE-70 KE-69 KE-68 KE-67 KE-65 KE-64 KE-63 KE-62 KE-61 KE-60 KE-59 KE-58 KE-57 KE-56 KE-55 KE-54 KE-53 KE-52 KE-51 KE-50 KE-49 KE-48 KE-46 KE-45 KE-44 KE-42 KE-41 KE-40 KE-86 KE 85 KE-84KE-83KE-82KE-81 KE-38 KE-39 KE-47 KE-66 KE-43 KE-59BD KE-57BD KE-54BD KE-48BD KE-51BD KS-7 KS-2 KS-6KS-4 KS-1 KS-5KS-3 KP-9 KP-8 KP-6 KP-5 KP-4 KP-7 KP-1 KP-24 KP-23 KP-22 KP-19 KP-12 KP-21 KP-42 KP-41 KP-18 KP-20 KP-10 KP-11 KP-2C KP-3C KP-13 KP-25 KP-14 KP-15 KP-49 KP-50 KP-48 KP-45 KP-46 KP-47 KP-44 KP-43 KP-27 KP-29 KP-30 KP-31 KP-32 KP-33 KP-34 KP-35 KP-36 KP-37 KP-38 KP-39 KP-40 KP-28 KP-16 KP-26 KP-17 KT-7 KT-11 KT-4 KT-5 KT-8 KT-6 KT-9 KT-13 KT-14 KT-12 KT-10 PROPOSED LAND USE A NDPRIOR SITE CHARACTERIZATION RESULTS LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE2 0 200 400Feet£Locations are Approximate SALT LAKE CITY, UT L:\2020\20201466.001A - Lark Monofill\2.0 Technical Information\2.8 GIS PLOTTED: 7/28/2023, KHagan Explanation !(Lead and Arsenic < U nrestricted Land Use !(Lead and Arsenic > U nrestricted Land Use Standardsbut < Commer cial Land Use Standards !(Lead and Arsenic > C ommercial Land Use Proposed Highw ay 111 Alignment Main Bastian Ditch Channel Side D rainage Bastian Ditch Drainage Sediments w ith Elevated MetalsLeft Outside Lark Fenceline During Bastian D itchDrainage Excavation by R io Tinto (2015) Bastian Ditch Drainage KUC Excavation Area OU6 Lar k Waste Rock and Tailings OU17 Bastian Sink Approximate Site Boundary LandUse_Fig2.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O:The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. Source: Esri, Maxar, Earthstar Geographics, and the GIS User Com munity; ESRI W orld Imagery,Salt Lake County image 10/15/2021. BACCHUS HIGHWAY UV111 11800 SOUTH SOIL EXCAVATION BOUND ARY LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3 ExcavAll_Fig3.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_Fig3.mxd PLOTTED: 7/21/2023, KHagan The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 200 400Feet £ Locations are Approximate Explanation Main Bastian D itch C hannel Side Drainage Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Recreation Parcel Commercial Development and Substation Parcels Excavation Area (Kleinfelder) Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary Source: Esri, Maxar, Earthstar Geographics, and the GIS User Com munity; ESRI W orld Imagery,Salt Lake County image 10/15/2021. BACCHUS HIGHWAY UV111 11800 SOUTH FIGURE 3-2 FIGURE 3-3 FIGURE 3-4 FIGURE 3-7 FIGURE 3-8 FIGURE 3-9 FIGURE 3-6FIGURE 3-5 POST-REMOVAL SAM PLES - DETAIL EXTENTS LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-1 ExcavAll_Fig3-1.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_Fig3-1.mxd PLOTTED: 7/21/2023, KHagan The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 200 400Feet £ Locations are Approximate Explanation Main Bastian D itch C hannel Side Drainage Elevated Metals Left at Fenceline D uringKleinfelder E xcavation Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Excavation Area (Kleinfelder) Recreation Parcel Commercial Development and Substation Parcels Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary Source: Esri, Maxar, Earthstar Geographics, and the GIS User Com munity; ESRI W orld Imagery,Salt Lake County image 10/15/2021. MAP LEGEND !( !( !( !( !( !( !( !( !( !(!( !( !( DS-24 DG-24 Soil w ith elevated lead found at property line,represented by sample R -4 (1,510 mg/kg lead).XRF readings near R-4 ranged from 2,000 to5,000 mg/kg lead at 1.5 feet deep. KP-2CLead: 799 mg/kg at 3 feet bgs R-4 KP-1WLead: 545 to 1,630 mg/kg at 10-13 feet bgs KP-2C POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-2 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple !(Characterization Composite Sam ple G roupMain Bastian D itch Side Drainage Elevated Metals Left at Fenceline D uringKleinfelder E xcavation Excavation Area (Kleinfelder) Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !( !( !( !( !( !(!( !(!( !(!( !( !(!( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !(!( !(!(!(!(!(!( !(!( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !(!( !( !(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!( !(!(!( !(!(!( !(!(!(!(!(!( !(!(!( !(!(!( !(!(!( !( !( !(!(!( !(!( !( !( !(!( !(!(!( !(!( !(!( !(!(!( !(!(!( !(!(!( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( DS-8E DS-4W FG-9 DS-8W DS-10E DS-9E DS-33 DG-9x FS-10 DS-9Wx FG-10DS-36 DS-11W DG-10x D-36 DS-10Wx G10 S DS-37 DS-4E DG-33 DG-10-1 DG-9 DG-37 G-26S No rth DG-32 DS-34 DS-35DG-34 DG-35 G-26G DG-4 DG-11 DG-8 G10 F G-26S SouthSidewall impacts remain(600 to 800 mg/kg lead)at 10 to 17 feet deep(see Figure 4) POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-3 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple Composite Sam ple G roup Main Bastian D itch C hannel Side Drainage Elevated Metals Left at Fenceline D uringKleinfelder E xcavation Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Excavation Area (Kleinfelder) Recreation Parcel Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. Sidewall impacts remain (600 to 800 mg/kg lead) at 15 to 18 feet deep. (See Figure 6) Sidewall impacts remain (600 to 800 mg/kg lead) btw 17 and 18 feet deep. (See Figure 6) Lead concentrations of 600 to 800 mg/kg remain on the sidewall at 17 to 18 feet deep. (See Figure 6) Lead concentrations of 600 to 899 mg/kg remain in-situ at 17 to 18 feet deep. (See Figure 6) !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !(!( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( DS-6E DS-7E DS-13E DS-5E DS-7W DS-12E DS-6W DS-12W DS-5W DS-14E DS-17E DS-13W DG-12 DG-6 DG-14 DS-14Wx DG-5 DG-13 DG-7 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-4 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple Composite Sam ple G roup Main Bastian D itch C hannel Excavation Area (Kleinfelder) Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( DG-25 DS-1 DS-2 DS-28DS-27 DS-3 DS-32 DG-2 DS-15W DS-14E DS-16W DS-21 DS-25 DS-26 DG-27 DS-22 DG-26 DG-28 DG-22 DG-29 DG-15 DG-14 DS-14Wx DG-16 DG-1 DG-21 11800 SOUTHSoil with elevated metals continues south of Site,represented by samples R-1 (2,740 mg/kg lead)and R -2 (740 mg/kg lead). Ditch is 10 - 20 feetwide and 3 to 5 feet deep at the property line. Soil with elevated metals continues south of Site,represented by samples R-1 (2,740 mg/kg lead)and R -2 (740 mg/kg lead). Ditch is 10 - 20 feetwide and 3 to 5 feet deep at the property line. R-2R-1 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-5 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple !(Characterization S am ple Composite Sam ple G roup Main Bastian D itch C hannel Side Drainage Elevated Metals Left at Fenceline D uringKleinfelder E xcavation Excavation Area (Kleinfelder) Commercial Development Parcel Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( DS-23 DS-29 DS-30 DS-19E DS-19W DS-18E DS-14E DS-17E DS-17W DS-18W DS-31 DS-20E DS-20W DG-31 DG-30 DG-17 DG-14 DG-20 DG-19 DG-18 DG-23 11800 SOUTH Bastian Ditch soil with elevated metals continuessouth of Site. XRF results of impacts at the fence/property line range between 400 to 3,900 mg/kglead, represented by sample R-3 (1,200 mg/kglead). Ditch is approximately 20 feet wide and 4feet deep at the property line. R-3 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-6 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple !(Characterization S am ple Composite Sam ple G roup Main Bastian D itch C hannel Elevated Metals Left at Fenceline D uringKleinfelder E xcavation Excavation Area (Kleinfelder) Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(FS-12 FG-11 FG-12 FS-11 FS-13 FG-13 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-7 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple Composite Sam ple G roup Side Drainage Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Excavation Area (Kleinfelder) Recreation Parcel Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !( !( !( !( !(!( !( !(!(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!( !( !( !( !( !( !( !(!( !( !(!( !(!( !( !( !( !( !( !(!( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( FS-7 FG-7 FS-8 FS-18 FG-8 FS-14FS-13 FG-14FG-13 C3S FG-18 FG-15 C7FG C3F KT8 F FG-16 FS-15 C7 FS-7 C7 FS-3C7FS-6 C7 FS-9 C7 FS-5C7FS-4 C7 FS-1 KT-8-9KT-8-8 KT-8-7 KT-8-6KT-8-5 KT-8-4 KT-8-3 KT-8-2 KT-8-1 C7FS-11 C7FS-12 C7FS-10 KT-8-1x KT-8-14KT-8-13 KT-8-11 KT-8-10 C7 FS-8 C7 FS-2 KT-8-12 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-8 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple Composite Sam ple G roup Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Excavation Area (Kleinfelder) Recreation Parcel Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !(!( !(!( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !(!( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( FS-3 FS-4 FS-6 FS-5 FG-17 FG-4 FS-17 FG-3 FG-5 FG-6 POST-REMOVAL SAM PLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE3-9 ExcavAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_2023.mxd PLOTTED: 7/21/2023, KHagan Explanation !(Post-Rem oval Excavation Floor Sam ple !(Post-Rem oval Excavation Sidewall Sam ple Composite Sam ple G roup Bastian Ditch Drainage Sedim ents with ElevatedMetals Left on Daybreak Property During BastianDitch Drainage Excvavation by Rio Tinto (2015) Excavation Area (Kleinfelder) Substation P arcel Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 40 80Feet£Locations are Approximate Source: Esri, Maxar, Earthstar Geographics,and the GIS User Com munity; ESRI W orldImagery, Salt Lake County im age 10/15/2021. !(!( !(!(!(!(!( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!(!(!( !(!( !( !( !(!(!(!( !(!( !(!(!( !( !( !(!( !( !(!( !(!( !( !( !(!(!( !(!(!(!( !(!(!(!( !(!( !( !(!(!(!(!(!( !( !( !( !(!( !(!(!(!(!(!(!(!(!(!(!( !( !( !(!( !(!( !( !(!(!(!(!(!(!( !(!( !( !( !( !( !(!(!(!(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!(!(!(!( !(!( !(!( !( !( !(!(!(!( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !(!(!(!( !( !(!( !( !( !( !(!( !( !( !(!( !(!(!( !( !( !( !( !( !( !( !(!(!(!( !( !( !( !( !( !( !(!( !( !(!(!(!(!( !( !(!(!( !( !( !( !( !( !( ES-9 ES-8 ES-6 ES-5 ES-3ES-2ES-1 ES-35 ES-34 ES-99ES-98 ES-97 ES-96 ES-95 ES-94ES-93ES-92 ES-90 ES-87 ES-85 ES-84 ES-81 ES-80 ES-76ES-74 ES-72 ES-71 ES-68 ES-66 ES-64ES-60 ES-59 ES-57ES-56ES-55 ES-53 ES-50 ES-47 ES-44 ES-16 ES-14ES-13ES-12 ES-10 ES-42 ES-40ES-39ES-37ES-36 ES-33ES-32 ES-31 ES-30ES-27 ES-22ES-18 ES-306 ES-304 ES-303 ES-302 ES-301 ES-300 ES-299 ES-297 ES-294 ES-291 ES-289 ES-287 ES-284 ES-283 ES-282ES-281 ES-280ES-279 ES-278 ES-277 ES-276 ES-275 ES-273 ES-272 ES-271ES-270 ES-266ES-265 ES-264ES-263 ES-261 ES-259 ES-257 ES-255 ES-252 ES-241ES-240ES-239 ES-234 ES-232 ES-230 ES-237ES-236 ES-235 ES-223 ES-229 ES-228ES-227 ES-226 ES-224ES-247 ES-246 ES-245 ES-222 ES-242 ES-218ES-217 ES-214 ES-213 ES-210 ES-209 ES-208 ES-207 ES-206 ES-204 ES-203 ES-201ES-200 ES-196 ES-193 ES-192 ES-190 ES-188 ES-187 ES-181 ES-166 ES-164ES-163 ES-160ES-159 ES-157ES-156 ES-154ES-153 ES-151 ES-149 ES-147 ES-146ES-145ES-144 ES-134 ES-133 ES-142ES-141ES-140ES-139 ES-137 ES-123 ES-122 ES-119 ES-117 ES-115 ES-125ES-124 ES-131 ES-126 ES-114 ES-113 ES-111 ES-109ES-107 ES-7 ES-4 ES-91 ES-89 ES-88 ES-86 ES-83 ES-82 ES-79 ES-78ES-77 ES-75 ES-73 ES-70 ES-69ES-67ES-65 ES-63 ES-62ES-61 ES-58 ES-54 ES-52 ES-51 ES-49 ES-48 ES-46ES-45 ES-43 ES-15 ES-11 ES-41 ES-29ES-28 ES-26 ES-25 ES-24ES-23 ES-21ES-20 ES-19ES-17 ES-305 ES-298ES-296 ES-295 ES-293ES-292 ES-290 ES-288 ES-286 ES-285 ES-274 ES-269 ES-268ES-267 ES-262 ES-260 ES-258 ES-256 ES-254ES-253 ES-251 ES-250ES-249ES-248 ES-238 ES-233 ES-231 ES-225 ES-244 ES-243 ES-221 ES-220ES-219 ES-216 ES-215 ES-212 ES-211 ES-205 ES-202 ES-199ES-198 ES-197 ES-195 ES-194 ES-191 ES-189 ES-186 ES-180ES-179 ES-178 ES-177ES-176ES-175 ES-185 ES-184ES-183 ES-182 ES-174ES-173ES-172ES-171 ES-170ES-169ES-168ES-167 ES-165 ES-162 ES-161 ES-158 ES-155 ES-152 ES-150 ES-148 ES-143 ES-138 ES-136 ES-135 ES-121 ES-120 ES-118 ES-116 ES-132ES-130 ES-129 ES-128 ES-127 ES-112 ES-110 ES-108 ES-106ES-105 ES-104 ES-103ES-102 ES-101ES-100 ES-125 ES-124 BACCHUS HIGHWAY UV111 EXCAVATED BASTIAN DITCHSTOCKPILE SAMPLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE4 ExcavAll_Fig4.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_Fig4.mxd PLOTTED: 7/21/2023, KHagan The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 100 200Feet £ Locations are Approximate Explanation !(Stockpile Sam ple Main Bastian D itch C hannel Side Drainage Recreation Parcel Commercial Development and Substation Parcels Excavation Area (Kleinfelder) Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary Source: Esri, Maxar, Earthstar Geographics, and the GIS User Com munity; ESRI W orld Imagery,Salt Lake County image 10/15/2021. 11800 SOUTH IMPACTED SOIL FOOTPRINTIN COMM ERC IAL PARCEL LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE5 ExcavAll_Fig5.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\ExcavAll_Fig5.mxd PLOTTED: 7/21/2023, KHagan The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 50 100Feet£Locations are Approximate Explanation Impacted S oil Footprint Commercial Development Parcel Approximate Site Boundary Source: Esri, Maxar, Earthstar Geographics, and the GIS UserCommunity; ESR I World Imagery, Salt Lake County image10/15/2021. !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( C8 C6 C5C4 C9 G-8 G-1G-2 G-3 G-4 C10 I-9 I-8 I-7 I-5 I-4 I-3 I-2 I-1 F-6 F-3 G-7 G-9 G-6 G-5 F-4 C11 D-3 D-2 D-1 E-6 E-5 E-4 E-3 E-2 E-1 G-11 G-35 G-63 G-67 G-66 G-65 G-64 G-59 G-62 G-61G-60G-58 G-57 G-56 G-55 G-49 G-50 G-51 G-47 G-46 G-54 G-53 G-52 G-45 G-44 G-39 G-42 G-43 G-40 G-41 G-38 G-37 G-36 G-34 G-33 G-32 G-31 G-30G-29G-28 G-25 G-23 G-22 G-21 G-20 C7-A C7-B F-16 G-16G-17G-18 G-14 G-15G-13 G-12 G-10 CTP-7 CTP-6 STP-9 RTP-2 RTP-3 CTP-3 CTP-9 CTP-8 CTP-2 CTP-1 G-26 S WETP-3 WETP-5 WETP-7WETP-8 WETP-4 STP-10 WETP-6 CTP-11 CTP-10 CTP-12 WETP-2a WETP-1a G-48 G-26G-27 G-24 G-19 G-7A G-19A G-23C CTP-5 CHARACTERIZATION SAMPLES LARK MONOFILLNORTHEAST CORNER OF HIGHWAY 111 AND 11800 SOUTHSOUTH JORD AN, UTAH FIGURE6 CharAll_2023.mxd FILE NAME: C. HILLARDCHECKED BY: K. HAGANDRAWN BY: JUL 2023DRAWN: 20201466PROJECT N O: SALT LAKE CITY, UT \\azrgisstorp03\GIS_Projects\Client\SOJO118\20201466.04-LarkMonofill\CharAll_2023.mxd PLOTTED: 7/28/2023, KHagan The inform ation included on this graphicrepresentation has been compiled from a varietyof sources and is subject to change withoutnotice. Kleinfelder m akes no representations orwarranties, express or implied, as to accuracy,completeness, tim eliness, or rights to the use ofsuch information. This document is not intendedfor use as a land survey product nor is it designedor intended as a construction design docum ent.The use or misuse of the information containedon this graphic representation is at the sole risk ofthe party using or misusing the inform ation. 0 100 200Feet £ Locations are Approximate Explanation !(< 500 mg/kg Lead !(500 - 700 mg/kg Lead !(700 - 1,100 mg/kg Lead Deep soil impacts between 700 and 1,100 mg/kg lead Proposed Highw ay 111 Recreation Parcel Main Bastian Ditch Channel Side D rainages Visible on H istorical Aerial Photos Bastian Ditch Drainage Sediments w ith Elevated MetalsLeft Outside Lark Fenceline During Bastian D itchDrainage Excavation by R io Tinto Excavation Area (Kleinfelder 2021) Bastian Ditch Drainage KUC Excavation Area Approximate Site Boundary Source: Esri, Maxar, Earthstar Geographics, and the GIS User Com munity; ESRI W orld Imagery,Salt Lake County image 10/15/2021. Ap p e n d i x A 20201466.001A/SLC23R156681_ FINAL July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 APPENDIX A PRIOR INVESTIGATION DATA AND REGULATORY APPROVAL LETTERS ___________________________________________________________________________________ · RioTinto Figures – Bastian Ditch Drainage Soil Impacts Left at Property Line. · Bevill Exclusion Approval Letter from Utah Div. Waste Management. · Lark Remediation Work Plan Approval Letter from UDERR. · Use of Daybreak Residential and Commercial Standards Approval from UDERR. · Lark Work Plan Addendum One Approval Letter from UDERR. · Lark Substation Remediation NFA Letter from UDERR. 1 Corinne Hillard From:Katie Crane <kcrane@utah.gov> Sent:Thursday, August 5, 2021 2:24 PM To:Corinne Hillard Subject:Re: Clarification question re: Lark Monofill Soil Removal Work Plan External Email Hello Corrine, Upon further discussion with our toxicologist, and the Kennecott Project Manager, the Daybreak Commercial Land Use Action Levels of 2,000 mg/kg lead and 450 mg/kg arsenic that we agreed to in the April 16th Work Plan were intended to be applied to material located in the east side ditch only. This was based on the assumption that the material in the eastside ditch was the same as the contaminated material on the Daybreak property, and therefore had the same properties. However, that assumption cannot be made for the whole Lark Monofil site and our intent was not to accept this value across the whole site. Based on our review of our April comments we agree that we were unclear, and will accept the Daybreak Commercial Land Use Action Levels for soils throughout the entire site being moved to the commercial-use platted area in the Southwest corner of the site. We cannot accept the Daybreak Residential Land Use Action Levels of 700 mg/kg lead and 100 mg/kg arsenic for the reasons discussed above for the entire site, without the appropriate evaluation of a residential scenario with the specific contaminated material. As originally intended, we can agree to the Daybreak Residential Land Use Action Levels of 700 mg/kg lead and 100 mg/kg arsenic within the east side ditch along the east property line only. I will note, based on the conversation we had last week, you indicated the contaminated material was around ten feet below ground surface. Contaminated material at a two-foot depth is most likely protective (if left undisturbed) and we could agree to leave material at depth, but we would require institutional controls down to ten feet. Please let me know if this is something you would like to discuss further. We can agree with stockpiling the soil alongside the ditch and collecting composite samples. Please submit an addendum to the Work Plan. Thank you, Katie 2053 N. HILLCREST RD. SARATOGA SPRINGS, UT 84045 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF ANDERSON ENGINEERING COMPANY, INC., 2053 N HILLCREST ROAD,SARATOGA SPRINGS, UTAH 84045 AND SHALL NOT BE COPIED, REDUCED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION "\ "\"\!1167 160707-2 ! 1167 160623-1SOIL WITH ELEVATEDLEAD (1500 TO 2600 PPM)LEFT IN PLACE ADJACENT TOFENCE ON PROPERTY LINE(REPRESENTED BY SAMPLES1167Z-40 TO 1167Z-43) ! PROPERTY LINE 11800 S DAYBREAK COMMERCEPARK/WEST VILLAGESOIL REMOVAL SALT LAKE COUNTY, UT KENNECOTT LANDCOMPANY 1167 A-8Date Project Scale Sheet 1 " = 160 ' 05-OCT-2016 0 80 160 SCALE IN FEET OLD BINGHAM HWY MOUN TA I N V I E W C O R RID O R 11800 SOUTH BA C C H U S H W Y ! SITE LOCATION BASTIAN DITCHDRAINAGE SITE FIELDOBSERVATIONS SOIL REMOVAL AREA SOIL WITH COCs LEFT IN PLACE FOUND HISTORICAL DITCH "\PHOTOGRAPH LOCATION 2053 N. HILLCREST RD. SARATOGA SPRINGS, UT 84045 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF ANDERSON ENGINEERING COMPANY, INC., 2053 N HILLCREST ROAD,SARATOGA SPRINGS, UTAH 84045 AND SHALL NOT BE COPIED, REDUCED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION "\ "\ "\ "\"\ "\ "\ "\ ! 1167 160804-3 !1167 160714-1 !1167 160706-2 !1167 160706-1 !1167 160714-2 ! 1167 160729-3 SOIL WITH ELEVATEDLEAD (500 TO 700 PPM)LEFT IN PLACE ADJACENT TOFENCE ON PROPERTY LINE(NOT SAMPLED DUE TODEPTH OF REMOVAL) !PROPERTY LINE SOIL WITH ELEVATEDLEAD (500 TO 1000 PPM)LEFT IN PLACE ADJACENT TOFENCE ON PROPERTY LINE(REPRESENTED BY SAMPLES1167Z-59 TO 1167Z-60) ! PROPERTY LINE SOIL WITH ELEVATED LEAD (800 TO 1100 PPM)WAS FOUND ADJACENT TO THE FENCE ANDPROPERTY LINE BETWEEN 1 AND 6 FEET DEEP.THIS SOIL DID NOT EXTEND FAR ENOUGH ONTOTHE PROPERTY TO JUSTIFY REMOVAL.(REPRESENTED BY SAMPLE 1167Z-111) ABUNDANT IRON OXIDE STAININGWAS FOUND IN THE SOIL ADJACENTTO THE FENCE AND PROPERTY LINELEAD CONCENTRATIONS IN THISSOIL WERE BELOW THE ACTION LEVEL !10-FOOT SIDEWALL3-FOOT SIDEWALL IRON-OXIDE STAINED SOIL WITHELEVATED LEAD (600 TO 1100 PPM)WAS FOUND AS DEEP AS 10 FEETWHERE THE HISTORIC DITCHCROSSED THE PROPERTY LINE DAYBREAK COMMERCEPARK/WEST VILLAGESOIL REMOVAL SALT LAKE COUNTY, UT KENNECOTT LANDCOMPANY 1167 A-10Date Project Scale Sheet 1 " = 200 ' 05-OCT-2016 0 100 200 SCALE IN FEET OLD BINGHAM HWY MOUN TA I N V I E W C O R RID O R 11800 SOUTH BA C C H U S H W Y ! SITE LOCATION BASTIAN DITCHDRAINAGE SITE FIELDOBSERVATIONS SOIL REMOVAL AREA SOIL WITH COCs LEFT IN PLACE FOUND HISTORICAL DITCH "\PHOTOGRAPH LOCATION 2053 N. HILLCREST RD. SARATOGA SPRINGS, UT 84045 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF ANDERSON ENGINEERING COMPANY, INC., 2053 N HILLCREST ROAD,SARATOGA SPRINGS, UTAH 84045 AND SHALL NOT BE COPIED, REDUCED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION "\ "\ "\ "\! 1167 160804-3!1167 160728-1 ! 1167 160802-3 ! 1167 160727-1 SOIL WITH ELEVATEDLEAD (500 TO 1200 PPM)LEFT IN PLACE ADJACENT TOFENCE ON PROPERTY LINE(REPRESENTED BY SAMPLES1167Z-128 AND 1167Z-129) SOIL WITH ELEVATEDLEAD (500 TO 700 PPM)LEFT IN PLACE ADJACENT TOFENCE ON PROPERTY LINE(NOT SAMPLED DUE TODEPTH OF REMOVAL) ! PROPERTY LINE ! PROPERTY LINE !SOUTH VALLEY WATER RECLAMATIONBIOSOLIDS DISPOSAL FACILITY !10-FOOT SIDEWALL !3-FOOT SIDEWALL IRON-OXIDE STAINED SOIL WITHELEVATED LEAD (600 TO 1100 PPM)WAS FOUND AS DEEP AS 10 FEETWHERE THE HISTORIC DITCHCROSSED THE PROPERTY LINE DAYBREAK COMMERCEPARK/WEST VILLAGESOIL REMOVAL SALT LAKE COUNTY, UT KENNECOTT LANDCOMPANY 1167 A-11Date Project Scale Sheet 1 " = 100 ' 05-OCT-2016 0 50 100 SCALE IN FEET OLD BINGHAM HWY MOUN TA I N V I E W C O R RID O R 11800 SOUTH BA C C H U S H W Y ! SITE LOCATION BASTIAN DITCHDRAINAGE SITE FIELDOBSERVATIONS SOIL REMOVAL AREA SOIL WITH COCs LEFT IN PLACE FOUND HISTORICAL DITCH "\PHOTOGRAPH LOCATION Ap p e n d i x B 20201466.001A/SLC23R156681_ FINAL July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 APPENDIX B STANDARD OPERATING PROCEDURES ___________________________________________________________________________________ 20201466.001A/SLC23R156681 B-1 of B-4 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 KLEINFELDER, INC. STANDARD OPERATING PROCEDURES ___________________________________________________________________________________ EQUIPMENT DECONTAMINATION Decontamination procedures will be used to prevent cross-contamination of samples. Decontamination procedures will be established for each site based on the contaminants of concern to be sampled and the degree of hazard associated with the site. Decontamination procedures will be reviewed and approved by the Site Health and Safety Manager. The following procedure contains standard decontamination protocols, suitable for most sites. All non-disposable sampling equipment will be decontaminated prior to use and between samples as follows: • Remove Gross Contaminants – Equipment will be scrubbed using a water/detergent solution and stiff brush until visible contaminants are removed. The water will be changed as necessary, daily at a minimum. • Wash with Alconox soap or similar detergent – An Alconox wash will be prepared as indicated on the product labeling, typically mixing 1 to 1.5 tablespoons of Alconox per gallon of water. The water will be changed as necessary, daily at a minimum. • Water Rinse – Equipment will be rinsed with clear potable water. The water will be changed as necessary, daily at a minimum. • Deionized Water Rinse – Deionized water will be used as a final rinse for all equipment. The water may be poured or sprayed, or the equipment submerged. • Gloves – Sampling personnel will change into a new pair of chemical-resistant gloves between samples and discard the previous pair. The backhoe bucket will be decontaminated prior to use using a high-pressure washer. Decontamination water will be dispersed on the ground surface and allowed to infiltrate near the source. Between trench/sample locations, the backhoe bucket will be shaken and/or swept to remove loose dirt. SAMPLE COLLECTION Sample containers, preservation techniques, and holding times will be consistent with EPA SW-846 guidelines. Soil samples to be analyzed for metals will be placed in plastic Ziplock bags. No preservation or sample cooling is necessary for lead and arsenic analysis and the holding time is six months. Sample intervals will be selected based on the project sampling plan. Soil samples will be collected using disposable plastic or decontaminated hand tools. These tools may include one or more of the following: • Disposable plastic spoon, trowel, or cup, • Stainless steel spoon, trowel, or cup, and/or • Clean, disposable gloves (vinyl, latex, nitrile). 20201466.001A/SLC23R156681 B-2 of B-4 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 Only disposable plastic or decontaminated stainless-steel tools will be used to sample the material. Reusable sampling tools will be decontaminated prior to use following the procedures described in the “Equipment Decontamination” SOP. Grab Samples A soil sample will be collected at the selected depths with a spoon, trowel, or chemical-resistant gloves. The material will be screened with the appropriate direct reading instrument, such as a PID or XRF, and the reading will be recorded on the log form or in the field notebook. The portion of the sample collected for chemical analysis will be transferred immediately into the appropriate sample container using decontaminated equipment, clean disposable spoons or equipment, or by hand wearing new disposable chemical-resistant gloves. Avoid gravels and rock fragments when filling soil sample containers. If the sample is to be analyzed for volatile organics, the container will be completely filled with soil to minimize headspace. The container will be labeled appropriately and immediately stored in an iced cooler to maintain a temperature of 4° Celsius (if cooling is required for the analytical method). Composite Soil Samples Composite samples will be prepared by placing equal amounts of soil in a stainless-steel bowl or clean plastic bag using a stainless-steel spoon or by hand wearing new chemical-resistant gloves. The composite sample will be comprised of a minimum of five aliquots. The sample will be homogenized with a stainless-steel spoon or gloved hand. The homogenized soil will be packaged in a laboratory-supplied sample container, labeled appropriately, and placed in an iced cooler to maintain a temperature of 4° Celsius, if appropriate for the analytical method. Enough soil will be collected for each sample to allow for additional laboratory analysis of lead and arsenic if necessary. The samples will be held at the laboratory for 30 days after analysis to accommodate possible additional analysis. Soil sample material will be homogenized prior to analysis. The sample will be placed in a new, re-sealable plastic bag. Large debris and rocks will be removed, and the sample will be homogenized by kneading the soil within the bag. Clay soils, if encountered, will be thoroughly mixed to the extent practicable. Sample Identification and Labeling To prevent misidentification of samples, each sample container will be labeled with indelible ink. The following information will be recorded on the sample container: • Project name or number, • Sample identification number, • Sample depth, and • Date and time of collection. Samples will be transported in laboratory-supplied coolers and stored on ice to maintain a temperature between 2 and 6 degrees Centigrade, if sample cooling is required for the analytical method. DOCUMENTATION AND SAMPLE HANDLING 20201466.001A/SLC23R156681 B-3 of B-4 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 Field Records Field activities will be recorded on a Daily Field Report (DFR) form or in a field logbook by on-site personnel during all sampling activities. All notes/comments and data generated during the project will be recorded on the DFR or logbook. The general information recorded for each day’s sampling event includes: • Date, • Name of overall sampling event and project number, • Sampling personnel, • Climatic conditions, • Field equipment and subcontractor personnel, • Daily operations and observations, and • Any deviation from the sampling protocol will be formally noted along with the names of visiting personnel and any unusual circumstances pertinent to the sampling effort. Sample Control Log For each sample collected, the following will be recorded in a sample control log or DFR: • Sample identification number, • Location with measurements, • Sample time, • Sample type (grab, composite, etc.), and • Field observations Map or diagram. Boring and Trench Logs Subsurface conditions encountered will be described in the boring or trench log using the unified soil classification system. The logs will include the following, as applicable: • GPS Coordinate, • Color/discoloration, • Sample location/depth, • Drawing of the trench dimensions and observations, and • Any other observations pertinent to the sampling effort. 20201466.001A/SLC23R156681 B-4 of B-4 July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 Photographs Photographs may be taken of the trenches and other investigation features as deemed appropriate to document the field activities. A photograph log will be maintained on the DFR. The log will contain the following information: • Photograph identification number, • Identification of site, and • Date of photograph. Chain-of-Custody Sample chain-of-custody will be maintained for all samples collected. A chain-of-custody record will be filled out and will accompany every set of samples in order to establish the documentation necessary to trace sample possession from the time of collection. Samples will remain in the possession of the sampler at all times, or in a locked facility until delivery to the analytical laboratory. Ap p e n d i x C 20201466.001A/SLC23R156681_ FINAL July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 APPENDIX C TRANS-JORDAN LANDFILL DISPOSAL SUMMARY AND MONITORING WELL CLOSURE RECORDS ___________________________________________________________________________________ Date Time Tran Num Net Tons 12/20/2021 2:10 PM 3599167 13.34 12/20/2021 2:47 PM 3599199 13.26 12/20/2021 3:13 PM 3599220 13.04 12/20/2021 3:37 PM 3599249 12.31 12/21/2021 8:40 AM 3599365 15.1 12/21/2021 9:15 AM 3599383 15.51 12/21/2021 9:44 AM 3599405 15.61 12/21/2021 10:14 AM 3599435 15.17 12/21/2021 10:48 AM 3599464 15.55 12/21/2021 11:18 AM 3599490 16.7 12/21/2021 1:14 PM 3599580 17.59 12/21/2021 1:42 PM 3599608 16.91 12/21/2021 2:14 PM 3599637 16.52 12/21/2021 3:33 PM 3599719 17.43 12/22/2021 9:11 AM 3599821 14.91 12/22/2021 9:38 AM 3599838 16.42 12/22/2021 10:03 AM 3599855 16.89 12/22/2021 10:35 AM 3599886 17.94 12/22/2021 10:59 AM 3599902 17.25 12/22/2021 12:52 PM 3599999 14.76 12/22/2021 1:17 PM 3600028 16.2 12/22/2021 1:43 PM 3600049 16.21 12/22/2021 2:11 PM 3600068 16.83 12/22/2021 2:39 PM 3600098 17.14 12/22/2021 3:28 PM 3600133 17.37 12/28/2021 11:23 AM 3601778 19.32 12/28/2021 12:36 PM 3601839 18.55 12/28/2021 1:12 PM 3601869 17.95 12/28/2021 1:53 PM 3601911 19.44 12/28/2021 2:27 PM 3601940 18.04 12/28/2021 3:00 PM 3601971 18.7 12/28/2021 3:29 PM 3601995 18.12 12/28/2021 4:08 PM 3602021 18.83 12/30/2021 9:10 AM 3602697 17.88 12/30/2021 9:48 AM 3602713 17.98 12/30/2021 10:34 AM 3602756 17.46 12/30/2021 11:16 AM 3602809 18.87 01/03/2022 2:52 PM 3603839 15.01 01/03/2022 3:33 PM 3603885 15.61 01/03/2022 4:11 PM 3603923 16.37 01/04/2022 9:21 AM 3604049 17.01 01/04/2022 10:04 AM 3604080 18.18 01/04/2022 1:41 PM 3604243 16.9 01/04/2022 2:11 PM 3604270 15.43 01/04/2022 2:48 PM 3604298 14.84 01/04/2022 3:29 PM 3604340 16.13 01/05/2022 9:27 AM 3604474 16.89 01/05/2022 10:07 AM 3604500 16.56 01/05/2022 12:50 PM 3604635 16.46 01/05/2022 1:19 PM 3604656 16.83 01/05/2022 1:47 PM 3604674 17.72 01/05/2022 2:21 PM 3604709 15.19 Soil Disposal Summary to Trans Jordan Landfill from Lark Monofill 1 of 2 01/05/2022 3:03 PM 3604748 15.6 01/06/2022 10:04 AM 3604923 17.12 01/13/2022 10:23 AM 3608153 17.29 01/13/2022 11:06 AM 3608183 17.51 01/13/2022 1:22 PM 3608283 16.92 01/13/2022 1:58 PM 3608319 17.75 01/13/2022 2:33 PM 3608356 18.2 01/13/2022 3:10 PM 3608390 17.92 01/13/2022 3:57 PM 3608431 16.46 01/14/2022 10:07 AM 3608597 16.69 01/14/2022 11:52 AM 3608701 17.28 01/14/2022 12:35 PM 3608735 16.72 01/14/2022 1:29 PM 3608780 19.3 01/14/2022 2:11 PM 3608826 19.03 01/14/2022 3:14 PM 3608882 18.06 01/17/2022 10:33 AM 3609759 15.34 01/17/2022 11:09 AM 3609811 18.43 01/17/2022 12:50 PM 3609922 18.31 01/17/2022 1:27 PM 3609967 18.42 01/17/2022 2:03 PM 3610013 17.49 01/17/2022 2:34 PM 3610047 17.42 01/17/2022 3:10 PM 3610089 16.6 01/17/2022 3:50 PM 3610146 17.81 01/18/2022 9:14 AM 3610310 16.98 01/18/2022 9:49 AM 3610334 17.05 01/18/2022 10:46 AM 3610396 18.38 01/18/2022 11:23 AM 3610428 19.23 01/18/2022 12:01 PM 3610471 17.23 01/18/2022 12:49 PM 3610511 18 01/18/2022 1:23 PM 3610539 18.47 01/18/2022 1:57 PM 3610573 16.63 01/18/2022 2:41 PM 3610625 18.66 01/19/2022 9:14 AM 3610802 18.77 02/28/2022 9:57 AM 3627381 16.45 02/28/2022 10:32 AM 3627397 17.64 02/28/2022 11:00 AM 3627431 18.48 02/28/2022 12:17 PM 3627512 16.8 02/28/2022 12:46 PM 3627535 16.86 02/28/2022 1:15 PM 3627571 18.19 02/28/2022 1:43 PM 3627595 17.01 02/28/2022 2:11 PM 3627623 16.77 02/28/2022 3:01 PM 3627689 18.66 02/28/2022 3:29 PM 3627716 19.72 03/01/2022 8:46 AM 3627893 19.09 03/01/2022 9:28 AM 3627911 18.67 03/01/2022 10:41 AM 3627964 20.88 03/01/2022 11:14 AM 3627998 15.95 03/12/2022 9:17 AM 3632876 1.67 03/22/2022 1:14 PM 3638395 13.21 03/22/2022 1:37 PM 3638411 15.4 03/22/2022 1:57 PM 3638433 14.89 03/22/2022 2:21 PM 3638465 19.31 03/22/2022 2:43 PM 3638498 16.6 1776 1420 Total Tons Estimated Volume (1 ton = .80 Cubic Yards) 2 of 2 Monitoring Wells MW-1, located in the west bound lanes of 11800 South Street and the replacement water supply well located south of 11800 South were not abandoned. Stormdrain Culvert MW-1 Replacement Water Supply Well Monitoring well MW-1 lies in the west bound lanes of 11800 S street pavement, and the replacement water supply well is south of 11800 S. Neither of these wells were abandoned by Kleinfelder. KENNECOTT Nested Wells BSG-1153 A, B, C LARK LARK LARK Ap p e n d i x D 20201466.001A/SLC23R156681_ FINAL July 31, 2023 © 2023 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200, Taylorsville, UT 84123-2544 p | 801.261.3336 APPENDIX D POST-REMOVAL CLOSURE SAMPLE INFORMATION SHEETS ___________________________________________________________________________________ · West Lark Post-Removal Sample Info Sheets – Ground and Sidewall Samples. o Bastian Ditch Excavation (DG, DS), G-10 Excavation, samples R-1 thru R-4. · East Lark Post-Removal Sample Info Sheets – Ground and Sidewall Samples. o Fence line excavation (FG,FS), Excavations KT-8, C3, C7, and G26. · Impacted Stockpile Removal Footprint Post-Removal Sample Info Sheets. o ESG 1 thru 23, H5x, H11x, and H13x. WEST LARK POST-REMOVAL GROUND AND SIDEWALL SAMPLES (Excavations- Bastian Ditch (DG, DS), G10, R-1 thru 4 ) SAMPLE INFORMATION SHEETS Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-1 Date/Time:September 22, 2021 10:40 AM Location:Bastian Ditch Channel Coordinates:40.537325, -112.066597 Represents:Post Removal Ground Surface 0-6 inches below ground surface Samples collected over 205-ft of distance. Configuration:12 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sampling. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 1 of 7 Pages Kleinfelder Representative Signature 5/10/2023 12:53:22 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-2 Date/Time:September 22, 2021 10:50 AM Location:Bastian Ditch Channel Coordinates:40.537229, -112.066356 Represents:Post Removal Ground Surface 0-6 inches below ground surface Sample collected over 230-ft of distance. Configuration:8 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sampling. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 2 of 7 Pages5/10/2023 12:53:22 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-4 Date/Time:January 07, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.544880, -112.063437 Represents:Post Removal Ground Surface 0-6 inches below ground surface This section represents 220 ft of the Bastian Ditch. Configuration:8 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Stockpile Characterization Notes:This sample represents approx 220 ft. Photos DG-4 Looking South DG-4 Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_211 Page 1 of 3 Pages Kleinfelder Representative Signature 5/10/2023 12:55:29 PM Confirmation Sample 50 feet Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-5 Date/Time:January 11, 2022 09:30 AM Location:Bastian Ditch Channel Coordinates:40.540767, -112.064406 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Sample aliquots collected avoiding fill used to bridge east and west sides of the Bastian Ditch to facilitate stockpile removal to Trans-Jordan landfill. Photos Facing southwest.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 1 of 9 Pages Kleinfelder Representative Signature 5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-6 Date/Time:January 11, 2022 09:55 PM Location:Bastian Ditch Channel Coordinates:40.541306, -112.063875 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:12 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 4 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-7 Date/Time:January 11, 2022 01:18 PM Location:Bastian Ditch Channel Coordinates:40.541887, -112.063688 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:11 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 7 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-8 Date/Time:January 12, 2022 09:00 AM Location:Bastian Ditch Channel Coordinates:40.542573, -112.063501 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 1 of 11 Pages Kleinfelder Representative Signature 5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-9 Date/Time:January 12, 2022 10:02 AM Location:Bastian Ditch Channel Coordinates:40.543249, -112.063518 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:11 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 4 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-9x Date/Time:April 06, 2022 10:15 AM Location:Bastian Ditch Channel Coordinates:40.543245, -112.063630 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_322 Page 2 of 8 Pages5/10/2023 1:01:14 PM The DS-9W west sidewall required additional over-excavation based on post-removal sampling. This represents the ground surface beneath the additional lateral excavation. Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-10 Date/Time:January 12, 2022 10:20 AM Location:Bastian Ditch Channel Coordinates:40.543869, -112.063656 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 11 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-10x Date/Time:April 06, 2022 10:20 AM Location:Bastian Ditch Channel Coordinates:40.543883, -112.063817 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:3 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_322 Page 4 of 8 Pages5/10/2023 1:01:14 PM The DS-10W west sidewall required additional over-excavation based on post-removal sampling. This represents the ground surface beneath the additional lateral excavation. Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-11 Date/Time:January 12, 2022 10:45 AM Location:Bastian Ditch Channel Coordinates:40.544446, -112.063444 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 10 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-12 Date/Time:January 12, 2022 01:40 PM Location:Bastian Ditch Channel Coordinates:40.540109, -112.064802 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:13 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 3 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-13 Date/Time:January 12, 2022 01:55 PM Location:Bastian Ditch Channel Coordinates:40.539501, -112.064927 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing east.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 4 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-14 Date/Time:January 12, 2022 02:30 PM Location:Bastian Ditch Channel Coordinates:40.538983, -112.065506 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:7 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 7 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-15 Date/Time:January 12, 2022 03:00 PM Location:Bastian Ditch Channel Coordinates:40.538315, -112.065735 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facng north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 10 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-16 Date/Time:January 12, 2022 03:20 PM Location:Bastian Ditch Channel Coordinates:40.537717, -112.066081 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:7 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facng north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 13 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-17 Date/Time:January 13, 2022 09:30 AM Location:Bastian Ditch Channel Coordinates:40.538948, -112.064366 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:Sample represents 250 ft. Photos DG-17 Looking South DG-17 Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 22 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-18 Date/Time:January 13, 2022 09:45 AM Location:Bastian Ditch Channel Coordinates:40.538379, -112.063867 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DG-18 Facing South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 19 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-19 Date/Time:January 13, 2022 10:15 AM Location:Bastian Ditch Channel Coordinates:40.537818, -112.063343 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 16 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-20 Date/Time:January 13, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.537336, -112.063033 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 13 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-21 Date/Time:March 03, 2022 11:20 AM Location:Bastian Ditch Channel Coordinates:40.537115, -112.066600 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes:Excavated area crosses southern E-W dirt road. Photos Faing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 3 of 7 Pages5/10/2023 12:59:59 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-22 Date/Time:March 03, 2022 02:45 PM Location:Bastian Ditch Channel Coordinates:40.537137, -112.066181 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 6 of 7 Pages5/10/2023 12:59:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-23 Date/Time:March 15, 2022 10:10 AM Location:Bastian Ditch Channel Coordinates:40.537080, -112.062668 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:7 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_289 Page 1 of 7 Pages Kleinfelder Representative Signature 5/10/2023 1:00:20 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-24 Date/Time:March 25, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.550044, -112.062676 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_307 Page 14 of 14 Pages5/10/2023 1:00:42 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-25 Date/Time:April 29, 2022 09:15 AM Location:Bastian Ditch Channel Coordinates:40.537743, -112.065919 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing east Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 1 of 8 Pages Kleinfelder Representative Signature 5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-26 Date/Time:April 29, 2022 09:45 AM Location:Bastian Ditch Channel Coordinates:40.537394, -112.065896 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 2 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-27 Date/Time:April 29, 2022 12:00 PM Location:Bastian Ditch Channel Coordinates:40.537987, -112.065534 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:16 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 8 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-28 Date/Time:April 29, 2022 12:45 PM Location:Bastian Ditch Channel Coordinates:40.537861, -112.065246 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 25 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 4 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-29 Date/Time:April 29, 2022 01:00 PM Location:Bastian Ditch Channel Coordinates:40.537433, -112.065473 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:11 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 5 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-30 Date/Time:April 29, 2022 01:30 PM Location:Bastian Ditch Channel Coordinates:40.537838, -112.064403 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:13 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 6 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-31 Date/Time:April 29, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.537965, -112.064511 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 25 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_328 Page 7 of 8 Pages5/10/2023 3:12:28 PM Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-32 Date/Time:June 20, 2022 12:45 PM Location:Bastian Ditch Channel Coordinates:40.544107, -112.063152 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 6 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-33 Date/Time:June 20, 2022 12:50 PM Location:Bastian Ditch Channel Coordinates:40.544078, -112.062990 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 7 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-34 Date/Time:June 20, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.544776, -112.063156 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 8 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-35 Date/Time:June 20, 2022 02:30 PM Location:Bastian Ditch Channel Coordinates:40.544764, -112.062887 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 9 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-36 Date/Time:June 21, 2022 10:00 AM Location:Bastian Ditch Channel Coordinates:40.544750, -112.062650 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_365 Page 1 of 5 Pages Kleinfelder Representative Signature 5/10/2023 1:03:55 PM Confirmation Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DG-37 Date/Time:June 21, 2022 11:30 AM Location:Bastian Ditch Channel Coordinates:40.544197, -112.062602 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:8 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_365 Page 2 of 5 Pages5/10/2023 1:03:55 PM Confirmation Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-1 Date/Time:September 22, 2021 09:40 AM Location:Bastian Ditch Channel Coordinates:40.537253, -112.066718 Represents:Post Removal Sidewall 3-4 feet below ground surface 205-ft long. At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sampling. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 3 of 7 Pages5/10/2023 12:53:22 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-2 Date/Time:September 22, 2021 10:10 AM Location:Bastian Ditch Channel Coordinates:40.537278, -112.066310 Represents:Post Removal Sidewall 3-4 feet below ground surface 226-ft long. At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 49 feet apart Sample Purpose:Confirmation Sampling. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 4 of 7 Pages5/10/2023 12:53:22 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-3 Date/Time:September 22, 2021 09:20 AM Location:Bastian Ditch Channel Coordinates:40.537293, -112.066373 Represents:Post Removal Sidewall 3-4 feet below ground surface 250-ft. Long. At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sampling. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 5 of 7 Pages5/10/2023 12:53:22 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-4W Date/Time:January 07, 2022 02:35 PM Location:Bastian Ditch Channel Coordinates:40.544943, -112.063438 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 25 feet apart Sample Purpose:Stockpile Characterization Notes:This section represents approx 220 ft. Photos DS-4 W Looking South DS-4 W Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_211 Page 3 of 3 Pages5/10/2023 12:55:29 PM Confirmation Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-4E Date/Time:January 07, 2022 02:50 PM Location:Bastian Ditch Channel Coordinates:40.544938, -112.063403 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 25 feet apart Sample Purpose:Stockpile Characterization Notes:This section represents approx 220 ft. Photos DS-4 E Looking South DS-4 E Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_211 Page 2 of 3 Pages5/10/2023 12:55:29 PM Confirmation Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-5W Date/Time:January 11, 2022 09:35 AM Location:Bastian Ditch Channel Coordinates:40.540811, -112.064586 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing southwest.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 2 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-5E Date/Time:January 11, 2022 09:40 AM Location:Bastian Ditch Channel Coordinates:40.540689, -112.064478 Represents:Post Removal Sidewall 1.5-2 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing southwest.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 3 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-6W Date/Time:January 11, 2022 10:15 AM Location:Bastian Ditch Channel Coordinates:40.541257, -112.064003 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 5 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-6E Date/Time:January 11, 2022 10:05 AM Location:Bastian Ditch Channel Coordinates:40.541243, -112.063947 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 6 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-7W Date/Time:January 11, 2022 11:25 AM Location:Bastian Ditch Channel Coordinates:40.541935, -112.064040 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 8 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-7E Date/Time:January 11, 2022 11:20 AM Location:Bastian Ditch Channel Coordinates:40.541852, -112.063514 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_187 Page 9 of 9 Pages5/10/2023 12:56:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-8W Date/Time:January 12, 2022 09:05 AM Location:Bastian Ditch Channel Coordinates:40.542542, -112.063666 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 2 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-8E Date/Time:January 12, 2022 09:10 AM Location:Bastian Ditch Channel Coordinates:40.542482, -112.063535 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 3 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-9W Date/Time:January 12, 2022 10:05 AM Location:Bastian Ditch Channel Coordinates:40.543207, -112.063631 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 6 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-9Wx Date/Time:April 06, 2022 10:10 AM Location:Bastian Ditch Channel Coordinates:40.543246, -112.063681 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_322 Page 1 of 8 Pages Kleinfelder Representative Signature 5/10/2023 1:01:14 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-9E Date/Time:January 12, 2022 10:10 AM Location:Bastian Ditch Channel Coordinates:40.543161, -112.063497 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 5 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-10W Date/Time:January 12, 2022 10:25 AM Location:Bastian Ditch Channel Coordinates:40.543797, -112.063743 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-10W Looking South DS-10W Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_241 Page 1 of 1 Pages Kleinfelder Representative Signature 5/10/2023 12:57:41 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-10Wx Date/Time:April 06, 2022 10:25 AM Location:Bastian Ditch Channel Coordinates:40.543894, -112.063857 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_322 Page 3 of 8 Pages5/10/2023 1:01:14 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-10E Date/Time:January 12, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.543774, -112.063730 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 7 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-11W Date/Time:January 12, 2022 10:50 AM Location:Bastian Ditch Channel Coordinates:40.544361, -112.063465 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 8 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-11E Date/Time:January 12, 2022 10:55 AM Location:Bastian Ditch Channel Coordinates:40.544384, -112.063438 Represents:Post Removal Sidewall 1-1.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 200 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_190 Page 9 of 11 Pages5/10/2023 12:57:23 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-12W Date/Time:January 12, 2022 01:50 PM Location:Bastian Ditch Channel Coordinates:40.540162, -112.064958 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 1 of 17 Pages Kleinfelder Representative Signature 5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-12E Date/Time:January 12, 2022 01:45 PM Location:Bastian Ditch Channel Coordinates:40.540160, -112.064794 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 2 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-13W Date/Time:January 12, 2022 02:05 AM Location:Bastian Ditch Channel Coordinates:40.539552, -112.064910 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing east.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 5 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-13E Date/Time:January 12, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.539510, -112.064817 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing east.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 6 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-14W Date/Time:January 12, 2022 02:35 PM Location:Bastian Ditch Channel Coordinates:40.539052, -112.065494 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 8 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-14Wx Date/Time:April 06, 2022 09:10 AM Location:Bastian Ditch Channel Coordinates:40.539039, -112.065503 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approximately 250 ft. Photos DS-14WX Looking south DS-14WX Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_322 Page 5 of 8 Pages5/10/2023 1:01:14 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-14E Date/Time:January 12, 2022 02:40 AM Location:Bastian Ditch Channel Coordinates:40.539017, -112.065424 Represents:Post Removal Sidewall 1-2 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 9 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-15W Date/Time:January 12, 2022 03:10 PM Location:Bastian Ditch Channel Coordinates:40.538394, -112.065748 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 11 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-15E Date/Time:January 12, 2022 03:05 AM Location:Bastian Ditch Channel Coordinates:40.538413, -112.065690 Represents:Post Removal Sidewall 1.5-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 12 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-16W Date/Time:January 12, 2022 03:30 PM Location:Bastian Ditch Channel Coordinates:40.537767, -112.066034 Represents:Post Removal Sidewall 1-2 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facng north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 14 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-16E Date/Time:January 12, 2022 03:25 PM Location:Bastian Ditch Channel Coordinates:40.537734, -112.065971 Represents:Post Removal Sidewall 1-2 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facng north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_193 Page 15 of 17 Pages5/10/2023 12:57:11 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-17W Date/Time:January 13, 2022 09:35 AM Location:Bastian Ditch Channel Coordinates:40.538970, -112.064476 Represents:Post Removal Sidewall 3-5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos DS-16W Looking North DS-17W Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 23 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-17E Date/Time:January 13, 2022 09:40 AM Location:Bastian Ditch Channel Coordinates:40.539031, -112.064411 Represents:Post Removal Sidewall 3-5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos DS-17E Looking South DS-17E Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 24 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-18W Date/Time:January 13, 2022 09:55 AM Location:Bastian Ditch Channel Coordinates:40.538372, -112.063878 Represents:Post Removal Sidewall 4-6 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos DS-18W Looking South DS-18W /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 21 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-18E Date/Time:January 13, 2022 10:05 AM Location:Bastian Ditch Channel Coordinates:40.538454, -112.063902 Represents:Post Removal Sidewall 4-6 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos DS-18E Facing North DS-18E Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 20 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-19W Date/Time:January 13, 2022 10:10 AM Location:Bastian Ditch Channel Coordinates:40.537847, -112.063454 Represents:Post Removal Sidewall 4-6 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 17 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-19E Date/Time:January 13, 2022 10:20 AM Location:Bastian Ditch Channel Coordinates:40.537869, -112.063398 Represents:Post Removal Sidewall 3-5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:This sample represents approx 250 ft. Photos DS-19E Facing North DS-19E Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 18 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-20W Date/Time:January 13, 2022 02:20 PM Location:Bastian Ditch Channel Coordinates:40.537375, -112.063094 Represents:Post Removal Sidewall 3-5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 14 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-20E Date/Time:January 13, 2022 02:20 PM Location:Bastian Ditch Channel Coordinates:40.537401, -112.063039 Represents:Post Removal Sidewall 4.5-6.6 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 5 feet apart Sample Purpose:Confirmation Notes: Photos Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_214 Page 15 of 24 Pages5/10/2023 12:58:21 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-21 Date/Time:March 03, 2022 11:15 AM Location:Bastian Ditch Channel Coordinates:40.537147, -112.066586 Represents:Post Removal Sidewall 3-5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 2 of 7 Pages5/10/2023 12:59:59 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-22 Date/Time:March 03, 2022 02:40 PM Location:Bastian Ditch Channel Coordinates:40.537120, -112.066183 Represents:Post Removal Sidewall 7-9 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 5 of 7 Pages5/10/2023 12:59:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-23 Date/Time:March 15, 2022 10:31 AM Location:Bastian Ditch Channel Coordinates:40.537090, -112.062812 Represents:Post Removal Sidewall 3-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_289 Page 7 of 7 Pages5/10/2023 1:00:20 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-24 Date/Time:March 25, 2022 02:05 PM Location:Bastian Ditch Channel Coordinates:40.550031, -112.062678 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south.Facing east. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_307 Page 13 of 14 Pages5/10/2023 1:00:42 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-25 Date/Time:May 04, 2022 01:30 PM Location:Bastian Ditch Channel Coordinates:40.537812, -112.066899 Represents:Post Removal Sidewall 3-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:3 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-25 Facing West DS-25 Facing East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_334 Page 1 of 3 Pages Kleinfelder Representative Signature 5/10/2023 1:02:02 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-26 Date/Time:May 04, 2022 01:00 PM Location:Bastian Ditch Channel Coordinates:40.537710, -112.066193 Represents:Post Removal Sidewall 3-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:3 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-26 Facing West DS-26 Facing East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_334 Page 2 of 3 Pages5/10/2023 1:02:02 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-27 Date/Time:May 04, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.537425, -112.065851 Represents:Post Removal Sidewall 1-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-27 Facing West DS-27 Facing East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_334 Page 3 of 3 Pages5/10/2023 1:02:02 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-28 Date/Time:May 25, 2022 08:30 AM Location:Bastian Ditch Channel Coordinates:40.537492, -112.065642 Represents:Post Removal Sidewall 1.5-2 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_349 Page 1 of 1 Pages Kleinfelder Representative Signature 5/10/2023 1:03:07 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-29 Date/Time:May 05, 2022 10:00 AM Location:Bastian Ditch Channel Coordinates:40.537794, -112.064555 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_337 Page 1 of 2 Pages Kleinfelder Representative Signature 5/10/2023 1:02:23 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-30 Date/Time:May 23, 2022 10:00 AM Location:Bastian Ditch Channel Coordinates:40.537843, -112.064426 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-30 Looking East DS-30 Looking West /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_343 Page 1 of 2 Pages Kleinfelder Representative Signature 5/10/2023 1:02:40 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-31 Date/Time:May 23, 2022 10:15 AM Location:Bastian Ditch Channel Coordinates:40.537957, -112.064826 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos DS-31 Looking East DS-31 Looking West /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_343 Page 2 of 2 Pages5/10/2023 1:02:40 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-32 Date/Time:May 05, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.538471, -112.065204 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing east Facing west /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_337 Page 2 of 2 Pages5/10/2023 1:02:23 PM Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-33 Date/Time:June 20, 2022 08:50 AM Location:Bastian Ditch Channel Coordinates:40.545265, -112.062938 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 1 of 9 Pages Kleinfelder Representative Signature 5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-34 Date/Time:June 20, 2022 08:55 AM Location:Bastian Ditch Channel Coordinates:40.545374, -112.063035 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:2 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 2 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-35 Date/Time:June 20, 2022 10:45 AM Location:Bastian Ditch Channel Coordinates:40.545038, -112.062703 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:2 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 3 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-36 Date/Time:June 20, 2022 10:50 AM Location:Bastian Ditch Channel Coordinates:40.544198, -112.062676 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 4 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:DS-37 Date/Time:June 20, 2022 10:55 AM Location:Bastian Ditch Channel Coordinates:40.544075, -112.063045 Represents:Post Removal Sidewall 1-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:3 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Characterization Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_359 Page 5 of 9 Pages5/10/2023 1:03:26 PM Confirmation Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:G10F Date/Time:January 06, 2022 09:54 AM Location:Bastian Ditch Channel Coordinates:40.543839, -112.062955 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 10 feet apart Sample Purpose:Confirmation Notes: Photos G10F LOOKING SOUTH G10F LOOKING NORTH /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_202 Page 7 of 8 Pages5/10/2023 12:54:48 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:G10S Date/Time:January 06, 2022 01:15 PM Location:Bastian Ditch Channel Coordinates:40.543814, -112.062955 Represents:Post Removal Sidewall 3-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 30 feet apart Sample Purpose:Confirmation Notes: Photos G10S LOOKING SOUTH G10S LOOKING NORTH /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_202 Page 8 of 8 Pages5/10/2023 12:54:48 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:R-1 Date/Time:March 03, 2022 11:25 AM Location:Bastian Ditch Channel Coordinates:40.537085, -112.066625 Represents:Post Removal Sidewall 3-3.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Characterization Notes: Remaining impacts at site boundary (south E-W fence line) continue off property. Width: 10-feet Depth 2.5 to 5-feet below ground surface Photos Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 4 of 7 Pages5/10/2023 12:59:59 PM location with the highest impacts at the south property line. Characterization of soil remaining at the southern property line after on-site Ditch removal. Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:R-2 Date/Time:March 03, 2022 02:50 PM Location:Bastian Ditch Channel Coordinates:40.537137, -112.066166 Represents:Post Removal Sidewall 5-5.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Characterization Notes: Impacts at southern E-W fence line. Width: 10-feet Depth 4-6 bgs XRF results ~500 ppm lead. Photos Facing south Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_286 Page 7 of 7 Pages5/10/2023 12:59:59 PM location with the highest impacts at the south property line. Characterization of soil remaining at the southern property line after on-site Ditch removal. Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:R-3 Date/Time:March 15, 2022 10:20 AM Location:Bastian Ditch Channel Coordinates:40.537076, -112.062685 Represents:Characterization Sample 3-4 feet below ground surface Configuration:Single Point Grab Sample Sample Purpose:Sample Collected As Property Line. Notes: Bastian Ditch continues south below 118th South. XRF results of impacts at the fence/property line range between 400 to 3900 PPM Lead. Ditch width is approximately 20’ wide at the fence/property line. Photos Facing south-east.Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_289 Page 3 of 7 Pages5/10/2023 5:43:32 PM Characterization of soil remaining at the southern property line after on-site Ditch removal. Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:R-4 Date/Time:March 25, 2022 01:55 PM Location:Bastian Ditch Channel Coordinates:40.550239, -112.062609 Represents:Characterization Sample 1.5-1.7 feet below ground surface Configuration:Single Point Grab Sample Sample Purpose:Characterization Notes: Impacts approx. 15-ft wide, lead impacts approx. 2000-5000 ppm at 1.5-ft bgs. Sample collected at property line. Photos Facing east. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_307 Page 12 of 14 Pages5/10/2023 5:51:09 PM Characterization of soil remaining at the northern east property line after on-site Ditch removal. EAST LARK POST-REMOVAL GROUND AND SIDEWALL SAMPLES (Excavations FG, FS, KT-8, C3, C7, G26) SAMPLE INFORMATION SHEETS Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-1 Date/Time:June 16, 2021 04:25 PM Location:East/northeast Fence Line Coordinates:40.537068, -112.057899 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:11 -point composite sample with subsamples spaced 10 feet apart Sample Purpose:Confirmation Notes: Photos North facing photo at FG-1 excavation ground surface.South facing photo of FG-1 excavation ground surface. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_12 Page 4 of 8 Pages5/10/2023 12:44:05 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-2 Date/Time:June 16, 2021 03:00 AM Location:East/northeast Fence Line Coordinates:40.537751, -112.057952 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 10 feet apart Sample Purpose:Confirmation Notes: Photos North facing photo of FG-2 excavation ground surface.South facing photo of FG-2 excavation ground surface. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_12 Page 6 of 8 Pages5/10/2023 12:44:05 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-3 Date/Time:July 13, 2021 10:00 AM Location:East/northeast Fence Line Coordinates:40.538282, -112.057904 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:11 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos North facing groung/sidewall Southeasternmost aliquot /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_24 Page 1 of 2 Pages Kleinfelder Representative Signature 5/10/2023 12:44:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-4 Date/Time:July 15, 2021 08:00 AM Location:East/northeast Fence Line Coordinates:40.538958, -112.057924 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Delineation Notes: Photos FG-4 looking north FG-4 looking south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_27 Page 1 of 2 Pages Kleinfelder Representative Signature 5/10/2023 12:46:13 PM Confirmation Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-5 Date/Time:July 22, 2021 10:45 AM Location:East/northeast Fence Line Coordinates:40.539666, -112.057912 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:7 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_75 Page 1 of 4 Pages Kleinfelder Representative Signature 5/10/2023 12:46:36 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-6 Date/Time:July 22, 2021 01:25 PM Location:East/northeast Fence Line Coordinates:40.540308, -112.057890 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:9 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_75 Page 3 of 4 Pages5/10/2023 12:46:36 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-7 Date/Time:August 05, 2021 08:32 AM Location:East/northeast Fence Line Coordinates:40.542582, -112.057908 Represents:Post Removal Ground Surface 0-6 inches below ground surface Sample spans 240 linear ft Configuration:7 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_33 Page 1 of 4 Pages Kleinfelder Representative Signature 5/10/2023 3:13:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-8 Date/Time:August 05, 2021 09:58 AM Location:East/northeast Fence Line Coordinates:40.543329, -112.057888 Represents:Post Removal Ground Surface 0-6 inches below ground surface 240ft linear sample Last 40ft of sample orients NW Configuration:7 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing southeast /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_33 Page 3 of 4 Pages5/10/2023 3:13:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-9 Date/Time:August 06, 2021 08:15 AM Location:East/northeast Fence Line Coordinates:40.544720, -112.062640 Represents:Post Removal Ground Surface 0-6 inches below ground surface 175 linear ft Configuration:7 -point composite sample with subsamples spaced 30 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 1 of 7 Pages Kleinfelder Representative Signature 5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-10 Date/Time:August 06, 2021 10:10 AM Location:East/northeast Fence Line Coordinates:40.54423, -120.06264 Represents:Post Removal Ground Surface 0-6 inches below ground surface 250 linear ft Configuration:9 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing west Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 2 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-11 Date/Time:August 06, 2021 10:15 AM Location:East/northeast Fence Line Coordinates:40.544204, -112.061722 Represents:Post Removal Ground Surface 0-6 inches below ground surface 240 linear ft Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing west Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 6 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-12 Date/Time:August 06, 2021 10:25 AM Location:East/northeast Fence Line Coordinates:40.544181, -112.060735 Represents:Post Removal Ground Surface 0-6 inches below ground surface 240 linear ft Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing east Facing west /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 7 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-13 Date/Time:August 27, 2021 09:50 AM Location:East/northeast Fence Line Coordinates:40.544218, -112.059911 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 1 of 9 Pages Kleinfelder Representative Signature 5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-14 Date/Time:August 27, 2021 10:30 AM Location:East/northeast Fence Line Coordinates:40.544217, -112.059205 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 3 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-15 Date/Time:August 27, 2021 10:50 AM Location:East/northeast Fence Line Coordinates:40.544180, -112.058512 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 9 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-16 Date/Time:August 27, 2021 12:45 PM Location:East/northeast Fence Line Coordinates:40.542037, -112.057939 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 20 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 7 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-17 Date/Time:October 12, 2021 09:50 AM Location:East/northeast Fence Line Coordinates:40.540844, -112.057893 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:7 -point composite sample with subsamples spaced 62.5 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_93 Page 1 of 18 Pages Kleinfelder Representative Signature 5/10/2023 12:53:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FG-18 Date/Time:October 12, 2021 10:00 AM Location:East/northeast Fence Line Coordinates:40.541679, -112.057896 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:9 -point composite sample with subsamples spaced 49 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_93 Page 3 of 18 Pages5/10/2023 12:53:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-1 Date/Time:June 16, 2021 02:40 PM Location:East/northeast Fence Line Coordinates:40.537123, -112.057904 Represents:Post Removal Sidewall 2-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos North facing photo of FS-2 excavation sidewall.South facing photo of FS-2 excavation sidewall. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_12 Page 5 of 8 Pages5/10/2023 12:44:05 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-2 Date/Time:June 16, 2021 03:25 PM Location:East/northeast Fence Line Coordinates:40.537669, -112.058003 Represents:Post Removal Sidewall 2-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos North facing photo of FS-2 excavated sidewall.South facing photo of FG-2 excavated sidewall. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_12 Page 7 of 8 Pages5/10/2023 12:44:05 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-3 Date/Time:July 13, 2021 12:55 PM Location:East/northeast Fence Line Coordinates:40.538368, -112.057979 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:8 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos North facing photo of FS-3.South facing photo of FS-3. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_24 Page 2 of 2 Pages5/10/2023 12:44:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-4 Date/Time:July 15, 2021 08:10 AM Location:East/northeast Fence Line Coordinates:40.538915, -112.057962 Represents:Post Removal Sidewall 2-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:8 -point composite sample with subsamples spaced 25 feet apart Sample Purpose:Confirmation Notes:Half of the aliquots collected in line with FG-4 transects Photos North facing FS-4 South facing FS-4 /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_27 Page 2 of 2 Pages5/10/2023 12:46:13 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-5 Date/Time:July 22, 2021 10:50 AM Location:East/northeast Fence Line Coordinates:40.539590, -112.057944 Represents:Post Removal Sidewall 3-3.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_75 Page 2 of 4 Pages5/10/2023 12:46:36 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-6 Date/Time:July 22, 2021 01:42 PM Location:East/northeast Fence Line Coordinates:40.540266, -112.057930 Represents:Post Removal Sidewall 3-3.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_75 Page 4 of 4 Pages5/10/2023 12:46:36 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-7 Date/Time:August 05, 2021 08:52 AM Location:East/northeast Fence Line Coordinates:40.542611, -112.058029 Represents:Post Removal Sidewall 2-4 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing south Facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_33 Page 2 of 4 Pages5/10/2023 3:13:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-8 Date/Time:August 05, 2021 10:29 AM Location:East/northeast Fence Line Coordinates:40.543279, -112.057903 Represents:Post Removal Sidewall 2-5 feet below ground surface Last 40ft of sample orients NW At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_33 Page 4 of 4 Pages5/10/2023 3:13:59 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-10 Date/Time:August 06, 2021 08:40 AM Location:East/northeast Fence Line Coordinates:40.544067, -112.062547 Represents:Post Removal Sidewall 2-3 feet below ground surface 250 linear ft. Wider at west end At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing west Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 3 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-11 Date/Time:August 06, 2021 09:00 AM Location:East/northeast Fence Line Coordinates:40.544225, -112.061757 Represents:Post Removal Sidewall 1.5-2 feet below ground surface 240 linear ft At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing west Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 4 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-12 Date/Time:August 06, 2021 10:20 AM Location:East/northeast Fence Line Coordinates:40.544212, -112.060906 Represents:Post Removal Sidewall 1-2 feet below ground surface 240 linear ft At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 40 feet apart Sample Purpose:Confirmation Sample Notes: Photos Facing west Facing east /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_39 Page 5 of 7 Pages5/10/2023 12:47:29 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-13 Date/Time:August 27, 2021 10:00 AM Location:East/northeast Fence Line Coordinates:40.544221, -112.059976 Represents:Post Removal Sidewall 2.5-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 2 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-14 Date/Time:August 27, 2021 10:40 AM Location:East/northeast Fence Line Coordinates:40.544207, -112.059273 Represents:Post Removal Sidewall 2.5-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:6 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 4 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-15 Date/Time:August 27, 2021 11:00 AM Location:East/northeast Fence Line Coordinates:40.544175, -112.058558 Represents:Post Removal Sidewall 2.5-3 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:9 -point composite sample with subsamples spaced 33 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 6 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-16 Date/Time:August 27, 2021 12:55 PM Location:East/northeast Fence Line Coordinates:40.542032, -112.057975 Represents:Post Removal Ground Surface 3-3.5 feet below ground surface Configuration:6 -point composite sample with subsamples spaced 20 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_69 Page 8 of 9 Pages5/10/2023 3:13:28 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-17 Date/Time:October 12, 2021 09:55 AM Location:East/northeast Fence Line Coordinates:40.540852, -112.057954 Represents:Post Removal Sidewall 2-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 62.5 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_93 Page 2 of 18 Pages5/10/2023 12:53:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:FS-18 Date/Time:October 12, 2021 10:05 AM Location:East/northeast Fence Line Coordinates:40.541677, -112.057922 Represents:Post Removal Sidewall 2-2.5 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 49 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_93 Page 4 of 18 Pages5/10/2023 12:53:50 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C3S Date/Time:September 22, 2021 01:40 PM Location:East/northeast Fence Line Coordinates:40.542183, -112.058519 Represents:Post Removal Sidewall 8-9 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:4 -point composite sample with subsamples spaced 20 feet apart Sample Purpose:Confirmation Sampling. Notes: Unable to access area due to high wall safety. Samples collected via excavator bucket. Photos Facing southwest. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_87 Page 7 of 7 Pages5/10/2023 12:53:22 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-1 Date/Time:September 02, 2021 12:30 PM Location:C7 Excavation Coordinates:40.541961, -112.058684 Represents:Post Removal Sidewall 6.5-7 feet below ground surface Between S12 and S20. At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 1 of 13 Pages Kleinfelder Representative Signature 5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-2 Date/Time:September 02, 2021 02:20 PM Location:C7 Excavation Coordinates:40.541976, -112.058666 Represents:Post Removal Sidewall 6.5-7 feet below ground surface C7 Excavation At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos C7 Excavation “A” wall, facing northeast /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 2 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-3 Date/Time:September 02, 2021 02:25 PM Location:C7 Excavation Coordinates:40.542022, -112.058708 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos C7 Excavation “A” wall, facing northeast /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 3 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-4 Date/Time:September 02, 2021 02:30 PM Location:C7 Excavation Coordinates:40.542015, -112.058799 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos Corner between “A” and “D” wall, facing north /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 4 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-5 Date/Time:September 02, 2021 02:35 PM Location:C7 Excavation Coordinates:40.542022, -112.058879 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos “D” wall, facing northwest, sample C7FS-5 collected on wall where sluff is located in photo /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 5 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-6 Date/Time:September 02, 2021 02:40 PM Location:C7 Excavation Coordinates:40.542001, -112.058920 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos “D” wall, facing northwest, C7FS-6 collected on wall on the left side of sluffed material /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 6 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-7 Date/Time:September 02, 2021 02:45 PM Location:C7 Excavation Coordinates:40.541969, -112.058972 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos C wall, facing west, C7FS collected on corner near test pit /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 7 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-8 Date/Time:September 02, 2021 02:50 PM Location:C7 Excavation Coordinates:40.541922, -112.058899 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 8 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-9 Date/Time:September 02, 2021 02:55 PM Location:C7 Excavation Coordinates:40.541881, -112.058849 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos Corner between “B” and “C” wall of C7 excavation, facing southwest /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 9 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-10 Date/Time:September 02, 2021 03:00 PM Location:C7 Excavation Coordinates:40.541875, -112.058786 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 10 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-11 Date/Time:September 02, 2021 03:05 PM Location:C7 Excavation Coordinates:40.541851, -112.058716 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos View facing southwest of “B” wall /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 11 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:C7FS-12 Date/Time:September 02, 2021 03:10 PM Location:C7 Excavation Coordinates:40.541848, -112.058661 Represents:Post Removal Sidewall 6.5-7 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall C7fs Was Not Compiled In Order To Provide The Most Conservative Data. Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_84 Page 12 of 13 Pages5/10/2023 12:52:06 PM Confirmation Sample Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:KT-8-1x Date/Time:September 07, 2021 10:30 AM Location:KT-8 Excavation Area Coordinates:40.542302, -112.058070 Represents:Post Removal Sidewall 17-17.5 feet below ground surface Repeat KT8-1 sample. Excavated an additional 2 feet northeast. At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Sidewall Kt-8 Was Not Compiled In Order To Provide The Most Conservative Data. Kt-8-1x Was Overexcavated And Resampled. Notes: Photos Actual sample location lies below sidewall sluff. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_78 Page 1 of 10 Pages Kleinfelder Representative Signature 5/10/2023 12:52:40 PM Confirmation Sample Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:G-26G Date/Time:January 26, 2022 02:15 PM Location:East/northeast Fence Line Coordinates:40.543669, -112.062159 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:9 -point composite sample with subsamples spaced 30 feet apart Sample Purpose:Confirmation Notes:This sample is the original version of G-26. Photos G-26G Looking East G-26G looking West /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_238 Page 1 of 3 Pages Kleinfelder Representative Signature 5/10/2023 12:59:33 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:G-26S North Date/Time:January 26, 2022 02:20 PM Location:East/northeast Fence Line Coordinates:40.543787, -112.062055 Represents:Post Removal Sidewall 11-14 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:5 -point composite sample with subsamples spaced 30 feet apart Sample Purpose:Confirmation Notes: “South GPS point” represents the easternmost corner of the north sidewall. This sample is the original version of G-26 North. Photos G-26S North Looking West G-26S North Looking East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_238 Page 3 of 3 Pages5/10/2023 12:59:33 PM Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:G-26S South Date/Time:January 26, 2022 09:30 AM Location:East/northeast Fence Line Coordinates:40.543667, -112.062332 Represents:Post Removal Sidewall 13-14 feet below ground surface At the interval with the highest impacts prior to soil removal Configuration:Single Point Grab Sample Sample Purpose:Confirmation Notes:This sample is the original version of G-26 south sample. Photos G-26 S S Looking West G-26 S S Looking East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_238 Page 2 of 3 Pages5/10/2023 12:59:33 PM 5-point composite sample with subsamples spaced 30 feet apart WEST LARK POST-REMOVAL GROUND AND SIDEWALL SAMPLES (Excavations- Bastian Ditch (DG, DS), G10, R-1 thru 4 ) SAMPLE INFORMATION SHEETS POST-REMOVAL GROUND SAMPLES BENEATH IMPACTED/ REMOVED STOCKPILES (ESG 1 thru 23, H 5x, 11x, 13x) Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-1 Date/Time:March 15, 2022 10:31 AM Location:Bastian Ditch Channel Coordinates:40.540860, -112.064591 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:Confirmation sampling post-removal ES stockpiles. Photos Facing north.Facing south. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_289 Page 4 of 7 Pages5/23/2023 3:37:40 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-2 Date/Time:March 15, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.540305, -112.064996 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes:Confirmation sampling post-removal ES stockpiles. Photos Facing south.Facing north. /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_289 Page 5 of 7 Pages5/23/2023 3:37:40 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-3 Date/Time:May 02, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.544373, -112.063559 Represents:Post Removal Ground Surface 0-6 inches below ground surface Ground surface below former ES stockpile location. Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Sample taken from post-removal ES stockpile ground surface. Photos Facing north.Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_331 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:37:08 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-4 Date/Time:May 02, 2022 10:25 AM Location:Bastian Ditch Channel Coordinates:40.542744, -112.063812 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Sample taken from post-removal ES stockpile ground surface. Photos Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_331 Page 2 of 2 Pages5/23/2023 3:37:08 PM Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-5 Date/Time:May 19, 2022 08:14 AM Location:Bastian Ditch Channel Coordinates:40.539616, -112.065019 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos Facing north Facing south /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_340 Page 1 of 1 Pages Kleinfelder Representative Signature 5/23/2023 3:36:18 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-6 Date/Time:May 24, 2022 12:30 PM Location:Bastian Ditch Channel Coordinates:40.542240, -112.063864 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_346 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:35:57 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-7 Date/Time:May 24, 2022 12:45 PM Location:Bastian Ditch Channel Coordinates:40.541583, -112.064050 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_346 Page 2 of 2 Pages5/23/2023 3:35:57 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-8 Date/Time:June 21, 2022 02:00 PM Location:Bastian Ditch Channel Coordinates:40.538951, -112.063921 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:6 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_365 Page 5 of 5 Pages5/23/2023 3:35:25 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-9 Date/Time:June 22, 2022 09:00 AM Location:Bastian Ditch Channel Coordinates:40.539005, -112.063700 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:13 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_362 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:46:42 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-10 Date/Time:June 22, 2022 09:30 AM Location:Bastian Ditch Channel Coordinates:40.539045, -112.063438 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_362 Page 2 of 2 Pages5/23/2023 3:46:42 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-11 Date/Time:June 21, 2022 11:15 AM Location:Bastian Ditch Channel Coordinates:40.539252, -112.062853 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:15 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_365 Page 4 of 5 Pages5/23/2023 3:35:25 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Bill Bragdon Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-12 Date/Time:June 21, 2022 11:00 AM Location:Bastian Ditch Channel Coordinates:40.539758, -112.062901 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:9 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_365 Page 3 of 5 Pages5/23/2023 3:35:25 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-13 Date/Time:June 28, 2022 10:45 AM Location:Bastian Ditch Channel Coordinates:40.539074, -112.064342 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_368 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:34:37 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-14 Date/Time:June 28, 2022 11:00 AM Location:Bastian Ditch Channel Coordinates:40.538505, -112.063829 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_368 Page 2 of 2 Pages5/23/2023 3:34:37 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-15 Date/Time:July 05, 2022 09:30 AM Location:Bastian Ditch Channel Coordinates:40.537937, -112.063328 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_371 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:34:14 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-16 Date/Time:July 05, 2022 10:00 AM Location:Bastian Ditch Channel Coordinates:40.537356, -112.062861 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Conformation Samples Notes: Photos /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_371 Page 2 of 2 Pages5/23/2023 3:34:14 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-17 Date/Time:July 12, 2022 10:00 AM Location:Bastian Ditch Channel Coordinates:40.539130, -112.065487 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos ESG-17 Looking North ESG-17 Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_380 Page 1 of 2 Pages Kleinfelder Representative Signature 5/23/2023 3:30:27 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Josh Overly Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-18 Date/Time:July 12, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.538464, -112.065814 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: Photos ESG-18 Looking South ESG-18 Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_380 Page 2 of 2 Pages5/23/2023 3:30:27 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-19 Date/Time:July 21, 2022 09:12 AM Location:Bastian Ditch Channel Coordinates:40.537827, -112.066145 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:10 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Confirmation Notes: Photos ESG-19 Facing South ESG-19 Facing North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_386 Page 1 of 1 Pages Kleinfelder Representative Signature 5/23/2023 3:26:58 PM Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-20 Date/Time:August 09, 2022 09:15 AM Location:Bastian Ditch Channel Coordinates:40.544551, -112.063555 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: This sample represents approximately 250 ft of post-removal ground surface. Photos ESG-20 Looking Southeast ESG-20 Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_389 Page 1 of 3 Pages Kleinfelder Representative Signature 5/23/2023 3:26:12 PM sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-21 Date/Time:August 09, 2022 10:30 AM Location:Bastian Ditch Channel Coordinates:40.544151, -112.064141 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: This sample represents approximately 250 ft of post-removal ground surface. Photos ESG-21 Looking Northeast ESG-21 Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_389 Page 2 of 3 Pages5/23/2023 3:26:12 PM sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-22 Date/Time:August 09, 2022 11:00 AM Location:Bastian Ditch Channel Coordinates:40.543599, -112.063846 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Confirmation Notes: This sample represents approximately 250 ft of post-removal ground surface. Photos ESG-22 Looking North ESG-22 Looking South /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_389 Page 3 of 3 Pages5/23/2023 3:26:12 PM sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Katherine Meyr Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:ESG-23 Date/Time:October 28, 2022 10:25 AM Location:Bastian Ditch Channel Coordinates:40.53750, -112.06340 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:5 -point composite sample with subsamples spaced 50 feet apart Sample Purpose:Post Removal Stockpile Ground Surface Notes: Photos ESG-23 Looking South ESG-23 Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_404 Page 1 of 1 Pages Kleinfelder Representative Signature 5/23/2023 3:25:14 PM Confirmation Sample Sample taken from ES stockpile post-removal ground surface Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:H-5X Date/Time:March 29, 2022 10:30 AM Location:East/northeast Fence Line Coordinates:40.543405, -112.062354 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Confirmation Notes: Photos H-5X Looking East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_316 Page 1 of 3 Pages Kleinfelder Representative Signature 5/10/2023 1:00:58 PM Ground surface remaining after removal of impacted soil stockpile H-5 Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:H-11X Date/Time:March 29, 2022 10:40 AM Location:East/northeast Fence Line Coordinates:40.543392, -112.062054 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Confirmation Notes: Photos H-11X Looking North /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_316 Page 2 of 3 Pages5/10/2023 1:00:58 PM Ground surface remaining after removal of impacted soil stockpile H-11 Sample Information Sheet by Ted Wallace Lark Monofill Environmental Consulting 20201466.001A Hillard, Corinne Sample Information Sample ID:H-13X Date/Time:March 29, 2022 10:50 AM Location:East/northeast Fence Line Coordinates:40.543309, -112.061486 Represents:Post Removal Ground Surface 0-6 inches below ground surface Configuration:4 -point composite sample with subsamples spaced 0 feet apart Sample Purpose:Confirmation Notes: Photos H-13X Looking East /FieldNet/Service_Lines/Contaminated_Lands/Env_trench_remediation_qc/even t_id_316 Page 3 of 3 Pages5/10/2023 1:00:58 PM Ground surface remaining after removal of impacted soil stockpile H-13