Loading...
HomeMy WebLinkAboutDSHW-2024-005217DEPARTMENT OF THE ARMY TOOELE ARMY DEPOT/HEADQUARTERS 1 TOOELE ARMY DEPOT , BUILDING 1 TOOELE, UT 84074-5003 MARCH 12, 2024 Div of Waste Management and Radiation Cor;trol MAR 12 2024 Subject: Treatability Study Annual Reporting, Tooele Army Depot Tooele, Utah, EPA ID#UT3213820894 . Mr. Doug Hansen Utah Department of Environmental Quality Division of Waste Management & Radiation Control ATTN: Gabrielle Marinick 195 North 1950 West Salt Lake City, UT 84114-4880 Dear Mr. Hansen: Tooele Army Depot (TEAD) North is providing the enclosed summary sheets for the treatability studies conducted in 2023. The summary sheet is intended to provide the information as specified in 40 CFR 261.4(f)(9). Should you have any questions or require any additional information regarding this matter, please contact myself at (435) 833-2526. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision according to a system designed to assure that quality personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system , or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations . Sincerely, ~:ro~ Chief, Environmental Management Division Enclosure 1. CY 2023 Treatability Study Annual Reporting .. . 2023 TREATABILITY STUDY SUMMARY SHEET "' Name of study: Demil Study-Size Reduction Study Number: of Ctg 40mm HE XM684 and Deactivation using APE 1236M2 Deactivation Furnace System Description of Study: Demonstrate the capability to cryofracture then deactivate the 40mm HE Cartridge XM684 in the APE 1236M2. For whom was the study conducted? Date study was initiated: Name: Project Director-Joint Services 06 November 2023 Address: Picatinny Arsenal, NJ Date study was completed: 15 November 2023 Types of waste treated in the study: 1310-00-133-9342-B573 Ctg, 40mm HE XM684 Quantity of waste treated in the study: 600 each Disposition of unused sample: All samples consumed 2