Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DSHW-2024-009835
Deq submit <dwmrcsubmit@utah.gov> Salt Lake Valley Solid Waste Management Facility, SW120 1 message Matt Sullivan <msullivan@utah.gov>Mon, Dec 23, 2024 at 10:37 AM To: Deq submit <dwmrcsubmit@utah.gov> Salt Lake Valley Solid Waste Management Facility, SW120 Construction QC/QA As-Built Report for Module 8 Received December 23, 2024. There are three attachments (two in PDF and one in Word) with this email. The main one is an As-Built Report for Module 8 in pdf, another is a Word document with questions/comments and owner responses, and the third is a GSI email response in pdf. Please arrange them in that order if possible. Thank you -- Matt Sullivan | Environmental Scientist Solid Waste Program, Division of Waste Management & Radiation Control Email: msullivan@utah.gov Office: (385) 454-8012 | Front Desk: (801) 536-0200 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Statements made in this email do not constitute the official position of the Director of the Division of Waste Management and Radiation Control. If you desire a statement of the Division Director’s position, please submit a written request to the Director, including copies of documents relevant to your request. As-Built Report for Module 8 2024-12-19.pdf 3 attachments Module 8 QAQC question & clarifications with responses 12-19-2024.docx 15K GSI's Email Explanation.pdf 205K GSI's Email Explanation.pdf 205K 12/23/24, 11:27 AM State of Utah Mail - Salt Lake Valley Solid Waste Management Facility, SW120 https://mail.google.com/mail/b/AEoRXRR3QVZRqk7NnErhEB1quOX_n4rTKLBjIy9z68Hvi2nOBV0_/u/0/?ik=adf9d5e615&view=pt&search=all&permthi…1/1 The CONSTRUCTION QC/QA AS-BUILT REPORT pdf is 678 pages. On p 387 of the pdf, under the column “Preweld ID”, Preweld ID 89’s far right column “Test Results” displays “Inc.” where the rest of the column displays “Pass”. On p. 398 of the pdf, it is the same situation. Please explain. The liner installer GSI used the software GeoCABB to log and summarize the test results on the project. The code “Inc.” meant the installer needed to provide more data or that the data was “incomplete” when they ran the report. GSI provided the additional data and sent over the updated pages. The Construction QC/QA As-Built Report has been updated (see pages 379-391 of the report). On p. 500 of the pdf, there were two rows using Air Pressure (under column Test Type) that appear incomplete. On page 515 of the pdf, it is the same situation. Please explain. GSI provided the additional data and re-ran the report. The Construction QC/QA As- Built Report has been updated (see pages 488-518 of the report). On p 537 of the pdf, the repair weld dates end on 11-17-2023 but pick up on the next line on 6-1-2024. Why the six-month gap? The Test Date column is similar. Why? Around mid-November 2023, the weather changed, and the site began receiving rain heading into winter. After several rainstorms and cold outside temperatures, the subgrade became saturated with water and wouldn't dry out. The top 3 inches or so of the subgrade was very wet and muddy. As per the geosynthetic clay liner (GCL) Installation Guidelines, the subgrade when in an unfrozen state should be firm and unyielding. The project team discussed the issue at a meeting on site. The decision was made to not install any more GCL and HDPE liners until the subgrade had dried out and stabilized. GSI left the project and would return to finish their work next year. Around mid-May 2024, the subgrade had dried out and final grade had been re-established. The area was compaction tested and passed off (see page 198 of the report). GSI returned to the project and resumed their work around the beginning of June 2024. CONSTRUCTION QC/QA AS-BUILT REPORT FOR SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY MODULE 8 Job No. LDF20015 Prepared for: Salt Lake City Corporation Engineering Division 349 South, 200 East, Suite 600 Salt Lake City, UT 84114 Prepared by: Wall Consultant Group 2139 S. 1260 W. Salt Lake City, UT 84119 November 2024 This document presents the project bid documents, contractor submittals and the associated field Quality Control/Quality Assurance documents generated during the construction of Module 8 at the Salt Lake Valley Solid Waste Management Facility located at 6030 California Ave, Salt Lake City, UT 84104. Procore was used for project management and documentation purposes. See Procore for all inspection daily reports and photographs. To access the project in Procore, contact the Department of Public Services | Salt Lake City Corporation: Darwin Taylor Engineer II (801) 819-3582 darwin.taylor@slcgov.com OR John M. Coyle, P.E. Engineer VII (801) 870-3617 john.coyle@slcgov.com Salt Lake City Corporation contracted Wall Consultant Group (WCG) to design Module 8. WCG also provided personnel to assist Salt Lake City Corporation with project management, general inspection, laboratory and field testing of materials during construction. The Module 8 contract was awarded to the general contractor Whitaker Construction. Whitaker subcontracted Geo-Synthetics Systems (GSI) to provide and install the geosynthetic clay liner, HDPE liner, and the Geonet drainage layer. Whitaker Construction began working on the project in June 2023 and achieved substantial completion in August 2024. Table of Contents 1.0 PROJECT MANUAL 2.0 AS-BUILT DRAWINGS 3.0 SUBGRADE 3.1 Construction QC/QA Plan 3.2 Subgrade Acceptance 3.2.1 Laboratory Test Results 3.2.2 Field Density Test Reports 3.2.3 GSI’s Certificate of Acceptance of Subgrade 4.0 GEOSYNTHETIC CLAY LINER 4.1 Construction QC/QA Plan 4.2 Contractor Submittals 5.0 HDPE LINER 5.1 Construction QC/QA Plan 5.2 Contractor Submittals 5.3 Pre-Weld Test Reports 5.4 Destructive Sample Reports 5.5 Seam Control Forms 5.6 Repair Reports 5.7 Panel Placement Summary 5.8 Liner As-Built Drawings 6.0 GEONET DRAINAGE LAYER 6.1 Construction QC/QA Plan 6.2 Contractor Submittals 7.0 LEACHATE COLLECTION AND REMOVAL SYSTEM 7.1 Contractor Submittals 7.1.1 Precast Headwall 7.1.2 Leachate Pipe 7.1.3 Nonwoven Geotextile 7.1.4 Sewer Rock Table of Contents 8.0 PROTECTIVE COVER SOIL 8.1 Construction QC/QA Plan 9.0 RISER 5 ABANDONMENT 9.1 Sewer Rock 9.2 Nonwoven Geotextile 9.3 Photos 1.0 PROJECT MANUAL Project Title Page 00 01 01 - 1 SALT LAKE CITY CORPORATION Salt Lake City, Utah PROJECT MANUAL FOR SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY MODULE 8 JOB No. LDF20015 PREPARED BY Department of Public Services Engineering Division 349 South 200 East, Suite 100 Salt Lake City, UT 84111 2023 Revised March 15, 2013 Table of Contents 00 01 10 - 1 T A B L E O F C O N T E N T S SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY MODULE 8 JOB No. LDF20015 Reference No. of Number Title Pages PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 01 Project Title Page .................................................................................... 1 00 01 07 Seals Page ............................................................................................. 1 00 01 10 Table of Contents .................................................................................... 3 00 11 16 Invitation to Bid ...................................................................................... 3 00 21 13 Instructions to Bidders ............................................................................. 10 00 21 14 Instructions to Bidders - UDOT .................................................................. 1 00 22 13 Supplementary Instructions to Bidders ......................................................... 11 00 22 16 Supplementary Instructions (BIPW) ............................................................. 2 00 41 00 Bid Form .............................................................................................. 4 00 43 00 Bid Schedule .......................................................................................... 6 00 43 36 Proposed Subcontractor Form .................................................................... 3 00 43 37 Work Under Contract Report ..................................................................... 2 00 43 38 Bidder Status Report ................................................................................ 2 00 43 45 Qualified Health Insurance Certification Form ................................................ 2 00 43 46 Work Environment Certification Form .......................................................... 2 00 52 00 Agreement ............................................................................................ 8 00 54 16 Qualified Health Insurance Supplemental Agreement ........................................ 4 00 61 13 Performance Bond ................................................................................... 6 00 61 14 Payment Bond ........................................................................................ 6 00 62 11 Submittal Transmittal Form ....................................................................... 3 00 62 16 Certificate of Insurance Form ..................................................................... 1 00 65 13 Certificate of Substantial Completion ............................................................ 2 00 73 00 Sewer SPecial Provisions .......................................................................... 5 00 73 10 Modifications to the General Conditions ........................................................ 8 00 73 15 Modifications to APWA Standard Plans ....................................................... 2 00 73 50 Requirements of the Department of Public Utilities ......................................... 4 00 91 13 Addenda ............................................................................................... 1 GENERAL REQUIREMENTS 01 11 00 Summary of Work ................................................................................... 2 01 14 00 Work Restrictions ................................................................................... 1 01 31 13 Coordination .......................................................................................... 1 01 32 16 Progress Schedule ................................................................................... 1 01 33 00 Submittal Procdure .................................................................................. 4 Revised March 15, 2013 Table of Contents 00 01 10 - 2 01 35 10 Acceptance ............................................................................................ 1 01 55 26 Traffic Control ....................................................................................... 1 01 57 00 Temporary Controls ................................................................................ 2 01 71 23 Construction Layout ................................................................................ 3 05 05 10S Debris Fence ......................................................................................... 1 33 50 10S 60 mil HDPE Liner…………………… ....................................... ………………….7 33 50 20S Geosynthetic Clay Liner…………………………………………………........ ............... 7 END OF DOCUMENT Revised February 1, 2019 Instructions to Bidders 00 21 13 - 1 DOCUMENT 00 21 13 INSTRUCTIONS TO BIDDERS PART 1 GENERAL 1.1 DEFINED TERMS A. Terms used in the Bid Documents that are defined in Article 1.1 of the General Conditions will have the meanings indicated in the General Conditions. B. General Conditions: as published in Document 00 72 00 in the current edition of the Manual of Standard Specifications by the Utah Chapter of the American Public Works Association. 1.2 COPIES OF BID DOCUMENTS A. Bidders must use complete sets of Bid Documents in preparing Bids. OWNER and ENGINEER assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents. B. Bid Documents are made available to Bidder only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given. C. Bid Document copyrights shall remain with OWNER. D. All provisions of the current edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association that are applicable to the Work are made a part of the Contract Documents by reference. Those publications are available on the web at http://utah.apwa.net. E. Salt Lake City’s Department of Public Utilities has a document entitled “Standard Practices for Salt Lake City Public Utilities” (January 5, 2010 edition). The document is available from 1530 South West Temple, Salt Lake City, Utah. 1.3 PRE-BID CONFERENCE A. Representatives of OWNER and ENGINEER will be present at a pre-bid conference to discuss the Project. Bidders are encouraged to attend and participate in the conference. ENGINEER will transmit to all persons or agencies who have signed up to receive copies of the Bid Documents such Addenda as ENGINEER considers necessary in response to questions arising at the conference. The location and time of the conference are identified in the Invitation to Bid (Document 00 11 16). 1.4 EXAMINATION OF SITE AND CONTRACT DOCUMENTS A. In General: Bidders are permitted to converse with ENGINEER or ENGINEER's personnel having knowledge of the Project, Plans, Specifications, material sites, or conditions generally prevailing in the area of the Project to aid in pre-bid investigations. OWNER is not bound by any statements or representations made by ENGINEER or ENGINEER's personnel before the Bid opening or award of the Construction Contract, nor for any assumptions or conclusions reached by a prospective Bidder as a result of such communication unless ENGINEER issues an Addendum to all prospective Bidders. B. Access to Site: The lands upon which the Work is to be performed, and rights-of-way Revised February 1, 2019 Instructions to Bidders 00 21 13 - 2 and easements for access thereto and other lands designated for use by Bidder in performing the Work are identified in the Contract Documents. All additional off-site lands and access thereto required for temporary construction facilities or storage of materials and equipment must be provided by Bidder. C. Contract Documents: The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 1.4; that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. D. Bidder's Obligations: The submission of a Bid constitutes acknowledgement that Bidder has complied with all bidding instructions. It is the responsibility of each bidder, before submitting a Bid, to: 1. Examine the Contract Documents thoroughly; 2. Visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work; 3. Consider federal, state, and local Laws and Regulations that may affect cost, progress, performance, or furnishing of the Work; 4. Study and carefully correlate Bidder's observations with the Contract Documents; and 5. Identify and notify ENGINEER in writing of all specific conflicts, errors, or discrepancies in the Contract Documents, and of any doubts of Bidder about their meanings. The failure or omission of any Bidder to receive or examine any form, instrument, Addendum, or other document, visit the site and become acquainted with conditions there existing, or attend the pre-bid conference, shall in no way relieve any Bidder from obligations with respect to Bidder's Bid or to the Construction Contract. E. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement (Document 00 52 00) and the Contract Documents, except by Addendum or Change Order. 1.5 PHYSICAL CONDITIONS A. In General: Before submitting a Bid, each Bidder is responsible for review of OWNER's explorations, tests, and data concerning surface conditions, subsurface conditions, and Underground Facilities at or contiguous to the site, or otherwise, that may affect cost, progress, performance, or furnishing of the Work in accordance with the time, price, and other terms and conditions of the Contract Documents. B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in the Geotechnical Data (Document 00 31 32). That document provides the identification of: 1. Those reports of explorations and tests of subsurface conditions at the site that have been used by ENGINEER in preparing the Contract Documents; and Revised February 1, 2019 Instructions to Bidders 00 21 13 - 3 2. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) at or contiguous to the site that have been used by ENGINEER in preparing the Contract Documents. C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities. OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in paragraph 4.3A.2 of the General Conditions or unless expressly provided in the Modifications to the General Conditions (Document 00 73 10). D. Additional Explorations: On request in advance, and if possible, OWNER will provide to each Bidder access to the site to conduct any explorations and tests as each bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, and clean up and restore the site to its former condition upon completion of such explorations. Bidder shall indemnify and save OWNER harmless during and after the performance of additional explorations. E. Modifications to the Contract Documents: Provisions concerning the adequacy of the data furnished for subsurface structures and underground facilities and the possibility of changes in the documents due to differing conditions appear in Articles 4.2 and 4.3 of the General Conditions. PART 2 BIDDING PROCEDURES 2.1 INTERPRETATIONS AND ADDENDA A. All requests for interpretation of the Contract Documents shall be made in writing and delivered to ENGINEER no later than 7 calendar days before the Bid opening. If required, ENGINEER will send a written interpretation to all persons receiving a set of Bid Documents in the form of a written Addendum. If ENGINEER doesn’t respond to a Bidder's request for interpretation, Bidder shall not rely on any interpretation in the request that is contrary to the intent and terms of the Contract Documents. B. OWNER will not be responsible for any explanations or interpretations, except those duly issued in the form of written Addendum. C. Addenda may also be issued to modify the Bidding Documents as deemed advisable by ENGINEER. D. Any Addendum so issued during the time of bidding shall be deemed to be included in the Bid. All Addenda shall become a part of the Contract Documents. E. Except to cancel the Bid opening, no Addendum shall be issued within 48 hours before the Bid opening. 2.2 EQUIPMENT AND MATERIAL OPTIONS BEFORE OPENING A. If a Bidder or Supplier wishes to use items of equipment or materials other than those identified in the Contract Documents, Bidder or Supplier shall submit a written request for approval to ENGINEER at least 10 days before the date set for the Bid opening. B. The procedure for submission of any such request shall be as follows: submit 1) two sets Revised February 1, 2019 Instructions to Bidders 00 21 13 - 4 of the written request and technical brochures and 2) a statement of variances. The statement of variances must list all features of the proposed substitution that differ from the Contract Documents and must further certify that the substitution has no other variant features. The brochure and information submitted must be clearly marked showing make, model, size, options, and any other features and must include sufficient evidence for ENGINEER to evaluate each feature listed as a variance. If after installing the substituted product, an unlisted variance is discovered, CONTRACTOR shall immediately replace the product with a specified product at no cost to OWNER. C. Any approval of such a request by ENGINEER must be made not later than 48 hours before the Bid opening. ENGINEER's failure to approve by such time shall be deemed a denial of the request. D. Any such approval is at the sole discretion of ENGINEER and will be in the form of an Addendum, issued to all Bidders holding Bid Documents, indicating that the additional equipment or materials are approved as equal to those specified for the Project. 2.3 BID SECURITY A. Delivery of Bid Security: Bidders must deliver Bid security to OWNER at the time they deliver their Bid. If Bid Security is not delivered with the Bid, the Bid will not be read or accepted B. Amount of Bid security: The Bid security amount must equal at least 5 percent of the total amount of the Bid. The total amount of the Bid shall be the sum of all items of the Bid, constituting the maximum amount of the possible award to the Bidder. C. Bid Bond: If a Bidder submits a bid electronically using SciQuest, the Bid security must be an electronic or scanned Bid bond. OWNER will not accept an emailed or faxed Bid bond. If a Bidder submits a bid by U.S. mail or hand-delivery, the Bid security must be either a hard-copy original Bid bond or a hard-copy original cashier’s check. Electronic or scanned copies, photocopies, or faxes of the Bid bond or cashier’s check will not be accepted with hard-copy Bid submissions delivered in-person or by U.S. mail. The Bond must guarantee that the Bidder, if awarded the Work, will promptly enter into the Construction Contract to perform the Work in the manner required by the Contract Documents. D. Cashier's Check: If a cashier's check is used, the cashier's check must be made payable to Salt Lake City Corporation. Personal or company checks will not be accepted. E. Return of Bid Security: OWNER will return any hard-copy Bid securities to all Bidders by the earlier of 45 days after the date of the Bid opening and 7 days after the effective date of the Construction Contract. The liability of OWNER in regards to cashier’s checks shall be limited only to the return of the checks. F. Default: If the Bidder fails, within the time limit described in Article 3.7A, to enter into the Construction Contract and to deliver to OWNER a Performance Bond, Payment Bond, or any other Bonds or documents required by the Contract Documents after Notice of Intent to Award by OWNER, the Bidder shall forfeit the amount of the Bid security as liquidated damages to OWNER. 2.4 CONTRACT TIME AND PUNCH LIST TIME Revised February 1, 2019 Instructions to Bidders 00 21 13 - 5 A. Provisions concerning Contract Time and Punch List Time are set forth in the Agreement (Document 00 52 00). 2.5 LIQUIDATED DAMAGES A. Provisions concerning liquidated damages are set forth in the Agreement (Document 00 52 00). 2.6 BID FORM A. The Bid Form (Document 00 41 00) identifies all forms comprising the Bid Documents. Additional copies may be obtained from ENGINEER. B. All names must be typed or printed under or near the signature. The signature must be an original signature. C. The Bid must contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid Form. D. The Bidder's address, telephone number, and facsimile number for communications regarding the Bid must be shown on the first page of the Bid Form. E. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use only the Bid Form and Bid Schedules bound in the Contract Documents (unless updated forms are included in an addendum, in which cause the Bidder shall use the updated forms). F. OWNER may waive any failure to comply with the requirements of this paragraph 2.6 if OWNER determines that such failure (1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or (2) involves ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price. 2.7 BID SCHEDULE A. Any work or material that is specified in the Contract Documents or that is necessary because of the nature of the Work, but that is not listed separately in the Bid Schedule (Document 00 43 00), shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price. B. All blanks on the Bid Schedule (Document 00 43 00) must be completed. If applicable, furnish both the unit and the total costs for each item. Numbers shall be stated in figures, and the signature of all persons signing shall be in longhand. Any corrections, alterations or erasures made by the Bidder to the information the Bidder entered on the Bid Schedule shall be initialed in ink by the Bidder. OWNER may waive any failure to comply with the requirements of this paragraph if OWNER determines that such failure (1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or (2) involves ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price. 2.8 SUBMISSION OF BIDS Revised February 1, 2019 Instructions to Bidders 00 21 13 - 6 A. Bids shall be submitted at the time and place and in the manner indicated in the Invitation to Bid (Document 00 11 16). It is the sole responsibility of the Bidder to deliver the Bid before the scheduled time. B. Alternate bids, other than those called for in the Bid form, will not be considered. C. No oral, telegraphic, telephonic, facsimile, or modified bids will be considered. OWNER will not consider any attempted modification of a Bid written or made on the outside of the envelope containing the Bid. 2.9 MODIFICATIONS AND WITHDRAWAL OF BIDS A. At any time before the Bid opening, Bids may be modified or withdrawn if a written notice of the modification or withdrawal, as the case may be, is signed by Bidder and delivered to the place where Bids are to be submitted. B. Within two business days after Bids are opened, any Bidder may file written notice with OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake to the reasonable satisfaction of OWNER. If OWNER agrees, Bidder may withdraw its Bid and the Bid security will be returned to Bidder. 2.10 OPENING OF BIDS A. Bids will be opened and read aloud publicly unless obviously non-responsive. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids. B. Any Bids received after the time specified in the Invitation to Bid (Document 00 11 16) will be returned unopened. 2.11 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS A. Subject to Paragraph 2.3E hereof, Bids remain subject to acceptance for 45 days after the day of the Bid opening. OWNER may, in its sole discretion, release any Bid and return the Bid security before that date. OWNER and Bidder may agree to extend the 45-day deadline. 2.12 NONDISCRIMINATION IN EMPLOYMENT A. Work under this Bid will obligate the Bidder and Subcontractors not to discriminate in employment practices. B. Bidders must, if requested, submit a compliance report concerning employment practices and policies in order to maintain their eligibility to receive the award of the Construction Contract. C. Equal opportunity employment shall be reflected in the racial and sexual composition of Bidder's work force and OWNER urges an affirmative action program to overcome under- utilization. D. Bidders are advised that the Construction Contract and its performance are subject to the applicable provisions of all Laws and Regulations. Bidder will be obligated, upon written request, to give all applicable assurances of compliance in connection therewith. E. If federal nondiscrimination requirements are applicable, Bidder must be fully Revised February 1, 2019 Instructions to Bidders 00 21 13 - 7 knowledgeable and comply with such requirements. Refer to Community Development Block Grant Supplementary Conditions (CDBG) (Document 00 73 12) or Federal Aviation Administration Supplementary Conditions as applicable. 2.13 SECTION 3, HOUSING AND URBAN DEVELOPMENT ACT OF 1968 A. If Work under this Bid is funded with a federal community development block grant the requirements of Section 3 of the Housing and Urban Development Act of 1968 may apply to the Bidder and its Subcontractors. OWNER encourages the use of the State of Utah Section 3 register for all subcontracting http://housing.utah.gov/section3/HUD Section 3.html. B. Bidder will be obligated to give all applicable assurances of compliance in connection with this Section 2.13 at any time. PART 3 AWARD OF CONSTRUCTION CONTRACT 3.1 QUALIFICATIONS OF BIDDERS A. Within 7 calendar days after ENGINEER's request, a Bidder whose Bid is under consideration for award shall submit to ENGINEER any of the following information requested by ENGINEER. ENGINEER may request like information regarding Bidder's Subcontractors or Bidder's Suppliers. 1. A current financial statement for the Work (as provided to the bonding company); 2. A chronological list of "completed" construction work done by Bidder during the last 3 years, including project name, address, owner, contract name, and current telephone number; 3. Work Under Contract Report (Document 00 43 37); 4. The proposed organizational structure for the project: firm ownership, project manager, progress scheduler, and CONTRACTOR’s Resident Superintendent’s resume; 5. Owned and rented equipment that is to be used to do the Work; 6. Investigations, arbitrations, litigation, or claims that are pending, threatened, settled, or disposed of within the last 3 years; 7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and Resident Superintendent designated to construct this project are different than that of Bidder, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project; 8. Names of three (3) projects of similar size and nature that the Resident Superintendent has completed. Include the name, address, and telephone number of the office contracting for each project. 9. Information so OWNER’s Labor Relations Specialist can certify that Bidder has an Revised February 1, 2019 Instructions to Bidders 00 21 13 - 8 acceptable Utilization Plan that offers economic opportunities to low and very low income persons and that Bidder qualifies as a Section 3 Contractor; and 10. Such other data as may be called for in the Supplementary Instructions to Bidders (Document 00 22 13) (if any). B. OWNER will hold all requested information confidential and, upon request, shall return such information to Bidder after acceptance or rejection of Bidder’s Bid. C. Untimely response by Bidder will release OWNER of any obligation to further negotiate or consider Bidder's Bid. 3.2 EVALUATION OF BIDS A. OWNER reserves the right: (1) to reject any and all Bids; (2) to waive minor informalities in the Bid Schedule and elsewhere so long as the informalities (a) are not material to OWNER’s Bid Documents and process and do not render the Bid non-compliant with Laws and Regulation pertaining to bidding, or (b) involve ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price; (3) to negotiate and agree to contract terms with the successful Bidder; and (4) to disregard non-conform- ing, non-responsive, unbalanced, or conditional Bids. B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or OWNER to make an award to that Bidder. Such rejection may be because the Bid is non-responsive, or Bidder is unqualified or of doubtful ability, or Bidder’s Resident Superintendent is unqualified or of doubtful ability, or the Bid or Bidder fails to meet any other pertinent standard or criteria established by OWNER in the Supplementary Instructions to Bidders (Document 00 22 13). C. OWNER will consider the qualifications of Bidder and such alternates, prices, and other data as may be requested in the Bid Form (Document 00 41 00), Bid Schedule (Document 00 43 00), or written requests issued prior to OWNER's Notice of Intent to Award the Construction Contract. OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code. See Document 00 22 16 Supplementary Instructions to Bidders. D. OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for portions of the Work as provided in the Proposed Subcontractor Form (Document 00 43 36). OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code. See Document 00 22 16 Supplementary Instructions to Bidders. E. OWNER may consider the operating costs, maintenance requirements, performance data, and guarantees of materials and equipment when such data is required to be submitted prior to the Notice of Intent to Award the Construction Contract. F. To establish qualifications of Bidder, OWNER may request such data indicated in Article 3.1 hereinabove and conduct such investigations as OWNER deems appropriate. G. If the Construction Contract is to be awarded, it will be awarded to the most responsive and lowest, qualified, responsible Bidder as determined by OWNER. Alternates may be accepted depending upon availability of OWNER funds. Bid alternates will be considered Revised February 1, 2019 Instructions to Bidders 00 21 13 - 9 in determining the most responsive, lowest, qualified, and responsible Bidder. H. OWNER will evaluate Bid Schedules as follows: 1. OWNER will resolve discrepancies in the multiplication of quantities of Work items and unit prices in favor of the unit prices. 2. Prices written out in words shall govern over prices written out in numbers. 3. OWNER will resolve discrepancies between the indicated sum of any column of figures and the correct sum thereof in favor of the correct sum. 4. Bids shall not contain any recapitulations of or changes in the work to be done. 5. OWNER may accept a Bid despite obvious errors in a Bid Schedule, such as a failure to include unit prices or a misplaced decimal point, as long as OWNER reasonably can discern the intention of Bidder as to the amounts to be bid. 6. Owner has determined that in accordance with Section 3.24.115 of the Salt Lake City Code the health, safety, and general welfare of the citizens of Salt Lake City are reasonably furthered by Owner’s Building Improvement or Public Works Projects procurement code requirements. 3.3 BUILDING IMPROVEMENT OR PUBLIC WORKS PROJECTS A. The Building Improvement or Public Works Projects procurement requirements are set forth in Salt Lake City Code Section 3.24.115 and can be found at the following web address: www.slcinfobase.com. To access the code, section select Ordinances, Policies & Procedures, General City; select City Code/Sterling; select Title 3, Revenue and Finance; select Chapter 3.24, Procurement; select Article III, Source Selection; select 3.24.115 Building Improvement or Public Works Projects. B. Bidder shall submit with its bid the Qualified Health Insurance Coverage Form. In that form Bidder certifies that the information given is true as of the time of submitting its bid. The information will be used in the manner stated in paragraph “F” below to evaluate “responsiveness” if bids are within 10% of each other. That form is used by Bidder to certify that Bidder and all subcontractors of Bidder with a subcontract value of $1,000,000 or more at the original execution of the subcontract working on the project have and will maintain, qualified health insurance coverage in compliance with Salt Lake City Code 3.24.115 for the duration of the contract. Neither the failure to submit that form nor checking “No” regarding Qualified Health Insurance Coverage will render the bid non- responsive. C. Bidder shall submit with its bid the Work Environment Certification Form. In that form Bidder certifies that the information given is true as of the time of submitting its bid. If “Yes” is not certified for each item 1 through 5, the bid will be rejected as non-responsive. See Salt Lake City Code Section 3.24.115. That form is used by Bidder to certify that Bidder and every subcontractor, if any, of Bidder working on the project have and will maintain 1) a drug and alcohol testing policy; 2) a program to recruit and/or employ veterans; 3) a job training program; 4) a safety program; and 5) a formal policy of non- discrimination in compliance with Salt Lake City Code Section 3.24.115 for the duration of the contract. D. Owner reserves the right to review or audit any information provided by Bidder to make Revised February 1, 2019 Instructions to Bidders 00 21 13 - 10 its evaluation. Bidder shall provide or furnish access to any necessary records or other information in order to permit Owner to verify Bidder’s and/or a subcontractor’s certifications. Bidder shall provide or furnish access to such records and information no later than three (3) business days after Owner issues a written request for the same. E. The Building Improvement or Public Works Projects procurement requirements will only apply to contracts in the amount of $2,000,000 or more, as determined by the engineer’s estimate. F. If more than one Bidder answers "Yes" on the Qualified Health Insurance Coverage Form, the following analysis will apply: A Bidder who certifies that it has and will maintain an offer of qualified health insurance coverage in compliance with the Building Improvement or Public Works Projects procurement requirements and whose bid is not more than 10 percent higher than the bid of any other offers who do not offer such insurance, will be deemed the more responsive Bidder. If two or more Bidders are judged to be equally responsive, Owner will make the award to the bidder with the lowest bid price. For purposes of this paragraph “F” references to “Bidder” with respect to qualified health insurance coverage shall be deemed to refer also to any subcontractors with a subcontract value of $1,000,000 or more at the original execution of the subcontract under such Bidder. G. Qualified Health Insurance Coverage documentation for bidder and each subcontractor of bidder with a subcontract value of $1,000,000 or more which shall include the following two documents: (i) An original statement on company letterhead signed by a duly authorized officer of the bidder/subcontractor stating that the bidder/subcontractor will maintain qualified health insurance coverage for the duration of the contract as defined in Section 26-40-115, Utah Code Annotated, as amended, or its successor in compliance with Salt Lake City Code 3.24.115. (ii) A written statement of actuarial equivalency from either: 1. An actuary selected by the bidder/subcontractor or bidder’s/subcontractor’s health insurer; or 2. An underwriter who is responsible for developing the bidder’s/subcontractor’s health insurance premium rates. 3.4 SUBCONTRACTORS, SUPPLIERS AND OTHERS A. Bidder shall not subcontract more than 75 percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's written approval. B. Conflict of interest restrictions pertaining to Subcontractors are described in paragraph 6.5H of the General Conditions. 3.5 CONTRACT SECURITY AND OTHER SUBMITTALS A. Performance Bond (Document 00 61 13) and Payment Bond (Document 00 61 14): OWNER's requirements as to Performance and Payment Bonds are as set forth in the Modifications to General Conditions (Document 00 73 10). Specific requirements are set forth in the Performance Bond (Document 00 61 13) and the Payment Bond (Document 00 61 14). 1. Bidder should carefully examine the form of the Bonds. Revised February 1, 2019 Instructions to Bidders 00 21 13 - 11 2. When the successful Bidder delivers the executed Construction Contract to OWNER, it must be accompanied by the required Performance and Payment Bonds (using Documents 00 61 13 and 00 61 14, respectively). B. Proposed Subcontractor Form (Document 00 43 36): Bidder must provide this report form to OWNER within 24 hours after ENGINEER's request. See Bid Form, paragraph 1.5B (Document 00 41 00) for additional information. The form shall list the name and address of each Subcontractor who will perform work or labor or render service to Bidder at the site of the Work, or a Subcontractor who, off the job site, will specially fabricate a portion of the Work or improvement according to detail Drawings. In each instance, the nature and extent of any Work to be subcontracted in an amount in excess of 2 percent of the Bid sum shall be described. Bidder must have the written consent of OWNER to substitute for any of the Subcontractors or Suppliers designated or to employ any Subcontractor or Supplier that is not listed. C. Bidder Status Report (Document 00 43 38): Bidder must submit the completed form upon ENGINEER's request or after Bidder receives the Notice of Intent to Award. D. Other Information: When a determination has been made to award the Construction Contract, Bidder is required, before the award or after the award, or both, to furnish such other information as ENGINEER requests. 3.6 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS A. The Contract Price identified in the Agreement (Document 00 52 00) represents the Cost of the Work that is to be paid by OWNER to CONTRACTOR. Adjustments to the Contract Price that are agreed to between OWNER and the successful Bidder shall be affected by signing an Agreement Supplement. 3.7 SIGNING OF AGREEMENT A. Within 10 days, (or such longer period of time that OWNER in its discretion may allow) after OWNER gives Notice of Intent to Award the Construction Contract to the successful Bidder, Bidder shall pick up, sign, and return the required number of copies of the Agreement (Document 00 52 00) and attached documents to OWNER with the required Bonds. A minimum of 2 originals will be signed. One executed original will be returned to Bidder. B. Transfers, delegations, or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from OWNER. C. At and from the time of Bidding through the completion of the Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, Salt Lake City and Salt Lake County. PART 4 MISCELLANEOUS 4.1 EQUIPMENT AND MATERIAL OPTIONS AFTER BID OPENING A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications, and any Addenda. Revised February 1, 2019 Instructions to Bidders 00 21 13 - 12 B. The procedure for submitting an application for substitution after the effective date of the Construction Contract is set forth in Article 6.4 of the General Conditions. END OF DOCUMENT Revised Nov. 27, 2006 Supplementary Instructions to Bidders 00 22 13 - 1 DOCUMENT 00 22 13 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS Add the following paragraph to Article 3.3. 3.3 SUBCONTRACTOR, SUPPLIERS AND OTHERS C. The following firms, that have been under contract to the OWNER in the design phase of the Work, shall not be used as subcontractors by the CONTRACTOR. 1. Design Consultant: Wall Consulting Group . 2. Geotechnical Consultants: Kleinfelder . 3. Surveying Consultant: . 4. Testing Consultantt: Wall Consulting Group . 5. Other: . Add the following article to Part 4. 4.2 PARTNERING A. Refer to Section 01 31 20 for description of partnering requirements. B. OWNER's consultants listed in this project manual will be partners to the project. END OF DOCUMENT Revised March 15, 2013 Supplementary Instructions 00 22 16 - 1 DOCUMENT 00 22 16 SUPPLEMENTARY INSTRUCTIONS (Building Improvement and Public Works Project) PART 1 GENERAL 1.1 INTRODUCTION A. OWNER has determined that in accordance with Section 3.24.115 of the Salt Lake City Code the health, safety, and general welfare of the citizens of Salt Lake City is reasonably furthered by OWNER’s Building Improvement and Public Works bidding program (BIPW Program). 1.2 BIPW PROGRAM A. The BIPW program is set forth in Salt Lake City Code Section 3.24.115 and can be found at the following web address: www.slcinfobase.com. Click on Municipal Ordinances (City Code/Sterling), click on Title 3 – Revenue and Finance, click on Chapter 3.24, click on Article III – Source Selection, click on 3.24.115 Building Improvement or Public Works Projects. B. Bidder shall submit with its bid the information shown on the Qualified Health Insurance Certification Form (document 00 43 45). In that form Bidder certifies that the information given is true as of the time of submitting its bid. The information will be used in the manner stated in paragraph “F” below to evaluate “responsiveness” if bids are within 10% of each other. That form is used by Bidder to certify that Bidder and all subcontractors of Bidder working on the project have and will maintain an offer of qualified health insurance in compliance with Salt Lake City Code 3.24.115 for the duration of the contract. Neither the failure to submit document 00 43 45 nor checking “No” will render the bid non-responsive. C. Bidder shall submit with its bid the information shown on the Work Environment Certification Form (Document 00 43 46). In that form Bidder certifies that the information given is true as of the time of submitting its bid. If “Yes” is not certified for each item, the bid will be rejected as non-responsive. See Section 3.24.115 of the Salt Lake City Code. That form is used by Bidder to certify that Bidder and all subcontractors of Bidder working on the project have and will maintain 1) a drug and alcohol testing policy; 2) a program to recruit and/or employ veterans; 3) a job training program; 4) a safety program; and 5) a formal policy of non-discrimination in compliance with Salt Lake City Code Section 3.24.115 for the duration of the contract D. OWNER reserves the right to review or audit any information provided by Bidder to make its evaluation. Bidder shall provide or furnish access to any necessary records or other information in order to permit OWNER to verify Bidder’s or and Subcontractor’s certifications. Bidder shall provide or furnish access to such records and information no later than 3 business days after OWNER issues a written request for the same. Revised March 15, 2013 Supplementary Instructions 00 22 16 - 2 E. The BIPW program will only affect bids in excess of $2,000,000, as determined by a city engineer’s estimate. See 1.3C of Document 00 41 00 to determine if the City engineer’s estimate exceeds $2,000,000. F. If more than one Bidder answers “YES” to the question on the Qualified Health Insurance Certification Form (document 00 43 45), the following analysis will apply: A Bidder who has and will maintain an offer of qualified health insurance coverage under the BIPW program and whose bid is not more than 10 percent higher than the bid of another Bidder who does not have such insurance, will be deemed the more responsive Bidder. If two or more Bidders are judged to be equally responsive, OWNER will make the award to the Bidder with the lowest bid price. For purposes of this paragraph “F”, references to “Bidder” with respect to qualified health insurance coverage shall be deemed to refer also to any subcontractors under such Bidder. 1.3 BIPW Program A. In situations in which the factors listed in the Qualified Health Insurance Certification form affect the award of the Bid, the winning Bidder will be required to enter into a Qualified Health Insurance Supplemental Agreement (document 00 54 16) with OWNER. 1.4 Important information for Bidder and all Subcontractors of the successful Bidder. A. Salt Lake City Code Section 3.24.115 paragraph B.3 states the following: 3. A contractor and any subcontractor who does not certify compliance with the factors in Subsection B.1b to B.1f of this subsection shall be deemed non- responsive and shall be disqualified. B. Refer to the Bid Form (document 00 41 00) for the sequence of submittals to ensure compliance with Salt Lake City Code Section 3.24.115. END OF DOCUMENT Revised Nov. 27, 2006 Geotechnical Data 00 31 32 - 1 DOCUMENT 00 31 32 GEOTECHNICAL DATA PART 1 GENERAL 1.1 REPORTS OF EXPLORATIONS AND TESTS A. In the preparation of Drawings and Specifications, ENGINEER has relied upon the following geotechnical reports of explorations and tests of subsurface conditions at or contiguous to the Work site. 1. Report dated December 9, 2022 prepared by Kleinfelder entitled:Aquifer Testing and Subsurface Investigation, Proposed Module 8, consisting of 34 pages. 2. Report dated ____ prepared by _____entitled: ____ consisting of ____ pages. B. Accuracy: For the purposes of bidding or construction, the Bidder may rely upon the accuracy of the geotechnical data at the locations where the data was obtained and to the depths indicated, but not upon any other information, interpretations or opinions contained in the geotechnical data itemized above or for the completeness thereof expressed or implied. C. Geotechnical Data Not a Part of the Contract Documents: Geotechnical data itemized above are not a part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in Article 4.02 of the General Conditions (Document 00 72 00) are incorporated by reference. 1.2 DRAWINGS OF SURFACE AND SUBSURFACE STRUCTURES A. In the preparation of Drawings and Specifications, ENGINEER has relied upon the following drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the Work site. 1. Drawings dated ____ prepared by ____ entitled: ____ consisting of ____ pages. 2. Drawings dated ____ prepared by ____ entitled: ____ consisting of ____ pages. B. Drawings Not a Part of the Contract Documents: Drawings itemized above are not a part of the Contract Documents. Location of the surface and subsurface structures and utilities are further described in Article 4.3 of the General Conditions (Document 00 72 00). 1.3 EXAMINATION OF DATA A. A copy of the Aquifer Testing and Subsurface Investigation, Proposed Module 8 Report is available on SciQuest. END OF DOCUMENT Revised December 1, 2013 Bid Form 00 41 00 - 1 DOCUMENT 00 41 00 BID FORM PART 1 GENERAL 1.1 BIDDER A. Name: B. Address: C. Telephone number: D. Email address: E. Facsimile number: F. Tax identification number: G. DUNS number (for CDBG funded projects) See 1.3 C to determine if this project is CDBG funded. H. Bidder holds license number ____________________________________, issued by the Utah State Department of Commerce, Division of Occupational and Professional Licensing. Bidder is licensed to practice as a _________________________________ Contractor. The license expiration date is the ____ day of __________, 20____. 1.2 NOTICE A. Pursuant to Section 58-55-501(8), Utah Code Annotated (UCA), it is unlawful to submit a bid for any work for which a license is required under Chapter 55 of Title 58, UCA, by a person or other business entity not licensed or excepted from licensure as a contractor under Chapter 55 of Title 58, UCA. Pursuant to Section 58-55-503(1), UCA, contracts for the work may not be awarded to any person or other business entity that violates Sections 58-55-501(8) UCA, in submitting its Bid. 1.3 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 B. The city engineer’s estimate for this project is over $250,000.00. C. The city engineer’s estimate for this project is over $2,000,000.00. D. This project is not CDBG funded. E. This project does require a permit to work in the Public Way from Salt Lake City Engineering, 349 South 200 East, Suite 100. If such a permit is required, Section 6.7 (H) (1) (d) of Document 00 73 10 (Modifications to the General Conditions) shall apply. Revised December 1, 2013 Bid Form 00 41 00 - 2 1.4 ADDENDA A. Bidder hereby acknowledges receipt of the following Addenda. (list Addenda numbers here) 1.5 SUBMITTALS A. With Bid: 1. This Bid Form (Document 00 41 00). 2. Bid Schedule (Document 00 43 00). 3. Bid bond. 4. Voluntary Submittal: If the document noted below is included in the Project Manual. a. Value Program Form (Document 00 43 40) Bidder may be at a competitive disadvantage if it does not submit the Value Program Form. 5. Mandatory Submittals: If the documents noted below are included in the Project Manual. a. Qualified Health Insurance Certification Form (Document 00 43 45), Checking “No” will not render the bid non-responsive. That form is used by Bidder to certify whether Bidder and all subcontractors of Bidder working on the project have and will maintain an offer of qualified health insurance in compliance with Salt Lake City Code Section 3.24.115 for the duration of the contract. b. Work Environment Certification Form (Document 00 43 46) If the Bidder does not certify yes to each question in Document 00 43 46 the bid will be rejected as non-responsive. That form is used by Bidder to certify that Bidder and all subcontractors of Bidder working on the project have and will maintain 1) a drug and alcohol testing policy; 2) a program to recruit and/or employ veterans; 3) a job training program; 4) a safety program; and 5) a formal policy of non-discrimination in compliance with Salt Lake City Code Section 3.24.115 for the duration of the contract. See Section 3.24.115 of the Salt Lake City Code and Article 1.4 of Section 00 22 16 Supplemental Instructions. c. Section 3 Business Certification (CDBG) (Document 00 43 42). B. Due diligence letter to Bidder: If Bidder receives a due diligence letter from OWNER after bid opening, Bidder must submit the following documents to OWNER after ENGINEER’s request. 1. Document 00 43 36: Proposed Subcontractor Form. 2. Document 00 43 37: Work Under Contract Report. 3. Document 00 43 38: Bidder Status Report. Revised December 1, 2013 Bid Form 00 41 00 - 3 4. Other information requested and as defined in Article 3.1 and 3.4 D of Document 00 21 13. C. After Notice of Intent to Award: If Bidder receives a notice of intent to award the Contract from OWNER after bid opening, Bidder must submit the following documents to OWNER. 1. Document 00 52 00: Agreement. 2. Document 00 61 13: Performance Bond. 3. Document 00 61 14: Payment Bond. 4. Document 00 73 10: Applicable Insurance Certificate. 5. Supplementary Submittals (if applicable): a. Document 00 54 00: Agreement Supplement. b. Document 00 54 15 Value Program Supplemental Agreement. c. Document 00 54 16: Qualified Health Insurance Supplemental Agreement. D. At the preconstruction meeting: If the Documents noted below are included in the project manual, Bidder must submit the following documents to OWNER. 1. Section 3 Business Certification (Document 00 43 42). 2. Current Employee Information (Document 00 43 43). E. Prior to Final Payment: If the Document noted below is included in the project manual CONTRACTOR must submit the following document to OWNER. 1. Section 3 Report Form (Document 00 43 44). 1.6 DEFINITIONS A. Bid Documents: The Bid Documents consist of the Invitation to Bid, the Instructions to Bidders, any Supplementary Instructions to Bidders, this Bid form, any supplements (or post-bid supplements), the Bid Schedule, any data listed by and limited to the provisions in the Geotechnical Data Document, and the Bid Bond. B. Bid Bond: AIA Document A310 as published by the American Institute of Architects, 1736 N. Y. Ave. N. W. Washington, D.C. 20006 or one substantially the same and acceptable to OWNER. C. HUD: United States Department of Housing and Urban Development. PART 2 COVENANTS 2.1 BIDDER TO ENTER INTO AN AGREEMENT A. In General: Bidder agrees, if this Bid is accepted, to enter into a Construction Contract with OWNER to perform and furnish all Work specified or indicated in the Contract Documents at the Contract Time and Contract Price identified in the Agreement (Document 00 52 00). Revised December 1, 2013 Bid Form 00 41 00 - 4 B. Agreement Supplement: If it becomes necessary to further define the Work, Contract Price, Contract Time, or some other portion of the Construction Contract before signing the Agreement (Document 00 52 00), ENGINEER shall prepare an Agreement Supplement (Document 00 54 00) describing such change. OWNER shall have sole discretion in determining the necessity of preparing such a contract modification. If the Agreement Supplement is acceptable to Bidder, Bidder shall execute the Agreement Supplement before or concurrently with the execution of the Agreement (Document 00 52 00). C. If Bidder was awarded the Construction Contract in part as a result of OWNER’s Value-Based Procurement Program, Bidder shall enter into a Value Program Supplemental Agreement (Document 00 54 15) with OWNER concurrently with its execution of the Agreement (Document 00 52 00). D. If Bidder was awarded the Construction Contact in part as a result of OWNER’s Qualified Health Insurance program, Bidder shall enter into a Qualified Health Insurance Supplemental Agreement (Document 00 54 16) with OWNER concurrently with its execution of the Agreement (Document 00 52 00). 2.2 BIDDER ACCEPTS TERMS AND CONDITIONS A. Bidder accepts all of the terms and conditions of the Bid Documents, including without limitation those dealing with the disposition of Bid security. B. Bidder must pick up, sign, and submit, the required number of copies of the Agreement (Document 00 52 00) with the Bonds and other documents required by the Agreement within 10 days (or such longer period of time that OWNER in its discretion may allow) after the date of OWNER's Notice of Intent to Award the Construction Contract. 2.3 REPRESENTATION OF BIDDER A. In submitting this Bid, Bidder represents, as more fully set forth in the Instructions To Bidders (Document 00 21 13), that: 1. Nature of the Work: Bidder has become familiar with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 2. Surface and Subsurface Conditions: Bidder has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions that are identified in the Geotechnical Data (Document 00 31 32) (if any). 3. Underground Utilities: Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site. 4. Bidder Investigation: Bidder has correlated the results of all observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. Revised December 1, 2013 Bid Form 00 41 00 - 5 5. Discrepancy Resolutions: Bidder has given ENGINEER written notice of all conflicts, errors, or discrepancies that Bidder has discovered in the Contract Documents and acknowledges that all written resolutions thereof issued by ENGINEER before Bid opening, are acceptable to Bidder. 2.4 OWNER'S RIGHTS AT BID AWARD A. Bidder agrees that OWNER has the right to reject this Bid or to award the Work or any part thereof to the undersigned at the prices stipulated. Bidder agrees to make no claim for damages for such rejection or award. B. If the Bid is rejected, then the Bid security shall be returned to Bidder. C. If the Bid is accepted, OWNER shall notify Bidder of OWNER's intent to award the Construction Contract to Bidder. Bidder shall have 10 days (or such longer period of time that OWNER in its discretion may allow) to sign and return the Agreement (Document 00 52 00) to ENGINEER. If Bidder fails to sign the Agreement, the Bid security, at OWNER's option, shall be claimed and cashed and the amount thereof paid to OWNER as liquidated damages for the failure of Bidder to comply with the terms of the Bid. D. Bidder agrees that the Bid may be rejected if the submittals listed in this Document or the Notice of Intent to Award are not submitted within the time listed in the Notice of Intent to Award (or described in paragraph 2.4C hereof). 2.5 NON-COLLUSION; ETHICS A. Bidder represents that the Bid is genuine. The Bid is not made in the interest of or on behalf of any undisclosed person, firm, or corporation. B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. C. Bidder has not solicited or induced any person, firm, or corporation to refrain from bidding. D. Bidder has not sought by collusion to obtain for itself any other advantage over any separate Bidder or over OWNER. E. REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY OFFICERS AND EMPLOYEES AND FORMER CITY OFFICERS AND EMPLOYEES Bidder represents that it has not: 1. Provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or his or her relative or business entity. 2. Retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, Revised December 1, 2013 Bid Form 00 41 00 - 6 other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business. 3. Knowingly breached any of the ethical standards set forth in the City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code; or 4. Knowingly influenced, and hereby promises that it will not knowingly influence, a City officer or employee or former City officer or employee to breach any of the ethical standards set forth in the City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code. 2.6 BID PRICING A. Bidder will complete the Work for the prices listed in the Bid Schedule (Document 00 43 00). Bidder agrees that quantities for Unit Price Work are not guaranteed. (Refer to Article 11.7 of the General Conditions (Document 00 72 00)). 2.7 SUBSTANTIAL COMPLETION, PROJECT COMPLETION, AND LIQUIDATED DAMAGES A. Bidder agrees that the Work will be Substantially Complete and ready for Final Inspection on or before the expiration of the Contract Time indicated in the Agreement (Document 00 52 00). B. Bidder agrees that the Work will be complete and ready for final payment in accordance with Article 14.9 of the General Conditions (Document 00 72 00) on or before the expiration of the Punch List Time indicated in the Agreement. C. Bidder accepts the provisions of the Agreement (Document 00 52 00) as to liquidated damages in the event of failure to complete the Work on time and in accordance with the Contract Documents. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. Bidder executes this Bid and declares it to be in effect as of the _____ day of _______- ________________________________________, 20 _____. 3.2 BIDDER'S SUBSCRIPTION A. Bidder's Signature: B. Please print Bidder's name here: C. Title: END OF DOCUMENT Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 1 DOCUMENT 00 43 00 BID SCHEDULE PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Price schedules. B. Measurement and payment provisions. 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8 JOB No. LDF20015 1.3 REFERENCES A. APWA Section 01 29 00: Payment Procedures. B. Document 00 52 00: Agreement. 1.4 SCHEDULE TO BE ADDED TO THE AGREEMENT A. This document will be added to the Agreement by reference. PART 2 PRICE SCHEDULES 2.1 GENERAL A. Number of Base Bid schedules: One B. Number of Alternate schedules: None. C. For progress payment procedures, see APWA Section 01 29 00 requirements. Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 2 2.2 BASE BID A. CAUTION: Bidder shall complete all blanks in the following price schedules. Failure to do so may cause the bid to be declared non-responsive by ENGINEER. Ite m Specification Reference Number Classification of Work Quantity and Unit Unit Price Total Cost SLVSWMF - Module 8, Job No. LDF20015 1 01 57 00 Dust Control 1 Lump Sum N/A $ 2 01 71 13 Mobilization 1 Lump Sum N/A $ 3 01 71 23 Survey 1 Lump Sum N/A $ 4 31 25 00 SWPPP and NOI 1 Lump Sum N/A $ 5 01 57 00 Groundwater Control 1 Lump Sum N/A $ 6 31 23 16, 31 11 00 West Ditch 1 Lump Sum N/A $ 7 31 23 16, 33 05 06 South Ditch 1 Lump Sum N/A $ 8 31 23 16, 33 05 06, 31 05 13, 31 05 19 French Drains 1 Lump Sum N/A $ 9 31 23 16, 33 05 10S, 31 05 13, 4-ft Liner Wall 1 Lump Sum N/A $ 10 31 23 16, 31 05 13 Module 8 & 11 Earthwork 1 Lump Sum N/A $ 11 33 50 10S, 33 50 20S, 31 05 19 Module 8 Liner 1 Lump Sum N/A $ 12 33 05 06, 31 05 19, 31 05 13 Module 8 Leachate Collection and Removal System (LCRS) 1 Lump Sum N/A $ 13 31 23 16 Protective Soil Cover 1 Lump Sum N/A $ 14 05 05 10S, 31 23 16, 31 05 13, 32 11 23 South Road & Debris Fence 1 Lump Sum N/A $ 15 05 05 10S, 31 23 16, 31 05 13, 32 11 23 West Road & Debris Fence 1 Lump Sum N/A $ Total Bid Amount = $ ______________________ Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 3 PART 3 MEASUREMENT AND PAYMENT 3.1 IN GENERAL A. See APWA Section 01 29 00 for general measurement and payment provisions. B. Specification sections referenced in price schedule line items give additional definitions to the classification of work. C. Incidental work or material will not be measured, counted, or paid for separately. D. Backfilling demolition work depressions will not be measured or paid for separately except where structure or obstructions that are not designated for removal and disposal in the Bidding Documents, and that cannot be removed with equipment reasonably expected to be used in the Work without cutting, drilling, or blasting, will be paid for after adjusting the Contract Price by Contract Modification pricing. E. Form Strip Filler (APWA Plan 242): This is incidental work. Work includes (but is not limited to) reinstalling irrigation pipe and heads, replacing damaged irrigation pipe and heads, replacing topsoil, grass seed, sod, and other landscape corrections or activities. 3.2 DUST CONTROL A. Measurement: Overall project percent complete. B. Includes water required to control dust or air pollution to comply with Utah State air quality regulations. 3.3 MOBILIZATION A. Measurement: Percent of Original Contract Amount Earned Percent of Amount Bid for Mobilization to be Paid 5 40 15 20 40 30 50 10 B. Includes installation of temporary facilities, progress schedule, bringing all necessary construction equipment to site, risk, and incidentals such as coordination with Landfill personnel and ENGINEER, miscellaneous probing for buried utilities and demobilization. 3.4 SURVEY A. Includes submission of a certificate by a licensed land surveyor that horizontal and vertical survey control shown in the Contract Documents and in construction has been checked and verified. B. Includes as-built drawing of all features in AutoCAD Civil3D. 3.5 SWPPP and NOI A. Measurement: Percent complete. B. Payment: Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 4 • 20 percent when Notice of Intent (NOI) has been published on EPA’s website for at least 72 hours and a copy of the Storm Water Pollution Prevention Plan (SWPPP) has been submitted to ENGINEER. • 80 percent as work progresses. 3.6 GROUNDWATER CONTROL A. Measurement: Overall project percent complete. B. Includes all labor and equipment including pumps, generators, fuel, etc. to dewater the site as required to support all construction activities and minimize impacts to ongoing landfill operations. C. Includes dewatering all existing depressions and ditches within and immediately adjacent to the project site including the north and east ditches within module 8 as well as the existing ditch west of the clay dam. D. All diverted water shall be routed to the west ditch unless otherwise instructed by the Owner or Engineer. 3.7 WEST DITCH A. Measurement: Percent Complete B. Includes all labor, equipment and material for reconditioning and reshaping the west ditch per plan to remove debris, vegetation, high points, or other obstructions as required to ensure proper flow and discharge. 3.8 SOUTH DITCH A. Measurement: Percent Complete B. Includes all labor, equipment and material for excavation, stockpile of native subgrade material, and finish grading. Also includes pipes, fittings, manholes, animal guards, etc. for ditch dewatering. C. Includes installation the clay dam, as shown on plans, and as directed by the Engineer. 3.9 FRENCH DRAINS A. Measurement: Percent Complete based on drain installed including drain rock column. B. Includes all labor, equipment and material for french drains including perforated piping, fittings, connections, drain rock, separation fabric, animal guards, etc. Includes backfill and compaction of native excavated material in the immediate vicinity of the french drain section. C. Excavation is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.10 4-FT LINER WALL A. Measurement: Percent complete B. Includes labor, equipment and materials for installation of the 4-foot high vertical HDPE liner wall on the southern edge of modules 1, 6, and 7 as shown in the plans up to and including the connection to the module 8 liner wall transition. Includes HDPE liner extension, extrusion welding, and periodic testing & inspection. C. Includes labor, equipment and material for installation of inspection ports including perforated pipe riser, drain rock, fabric, etc. 33 Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 5 C. Includes excavation and temporary stockpile of materials removed to expose the existing liner edge, including transportation of any trash to the tipping face. Also includes general backfill & compaction to restore existing finish grade as well as staged backfill lifts required for vertical liner installation. 3.11 MODULE 8 & 11 EARTHWORK A. Measurement: Percent complete based on plan area of prepared subgrade. B. Includes labor and equipment to excavate module 8 on-site native material and stockpile in module 11 or as directed by the Engineer. Includes excavation required for french drain installation and subgrade preparation for placement of module 8 liner layers. Includes excavation into the Module 7 footprint to tie liner into Module 7 at the lowest possible elevation and disposal of trash at the current tipping face. C. Includes all temporary earthwork facilities, staging, etc. including temporary ditch crossings & culverts, movement of existing module 11 stockpiled materials, temporary equipment paths. Also includes installation of additional protective soil over liner where required for heavy equipment paths based on HDPE liner manufacturer warranty requirements. D. Excavation and stockpile required for construction of the south ditch is covered under 3.8 SOUTH DITCH. 3.12 MODULE 8 LINER A. Measurement: Percent complete of total area of sheet material installed for all layers. B. Relative or weighted cost of material and installation for the different layers for payment may be considered as proposed by the contractor and approved by the engineer based on a detailed cost breakdown (Schedule of Values). C. Includes labor, equipment and material to install the geosynthetic clay liner (GCL), HDPE liner, and class A drainage geotextile. Includes inspection, testing and providing a final report of test results to ENGINEER. Includes all storage and staging of materials. Extra payment will not be made for damaged materials due to improper storage practices. D. Includes all material, equipment and labor required for connections and tie-ins to liners in adjacent modules 5 and 7. E. General subgrade preparation and excavation required to expose adjacent module liner edges is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.13 MODULE 8 LEACHATE COLLECTION AND REMOVAL SYSTEM (LCRS) A. Measurement: Percent Complete B. Includes labor, equipment and material to install various components of the leachate collection and removal system including perforated piping, solid piping, drain rock, geotextile fabric, extraction piping, fittings. Includes all sumps, trenches, etc. above primary liner layers, but excluding protective soil. C. Includes all labor, equipment and material for connections to Module 5 and 7 leachate piping where indicated in plans. D. Includes labor, equipment and material for the reinforced concrete headwall and slab Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 6 at primary leachate extraction site. D. Excavation required to locate and exposed existing leachate piping is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.14 PROTECTIVE SOIL COVER A. Measurement: Percent Complete based on plan area of liner covered. B. Includes equipment, material and labor to place 2-foot minimum protective soil cover over Module 8 primary liner layers. Also includes backfill and compaction at Module 5 and 7 liner tie-in locations. C. It is expected that previously excavated native material will be reused. No additional payment will be made for screening or stockpile separation of acceptable materials based on HDPE liner manufacturer’s warranty requirements. 3.15 SOUTH ROAD & DEBRIS FENCE A. Measurement: Percent complete based on plan length of installed road and fence. B. Contractor may propose independent payment for road and fence respectively based on detailed cost breakdown submitted to and approved by the Engineer (Schedule of Values). C. Includes all labor, equipment and material required for subgrade preparation including cut & fill of native material, placement & compaction of granular borrow & untreated base material. Also includes finish grading of all shoulders, swales, berms, adjacent infill areas, slope tie-ins, etc. D. Includes all labor, equipment and material for debris fence installation including detailing, fabrication, delivery, and storage or fence materials. Includes fence post erection and installation of concrete monopole foundations. Also includes nylon debris fabric material and placement. E. Includes southwest gravel road intersection, infill area, and gravel pad including subgrade preparation, granular material placement & compaction, and finish grading. 3.16 WEST ROAD & DEBRIS FENCE A. Measurement: Percent complete based on plan length of installed road and fence. B. Contractor may propose independent payment for road and fence respectively based on detailed cost breakdown submitted to and approved by the Engineer (Schedule of Values). C. Includes all labor, equipment and material required for subgrade preparation including cut & fill of native material, placement & compaction of granular borrow & untreated base material. Also includes finish grading of all shoulders, swales, berms, adjacent infill areas, slope tie-ins, etc. D. Includes all labor, equipment and material for debris fence installation including detailing, fabrication, delivery, and storage or fence materials. Includes fence post erection and installation of concrete monopole foundations. Also includes nylon debris fabric material and placement. END OF SECTION Acceptance 01 35 10 - 1 Drainage Geotextile Class A Do you have a specification for the Drainage Geotextile Class A? Also need to know if we can sew or heat bond the material? Asked 4/27/2023 at 4:28 PM by Mark Downs Geo-Synthetics, LLC (GSI) Answer On Detail 1 on Sheet DT-1 in the plans, it shows the Drainage Geotextile, Class A. The specification is given on the right-hand side of that sheet as AWPA Section 31 05 19. I am including that specification as an attachment. All materials should be installed per the manufacturer’s recommendations. Confirm that this woven geotextile meets the warrantee requirements for puncture resistance to protect the HDPE liner. 31 05 19 – Geotextiles.pdf Actions Answered 4/27/2023 at 4:28 PM by John Coyle Litter Fence contractor qualifications Does the litter Fence subcontractor need to have a Utah Contractors license? And do they need to submit prior work or project experience or 3 or 4 similar projects? Asked 4/27/2023 at 4:21 PM by Kirt Ecker Ecker Netting Inc. dba Judge Netting Mountain West Answer All contracting rules shall be followed. Please review the state procurement rules. Actions Answered 4/27/2023 at 5:07 PM by John Coyle Litter Fence Poles The plans and addendum call for poles to be fabricated with a bend at grade level. It is believed that the existing poles are straight poles, but leaned over in the hole footing Is this acceptable? Can the footings be deeper so we can exclude rebar cages? Asked 4/27/2023 at 3:44 PM by Kirt Ecker Ecker Netting Inc. dba Judge Netting Mountain West Answer Please construct the debris fence posts per plan. One intent of the rebar cage is to prop the pipe off from the bottom of the hole, to allow concrete to enter the bottom of the pipe. There should be a uniform annular space surrounding the posts. Actions Answered 4/27/2023 at 5:04 PM by John Coyle Prime Bidders Can we get a list of people would be Prime Bidders for this project. Asked 4/27/2023 at 10:53 AM by Telford Myers Jwright Companies, Inc. Answer We don’t have a list of bidders for this project. The best information that I have is the pre-bid attendance log and I have been contacted by BHI. Actions Answered 4/27/2023 at 12:37 PM by John Coyle Form 00 43 42 Section 3 Business Certification Please verify that we do not need to include form 00 43 42 since this is not CDBG funded. Asked 4/25/2023 at 11:04 AM by Jarel Yantes Acceptance 01 35 10 - 2 B.H. Inc. Answer This project is not CDBG funded, therefore, no CDBG forms will be required for the bid. Additionally, none of those forms are included in the contract documents. Actions Answered 4/25/2023 at 11:12 AM by John Coyle Form 00 43 40 Value Program Form Please verify that we do not need to include form 00 43 40 with the bid. Asked 4/25/2023 at 11:02 AM by Jarel Yantes B.H. Inc. Answer Form 00 43 40 is not included in the project manual and is not required for this bid event. Actions Answered 4/25/2023 at 1:21 PM by Dan Hanover Bid Extension Why is this project being pushed for one contractor who is not able to get their bid bond in time? If they are not able to get their bond in time for this project maybe, they should not be bidding this project. This seems to be preferential treatment that is being given to one contractor. We request that this bid be moved back to the original bid date. Asked 4/24/2023 at 7:36 AM by Winn Lindsey Whitaker Construction Answer We delayed the bid by a week, because this is a large project and specialty sub-contractors are needed. Particularly, we were thinking about the crews for the HDPE liner. There is not preferential treatment for ANY given contractor. Good luck on the bid. Actions Answered 4/24/2023 at 8:15 AM by John Coyle Dumping fees Can the Unclassified Excavation be dumped at the landfill for no charge. Asked 4/21/2023 at 9:02 PM by John Coyle Answer Yes, there will not be a cost for placing the excavated material at the landfill. Actions Answered 4/21/2023 at 9:02 PM by John Coyle Bid Extension We need to ask again if we can extend this bid by 1 week. This will give us time to secure our best costing and be able to prepare the required bid bond. Thank you Asked 4/20/2023 at 10:49 AM by Aaron Norton E.T.Technologies, Inc Answer I will issue an addendum moving the bid date back to May 3, 2023 Actions Answered 4/20/2023 at 12:53 PM by John Coyle Drainage Geotextile Can you clarify what type/weight of geotextile you are looking for pertaining to the “Class A”. Also can you supply specs for this product that include the installation, (seams to be sewn or heat bonded?). Asked 4/20/2023 at 9:07 AM by Barrett Sawatzky GSI – Geosynthetics Systems Answer Acceptance 01 35 10 - 3 See answer to similar question about the Drainage Geotextile. Actions Answered 4/20/2023 at 2:20 PM by John Coyle Clay layer On the new liner, is a 2 foot thick compacted clay layer under MOD 8 required? Asked 4/19/2023 at 3:58 PM by Dawn Rinaldi E.T.Technologies, Inc Answer No, 2 feet of compacted clay will not be used on this project. Detail 1 on Sheet DT-1 shows a Geosynthetic Clay Liner (GCL) under the HDPE liner. The GCL liner does the same thing that we used to use the 2' clay liner for. Actions Answered 4/19/2023 at 4:25 PM by John Coyle Bid Bond Due to the short time frame we may have an issue securing a bid bond in time. Is it possible to extend the due date by one week? Asked 4/19/2023 at 10:00 AM by Dawn Rinaldi E.T.Technologies, Inc Answer I hesitate to delay this bid, as we are already getting late in the year for bidding projects. Actions Answered 4/19/2023 at 4:27 PM by John Coyle Pre-Bid meeting Can you provide the pre-bid meeting agenda and attendance log? Asked 4/18/2023 at 3:15 PM by John Coyle Answer See attached pre-bid agenda and attendance log. Pre-Bid meeting agenda and attendance log.pdf Actions Answered 4/18/2023 at 3:15 PM by John Coyle CADD file of the project Can bidders get the CADD file of the project? Asked 4/13/2023 at 1:30 PM by John Coyle Answer The CADD file is not available to bidders, as it is not part of the contract documents. The needed quantities for the bid are shown on the plans. The successful bidder will receive the CADD file, as a courtesy to facilitate construction. Actions Answered 4/13/2023 at 1:30 PM by John Coyle Engineer's estimate What is the engineer's estimate for Module 8? Asked 4/12/2023 at 6:01 AM by John Coyle Answer The engineer's estimate is $10,500,000. Actions Answered 4/12/2023 at 6:01 AM by John Coyle 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FILL FILL 10''10''10'' FI L L FIL L CU T CU T CU T CU T leach leach C U T CUT CUT FIL L FILL FILL FILL FILL FILL FIL L 100' SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMICDEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEYSOLID WASTEFACILITYMODULE 8 MODULE 8SITE PLAN CS-2 5 OF 24 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.2_Module 8 Site Plan.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100' 200' SUMP(SEE DETAIL 1/DT-2) TRANSITION FROM 4-FT LINERWALL (3/DT-6) TO STANDARDANCHOR TRENCH (5/DT-1) MOD 7 LINER TIE-IN(SEE DETAIL 4/DT-1) MOD 5 LINER TIE-IN(SEE DETAIL 2/DT-4) NORTH FRENCH DRAIN(SEE DETAIL 2/DT-4,PROFILE ON PR-1) EAST FRENCH DRAIN(SEE DETAIL 1/DT-5PROFILE ON PR-2) SOUTH DITCH(SEE DETAIL 2/DT-5, PROFILE ON PR-3) 4" PERFORATED LEACHATE PIPE ATTOE OF SLOPE (SEE DETAIL 5/DT-2) 10" PERFORATEDLEACHATE PIPE(SEE DETAIL 3/DT-2) 4-18" WITHDRAWL PIPES(SEE DETAIL 4/DT-2) WEST ROAD(SEE DETAIL 1/DT-4AND PROFILE ON PR-4) 2 DT-5 1 DT-5 1 DT-4 2 DT-4 MANHOLE (SEE PROFILE ON PR-3) MOD 5 EXISTING SUMP. ABANDONIN PLACE AND PLACE COMPACTEDPROTECTIVE SOIL TO PREVENTEQUIPMENT DAMAGE 6" PERFORATED PIPE AT TOE OF SLOPE(SEE DETAIL 5/DT-2) 6" PERFORATEDLEACHATE PIPE(SEE DETAIL 6/DT-1) 4" PERFORATEDLECHATE PIPE (SEE DETAIL 6/DT-1) WEST FRENCH DRAIN(SEE DETAIL 3/DT-4,PROFILE ON PR-2) GRAVEL PAD FOR FUTURE FLARE. USE12" CLASS A-1-a GRANULAR BORROWPER SPECIFICATION 31 05 13 40' 100' 6" PIPE WITH TEE'S TOCONNECT TO 6" PIPES(SEE SHEET DR-2) 4-6" PERFORATED LEACHATE PIPESCONNECT TO EXISTING 6" LEACHATE PIPES (SEE SHEET DR-2 AND DETAIL 6/DT-1) LOCATE AND CONNECT 6"PERFORATED LEACHATE PIPEEXISTING 6" LEACHATE PIPE.APPROXIMATE ELEV. OF 4220.20. DEBRIS FENCE(SEE DETAIL 1/DT-6) DEBRIS FENCE(SEE DETAIL 1/DT-6) TIE INTO MESH EXISTING DEBRIS FENCE CLEAR AND GRUB AND REGRADEDITCH (SEE DETAIL 1/DT-4, ANDSHEET CS-1 FOR EXTENT) 18" PIPE (SEE PROFILE ON PR-3) 18" PIPE (SEE PROFILE ON PR-3) 18" PEROFRATED PIPE (SEE PROFILE ON PR-3) CENTER FRENCH DRAIN(SEE PROFILE ON PR-1AND DETAIL 3/DT-2) EXISTING 48" DIA. MANHOLE (13' DEEP)BACKFILL AND ABANDON, REMOVE SECTIONS AS NECESSARY FOR LINERINSTALLATION (SEE NOTE 1). WATER LEVEL OF DITCH/SUMPTO REMAIN BELOW EL: 4208PUMP WATER TO WEST DITCH ASNECESSARY EXISTING GROUNDWATER CONTROLPUMP AND GENERATOR TO BE REMOVED BY LANDFILL/OWNERPRIOR TO CONSTRUCTION START(SEE NOTE 1). NATIVE CLAY DAM TOISOLATE DITCH (TO BEREMOVED BY OWNER) HEADWALL AND SLAB ATLRCS EXTRACTION PIPES(SEE DETAIL 3/DT-3) NOTES:1. AFTER CONSTRUCTION START ALL MODULE 8 GROUNDWATER CONTROL AND DEWATERINGSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL LANDFILL OWNEDDEWATERING PUMPS, GENERATORS, ETC.SHALL BE REMOVED PRIOR TO CONSTRUCTION.CONTRACTOR SHALL PROVIDE ALL EQUIPMENTAND PORTABLE POWER SERVICE FORGROUNDWATER CONTROL.2. INSTALL GAVLVANIZED BAND-TYPE ANIMALGUARD SUCH AS AGRI-DRAIN ORENGINEER-APPROVED EQUAL AT THE END OFALL EXPOSED HDPE DRAIN AND INTAKE PIPES. ROADSIDE SWALE FLSEE DETAIL 2/DT-5 ROADSIDE SWALE FLSEE DETAIL 1/DT-4 LINER ANCHOR TRENCHDIRECTLY BELOW TOP OF BERM.SEE DETAILS 5/DT-1 AND 1/DT-4 LINER ANCHOR TRENCHDIRECTLY BELOW TOP OF BERM.SEE DETAILS 5/DT-1 AND 2/DT-5 SOUTH ROAD(SEE DETAIL 2/DT-5AND PROFILE ON PR-3) MOD 7 LINER TIE-IN(SEE DETAIL 4/DT-1) ENTEND LINER TIE-IN ANDEXCAVATION INTO MOD 7 ASREQUIRED TO MAKE CONNECTIONTO EXISTING LEACHATE PIPE. SEE NOTE 2 SEE NOTE 2 2 2 04 / 2 0 / 2 3 A D D E N D U M # 2 2 2 Revised February 11, 2013 Proposed Subcontractor Form 00 43 36 - 1 DOCUMENT 00 43 36 PROPOSED SUBCONTRACTOR FORM PART 1 GENERAL 1.1 BIDDER A. Name: Address: B. Telephone Number: 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 PART 2 REPORT 2.1 SUBCONTRACTOR AND SUPPLIER REPORT A. Failure of Bidder to specify a Subcontractor for any portion of the Work constitutes an agreement by Bidder that Bidder is fully qualified to perform that portion and that Bidder shall perform that portion. See Instructions to Bidders (Document 00 21 13, paragraph 3.4B for additional information concerning the subcontractors and the nature and extent of any work that must be listed on this form. B. Bidder will be fully responsible to OWNER for the acts and omissions of Subcontrac- tors and Suppliers and of persons either directly or indirectly employed by them, as Bidder is for the acts and omissions of persons employed by Bidder directly. C. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor or Supplier and OWNER. Bidder agrees that each subcontract with Bidder's Subcontractor will disclaim any third party or direct relationship between OWNER and any Subcontractor or Supplier. D. The names and addresses of the Subcontractors and Suppliers who will work under the terms of the Contract Documents and the estimated dollar amount of each subcontract, as appropriate, are set forth in the following tables. Revised February 11, 2013 Proposed Subcontractor Form 00 43 36 - 2 SUBCONTRACTORS Name Nature and Extent of Work to be Subcontracted Amount 1. 2. 3. Total $ ________________ Percent of Total Contract _________% SUPPLIERS Name Nature and Extent of Work to be Subcontracted Amount 1. 2. 3. 4. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. Bidder executes this Subcontractor and Supplier report and declares it to be a supplement to the Bid (Document 00 41 00) and in effect as of _____________________________, 20___ 3.2 BIDDER'S SUBSCRIPTION A. Bidder's signature: B. Please print Bidder's name here: C. Title: END OF DOCUMENT Revised July 7, 2008 Work Under Contract Report 00 43 37 - 1 DOCUMENT 00 43 37 WORK UNDER CONTRACT REPORT PART 1 GENERAL 1.1 BIDDER A. Name: Address: B. Telephone Number: 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 PART 2 REPORT 2.1 STATUS OF WORK UNDER CONTRACT A. The completion and submission to OWNER of the following table by Bidder is required within 7 calendar days after ENGINEER’s request per Article 3.1 of the Instructions to Bidders (Document 00 21 13). OWNER may declare Bidder non-responsive if this report is not submitted on time. B. The successful Bidder is required to notify OWNER in writing of any new contracts awarded before the execution of the Construction Contract. Revised July 7, 2008 Work Under Contract Report 00 43 37 - 2 STATUS OF WORK UNDER CONTRACT Description of Contract And for Whom Performed Date of Award Amount of Contract Contract Completion Date Percent Complete Scheduled Completion Date Dollar Amount Outstanding 1 2 3 4 5 6 7 8 9 Total of Dollar Amount Outstanding $____________________________ CONTRACTOR’s Bid for this Project $____________________________ TOTAL $____________________________ C. Add supplemental sheets if necessary to account for all work under contract. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. Bidder executes this Work Under Contract Report and declares it to be a supplement to the Bid (Document 00 41 00) and in effect as of _____________________________, 20____. 3.2 BIDDER'S SUBSCRIPTION A. Bidder's signature: B. Please print Bidder's name here: C. Title: END OF DOCUMENT Revised July 7, 2008 Bidder Status Report 00 43 38 - 1 DOCUMENT 00 43 38 BIDDER STATUS REPORT PART 1 GENERAL 1.1 BIDDER A. Name: B. Address: C. Telephone number: 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 PART 2 REPORT 2.1 BIDDER STATUS REPORT A. Bidder affirms that the following information is true and correct. 1. Number of employees: ____________________ 2. Bidder's firm is: (check all of the following that are applicable) [___] Independently owned and operated. [___] An affiliate of* [___] A subsidiary of* [___] A division of* [___] A business with gross revenue in excess of $________________________ [___] A business with gross revenue below $ _______________________ * PARENT COMPANY: Name: Address: Telephone Number: ________________________ Facsimile Number: ________________________ Revised July 7, 2008 Bidder Status Report 00 43 38 - 2 PART 3 EXECUTION 3.1 EFFECTIVE DATE A. Bidder executes this status report and declares it to be a supplement to the Bid Form (Document 00 41 00) and in effect as of _________________________, 20 ____. 3.2 BIDDER'S SUBSCRIPTION A. Bidder's Signature: B. Please print Bidder's name here: C. Title: END OF DOCUMENT Revised February, 2019 Qualified Health Insurance Certification Form 00 43 45 - 1 DOCUMENT 00 43 45 QUALIFIED HEALTH INSURANCE CERTIFICATION FORM PART 1 GENERAL 1.1 BIDDER A. Name: B. Address: C. Telephone number: 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 1.3 CERTIFICATION Bidder, on behalf of Bidder and every subcontractor with a subcontract value of $1,000,000 or more at the original execution of the subcontract under Bidder, if any, certifies that the following information is true and correct as of the time of submitting its bid. Bidder and every subcontractor with a subcontract value of $1,000,000 or more at the original execution of the subcontract, if any, provides and will maintain an offer of Qualified Health Insurance Coverage as defined in Salt Lake City Code Section 3.24.115 as described below for the duration of the contract. Yes _____ No ________ INITIAL INITIAL Qualified Health Insurance Coverage as defined in Salt Lake City Code Section 3.24.115 means the same as that term defined in Utah Code, Section 26-40-115, Utah Code Annotated, as amended, or its successor: 1. A health benefit plan and employer contribution level with a combined actuarial value at least actuarially equivalent to the combined actuarial value of the benchmark plan found at http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf, determined by the program under Utah Code Section 26-40-106(1) and a contribution level at which the employer pays at least 50% of the premiums for the employee and the dependents of the employee who reside or work in Utah; or 2. A federally qualified high deductible health plan that, at a minimum: a. Has a deductible that is: i. The lowest deductible permitted for a federally qualified high deductible health plan; or Revised February, 2019 Qualified Health Insurance Certification Form 00 43 45 - 2 ii. A deductible that is higher than the lowest deductible permitted for a deductible qualified high deductible health plan, but includes an employer contribution to a health savings account in a dollar amount at least equal to the dollar amount difference between the lowest deductible permitted for a federally qualified high deductible plan and the deductible for the employer offered federally qualified high deductible plan; b. Has an out-of-pocket maximum that does not exceed three times the amount of the annual deductible; and c. Provides that the employer pays 60% of the premium for the employee and the dependents of the employee who work or reside in Utah. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. Bidder executes this form, a supplement to the Bid Form (Document 00 41 00) and declares it to be true and correct and in effect as of ___________________, 20 ____. Bidder's signature: ___________________________________________________ Bidder's name (Print): ________________________________________________ Title: _______________________________________________________________ END OF DOCUMENT Revised February 1, 2019 Work Environment Certification Form 00 43 46 - 1 DOCUMENT 00 43 46 WORK ENVIRONMENT CERTIFICATION FORM PART 1 GENERAL 1.1 BIDDER A. Name: B. Address: C. Telephone number: 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 1.3 CERTIFICATION A. Bidder, on behalf of Bidder and every subcontractor under Bidder, if any, certifies that the following information is true and correct as of the time of submitting its bid. 1. Bidder and every subcontractor, if any, provides and will maintain the following policies and programs listed below as defined in Salt Lake City Code, Section 3.24.115 for the duration of the contract. a. A drug and alcohol testing policy during the period of the contract. Yes Initial No Initial b. A program to actively recruit and/or employ veterans. Yes Initial No Initial Revised February 1, 2019 Work Environment Certification Form 00 43 46 - 2 c. A job training program. Yes Initial No Initial d. A safety program. Yes Initial No Initial e. A formal policy of non-discrimination consistent with federal, state, and local law. Yes Initial No Initial PART 3 EXECUTION 3.1 EFFECTIVE DATE A. BIDDER executes this form and declares it to be true and correct and in effect as of ___________________, 20 ____. 3.2 BIDDER'S SIGNATURE A. BIDDER’s signature: B. Please print BIDDER’s name here: C. Title: END OF DOCUMENT Revised September 15, 2020 Agreement 00 52 00 - 1 DOCUMENT 00 52 00 AGREEMENT This Agreement is dated as of the date that the City Recorder attests the applicable City signature (which date shall be the recordation date, and is between Salt Lake City Corporation, a Utah municipal corporation, 349 South 200 East, Suite 100, P.O. Box 145506, Salt Lake City, Utah 84114-5506 (OWNER or City) and the following entity (CONTRACTOR) Name: Address: Telephone number: Facsimile number: For valuable consideration, the receipt of which the parties acknowledge, OWNER and CONTRACTOR agree to the following. PART 1 GENERAL 1.1 DEFINITIONS A. Words used in this Agreement, in any Qualified Health Insurance Supplemental Agreement (Document 00 54 16), in any Value Program Supplemental Agreement (Document 00 54 15), and in any Supplemental Agreement (00 54 00) related hereto that are defined in Document 00 72 00 in the current edition of the Manual of Standard Specifications published by the Utah Chapter of the American Public Works Association (APWA) shall have meaning as defined therein. 1.2 WORK A. CONTRACTOR shall provide the construction and services specified in the Drawing and Specifications in the Construction Contract known as: Name: SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8 Number: LDF20015 B. CONTRACTOR shall comply with its obligations under the Contract Documents. C. The following Contract Documents are all hereby made part of this Agreement to the same extent as if incorporated herein in full: a. Bid Documents b. Project Manual c. The Construction Drawings Revised September 15, 2020 Agreement 00 52 00 - 2 d. Federal Provisions (CDBG) – As Applicable (Documents 00 43 42, 00 43 43, 00 43 44, 00 73 12 and 00 73 46) e. 2017 APWA Manual of Standard Specifications f. 2017 APWA Manual of Standard Plans g. Modifications to the General Conditions (Document 00 73 10) h. Supplemental Agreement(s) – (Documents 00 54 00, 00 54 15, 00 54 16) i. The following enumerated addenda: _____ 1.3 ENGINEER A. John M. Coyle, P.E. is OWNER’s representative and agent who has the rights, authority, and duties assigned to ENGINEER in the Contract Documents. 1.4 ASSIGNMENT NOT BINDING WITHOUT WRITTEN CONSENT A. No assignment of any right or interest in the Construction Contract shall be made without written consent of OWNER and CONTRACTOR. No assignment will release or discharge OWNER or CONTRACTOR from any duty or responsibility under the Construction Contract unless specifically stated to the contrary in any written consent to an assignment. B. CONTRACTOR shall make no assignment of money that is due without OWNER's written consent (except to the extent that the effect of this restriction may be limited by Law or Regulation). 1.5 BINDING TERMS A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Construction Contract. 1.6 REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY OFFICERS AND EMPLOYEES AND FORMER CITY OFFICERS AND EMPLOYEES A. CONTRACTOR represents that it has not: 1. Provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or his or her relative or business entity. 2. Retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the propose of securing business. 3. Knowingly breached any of the ethical standards set forth in City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code; or 4. Knowingly influenced, and hereby promises that it will not knowingly influence, a City officer or employee or former City officer or employee to breach any of the ethical standards set forth in City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code. Revised September 15, 2020 Agreement 00 52 00 - 3 PART 2 TIME AND MONEY CONSIDERATIONS 2.1 CONTRACT PRICE A. The Contract Price includes the cost of the Work specified in the Contract Documents, plus the cost of all bonds, insurance, permits, and fees, and all charges, expenses, and assessments of whatever kind or character. B. The Schedules of Prices awarded from the Bid Schedule (Document 00 43 00) are as follows. 1. 2. 3. 4. C. An Agreement Supplement (Document 00 54 00) [ ____ ] is, [ ____ ] is not attached to this Agreement. D. A Qualified Health Insurance Supplemental Agreement (Document 00 54 16) [ __ ] is, [ ___ ] is not attached to this Agreement. E. A Value Program Supplemental Agreement (Document 00 54 15) [ ] is [ ] is not attached to this Agreement. F. Based upon the above-awarded schedules and the Agreement Supplement (if any), the Contract Price awarded is: dollars and cents ($ ). 2.2 CONTRACT TIME A. Contract Time shall: 1. Terminate at mid-night of the 27th day of September, 2024. B. Any time specified in work sequences in the Summary of Work (Section 01 11 00) shall be a part of the Contract Time. 2.3 PUNCH LIST TIME A. CONTRACTOR shall complete all Work within 15 days after CONTRACTOR receives ENGINEER's Final Inspection Punch List unless ENGINEER grants additional time in writing or an exception has been specified in the Contract Documents. B. Permitting CONTRACTOR to continue and finish the Work or any part of the Work after the time fixed for its completion, or after the date to which the time for completion may have been extended, whether or not a new completion date is Revised September 15, 2020 Agreement 00 52 00 - 4 established, shall in no way operate as a waiver on the part of OWNER of any of OWNER's rights. 2.4 LIQUIDATED DAMAGES A. CONTRACTOR agrees that OWNER will suffer damage or financial loss if the Work is not completed within the Contract Time, if sequenced work is not completed on time, or if public services are interrupted. CONTRACTOR and OWNER agree that the exact amount of damage or loss is difficult to determine. B. OWNER shall be entitled to deduct and retain liquidated damages out of any money that may be due or become due CONTRACTOR. To the extent liquidated damages exceed any amounts due CONTRACTOR, CONTRACTOR shall be liable for such amounts and shall return such amounts to OWNER. C. Instead of requiring proof of damage or specific financial loss, CONTRACTOR shall pay the following sums to OWNER as liquidated damages and not as a penalty. Such liquidated damages shall relate only to the additional administrative costs and expenses incurred by OWNER and shall not prevent OWNER from pursuing other remedies or collecting actual damages for damage or loss other than administrative costs and expenses. 1. Late Completion: One Thousand Dollars And Zero cents ($ 1000.00) for each day or part thereof that expires after the Contract Time until the Work is Substantially Complete as provided in Article 14.5 of the General Conditions (Document 00 72 00). 2. Late Punch List Time Completion: 50 percent of the amount specified for Late Contract Time Completion for each day or part thereof that the Work remains incomplete after the Punch List Time. The Punch List shall be considered received by CONTRACTOR on the day it is transmitted by facsimile or hand delivery or the day it is received by registered or certified mail. 3. Work Sequence Completion: If a Work sequence is specified, then for each day or part thereof that exceeds the specified time and until ENGINEER determines that such Work sequence is Substantially Complete, CONTRACTOR shall pay the following sums to OWNER. a. Work Sequence 1: Failure to construct and the south ditch and west, center, east and north French drains prior to October 6, 2023. One thousand dollars and zero cents ($1,000.00) per day. b. Work Sequence 2: dollars and cents ($ ) per day. c. Work Sequence 3: dollars and cents ($ ) per day. d. Work Sequence 4: dollars Revised September 15, 2020 Agreement 00 52 00 - 5 and cents ($ ) per day. e. Work Sequence 5: dollars and cents ($ ) per day. 4. Survey Monuments: $1,000.00 if a land survey monument is disturbed or moved and ENGINEER's surveyor has not referenced the survey monument for resetting. 5. Interruption of Public Services: No interruption of public services shall be caused by CONTRACTOR, its agents, or employees, without ENGINEER’s prior written approval. 2.5 RETAINAGE A. Retainage is at OWNER's Option: OWNER may, in its sole discretion, retain and withhold up to five percent of any payment due to CONTRACTOR under the Construction Contract, but the total retention may not exceed five percent of the total Contract Price. If, in ENGINEER's opinion, the Work is proceeding in accordance with CONTRACTOR's approved progress schedule, and all progress schedule submittals are current and up to date, and all required payrolls, Shop Drawings, and miscellaneous submittals are current and up to date, OWNER may choose not to withhold retainage. 1. Payments: At any time after 50 percent of the Work has been completed and if $50,000 or more has been retained, OWNER may make any of the remaining progress payments in full if, in OWNER's sole discretion, the Work is progressing satisfactorily. While CONTRACTOR is carrying on the Work, OWNER may pay monthly the balance not retained as aforesaid, after deducting all previous payments and all sums to be kept or retained under the provisions of the Construction Contract. No such payment shall be required to be made when, in the judgment of ENGINEER, the Work is not proceeding in accordance with the Contract Documents or when in ENGINEER's judgment the total value of the Work done since the last estimate amounts to less than $300. No such payment shall be construed to be an acceptance of any defective or improper Work or materials. 2. Reducing the Retainage: As the Work nears completion and solely at ENGINEER's discretion, OWNER may reduce the retainage to an amount more in line with the Work actually remaining. B. Interest: Any money retained by OWNER shall be placed in an interest-bearing account held by OWNER as of the date such money would have otherwise been payable. The interest accrued thereon shall be for the benefit of CONTRACTOR. C. Release of Retainage and Interest: Any retained moneys and any accrued interest thereon shall be released to CONTRACTOR pursuant to a billing statement from CONTRACTOR within 45 days after the later of: (1) the date that OWNER receives the billing statement from CONTRACTOR; (2) the date that a certificate of occupancy or final acceptance notice is issued to CONTRACTOR or OWNER; (3) the date that Revised September 15, 2020 Agreement 00 52 00 - 6 OWNER (or other authorized building inspector) does not issue a certificate of occupancy but permits partial or complete occupancy of a newly constructed or remodeled building at the Project; or (4) the date that CONTRACTOR accepts the final pay quantities. D. Other Retainage: Notwithstanding paragraph 2.5A: (1) if CONTRACTOR is in default or breach of the terms and conditions of the Construction Contract, OWNER may withhold from payment for as long as reasonably necessary an amount necessary to cure the breach or default of CONTRACTOR; or (2) if the Project or a portion of the Project has been substantially completed, OWNER may retain until completion up to twice the fair market value of the Work of CONTRACTOR that has not been completed in accordance with the Construction Contract. 2.6 PAYMENT PROCEDURES A. Progress Payments: CONTRACTOR shall submit Applications for Payment in accordance with Part 14 of the General Conditions (Document 00 72 00). Payment shall not become due or payable for any contract item not provided or installed by CONTRACTOR. As work is performed, OWNER shall pay money due to CONTRACTOR. 1. Withholding Payment: OWNER reserves the right to withhold payment from CONTRACTOR for non-compliance with any provision of the Contract Documents. 2. Price Adjustments: OWNER will consider making partial payment to CONTRACTOR for certain non-conforming work in advance of any negotiated settlement reached between CONTRACTOR and OWNER, provided CONTRACTOR requests in writing that this be done. CONTRACTOR agrees that any such payments made by OWNER are "payments in advance" and that any money that becomes due when the final settlement is negotiated will not constitute payments "withheld" or "retained" under State law. B. Final Payment: After completion of all Work and Punch List items, OWNER shall pay the Contract Price due after deducting all previous payments, unit price quantity adjustments, penalties, liquidated damages, and other amounts to be retained. All prior progress payments shall be subject to correction in the final payment. The final payment shall not be due and payable until 30 days after approval of the request for final payment by OWNER's finance department. 1. Submittal: Final payment shall not be made until CONTRACTOR has delivered and ENGINEER has accepted all submittals specified in Article 14.8 of the General Conditions (Document 00 72 00). 2. OWNER Released From Claims: The payment and acceptance of the final Contract Price due and the adjustment and payment for any Work done in accordance with any alterations of the same shall release OWNER from any and all claims of CONTRACTOR on account of Work performed under the Contract Documents or any Modification thereof, except for those claims specifically agreed to by OWNER as reserved and unresolved. Revised September 15, 2020 Agreement 00 52 00 - 7 2.7 EXTRA WORK A. No money will be paid to CONTRACTOR for any additions, deletions, or revisions in the Work as stipulated in Article 10.1 of the General Conditions (Document 00 72 00), unless a contract Modification for such has been made in writing and executed by OWNER and CONTRACTOR. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. OWNER and CONTRACTOR executed this Agreement and declared it in effect as of the day and year first written above. 3.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGEMENT A. Name of organization: B. Type of organization: (Corporation, partnership, limited liability company, individual, etc.) C. CONTRACTOR's Utah license number: D. CONTRACTOR's signature: E. Please print name here: F. Title: G. Business Entity Acknowledgement: STATE OF __________ ) : ss. COUNTY OF __________ ) The foregoing instrument was acknowledged before me this _____ day of Revised September 15, 2020 Agreement 00 52 00 - 8 ______________, 20___, by _______________________________, the [Name of signer] __________________ of ______________________________, a _____________ [Title of signer] [Name of entity] . [State where organized and type of entity] ____________________________________ NOTARY PUBLIC Residing at My Commission Expires: Notary’s Seal _____________________ Revised September 15, 2020 Agreement 00 52 00 - 9 H. Individual Acknowledgement: STATE OF UTAH ) : ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 20 by , an individual. Notary’s signature Residing at My commission expires: Notary’s seal I. Signature Authority: At the request of OWNER, evidence satisfactory to OWNER shall be submitted that shows that the person executing this Agreement has the required authority to execute this Agreement. For a corporation such evidence will be in the bylaws or a resolution of the board of directors. For a limited liability company such evidence will be in the operating agreement. 3.3 OWNER'S SUBSCRIPTION AND ATTESTATION A. Approval as to form: (OWNER's attorney) B. Approval as to budget: (OWNER's financial officer) C. OWNER's signature: D. Name and Title: E. Attest: (Signature of City recorder or City recorder designee) END OF DOCUMENT February 11, 2013 Qualified Health Insurance Supplemental Agreement 00 54 16 - 1 DOCUMENT 00 54 16 QUALIFIED HEALTH INSURANCE SUPPLEMENTAL AGREEMENT PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Changes negotiated between Bidder / Contractor and OWNER that will be incorporated into the Construction Contract by reference. 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 1.3 PRACTICES TO BE MAINTAINED A. As part of its bid, CONTRACTOR certified to OWNER that CONTRACTOR and all its subcontractors provided Qualified Health Insurance Coverage, as defined in Section 3.24.115 of the Salt Lake City Code and as described below, for their respective full time and part time employees. CONTRACTOR and Subcontractor shall maintain such Qualified Health Insurance Coverage for the entire term of this Contract, including any extensions or renewals. 1. A health benefit plan (not including dental coverage) and employer contribution level with a combined actuarial value at least actuarially equivalent to the combined actuarial value of the benchmark plan determined by the Children’s Health Insurance Program under Utah Code Section 26-40-106(2)(a), and a contribution level of 50% of the premiums for the employee and the dependents of the employee who reside or work in Utah under which: a. The employer pays at least 50% of the premium for the employee and the dependents of the employee who reside or work in Utah; and b. For purposes of calculating actuarial equivalency under this provision, rather than the benchmark plan’s deductible and the benchmark plan’s out-of-pocket maximum based on income levels: i. The annual deductible is $1,000 per individual and $3,000 per family; and ii. The annual out-of-pocket maximum is $3,000 per individual and $9,000 per family; or 2. A federally qualified high-deductible health plan ( not including dental coverage) that at a minimum: a. Has a deductible that is either: i. The lowest deductible permitted for a federally qualified high-deductible plan; or February 11, 2013 Qualified Health Insurance Supplemental Agreement 00 54 16 - 2 ii. A deductible that is higher than the lowest deductible permitted for a federally qualified high-deductible health plan, but includes an employer contribution to a health savings account in a dollar amount at least equal to the dollar amount difference between the lowest deductible permitted for a federally qualified high-deductible plan and the deductible for an employer offered federally qualified high-deductible plan; a. Has an out-of-pocket maximum that does not exceed three times the amount of the annual deductible; and b. The employer pays 60% of the premium for the employee and the dependents of the employee who work or reside in Utah. 1.4 LEGAL REMEDIES A. CONTRACTOR received the award of the Construction Contract in part because CONTRACTOR certified to OWNER that CONTRACTOR and all its subcontractors had and will maintain Qualified Health Insurance Coverage for their full-time and part time employees that complied with the Qualified Health Insurance Coverage provisions of Salt Lake City Code Section 3.24.115. B. If CONTRACTOR fails to maintain the Qualified Health Insurance Coverage during the term of the Construction Contract, OWNER may pursue any available legal remedies against CONTRACTOR. PART 2 EXECUTION 2.1 EFFECTIVE DATE A. OWNER and CONTRACTOR executed this Agreement and declared it in effect as of the ________ day of _______________________________________, 20 _____. 2.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGEMENT A. Name of organization: B. Type of Organization: (Corporation, partnership, limited liability company, individual, etc.) C. CONTRACTOR's Utah license number: D. CONTRACTOR's signature: E. Please print name here: F. Title: February 11, 2013 Qualified Health Insurance Supplemental Agreement 00 54 16 - 3 G. Business Entity Acknowledgement: STATE OF UTAH ) : ss COUNTY OF SALT LAKE ) The foregoing instrument was acknowledged before me this _____ day of ______________, 20___, by _______________________________, the [Name of signer] __________________ of ______________________________, a _____________ [Title of signer] [Name of entity] . [State where organized and type of entity] ____________________________________ NOTARY PUBLIC Residing at Notary’s Seal My Commission Expires: _____________________ February 11, 2013 Qualified Health Insurance Supplemental Agreement 00 54 16 - 4 H. Individual Acknowledgement: STATE OF UTAH ) : ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of ________________________, 20 , by , an individual. Notary’s signature Residing at My commission expires: Notary’s seal I. Signature Authority: At the request of OWNER, CONTRACTOR shall submit to OWNER evidence satisfactory to OWNER that shows that the person executing this Agreement has the required authority to execute this Agreement. For a corporation such evidence will be in the bylaws or a resolution of the board of directors. For a limited liability company such evidence will be in the operating agreement. 2.3 OWNER'S SUBSCRIPTION AND ATTESTATION A. Approval as to form: (OWNER's attorney) B. Approval as to budget: (OWNER's financial officer) C. OWNER's signature: D. Name and Title: E. Attest: (Signature of City Recorder or City Recorder designee) Revised February 23, 2009 Performance Bond 00 61 13 - 1 DOCUMENT 00 61 13 PERFORMANCE BOND PART 1 GENERAL 1.1 BOND A. Number: ______________________________. B. Amount: dollars ($ ______________). 1.2 SURETY A. Name: B. Address: C. Telephone number: _____________________________. D. Facsimile number: _____________________________. 1.3 CONTRACTOR A. Name: B. Address: C. Telephone number: _____________________________. D. Facsimile number: _____________________________. 1.4 OWNER A. Salt Lake City Corporation, a Utah municipal corporation, 349 South 200 East, Suite 100, Salt Lake City, P.O. Box 145506, Salt Lake City, Utah 84114-5506. 1.5 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 1.6 DEFINED TERMS A. Terms used in this Performance Bond which are defined in Article 1.1 of the General Conditions (Document 00 72 00) will have the meanings indicated in the General Conditions. Revised February 23, 2009 Performance Bond 00 61 13 - 2 PART 2 COVENANTS 2.1 SURETY'S AND CONTRACTOR'S RELATIONSHIP A. The Surety, as surety, and the CONTRACTOR, as principal, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the OWNER, as obligee, for the performance of the Construction Contract. B. If the CONTRACTOR performs the Construction Contract, the Surety and the CONTRACTOR shall have no obligation under this Bond; otherwise this Bond shall remain in full force and effect. 2.2 NOTICE A. Notice to the Surety, the OWNER, or the CONTRACTOR shall be sent by registered or certified mail, postage prepaid, by facsimile, by hand delivery, or by overnight delivery service for which a delivery receipt is required, to the address shown on this Bond. B. Notices sent as provided in Section 2.2A shall be effective on the date on which such notice was sent. C. Notice may be sent by facsimile. Facsimile notice shall be effective on the date of transmission provided that a confirmation establishing the successful transmission of the notice is sent by first-class mail, postage prepaid, along with a copy of the notice transmitted, no later than twenty-four (24) hours after the facsimile notice is transmitted. D. If any notice requires a period of less than seven (7) days for response, the notice shall be sent by facsimile. E. If the time for response to any notice expires on a Saturday, Sunday, or a legal holiday in the State of Utah, the time shall be extended to the next business day. 2.3 PROCEDURE TO INVOKE SURETY'S OBLIGATION A. If the CONTRACTOR fails to perform any of its obligations under the Construction Contract, and such failure to perform has not been waived by the OWNER, the OWNER may notify the CONTRACTOR and the Surety, at their addresses described above, that the CONTRACTOR is in default, and may formally terminate the CONTRACTOR’s right to perform its obligations under the Construction Contract. B. If the Construction Contract is terminated, the OWNER shall pay the unpaid Balance of the Contract Price to the Surety for completion of the Work in accordance with the terms of the Construction Contract or to a contractor selected by the Surety to perform the Work in accordance with the terms of the Construction Contract. 2.4 SURETY'S OPTIONS AT CONTRACTOR TERMINATION A. Surety Completes the Work: The Surety may undertake to perform and complete the Work itself, through its agents, or through independent contractors. Revised February 23, 2009 Performance Bond 00 61 13 - 3 B. Surety Obtains Bids or Proposals: The Surety may obtain bids or negotiated proposals from qualified contractors acceptable to the OWNER for a contract for performance and completion of the Work. 1. Such bids or proposals shall be prepared by the Surety for execution by the OWNER and the completion contractor selected. 2. The Surety shall secure the contract with performance and payment bonds executed by a qualified surety equivalent to this Bond and the payment bond (Document 00 61 14). 3. The Surety shall pay to the OWNER the amount of damages as described in Section 2.6 in excess of the balance of the Contract Price incurred by the OWNER resulting from the CONTRACTOR's default. C. Surety to Pay OWNER: The Surety may determine the amount, not to exceed the amount of this Bond specified in Section 1.1B, for which the Surety believes it may be liable to pay, and tender payment therefore to the OWNER. The OWNER has sole discretion to accept payment. 2.5 PROCEDURE FOR OWNER TO DECLARE SURETY IN DEFAULT A. The OWNER may declare the Surety to be in default pursuant to the following procedures: 1. The OWNER shall issue an additional written notice to the Surety, after declaring the CONTRACTOR in default as provided in Section 2.3, demanding that the Surety perform its obligations under this Bond; and 2. The Surety shall respond to the OWNER within 15 days after receipt of the OWNER's additional notice, either denying the claim or accepting liability and exercising its options under Section 2.4. B. If the OWNER declines to accept the payment tendered by the Surety pursuant to Section 2.4(C), or if the Surety has denied the claim in whole or in part, the OWNER, without further notice, may pursue any remedies available to the OWNER. 2.6 SURETY'S OBLIGATIONS A. After the OWNER has terminated the CONTRACTOR's right to complete its obligations under the Construction Contract, and if the Surety elects to complete the Work under the Construction Contract as provided in Section 2.4, then the responsibilities of the Surety to the OWNER shall not be greater than those of the CONTRACTOR under the Construction Contract, and the responsibilities of the OWNER to the Surety shall not be greater than those of the OWNER under the Construction Contract. B. To the limit of the amount of this Bond, but subject to a commitment by the OWNER to pay all valid and proper payments made to or on behalf of the CONTRACTOR under the Construction Contract, the Surety is obligated, without duplication, for: 1. the responsibilities of the CONTRACTOR for correction of Defective Work and completion of the Work under the Construction Contract; Revised February 23, 2009 Performance Bond 00 61 13 - 4 2. any additional legal, design professional, and delay costs resulting from the CONTRACTOR's default, and resulting from the actions or failure to act of the Surety under Section 2.4; and 3. liquidated damages that are or may become due for any reason. 2.7 UNRELATED OBLIGATIONS OF THE CONTRACTOR A. The Surety shall not be liable to the OWNER for obligations of the CONTRACTOR that are unrelated to the Construction Contract, and the balance of the Contract Price shall not be reduced or changed on account of any such unrelated obligations. B. No right of action shall accrue on this Bond to any person or entity other than the OWNER or its heirs, executors, administrators, or successors. 2.8 SURETY WAIVES NOTICE OF ANY CHANGE A. Surety hereby waives notice of any change, including changes of Contract Time, Contract Price, and scope of Work, to the Construction Contract or to related subcontracts, purchase orders, and other obligations. 2.9 VENUE A. Any suit or action commenced by the OWNER under this Bond shall be in a court of competent jurisdiction in Salt Lake City, Utah. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. The Surety and the CONTRACTOR executed this Bond and declared it to be in effect as of the ______day of _______________________, 20___. 3.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGMENT A. Name of organization: B. Type of organization: (corporation, partnership, limited liability company, individual, etc.) C. CONTRACTOR's signature: D. Print name here: E. Title: Revised February 23, 2009 Performance Bond 00 61 13 - 5 F. Business Entity Acknowledgement: STATE OF UTAH ) : ss. COUNTY OF ) The foregoing performance bond was acknowledged before me this _____ day of ______________, 20___, by _______________________________, the [Name of signer] __________________ of ______________________________, a _____________ [Title of signer] [Name of entity] [State] . [State where organized and type of entity] NOTARY PUBLIC, residing in G. Individual Acknowledgement: STATE OF UTAH ) : ss. COUNTY OF ) The foregoing performance bond was acknowledged before me this day of , 20 by , an individual. NOTARY PUBLIC, residing in Revised February 23, 2009 Performance Bond 00 61 13 - 6 H. Signature Authority: At the request of OWNER, CONTRACTOR shall submit to OWNER evidence satisfactory to OWNER that shows that the person executing this Bond has the required authority to execute this Bond. For a corporation such evidence will be in the bylaws or a resolution of the board of directors. For a limited liability company such evidence will be in the operating agreement. 3.3 SURETY'S SUBSCRIPTION AND ACKNOWLEDGMENT A. Attach evidence of Surety's corporate authority to sign. B. Surety's signature: C. Please print name here: D. Title: E. Acknowledgment: STATE OF ____________ ) : COUNTY OF ) The foregoing performance bond was acknowledged before me this day of , 20 by , the (Name of signee) of , (Title of signee) (Name of entity) a . (State where organized and type of entity) NOTARY PUBLIC, residing in: My Commission Expires: Notary’s Seal: END OF DOCUMENT Revised February 3, 2014 Payment Bond 00 61 14 - 1 DOCUMENT 00 61 14 PAYMENT BOND PART 1 GENERAL 1.1 BOND A. Number: ______________________________. B. Amount: dollars ($ ________________). 1.2 SURETY A. Name: B. Address: C. Telephone number: _____________________________. D. Facsimile number: _____________________________. 1.3 CONTRACTOR A. Name: B. Address: C. Telephone number: _____________________________. D. Facsimile number: _____________________________. 1.4 OWNER A. Salt Lake City Corporation, a Utah municipal corporation, 349 South 200 East, Suite 100, P.O. Box 145506, Salt Lake City Utah 84114-5506. 1.5 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8, JOB No. LDF20015 1.6 DEFINED TERMS A. Terms used in this Payment Bond that are defined in Article 1.1 of the General Conditions (Document 00 72 00) will have the meanings indicated in the General Conditions. Revised February 3, 2014 Payment Bond 00 61 14 - 2 PART 2 COVENANTS 2.1 SURETY's AND CONTRACTOR's RELATIONSHIP A. The Surety as surety, and the CONTRACTOR, as principal, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the OWNER, as obligee, to pay for labor, materials, and equipment furnished for use in the performance of the Construction Contract. B. If the CONTRACTOR makes payment for all labor, materials, and equipment furnished for use in the performance of the Construction Contract, the Surety and the CONTRACTOR shall have no obligation under this Bond; otherwise this Bond shall remain in full force and effect. 2.2 NOTICE A. Notice to the Surety, the OWNER, or the CONTRACTOR shall be sent by registered or certified mail, postage prepaid, by facsimile, by hand delivery, or by overnight delivery service for which a delivery receipt is required, to the address shown on this Bond. B. Notices sent as provided in Section 2.2A shall be effective on the date on which such notice was sent. C. Notice may be sent by facsimile. Facsimile notice shall be effective on the date of transmission provided that a confirmation establishing the successful transmission of the notice is sent by first-class mail, postage prepaid, along with a copy of the notice transmitted, no later than twenty-four (24) hours after the facsimile notice is transmitted. D. If any notice requires a period of less than seven (7) days for response, the notice shall be sent by facsimile. E. If the time for response to any notice expires on a Saturday, Sunday, or a legal holiday in the State of Utah, the time shall be extended to the next business day. 2.3 CONDITIONS OF SURETY'S LIABILITY A. With respect to the OWNER, this Bond shall be null and void if the CONTRACTOR promptly takes the following actions: 1. makes payment, directly or indirectly, for all sums due Claimants; and 2. defends, indemnifies, and saves harmless the OWNER from all claims, demands, Liens, or suits by any person or entity who furnished labor, materials, or equipment for use in the performance of the Work, provided the OWNER has tendered defense of such claims, demands, Liens, or suits to the CONTRACTOR and the Surety. 2.4 PROCEDURE TO INVOKE SURETY'S OBLIGATION Revised February 3, 2014 Payment Bond 00 61 14 - 3 A. Concerning Claimants who have a Direct Contract with the CONTRACTOR: The Surety shall have no obligation to Claimants under this Bond who are employed by or have a direct contract with the CONTRACTOR until such Claimants have given notice to the Surety at the address shown on this Bond and have sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and, with substantial accuracy, stating the amount of the claim. B. Concerning a Claimant who does not have a Direct Contract with the CONTRAC- TOR: The Surety shall have no obligation to a Claimant under this Bond who does not have a direct contract with the CONTRACTOR until such Claimant takes the following actions. 1. The Claimant furnishes written notice to the CONTRACTOR and sends a copy, or notice thereof, to the OWNER, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; 2. The Claimant either receives a rejection in whole or in part from the CONTRACTOR, or does not receive within 15 days after furnishing the above notice any communication from the CONTRACTOR by which the CONTRACTOR indicates that the claim will be paid directly or indirectly; and 3. Not having been paid within the above 15 days, the Claimant sends a written notice to the Surety at the address described on this Bond and sends a copy, or notice thereof, to the OWNER stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the CONTRACTOR. 2.5 SURETY'S OPTION TO SETTLE CLAIMS A. When the Claimant has satisfied the conditions of Section 2.4, the Surety shall promptly and at the Surety's expense take the following actions: 1. Send an answer to the Claimant, with a copy to the OWNER, within 60 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and 2. Pay or arrange for payment of any undisputed amounts. 2.6 SURETY'S OBLIGATION A. The Surety's total obligation under this Bond shall not exceed the amount of this Bond, and the amount of this Bond shall be reduced in the amount of any payments made in good faith by the Surety. 2.7 UNRELATED OBLIGATIONS OF THE CONTRACTOR A. The Surety and the OWNER shall not be liable to Claimants or others for obligations of the CONTRACTOR that are unrelated to the Construction Contract. B. The OWNER shall not be liable for payment of any damages, costs, or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make Revised February 3, 2014 Payment Bond 00 61 14 - 4 payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 2.8 SURETY WAIVES NOTICE OF ANY CHANGE A. Surety hereby waives notice of any change to the Construction Contract including changes of Contract Time, Contract Price, and scope of Work, or to related subcontracts, purchase orders, or other obligations. 2.9 VENUE A. Any suit or action commenced by a Claimant under this Bond shall be in a court of competent jurisdiction in Salt Lake City, Utah. 2.10 COPIES OF THIS BOND A. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the CONTRACTOR or the OWNER shall promptly furnish a copy of this Bond or shall permit a copy to be made. PART 3 EXECUTION 3.1 EFFECTIVE DATE A. The Surety and the CONTRACTOR executed this Bond and declared it to be in effect as of the ______day of _______________________, 20___. 3.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGMENT A. Name of organization: B. Type of organization: (corporation, partnership, limited liability company, individual, etc.) C. CONTRACTOR's signature: D. Please print name here: E. Title: Revised February 3, 2014 Payment Bond 00 61 14 - 5 F. Business Entity Acknowledgement: STATE OF ) : ss. COUNTY OF ) The foregoing payment bond was acknowledged before me this _____ day of ______________, 20___, by _______________________________, the [Name of signer] __________________ of ______________________________, a _____________ [Title of signer] [Name of entity] [State] . [State where organized and type of entity] NOTARY PUBLIC, residing in G. Individual Acknowledgement: STATE OF UTAH ) : ss. COUNTY OF ) The foregoing payment bond was acknowledged before me this day of , 20 by , an individual. NOTARY PUBLIC, residing in My Commission Expires Revised February 3, 2014 Payment Bond 00 61 14 - 6 H. Signature Authority: At the request of OWNER, CONTRACTOR shall submit to OWNER evidence satisfactory to OWNER that shows that the person executing this Bond has the required authority to execute this Bond. For a corporation such evidence will be in the bylaws or a resolution of the board of directors. For a limited liability company such evidence will be in the operating agreement. 3.3 SURETY'S SUBSCRIPTION AND ACKNOWLEDGMENT A. Attach evidence of Surety's corporate authority to sign. B. Surety's signature: C. Print name here: D. Title: E. Acknowledgment: STATE OF UTAH ) : COUNTY OF ) The foregoing payment bond was acknowledged before me this day of , 20 by , the (Name of signee) of , (Title of signee) (Name of entity) a . (State where organized and type of entity) NOTARY PUBLIC, residing in: My Commission Expires: Notary’s Seal: END OF DOCUMENT Rev. Sept 25, 2007 Submittal Transmittal Form 00 62 11 - 1 DOCUMENT 00 62 11 SUBMITTAL TRANSMITTAL FORM PART 1 GENERAL 1.1 SUMMARY A. Form is self-transmittal. Letter of transmittal is not required. B. Submittals requiring expeditious handling must be submitted individually on Submittal Transmittal Form. C. ENGINEER's review of submittals does not release or relieve CONTRACTOR from complying with all requirements of the Contract Documents. 1.2 ENGINEER'S STAMP A. Form of the ENGINEER's stamp is as follows: SUBMITTAL REVIEW [ ] NO EXCEPTIONS TAKEN [ ] REJECTED [ ] MAKE CORRECTIONS NOTED [ ] RESUBMIT [ ] SUBMIT SPECIFIED ITEM [ ] DO NOT RESUBMIT This review is for general conformance with the design concepts of the Work and general compliance with the Contract Documents and does not constitute an approval or variance. Corrections or comments, or the failure to make them, on this review does not relieve the CONTRACTOR from full contract compliance. The CONTRACTOR is responsible for compliance with all contract provisions, dimensions, sizes, capacities, fabrication and construction techniques, installation, coordinating work with others, and performing the Work in a safe and satisfactory manner. Date: ____________ By: ________________________________________ SALT LAKE CITY ENGINEERING B. Meaning of ENGINEER's stamp: 1. No Exceptions Taken: Submittals have been reviewed and no corrections were noted. 2. Make Corrections Noted: Submittals that have only minor discrepancies. Resubmission will not be required unless the stamp is marked "Resubmit". 3. Submit Specified Item: Submittals that are incomplete or require more than minor corrections will be annotated to indicate necessary corrections. Resubmit the part of the submittal showing the corrections. 4. Rejected: Submittals that are fundamentally in error, cover wrong equipment or construction, or require extensive corrections. 5. Resubmit: Submittals that require resubmission. Make corrections required, note any changes by dating the revisions to correspond with the change require date, and resubmit the corrected material. 6. Do Not Resubmit: Submittals that are not necessary to resubmit. SUBMITTAL TRANSMITTAL FORM DATE [ ] NEW SUBMITTAL [ ] RESUBMITTAL Section I REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the CONTRACTOR) TO FROM TRANSMITTAL No. PREVIOUS TRANSMITTAL No. SPECIFICATION SECTION NUMBER (See instructions) CONTRACT TITLE CONTRACT No. SUBMITTAL ITEM No. DESCRIPTION OF ITEM SUBMITTED (Type, size, model number, etc.) SAMPLE OR CERTIFICATE (See instructions) NO. OF COPIES CONTRACT REFERENCE DOCUMENT VARIATION (See instructions) ENGINEER REVIEW CODE (See instructions) SPEC. PARA. No. DRAWING SHEET No. a. b. c. d. e. f. g. h. REMARKS I certify that the above submitted items have been reviewed in detail and are correct and conform with the contract Drawings and specifications except as otherwise noted. _________________________________________________________ NAME AND SIGNATURE OF CONTRACTOR Section II OWNER'S ACTION This section will be completed by the ENGINEER) ENCLOSURES RETURNED (List by Item No.) SIGNATURE OF REVIEWING AGENT DATE FORM 00 62 11.1 (Read Instructions on the reverse side prior to initiating this form) INSTRUCTIONS 1. TRANSMITTAL No: Number each transmittal consecutively in the space entitled “Transmittal No.”. This number will identify each submittal. 1. PREVIOUS TRANSMITTAL No: Mark the box for re-submittal and insert the transmittal number of last submission as well as the new submittal number in the spaces provided. Each re-submittal will become a new transmittal. 2. SPECIFICATION SECTION NUMBER: Cover only one specification section with each transmittal. 3. Column “a”: For each entry on this form, the “SUBMITTAL ITEM No.” will be the same SUBMITTAL ITEM No. indicated on the Submittal Register (Form 01 33 00). 4. Column “c”: When a sample of material or Manufacturer’s Certificate of Compliance is transmitted, indicate “Sample” or “Certificate”. 5. Column “g”: CONTRACTOR will place a check mark in the “Variation” column when a submittal is not in accordance with the plans and specifications – also, a written statement to that effect shall be included in the space provided for “Remarks” or on a separate page. 6. Column “h” For each item reviewed, ENGINEER shall assign action codes as follows: A. No Exceptions Taken. B. Make Corrections Noted. Re-submission not required. C. Submit Specified Item. D. Rejected. E. Re-submit F. Do Not Re-submit. Receipt acknowledged. G. Will be returned by separate correspondence. H. Other (Specify). END OF SECTION Revised January 10, 2005 Certificate of Insurance 00 62 16 - 1 DOCUMENT 00 62 16 CERTIFICATE OF INSURANCE PART 1 GENERAL 1.1 PROCEDURE A. For filing purposes, add Certificates of Insurance to the Contract Documents following this page. END OF DOCUMENT Revised Nov. 27, 2006 Certificate of Substantial Completion 00 65 13 – 1 DOCUMENT 00 65 13 CERTIFICATE OF SUBSTANTIAL COMPLETION PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Certificate of Substantial Completion Form. 1. 2 REFERENCES A. APWA Section 01 78 50 – Closeout Procedures. 1.3 SUBSTANTIAL COMPLETION A. When Work or designated portion thereof is Substantially Complete, a notice per paragraph 1.2A in APWA Section 01 78 50 is to be submitted. B. The attached form also requests final inspection. C. ENGINEER's review of notice does not release or relieve CONTRACTOR from complying with all requirements of the Contract Documents. END OF SECTION Revised Nov. 27, 2006 Certificate of Substantial Completion 00 65 13 – 2 CONTRACTOR'S CERTIFICATE OF SUBSTANTIAL COMPLETION (and request for Final Inspection) DATE ___________________________ PROJECT NAME AND NUMBER PORTION OF WORK COMPLETE CERTIFICATION I certify that I, (name) am an authorized official of (company) working in the capacity of and have been duly authorized by said company to make the following statements. A. As the CONTRACTOR's representative, I do hereby certify by personal knowl- edge that all Work or portion of the Work described above has been performed in every particular in accordance with and conformance to the Contract Documents and that the Work or portion of the Work is ready for Final Inspection. B. It is understood that neither the determination of the ENGINEER that the Work is Substantially Complete, nor the acceptance thereof, shall operate to bar claims against the CONTRACTOR for non-compliance with the Contract Documents. I hereby request the ENGINEER accept the Work as being Substantially Complete and schedule the Final Inspection. _______________________________________________ Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 1 DOCUMENT 00 73 10 MODIFICATIONS TO THE GENERAL CONDITIONS This document changes provisions specified in the General Conditions (Document 00 72 00) in the Manual of Standard Specifications published by the Utah Chapter of the American Public Works Association. Add the following paragraphs to Article 2.2 2.2 COPIES OF DOCUMENTS B. OWNER shall not furnish to CONTRACTOR published Contract Documents that include the current edition of the Manual of Standard Plans and the Manual of Standard Specifications. The CONTRACTOR shall purchase such documents separately. C. Copies of all Contract Documents including the current edition of the Manual of Standard Plans and the Manual of Standard Specifications shall be provided on site by the CONTRACTOR. Modify paragraph 2.5C 2.5 BEFORE STARTING CONSTRUCTION C. Field Office: An on-site field office is not required however, CONTRACTOR shall provide and maintain a telephone in the field during performance of the Work such that ENGINEER may always contact CONTRACTOR for transmittal of Plans and instructions and, for dissemination of project information. Modify Article 5.1 5.1 PERFORMANCE, PAYMENT AND OTHER BONDS A. Before OWNER executes the Agreement, CONTRACTOR shall file with OWNER a good and sufficient Performance Bond (using OWNER’s Document 00 61 13) and a Payment Bond (using OWNER’s Document 00 61 14), each in the sum of not less than 100 percent of the Contract Price. B. The Bonds shall be executed by CONTRACTOR and issued by a company duly and regularly authorized to do a general surety business in the State of Utah and either (i) named in the current U.S. Treasury Department's listing of approved sureties (Department Circular 570) (as amended), or (ii) with a current "A-" rating and a financial size category rating of at least a “VII” or better in A.M. Best Co., Inc.’s Best Insurance Reports, Property and Casualty Edition. C. The Performance Bond shall guarantee the faithful performance of the Construction Contract by CONTRACTOR and the Payment Bond shall guarantee the payment of labor and materials. The Bonds shall inure by their terms to the benefit of OWNER. Neither this nor any other provision requiring a Performance Bond shall be construed to Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 2 create any rights in any third party Claimant as against OWNER for performance of the Work under the Construction Contract. D. If the surety on any Bond furnished by CONTRACTOR is subject to any proceeding under the Bankruptcy Code (Title 11, United States Code) or becomes insolvent or its right to do business is terminated in the State of Utah or it ceases to meet the requirements of this Article, CONTRACTOR shall, within 15 days thereafter, substitute another Bond and surety, both of which must be acceptable to OWNER. Modify Article 5.2 5.2 INSURANCE A. In General: 1. Any insurance coverage required herein that is written on a “claims made” form rather than on an “occurrence” form shall (i) provide full prior acts coverage or have a retroactive date effective before the date of this Agreement, and (ii) be maintained for a period of at least three (3) years following the end of the term of this Agreement or contain a comparable “extended discovery” clause. Evidence of current extended discovery coverage and the purchase options available upon policy termination shall be provided to OWNER. 2. All policies of insurance shall be issued by insurance companies licensed to do business in the state of Utah and either: a. Currently rated A- or better by A.M. Best Company; -OR- b. Listed in the United States Treasury Department’s current Listing of Approved Sureties (Department Circular 570), as amended. 3. CONTRACTOR shall furnish certificates of insurance, acceptable to OWNER, verifying the foregoing matters concurrent with the execution of this Agreement and thereafter as required. 4. In the event any work is subcontracted, CONTRACTOR shall require its subcontractor, at no cost to OWNER, to secure and maintain all minimum insurance coverages required of CONTRACTOR hereunder. If professional liability insurance is required by Paragraph 5.2B below, a subcontractor (or supplier) must provide such insurance only if such subcontractor’s (or supplier’s) product requires the stamp of a professional engineer. 5. All required certificates and policies shall provide that coverage thereunder shall not be canceled or modified without providing, in a manner approved by the City Attorney, 30 days prior written notice to OWNER. B. Required Insurance Policies: CONTRACTOR, at its own cost, shall secure and maintain during the term of this Agreement, including all renewal terms, the following minimum insurance coverage: Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 3 1. Worker's compensation and employer’s liability insurance sufficient to cover all of CONTRACTOR’s employees pursuant to Utah law, unless a waiver of coverage is allowed and acquired pursuant to Utah law. In the event any work is subcontracted, CONTRACTOR shall require its subcontractor(s) similarly to provide worker’s compensation insurance for all of the latter’s employees, unless a waiver of coverage is allowed and acquired pursuant to Utah law. a. OWNER should not be an additional insured for worker’s compensation insurance. 2. Commercial general liability (CGL) insurance with Salt Lake City Corporation as an additional insured on a primary and non-contributory basis in comparison to all other insurance including OWNER’s own policy or policies of insurance, in the minimum amount of $1,000,000 per occurrence with a $2,000,000 general aggregate and $2,000,000 products completed operations aggregate. These limits can be covered either under a CGL insurance policy alone, or a combination of a CGL insurance policy and an umbrella insurance policy and/or a CGL insurance policy and an excess insurance policy. The policy shall protect OWNER, CONTRACTOR, and any subcontractor from claims for damages for personal injury, including accidental death, and from claims for property damage that may arise from Contractor’s operations under this Agreement, whether performed by CONTRACTOR itself, any subcontractor, or anyone directly or indirectly employed by either of them. Such insurance shall provide coverage for premises operations, acts of independent contractors, products and completed operations. 3. Commercial automobile liability insurance that provides coverage for owned, hired, and non-owned automobiles used in connection with this Agreement in the minimum amount of a combined single limit of $1,000,000 or $500,000 liability per person, $1,000,000 liability per accident, and $250,000 property damage. These limits can be reached either with a commercial automobile liability insurance policy alone, or with a combination of a commercial automobile liability insurance policy and an umbrella insurance policy and/or a commercial automobile liability insurance policy and an excess insurance policy. If the policy only covers certain vehicles or types of vehicles, such as scheduled autos or only hired and non-owned autos, CONTRACTOR shall use only those vehicles that are covered by its policy in connection with any work performed under this Agreement. 4. Builder's Risk: The Project involves construction that does not require the CONTRACTOR to provide builder's risk insurance. C. Government of Salt Lake County Additional Insured: Each policy of insurance provided in the Contract Documents shall also protect the government of Salt Lake County during the life of the Construction Contract and at all time thereafter. Add the following paragraphs to Article 6.7 6.7 PERMITS Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 4 H. Salt Lake City Permits: In addition to any other permits required for the Work, CONTRACTOR shall obtain permits from Salt Lake City Corporation for Work on the Project. 1. OWNER-Paid Permits: CONTRACTOR shall be responsible for submitting plans, scheduling inspections and paying all costs incidental to such actions as required for any permit required by Salt Lake City Corporation. Except for construction water meter fees, the fees for these permits shall be paid by OWNER and shall not be included in CONTRACTOR's bid. The following list is not exclusive and does not relieve CONTRACTOR of the responsibility of obtaining all permits. a. From Salt Lake City Community & Neighborhoods Department, Division of Transportation, 349 South 200 East, Suite 450, Salt Lake City, Utah 84111. Phone 801-535-6630 1. Parking meter bagging and removal permit 2. Street closure permit 3. Traffic control permit 4. Any other applicable Division of Transportation imposed fee b. From Salt Lake City Department of Public Utilities, 1530 South West Temple Street, Salt Lake City, Utah 84115 1. UPDES storm drain water discharge permit for sites 1 to 5 acres 2. SLC SWPPP permit 3. All applicable water, fire, sewer and storm drainage impact and connection fees 4. ¾ inch meter permit for new and existing drinking fountain c. From Salt Lake City Building Services and Licensing, 451 South State Street, Salt Lake City, Utah 84111. Phone 801-535-7751 1. Building, plumbing, mechanical, electrical permit (as applicable) d. The CONTRACTOR or subcontractor (whichever is doing work in the public way) shall obtain from Salt Lake City Corporation Department of Community and Neighborhoods, Engineering Division, 349 South 200 East, Suite 100, Salt Lake City, Utah 84111a permit to work in the Public Way. To obtain such permit the CONTRACTOR or subcontractor, as the case may be, shall provide or have on file a $15,000.00 bond to work in the Public Way and applicable insurance. The insurance required is the same as that required for this contract. 2. CONTRACTOR-Paid Permits: The fees for permits not paid for by OWNER shall be included in CONTRACTOR's Bid. The following list is not exclusive and does not relieve CONTRACTOR of the responsibility of obtaining all permits: a. Construction Water Meter: If water for construction is required to be taken from fire hydrants or a new water meter, CONTRACTOR shall be solely responsible for obtaining and paying for such permits and water usage to Salt Lake City Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 5 Corporation Department of Public Utilities permit office, 1530 South West Temple Street, Salt Lake City, Utah. 1. Hydrant meters require a $1,000.00 deposit ($100.00, non-refundable). A refund will be returned to CONTRACTOR by the Department of Public Utilities if the meter and equipment is returned undamaged. I. Other Permits: All other permit fees required by Salt Lake County, the State of Utah, the United States of America, and any of their agencies, or by any private utility companies, shall be paid for and obtained by CONTRACTOR and included in CONTRACTOR's Bid. The following list is not exclusive and does not relieve CONTRACTOR of the responsibility of obtaining all permits: 1. UDOT Region 2: Digging permit in a UDOT roadway right of way. 2. Private Property Owner Permit: Written permission to use private water. 3. Private Property Owner Permit: Written permission to store product, equipment, materials, and supplies outside of the Work site boundaries. 4. General Permit for Storm Water Discharge (Sites greater than 1 acres): From the State of Utah, Department of Environmental Quality, Division of Water Quality, 288 North 1460 West Street. P.O. Box 144870, Salt Lake City, Utah 84114-4879. Fee varies; contact the State for a quote. 5. Flood Control Permit: From Salt Lake County, Department of Public Works, Division of Flood Control, 2001 South State Street, Salt Lake City, Utah. 6. Monument Permit: From Salt Lake County Surveyor, 2001 South State Street, Salt Lake City, Utah. Fee will be at least $100.00 per monument and is based upon time of performance. Modify paragraph 6.17A and add paragraph 6.17E 6.17 INDEMNIFICATION A. Indemnification of OWNER: Subject to paragraph 6.17E below, CONTRACTOR shall indemnify, save harmless, and defend OWNER, its officers and employees, from and against all losses, claims, demands, actions, damages, costs, charges, and causes of action of every kind or character, including attorney's fees, arising out of CONTRACTOR's wrongful, reckless, or negligent performance hereunder. CONTRACTOR’s duty to defend OWNER shall exist regardless of whether OWNER or CONTRACTOR may ultimately be found to be liable for anyone’s negligence or other conduct. If OWNER's tender of defense, based upon this indemnity provision, is rejected by CONTRACTOR, and CONTRACTOR is later found by a court of competent jurisdiction to have been required to indemnify OWNER, then in addition to any other remedies OWNER may have, CONTRACTOR shall pay OWNER's reasonable costs, expenses, and attorney's fees incurred in proving such indemnification, defending itself, or enforcing this provision. Nothing herein shall be construed to Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 6 require CONTRACTOR to indemnify the indemnitee against the indemnitee's own negligence. E. Nothing herein shall be construed to require CONTRACTOR to indemnify OWNER, ENGINEER, or their agents or employees for any damages that are caused by or result from the fault of OWNER, ENGINEER, or their agents or employees. Modify paragraph 13.6A 13.6 CORRECTION OR REMOVAL OF DEFECTIVE WORK BY CONTRACTOR A. In addition to CONTRACTOR’S obligations under Article 6.16, if required by ENGINEER, CONTRACTOR shall promptly, as directed, either correct all Defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by ENGINEER, remove it from the site and replace it with non-Defective Work. No rejected material, the defects of which have been subsequently corrected, shall be used in the Work unless approval in writing has been given by ENGINEER. CONTRACTOR shall bear all direct, indirect, and consequential costs of such correction or removal (including but not limited to fees and charges of OWNER, engineers, architects, and other professionals) made necessary thereby. Modify paragraph 13.7A 13.7 CORRECTION PERIOD A. In addition to CONTRACTOR’S obligations under Article 6.16, if any portion of the Work is found to be defective within one year after the date of Substantial Completion, CONTRACTOR shall correct it or replace it with non-Defective Work. The one year correction period may be superseded by such longer period of time as prescribed in the Contract Documents or by special guarantee terms required by the Contract Documents. Add the following paragraph to Article 13.7 13.7 CORRECTION PERIOD E. Nothing contained in this Article 13.7 shall be construed to establish a period of limitation with respect to other obligations CONTRACTOR has under the Contract Documents, including Article 6.16. Establishment of the one year period for correction of Work as described in this Article 13.7 relates only to the specific obligation of CONTRACTOR to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be enforced, nor the time within which proceedings may be commenced to establish CONTRACTOR’S liability with respect to CONTRACTOR’S obligations other than specifically to correct the Work. Such times include the applicable statute of limitations or statute of repose, which may be longer than one year. Add the following Articles to Part 16 PART 16 DISPUTE RESOLUTION 16.2. GENERAL Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 7 A. Unless a decision is held by an appropriate court of law to have been procured by fraud or to be arbitrary and capricious or so grossly erroneous as necessarily to imply bad faith, any factual decision made under this dispute resolution procedure shall be final and binding in any suit or action arising under the Construction Contract, including any actions by CONTRACTOR or others against OWNER or any of OWNER's agents, consultants, or employees. B. Compliance by CONTRACTOR with provisions of this Part shall be a condition precedent to any legal action by CONTRACTOR or any of CONTRACTOR's Subcontractors and Suppliers against OWNER or any of OWNER's agents, consultants, or employees. C. The provisions of this Part shall not preclude or limit judicial review of issues of law. D. Ambiguities in or between Contract Documents shall be construed in favor of the OWNER. 16.3 DISPUTES NOT RELATED TO THE GUARANTEE OF THE WORK A. Any dispute arising under the Construction Contract concerning a question of fact, not related to the guarantee of the Work (Article 13.1 of the General Conditions (Document 00 72 00), that is not disposed of by contract Modification shall be decided pursuant to the following procedure. 1. Any decision by ENGINEER interpreting the requirements of the Contract Documents may be appealed in writing to the ENGINEER. The ENGINEER's decision, regarding that appeal shall be reduced to writing and a copy shall be mailed or otherwise furnished to CONTRACTOR within 10 days. The decision of ENGINEER shall be final and conclusive unless, within 30 days after the date of receipt of such copy, CONTRACTOR mails or otherwise furnishes to ENGINEER a written appeal to the CITY ENGINEER. 2. Within 15 days from the receipt of any such appeal, the CITY ENGINEER shall issue a decision in writing and mail or otherwise furnish a copy thereof to CONTRACTOR. The decision of the CITY ENGINEER shall be final and conclusive unless, within 15 days from the date of receipt of such decision, the CONTRACTOR mails or otherwise furnishes to the CITY ENGINEER a written appeal to OWNER’s Committee. 3. The Dispute Committee shall consist of three persons selected by the CITY ENGINEER who are knowledgeable about the Work. 4. OWNER and CONTRACTOR shall each have the opportunity to fully present its case to the Dispute Committee before the Dispute Committee’s deliberation. The Dispute Committee may request any other materials or written memoranda necessary to consider the issues, and may schedule other proceedings as necessary. 5. The decision of the Dispute Committee shall be rendered in writing within 15 days after the Dispute Committee’s final hearing of the issue and receipt of any supplemental material requested by the Dispute Committee. The decision shall be mailed or otherwise delivered to CONTRACTOR. Modifications to the General Conditions Revised August 14, 2020 00 73 10 - 8 6. The decision of the Dispute Committee shall be the final binding interpretation of the facts that are the subject of the appeal. 16.4 DISPUTES RELATED TO THE GUARANTEE A. Except as otherwise provided by contract Modification, any dispute concerning a question of fact involving or arising out of the guarantee required by the Contract Documents (Article 13.1 of the General Conditions (Document 00 72 00), that is not disposed of by contract Modification, shall be decided pursuant to the provisions of Paragraph 16.3 above, except that the initial factual decision shall be issued in writing by the ENGINEER, together with the department head. B. Any appeal therefrom shall be made within 15 days directly to the Dispute Committee where such disputes shall be governed by provisions in sub-paragraphs 3 to 6 in paragraph 16.3A above. 16.5 WORK DURING APPEAL A. Notwithstanding the pendency of any protest or appeal provided above, CONTRACTOR shall, if so ordered by ENGINEER, proceed with the Work under the Contract Documents according to ENGINEER's direction and according to the decision on any appeal. The existence of a claim or protest shall not excuse CONTRACTOR from the requirements of the Contract Documents, including, but not limited to, the Contract Time. 16.6 APPEALS OF TERMINATION OR SUSPENSION A. Any decision of OWNER to terminate or suspend the Work shall not be subject to the provisions of this Part. END OF DOCUMENT Revised Sept. 25, 2007 Modifications to APWA Standard Plans 00 73 15 - 1 SECTION 00 73 15 MODIFICATIONS TO APWA STANDARD PLANS (Supplementary Conditions) PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. This Document specifies changes to the Standard Plans published by the Utah Chapter of the American Public Works Association. Not all of these modifications will apply to the Work. CONTRACTOR is to apply the appropriate modification to the appropriate Standard Plan. 1.2 CHANGES A. Modify the standard plans as follows. Table 1 – WATER APWA Standard Plan No. Description Modification 381 Trench backfill Refer to Salt Lake City Public Utility (SLCPU) - Standard Practice #1. Maximum depth for magnetic marking tape is 18 inches. 382 Pipe zone backfill Refer to SLCPU – Standard Practice #1 and notes given in Table 3 – Storm Drain. 502 27” frame & cover Use smooth surface “waffle” pattern class 35 lid. 511 Fire hydrant • Move the auxiliary valve to connect to the fitting at the fire hydrant. • If the pipe connecting to the main is greater than 16 feet, a second shutoff valve is required at the main. 521 3/4” & 1” meter No material is to be backfilled inside meter box. 522-529 Various sized meters See SLCPU standard drawings for Contractor checklist. 543 Not used 551 3/4” & 1” service taps • Depth of service line is 48” minimum. • Tap will be at 10 or 2 o’clock position. 552 1-1/2” & 2” service taps • B - 2-piece cast iron valve box with lid is required. • H – Type K–soft copper. 572 Detector check valve • Fitting D will be MJ x flange • The extra gate valve located in the vault on the same side as the main supply pipeline is not required. 574 Cover collar Concrete supports required under traffic box. 575 Air release valve Not used – refer to SLCPU drawing. Use PVC piping above air released valve Table 2 - SANITARY SEWER Standard Plan No. Description Modification 381 Trench backfill Refer to SLCPU - Standard Practice #1. 382 Pipe zone backfill Refer to SLCPU - Standard Practice #1 and notes given in Table 3 – Storm Drain. 402 30” frame & cover • Use smooth surface “waffle” pattern class 35 lid. • Low profile (1”) rings are not allowed. 411 Manhole • 5-foot minimum manhole diameter required. Revised Sept. 25, 2007 Modifications to APWA Standard Plans 00 73 15 - 2 • Eccentric manhole cones are not allowed. • Lateral connections directly to the manhole are not allowed. • Ramneck manhole section joint sealant and concrete grouting of manhole section joints is required. • On precast manhole bases provide base with neoprene or rubber coupling system and stainless steel clamps 412 Invert cover • 2”x4” bracing only required at manholes with pipe entering above the mainline flowline. • Normal manholes will have the invert cover supported by the manhole “shelf”. 431 Sewer lateral connection • Prior Public Utilities approval and permit required for all lateral installations. • Salt Lake City will provide and install wye. • 24-hour notice required. • Stainless steel straps required. 432 Sewer lateral relocation • Note 2- Salt Lake City will provide & install wye. • Material under bottom of obstruction will be loosely compacted ¾”minus well graded granular material or sand. Flowable fill not allowed. 433 Pipe drop Alternate 2- not used unless approved in writing by Public Utilities Chief Engineer. Table 3 - STORM DRAIN Standard Plan No. Description Modification 302 30” frame & cover Use smooth surface “waffle” pattern class 35 lid. 303 44” frame & cover Use smooth surface “waffle” pattern class 35 lid. 310 48” grate & frame Not used 315 Catch basin Note: CONTRACTOR to make back wall of box behind curb face opening as detailed. 316 Catch basin Not used 320 Debris grate inlet Not used 321 Automatic flap gate Modify to include a clean-out box and lid over the flap gate. 361 Concrete grade rings minimum height 6-1/2” 381 Trench backfill Refer to SLCPU - Standard Practice #1. 382 Pipe zone backfill Refer to SLCPU - Standard Practice #1 • Pipe zone material will be ¾” minus material. An exception may be granted for concrete pipe being installed below the water table. In these cases, the fill material below the pipe springline may be 2 inches minus sewer rock when approved in advance by the Chief Engineer. Sewer rock is not allowed with PVC and HDPE-N12 pipe. • In all cases, backfill in the pipe zone above springline of pipe will be Grade ¾” minus material . • The thickness of Type B – haunch material will be 6 inches below the outside diameter of the pipe. PART 2 PRODUCT Not Used PART 3 EXECUTION Not Used END OF DOCUMENT Revised March 3, 2010 Requirements of the Department of Public Utilities 00 73 50 - 1 DOCUMENT 00 73 50 REQUIREMENTS OF THE DEPARTMENT OF PUBLIC UTILITIES (Supplementary Conditions) PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Procedures for water line and sewer line construction. 1.2 RELATED WORK A. Salt Lake City’s Department of Public Utilities has published a document entitled Standard Practices for Salt Lake City Public Utilities (January 5, 2010 edition). The document is available from 1530 South West Temple Street, Salt Lake City, Utah. In that publication there is a list of standard practices that apply to contractors. 1. The standard practices are as follows a. Trench Backfill Requirements (No. 1). b. Jordan and Salt Lake Canal Standards (No. 3). c. Flushing and De-chlorination (No. 4). d. Cable Installations (No. 8). e. Water Service Kills (No. 9). f. Commissioning Waterlines (No. 12). g. Commissioning Large Service and Fire Lines (No. 13). h. Hydrostatic Testing of Water Lines (No. 14). i. Tree Pruning and Root Cutting (No. 15). j. Raising Manholes, Cleanout and Water Valve Boxes (No. 16). k. Standard Fire Hydrant Colors (No. 17). l. Disinfection large Water Connections (No. 18). m. Waterline Installation in Hydrocarbon Contaminated Areas (No. 19). 2. Use the appropriate standard practice when doing work on sewer, water, and storm drain facilities that are owned by the City’s Department of Public Utilities. 1.3 SUBMITTALS A. Prior to final payment, submit. 1. All Contract Documents as required by Article 6.11 of Document 00 72 00 in the Standard Specifications. 2. Water Service Work Performance Form. Use form at the end of this document. Revised March 3, 2010 Requirements of the Department of Public Utilities 00 73 50 - 2 PART 2 CHANGES TO THE APWA SPECIFICATIONS 2.1 SECTION 33 08 00 - COMMISSIONING OF WATER UTILITIES. A. Add a new paragraph to Article 1.6 1.6 REFERENCES A. AWWA C600, C602, and C606. 2.2 SECTION 33 08 00 – COMMISSIONING OF WATER UTILITIES. A. Replace Article 3.3 with the following. 3.3 PRESSURE TEST AND DISINFECTION A. Prevent contamination from entering the line during storage, construction, or repairs. For new construction, keep a plug on the end of the pipe except for installing the next section of pipe. B. Disinfect the line by placing granular or tablet chlorine (10 to 25 mg/l concentration for 24 hours) in the line during installation and filling the line with water. C. De-chlorinate the line or dispose of chlorinated water in an acceptable manner and flush the line (see Standard practice No. 4 and the following paragraphs. D. Provide air release taps at pipeline’s highest elevations and expel all air before test. Insert permanent plugs or air relief valves after test has been completed. E. Complete a hydrostatic test of the line according to AWWA for the type of pipe used (i.e. for ductile iron pipe; AWWA C600, PVC pip AWWA C605). This will include connecting any external pump to the pipe and applying a hydrostatic pressure as established for the work by the Chief engineer. This will be at least 200 pse at the lowest point of the line. This pressure will be maintained within 5 psi for two hours (2 hrs.) and the amount of makeup water will be measured. The amount of makeup water must be less than 1.5 gallons and 2.2 gallons per 1,000 feet of pipe for eight inch (8”) and 12 inch (12”) pipe respectively. No piping installation will be accepted until the leakage is less than the amount listed above. F. Locate and repair defective joints and retest until leakage rate is less than allowable. G. Repair any noticeable leakage even if the total leakage is less than allowable. H. Flush after hydrostatic test and let the line sit for at least 16 hours before collecting a water sample. I. A representative of the Chief Engineer will collect and deliver a water sample to the City laboratory. J. Earliest test results may be available the next day. K. If the test passes, a second sample will be collected by the City representative and delivered to the City laboratory. Revised March 3, 2010 Requirements of the Department of Public Utilities 00 73 50 - 3 L. If the first sample is bad, then the line will be flushed and allowed to sit in chlorinated state for 16 hours before another sample is collected. M. When two (2) acceptable samples have been obtained, the line is acceptable3 and services can be connected. 2.3 SECTION 33 11 00 – WATER DISTRIBUTION AND TRANSMISSION. A. Add a new paragraph to Article 2.1 2.1 PIPES AND FITTINGS E. Provide Chevron fm #1 non-oxide grease and 8 mil polyethylene wrap. B. Add a new paragraph to Article 3.4 3.4 INSTALLATION – PIPE AND FITTINGS I. Coat all exposed nuts and bolts with Chevron fm #1 non-oxide grease and 8 mil polyethylene wrap. 2.4 SECTION 33 13 00 – DISINFECTION. A. Add a new paragraph to Article 3.2 3.2 DISINFECTION OF WATER LINES H. Refer to Article 3.3 of Section 33 08 00 – Commissioning of Water utilities as amended in Section 00 73 50. END OF DOCUMENT WATER SERVICE WORK PERFORMANCE FORM Department of Public Utilities Salt Lake City, Utah Project Number: 513301876 . Location: Spring Lane Dr (5155 S) from About 1500 East to About 1720 East Ex a m p l e Address Existing Service Size Work Plan Notes on Work Performed 1630 E Spring Lane Dr 3/4" Replace New water meter required, property owner line copper 1646 E Spring Lane Dr 3/4" Replace Property owner line galvanized 1660 E Spring Lane Dr 3/4" Reconnect 4 feet galvanized line replaced property owner side Project Number: _______________ Location: ____________________________________________ Address Existing Service Size Work Plan Notes on Work Performed Project Number: _______________ Location: ____________________________________________ Address Existing Service Size Work Plan Notes on Work Performed Revised March 7, 2007 Addenda 00 91 13 - 1 DOCUMENT 00 91 13 ADDENDA PART 1 GENERAL 1.1 PROCEDURE A. For filing purposes, add Addenda and Modifications to the Contract Documents follow- ing this page. END OF DOCUMENT DEPARTMENT of COMMUNITY and NEIGHBORHOODS ERIN MENDENHALL MARK STEPHENS, P.E., ENV-SP MAYOR CITY ENGINEER ENGINEERING DIVISION P.O. BOX 145506 349 S 200 EAST, STE 100 WWW.SLCGOV.COM SALT LAKE CITY, UT 84114-5506 TEL 801-535-7961 FAX 801-535-6093 April 19, 2023 ADDENDUM NO. 1 (DOCUMENT 00 91 14) SLVSWMF – Module 8 Job No: LDF20015 Addendum No. 1 makes changes, corrections, deletions and additions to the initial Bidding Documents. In case of any conflict between the drawings, specifications and the attached Addendum, the Addendum shall govern. The Addendum forms a part of the Contract Documents and modifies the original Bidding documents. Acknowledge receipt of the Addendum in the space provided on 00 41 00-1 of the Bid (Document 00 41 00). Failure to do so may disqualify Bidder's bid. The addendum consists of 6 pages, that include this letter, Document 00 91 14 -Addendum #1 and 4 Plan Sheets. Sincerely, John M. Coyle, P.E. City Right-of-Way Manager cc: Procore Addendum No. 1 00 91 14 - 1 DOCUMENT 00 91 14 ADDENDUM No. 1 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Changes to the Bid Documents. 1.2 CONSTRUCTION CONTRACT A. SLVSWMF – Module 8 Job No: LDF20015 PART 2 CHANGES 2.1 CHANGES TO PRIOR ADDENDA A. N.A. 2.2 CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS A. None 2.3 CHANGES TO GENERAL REQUIREMENTS A. None. 2.4 CHANGES TO SPECIFICATIONS A. None 2.5 CHANGES TO DRAWINGS A. Title Page – Revised Revision Block. Added sheets ST-1 and ST-2 to Sheet Set Table. B. Sheet DT-6 – Deleted Detail 1 for Debris Fence. Deleted Debris Fence from Specification Reference Table. C. Sheet ST-1 – Added Sheet ST-1, Structural Notes. D. Sheet ST-2 – Added Sheet ST-2, Structural Details. END OF ADDENDUM 3/17/2023 SHEET SET ASSEMBLY ORDER SHEET DESIGNATOR SHEET TITLE BINDING ORDER 1-A 1-B 1-C CS-1 CS-2 GR-1 GR-2 DR-1 - DR-2 DR-3 ALG-1 - ALG-2 PR-1 - PR-4 DT-1 - DT-6 1 2 3 4 5 6 7 8 - 9 10 11 - 12 13 - 16 17 - 22 TITLE SHEET NOTES & LEGEND SURVEY CONTROL OVERALL SITE PLAN MODULE 8 SITE PLAN OVERALL GRADING PLAN LINER GRADING PLAN LEACHATE DRAINAGE PLAN GROUNDWATER DRAINAGE PLAN ALIGNMENT PLAN ALIGNMENT PROFILES DETAILS SHEET SET ASSEMBLY ORDER SHEET DESIGNATOR SHEET TITLE BINDING ORDER 1-A 1-B 1-C CS-1 CS-2 GR-1 GR-2 DR-1 - DR-2 DR-3 ALG-1 - ALG-2 PR-1 - PR-4 DT-1 - DT-6 ST-1 ST-2 1 2 3 4 5 6 7 8 - 9 10 11 - 12 13 - 16 17 - 22 23 24 TITLE SHEET NOTES & LEGEND SURVEY CONTROL OVERALL SITE PLAN MODULE 8 SITE PLAN OVERALL GRADING PLAN LINER GRADING PLAN LEACHATE DRAINAGE PLAN GROUNDWATER DRAINAGE PLAN ALIGNMENT PLAN ALIGNMENT PROFILES DETAILS STRUCTURAL NOTES STRUCTURAL DETAILS REVISIONS NUMBER DECRIPTIONTITLE ADDENDUM #1 DEBRIS FENCE STRUCTURAL CHANGES1 1 3-17-23 3-17-23 Geonet Drainage Layer 31 05 20S - 1 SECTION 31 05 20S GEONET DRAINAGE LAYER PART 1 - GENERAL 1.1 SCOPE This drop-in specifcation covers the technical requirements for the manufacturing and installation of the geonet drainage layer. All materials meet or exceed the requirements of this specifcation, and all work will be performed in accordance with the procedures provided in these project specifcations. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM) 1. ASTM D 1238-13 Standard Test Method for Melt Flow Rates of Thermoplastics by Extrusion Plastometer 2. ASTM D 792-13 Standard Test Method for Density and Specifc Gravity of Plastics by Displacement 3. ASTM D 4218-15 Standard Test Method for Determination of Carbon Black Content in Polyethylene Compounds by the Muffe-Furnace Technique 4. ASTM D 4716-14 Standard Test Method for Determining the (In-Plane) Flow Rate Per Unit Width and Hydraulic Transmis-sivity of a Geosynthetic Using a Constant Head 5. ASTM D7179 Standard Test Method for Determining Geonet Breaking Force 1.3 DEFINITIONS A. ENGINEER- The individual or firm responsible for the design and preparation of the project’s Contract Drawings and Specifications. B. Geonet Manufacturer (MANUFACTURER) - The party responsible for manufacturing the geonet rolls. C. INSTALLER- Party responsible for feld handling, transporting, storing and deploying the geonet. D. Lot- A quantity of resin (usually the capacity of one rail car) used to manufacture polyethylene geonet rolls. The fnished rolls will be identifed by a roll number traceable to the resin lot. 1.4 QUALIFICATIONS A. MANUFACTURER Geonet Drainage Layer 31 05 20S - 2 1. MANUFACTURER shall have manufactured a minimum of 10,000,000 square feet of polyethylene geonet material during the last year. B. INSTALLER 1. INSTALLER shall have installed a minimum of 1,000,000 square feet of geonet during the 5 last years. 2. INSTALLER shall have worked in a similar capacity on at least 5 projects similar in complexity to the project described in the contract documents, and with at least 100,000 square feet of geonet installation on each project. 3. The Installation Supervisor shall have worked in a similar capacity on projects similar in size and complexity to the project described in the Contract Documents. 1.5 MATERIAL LABELING, DELIVERY, STORAGE AND HANDLING A. Labeling - Each roll of geomembrane delivered to the site shall be labeled by the MANUFACTURER. The label will identify: 1. Manufacturer’s Name 2. Product Identification 3. Length 4. Width 5. Roll Number B. Delivery- Rolls of geonet will be prepared to ship by appropriate means to prevent damage to the material and to facilitate off-loading. C. Storage- The on-site storage location for the geonet, provided by the CONTRACTOR to protect the geonet from abrasions, excessive dirt and moisture shall have the following characteristics: 1. Level (no wooden pallets) 2. Smooth 3. Protected from theft and vandalism 4. Adjacent to the area being lined D. Handling- Materials are to be handled so as to prevent damage. 1. The CONTRACTOR and INSTALLER shall handle all geonet in such a manner as to ensure it is not damaged in any way. 2. The INSTALLER shall take any necessary precautions to prevent damage to underlying layers during placement of the geonet. PART 2 - PRODUCTS 2.1 GEOMEMBRANE PROPERTIES A. A geonet shall be manufactured by extruding two crossing strands to form a bi-planar drainage net structure. Geonet Drainage Layer 31 05 20S - 3 B. The geonet specifed shall have properties that meet or exceed the values listed in Table 1 below: C. Resin 1. Natural resin (without carbon black) shall meet the requirements in Table 2: Table 2: Raw Material Properties Property Test Method HDPE Density (g/cc)ASTM D792, Method B >0.94 Melt Flow Index (g/10 min)ASTM D 1238 (190/2.16)<1.0 2.2 MANUFACTURING QUALITY CONTROL A. The geonet and/or geocomposite shall be manufactured in accordance with the Manufacturer’s Quality Control Plan submitted to and approved by the ENGINEER. B. The geonet shall be tested according to the test methods and frequencies listed in Table 3 below: Table 3: Geonet Component Test Frequencies Test Property Test Method Frequency Thickness ASTM D5199 50,000 SF Tensile ASTM D5035 50,000 SF Melt Flow ASTM D1238 Per lot Density ASTM D792, B 50,000 SF Carbon Content ASTM D4218 50,000 SF Transmissivity ASTM D4716 500,000 SF Table 1 – Geonet Properties† Thickness – ASTM D51999 Density – ASTM D792, B Tensile – ASTM D5035 Melt Flow – ASTM D1238* Carbon Content – ASTM D4218 Transmissivity – ASTM D4761** 200 mils 0.940 g/cc 45 lb <1.0 g/10 minutes >2.0 2 x 10-3 m2/s 250 mils 0.940 g/cc 55 lb <1.0 g/10 minutes >2.0 3 x 10-3 m2/s 275 mils 0.940 g/cc 65 lb <1.0 g/10 minutes >2.0 6 x 10-3 m2/s 300 mils 0.940 g/cc 75 lb <1.0 g/10 minutes >2.0 8 x 10-3 m2/s NOTES: †Properties above are Minimum Average Roll Values unless otherwise specified *Measured at 190°C, 2.16 kg ** Measured at 10,000 psf, gradient of 0.1, seat time of 15 minutes between stainless steel plates Geonet Drainage Layer 31 05 20S - 4 PART 3 - EXECUTION 3.1 FAMILIARIZATION A. Inspection 1. Prior to implementing any of the work in the Section to be lined, the INSTALLER shall carefully inspect the installed work of all other Sections and verify that all work is complete to the point where the installation of the Section may properly commence without adverse impact. 2. If the INSTALLER has any concerns regarding the installed work of other sections, he shall notify the Project ENGINEER. 3.2 MATERIAL PLACEMENT A. The geonet roll should be installed in the direction of the slope and in the intended direction of fow unless otherwise specifed by the ENGINEER. B. If the project contains long, steep slopes, special care should be taken so that only full- length rolls are used at the top of the slope. C. In the presence of wind, all geonets shall be weighted down with sandbags or the equivalent. Such sandbags shall be used during placement and remain until replaced with cover material. D. If the project includes an anchor trench at the top of the slopes, the geonet shall be properly anchored to resist sliding. Anchor trench compacting equipment shall not come into direct contact with the geonet. E. In applying fll material, no equipment can drive directly across the geonet. The specifed fll material shall be placed and spread utilizing vehicles with a low ground pressure. F. The cover soil shall be placed in the geonet in a manner that prevents damage to the geonet. Placement of the cover soil shall proceed immediately following the placement and inspection of the geonet. 3.3 SEAMS AND OVERLAPS A. Each component of the geonet will be secured to the like component at overlaps. B. Geonet Components 1. Adjacent edges along the length of the geonet roll shall be overlapped a minimum of 6” or as recommended by the engineer. 2. The overlapped edges shall be joined by tying the geonet structure with cable ties. These ties shall be spaced every 5 feet along the roll length. 3. Adjoining rolls across the roll width should be shingled down in the direction of the slope and joined together with cable ties spaced every foot along the roll width. 3.4 REPAIR Geonet Drainage Layer 31 05 20S - 5 A. Prior to covering the deployed geonet, each roll shall be inspected for damage resulting from construction. B.Any rips, tears or damaged areas on the deployed geonet shall be removed and patched. The patch shall be secured to the original geonet by tying every 6 inches with the approved tying devices. If the area to be repaired is more than 50 percent of the width of the panel, the damaged area shall be cut out and the two portions of the geonet shall be joined. END OF SECTION Summary of Work 01 11 00 - 1 SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.1 WORK COVERED BY CONTRACT DOCUMENTS A. This Construction Contract provides for: 1) Construct a new landfill module (approximately 40 acres), including, but not limited to: excavation, installation of French drains, excavation of a new dewatering ditch (south drain), groundwater pumping, installation of a Geosynthetic Clay Liner, HDPE welded liner, drainage geotextile, HDPE piping for leachate and 2 feet of protective soil cover. B. CONTRACTOR shall develop a plan to perform the work in accordance with the Plans and Specifications. The plan shall include coordination with the City, the Landfill, Wall Consultant Group (designer), as needed. 1.2 CONTRACT METHOD A. Construct the Work under a single unit price contract. 1.3 NOTICE TO PROCEED A. Anticipated notice to proceed date is June 6, 2023. 1.4 WORK BY OTHERS A. N/A 1.5 WORK SEQUENCE A. Control of groundwater is a key part of this project and should be approached in the following order: 1. Install the clay plug in the existing dewatering ditch, near the southwest corner of Module 7 to limit groundwater flowing to the west. 2. Clear, grub and regrade the existing drainage ditch along the west property fence down to California Avenue to provide positive drainage. 3. Pump water from the existing pump location near the northwest corner of Module 8. 4. Excavate the south ditch from west to east, including pump setup at west end and begin pumping from that location. 5. Install the west and center French drains. 6. Install the east and north French drains. B. The south ditch and west, center, east and north French drains shall be in in place and operational prior to October 6, 2023 and CONTRACTOR shall pump, as needed, to control groundwater. See Section 00 52 00, Article 2.4, paragraph 3. Summary of Work 01 11 00 - 2 C. All spoil material will be placed with Module 11, with the exception of trash which the CONTRATOR shall deliver to the current tipping face. D. All work must be complete and operational before the contract termination date. 1.5 CONTRACTOR USE OF PREMISES A. Limit use of premises to accommodate landfill operations and patrons during construction. B. CONTRACTOR shall access the site, from California Avenue, on the roadway between Modules 9 and 10 and continue west on the south side of the existing landfill slope to Module 8. Coordinate access with landfill personnel. Landfill operations and patrons will be using the access road between Modules 9 and 10. 1.6 PARTIAL OWNER UTILIZATION A. OWNER and ET Technologies (Modules 10 and 11) will occupy the site for the purpose of landfill operations and maintenance work. B. ENGINEER and OWNER will likely access the site mainly from the perimeter roads, but will occasionally access from the top of the slope. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) END OF DOCUMENT Work Restrictions 01 14 00 - 1 SECTION 01 14 00 WORK RESTRICTIONS PART 1 GENERAL 1.1 SECTION INCLUDES A. Conditions affecting construction. 1.2 EXISTING CONDITIONS A. Storm water can make site work and access difficult. B. Toxic and explosive landfill gas may accumulate in trenches or depressions. 1.3 SITE CONDTIONS A. Control all water impacting the work site. Provide drainage protection of existing facilities. In the event of rain, maintain drainage lines to insure no flooding, the integrity of trenches and stability of existing excavations. B. Control groundwater with French drains, ditches and pumping to facilitate excavation, compaction and other work, at the lower elevations, in Module 8. 1.4 SCHEDULE RESTRICTIONS A. Disposal location of excavated refuse is at the direction of landfill personnel at tipping face. C. Disposal of excavated soil is at the direction ENGINEER. Most soil will be placed in Module 11. D. Protect and do not cover existing wells and wellheads during this operation. E. Coordinate any road closures with landfill operations. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION Revised April 19, 2010 Coordination 01 31 13 - 1 SECTION 01 31 13 COORDINATION This specification changes a portion of APWA Standard Specification Section 01 31 13. All other provisions of the Section remain in full force and effect. Add the following paragraph to Article 1.5. 1.5 COORDINATION G. Attend meetings with OWNER, ENGINEER, Third party quality control, and any regulatory bodies affected by the work, or requiring project progress updates as required. Failure to attend may be considered grounds for project suspension per Article 15.1 of the General Conditions (APWA Document 00 72 00). Add the following article to Part 1 1.8 PUBLIC AGENCY CONTACTS A. Regulatory agencies: Contact the following individuals to coordinate. 1. Utah Department of Environmental Quality: a. Division of Solid and Hazardous Waste: Wade Hess; phone (801)536-0213 b. Division of Air Quality: Jim Stevens; phone (801)536-4078 2. Salt Lake Valley Health department: Mary Pat Buckman (801) 313-6707 B. Salt Lake City Public Utilities: SWPPP 1. Greg Archuleta: phone (801) 483-6821 END OF SECTION Progress Schedule 01 32 16 - 1 SECTION 01 32 16 PROGRESS SCHEDULE This specification changes a portion of APWA Standard Specification Section 01 32 16. All other provisions of the Section remain in full force and effect. Add the following paragraph to Article 1.10 1.10 PERFORMANCE B. No additional money will be due CONTRACTOR if CONTRACTOR chooses to complete the Work early. No additional money will be due if any delay costs are incurred for not completing the Work at any anticipated early completion date. END OF SECTION Submittal Procedure 01 33 00 - 1 SECTION 01 33 00 SUBMITTAL PROCEDURE This specification changes a portion of APWA Standard Specification Section 01 33 00. All other provisions of the Section remain in full force and effect. Add the following article to Part 1 1.8 SUBMITTAL REGISTER A. List submittals required by Contract Documents on the attached Submittal Register form. Identify CONTRACTOR’s need dates and ENGINEER’s action dates. B. The following list identifies required submittal due dates. Submittals not identified in the list but specified in the Standard Specifications shall be submitted for information only. When Due Section Reference Submittal Pre-construction conference 01 33 00 Submittal Register 00 72 00 Preliminary Progress Schedule 00 72 00 Mobilization Plan 00 72 00 Safety and Protection Plan 00 72 00 Quality Control Program Prior to Starting Work 00 73 10 Permits for Work 01 55 26 Traffic Control Plan 01 57 00 Storm Water Pollution Prevention Plan 01 71 23 Surveyor’s Name, Certificate of Assurance, License Number, Schedule of Values. 32 01 93 Arborist’s Certification and Registration Number 32 01 93 Tree Protection Plan Prior to Use 00 73 10 Written Permission to use Private Citizen's Property and Water 31 05 13 Top Soil Supplier and Source Data Prior to Delivery On Site 31 05 13 Common Fill 32 11 23 Target Gradation Curve Crushed Aggregate 32 12 05 Asphalt Concrete Mix Design Supplier's Mix Number. Submittal Procedure 01 33 00 - 2 Prior to Delivery On Site 03 30 04 Portland Cement Concrete Source Data and Supplier's Mix Number. 33 11 00 Water System Product Data Upon Delivery to Site 32 12 16.13 Asphalt Concrete Batch Delivery Ticket 03 30 10 Portland Cement Concrete Batch Delivery Ticket Prior to 1st Concrete Placement 03 30 10 Name, Certification Number and renewal date for all ACI Certified Finishers 03 30 10 Portland Cement Concrete Curing Compound Source, Type, and Data With Each Monthly Pay Request 01 32 16 Progress Schedule 01 45 00 Schedule of values for quality control testing performed 5 Working Days Prior to Substantial Completion 01 78 50 Certification of Compliance and Request for Final Inspection Prior to Final Payment 01 45 00 Summary report of control testing performed 01 78 50 Evidence of Payment to Suppliers and Sub- contractors 01 78 39 Redlines and Photographs NOTES: 1. Section references listed in this table that are not found in the Project Manual may be found in the APWA Standard Specifications. END OF SECTION SUBMITTAL REGISTER PROJECT TITLE: LOCATION: CONTRACTOR: Job No. SC H E D U L E D A C T I V I T Y SU B M I T T A L I T E M N o . SP E C I F I C A T I O N P A R A G R A P H N o . DESCRIPTION OF MATERIAL TYPE OF SUBMITTAL REVIEW ACTION CONTRACTOR NEED DATES ENGINEER ACTION DATES OTHER SA M P L E S SH O P D R A W I N G S PA R T S L I S T PR O D U C T D A T A DE S I G N D A T A SP E C I F I C A I T ON S CE R T I F I C A T I O N S IN S T R U C T I O N S O& M M A N U A L OT H E R RE V I E W R E Q U I R E D B Y SU B M I T T A L D A T E AP P R O V A L N E E D E D B Y MA T E R I A L N E E D E D B Y DA T E R E C E I V E D AC T I O N C O D E FORM 01 33 00.1 IN S T R U C T I O N S GE N E R A L 1. CO N T R A C T O R t o C o m p l e t e F o r m : R e v i e w t h e C o n t r a c t D o c u m e n t s t o i n s u r e co m p l e t e n e s s . E x p a n d g e n e r a l c a t e g o r y l i s t i n g s . S h ow i n d i v i d u a l e n t r i e s o n t h i s f o r m f o r ea c h i t e m . a. As a n e x a m p l e , a g e n e r a l c a t e g o r y w o u l d b e " P l u m b i n g F i x t u r e s " w h i c h t h e CO N T R A C T O R i s t o b r e a k d o w n i n t o i n d i v i d u a l e nt r i e s s u c h a s " T o i l e t P -1, L a v a t o r y P - 2, e t c . " . C o m p l e t e t h e S u b m i t t a l R e g i s t e r , a n d s u b mi t i t t o E N G I N E E R . 2. Re s u b m i t t a l s : I f a s u b m i t t a l i s r e t u r n e d f o r c o r r e ct i o n , p r o v i d e a n e w S u b m i t t a l I d e n t i f i c a t i o n Nu m b e r . I d e n t i f y t h e n u m b e r o n t h e s u b m i t t a l r e g i s te r a n d r e s u b m i t t h e i n f o r m a t i o n f o r re v i e w . D o n o t a m e n d t h e d a t a a l r e a d y c o n t a i n e d o n t h e s u b m i t t a l r e g i s t e r . SU B M I T T A L R E G I S T E R 1. SC H E D U L E D A C T I V I T Y : I f a n a c t i v i t y o n t h e P r o g r e s s S c h e d u l e i s a s s i g n e d t o t h e su b m i t t a l , p l a c e t h e s c h e d u l e a c t i v it y n u m b e r i n t h e " S C H E D U L E D A C T I V I T Y " c o l u m n . 2. SU B M I T T A L I T E M N o . : A s s i g n t o e a c h e n t r y o n t h e S u bm i t t a l R e g i s t e r a s e q u e n t i a l nu m b e r i n t h e " S U B M I T T A L I D E N T I F I C A T I O N ( I T E M N U M B E R) " c o l u m n . 3. RE V I E W A C T I O N : T h e " R E V I E W A C T I O N " c o l u m n i d e n t i f i es t e c h n i c a l r e v i e w re s p o n s i b i l i ty o f s u b m i t t a l . R e v i e w o f a l l p r o d u c t s a n d m a t e r i al s i s t h e C O N T R A C T O R ' s re s p o n s i b i l i t y ; h o w e v e r , c e r t a i n s p e c i f i e d s u b m i t t a ls w i l l a l s o r e q u i r e E N G I N E E R ' s r e v i e w . a. If R E V I E W A C T I O N C o l u m n i s B l a n k : I d e n t i f i e d s u b m i tt a l s h a l l be a p p r o v e d b y t h e CO N T R A C T O R a n d t h e n s u b m i t t e d t o t h e E N G I N E E R f o r i nf o r m a t i o n . b. If t h e " E N G I N E E R " i s I d e n t i f i e d i n t h e R E V I E W A C T I O N C o l u m n : I d e n t i f i e d su b m i t t a l s s h a l l b e f i r s t a p p r o v e d b y t h e C O N T R A C T O R a n d t h e n s u b m i t t e d t o t h e EN G I N E E R f o r r e v i e w . 4. EN G I N E E R A C T I O N D A T E S : T h i s c o l u m n i s f o r E N G I N E E R 's u s e t o r e c o r d d a t e su b m i t t a l w a s r e c e i v e d a n d t h e a c t i o n c o d e a s s i g n e d i n t h e s u b m i t t a l r e v i e w p r o c e s s . Acceptance 01 35 10 - 1 SECTION 01 35 10 ACCEPTANCE This specification changes a portion of APWA Standard Specification Section 01 35 10. All other provisions of the Section remain in full force and effect. Add the following article to Part 1 1.6 TESTING A. OWNER has contracted with an independent testing agency (Agency) to do acceptance testing. B. Agency’s responsibilities. 1. Provide sufficient personnel and cooperate with CONTRACTOR and ENGINEER in performing acceptance testing. 2. Secure samples using procedures specified in the testing code and Construction Contract requirements. 3. Correlate tests with CONTRACTOR’s testing agency. 4. Report any non-compliance of materials and mixes to CONTRACTOR and ENGINEER immediately. 5. Notify ENGINEER and CONTRACTOR immediately if stand-by time is required for acceptance testing, or re-testing is required when the initial acceptance test fails. C. CONTRACTOR’s responsibility. 1. Cooperate with Agency, ENGINEER, inspectors, and others to establish on-site lines of authority for communications. 2. Correlate with Agency’s acceptance testing program. Give at least 24 hours notice of readiness of work for all required observations, tests and inspections. 3. When Agency arrives to do acceptance testing, the work must be ready for testing. CONTRACTOR shall pay for Agency’s wait time if work is not ready to be tested. 4. If acceptance testing does not pass, and acceptance re-testing must be performed, pay for cost of acceptance re-testing. 5. Provide ENGINEER with all testing results for the final QC report to be submitted to the UDEQ. D. ENGINEER’s responsibility: 1. Pay Agency for acceptance testing performed. 2. Pay Agency if acceptance re-testing is performed until tolerance is attained. 3. Deduct from Contract Price, the cost of Agency’s standby time when delayed by CONTRACTOR, and the cost of acceptance re-testing until tolerance is attained. 4. Compile all testing results for final QC report to be submitted to the UDEQ. Acceptance 01 35 10 - 1 Drainage Geotextile Class A Do you have a specification for the Drainage Geotextile Class A? Also need to know if we can sew or heat bond the material? Asked 4/27/2023 at 4:28 PM by Mark Downs Geo-Synthetics, LLC (GSI) Answer On Detail 1 on Sheet DT-1 in the plans, it shows the Drainage Geotextile, Class A. The specification is given on the right-hand side of that sheet as AWPA Section 31 05 19. I am including that specification as an attachment. All materials should be installed per the manufacturer’s recommendations. Confirm that this woven geotextile meets the warrantee requirements for puncture resistance to protect the HDPE liner. 31 05 19 – Geotextiles.pdf Actions Answered 4/27/2023 at 4:28 PM by John Coyle Litter Fence contractor qualifications Does the litter Fence subcontractor need to have a Utah Contractors license? And do they need to submit prior work or project experience or 3 or 4 similar projects? Asked 4/27/2023 at 4:21 PM by Kirt Ecker Ecker Netting Inc. dba Judge Netting Mountain West Answer All contracting rules shall be followed. Please review the state procurement rules. Actions Answered 4/27/2023 at 5:07 PM by John Coyle Litter Fence Poles The plans and addendum call for poles to be fabricated with a bend at grade level. It is believed that the existing poles are straight poles, but leaned over in the hole footing Is this acceptable? Can the footings be deeper so we can exclude rebar cages? Asked 4/27/2023 at 3:44 PM by Kirt Ecker Ecker Netting Inc. dba Judge Netting Mountain West Answer Please construct the debris fence posts per plan. One intent of the rebar cage is to prop the pipe off from the bottom of the hole, to allow concrete to enter the bottom of the pipe. There should be a uniform annular space surrounding the posts. Actions Answered 4/27/2023 at 5:04 PM by John Coyle Prime Bidders Can we get a list of people would be Prime Bidders for this project. Asked 4/27/2023 at 10:53 AM by Telford Myers Jwright Companies, Inc. Answer We don’t have a list of bidders for this project. The best information that I have is the pre-bid attendance log and I have been contacted by BHI. Actions Answered 4/27/2023 at 12:37 PM by John Coyle Form 00 43 42 Section 3 Business Certification Please verify that we do not need to include form 00 43 42 since this is not CDBG funded. Asked 4/25/2023 at 11:04 AM by Jarel Yantes Acceptance 01 35 10 - 2 B.H. Inc. Answer This project is not CDBG funded, therefore, no CDBG forms will be required for the bid. Additionally, none of those forms are included in the contract documents. Actions Answered 4/25/2023 at 11:12 AM by John Coyle Form 00 43 40 Value Program Form Please verify that we do not need to include form 00 43 40 with the bid. Asked 4/25/2023 at 11:02 AM by Jarel Yantes B.H. Inc. Answer Form 00 43 40 is not included in the project manual and is not required for this bid event. Actions Answered 4/25/2023 at 1:21 PM by Dan Hanover Bid Extension Why is this project being pushed for one contractor who is not able to get their bid bond in time? If they are not able to get their bond in time for this project maybe, they should not be bidding this project. This seems to be preferential treatment that is being given to one contractor. We request that this bid be moved back to the original bid date. Asked 4/24/2023 at 7:36 AM by Winn Lindsey Whitaker Construction Answer We delayed the bid by a week, because this is a large project and specialty sub-contractors are needed. Particularly, we were thinking about the crews for the HDPE liner. There is not preferential treatment for ANY given contractor. Good luck on the bid. Actions Answered 4/24/2023 at 8:15 AM by John Coyle Dumping fees Can the Unclassified Excavation be dumped at the landfill for no charge. Asked 4/21/2023 at 9:02 PM by John Coyle Answer Yes, there will not be a cost for placing the excavated material at the landfill. Actions Answered 4/21/2023 at 9:02 PM by John Coyle Bid Extension We need to ask again if we can extend this bid by 1 week. This will give us time to secure our best costing and be able to prepare the required bid bond. Thank you Asked 4/20/2023 at 10:49 AM by Aaron Norton E.T.Technologies, Inc Answer I will issue an addendum moving the bid date back to May 3, 2023 Actions Answered 4/20/2023 at 12:53 PM by John Coyle Drainage Geotextile Can you clarify what type/weight of geotextile you are looking for pertaining to the “Class A”. Also can you supply specs for this product that include the installation, (seams to be sewn or heat bonded?). Asked 4/20/2023 at 9:07 AM by Barrett Sawatzky GSI – Geosynthetics Systems Answer Acceptance 01 35 10 - 3 See answer to similar question about the Drainage Geotextile. Actions Answered 4/20/2023 at 2:20 PM by John Coyle Clay layer On the new liner, is a 2 foot thick compacted clay layer under MOD 8 required? Asked 4/19/2023 at 3:58 PM by Dawn Rinaldi E.T.Technologies, Inc Answer No, 2 feet of compacted clay will not be used on this project. Detail 1 on Sheet DT-1 shows a Geosynthetic Clay Liner (GCL) under the HDPE liner. The GCL liner does the same thing that we used to use the 2' clay liner for. Actions Answered 4/19/2023 at 4:25 PM by John Coyle Bid Bond Due to the short time frame we may have an issue securing a bid bond in time. Is it possible to extend the due date by one week? Asked 4/19/2023 at 10:00 AM by Dawn Rinaldi E.T.Technologies, Inc Answer I hesitate to delay this bid, as we are already getting late in the year for bidding projects. Actions Answered 4/19/2023 at 4:27 PM by John Coyle Pre-Bid meeting Can you provide the pre-bid meeting agenda and attendance log? Asked 4/18/2023 at 3:15 PM by John Coyle Answer See attached pre-bid agenda and attendance log. Pre-Bid meeting agenda and attendance log.pdf Actions Answered 4/18/2023 at 3:15 PM by John Coyle CADD file of the project Can bidders get the CADD file of the project? Asked 4/13/2023 at 1:30 PM by John Coyle Answer The CADD file is not available to bidders, as it is not part of the contract documents. The needed quantities for the bid are shown on the plans. The successful bidder will receive the CADD file, as a courtesy to facilitate construction. Actions Answered 4/13/2023 at 1:30 PM by John Coyle Engineer's estimate What is the engineer's estimate for Module 8? Asked 4/12/2023 at 6:01 AM by John Coyle Answer The engineer's estimate is $10,500,000. Actions Answered 4/12/2023 at 6:01 AM by John Coyle 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FILL FILL 10''10''10'' FI L L FIL L CU T CU T CU T CU T leach leach C U T CUT CUT FIL L FILL FILL FILL FILL FILL FIL L 100' SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMICDEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEYSOLID WASTEFACILITYMODULE 8 MODULE 8SITE PLAN CS-2 5 OF 24 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.2_Module 8 Site Plan.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100' 200' SUMP(SEE DETAIL 1/DT-2) TRANSITION FROM 4-FT LINERWALL (3/DT-6) TO STANDARDANCHOR TRENCH (5/DT-1) MOD 7 LINER TIE-IN(SEE DETAIL 4/DT-1) MOD 5 LINER TIE-IN(SEE DETAIL 2/DT-4) NORTH FRENCH DRAIN(SEE DETAIL 2/DT-4,PROFILE ON PR-1) EAST FRENCH DRAIN(SEE DETAIL 1/DT-5PROFILE ON PR-2) SOUTH DITCH(SEE DETAIL 2/DT-5, PROFILE ON PR-3) 4" PERFORATED LEACHATE PIPE ATTOE OF SLOPE (SEE DETAIL 5/DT-2) 10" PERFORATEDLEACHATE PIPE(SEE DETAIL 3/DT-2) 4-18" WITHDRAWL PIPES(SEE DETAIL 4/DT-2) WEST ROAD(SEE DETAIL 1/DT-4AND PROFILE ON PR-4) 2 DT-5 1 DT-5 1 DT-4 2 DT-4 MANHOLE (SEE PROFILE ON PR-3) MOD 5 EXISTING SUMP. ABANDONIN PLACE AND PLACE COMPACTEDPROTECTIVE SOIL TO PREVENTEQUIPMENT DAMAGE 6" PERFORATED PIPE AT TOE OF SLOPE(SEE DETAIL 5/DT-2) 6" PERFORATEDLEACHATE PIPE(SEE DETAIL 6/DT-1) 4" PERFORATEDLECHATE PIPE (SEE DETAIL 6/DT-1) WEST FRENCH DRAIN(SEE DETAIL 3/DT-4,PROFILE ON PR-2) GRAVEL PAD FOR FUTURE FLARE. USE12" CLASS A-1-a GRANULAR BORROWPER SPECIFICATION 31 05 13 40' 100' 6" PIPE WITH TEE'S TOCONNECT TO 6" PIPES(SEE SHEET DR-2) 4-6" PERFORATED LEACHATE PIPESCONNECT TO EXISTING 6" LEACHATE PIPES (SEE SHEET DR-2 AND DETAIL 6/DT-1) LOCATE AND CONNECT 6"PERFORATED LEACHATE PIPEEXISTING 6" LEACHATE PIPE.APPROXIMATE ELEV. OF 4220.20. DEBRIS FENCE(SEE DETAIL 1/DT-6) DEBRIS FENCE(SEE DETAIL 1/DT-6) TIE INTO MESH EXISTING DEBRIS FENCE CLEAR AND GRUB AND REGRADEDITCH (SEE DETAIL 1/DT-4, ANDSHEET CS-1 FOR EXTENT) 18" PIPE (SEE PROFILE ON PR-3) 18" PIPE (SEE PROFILE ON PR-3) 18" PEROFRATED PIPE (SEE PROFILE ON PR-3) CENTER FRENCH DRAIN(SEE PROFILE ON PR-1AND DETAIL 3/DT-2) EXISTING 48" DIA. MANHOLE (13' DEEP)BACKFILL AND ABANDON, REMOVE SECTIONS AS NECESSARY FOR LINERINSTALLATION (SEE NOTE 1). WATER LEVEL OF DITCH/SUMPTO REMAIN BELOW EL: 4208PUMP WATER TO WEST DITCH ASNECESSARY EXISTING GROUNDWATER CONTROLPUMP AND GENERATOR TO BE REMOVED BY LANDFILL/OWNERPRIOR TO CONSTRUCTION START(SEE NOTE 1). NATIVE CLAY DAM TOISOLATE DITCH (TO BEREMOVED BY OWNER) HEADWALL AND SLAB ATLRCS EXTRACTION PIPES(SEE DETAIL 3/DT-3) NOTES:1. AFTER CONSTRUCTION START ALL MODULE 8 GROUNDWATER CONTROL AND DEWATERINGSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL LANDFILL OWNEDDEWATERING PUMPS, GENERATORS, ETC.SHALL BE REMOVED PRIOR TO CONSTRUCTION.CONTRACTOR SHALL PROVIDE ALL EQUIPMENTAND PORTABLE POWER SERVICE FORGROUNDWATER CONTROL.2. INSTALL GAVLVANIZED BAND-TYPE ANIMALGUARD SUCH AS AGRI-DRAIN ORENGINEER-APPROVED EQUAL AT THE END OFALL EXPOSED HDPE DRAIN AND INTAKE PIPES. ROADSIDE SWALE FLSEE DETAIL 2/DT-5 ROADSIDE SWALE FLSEE DETAIL 1/DT-4 LINER ANCHOR TRENCHDIRECTLY BELOW TOP OF BERM.SEE DETAILS 5/DT-1 AND 1/DT-4 LINER ANCHOR TRENCHDIRECTLY BELOW TOP OF BERM.SEE DETAILS 5/DT-1 AND 2/DT-5 SOUTH ROAD(SEE DETAIL 2/DT-5AND PROFILE ON PR-3) MOD 7 LINER TIE-IN(SEE DETAIL 4/DT-1) ENTEND LINER TIE-IN ANDEXCAVATION INTO MOD 7 ASREQUIRED TO MAKE CONNECTIONTO EXISTING LEACHATE PIPE. SEE NOTE 2 SEE NOTE 2 2 2 04 / 2 0 / 2 3 A D D E N D U M # 2 2 2 Traffic Control 01 55 26-1 SECTION 01 55 26 TRAFFIC CONTROL This specification changes a portion of APWA Standard Specification Section 01 55 26. All other provisions of the Section remain in full force and effect. Modify Article 1.3, Paragraphs A to read as follows. 1.3 SUBMITTAL A. Traffic Control Plan: Submit a plan prior to starting work that affects any landfill access or landfill road. END OF SECTION SECTION 01 57 00 TEMPORARY CONTROLS This specification changes a portion of APWA Standard Specification Section 01 57 00. All other provisions of the Section remain in full force and effect. Change the following paragraph in Article 3.2 DUST AND MUD CONTROL to: C. At a minimum, dust and mud control efforts shall include a daily sweeping of the work area streets. One sweeping shall take place at the end of the workday at a minimum, if needed additional sweeping shall take place midway through the workday. Additional efforts may be required as determined by the ENGINEER, OWNER, SWPPP inspector, or other representative. Add the following paragraph in Article 3.2 DUST AND MUD CONTROL: D. Contractor shall prepare, submit and implement a Fugitive Dust Control Plan with the Utah Department of Environmental Quality, Division of Air Quality. Change the following paragraph to Article 3.3 SURFACE WATER CONTROL to: A. Control all on-site surface water. Provide proper drainage so flooding of the site or changed flow conditions including path, quantity or quality onto an adjacent property does not occur. Add the following paragraph to Article 3.3 SURFACE WATER CONTROL: E. CONTRACTOR shall prepare a Storm Water Pollution Prevention Plan (SWPPP) specifically for this project in compliance with Salt Lake City and State of Utah requirements for Stormwater Discharges Associated with Construction and Land Disturbance Activities. CONTRACTOR shall comply with all Clean Water Act, City Ordinance and SWPPP requirements for the project. F. Some minimum erosion control and storm water protection components have been identified. These do not constitute all necessary components of a comprehensive SWPPP. 1. For projects less than one acre the CONTRACTOR shall provide all labor, equipment, materials, and services necessary to complete the work. a) Site Map: Showing boundaries and BMPs that will be implemented. b) Concrete washout: Describe in detail how concrete washout will be contained. c) Concrete/Road cutting (must be contained): Describe in detail how concrete & road cutting dust and pollutants will be contained. d) Housekeeping BMPs: Describe in detail general housekeeping e.g. restroom (port-a-potty), dumpster(s), roll off container or cans, etc. e) Erosion/sediment controls: Describe in detail the boundary controls to be used e.g. inlet protection, silt fence, fiber rolls, wattle, cut back, etc. f) Offsite tracking prevention: Describe in detail how you will mitigate tracking dirt/mud outside of construction boundaries in compliance with the City’s Clean Wheel Ordinance. g) De-watering: Describe in detail BMPs that will be used to de-silt the discharge before entering a waterway/storm drain e.g. de-watering bag, filter sock, check down dam, frac tank, etc. 2. The CONTRACTOR shall identify type and placement of BMPs. 3. The CONTRACTOR shall be responsible for implementation and maintenance of all BMPs. 4. The CONTRACTOR shall perform weekly inspections of the site for the duration of the project. Note: Inspection shall include housekeeping, placement and condition of all BMPs. 5. The CONTRATOR shall be responsible stabilizing and removing all temporary BMPs at the conclusion of the job. 6. If work is being performed outside the boundaries of Salt Lake City the CONTRACTOR shall contact the MS4 operator and comply to any additional stormwater pollution prevention requirements for that jurisdiction. G. If CONTRACTOR is assessed fines for not meeting permit requirements, those costs will not be passed onto the OWNER. Change the following paragraph to Article 3.4 GROUND WATER CONTROL to: C. Remove all dewatering facilities meeting inspector requirements when no longer required. Add the following Article 3.7 Sanitation to Part 3 – Execution 3.7 Sanitation A. Toilet Facilities: Provide portable chemical toilets at each active work site or staging area for the use of employees. Toilets at construction job sites shall conform to the requirements of Part 1926 of the OSHA Standards for Construction. 1. Furnish at least one portable toilet at each active work site. END OF SECTION Construction Layout 01 71 23 - 1 SECTION 01 71 23 CONSTRUCTION LAYOUT This specification changes a portion of APWA Standard Specification Section 01 71 23. All other provisions of the Section remain in full force and effect. Revise Article 1.2 1.2 SUBMITTALS A. Prior to start of construction submit: 1. Name of licensed land surveyor. 2. Certificate of Assurance. Verify bearings and benchmarks on Drawings match bearings and benchmarks in the field. 3. Schedule of Values. Identify survey control unit price, value weight, and dollar value on the attached form. (Form 01 71 23.1) B. During construction submit an updated schedule of values with each partial pay request. C. Prior to contract closeout submit: 1. Documentation to verify accuracy of survey work. 2. Submit a certificate signed by a licensed professional certifying that elevations and locations of improvements conform with the Contract Documents. 3. All <as built= survey data, survey information showing dimensions, location angles and elevations of construction on contract Record Documents. Add the following paragraphs to Article 3.1 3.1 PROJECT SURVEY REQUIREMENTS C. Provide necessary survey to correct survey error. D. Reset control stakes, control points, benchmarks and any other stakes that are damaged or destroyed. E. Protect control points and stationing. F. Locate and layout. 1. Utility locations and elevations for those to be installed or potholed i.e., existing horizontal well piping, manholes, liner and liner trench, etc. 2. Landfill Gas Collection and Control System (LGCCS) layout and staking. 3. Topo survey of completed intermediate soil cover. 4. Topo survey of Final Cover G. Perform cross-section surveys and all other interim and final measurements. 1. Verify thickness of final cover. Construction Layout 01 71 23 - 2 2. Notify ENGINEER if elevations and locations of improvements do not conform to Contract Documents. END OF DOCUMENT Form 01 71 23.1 SCHEDULE OF VALUES FORM (Survey Control) SLVSWF – Module 8___________________ LDF20015 Project Name Job No. CONTRACTOR Date Land Surveyor License No. Note to CONTRACTOR: Indicate the Value Weight for each of the classifications of work in the following table. Use the Survey Control unit price and prorate the value of each item of work. Survey Control Lump Sum per Bid Item Price - __________________ CLASSIFICATION OF WORK VALUE WEIGHT $ VALUE 1. Certificate of Assurance % $ 2. Locate existing horizontal leachate piping % $ 3. French Drain, roadway and ditch layout and staking % $ 4. Module cut staking % $ 4. Survey for finished grading and location of liner % $ 5. As-built survey of Final project in AutoCAD Civil3D % $ $ $ $ TOTAL VALUES = 1.0 $ COMMENTS Signed by _____________________________________ _____________________________ CONTRACTOR Land Surveyor Salt Lake Valley Solid Waste Facility Module 8 05 05 10S - 1 DOCUMENT 05 05 10S DEBRIS FENCE PART 1 GENERAL 1.1 SECTION INCLUDES A. Debris Fence 1.2 RELATED SECTIONS A. APWA Section 03 30 04 Concrete B. APWA Section 05 05 10 Metal Galvanizing C. APWA Section 05 05 23 Bolts, Nuts and Accessories D. APWA Section 32 31 13 Chain Link Fences and Gates 1.3 REFERENCES A. ASTM Standards: A392 Zinc Coated Steel Chain-Link Fence Fabric A641 Zinc Coated (Galvanized) Carbon Steel Wire PART 2 PRODUCTS 2.1 CONCRETE A. Class B concrete. Refer to Section 03055 B. Contractor may substitute higher class of concrete. 2.2 STEEL POSTS AND LOOPS A. 1/4= thick steel, galvanized after punching and cutting is complete. 2.3 STEEL CABLE A. Galvanized steel cable with a breaking strength of 10,000 lbs. 2.4 NYLONG FENCING MESH A. Use material matching strength and appearance of existing fence. Submit for approval prior to installation. PART 3 EXECUTION 3.1 GENERAL A. Install fence fabric and steel loops on the side of the post away from the trail. END OF SECTION 03 30 04 Class 4000 concrete Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 1 DOCUMENT 33 50 10S 60 MIL HDPE LINER PART 1 GENERAL 1.1 SECTION INCLUDES A. High density polyethylene (HDPE) synthetic geomembrane liner 1.2 REFERENCES A. American Society for Testing and Materials (ASTM). 1. ASTM D 413: Standard Test Methods for Rubber Property - Adhesion to Flexible Substrate. 2. ASTM D 638: Standard Test Method for Tensile Properties of Plastics. 3. ASTM D 746: Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact. 4. ASTM D 1004: Standard Test Method for Initial Tear Resistance of Plastic Film and Sheeting. 5. ASTM D 1204: Standard Test Method for Linear Dimensional Changes of Nonrigid Thermoplastic Sheeting or Film at Elevated Temperature. 6. ASTM D 1238: Standard Test Method for Flow Rates of Thermoplastics by Extrusion Plastometer. 7. ASTM D 1505: Standard Test Method for Density of Plastics by the Density- Gradient Technique. 8. ASTM D 1557: Standard Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, using 10-1b (4.54-kg) Rammer and 18-In. (457- mm) Drop. 9. ASTM D 1603: Standard Test Method for Carbon Black in Olefin Plastics. 10. ASTM D 1693: Standard Test Method for Environmental Stress-Cracking of Ethylene Plastics. 11. ASTM D 4437: Standard Practice for Determining the Integrity of Field Seams Used in Joining Flexible Polymeric Sheet Geomembranes. 12. ASTM D 4833: Standard Test Method of Index Puncture Resistance of Geotextiles, Geomembranes and Related Products. 13. ASTM D 5321: Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method. 14. ASTM D 5596: Standard Test Method for Microscopic Evaluation of the Dispersion of Carbon Black in Polyole Geosynthetics. 15. ASTM D 5994: Standard Test Method for Measuring Core Thickness of Textured Geomembranes American Society for Testing and Materials (ASTM). 1.3 SUBMITTALS A. Prior to delivery of geomembrane submit. Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 2 1. Report which shows texture of geomembrane meets minimum friction angle (See Table 1). Soil samples shall be fabricated from on-site soil acceptable to the ENGINEER. 2. Report for each source quality control test. (See Table 1). 3. Manufacturer9s warranty. B. Prior to installing geomembrane submit. 1. Installer9s warranty. 2. Panel layout drawings. (See Article 3.2) 3. Seam coding system. (See Article 3.3) C. After installing geomembrane submit. 1. Map of quality control test locations. (See Article 3.4) 1.4 QUALITY ASSURANCE A. Installer9s Qualification: Completed 5,000,000 square feet. If requested provide: 1. Name and purpose of facility, its location and date of installation. 2. Name of owner, contracting officer, manufacturer, fabricator, if applicable, and name and telephone number of contact at the facility who can discuss the project. 3. Thickness of geomembrane, texturing, and surface area of the installed geomembrane. 4. Type of seaming, patching and tacking equipment. 5. A copy of the manufacturer9s or fabricator9s approval 1etter(s) or license(s), if applicable. 6. Résumé of the qualifications of the geomembrane installation supervisor and master seamer. B. Manufacturer9s Services: Provide manufacturer9s on-site technical supervision and assistance if required for manufacturer9s warranty. C. Pre-Installation Conference, Items to clarify: 1. Project specifications and Drawings, submittals, training and qualification procedures for installation. 2. Personnel, installation crew size, final schedule for beginning and completing the lining system installation. 3. Designated quality control manager for the installation. 4. Demonstration by installer of the making of each type of seam and field tests. 5. Display of system for placing markings on the geomembrane. 1.5 WEATHER AND SITE CONDITIONS A. Do not place geomembrane when: 1. Air temperature is below 40 degF. unless trial welds verify that the material can be seamed and approval is received from ENGINEER in writing; or 2. In the presence of precipitation, excessive moisture (fog, dew, mist, etc.) or in areas of ponded water; or 3. In the presence of excessive winds (sufficient to lift panels and prohibit efficient placement of the panels). Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 3 1.6 ACCEPTANCE A. Acceptance of installed geomembrane shall not occur until: 1. Adequacy of field seams and repairs, including associated control testing is complete. Each field seam is bounded by 2 passed test locations. 1.7 WARRANTY A. Geomembrane Manufacturer: Warrant membrane for a period of 20 years on a prorata basis against manufacturing defects, workmanship, and deterioration due to exposure to the elements. B. Installer: Warrant material and workmanship for 2 years. C. Exclusion: Exclude CONTRACTOR from manufacturer9s and installer9s warranty. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Names, addresses, and telephone numbers of manufacturer9s corporate offices that provide material that can meet this specification are given below: 1. GSE, 19103 Gundle Road, Houston, Texas 77073, (800) 435-2008 2. National Seal Company, Inc., 525 Reactor Way, Reno Nevada 89502, (702) 856- 3200 3. Poly-Flex Inc., 2000 West Marshall Drive, Grande Prairie, Texas, 75051, (800) 527- 3322. FAX (972) 337-7233 4. Serrot Corporation, 8383 Cassia Way, P.O. Box 92708, Henderson, Nevada 89015- 2708, (800) 237-1777. FAX (702) 566-4739 B. Material may be provided by different office than shown above or by a manufacturer- approved distributor. C. Products from manufacturers other than those shown above may be used only with written authorization from ENGINEER. 2.2 GEOMEMBRANE A. New, uniform, unmodified high density polyethylene sheet containing no plasticizer, filters, reclaimed polymers or extenders and the product of only one manufacturer. B. Either black or white smooth surface on 1 side, textured black surface on other side. 1. White surface and black layer must be integral to the geomembrane. 2. No gaps in the white layer. 3. White layer must not delaminate during physical testing. 4. White layer thickness is CONTRACTOR9s option. 5. White material must be made with same resin, and stabilized with a non-carbon black ultra-violet stabilizer to meet warranty conditions. 6. Edge Trim: 2 maximum. 7. Heat Stabilizers, Antioxidants and Processing Aids in Resins: < 0.5. 8. No tears or defects. 9. Meet the requirements of Table 1. Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 4 2.3 EXTRUDATE A. Formulated from the same high density polyethylene resin as the geomembrane. 2.4 SEALANT CAULKING, CLAMPS, TAPE, RUBBER PADS A. Recommended by geomembrane manufacturer. 2.5 SOURCE QUALITY CONTROL A. Perform the quality control tests at the frequencies shown in Table 1. B. Supply copies of testing to ENGINEER. Table 1 - PROPERTIES OF GEOMEMBRANE Property Value Test Method Test Frequency RESIN MATERIAL Specific Gravity (before addition of carbon black) Melt Index 0.935 to 0. 950 <=1 g per 10 minutes ASTM D 1505 1 per 50,000 sq. ft. or 1 per resin batch ASTM D 1238 1 per 50,000 sq. ft. or 1 per resin batch Condition E GEOMEMBRANE SHEET Sheet Thickness, in. (Not 0.060 +/- 10%, ASTM D 5994 5 tests per roll including Texture) average 0.060 Tensile Strength at Yield >2,000 psi ASTM D 638 1 per 50,000 sq. ft. or 1 per resin batch Tensile Strength at Break > 800 psi ASTM D 638 1 per 50,000 sq. ft. or 1 per resin batch Elongation at Yield >10 ASTM D 638 (1) 1 per 50,000 sq. ft. or 1 per resin batch Elongation at Break > 1509a ASTM D 638 (1) 1 per 50,000 sq. ft. or 1 per resin batch Tear Resistance > 41 lb. ASTM D 1004, Die C 1 per 50,000 sq. ft. or 1 per resin batch Puncture Resistance >70 lb. ASTM D 4833 1 per 50,000 sq. ft. or 1 per resin batch Coefficient of Dimensional Stability Change (each +/-2% ASTM D 1204, 212 Deg F., 15 Certification direction) Environmental Stress Crack > 2,000 hrs. ASTM D 1693, Condi- tion C (modified NSP SN 54) Certification Low Temperature Brittle- < - 40 deg P. ASTM D 746 Certification ness Carbon Black Content 2 to 3% ASTM D 1603 1 per 50,000 sq. ft. or 1 per resin batch Carbon Black Dispersion 1, 2, or 3 ASTM D 5596 1 per 50,000 sq. it. or 1 per resin batch Property Value Test Method Test Frequency Direct Shear (Interface Fric- tion Angle) Min. dia. = 12 deg. ASTM D 5321 Procedure B (2) 1 test at each of the following: 85% and 90% 1. Use 2.5-inch gage length sample for testing (ASTM D 638). 2. Based upon the following parameters. a. Soil material is the Low Permeable Soil Layer of Section 02056 b. Nominal stress loads of 1,500; 3,000; 6,000; 9,000; and 12,000 psf c. Relative density based upon ASTM D 1557 (Modified Proctor) d. Laboratory specimens submerged under water at least 16 hours before running test e. Rate of placement is 0.04 inches per minute Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 5 PART 3 EXECUTION 3.1 PREPARATION A. Instruct workers about protecting geomembrane such as handling the material in high winds; handling of equipment; discard of utility knife blades; cleanup of membrane cuttings; shoes of all personnel walking on the membrane; smoking; eating or drinking; and placing heated equipment on the membrane. 3.2 LOW PERMEABILITY LAYER A. Roll surface of low permeability layer smooth and level. Round edges and grade changes to 12 inch radius minimum. Fill voids and cracks. B. Make surface free of stones or protrusions greater than 0.25-inch diameter, and free of organic and other deleterious material. C. Remove debris. D. Limit ruts on surface to a maximum depth of 1 inch. E. Repair damage surface prior to installation of geomembrane. 3.3 DEPLOYMENT A. Deploy each panel in accordance with panel layout drawings and manufacturer9s recommendations. B. Provide sufficient material to allow for geomembrane expansion and contraction. C. Install panels so overlapping panel is upgrade of the underlying panel. D. Do not fold membrane. E. Secure against wind uplift. F. Prevent sliding. 3.4 SEAMING A. On slopes, seam perpendicular to the line of the slope (i.e. down and not across slope) to at least 6-feet away from the crest or toe of the slope. B. On module floor, orient seams perpendicular to slope. C. Minimize number of seams in corners, odd-shaped geometric locations, and outside corners. D. Follow seam coding system. E. Test Seam: Make test seams to verify that adequate conditions exist for field searing to proceed. Produce a test seam at the beginning of each shift to determine the peel and tensile strength of the seam. ENGINEER may require a sample field seam be made at any time during seaming production to verify equipment. F. Searing suspensions: If seaming operation has been suspended for more than 1/2 hour or if the seaming equipment breaks down, produce a test seam prior to resuming of seaming operations. G. Do not build in wrinkles during seaming 3.5 FIELD QUALITY CONTROL A. Geomembrane Testing Equipment: 1. Field Tensiometer: Accompanied by evidence of calibration, used for on-site shear and peel testing of geomembrane seams. Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 6 2. Punch Press: Capable of cutting specimens in accordance with ASTM D 4437. 3. Vacuum Box: Capable of inducing and holding 10 inches of mercury vacuum. 4. Other Testing Equipment: As needed by CONTRACTOR. B. Observations: Visually inspect the geomembrane sheets, seams, anchors, seals, and repairs for defects. Test each seam and repair using a vacuum box or air channel pressure. Perform tests in ENGINEER9s presence. 1. Fillet Weld, Extrusion Lap Weld, or Single Hot-Wedge Fusion Lap Weld: Use a vacuum box at 4 to 8 inches of mercury. 2. Double Hot-Wedge Seam Weld: Use the following air channel pressure test. a. Pump air into the air channel between the welds to 35 psi and hold for 5 minutes + 1 minute. b. At the end of the period, de-pressurize the seam by placing needle hole in the air space between the welds at the opposite end of the seam and observe the gage. c. At the end of 5 minutes if the seam maintains at least 30 psi during the test and the pressure drops within 30 seconds of de-pressurization, the seam is acceptable. d. If the pressure drops below 30 psi during test period, repair needle holes and retest the seam by the same procedure or perform a vacuum box test along the entire length of the seam. e. If the second air pressure test fails, perform a vacuum box test along the entire length of the seam. If no bubbles appear in the vacuum box, the lower weld will be considered defective and the upper seam is acceptable. if any bubbles appear in the vacuum box, each defective area shall be repaired by extrusion welding and tested again by vacuum box. f. Option: As an option to the vacuum box, apply a soap solution to the exposed seam edge while maintaining the required air channel pressure test. If bubbles appear, mark and extrusion weld the defective area. If no bubbles appear and the test pressure cannot be maintained, the leak is judged to be in the bottom or second seam, and the length of the seam tested may be cap stripped. Repair the needle holes. 3. For Seams Where it will be Impracticable to Perform a Vacuum Test: Insert copper wire for spark test, prior to welding. Place copper wire in the extrudate of the weld and at the edge of the top sheet. C. Seam Testing: Perform the tests and meet the quality control criteria of Table 2. All 5 shear and 5 peel tests must pass. If 1 does not and is an end sample (bone), remove 1 bone from each end of the sample. If field tensiometer shows a pass the ENGINEER may deem the seam passing. If the bone fails, proceed with repairs. Salt Lake Valley Solid Waste Facility Module 8 33 50 10S - 7 Table 2 - QUALITY CONTROL TESTING Test Quality Control Criteria Frequency Shear Strength ASTM D 4437 > 90% of yield strength, FTB(1) 1 random test every 500 lineal feet (2) Pee1 Strength ASTM D 413 Fusion Welds: > 70% of yield strength; FTB (1) Extrusion Welds: > 60% of yield strength. FTB (1) 1 random test every 500 lineal feet (2) (1) Pilin Tear Bond is defined as failure of one of the sheets by tearing, instead of separating from the other sheet at the weld interface area (sheet fails before weld). (2) Includes cross seams. D. Repairs: Correct the tested field seam as follows. 1. Rerun the field weld test using a new sample. 2. If that second test passes, the ENGINEER may assume an error was made in the first test and accept the field seam. 3. If that second test fails, either cap the field seam between any two previous passed seam test locations that include the failed seam or take another sample on each side of the failed seam location (10-feet minimum), and test both. 4. If both pass, cap the field seam between the two locations. 5. If either fails, repeat the process of taking samples for test END OF SECTION ○○○ ○○○ ○ ○ ○ ○○○ ○ ○ ○ ○○○ ○ ○ ○ ○ ○○ ○ ○ SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMICDEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEYSOLID WASTEFACILITYMODULE 8 STRUCTURALDETAILS ST-2 24 OF 24 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATIONREFERENCE 05 05 10S DEBRIS FENCE DESCRIPTION 1 - DEBRIS FENCE POST 2 - CONCRETE PIER FOUNDATION 3 - DEBRIS FENCE ELEVATION (4) 4"x12" NELSON STUDS@ 36" O.C. VERT 2 HOOPSAT BASE (4) #5 VERT 12"x12" #3 HOOP @ 18" VERT 8'-0"MIN PIPEEMBED. 4" MIN CJP CJP 6" MIN 2'-0" Ø CONCRETEDRILLED PIER SLOPE TOP OF CONCRETE PIERTO PROVIDE POSITIVE DRAINAGE AWAY FROM STEEL POST 2" MIN SHOP-DRILL 3 EACH 12" Ø AIRRELIEF HOLES 3 INCHES BELOWFINISHED GRADE ELEVATION. SECURE REINFORCING CAGEUNDER NELSON STUDS SO CAGESUPPORTS POST DURINGERECTION & CONCRETEPLACEMENT NOTE: POST TO BECONCRETE-FILLED AS FAR ASPRACTICABLE. DO NOT CAPLOWER PIPE END. USE 6-8"SLUMP MIX W/ 1/2" MAX AGGREGATE. SEE NOTE 6" 18", TYP 1 04 / 1 7 / 2 3 A D D E N D U M # 1 1SHEET ADDED CAP PIPE W/A36 ENDPLATE AND BUTT WELDALL AROUND, TYP CONC PIER SEE DETAIL 2THIS SHEET 7° 123° 6' 23' 10" STD PIPE(10 3/4" OD) 20' TYP THRU-BOLT WITH EYELET FORBRAIDED CABLE SUPPORT. SEEDEBRIS FENCE NOTES 1 & 2. STEEL NETTING, SEEDEBRIS FENCE NOTES 1 & 2 TENSION CABLE GUYWIRES AND ANCHOR, SEE DEBRIS FENCENOTE 3. DEBRIS FENCE NOTES: 1. DEBRIS FENCE NETTING AND BRAIDED CABLE SUPPORTSYSTEM SHALL MATCH EXISTING DEBRIS FENCE INCLUDINGMATERIALS, FINISHES, CONNECTIONS, DETAILS, ETC.2. CONTRACTOR SHALL COORDINATE WITH NETTING SUPPLIERTO CONFIRM CABLE SUPPORT LOCATIONS, ARRANGEMENT,AND TENSION REQUIREMENTS.3. TENSION CABLE GUY WIRE ANCHORAGE AT FENCE END TO BEBASED ON COMBINED TENSION OF CONNECTED CABLES.CONTRACTOR TO SUBMIT ANCHOR TYPE AND ARRANGEMENTTO ENGINEER FOR APPROVAL.4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL DEBRIS FENCE MATERIAL SUPPLIERS TO CREATE AND SUBMITFOR APPROVAL A SINGLE SET OF COORDINATED SHOPDRAWINGS AND PRODUCT SUBMITTALS THAT COVER ALLASPECTS OF DEBRIS FENCE CONSTRUCTION INCLUDING, DETAILING, FABRICATION, DELIVERY, INSTALLATION,ERECTION, ETC. STEEL NETTING ANDBRAIDED CABLE SUPPORTSTO MATCH EXISTING. SEEDEBRIS FENCE NOTES. CONC PIERSEE DETAIL 2THIS SHEET STEEL PIPE POST.SEE DETAIL 1 THIS SHEET DEPARTMENT of COMMUNITY and NEIGHBORHOODS ERIN MENDENHALL MARK STEPHENS, P.E., ENV-SP MAYOR CITY ENGINEER ENGINEERING DIVISION P.O. BOX 145506 349 S 200 EAST, STE 100 WWW.SLCGOV.COM SALT LAKE CITY, UT 84114-5506 TEL 801-535-7961 FAX 801-535-6093 April 20, 2023 ADDENDUM NO. 2 (DOCUMENT 00 91 14) SLVSWMF – Module 8 Job No: LDF20015 Addendum No. 1 makes changes, corrections, deletions and additions to the initial Bidding Documents. In case of any conflict between the drawings, specifications and the attached Addendum, the Addendum shall govern. The Addendum forms a part of the Contract Documents and modifies the original Bidding documents. Acknowledge receipt of the Addendum in the space provided on 00 41 00-1 of the Bid (Document 00 41 00). Failure to do so may disqualify Bidder's bid. The addendum consists of 5 pages, that include this letter, Document 00 91 14 -Addendum #1 and Document 00 11 16 – Invitation To Bid (3 pages). Sincerely, John M. Coyle, P.E. City Right-of-Way Manager cc: Procore Addendum No. 1 00 91 14 - 1 DOCUMENT 00 91 14 ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Changes to the Bid Documents. 1.2 CONSTRUCTION CONTRACT A. SLVSWMF – Module 8 Job No: LDF20015 PART 2 CHANGES 2.1 CHANGES TO PRIOR ADDENDA A. N.A. 2.2 CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS A. Chane the bid date to May 3, 2023. 2.3 CHANGES TO GENERAL REQUIREMENTS A. Document 00 11 16 – Invitation To Bid 2.4 CHANGES TO SPECIFICATIONS A. None 2.5 CHANGES TO DRAWINGS A. None END OF ADDENDUM DEPARTMENT of COMMUNITY and NEIGHBORHOODS ERIN MENDENHALL MARK STEPHENS, P.E., ENV-SP MAYOR CITY ENGINEER ENGINEERING DIVISION P.O. BOX 145506 349 S 200 EAST, STE 100 WWW.SLCGOV.COM SALT LAKE CITY, UT 84114-5506 TEL 801-535-7961 FAX 801-535-6093 April 27, 2023 ADDENDUM NO. 3 (DOCUMENT 00 91 14) SLVSWMF – Module 8 Job No: LDF20015 Addendum No. 3 makes changes, corrections, deletions and additions to the initial Bidding Documents. In case of any conflict between the drawings, specifications and the attached Addendum, the Addendum shall govern. The Addendum forms a part of the Contract Documents and modifies the original Bidding documents. Acknowledge receipt of the Addendum in the space provided on 00 41 00-1 of the Bid (Document 00 41 00). Failure to do so may disqualify Bidder's bid. The addendum consists of 12 pages, that include this letter, Document 00 91 14 -Addendum #3, revised Bid Schedule (Document 00 43 00) (6 pages), 3 pages of contractor questions and answers and revised Sheet CS-2. Sincerely, John M. Coyle, P.E. City Right-of-Way Manager Addendum No. 1 00 91 14 - 1 DOCUMENT 00 91 14 ADDENDUM No. 3 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Changes to the Bid Documents. 1.2 CONSTRUCTION CONTRACT A. SLVSWMF – Module 8 Job No: LDF20015 PART 2 CHANGES 2.1 CHANGES TO PRIOR ADDENDA A. None 2.2 CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS A. None 2.3 CHANGES TO GENERAL REQUIREMENTS A. Replace Bid Schedule Document 00 43 00. (6 pages) – Only changes were adding animal guards to Measurement and Payment for South Ditch and French Drains. 2.4 CHANGES TO SPECIFICATIONS A. None 2.5 CHANGES TO DRAWINGS A. Revised Sheet CS-2. (1 sheet) 2.6 ANSWERS TO CONTRACTOR QUESTIONS A. Questions and answers. (2 pages) END OF ADDENDUM Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 1 DOCUMENT 00 43 00 BID SCHEDULE PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Price schedules. B. Measurement and payment provisions. 1.2 CONSTRUCTION CONTRACT A. SALT LAKE VALLEY SOLID WASTE MANAGEMENT FACILITY, MODULE 8 JOB No. LDF20015 1.3 REFERENCES A. APWA Section 01 29 00: Payment Procedures. B. Document 00 52 00: Agreement. 1.4 SCHEDULE TO BE ADDED TO THE AGREEMENT A. This document will be added to the Agreement by reference. PART 2 PRICE SCHEDULES 2.1 GENERAL A. Number of Base Bid schedules: One B. Number of Alternate schedules: None. C. For progress payment procedures, see APWA Section 01 29 00 requirements. Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 2 2.2 BASE BID A. CAUTION: Bidder shall complete all blanks in the following price schedules. Failure to do so may cause the bid to be declared non-responsive by ENGINEER. Ite m Specification Reference Number Classification of Work Quantity and Unit Unit Price Total Cost SLVSWMF - Module 8, Job No. LDF20015 1 01 57 00 Dust Control 1 Lump Sum N/A $ 2 01 71 13 Mobilization 1 Lump Sum N/A $ 3 01 71 23 Survey 1 Lump Sum N/A $ 4 31 25 00 SWPPP and NOI 1 Lump Sum N/A $ 5 01 57 00 Groundwater Control 1 Lump Sum N/A $ 6 31 23 16, 31 11 00 West Ditch 1 Lump Sum N/A $ 7 31 23 16, 33 05 06 South Ditch 1 Lump Sum N/A $ 8 31 23 16, 33 05 06, 31 05 13, 31 05 19 French Drains 1 Lump Sum N/A $ 9 31 23 16, 33 05 10S, 31 05 13, 4-ft Liner Wall 1 Lump Sum N/A $ 10 31 23 16, 31 05 13 Module 8 & 11 Earthwork 1 Lump Sum N/A $ 11 33 50 10S, 33 50 20S, 31 05 19 Module 8 Liner 1 Lump Sum N/A $ 12 33 05 06, 31 05 19, 31 05 13 Module 8 Leachate Collection and Removal System (LCRS) 1 Lump Sum N/A $ 13 31 23 16 Protective Soil Cover 1 Lump Sum N/A $ 14 05 05 10S, 31 23 16, 31 05 13, 32 11 23 South Road & Debris Fence 1 Lump Sum N/A $ 15 05 05 10S, 31 23 16, 31 05 13, 32 11 23 West Road & Debris Fence 1 Lump Sum N/A $ Total Bid Amount = $ ______________________ Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 3 PART 3 MEASUREMENT AND PAYMENT 3.1 IN GENERAL A. See APWA Section 01 29 00 for general measurement and payment provisions. B. Specification sections referenced in price schedule line items give additional definitions to the classification of work. C. Incidental work or material will not be measured, counted, or paid for separately. D. Backfilling demolition work depressions will not be measured or paid for separately except where structure or obstructions that are not designated for removal and disposal in the Bidding Documents, and that cannot be removed with equipment reasonably expected to be used in the Work without cutting, drilling, or blasting, will be paid for after adjusting the Contract Price by Contract Modification pricing. E. Form Strip Filler (APWA Plan 242): This is incidental work. Work includes (but is not limited to) reinstalling irrigation pipe and heads, replacing damaged irrigation pipe and heads, replacing topsoil, grass seed, sod, and other landscape corrections or activities. 3.2 DUST CONTROL A. Measurement: Overall project percent complete. B. Includes water required to control dust or air pollution to comply with Utah State air quality regulations. 3.3 MOBILIZATION A. Measurement: Percent of Original Contract Amount Earned Percent of Amount Bid for Mobilization to be Paid 5 40 15 20 40 30 50 10 B. Includes installation of temporary facilities, progress schedule, bringing all necessary construction equipment to site, risk, and incidentals such as coordination with Landfill personnel and ENGINEER, miscellaneous probing for buried utilities and demobilization. 3.4 SURVEY A. Includes submission of a certificate by a licensed land surveyor that horizontal and vertical survey control shown in the Contract Documents and in construction has been checked and verified. B. Includes as-built drawing of all features in AutoCAD Civil3D. 3.5 SWPPP and NOI A. Measurement: Percent complete. B. Payment: Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 4 • 20 percent when Notice of Intent (NOI) has been published on EPA’s website for at least 72 hours and a copy of the Storm Water Pollution Prevention Plan (SWPPP) has been submitted to ENGINEER. • 80 percent as work progresses. 3.6 GROUNDWATER CONTROL A. Measurement: Overall project percent complete. B. Includes all labor and equipment including pumps, generators, fuel, etc. to dewater the site as required to support all construction activities and minimize impacts to ongoing landfill operations. C. Includes dewatering all existing depressions and ditches within and immediately adjacent to the project site including the north and east ditches within module 8 as well as the existing ditch west of the clay dam. D. All diverted water shall be routed to the west ditch unless otherwise instructed by the Owner or Engineer. 3.7 WEST DITCH A. Measurement: Percent Complete B. Includes all labor, equipment and material for reconditioning and reshaping the west ditch per plan to remove debris, vegetation, high points, or other obstructions as required to ensure proper flow and discharge. 3.8 SOUTH DITCH A. Measurement: Percent Complete B. Includes all labor, equipment and material for excavation, stockpile of native subgrade material, and finish grading. Also includes pipes, fittings, manholes, animal guards, etc. for ditch dewatering. C. Includes installation the clay dam, as shown on plans, and as directed by the Engineer. 3.9 FRENCH DRAINS A. Measurement: Percent Complete based on drain installed including drain rock column. B. Includes all labor, equipment and material for french drains including perforated piping, fittings, connections, drain rock, separation fabric, animal guards, etc. Includes backfill and compaction of native excavated material in the immediate vicinity of the french drain section. C. Excavation is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.10 4-FT LINER WALL A. Measurement: Percent complete B. Includes labor, equipment and materials for installation of the 4-foot high vertical HDPE liner wall on the southern edge of modules 1, 6, and 7 as shown in the plans up to and including the connection to the module 8 liner wall transition. Includes HDPE liner extension, extrusion welding, and periodic testing & inspection. C. Includes labor, equipment and material for installation of inspection ports including perforated pipe riser, drain rock, fabric, etc. 33 Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 5 C. Includes excavation and temporary stockpile of materials removed to expose the existing liner edge, including transportation of any trash to the tipping face. Also includes general backfill & compaction to restore existing finish grade as well as staged backfill lifts required for vertical liner installation. 3.11 MODULE 8 & 11 EARTHWORK A. Measurement: Percent complete based on plan area of prepared subgrade. B. Includes labor and equipment to excavate module 8 on-site native material and stockpile in module 11 or as directed by the Engineer. Includes excavation required for french drain installation and subgrade preparation for placement of module 8 liner layers. Includes excavation into the Module 7 footprint to tie liner into Module 7 at the lowest possible elevation and disposal of trash at the current tipping face. C. Includes all temporary earthwork facilities, staging, etc. including temporary ditch crossings & culverts, movement of existing module 11 stockpiled materials, temporary equipment paths. Also includes installation of additional protective soil over liner where required for heavy equipment paths based on HDPE liner manufacturer warranty requirements. D. Excavation and stockpile required for construction of the south ditch is covered under 3.8 SOUTH DITCH. 3.12 MODULE 8 LINER A. Measurement: Percent complete of total area of sheet material installed for all layers. B. Relative or weighted cost of material and installation for the different layers for payment may be considered as proposed by the contractor and approved by the engineer based on a detailed cost breakdown (Schedule of Values). C. Includes labor, equipment and material to install the geosynthetic clay liner (GCL), HDPE liner, and class A drainage geotextile. Includes inspection, testing and providing a final report of test results to ENGINEER. Includes all storage and staging of materials. Extra payment will not be made for damaged materials due to improper storage practices. D. Includes all material, equipment and labor required for connections and tie-ins to liners in adjacent modules 5 and 7. E. General subgrade preparation and excavation required to expose adjacent module liner edges is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.13 MODULE 8 LEACHATE COLLECTION AND REMOVAL SYSTEM (LCRS) A. Measurement: Percent Complete B. Includes labor, equipment and material to install various components of the leachate collection and removal system including perforated piping, solid piping, drain rock, geotextile fabric, extraction piping, fittings. Includes all sumps, trenches, etc. above primary liner layers, but excluding protective soil. C. Includes all labor, equipment and material for connections to Module 5 and 7 leachate piping where indicated in plans. D. Includes labor, equipment and material for the reinforced concrete headwall and slab Salt Lake Valley Solid Waste Facility Module 8 00 43 00 - 6 at primary leachate extraction site. D. Excavation required to locate and exposed existing leachate piping is covered in 3.11 MODULE 8 & 11 EARTHWORK. 3.14 PROTECTIVE SOIL COVER A. Measurement: Percent Complete based on plan area of liner covered. B. Includes equipment, material and labor to place 2-foot minimum protective soil cover over Module 8 primary liner layers. Also includes backfill and compaction at Module 5 and 7 liner tie-in locations. C. It is expected that previously excavated native material will be reused. No additional payment will be made for screening or stockpile separation of acceptable materials based on HDPE liner manufacturer’s warranty requirements. 3.15 SOUTH ROAD & DEBRIS FENCE A. Measurement: Percent complete based on plan length of installed road and fence. B. Contractor may propose independent payment for road and fence respectively based on detailed cost breakdown submitted to and approved by the Engineer (Schedule of Values). C. Includes all labor, equipment and material required for subgrade preparation including cut & fill of native material, placement & compaction of granular borrow & untreated base material. Also includes finish grading of all shoulders, swales, berms, adjacent infill areas, slope tie-ins, etc. D. Includes all labor, equipment and material for debris fence installation including detailing, fabrication, delivery, and storage or fence materials. Includes fence post erection and installation of concrete monopole foundations. Also includes nylon debris fabric material and placement. E. Includes southwest gravel road intersection, infill area, and gravel pad including subgrade preparation, granular material placement & compaction, and finish grading. 3.16 WEST ROAD & DEBRIS FENCE A. Measurement: Percent complete based on plan length of installed road and fence. B. Contractor may propose independent payment for road and fence respectively based on detailed cost breakdown submitted to and approved by the Engineer (Schedule of Values). C. Includes all labor, equipment and material required for subgrade preparation including cut & fill of native material, placement & compaction of granular borrow & untreated base material. Also includes finish grading of all shoulders, swales, berms, adjacent infill areas, slope tie-ins, etc. D. Includes all labor, equipment and material for debris fence installation including detailing, fabrication, delivery, and storage or fence materials. Includes fence post erection and installation of concrete monopole foundations. Also includes nylon debris fabric material and placement. END OF SECTION 2.0 AS-BUILT DRAWINGS 3/17/2023 REVISIONS NUM DECRIPTIONTITLE CONFORMED SET REVISION #1 GEONET DRAINAGE LAYER1 DATE 05/22/230 05/22/23 SHEETS UPDATED DT-1 ALLCONFORMED SET REVISION #2 SOUTH DITCH EXTRACTION208/28/23 CS-2, DR-3, PR-3, DT-3, DT-4 REVISION #3 FENCING310/20/23 DT-6, FN-1 REVISION #4 SOUTH DITCH, WEST & SOUTH ROAD SWALES, LEACHATE FORCE MAIN, PUMP SHED 4 07/09/24 CS-2, GR-1, GR-2, DR-1, ALG-2, PR-1, PR-3, DT-3, DT-4, DT-5, LF-1, LF-2, LP-1, LP-2, LP-3 SHEET SET ASSEMBLY ORDER SHEET DESIGNATOR SHEET TITLE BINDING ORDER 1-A 1-B 1-C CS-1 CS-2 GR-1 GR-2 DR-1 - DR-2 DR-3 ALG-1 - ALG-2 PR-1 - PR-4 DT-1 - DT-6 ST-1 ST-2 FN-1 LF-1 LF-2 LP-1 LP-2 - LP-3 1 2 3 4 5 6 7 8 - 9 10 11 - 12 13 - 16 17 - 22 23 24 25 26 27 28 29 - 30 TITLE SHEET NOTES & LEGEND SURVEY CONTROL OVERALL SITE PLAN MODULE 8 SITE PLAN OVERALL GRADING PLAN LINER GRADING PLAN LEACHATE DRAINAGE PLAN GROUNDWATER DRAINAGE PLAN ALIGNMENT PLAN ALIGNMENT PROFILES DETAILS STRUCTURAL NOTES STRUCTURAL DETAILS FENCE PLAN LEACHATE FORCE MAIN PLAN AND PROFILE LEACHATE FORCE MAIN DETAILS LEACHATE PUMP SHED ENLARGED PLANS LEACHATE PUMP SHED DETAILS 3 4 NOTE: The plan was to add a leachate force main and pump shed to the project. Later on it was decided to cancel the additional work. The leachate force main and pump shed were not constructed. The associated sheets were removed from the plans. 3-17-23 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 NOTES & LEGEND 1-B 2 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\1.0_Title Sheet.dwg 18" LEACHATE WITHDRAWAL PIPE PERFORATED HDPE, SDR-11 PIPE (FOR LEACHATE COLLECTION, SIZE VARIES) LINER TIE-IN WITH EXIST. HDPE LINER TOP OF SLOPE ANCHOR 18''18'' 10''10'' LINE STYLESABBREVIATIONS CY CUBIC YARD DIA DIAMETER DWG DRAWING E EAST EA EACH EG EXISTING GRADE ELEV ELEVATION EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE EOG EDGE OF GRAVEL EX EXISTING FG FINISHED GRADE FL FLOW LINE FT FOOT GB GRADE BREAK HDPE HIGH DENSITY POLYETHYLENE PIPE IE INVERT ELEVATION IN INCHES INV INVERT LCRS LEACHATE CONVEYANCE & REMOVAL SYSTEM LP LOW POINT LT LEFT MAX MAXIMUM MFRS MANUFACTURERS MH MANHOLE MIN MINIMUM MOD MODULE N/A NOT APPLICABLE NTS NOT TO SCALE PVC POLYVINYL CHLORIDE Q RATE OF FLOW RCP REINFORCED CONCRETE PIPE REV REVISION RT RIGHT R/W RIGHT OF WAY TYP TYPICAL UTBC UNTREATED BASE COURSE 1.ALL UTILITY LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING BLUE STAKES FOR LOCATION OF ALL UTILITIES. 1-800-662-4111. 2.CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION AND ENSURE THEY REMAIN IN PLACE AND OPERATIONAL. 3.TRAFFIC CONTROL IS TO CONFORM WITH UTAH MUTCD AND UDOT STANDARDS. 4.RESTORE OR PRESERVE ALL EXISTING FENCES, ROADS AND DITCHES UNLESS OTHERWISE SPECIFIED. 5.CONTRACTOR IS RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS, ONE HARD COPY AND ONE CD WITH CAD FILES AND PDF'S, PRIOR TO FINAL PAYMENT. 6.SAFE CONSTRUCTION PROCEDURES AND WORKING CLEARANCES ARE TO BE MAINTAINED AT ALL TIMES. 7.IF THERE IS A CONFLICT BETWEEN THE PLAN AND SPECIFICATIONS, THE SPECIFICATIONS SHALL PREVAIL. GENERAL NOTES PERFORATED AND UNPERFORATED HDPE, SDR 11 PIPE (FOR GROUNDWATER COLLECTION, SIZE VARIES) 10''10'' DEBRIS FENCE FLOW LINE XX"XX" XX"XX" 1.DO NOT ALLOW DEBRIS TO ENTER NEW PIPES DURING CONSTRUCTION. 2.INSTALL INVERT COVERS IN ALL SANITARY SEWER AND STORM DRAIN MANHOLES AFFECTED BY THE PROJECT PRIOR TO STARTING CONSTRUCTION. 3.USE GOVERNING AGENCY STANDARDS FOR DUST CONTROL. WET DOWN DRY MATERIALS AND RUBBISH TO CONTAIN ALL LOOSE MATERIALS. 4.ALTHOUGH SOME SURFACE FEATURES (FENCES, WALLS, TREES, ETC.) HAVE BEEN CALLED OUT ON THE DRAWINGS, NOT ALL ARE SHOWN OR IDENTIFIED. PERFORM A WALK THROUGH OF THE CONSTRUCTION AREA PRIOR TO BIDDING TO IDENTIFY SURFACE FEATURES THAT MUST BE PROTECTED OR REPLACED AS PART OF THE WORK. 5.PROTECT EXISTING IMPROVEMENTS. ALL IMPROVEMENTS OR STRUCTURES DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED OR RECONSTRUCTED AT THE EXPENSE OF THE CONTRACTOR TO ORIGINAL OR BETTER CONDITION TO THE SATISFACTION OF THE OWNER. 6.KEEP ALL CONSTRUCTION ACTIVITIES WITHIN ESTABLISHED PUBLIC RIGHT-OF-WAYS, AND TEMPORARY CONSTRUCTION EASEMENTS AS SHOWN, IF ANY. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLES, EQUIPMENT, LIMITS OF TRENCH EXCAVATION, EXCAVATED MATERIAL AND BACKFILL STORAGE. IF ADDITIONAL CONSTRUCTION EASEMENTS ARE REQUIRED, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN THESE EASEMENTS. CONTRACTOR RESPONSIBILITIES 0 5 / 2 2 / 2 3 C O N F O R M E D S E T CONTROL POINT TABLE NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20 21 22 23 24 25 114 115 116 117 NORTHING 441567.292 441546.700 441615.821 442219.149 442866.628 442893.697 442853.279 441798.485 441864.375 441966.742 442505.089 442512.677 442584.528 440249.510 440472.590 441566.324 443168.044 443623.957 443811.250 443879.600 443925.192 443966.195 444034.030 440147.880 440218.851 440213.306 440205.685 442322.233 EASTING 487326.308 488085.121 488765.294 488818.109 488671.454 487937.029 487327.736 487381.076 487984.867 488453.567 487431.567 487942.034 488479.703 491925.579 492407.905 492464.994 492538.105 492524.866 491403.640 490120.383 489123.128 488273.107 487331.608 492551.140 487216.560 487274.940 490025.032 492527.048 ELEVATION 4231.33 4229.45 4219.31 4252.33 4234.80 4237.11 4236.06 4230.42 4227.93 4225.07 4225.53 4228.74 4223.39 4230.58 4230.10 4234.67 4234.26 4231.62 4230.02 4225.52 4226.02 4224.87 4223.59 4232.95 4227.06 4226.48 4228.87 4237.48 DESCRIPTION SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET SET REBAR WITH CAP - AERIAL TARGET FOUND BRASS CAP - S. QUARTER SEC 11 FOUND REBAR NO CAP FOUND REBAR WITH CAP FOUND REBAR WITH CAP FOUND NAIL CP 8 CP 1 CP 2 CP 9 CP 10 CP 3 CP 4 CP 13 CP 5CP 6 CP 12 CP 24 CP 23 CP 22 CP 21 CP 20 CP 19 CP 18 CP 117 CP 16 CP 15 CP 14 CP 116 CP 115 CP 114 CP 7 CP 11 CP 25 CALIFORNIA AVE (1300 SOUTH) MODULE 8 SALT LAKE VALLEY SOLID WASTE LANDFILL PERIMETER ROAD SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 SURVEY CONTROL 1-C 3 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\2.0_Survey Control.dwg 0 250 500 SURVEYOR'S CERTIFICATE: I, DARREN WILLIAMS, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR, HOLDING CERTIFICATE NUMBER 4975981, AS PRESCRIBED BY THE LAWS OF THE STATE OF UTAH. I FURTHER CERTIFY THAT THIS SURVEY CONTROL DIAGRAM IS REPRESENTED ACCURATELY, AND WAS CONDUCTED UNDER MY DIRECT SUPERVISION. COORDINATE SYSTEM AND PROJECTION INFORMATION: GEODETIC DATUM = NAD 83 (2011) EPOCH 2010.00 VERTICAL DATUM = NAVD 88 COORDINATE SYSTEM = STATE PLANE 1983 UTAH CENTRAL ZONE 4302 PROJECTED AT GROUND GEOID MODEL = GEOID 18 UNITS = US SURVEY FOOT FALSE NORTHING OFFSET= -7,000,000 FALSE EASTING OFFSET = -1,000,000 COMBINED SCALE FACTOR = 1.0001763008 COORDINATE DATUM (US SURVEY FOOT): PROJECT COORDINATES ARE MODIFIED NAD 1983 UTAH CENTRAL ZONE 4302 COORDINATES. THE STATE PLANE COORDINATE VALUES ARE SCALED BY THE COMBINED SCALE FACTOR (FROM COORDINATE 0,0) THEN TRUNCATED BY THE FALSE NORTHING AND EASTING OFFSET VALUES. THE RESULTING PROJECT COORDINATES ARE TABULATED HEREIN. TO CONVERT PROJECT COORDINATES TO STATE PLANE COORDINATES: ((PROJECT NORTHING + 7,000,000) / 1.0001763008) = STATE PLANE NORTHING ((PROJECT EASTING + 1,000,000) / 1.0001763008) = STATE PLANE EASTING NOTES: THE PROJECTION WAS DEFINED TO MINIMIZE THE DIFFERENCE BETWEEN GROUND DISTANCES AT THE TOPOGRAPHIC SURFACE AND STATE PLANE GRID DISTANCES WITHIN THE DESIGN AREA OF THE PROJECT. ALL BEARINGS SHOWN OR COMPUTED FROM COORDINATE VALUES TABULATED HEREIN, ARE GRID BEARINGS OF NAD 1983 UTAH CENTRAL ZONE 4302. GEODETIC COORDINATES ARE ON THE NAD 1983 (2011) EPOCH 2010.00 DATUM BASED ON GPS OBSERVATIONS FROM THE UTAH REFERENCE NETWORK (TURN) GPS. CONTROL POINT ELEVATIONS WERE COMPUTED WITH GEOID 18 USING GPS MEASUREMENTS. CONTROL POINT MARKS ARE SUBJECT TO THE EFFECTS OF SURFACE ACTIVITY AND SEASONAL MOVEMENTS. MARKS MAY ALSO BE DAMAGED OR REMOVED AFTER THE COMPLETION OF THIS SURVEY. CONTROL POINT POSITIONS SHOULD BE FIELD VERIFIED PRIOR TO SUBSEQUENT SURVEY ACTIVITIES. THIS CONTROL SURVEY WAS COMPLETED IN JANUARY OF 2023. A COUNTY PERMIT MUST BE OBTAINED FOR WORK PERFORMED WITHIN THIRTY FEET OF ANY GOVERNMENT SURVEY MONUMENT PER UTAH STATE CODE 17-23-14. HATUFOEAT S T PROFES S OI N A L LAND S U R E V Y O RDARREN RYAN WILLIAMS No. 4975981-2201 Electronic Seal 1/10/2023 CONTROL POINT SECTION CORNER FOUND LEGEND 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 4'' 10''10'' 4'' 4'' 4'' 6'' 6'' 6'' 10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT MSD FILL 10''CU T CUT FI L L FILL FILL CB 4' ' 4'' 4'' 4''4''4''4'' 4'' FL: 4220.77 N: 440304.697 E: 487251.200 FL: 4220.70 N: 440236.136 E: 487272.912 FL: 4223.25 N: 442808.017 E: 487291.296 ESTIMATED TOP OF LINER EL: 4216.00 N: 441635.345 E: 489299.385 ESTIMATED TOP OF LINER EL: 4218.75 N: 441623.347 E: 489940.703 ESTIMATED TOP OF LINER EL: 4217.30 N: 441609.067 E: 490703.955 ESTIMATED TOP OF LINER EL: UNKNOWN N: 441585.761 E: 491949.611 ESTIMATED TOP OF LINER EL: UNKNOWN N: 441803.452 E: 492384.100 N0 0 ° 5 5 ' 0 3 . 4 8 " E 25 0 3 . 6 4 INSPECTION PORT (SEE DETAIL 3/DT-6) N: 441673.559 E: 488724.189 INSPECTION PORT (SEE DETAIL 3/DT-6) N: 441635.007 E: 490140.480 INSPECTION PORT (SEE DETAIL 3/DT-6) N: 441616.457 E: 491509.686 N63° 2 3 ' 1 6 . 4 3 " E 485.9 7 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 OVERALL SITE PLAN CS-1 4 OF 30 0 250'500' G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.1_Overall Site Plan.dwg MOD 4 MOD 1 MOD 11 MOD 5 MOD 3 MOD 2 MOD 6MOD 7MOD 8 MOD 10 MOD 9 4' LINER WALL (SEE DETAIL 3/DT-6) TIPPING FACE STOCKPILE AREA FOR MATERIAL FROM MOD 8 WEST DITCH, REGRADING (SEE DETAIL 1/DT-4) 0. 1 0 % ( D I T C H S L O P E ) 0. 1 0 % ( D I T C H S L O P E ) CLAY DAM ACROSS DITCH, TO BE REMOVED BY OWNER WIDEN DITCH CROSSING TO THE EAST, EXTEND CULVERT AS NECESSARY 4' LINER WALL (SEE DETAIL 3/DT-6) 4' LINER WALL (SEE DETAIL 3/DT-6) 4' LINER WALL (SEE DETAIL 3/DT-6) 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FILL FILL 10''10''10'' FI L L FIL L CU T CU T CU T CU T leach leach CU T CUT CUT FIL L FILL FILL FILL FILL FILL FIL L CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 MODULE 8 SITE PLAN CS-2 5 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.2_Module 8 Site Plan.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' SUMP (SEE DETAIL 1/DT-2) TRANSITION FROM 4-FT LINER WALL (3/DT-6) TO STANDARD ANCHOR TRENCH (5/DT-1) MOD 7 LINER TIE-IN (SEE DETAIL 4/DT-1) MOD 5 LINER TIE-IN (SEE DETAIL 2/DT-4) NORTH FRENCH DRAIN (SEE DETAIL 2/DT-4, PROFILE ON PR-1) EAST FRENCH DRAIN (SEE DETAIL 1/DT-5 PROFILE ON PR-2) SOUTH DITCH (SEE DETAIL 2/DT-5, PROFILE ON PR-3) 4" PERFORATED LEACHATE PIPE AT TOE OF SLOPE (SEE DETAIL 5/DT-2) 10" PERFORATED LEACHATE PIPE (SEE DETAIL 3/DT-2) 4-18" WITHDRAWL PIPES (SEE DETAIL 4/DT-2) WEST ROAD (SEE DETAIL 1/DT-4 AND PROFILE ON PR-4) 2 DT-5 1 DT-5 1 DT-4 2 DT-4 MANHOLE (SEE PROFILE ON PR-3) MOD 5 EXISTING SUMP. ABANDON IN PLACE AND PLACE COMPACTED PROTECTIVE SOIL TO PREVENT EQUIPMENT DAMAGE 6" PERFORATED PIPE AT TOE OF SLOPE (SEE DETAIL 5/DT-2) 6" PERFORATED LEACHATE PIPE (SEE DETAIL 6/DT-1) 4" PERFORATED LECHATE PIPE (SEE DETAIL 6/DT-1) WEST FRENCH DRAIN (SEE DETAIL 3/DT-4, PROFILE ON PR-2) GRAVEL PAD FOR FUTURE FLARE. USE 12" CLASS A-1-a GRANULAR BORROW PER SPECIFICATION 31 05 13 40' 100' 6" PIPE WITH TEE'S TO CONNECT TO 6" PIPES (SEE SHEET DR-2) 4-6" PERFORATED LEACHATE PIPES CONNECT TO EXISTING 6" LEACHATE PIPES (SEE SHEET DR-2 AND DETAIL 6/DT-1) LOCATE AND CONNECT 6" PERFORATED LEACHATE PIPE EXISTING 6" LEACHATE PIPE. APPROXIMATE ELEV. OF 4220.20. DEBRIS FENCE (SEE DETAIL 1/DT-6) DEBRIS FENCE (SEE DETAIL 1/DT-6) TIE INTO MESH EXISTING DEBRIS FENCE CLEAR AND GRUB AND REGRADE DITCH (SEE DETAIL 1/DT-4, AND SHEET CS-1 FOR EXTENT) 18" PIPE (SEE PROFILE ON PR-3) 18" PIPE (SEE PROFILE ON PR-3) CENTER FRENCH DRAIN (SEE PROFILE ON PR-1 AND DETAIL 3/DT-2) EXISTING 48" DIA. MANHOLE (13' DEEP) BACKFILL AND ABANDON, REMOVE SECTIONS AS NECESSARY FOR LINER INSTALLATION (SEE NOTE 1). WATER LEVEL OF DITCH/SUMP TO REMAIN BELOW EL: 4208 PUMP WATER TO WEST DITCH AS NECESSARY EXISTING GROUNDWATER CONTROL PUMP AND GENERATOR TO BE REMOVED BY LANDFILL/OWNER PRIOR TO CONSTRUCTION START (SEE NOTE 1). NATIVE CLAY DAM TO ISOLATE DITCH (TO BE REMOVED BY OWNER) LEACHATE PUMP SHED. SEE ENLARGED PLANS ON SHEET LP-1. NOTES: 1.AFTER CONSTRUCTION START ALL MODULE 8 GROUNDWATER CONTROL AND DEWATERING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL LANDFILL OWNED DEWATERING PUMPS, GENERATORS, ETC. SHALL BE REMOVED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND PORTABLE POWER SERVICE FOR GROUNDWATER CONTROL. 2.INSTALL GAVLVANIZED BAND-TYPE ANIMAL GUARD SUCH AS AGRI-DRAIN OR ENGINEER-APPROVED EQUAL AT THE END OF ALL EXPOSED HDPE DRAIN AND INTAKE PIPES. LINER ANCHOR TRENCH DIRECTLY BELOW TOP OF SLOPE. SEE DETAILS 5/DT-1 AND 1/DT-4 LINER ANCHOR TRENCH DIRECTLY BELOW TOP OF SLOPE. SEE DETAILS 5/DT-1 AND 2/DT-5 SOUTH ROAD (SEE DETAIL 2/DT-5 AND PROFILE ON PR-3) MOD 7 LINER TIE-IN (SEE DETAIL 4/DT-1) ENTEND LINER TIE-IN AND EXCAVATION INTO MOD 7 AS REQUIRED TO MAKE CONNECTION TO EXISTING LEACHATE PIPE. SEE NOTE 2 SEE NOTE 2 0 5 / 2 2 / 2 3 C O N F O R M E D S E T PRECAST DEADMAN (SEE DETAIL 5/DT-3) CONCRETE HEADWALL & SLAB (SEE DETAIL 4/DT-3) 60" COMBO BOX W/ LINEAR INLET (SEE DETAIL 4/DT-4) 2 8 / 2 8 / 2 3 R E V I S I O N # 2 2 LEACHATE FORCE MAIN. SEE SHEET LF-1 4 4 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 4 4 4 6' ' 4'' 4'' 10''10''10''10''10'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT MSD 6' ' TOE TO E TO E TO E TO E FILL FILL 10''10'' CU T CU T CU T CU T TOE TOE TOE TOE TO E TO E TOE TO E CUT CUT CU T leach CUT CUT FIL L FILL FILL FILL FILL FIL L TO E TOE TO E CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' -1 . 9 : 1 -2.0:1 -1 . 9 : 1 -2 . 0 : 1 FLAT 4225 4225 4215 4215 4220 4220 42 1 5 4215 4220 4220 42 2 5 42 2 5 42 1 5 42 1 5 42 2 0 42 2 0 42 3 0 42 3 0 42 3 5 4225 4225 42054205 4210 4210 4215 4215 4220 4220 4230 -2 . 6 % - 0 . 6 % -0. 7 % -2 . 3 % -14.8% -14.9% MOD 8 MOD 7 MOD 11 MOD 10 0 125'250' ±1125' AREA SHOWN ACCOMMODATES APPROX 350,000 CY ADDITIONAL STOCKPILE VOLUME FROM MODULE 8 EXCAVATION. CONTRACTOR TO COORDINATE WITH ENGINEER FOR STOCKPILE LOCATION & CONFIGURATION FOR REMAINING WASTE MATERIAL. SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 OVERALL GRADING PLAN GR-1 6 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.3_Overall Grading Plan.dwg MOD 5 EXIST. 60" DIA. 107 FT PIPE, REMOVE AND REUSE FOR TEMPORARY CROSSINGS EXIST. 60" DIA. 135 FT PIPE, REMOVE AND REUSE FOR TEMPORARY CROSSINGS CLAY DAM ACROSS DITCH, TO BE REMOVED BY OWNER CUT BACK AND RESHAPE EXISTING STOCKPILE AS REQUIRED FOR SOUTH DITCH AND VEHICLE ACCESS GRADING 50-FT-WIDE EQUIPMENT PATH BETWEEN DITCH TOP OF SLOPE AND STOCKPILE BOTTOM OF SLOPE, TYP APPROX. LIMIT OF EXISTING STOCKPILE. ±400' 50' ±225' ANY TRASH ENCOUNTERED SHALL BE TRANSPORTED TO THE TIPPING FACE GRADE BREAK, TYP APPROX. GRADING TIE-IN LINE, TYP NOTES: 1.LEACHATE AND GROUNDWATER PIPING NOT SHOWN FOR CLARITY. SEE SHEETS DR-1 THRU DR-3 FOR MORE INFO. 2.THE SHEET IS FOR GENERAL GRADING INFORMATION AND IS NOT INTENDED TO DEFINE FINISH GRADES FOR THE PROJECT. FOR GRADING OF KEY FEATURES SUCH AS ROADS AND DITCHES, THE CONTRACTOR SHALL RELY ON ALIGNMENTS, PROFILES, AND DETAIL SECTIONS. GRADE GRAVEL PAD WITH MINIMUM 2% SLOPE TOWARD WEST DITCH WIDEN DITCH CROSSING TO THE EAST, EXTEND CULVERT AS NECESSARY 2% MIN 0 5 / 2 2 / 2 3 C O N F O R M E D S E T TIE SOUTH DITCH TO EXISTING FLOWLINE. SEE SOUTH DITCH PROFILE ON SHEET PR-3 FOR FLOWLINE TRANSITION. 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 TOL: 4210.43 N: 442245.40 E: 487465.11 TOL: 4211.40 N: 442245.31 E: 487623.74 TOL: 4212.17 N: 442230.03 E: 487773.74 TOL: 4212.17 N: 442210.03 E: 487773.48TOL: 4211.37 N: 442196.30 E: 487623.48 TOL: 4210.43 N: 442196.40 E: 487465.01 TIE-IN AT BOT OF 4' LINER WALL EL: 4217.71 N: 441675.33 E: 488659.31 LINER TIE-IN EL: 4215.15 N: 442167.58 E: 488665.74 LINER TIE-IN EL: 4218.50 N: 442769.80 E: 488673.61 LINER TIE-IN EL: 4223.70 N: 442759.38 E: 487370.53 TOL: 4225.46 N: 441693.39 E: 487368.39 TOL: 4215.15 N: 442207.53 E: 488666.26 TOL: 4215.15 N: 442227.53 E: 488666.52 LINER TIE-IN EL: 4214.50 N: 442207.33 E: 488736.36 LINER TIE-IN EL: 4214.50 N: 442227.33 E: 488736.43 LINER TIE-IN EL: 4215.15 N: 442267.57 E: 488667.04 BOT: 4209.78 N: 442220.45 E: 487623.46 BOS: 4209.37 N: 442201.04 E: 487539.16 BOT: 4209.37 N: 442240.63 E: 487539.16 BOS: 4208.93 N: 442240.74 E: 487467.72 BOS: 4208.93 N: 442200.97 E: 487467.60 BOT: 4210.44 N: 442220.15 E: 487773.62 BOT: 4214.21 N: 442217.62 E: 488666.36 4220 4214 4216 4218 4222 4224 4220 4214 4216 4218 4222 -14.9% -3 . 0 % -2 . 6 % - 0 . 6 % -0. 6 % -0. 7 % -2 . 2 % -14.8% -2 . 5 % -15.2%-0.4%-0.6% -0.6% 0. 2 % 0. 2 % -0.4% -0 . 7 % -0 . 5 % 421 4 421 6 421 8 42 1 2 42 1 4 42 1 4 42 1 6 42 1 8 42 1 8 42 2 0 42 2 2 4214421442124210 4210 -0.9% 4214 4216 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 LINER GRADING PLAN GR-2 7 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.4_Liner Grading Plan.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' NOTES: 1.ALL GRADES AND ELEVATIONS SHOWN ARE FOR TOP OF 60 MIL HDPE PRIMARY LINER SURFACE. THE TOP OF THE PROTECTIVE SOIL SURFACE SHALL BE A MINIMUM OF 2 FEET ABOVE THE ELEVATIONS SHOWN. 2.SEE SHEET CS-2 FOR MORE INFORMATION REGARDING LINER EDGE CONDITIONS INCLUDING DETAIL REFERENCES. 3.CONTINUE 4' LINER WALL FOR 50 FEET AND THEN TRANSITION LINER WALL HEIGHT FROM 4' TO '0 OVER 50 FEET. 4.LEACHATE AND GROUNDWATER PIPING NOT SHOWN FOR CLARITY. SEE SHEETS DR-1 THRU DR-3 FOR MORE INFO. 100' TOL TOP OF LINER BOS BOTTOM OF LINER SUMP BOT BOTTOM OF LINER TRENCH LINER ANCHOR LINER TIE-IN LINER SUMP LINER TRENCH FLOW LINE PRIMARY LINER AREA DUAL LINER AREA LEGEND LINER WALL TRANSITION, SEE NOTE 3.0 5 / 2 2 / 2 3 C O N F O R M E D S E T 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FILL FILL 10''10''10'' FI L L FIL L CU T CU T CU T CU T leach leach CU T CUT CUT FIL L FILL FILL FILL FIL L CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' IE (IN): 4235.08 N: 442221.17 E: 487363.81 IE (IN): 4214.19 N: 442217.49 E: 488666.39 IE (IN): 4219.26 N: 442582.17 E: 487403.14 IE (IN): 4225.46 N: 441693.38 E: 487368.39 IE (OUT): 4210.43 N: 442196.40 E: 487465.01 WITHDRAWAL PIPES 18" DIA. 101.6 LF @ 25.93% P-1 10" DIA. 1204.1 LF @ 0.44% P-4 6" DIA. 996.1 LF @ 0.61% P-3 4" DIA. 512.4 LF @ 2.93% IE (IN): 4217.43 N: 442690.38 E: 488514.66 IE (OUT): 4211.39 N: 442244.95 E: 487623.74 P-5 4" DIA. 1157.9 LF @ 0.55% IE (OUT): 4211.39 N: 442195.96 E: 487623.48 IE (IN): 4217.71 N: 441675.96 E: 488658.06 IE (OUT): 4208.93 N: 442220.90 E: 487462.30 P-15 6" DIA. 239.5 LF @ 0.39% IE (IN): 4220.20 N: 442821.66 E: 487406.18 S89° 50' 14.84"E 1201.34 N1 0 ° 5 2 ' 2 1 . 9 1 " E 53 3 . 3 2 N1 0 ° 2 5 ' 3 6 . 8 9 " W 36 1 . 5 6 P-17 10" DIA. 70.1 LF @ 0.44% SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 LEACHATE DRAINAGE PLAN DR-1 8 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.6_DRAINGE.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' FOR PIPE CROSSING ELEVATIONS SEE CENTER DRAIN PROFILE ON SHEET PR-2 AND WEST DRAIN PROFILE ON PR-3 SEE DR-2 FOR DRAINGE PIPES IN THIS AREA CONNECT TO EXISTING 6" PIPE, ELEVATION AND LOCATION ARE APPROXIMATE TIE INTO EXIST. MOD 7- 6" PIPE 4 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 7 / 0 9 / 2 4 R E V I S I O N # 4 4 LEACHATE FORCE MAIN. SEE SHEET LF-1 4 6'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 6''6''6'' 10''10''10''10''10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 6'' 6'' 6'' 6' ' 6' ' 6' ' 6'' 6'' 6'' 6' ' 6' ' 6' ' IE (OUT): 4217.43 IE (OUT): 4217.46 IE (OUT): 4217.48 IE (OUT): 4217.50 IE (OUT): 4217.58 P- 1 1 6 " D I A . 8 6 . 3 L F @ 0 . 6 3 % P- 1 2 6 " D I A . 8 6 . 1 L F @ 0 . 6 0 % P- 1 3 6 " D I A . 8 6 . 2 L F @ 0 . 5 8 % P- 1 4 6 " D I A . 8 5 . 9 L F @ 0 . 4 9 % IE (IN): 4218.00 N: 442776.75 E: 488523.70 IE (IN): 4218.00 N: 442776.53 E: 488529.27 IE (IN): 4218.00 N: 442776.66 E: 488536.08 IE (IN): 4218.00 N: 442776.39 E: 488558.23 P-10 6" DIA. 43.8 LF @ 0.34%SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 LEACHATE DRAINAGE PLAN DR-2 9 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.6_DRAINGE.dwg MOD 8 MOD 7 MOD 5 0 10'20' 15"X6" ELBOW 6"X6" TEE 6" 22.5° ELBOW CONNECT TO EXISTING 6" PIPE. ELEVATION AND LOCATION ARE APPROXIMATE. DO NOT CONNECT TO RISER PIPES. ABONDON RISERS IN PLACE AND MOUND PROTECTIVE SOIL AROUND RISER CAPS TO PREVENT FUTURE DAMAGE. 6" PERFORATED PIPE 6" NON PERFORATED PIPE 6" NON PERFORATED PIPE 6" PERFORATED PIPE 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FILL FILL 10''10''10'' FI L L FIL L CU T CU T CU T CU T leach leach CU T CUT CUT FIL L FILL FILL FILL FIL L CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' IE (IN): 4213.64 N: 442727.06 E: 488620.41 IE (IN): 4214.43 N: 442728.37 E: 488611.35 IE (OUT): 4209.19 N: 442724.69 E: 487515.52 IE (OUT): 4210.65 N: 441581.89 E: 488590.09 N-DRAIN-2 10" DIA. 1104.9 LF @ 0.40% (GROUNDWATER COLLECTION) E-DRAIN 10" DIA. 1146.7 LF @ 0.33% (GROUNDWATER COLLECTION) W-DRAIN-1 10" DIA. 508.0 LF @ 0.40% (GROUNDWATER COLLECTION) IE (OUT): 4207.16 N: 442216.68 E: 487516.62 P-9 18" DIA. 57.4 LF @ 1.06% IE (OUT): 4224.37 N: 441581.58 E: 487309.77 48" DIA. MH RIM: 4231.13 SUMP: 4225.00 IE OUT: 4225.00 (W) N-DRAIN-1 10" DIA. 110.0 LF @ 0.69% (GROUNDWATER COLLECTION) N89° 52' 36.48"E 1214.90 N0 1 ° 0 3 ' 4 4 . 0 6 " E 11 3 8 . 6 4 N0 0 ° 0 7 ' 2 2 . 7 4 " W 11 3 7 . 9 3 W-DRAIN-2 10" DIA. 627.0 LF @ 0.40% IE (IN): 4207.56 N: 442216.46 E: 487416.63 IE (OUT): 4204.65 N: 441589.70 E: 487517.96 IE (IN): 4209.36 N: 442215.29 E: 488016.63 C-DRAIN-2 10" DIA. 500.0 LF @ 0.44% P-7 18" DIA. 96.9 LF @ 33.39% 60" COMBO BOX RIM: 4204.50 SUMP: 4199.00 IE PIPE: 4200.44 (W) IE INLET: 4203.5 (E) IE (IN): 4231.90 N: 441581.60 E: 487379.32 C-DRAIN-1 10" DIA. 100.0 LF @ 0.40% SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 GROUNDWATER DRAINAGE PLAN DR-3 10 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.6_DRAINGE.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' CONNECT CENTER FRENCH DRAIN PIPES TO WEST FRENCH DRAIN PIPE WITH 10" DOUBLE WYE FITTING. 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 8 / 2 8 / 2 3 R E V I S I O N # 2 2 2 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FIL L FI L L FI L L FI L L FI L L FILL FILL FILL 10''10''10'' CU T CU T CU T CU T CU T CU TCU T FILL FILL FILL FILL FILL FI L L FI L L FILL FI L L FI L L FI L L FIL L CU T CU T CU T CU T leach leach CU T CUT CUT FIL L FILL FILL FILL FILL FILL FIL L FI L L FILL FI L L CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' 30 + 0 0 32 + 0 0 34 + 0 0 36 + 0 0 38 + 0 0 40 + 0 0 42 + 0 0 44 + 0 0 45 + 4 7 10+00 12+00 14+00 16+00 18+00 20+00 22+00 22+71 BP: 10+00.00 N: 441572.604 E: 487354.152 EP: 22+71.49 N: 442844.087 E: 487356.695 BP: 30+00.00 N: 441680.682 E: 487276.315 EP: 45+47.38 N: 441659.025 E: 488823.544 S89°11'53"E 1547.38' N0 0 ° 0 6 ' 5 3 " E 12 7 1 . 4 9 ' N0 1 ° 0 3 ' 4 4 . 0 6 " E 11 3 8 . 6 4 S89° 50' 21.49"E 892.79 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGNMENT PLAN ALG-1 11 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.7_ALIGNMENTS.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' WEST ROAD ALIGNMENT PROFILE ON SHEET PR-4 SOUTH ROAD ALIGNMENT PROFILE ON SHEET PR-3 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 6' ' 6' ' 4'' 4'' 4'' 10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 6'' 10''10''10''10''10''10'' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' 10 ' ' CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT MSD 6'' 6"6"6"6" FILL FIL L FI L L FI L L FI L L FI L L FILL FILL FILL 10''10''10'' CU T CU T CU T CU T CU T CU TCU T FILL FILL FILL FILL FILL FI L L FI L L FILL FI L L FI L L FI L L FIL L CU T CU T CU T CU T leach leach CU T CUT CUT FIL L FILL FILL FILL FILL FILL FIL L FI L L FILL FI L L CB 4'' 4'' 4'' 4'' 4'' 4'' 4'' 170+00 172+00 174+00 176+00 178+00 180+00 181+71 19 0 + 0 0 19 2 + 0 0 19 4 + 0 0 19 6 + 0 0 19 8 + 0 0 20 0 + 0 0 20 2 + 0 0 20 3 + 9 8 13 0 + 0 0 13 2 + 0 0 13 4 + 0 0 13 6 + 0 0 13 8 + 0 0 14 0 + 0 0 14 2 + 0 0 14 4 + 0 0 14 5 + 1 6 10 0 + 0 0 10 2 + 0 0 10 4 + 0 0 10 6 + 0 0 10 8 + 0 0 11 0 + 0 0 11 2 + 0 0 11 4 + 0 0 11 5 + 2 5 150+00 152+00 154+00 156+00 158+00 160+00 161+53 BP: 130+00.00 N: 441581.566 E: 487276.091 EP: 145+16.19 N: 441591.771 E: 488791.941 BP: 150+00.00 N: 441579.452 E: 487517.979 EP: 161+52.98 N: 442732.427 E: 487515.504 BP: 170+00.00 N: 441581.622 E: 488590.088 EP: 181+71.32 N: 442752.734 E: 488611.909 BP: 190+00.00 N: 442724.284 E: 487320.138 EP: 203+97.64 N: 442727.270 E: 488717.771 BP: 100+00.00 N: 442221.304 E: 487321.002 EP: 115+24.51 N: 442217.334 E: 488845.506 N89°58'56"E 1371.11' N0 0 ° 0 7 ' 2 3 " W 11 5 2 . 9 8 ' N0 1 ° 0 3 ' 4 4 . 0 6 " E 11 3 8 . 6 4 N89°52'39"E 1397.64' S89° 50' 21.49"E 892.79 PI: 143+76.93 N: 441581.9870 E: 488653.0160 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGNMENT PLAN ALG-2 12 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\3.7_ALIGNMENTS.dwg MOD 8 MOD 7 MOD 4MOD 5 MOD 11 MOD 10 0 100'200' NORTH DRAIN ALIGNMENT PROFILE ON SHEET PR-1 EAST DRAIN ALIGNMENT PROFILE ON SHEET PR-2 SOUTH DITCH ALIGNMENT PROFILE ON SHEET PR-3 WEST DRAIN ALIGNMENT PROFILE ON SHEET PR-2 CENTER DRAIN ALIGNMENT PROFILE ON SHEET PR-1 WEST DITCH ALIGNMENT REFER TO SHEET GR-1 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 4 7 / 0 9 / 2 4 R E V I S I O N # 4 4 CENTER DRAIN 4200 4210 4220 4230 4240 4250 4260 4200 4210 4220 4230 4240 4250 4260CENTER DRAIN 4200 4210 4220 4230 4240 4250 4200 4210 4220 4230 4240 4250 NORTH DRAIN 4200 4210 4220 4230 4240 4250 4200 4210 4220 4230 4240 4250 190+00 42 3 4 . 3 7 190+50 42 2 2 . 8 3 42 3 3 . 8 5 191+00 42 2 2 . 6 2 42 1 9 . 5 6 191+50 42 2 2 . 4 1 42 0 8 . 9 7 192+00 42 2 2 . 2 1 42 0 7 . 8 8 192+50 42 2 2 . 0 0 42 0 8 . 6 4 193+00 42 2 1 . 8 6 42 0 8 . 3 9 193+50 42 2 1 . 7 0 42 0 9 . 8 4 194+00 42 2 1 . 5 0 42 1 1 . 1 9 194+50 42 2 1 . 2 9 42 0 7 . 9 7 195+00 42 2 1 . 0 8 42 1 0 . 4 6 195+50 42 2 0 . 8 8 42 1 1 . 0 3 196+00 42 2 0 . 6 7 42 0 9 . 0 3 196+50 42 2 0 . 4 7 42 0 7 . 6 2 197+00 42 2 0 . 2 6 42 0 6 . 0 8 197+50 42 2 0 . 0 5 42 0 4 . 7 9 198+00 42 1 9 . 8 5 42 0 6 . 3 1 198+50 42 1 9 . 6 4 42 0 6 . 1 5 199+00 42 1 9 . 4 4 42 0 6 . 1 1 199+50 42 1 9 . 2 3 42 0 6 . 3 9 200+00 42 1 9 . 0 2 42 0 8 . 0 9 200+50 42 1 8 . 8 2 42 1 0 . 0 8 201+00 42 1 8 . 6 1 42 0 9 . 5 4 201+50 42 1 8 . 4 1 42 1 1 . 1 4 202+00 42 1 8 . 2 0 42 1 4 . 0 0 202+50 42 1 7 . 9 9 42 2 4 . 0 9 203+00 42 1 8 . 0 3 42 0 9 . 5 1 203+50 42 1 8 . 2 1 42 1 8 . 9 6 204+00 42 0 9 . 8 5 42 0 9 . 5 1 42 0 9 . 2 1 42 0 9 . 4 1 42 0 9 . 6 1 42 0 9 . 8 2 42 1 0 . 0 2 42 1 0 . 2 2 42 1 0 . 4 2 42 1 0 . 6 2 42 1 0 . 8 2 42 1 1 . 0 2 42 1 1 . 2 2 42 1 1 . 4 3 42 1 1 . 6 3 42 1 1 . 8 3 42 1 2 . 0 3 42 1 2 . 2 3 42 1 2 . 4 3 42 1 2 . 6 3 42 1 2 . 8 3 42 1 3 . 0 4 42 1 3 . 2 4 42 1 3 . 4 4 42 1 3 . 6 4 100+00 42 3 0 . 3 1 100+50 42 3 6 . 6 0 42 3 0 . 0 7 101+00 42 2 4 . 0 5 42 3 1 . 2 4 101+50 42 1 3 . 1 2 42 2 8 . 1 9 102+00 42 1 2 . 7 7 42 2 8 . 0 5 102+50 42 1 3 . 0 7 42 2 7 . 8 3 103+00 42 1 3 . 3 7 42 2 9 . 1 1 103+50 42 1 3 . 6 4 42 2 8 . 5 4 104+00 42 1 3 . 9 0 42 2 8 . 1 8 104+50 42 1 4 . 1 6 42 2 8 . 0 7 105+00 42 1 4 . 3 3 42 2 7 . 8 3 105+50 42 1 4 . 4 8 42 2 8 . 2 8 106+00 42 1 4 . 6 5 42 2 7 . 9 9 106+50 42 1 4 . 8 0 42 2 7 . 4 9 107+00 42 1 4 . 9 7 42 2 7 . 5 4 107+50 42 1 5 . 1 3 42 2 7 . 2 0 108+00 42 1 5 . 2 9 42 2 7 . 4 6 42 3 3 . 1 0 42 2 0 . 2 6 42 0 8 . 9 7 42 0 9 . 1 9 42 0 9 . 4 2 42 0 9 . 6 5 42 0 9 . 8 8 42 1 0 . 1 1 42 1 0 . 3 3 42 1 0 . 5 6 42 1 0 . 7 9 42 1 1 . 0 2 42 1 1 . 2 5 42 1 1 . 4 8 42 1 1 . 7 0 42 1 1 . 9 3 111+00 42 2 4 . 9 4 42 2 4 . 9 4 111+50 42 2 4 . 4 4 42 2 4 . 4 4 112+00 42 2 4 . 2 0 42 2 4 . 2 0 112+50 42 2 2 . 8 3 42 2 2 . 8 3 113+00 42 1 5 . 4 6 42 1 5 . 4 6 113+50 42 2 0 . 8 6 42 2 0 . 8 6 114+00 42 2 9 . 6 6 42 2 9 . 6 6 114+50 42 4 3 . 4 9 42 4 3 . 4 9 115+00 42 5 2 . 9 2 42 5 2 . 9 2 115+25 42 5 6 . 1 9 42 5 6 . 1 9 42 1 3 . 3 0 42 1 3 . 5 3 42 1 3 . 7 6 42 1 3 . 9 9 42 1 4 . 2 2 42 1 4 . 4 4 42 1 4 . 6 7 42 1 4 . 9 0 42 1 5 . 1 3 42 1 5 . 2 4 CONNECT TO EXISTING 6" MOD 7 LRCS PIPE W-DRAIN-1 10" DIA. IE: 4207.17 P-15 6" DIA. IE: 4219.82 E-DRAIN 10" DIA. IE: 4214.43 P-14 6" DIA. IE: 4217.76 P-13 6" DIA. IE: 4217.71 P-12 6" DIA. IE: 4217.70 P-11 6" DIA. IE: 4217.69 E-DRAIN 10" DIA. IE: 4212.75 WITHDRAWAL PIPES 18" DIA. 101.6 LF @ 25.93% IE (IN): 4235.08 STA: 100+43.26 0.00 IE (IN): 4209.95 STA: 190+85.38 0.00 WEST DRAIN CONNECTION IE (OUT): 4209.19 STA: 191+95.38 0.00 N-DRAIN-1 10" DIA. 110.0 LF @ 0.69% N-DRAIN-2 10" DIA. 1104.9 LF @ 0.40% IE (IN): 4213.64 STA: 203+00.28 0.00 P-1 10" DIA. 1204.1 LF @ 0.44% IE (IN): 4214.19 STA: 113+45.39 0.00 P-1 10" DIA. 1204.1 LF @ 0.44% IE (OUT): 4208.93 STA: 101+41.30 0.00 P-17 10" DIA. 70.1 LF @ 0.44% EX P-5 6" DIA @ 0.41% IE (IN): 4214.50 STA: 114+15.39 0.00 C-DRAIN-2 10" DIA. 500.0 LF @ 0.44% C-DRAIN-1 10" DIA. 100.0 LF @ 0.40% IE (IN): 4207.56 STA: 100+95.65 0.00 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGN. PROFILES PR-1 13 OF 30 FG EGFGEGPI P E I E EG WEST ROAD WEST ROAD FG EGPI P E I E FG LINER 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 4 7 / 0 9 / 2 4 R E V I S I O N # 4 4 EAST DRAIN 4200 4210 4220 4230 4240 4250 4200 4210 4220 4230 4240 4250 WEST DRAIN 4200 4210 4220 4230 4240 4250 4200 4210 4220 4230 4240 4250 169+00 169+50 170+00 42 0 9 . 8 8 42 2 3 . 2 8 170+50 42 2 4 . 0 4 42 1 1 . 0 5 171+00 42 2 2 . 9 9 42 1 0 . 4 3 171+50 42 1 9 . 1 8 42 1 1 . 3 1 172+00 42 1 8 . 9 2 42 1 0 . 8 2 172+50 42 1 8 . 6 6 42 0 9 . 6 7 173+00 42 1 8 . 4 1 42 1 5 . 2 0 173+50 42 1 8 . 1 5 42 1 8 . 9 4 174+00 42 1 7 . 9 0 42 2 3 . 5 4 174+50 42 1 7 . 6 6 42 1 9 . 5 1 175+00 42 1 7 . 4 0 42 1 2 . 7 7 175+50 42 1 7 . 1 4 42 1 4 . 1 7 176+00 42 1 6 . 8 9 42 1 5 . 0 6 176+50 42 1 6 . 9 1 42 1 4 . 9 9 177+00 42 1 7 . 1 5 42 1 3 . 1 9 177+50 42 1 7 . 4 6 42 1 2 . 3 4 178+00 42 1 7 . 7 6 42 1 1 . 1 1 178+50 42 1 8 . 0 6 42 0 9 . 1 3 179+00 42 1 8 . 3 7 42 0 9 . 2 5 179+50 42 1 8 . 7 0 42 0 8 . 9 7 180+00 42 1 9 . 0 4 42 0 9 . 7 1 180+50 42 1 9 . 3 7 42 1 1 . 6 1 181+00 42 1 9 . 7 1 42 1 2 . 6 1 181+50 42 2 0 . 0 4 42 1 5 . 3 9 182+00 42 1 0 . 8 1 42 1 0 . 9 8 42 1 1 . 1 4 42 1 1 . 3 1 42 1 1 . 4 7 42 1 1 . 6 4 42 1 1 . 8 0 42 1 1 . 9 7 42 1 2 . 1 3 42 1 2 . 3 0 42 1 2 . 4 6 42 1 2 . 6 3 42 1 2 . 7 9 42 1 2 . 9 6 42 1 3 . 1 2 42 1 3 . 2 9 42 1 3 . 4 5 42 1 3 . 6 2 42 1 3 . 7 8 42 1 3 . 9 5 42 1 4 . 1 1 42 1 4 . 2 8 149+00 149+50 150+00 42 0 2 . 0 0 42 3 7 . 8 7 150+50 42 2 3 . 4 1 42 3 6 . 0 2 151+00 42 3 0 . 3 0 42 3 4 . 0 5 151+50 42 2 5 . 2 8 42 3 1 . 7 0 152+00 42 2 3 . 8 9 42 2 8 . 6 5 152+50 42 2 2 . 5 2 42 2 9 . 0 5 153+00 42 2 1 . 2 5 42 2 7 . 3 1 153+50 42 1 9 . 9 8 42 2 9 . 0 1 154+00 42 1 8 . 7 1 42 2 9 . 7 2 154+50 42 1 7 . 4 8 42 2 7 . 2 5 155+00 42 1 6 . 1 1 42 2 6 . 4 6 155+50 42 1 4 . 8 2 42 2 5 . 9 7 156+00 42 1 3 . 2 6 42 2 7 . 1 4 156+50 42 1 2 . 7 4 42 2 8 . 2 3 157+00 42 1 3 . 6 6 42 2 7 . 4 3 157+50 42 1 5 . 0 1 42 2 8 . 4 1 158+00 42 1 6 . 0 3 42 2 7 . 3 7 158+50 42 1 7 . 3 4 42 2 9 . 4 0 159+00 42 1 8 . 3 9 42 2 7 . 8 4 159+50 42 1 9 . 5 3 42 2 4 . 9 6 160+00 42 2 0 . 6 6 42 2 3 . 7 5 160+50 42 2 1 . 8 4 42 2 2 . 8 3 161+00 42 2 3 . 0 9 42 2 5 . 9 2 161+50 42 2 4 . 3 4 42 0 8 . 8 1 162+00 42 0 4 . 8 4 42 0 5 . 0 4 42 0 5 . 2 4 42 0 5 . 4 4 42 0 5 . 6 3 42 0 5 . 8 3 42 0 6 . 0 3 42 0 6 . 2 3 42 0 6 . 4 3 42 0 6 . 6 3 42 0 6 . 8 3 42 0 7 . 0 2 42 0 7 . 2 2 42 0 7 . 4 2 42 0 7 . 6 2 42 0 7 . 8 2 42 0 8 . 0 2 42 0 8 . 2 2 42 0 8 . 4 1 42 0 8 . 6 1 42 0 8 . 8 1 42 0 9 . 0 1 P-1 10" DIA. IE: 4213.91 P-1 10" DIA. IE: 4209.17 N-DRAIN-2 10" DIA. IE: 4213.60 C-DRAIN-1 10" DIA. IE: 4207.16 E-DRAIN 10" DIA. 1146.7 LF @ 0.33% IE (OUT): 4210.65 STA: 170+00.27 0.00 IE (IN): 4214.43 STA: 181+46.94 0.00 W-DRAIN-1 10" DIA. 508.0 LF @ 0.40% IE (OUT): 4207.16 STA: 156+37.23 0.00 IE (IN): 4209.19 STA: 161+45.24 0.00 W-DRAIN-2 10" DIA. 627.0 LF @ 0.40% SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGN. PROFILES PR-2 14 OF 30 FG EG FG EGPI P E I E FG EG FG EGPI P E I E SOUTH ROAD SOUTH ROAD LINER LINER 0 5 / 2 2 / 2 3 C O N F O R M E D S E T SOUTH DITCH 4190 4200 4210 4220 4230 4240 4190 4200 4210 4220 4230 4240 SOUTH DITCH 4190 4200 4210 4220 4230 4240 4190 4200 4210 4220 4230 4240 SOUTH ROAD 4210 4220 4230 4240 4250 4260 4210 4220 4230 4240 4250 4260 W-DRAIN 10" DIA. IE: 4204.65 130+00 42 2 4 . 0 5 130+50 42 3 0 . 4 5 131+00 42 3 0 . 9 6 131+50 42 1 7 . 0 0 42 3 5 . 2 2 132+00 42 0 2 . 0 0 42 3 7 . 5 2 132+50 42 0 2 . 0 0 42 3 8 . 2 3 133+00 42 0 2 . 0 0 42 3 9 . 0 1 133+50 42 0 5 . 1 6 42 3 6 . 9 5 134+00 42 0 5 . 4 1 42 3 1 . 6 0 134+50 42 0 5 . 6 5 42 3 3 . 0 1 135+00 42 0 5 . 9 0 42 3 4 . 0 6 135+50 42 0 6 . 1 4 42 3 0 . 6 9 136+00 42 0 6 . 3 9 42 2 9 . 7 3 136+50 42 0 6 . 6 3 42 2 9 . 2 9 137+00 42 0 6 . 8 8 42 2 8 . 9 9 137+50 42 0 7 . 1 2 42 2 8 . 4 2 138+00 42 0 7 . 3 7 42 2 7 . 7 5 138+50 42 0 7 . 6 1 42 2 8 . 0 5 139+00 42 0 7 . 8 6 42 2 7 . 4 6 30+50 42 2 8 . 5 0 31+00 42 3 1 . 8 6 42 3 2 . 0 3 31+50 42 3 1 . 5 6 42 3 3 . 2 3 32+00 42 3 1 . 2 6 42 3 4 . 1 5 32+50 42 3 0 . 9 7 42 3 4 . 0 6 33+00 42 3 0 . 6 7 42 3 5 . 3 1 33+50 42 3 0 . 3 7 42 3 0 . 4 4 34+00 42 3 0 . 0 8 42 2 8 . 9 4 34+50 42 2 9 . 7 8 42 2 9 . 5 0 35+00 42 2 9 . 4 9 42 2 9 . 3 3 35+50 42 2 9 . 1 9 42 2 8 . 9 1 36+00 42 2 8 . 8 9 42 2 8 . 9 2 36+50 42 2 8 . 6 0 42 2 8 . 0 0 37+00 42 2 8 . 3 0 42 2 6 . 7 1 37+50 42 2 8 . 0 1 42 2 6 . 7 4 38+00 42 2 7 . 7 1 42 2 7 . 4 5 38+50 42 2 7 . 4 1 42 2 6 . 7 3 39+00 42 2 7 . 1 2 42 2 6 . 8 8 39+50 42 2 6 . 8 2 42 2 5 . 9 4 40+00 42 2 6 . 5 3 42 2 6 . 1 5 40+50 42 2 6 . 2 3 42 2 7 . 2 0 41+00 42 2 5 . 9 3 42 2 6 . 9 3 41+50 42 2 5 . 6 4 42 2 8 . 2 2 42+00 42 2 5 . 3 4 42 2 8 . 1 4 42+50 42 2 5 . 0 4 42 2 7 . 9 2 43+00 42 2 4 . 7 5 42 1 7 . 6 2 43+50 42 2 4 . 4 5 42 1 9 . 4 5 44+00 42 2 4 . 1 6 42 2 4 . 0 3 44+50 42 2 1 . 4 6 -0.59% ST A : 3 0 + 9 5 . 6 0 EL : 4 2 3 1 . 8 8 ST A : 4 4 + 3 1 . 0 3 EL : 4 2 2 3 . 9 7 -0.59% ST A : 3 0 + 9 5 . 6 0 EL : 4 2 3 1 . 8 8 ST A : 4 4 + 3 1 . 0 3 EL : 4 2 2 3 . 9 7 - 3 3 . 3 9 % 0.00%10.00 % 0.49% ST A : 1 3 1 + 0 6 . 6 1 EL : 4 2 3 1 . 4 9 ST A : 1 3 1 + 9 4 . 9 2 EL : 4 2 0 2 . 0 0 ST A : 1 3 3 + 0 5 . 3 0 EL : 4 2 0 2 . 0 0 ST A : 1 3 3 + 3 6 . 2 4 EL : 4 2 0 5 . 0 9 48" DIA. MH RIM: 4231.13 SUMP: 4225.00 IE OUT: 4225.00 (W) P-9 18" DIA. 57.4 LF @ 1.06% IE (OUT): 4224.37 STA: 130+33.68 0.00 P-7 18" DIA. 96.9 LF @ 33.39% 60" COMBO BOX RIM: 4204.50 SUMP: 4199.00 IE PIPE: 4200.44 (W) IE INLET: 4203.5 (E) ST A : 1 4 3 + 7 6 . 9 2 EL : 4 2 1 0 . 1 9 ST A : 1 4 5 + 1 6 . 1 9 EL : 4 2 1 3 . 9 4 - 3 3 . 3 9 % 0.00%10.00 % 0.49% 2.69% 142+00 42 0 9 . 3 3 42 3 7 . 2 7 142+50 42 0 9 . 5 7 42 2 9 . 0 2 143+00 42 0 9 . 8 2 42 2 7 . 1 1 143+50 42 1 0 . 0 6 42 1 8 . 5 7 144+00 42 1 0 . 8 1 42 1 7 . 6 6 144+50 42 1 2 . 1 6 42 1 5 . 8 4 145+00 42 1 3 . 5 0 42 1 3 . 8 0 145+50 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGN. PROFILES PR-3 15 OF 30 FG EG FG EG FL EG FL EG2 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 8 / 2 8 / 2 3 R E V I S I O N # 2 2 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 EG FL FL EG WEST ROAD 4210 4220 4230 4240 4250 4260 4210 4220 4230 4240 4250 4260 10+00 42 3 2 . 0 9 10+50 42 3 1 . 6 2 11+00 42 3 1 . 7 5 42 3 1 . 8 1 11+50 42 3 1 . 9 7 42 3 1 . 6 2 12+00 42 3 2 . 2 0 42 3 1 . 4 1 12+50 42 3 2 . 4 2 42 3 1 . 0 2 13+00 42 3 2 . 6 4 42 2 9 . 9 4 13+50 42 3 2 . 8 6 42 2 8 . 6 2 14+00 42 3 3 . 0 8 42 2 9 . 4 8 14+50 42 3 3 . 3 0 42 3 0 . 4 3 15+00 42 3 3 . 5 3 42 3 1 . 1 9 15+50 42 3 3 . 7 5 42 3 1 . 1 0 16+00 42 3 3 . 9 7 42 3 1 . 1 3 16+50 42 3 4 . 1 9 42 3 0 . 4 4 17+00 42 3 4 . 4 1 42 2 9 . 7 9 17+50 42 3 4 . 6 4 42 2 9 . 1 8 18+00 42 3 4 . 8 6 42 2 8 . 6 4 18+50 42 3 5 . 0 8 42 2 8 . 5 3 19+00 42 3 5 . 3 0 42 2 8 . 7 2 19+50 42 3 5 . 5 2 42 2 9 . 1 2 20+00 42 3 5 . 7 5 42 2 9 . 8 9 20+50 42 3 5 . 9 7 42 3 0 . 9 0 21+00 42 3 6 . 1 9 42 3 2 . 7 6 21+50 42 3 6 . 4 1 42 3 4 . 2 8 22+00 42 3 6 . 6 3 42 3 5 . 5 5 22+50 42 3 6 . 8 6 42 3 6 . 7 8 23+00 0.44%ST A : 1 0 + 8 0 . 9 8 EL : 4 2 3 1 . 6 7 ST A : 2 2 + 6 6 . 4 7 EL : 4 2 3 6 . 9 3 0.44%ST A : 1 0 + 8 0 . 9 8 EL : 4 2 3 1 . 6 7 ST A : 2 2 + 6 6 . 4 7 EL : 4 2 3 6 . 9 3 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 ALIGN. PROFILES PR-4 16 OF 30 FG EG FG EG 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 2' THICK PROTECTIVE SOIL COVER DRAINAGE GEOTEXTILE, CLASS A GEONET DRAINAGE LAYER 60 MIL HDPE LINER (TEXTURED) GEOSYNTHETIC CLAY LINER (GCL) A B D E 1 - TYPICAL LINER DETAIL 4 - MOD 7 LINER TIE-IN DETAIL 2' 3 - MOD 5 LINER TIE-IN DETAIL 2' THICK PROTECTIVE SOIL COVER NON-WOVEN GEOTEXTILE FILTER FABRIC SEWER ROCK, SIZE 4 DRAINAGE GEOTEXTILE, CLASS A GEONET DRAINAGE LAYER 60 MIL HDPE LINER (TEXTURED) - EXTRA LAYER IN SUMP ONLY GEOSYNTHETIC CLAY LINER (GCL) - EXTRA LAYER IN SUMP ONLY 60 MIL HDPE LINER (TEXTURED) GEOSYNTHETIC CLAY LINER (GCL) A D F G 2 - SUMP LINER DETAILS 2' H I 2' C B 5 - ANCHOR TRENCH 3' 3' 2' PROTECTIVE SOIL TYPICAL LINER (SEE DETAIL 1 THIS SHEET) SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-1 17 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg 6 - 4" OR 6" PERFORATED PIPE SECTION VIEW TYPICAL LINER, (SEE DETAIL 1 THIS SHEET) SEWER ROCK, SIZE 4 HIGH NON-WOVEN SEPARATION GEOTEXTILEPROTECTIVE SOIL 4" OR 6" PERFORATED HDPE, SDR 11 PIPE S=VARIES 2' 1' MIN. S=VARIES 1' SPECIFICATION REFERENCE 31 05 13 SEWER ROCK, SIZE 4 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 DRAINAGE GEOTEXTILE, CLASS A 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 31 05 20S GEONET DRAINAGE LAYER 33 05 06 4" PERFORATED HDPE, SDR 11 PIPE 33 05 06 16" PERFORATED HDPE, SDR 11 PIPE 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION WEST EDGE AND SOUTH EDGE FG ELEVATIONS FOR LINER ON SHEET GR-3 TYPICAL LINER (SEE DETAIL THIS SHEET) LAY GCL UNDER EXIST. LINER 2' MIN. 2' PROTECTIVE SOIL COVER 2' LINER TIE-IN ELEVATIONS TO MATCH EXIST., ELEVATIONS SHOWN ON GR-1 ARE ESTIMATED FROM PREVIOUS DESIGN PLANS EXTRUSION WELD EXIST. AND PROPOSED HDPE LINERS ±2' EXISTING 2FT THICK COMPACTED CLAY LINER 2' MIN 1 2 FG ELEV. (SEE SHEET GR-3) EXIST. MOD 5 LINER MODULE 8 FG ELEVATIONS FOR SHEET GR-2 FG ELEVATIONS FOR LINER ON SHEET GR-3 FG ELEVATIONS FOR SHEET GR-2 (SEE DETAILS 1/DT-4 AND 2/DT-5) REMOVE AND REPLACE EXISTING PLYWOOD TYPICAL LINER (SEE DETAIL THIS SHEET) LAY GCL UNDER EXIST. LINER 2' MIN. 2' PROTECTIVE SOIL COVER 2' LINER TIE-IN ELEVATIONS TO MATCH EXIST., ELEVATIONS SHOWN ON GR-1 ARE ESTIMATED FROM PREVIOUS DESIGN PLANS EXIST. MOD 7 LINER MODULE 8 EXTRUSION WELD EXIST. AND PROPOSED HDPE LINERS 5/8" EXTERIOR GRADE PLYWOOD REMOVE AND REPLACE EXISTING PLYWOOD BACKFILL TO EXISTING SLOPE LINE AFTER TIE-IN IS COMPLETED 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 1 1 1 1 5/2 2 / 2 3 R E V I S I O N # 1 C E 6' ' 6' ' 4'' 4'' 10''10''10''10''10''10''10''10''4'' 4'' 4'' 4'' 4'' 4'' 6'' 6'' 6'' 6'' 6'' 6'' 10 ' ' 10 ' ' 10 ' ' 10''10''10''10''10''10''10''10''10'' 1 - LEACHATE COLLECTION SUMP DETAIL 3 - 2 - 4 - 3 - 10" PERFORATED PIPE SECTION VIEW2 - SUMP SECTION VIEW 5 - 5 - 4 - EXTRACTION PIPE AT SUMP 5 - 4" PERFORATED PIPE AT TOE OF SLOPE DETAIL SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-2 18 OF 30 6" PERFORATED PIPE (LEACHATE) 10" PERFORATED PIPE (LEACHATE) S L O P E SLOPE TOP OF TRENCH (GRADE BREAK) TOP OF SUMP (GRADE BREAK) BOTTOM OF SUMP (GRADE BREAK)TOP OF SUMP (GRADE BREAK) 20' 1.5' SEWER ROCK, SIZE 410" PERFORATED PIPE (LEACHATE)TYPICAL LINER (SEE DETAIL 1/DT-1) FG LINER ELEV. 10" PERFORATED PIPES (LEACHATE) (4) 18" PERFORATED PIPES (LEACHATE) SEWER ROCK, SIZE 4 40' 1.5' SUMP LINER (SEE DETAIL 2/DT-1) 3 1 4.5' TYPICAL LINER (SEE DETAIL 1/DT-1) 2' TOP OF SUMP (GRADE BREAK) BOTTOM OF SUMP (GRADE BREAK) END SUMP LINER, EXTRUSION WELD TO TYPICAL LINER 2'2' PROTECTIVE SOILPROTECTIVE SOIL 20' TRANSITION FROM TRENCH TO SUMP 40' SUMP LINER (SEE DETAIL 2/DT-1) TYPICAL LINER (SEE DETAIL 1/DT-1) 15' (4) 18" PERFORATED (LEACHATE) 2' MIN. PROTECTIVE SOIL COVER 1.5' 6. 3 % SLO P E 6. 3 % 15 % 15 %0.5%0.4% S L O P E SLO P E SUMP CORNER TYPICAL LINER (SEE DETAIL 1/DT-1) SEWER ROCK, SIZE 4 PROTECTIVE SOIL 4" PERFORATED (LEACHATE) VARI E S % S=VARIES 2' 1' MIN. 1 2 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 31 05 13 SEWER ROCK, SIZE 4 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 33 05 06 4" PERFORATED HDPE, SDR 11 PIPE 33 05 06 10" PERFORATED HDPE, SDR 11 PIPE 33 05 06 18" HDPE, SDR 11 PIPE 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION HIGH NON-WOVEN SEPARATION GEOTEXTILE HIGH NON-WOVEN SEPARATION GEOTEXTILE HIGH NON-WOVEN SEPARATION GEOTEXTILE 4" PERFORATED PIPE (LEACHATE) 15' CAP ALL PIPE ENDS 0.5% 6" LIMITS OF SUMP LINER, EXTRUSION WELD (SEE DETAIL 2/DT-1) 4-18" ELBOWS 10" PERFORATED (LEACHATE) 18"18"18"18" (4) 18" PIPES (LEACHATE) SUMP CORNER END 10" PIPE FG LINER ELEV. END SUMP LINER, EXTRUSION WELD TO TYPICAL LINER 25% PROTECTIVE SOIL SURFACE BEYOND ±13% SUMP CORNER LINE SEE NOTE 1 LINER BEYOND 16' 2.5'3' 2' TOP OF SUMP ELEV. NOTES 1.PERFORATE 18" PIPES IN SUMP ONLY 2.FRENCH DRAIN NOT SHOWN FOR CLARITY 3' 2 - 1 DT-3 2 DT-3 6 DT-1 6 DT-1 10" PERFORATED PIPE (FRENCH DRAIN) ±3' 3' 1', MINFRENCH DRAIN, SEE DETAIL 3 THIS SHEET WEST DRAIN (GROUNDWATER) CENTER FRENCH DRAIN (GROUNDWATER) NOTES: 1.ALL PIPES SHOWN ON THIS SHEET ARE SDR 11, HDPE. 2.SEE DETAIL 3/DT-5 FOR ALL PIPE PERFORATIONS. 6" PERFORATED PIPE (LEACHATE) 4" PERFORATED PIPE (LEACHATE) 0 5 / 2 2 / 2 3 C O N F O R M E D S E T SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-3 19 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 03 30 04 CAST-IN-PLACE CONCRETE 03 40 00 PRECAST CONCRETE 31 05 13 GRANULAR BORROW 31 05 13 #4 SEWER ROCK 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 31 23 16 UNCLASSIFIED EXCAVATION 33 05 06 4" PERFORATED HDPE, SDR 11 PIPE 33 05 06 10" PERFORATED HDPE, SDR 11 PIPE 33 05 06 18" HDPE, SDR 11 PIPE 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION 3 - CONCRETE HEADWALL AND SLAB AT LEACHATE EXTRACTION PIPES 1 - LINER TRANSITION AT LEACHATE EXTRACTION PIPES 4-18" HDPE, SDR 11 PIPE 3 1 TYPICAL LINER (SEE DETAIL 1/DT-1)LINER TRANSITION, SLOPE VARIES 2' PROTECTIVE SOIL 2' VARIES 1'2 1 2' HIGH NON-WOVEN SEPARATION GEOTEXTILE TYPICAL LINER (SEE DETAIL 1/DT-1) PROTECTIVE SOIL SEWER ROCK, SIZE 4 2 - 4" & 6" LEACHATE PIPES OVER SUMP 1' OVER CENTER DRAIN ALL OTHER LOCATIONS 12'-0" 2'-6" 2'-6" 2'-6" 2'-6" 2'-6" 5'-4" 5-#4, T&B #4@18", T&B #5 VERT DOWEL, TYP #4 DIAG & HORIZ, TYP (3)#4 HORIZ AT CORNERS, TYP (3)#4 HORIZ #5 VERT DOWEL 3" MIN, TYPC - B - A - DETAIL A DETAIL B DETAIL C 8" FLANGE ADAPTER BLIND FLANGE SS BOLTS NOTE: FRENCH DRAIN NOT SHOWN FOR CLARITY, SEE DETAIL 3/DT-2 FOR MORE INFO 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 4 - CONCRETE HEADWALL AND SLAB AT SOUTH DITCH EXTRACTION PIPE 2% 12" 8"12" 5'-0" 2'-6" 2'-6" 5'-4" 12" (3)#4 HORIZ AT CORNERS, TYP A - SECTION A 33% PLAN NOTE: SEE DETAIL 3 THIS SHEET FOR REINFORCEMENT AND SUBGRADE PREP. 2'-6" BED PIPE TO SPRINGLINE, TYP 5 - PRECAST CONCRETE DEADMAN AT SOUTH DITCH EXTRACTION PIPE MIDPOINT 2'-0" 1'-6" 33% 3" WIDE X 12 GA. GALV. STEEL STRAP HDPE THRUST COLLAR SUCH AS ICONIX WALL ANCHOR OR APPROVED EQUAL BED PIPE TO SPRINGLINE, TYP SEE NOTE 1 NOTES: 1.STRAP ANCHORS SHALL BE 1/2"Ø CONCRETE SCREW ANCHOR SUCH AS SIMPSON TITAN HD OR APPROVED EQUAL W/ 9" EMBEDMENT AND 30° BEVELED WASHER. AT PRE-CASTER OPTION, CAST-IN-PLACE J-BOLTS MAY ALSO BE USED. 2.FORMED CHANNEL AT THRUST COLLAR. FILL WITH NON-SHRINK GROUT. B B SECTION B-B 2"2" 2" SEE NOTE 2 A - SECTION A 3'-0" 2"SEE NOTE 1 #3 STIRRUPS & CROSS-TIES. HOOK ALL BAR ENDS, TYP PRECAST CONCRETE DEADMAN HDPE PIPE WALL HDPE THRUST COLLAR KEY CONCRETE BLOCK INTO UNDISTURBED NATIVE SOIL. 2 2 8 / 2 8 / 2 3 R E V I S I O N # 2 2 2 7 / 0 9 / 2 4 R E V I S I O N # 4 4 SEE DETAIL 1/LP-2 4 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-4 20 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 03 40 00 PRECAST CONCRETE 05 05 10S DEBRIS FENCE 31 05 13 SEWER ROCK, SIZE 4 31 05 13 GRANULAR BORROW 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 DRAINAGE GEOTEXTILE, CLASS A 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 31 23 16 UNCLASSIFIED EXCAVATION 32 11 23 UNTREATED BASE COURSE 33 05 06 10" PERFORATED HDPE, SDR 11 PIPE 33 05 06 18" HDPE, SDR 11 PIPE 33 41 00 60" PRECAST COMBO BOX 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION 22'2' EXISTING DRAINAGE DITCH (WIDTH AND SHAPE VARY) TOP OF SLOPE ANCHOR (SEE DETAIL 5/DT-1) DEBRIS FENCE (SEE DETAIL 1/DT-6) 6" THICK UNTREATED BASE COURSE, GRADE 3/4 12" THICK GRANULAR BORROW WEST ROAD CONTROL LINE (PROFILE ON SHEET PR-4) 1 - WEST ROAD AND WEST DITCH EXISTING BERM AND SWALE LINER (SEE DETAIL 1/DT-1) EXISTING MODULE 5 CLAY LINER VARIES 4 - COMBO BOX AT SOUTH DITCH EXTRACTION PIPE 16' EDGE OF GRAVEL (EOG)EDGE OF GRAVEL (EOG) SLOPE SLOPE 2% TIE IN TO EXISTING MODULE 5 LINER (SEE LINER TIE-IN DETAIL 3/DT-1) WEST DITCH CONTROL LINE, SEE CS-1 2 1 2 12' 2 1 CATCH POINT OF 2:1 SLOPE AND 2' PROTECTIVE SOIL COVER 2' 3' 1' MIN SEE NOTES 1 & 2 NOTES: 1.RECONDITION WEST DITCH TO EXTENTS SHOWN ON CS-1. ENSURE MINIMUM WIDTH OF CHANNEL AND MAINTAIN EXISTING FLOW LINE AS FAR AS PRACTICABLE WHILE REMOVING HIGH SPOTS AND DEBRIS THAT IMPEDE DRAINAGE FLOW. 2.APPLY NATIVE SEED MIX TO DITCH SIDE SLOPES WHERE RECONDITIONING REQUIRES REMOVAL OF EXISTING STABILIZING VEGETATION OR WHERE NATIVE VEGETATION IS DAMAGED DURING CONSTRUCTION. 3 - NORTH AND EAST FRENCH DRAINS AT EXIST ROAD CROSSINGS 3' 1' MIN 3' MIN VARIES 3' MIN 3' MIN SLOPE OF EXCAVATION REQ'D FOR FRENCH DRAIN PIPE INSTALLATION EXISTING GRADE AT ACCESS ROAD OVER DRAINAGE DITCH CULVERT NOTE: THIS DETAIL IS ALSO APPLICABLE WHERE FRENCH DRAIN FLOW LINE IS BELOW EXISTING DITCH FLOW LINE. EXISTING SUBGRADE NATIVE BACKFILL, COMPACT PER 31 23 26 LINER (SEE DETAIL 1/DT-1)NATIVE BACKFILL, COMPACT PER 31 23 26 10" PERFORATED HDPE, SDR 11 PIPE, SEE PR-1 FOR INVERT ELEVATIONS SEWER ROCK, SIZE 4 DRAINAGE GEOTEXTILE, CLASS A LINER TIE-IN ELEVATIONS (SEE SHEET GR-1) EXISTING GRADE AT NORTH DRAINAGE DITCH (VARIES) UNCLASSIFIED EXCAVATION UNCLASSIFIED EXCAVATION 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 33% FINISH GRADE 4202.00' BOX INVERT 4203.50' SUMP 4199.00' 10" FL OUT 4204.65' BED PIPE TO SPRINGLINE, TYP 5-FOOT COMBO BOX WITH LINEAR INLET 8 / 2 8 / 2 3 R E V I S I O N # 2 2 2 2 - NORTH DRAIN AND MOD 5 LINER TIE-IN 2 2 6'-712" WP MH COVER PER APWA PLAN 302 2% LINEAR INLET REMOVE TOP HALF OF PIPE INSIDE BOX GROUT SHELF, TYP A A SECTION A-A 2% 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-5 21 OF 30 1 - EAST DRAIN AND MOD 7 LINER TIE-IN 2 - SOUTH ROAD AND SOUTH DRAINAGE DITCH 3 - PIPE PERFORATION DETAIL PIPE SIZE HOLE SIZE SPACING 4"1/4" Ø 12" 10"1/2" Ø 12" 10" (SUMP EXTENTS)1/2" Ø 6" 15"1/2" Ø 12" 18" (SUMP EXTENTS)1/2" Ø 6" G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 05 05 10S DEBRIS FENCE 31 05 13 SEWER ROCK, SIZE 4 31 05 13 GRANULAR BORROW 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 31 23 16 UNCLASSIFIED EXCAVATION 32 11 23 UNTREATED BASE COURSE 33 05 06 4" PERFORATED HDPE, SDR 11 PIPE 33 05 06 10" PERFORATED HDPE, SDR 11 PIPE 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION TIE IN TO EXISTING MODULE 7 LINER (SEE LINER TIE-IN DETAIL 4/DT-1) LINER (SEE DETAIL 1/DT-1) NATIVE BACKFILL, TYP COMPACT PER 31 23 26 SOUTH DITCH CONTROL LINE (PROFILE ON SHEET PR-3) UNCLASSIFIED EXCAVATION 10" PERFORATED HDPE, SDR 11 PIPE. SEE PR-2 FOR INVERT ELEVATIONS. SEWER ROCK, SIZE 4 DRAINAGE GEOTEXTILE, CLASS A 2 1 2 1 UNCLASSIFIED EXCAVATION, TYP SLOPE HOLE (TYP.)HOLE (TYP.) 60° (TYP.) SPACING 6 HOLES LOCATED AS SHOWN END CAP DETAIL VARIES LINER TIE-IN ELEVATIONS (SEE SHEET GR-1) 6'-18'24'2' DEBRIS FENCE (SEE DETAIL 1/DT-6) 6" THICK UNTREATED BASE COURSE, GRADE 3/4. 12" THICK GRANULAR BORROW SOUTH ROAD CONTROL LINE (PROFILE ON SHEET PR-3) LINER (SEE DETAIL 1/DT-1) 16' EDGE OF GRAVEL (EOG)EDGE OF GRAVEL (EOG) SLOPE 2% 2 1 CATCH POINT OF 2:1 SLOPE AND 2' PROTECTIVE SOIL COVER 2' 3' 1' MIN 3' TOP OF SLOPE ANCHOR (SEE DETAIL 5/DT-1) EXISTING EAST DRAINAGE DITCH GRADE LINE (VARIES) NATIVE SUBGRADE, TYP MOD 7 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 2% 7 / 0 9 / 2 4 R E V I S I O N # 4 4 4 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 DETAILS DT-6 22 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 31 05 13 GRANULAR BORROW 31 05 13 PROTECTIVE SOIL (NATIVE REUSE) 31 05 19 HIGH NON-WOVEN STABILIZATION SEPARATION GEOTEXTILE 31 23 16 UNCLASSIFIED EXCAVATION 32 31 13 CHAIN LINK FENCES AND GATES 33 05 06 4" PERFORATED HDPE, SDR 11 PIPE 33 50 10S 60 MIL HDPE LINER 33 50 20S GEOSYNTHETIC CLAY LINER DESCRIPTION 3' MIN. OVERLAPSUBGRADE ELEVATION 31 23 16 31 05 13 31 05 19 LIMITS AND DEPTHS OF STABILIZATION EXCAVATION TO BE AUTHORIZED ONLY BY ON SITE ENGINEER 2 - SUBGRADE STABILIZATION DETAIL 3 - 4' LINER WALL 4' EXTRUSION WELD EXIST. AND PROPOSED HDPE LINERS AT BASE OF 4' VERTICAL LINER INSTALLATION 5/8" EXTERIOR GRADE PLYWOOD THREADED PLUG CAST IRON RING AND LID D & L SUPPLY H-8020 OR APPROVED EQUAL FINISH GRADE 4" HDPE DETECTION PORT DETAIL EXISTING LINER BEYOND WALL TO BE REMOVED 4' SEE SHEET CS-1 FOR LOCATION AND BEARING OF WALL UNCLASSIFIED EXCAVATION. ANY TRASH ENCOUNTERED SHALL BE TAKEN TO THE TIPPING FACE. EXISTING LINER DETECTION PORT (SEE INSET DETAIL) 4" HDPE BOTTOM 4' PERFORATED PER DETAIL 3/DT-4 1'-0" TYP CONCRETE COLLAR 2' 4' 4'X4'X4' DRAINAGE SUMP WRAPPED IN HIGH NON-WOVEN SEPARATION FABRIC #4 SEWER ROCK 2' OVERLAP HEAVY EQUIP. PATH SEE NOTE 3 1 PROTECTIVE SOIL 2' NOTE: HEAVY EQUIPMENT PATHS SHALL MEET ALL LINER WARRANTY REQUIREMENTS FOR PROTECTIVE SOIL DEPTH, COMPACTION, MATERIAL COMPOSITION, ETC. BASED ON ACTUAL EQUIPMENT LOADING.3 16" 4 - PROTECTIVE SOIL AT HEAVY EQUIPMENT PATH LINER (SEE DETAIL 1/DT-1) BACKFILL TO MATCH EXISTING GRADES WITH NATIVE REUSE MATERIAL COMPACTED PER 31 23 26 0 5 / 2 2 / 2 3 C O N F O R M E D S E T 10' 4.5' 0.5'1.5' 1 - CHAINLINK FENCE DETAIL 18' CONC. POLE FOUNDATION SEE NOTE 1 CHAINLINK FENCE NOTES 1.FENCE POSTS SHALL BE 3.5-INCH DIAM. F1043 GROUP IC ELECTRIC RESISTANT WELDED STEEL PIPE (50KSI) 2.FENCE FABRIC SHALL BE ZINC-COATED, 11 GAUGE, 2-INCH MESH. SELVAGE SHALL BE TWISTED TOP AND KNUCKLED BOTTOM. 3.7 GAUGE TENSION WIRE. FASTEN FABRIC TO TENSION WIRE WITH HOG RINGS AT 18" O.C. 4.IN CASE OF CONFLICT BETWEEN DETAILS AND SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL APPLY UNLESS OTHERWISE APPROVED. 5.BRACING, FITTINGS, AND ALL OTHER DETAILS OF INSTALLATION SHALL BE IN ACCORDANCE WITH THE CHAIN LINK FENCE MANUFACTURER'S INSTITUTE PRODUCT MANUAL (CLF-PM0610) 6.NOMINAL FENCE AND POLE FOUNDATION SIZING PER SLC ENGINEERING BASED ON TEMPORARY USE. SEE NOTE 2 1 0 / 2 0 / 2 3 R E V I S I O N # 3 3 3 SEE NOTE 3 SEE NOTE 3 14' 3 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 STRUCTURAL NOTES ST-1 23 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg STRUCTURAL STEEL: DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE SPECIFICATIONS AND STANDARDS OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), AS CONTAINED IN THE LATEST EDITION OF "AISC MANUAL OF STEEL CONSTRUCTION" ALL STRUCTURAL STEEL SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING SHALL BE INSTALLED AND SHALL BE LEFT IN PLACE UNTIL OTHER MEANS IS PROVIDED TO ADEQUATELY BRACE THE STRUCTURE. PROVIDE THE FOLLOWING MATERIALS FOR STRUCTURAL STEEL, U.N.O. ALL STEEL FABRICATION SHALL BE PERFORMED BY A LICENSED FABRICATOR U.N.O. ALL STRUCTURAL STEEL AND MISCELLANEOUS STEEL PERMANENTLY EXPOSED TO THE ELEMENTS SHALL BE HOT DIP GALVANIZED AFTER FABRICATION. STAINLESS STEEL AND WEATHERING STEEL, WHERE SPECIFIED, ARE EXEMPT FROM THE REQUIREMENT. GALVANIZED SURFACES SHALL BE PROTECTED DURING CONSTRUCTION AND REPAIRED WITH ZINC RICH PAINT WHERE NECESSARY. PROVIDE WEEP HOLES IN ALL STEEL AS REQUIRED TO PREVENT ANY ACCUMULATION OF WATER. KEEP WEEP HOLES CLEAN AND OPEN. FIELD MODIFICATION OF STRUCTURAL STEEL MEMBERS IS PROHIBITED WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER. APPLICABLE ASTM SPECIFICATIONS FOR STRUCTURAL SHAPES SHAPE ASTM DESIGNATION GRADE Fy PIPE SECTIONS A53 GR. B 35 KSI WELDING: WELDING PROCEDURES, ELECTRODES, AND WELDER QUALIFICATIONS SHALL CONFORM TO THE AMERICAN WELDING SOCIETY (AWS) D1.1 AND THE AISC WELDING ELECTRODES SHALL BE E70XX GOVERNING DESIGN CODE: 2018 INTERNATIONAL BUILDING CODE (IBC) DESIGN LOADS AND DESIGN CRITERIA: RISK CATEGORY I WIND CRITERIA WIND VELOCITY (3 SECOND GUST)V = 97MPH STRENGTH WIND EXPOSURE C ASCE 7-16 CHAPTER 29 (DIRECTIONAL PROCEDURE) SECTION 29.4.2 - OPEN SIGNS ** DESIGN WIND FORCE FOR DEBRIS FENCE AND PIER FOUNDATIONS BASED ON OPEN MESH WITH OPENINGS APPROX. 95% OF GROSS AREA. POSTS ARE NOT DESIGNED AS A SOLID SIGN.** FOUNDATION AND EARTHWORK: FOUNDATION DESIGN ACCORDING TO INTERNATIONAL BUILDING CODE ASSUMED DESIGN BEARING CAPACITY = 1500 PSF ASSUMED SOIL LATERAL PASSIVE PRESSURE = 200 PSF UNDER NO CIRCUMSTANCE SHALL FOOTINGS BE PLACED OVERLYING NON-ENGINEERED FILL, LOOSE SOIL, FROZEN SOIL, SOIL CONTAINING FOREIGN DEBRIS, OR ANY OTHER DELETERIOUS MATERIAL. UNSUITABLE MATERIAL MUST BE REMOVED AND REPLACED WITH AN APPROVED STRUCTURAL FILL.. FORMWORK AND/OR EARTH TRENCHES SHALL BE FREE OF STANDING WATER AND FROST. IF GROUNDWATER IS ENCOUNTERED DURING EXCAVATION, DEWATERING IS REQUIRED TO BRING THE GROUNDWATER LEVEL BELOW THE EXCAVATION. CONCRETE FOUNDATION TO BE CAST AGAINST UNDISTURBED NATIVE SOIL. GENERAL STRUCTURAL NOTES: IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE AND TO VERIFY ALL DIMENSIONS AND ELEVATIONS. DO NOT SCALE THE DRAWINGS. STRUCTURAL PLANS DO NOT PORTRAY MEANS, METHODS AND SEQUENCE OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND BRACING AS NECESSARY DURING CONSTRUCTION. VISITS TO THE PROJECT SITE BY REPRESENTATIVES OF CIVIL SOLUTIONS GROUP SHALL NOT BE TAKEN AS APPROVAL OR SPECIAL INSPECTION. FAILURE TO FOLLOW PLANS AND/OR DETAILS RESULTS IN A CHANGE TO STRUCTURAL SCOPE. THE ENGINEER MAY REQUEST REPLACEMENT OF ANY STRUCTURAL ELEMENT(S) THAT DEVIATES FROM THE PLANS WHERE PRIOR WRITTEN APPROVAL WAS NOT OBTAINED, AT NO ADDITIONAL COST TO THE OWNER. STRUCTURAL MEMBERS SHALL NOT BE CUT OR ALTERED UNLESS NOTED OTHERWISE IN THE DRAWINGS, OR WITHOUT WRITTEN APPROVAL OF THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPENSATING THE OWNER FOR ANY CHANGES MADE AS A RESULT OF A DEVIATION FROM THE CONTRACT DOCUMENTS, FAULTY MATERIALS, OR FAULTY WORKMANSHIP CONCRETE: ALL CONCRETE CONSTRUCTION SHALL CONFORM TO THE LATEST, ADOPTED EDITIONS OF THE STANDARD AND MATERIAL SPECIFICATIONS REFERENCED BELOW ACI 301 - SPECIFICATIONS FOR STRUCTURAL CONCRETE ACI 304 - GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE ACI 305 - HOT WEATHER CONCRETING ACI 306 - COLD WEATHER CONCRETING ACI 318 - BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE CONCRETE STRENGTH SHALL MEET THE FOLLOWING 28-DAY COMPRESSIVE STRENGTH (f'c) UNLESS OTHERWISE NOTED IN THE DRAWINGS CONCRETE STRENGTH AND MIX REQUIRMENTS MEMBER 28 DAY COMPRESSIVE STRENGTH MAX WATER CEMENT RATIO AIR ENTRAINMENT SLUMP FOUNDATION PIERS 4000 PSI 0.45 3% ± 1 12%7" ± 1" ALL OTHER EXT. CONC.4500 PSI 0.40 6% ± 1 12%3" ± 1" REINFORCING STEEL: ALL CONCRETE REINFORCEMENT TO SHALL BE PLACED IN ACCORDANCE WITH ACI DETAILING MANUAL MNL-66(20) AND CONCRETE REINFORCING STEEL INSTITUTE (CRSI) MANUAL OF STANDARD PRACTICE CONCRETE REINFORCEMENT SHALL CONFORM TO THE FOLLOWING STANDARDS AND MATERIAL PROPERTIES DEFORMED BARS ASTM615 GRADE 60 TIES AND STIRRUPS ASTM615 GRADE 60 WHERE A 90°, 135°, OR 180° HOOK IS GRAPHICALLY INDICATED, PROVIDE CORRESPONDING ACI STANDARD HOOKS, U.N.O. REINFORCEMENT SHALL HAVE THE FOLLOWING CONCRETE PROTECTION (CLEAR COVER) PER ACI 318: CONDITION COVER CAST AGAINST EARTH 3" FORMED AND EXPOSED TO EARTH OR WEATHER 2" ALL REINFORCEMENT SHALL BE SECURELY TIED OR HELD IN PLACE WITH PROPER ACCESSORIES. DO NOT USE WOOD OR BRICK TO SUPPORT REINFORCEMENT. CHAIRS OR SPACERS SHALL BE PLASTIC WHEN RESTING ON EXPOSED SURFACES. ALL BARS SHALL BE KEPT CLEAN AND FREE OF RUST. UNLESS OTHERWISE NOTED, ALL BENDS SHALL BE A 90° STANDARD HOOK. ALL CONTINUOUS REINFORCEMENT SHALL TERMINATE WITH A 90° OR CORNER BAR. USE TYPE II PORTLAND CEMENT CEMENT TO CONFORM TO ASTM C150 FINE AND COARSE AGGREGATE TO BE CLEAN, HARD, DURABLE AND FREE OF DELETERIOUS SUBSTANCES. AND SHALL CONFORM TO ASTM C33. MAXIMUM AGGREGATE SIZE TO BE 3/4", UNO WATER SHALL BE POTABLE AIR ENTRAINMENT ADMIXTURE SHALL CONFORM TO ASTM C260 CONCRETE TO BE READY-MIXED AND DELIVERED IN COMPLIANCE WITH ASTM C94 CONCRETE IS TO BE MECHANICALLY VIBRATED AND CONSOLIDATED DURING PLACEMENT PER ACI STANDARDS. NO ALUMINUM ITEMS SHALL BE IN OR PLACED IN CONTACT WITH CONCRETE. 0 5 / 2 2 / 2 3 C O N F O R M E D S E T ○○○ ○○○ ○ ○ ○ ○○○ ○ ○ ○ ○○○ ○ ○ ○ ○ ○○ ○ ○ SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 STRUCTURAL DETAILS ST-2 24 OF 30 G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\5.1_details.dwg SPECIFICATION REFERENCE 05 05 10S DEBRIS FENCE DESCRIPTION 1 - DEBRIS FENCE POST 2 - CONCRETE PIER FOUNDATION 3 - DEBRIS FENCE ELEVATION (4) 4"x12" NELSON STUDS @ 36" O.C. VERT 2 HOOPS AT BASE (4) #5 VERT 12"x12" #3 HOOP @ 18" VERT 8'-0" MIN PIPE EMBED. 4" MIN CJP CJP 6" MIN 2'-0" Ø CONCRETE DRILLED PIER SLOPE TOP OF CONCRETE PIER TO PROVIDE POSITIVE DRAINAGE AWAY FROM STEEL POST 2" MIN SHOP-DRILL 3 EACH 1 2" Ø AIR RELIEF HOLES 3 INCHES BELOW FINISHED GRADE ELEVATION. SECURE REINFORCING CAGE UNDER NELSON STUDS SO CAGE SUPPORTS POST DURING ERECTION & CONCRETE PLACEMENT NOTE: POST TO BE CONCRETE-FILLED AS FAR AS PRACTICABLE. DO NOT CAP LOWER PIPE END. USE 6-8" SLUMP MIX W/ 1/2" MAX AGGREGATE. SEE NOTE 6" 18", TYP CAP PIPE W/A36 END PLATE AND BUTT WELD ALL AROUND, TYP CONC PIER SEE DETAIL 2 THIS SHEET 7° 123° 6' 23' 10" STD PIPE (10 3/4" OD) 20' TYP THRU-BOLT WITH EYELET FOR BRAIDED CABLE SUPPORT. SEE DEBRIS FENCE NOTES 1 & 2. STEEL NETTING, SEE DEBRIS FENCE NOTES 1 & 2 TENSION CABLE GUY WIRES AND ANCHOR, SEE DEBRIS FENCE NOTE 3. DEBRIS FENCE NOTES: 1.DEBRIS FENCE NETTING AND BRAIDED CABLE SUPPORT SYSTEM SHALL MATCH EXISTING DEBRIS FENCE INCLUDING MATERIALS, FINISHES, CONNECTIONS, DETAILS, ETC. 2.CONTRACTOR SHALL COORDINATE WITH NETTING SUPPLIER TO CONFIRM CABLE SUPPORT LOCATIONS, ARRANGEMENT, AND TENSION REQUIREMENTS. 3.TENSION CABLE GUY WIRE ANCHORAGE AT FENCE END TO BE BASED ON COMBINED TENSION OF CONNECTED CABLES. CONTRACTOR TO SUBMIT ANCHOR TYPE AND ARRANGEMENT TO ENGINEER FOR APPROVAL. 4.CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL DEBRIS FENCE MATERIAL SUPPLIERS TO CREATE AND SUBMIT FOR APPROVAL A SINGLE SET OF COORDINATED SHOP DRAWINGS AND PRODUCT SUBMITTALS THAT COVER ALL ASPECTS OF DEBRIS FENCE CONSTRUCTION INCLUDING, DETAILING, FABRICATION, DELIVERY, INSTALLATION, ERECTION, ETC. STEEL NETTING AND BRAIDED CABLE SUPPORTS TO MATCH EXISTING. SEE DEBRIS FENCE NOTES. CONC PIER SEE DETAIL 2 THIS SHEET STEEL PIPE POST. SEE DETAIL 1 THIS SHEET 0 5 / 2 2 / 2 3 C O N F O R M E D S E T CUT CUT CUT CUT CUT CUT FILL FILL FILL FILL FI L L FILL FILL FILL FILL FIL L EG: 4221.95 N: 441632.270 E: 488847.152 EG: 4224.01 N: 441634.676 E: 488705.414 EG: 4239.28 N: 443058.132 E: 487338.004 0 125'250' G:\Shared drives\Projects\2022 Projects\22-100 Salt Lake City On-Call\Task 2 -Landfill Design\09_Data\Roadway Design\Sheets\6.1_Fence Plan.dwg MOD 4 MOD 11 MOD 5 MOD 3 MOD 6 MOD 7 MOD 8 MOD 10 MOD 9 STOCKPILE AREA FOR MATERIAL FROM MOD 8 LEGEND X EXISTING ROAD/ROUTE EXISTING ROAD/ROUTE, ABANDON NEW GRAVEL ROAD (CONTRACT) NEW OPERATOR ROAD NEW PUBLIC ACCESS TO MOD 8 EXISTING DEBRIS FENCE NEW DEBRIS FENCE 2,454 LF - BASE CONTRACT 2,962 LF - FINAL QTY (508 LF ADDITIONAL) TEMP 14-FT CHAINLINK FENCE (SEE DETAIL 1 ON SHEET DT-6) 40 LF PROPOSED DEBRIS FENCE OPENING, SEE NOTE 1. EXTEND DEBRIS FENCE TO ALIGN WITH UPPER EXISTING DEBRIS FENCE EXTEND DEBRIS FENCE AROUND TURNOUT (2 SIDES) EXTEND DEBRIS FENCE X INSTALL 40 LF OF 14' CHAIN LINK FENCE BETWEEN DEBRIS FENCE ENDS NOTES 1.DEBRIS FENCE OPENING SHALL BE APPROXIMATELY 20' x 15' (W x H). CONTRACTOR SHALL CONFIRM OPENING DIMENSIONS WITH LANDFILL STAFF TO ENSURE OPENING ACCOMMODATES EXISTING EQUIPMENT WHILE MAXIMIZING DEBRIS CONTAINMENT. 1 0 / 2 0 / 2 3 R E V I S I O N # 3 3 3 SALT LAKE CITY CORPORATION ENGINEERING DIVISION SALT LAKE CITY CORPORATION COMMUNITY AND ECONOMIC DEVELOPMENT IC T Y S A L T L A K E 36912 SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 FENCE PLAN FN-1 25 OF 30 4 4 7 / 0 9 / 2 4 R E V I S I O N # 4 4 3.0 SUBGRADE 3.1 Construction QC/QA Plan Subgrade Construction QC/QA Plan Introduction This document (Subgrade Construc on Quality Control/Quality Assurance Plan) is intended to generally document standard procedures u lized to ensure a quality installa on. This document complements, and does not replace, applicable site-specific project specifica ons. References: CETCO Bentomat Installa on Guidelines and the 2017 APWA Manual of Standard Specifica ons Sec ons 31 05 13, 31 23 16, and 31 23 26. Subgrade Preparation The subgrade surface to receive geocomposite materials shall be prepared and inspected in accordance with the project specifica ons. Surfaces shall be smooth and free of sharp rocks or debris. Subgrade surfaces consis ng of granular soils or gravels are not acceptable due to their large void frac on and puncture poten al. When the GCL is placed over an earthen subgrade, the subgrade surface must be prepared in accordance with the project specifica ons. The engineer’s approval of the subgrade must be obtained prior to installa on. The finished surface should be firm and unyielding, without abrupt eleva on changes, voids, cracks, ice, or standing water. The subgrade surface must be smooth and free of vegeta on, sharp-edged rocks, stones, s cks, construc on debris, and other foreign ma;er that could contact the GCL. The subgrade should be rolled with a smooth-drum compactor to remove any wheel ruts greater than 1 inch in depth, footprints, or other abrupt grade changes. Furthermore, all protrusions extending more than 0.5 inch (12 mm) from the subgrade surface shall be removed, crushed, or pushed into the surface with a smooth- drumcompactor. The GCL may be installed on a frozen subgrade, but the subgrade soil in the unfrozen state should meet the above requirements. Material When allowed by Engineer, material obtained from Excava ons may be used as fill, provided organic material, rubbish, debris, and other objec onable materials are removed. For op mum soil density use ASTM D2216 and the following industry standards. 1. For A-1 Soils: Method C of ASTM D1557 (Modified Proctor) 2. For All Other Soils: Method C of ASTM D698 (Standard Proctor) Compaction Moisten or dewater backfill material to obtain op mum moisture for compac on. Compact the en re area to 95 percent of the maximum laboratory density and eliminate unstable zones. Correct deficient compac on condi ons. Replace or repair materials and damaged facili es. No density determina ons are required on any material containing more than 65 percent material retained on the number 10 sieve or more than 60 percent material retained on the number 4 sieve. In lieu of repor ng densi es in such cases, report the sieve analysis to document the material type. Inspection Prior to implemen ng any of the work in the sec on to be lined with GCL, the Installer shall carefully inspect the prepared subgrade of all other sec ons and verify that all work is complete to the point where the installa on of the sec on may properly commence without adverse impact. If the Installer has any concerns regarding the prepared subgrade, he shall no fy the Project Engineer. 3.2 Subgrade Acceptance 3.2.1 Laboratory Test Results WCG AGGREGATE AND SOILS PHYSICAL PROPERTIES REPORT PROJECT NAME :SUPPLIER: PROJECT NO:SOURCE / PLANT: PROJECT PIN:MATERIAL TYPE: CID:SPECIFICATIONS: RESIDENT ENGINEER:REQUIRED TESTS:No Data Entry Req'd SAMPLE DATE:SAMPLED BY: TEST DATE:TESTED BY: LOT LIMITS AND QUANTITY (IF APP) ITEM #:STATION FROM:TO: PRODUCTION DAY (IF APP):OFFSET FROM:LT/RT PLACEMENT TYPE (IF APP):OFFSET TO:LT/RT AGGREGATE CLASS (IF APP):THICKNESS (in): LIFT # or ELEV: LENGTH:0 QUANTITY PREV REPORTED:AREA (SY)0 TOTAL QUANTITY TO DATE:VOLUME (CY)0 Sample 1 ID:23A-37 Sample 2 ID:Sample 3 ID:Sample 4 ID: Sample 1 Sta:Sample 2 Sta:Sample 3 Sta:Sample 4 Sta: Sample 1 O/S:Sample 2 O/S:Sample 3 O/S:Sample 4 O/S: Sample 1 Elev:Sample 2 Elev:Sample 3 Elev:Sample 4 Elev: Multiple Stockpiles Yes or No % Used Yes or No % Used Yes or No % Used Yes or No % Used Include in Blend?No No Sieve Size Sample 1 % Passing IN SPEC?Sample 2 % Passing IN SPEC?Sample 3 % Passing IN SPEC?Sample 4 % Passing IN SPEC?Combined %Passing 450 mm (18")0 -- 375 mm (15")0 -- 300 mm (12")0 -- 250 mm (10")0 -- 225 mm (9")0 -- 200 mm (8")0 -- 150 mm (6")0 -- 125 mm (5")0 -- 100 mm (4")0 -- 75.0 mm (3")0 -- 63.0 mm (2-1/2")0 -- 50.0 mm (2")0 -- 37.5 mm (1-1/2")0 25.0 mm (1")0 19.0 mm (3/4")100 0 12.5 mm (1/2")99 0 9.5 mm (3/8")99 0 6.3 mm (1/4")98 0 4.75mm (No. 4)97 0 2.36 mm (No. 8)93 0 2.00 mm (No. 10)0 1.18mm (No.16)91 0 0.600 mm (No.30)89 0 0.425mm (No. 40)0 0.300mm (No. 50)86 0 0.180mm (No. 80)0 0.150mm (No.100)81 0 0.075mm (No. 200)69.5 0.0 Liquid Limit 0.0 In 0.0 0.0 40.0 Plastic Limit 0.0 0.0 -- Plasticity Limit 0.0 0.0 In 0.0 In 0.0 In 0.0 0.0 10.0 AASHTO T 89/90 Moisture Content, %7.1 0.0 AASHTO T255 Gauge Moisture Content, %Difference Difference Difference Difference 0.0 AASHTO T310 0.0 0.0 0.0 Soil Classification AASHTO M145 Uncorrected OptMoisture, %=14.1%Uncorrected OptMoisture, %=Uncorrected OptMoisture, %=Uncorrected OptMoisture, %= Uncorrected MaxDry Density, pcf=106.0 Uncorrected MaxDry Density, pcf=Uncorrected MaxDry Density, pcf=Uncorrected MaxDry Density, pcf= T180 Corrected Opt Moisture, %=14.1%Corrected Opt Moisture, %= Corrected Opt Moisture, %= Corrected Opt Moisture, %= Modified Corrected Max Dry Density, pcf=106.0 Corrected Max Dry Density, pcf= Corrected Max Dry Density, pcf= Corrected Max Dry Density, pcf= REMARKS: Laboratory Manager Chelsea Richards Date 10/3/2023 Native Onsite A-4 Proctor + Sieve Analysis Nate Hansen C.Richards & F.Ocampo 0 0 SLV-Landfill Module 8 23-298 Gary Horton NATIVE 2 A-4-8 N/A 9/29/2023 10/2/2023 Lab Max Dry Density / Opt Moisture Specifications Lower to Upper LEGEND Data Entry Required Value is OUT OF SPEC Blended? SIEVE ANALYSIS Spec:AASHTO T11 / AASHTO T27 100% Soils Report Lab Number: WCG Materials Lab Date: Maximum Laboratory Density ASTM D698 C Form Revised 12/6/2016 Maximum Dry Density Optimum Moisture106.0 14.1% 23A-37 9/29/2023 14.1, 106.0 98.0 100.0 102.0 104.0 106.0 108.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Dr y D e n s i t y ( L b s / C u . F t ) Moisture Content 3.2.2 Field Density Test Reports 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4395 Date Tested:10/20/2023 Standard Counts:DS 2437 MS 755 Production Date:10/20/2023 Material Description:Native Soil Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:100+50 To:113+50Sample Station and Offset: Offset:From:120 LT To:520 LT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 1 10 F 8 in.6 14.6 13.8 120.4 105.8 106.0 100 95 P STA / Location:100+73 LT 506 Module 8 Subgrade 2 10 F 8 in.6 14.8 14.1 119.8 105.0 106.0 99 95 P STA / Location:103+20 LT 483 Module 8 Subgrade 3 10 F 8 in.6 15.1 14.3 120.5 105.4 106.0 99 95 P STA / Location:104+37 LT 494 Module 8 Subgrade 4 10 F 8 in.6 15.1 15.0 115.9 100.8 106.0 95 95 P STA / Location:106+87 LT 476 Module 8 Subgrade 5 10 F 8 in.6 14.4 14.0 117.0 102.6 106.0 97 95 P STA / Location:109+14 LT 507 Module 8 Subgrade 6 10 F 8 in.6 15.8 15.0 121.0 105.2 106.0 99 95 P STA / Location:110+09 LT 201 Module 8 Subgrade 7 10 F 8 in.6 15.3 14.4 121.3 106.0 106.0 100 95 P STA / Location:112+69 LT 431 Module 8 Subgrade 2 areasSize of area being accepted:925'x50'+375'x400' /9=21,805.56 #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 2 Random Test Calculations Test #1 Test #5 Test #2 Test #6 Test #3 Test #7 Test #4 Beginning Station:10050 Beginning Offset:-520 Beginning Station:10790 Beginning Offset:-520 Ending Station:10235 Ending Offset:-470 Ending Station:10975 Ending Offset:-470 Distance Between:185 Distance Between:50 Distance Between:185 Distance Between:50 Random Number:0.126 Random Number:0.283 Random Number:0.671 Random Number:0.266 Beginning Station:10235 Beginning Offset:-520 Beginning Station:10975 Beginning Offset:-520 Ending Station:10420 Ending Offset:-470 Ending Station:11160 Ending Offset:-120 Distance Between:185 Distance Between:50 Distance Between:185 Distance Between:400 Random Number:0.461 Random Number:0.746 Random Number:0.183 Random Number:0.797 Beginning Station:10420 Beginning Offset:-520 Beginning Station:11160 Beginning Offset:-520 Ending Station:10605 Ending Offset:-470 Ending Station:11350 Ending Offset:-120 Distance Between:185 Distance Between:50 Distance Between:190 Distance Between:400 Random Number:0.093 Random Number:0.511 Random Number:0.572 Random Number:0.223 Beginning Station:10605 Beginning Offset:-520 Ending Station:10790 Ending Offset:-470 Distance Between:185 Distance Between:50 Random Number:0.444 Random Number:0.880 Test Station:10073 Test Offset:-506 LT Test Station:10914 Test Offset:-507 LT Test Station:10320 Test Offset:-483 LT Test Station:11009 Test Offset:-201 LT Test Station:10437 Test Offset:-494 LT Test Station:11269 Test Offset:-431 LT Test Station:10687 Test Offset:-476 LT Random numbers were generated by calculator. 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4395 Date Tested:10/24/2023 Standard Counts:DS 2462 MS 754 Production Date:10/24/2023 Material Description:Native Soil Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:109+75 To:113+50Sample Station and Offset: Offset:From:0 CL To:520 RT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 1 10 F 8 in.6 10.7 10.2 116.1 105.2 106.0 99 95 P STA / Location:109+82 RT 440 Subgrade south of center ditch east side of Module 8 2 10 F 8 in.6 11.9 11.3 117.4 105.5 106.0 100 95 P STA / Location:110+75 RT 171 Subgrade south of center ditch east side of Module 8 3 10 F 8 in.6 13.4 12.6 119.8 106.4 106.0 100 95 P STA / Location:111+61 RT 385 Subgrade south of center ditch east side of Module 8 4 10 F 8 in.6 14.1 13.3 120.4 106.3 106.0 100 95 P STA / Location:112+16 RT 160 Subgrade south of center ditch east side of Module 8 5 10 F 8 in.6 14.6 13.8 120.1 105.5 106.0 100 95 P STA / Location:113+16 RT 292 Subgrade south of center ditch east side of Module 8 6 10 F 8 in.6 15.5 15.0 118.7 103.2 106.0 97 95 p STA / Location:111+40 RT 32 Subgrade center ditch east side of Module 8 7 10 F 8 in.6 13.7 13.1 118.2 104.5 106.0 99 95 p STA / Location:112+99 RT 60 Subgrade center ditch east side of Module 8 Size of area being accepted:375' x 520' /9=21,666.67 #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 2 Random Test Calculations Test #1 Test #5 Test #2 Test #6 Test #3 Test #7 Test #4 Beginning Station:10975 Beginning Offset:120 Beginning Station:11275 Beginning Offset:120 Ending Station:11050 Ending Offset:520 Ending Station:11350 Ending Offset:520 Distance Between:75 Distance Between:400 Distance Between:75 Distance Between:400 Random Number:0.087 Random Number:0.801 Random Number:0.547 Random Number:0.430 Beginning Station:11050 Beginning Offset:120 Beginning Station:10975 Beginning Offset:0 Ending Station:11125 Ending Offset:520 Ending Station:11350 Ending Offset:120 Distance Between:75 Distance Between:400 Distance Between:375 Distance Between:120 Random Number:0.333 Random Number:0.128 Random Number:0.439 Random Number:0.267 Beginning Station:11125 Beginning Offset:120 Beginning Station:10975 Beginning Offset:0 Ending Station:11200 Ending Offset:520 Ending Station:11350 Ending Offset:120 Distance Between:75 Distance Between:400 Distance Between:375 Distance Between:120 Random Number:0.484 Random Number:0.663 Random Number:0.864 Random Number:0.499 Beginning Station:11200 Beginning Offset:120 Ending Station:11275 Ending Offset:520 Distance Between:75 Distance Between:400 Random Number:0.219 Random Number:0.099 Test Station:10982 Test Offset:440 RT Test Station:11316 Test Offset:292 RT Test Station:11075 Test Offset:171 RT Test Station:11140 Test Offset:32 RT Test Station:11161 Test Offset:385 RT Test Station:11299 Test Offset:60 RT Test Station:11216 Test Offset:160 RT Random numbers were generated by calculator. 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4395 Date Tested:11/4/2023 Standard Counts:DS 2424 MS 752 Production Date:11/4/2023 Material Description:Native Soil Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:100+50 To:109+75Sample Station and Offset: Offset:From:320 LT To:470 LT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 1 10 F 8 in.6 11.6 11.2 115.6 104.0 106.0 98 95 P STA / Location:101+14 LT 442 Module 8 subgrade north of center ditch 2 10 F 8 in.6 12.2 11.6 117.8 105.6 106.0 100 95 P STA / Location:102+37 LT 394 Module 8 subgrade north of center ditch 3 10 F 8 in.6 13.0 12.2 119.2 106.2 106.0 100 95 P STA / Location:104+02 LT 328 Module 8 subgrade north of center ditch 4 10 F 8 in.6 12.5 11.9 117.8 105.3 106.0 99 95 P STA / Location:105+19 LT 458 Module 8 subgrade north of center ditch 5 10 F 8 in.6 12.8 12.1 118.9 106.1 106.0 100 95 P STA / Location:106+71 LT 439 Module 8 subgrade north of center ditch 6 10 F 8 in.6 13.7 12.9 120.1 106.4 106.0 100 95 P STA / Location:108+05 LT 331 Module 8 subgrade north of center ditch 7 10 F 8 in.6 13.5 12.8 119.1 105.6 106.0 100 95 P STA / Location:108+61 LT 391 Module 8 subgrade north of center ditch Size of area being accepted: Continued Report 1 of 3 925' x 150' / 9 = 15,416.67 #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 2 Random Test Calculations Test #1 Test #5 Test #2 Test #6 Test #3 Test #7 Test #4 Beginning Station:10050 Beginning Offset:-470 Beginning Station:10578 Beginning Offset:-470 Ending Station:10182 Ending Offset:-320 Ending Station:10710 Ending Offset:-320 Distance Between:132 Distance Between:150 Distance Between:132 Distance Between:150 Random Number:0.483 Random Number:0.190 Random Number:0.701 Random Number:0.204 Beginning Station:10182 Beginning Offset:-470 Beginning Station:10710 Beginning Offset:-470 Ending Station:10314 Ending Offset:-320 Ending Station:10842 Ending Offset:-320 Distance Between:132 Distance Between:150 Distance Between:132 Distance Between:150 Random Number:0.420 Random Number:0.506 Random Number:0.723 Random Number:0.926 Beginning Station:10314 Beginning Offset:-470 Beginning Station:10842 Beginning Offset:-470 Ending Station:10446 Ending Offset:-320 Ending Station:10975 Ending Offset:-320 Distance Between:132 Distance Between:150 Distance Between:133 Distance Between:150 Random Number:0.670 Random Number:0.949 Random Number:0.143 Random Number:0.530 Beginning Station:10446 Beginning Offset:-470 Ending Station:10578 Ending Offset:-320 Distance Between:132 Distance Between:150 Random Number:0.552 Random Number:0.082 Test Station:10114 Test Offset:-442 LT Test Station:10671 Test Offset:-439 LT Test Station:10237 Test Offset:-394 LT Test Station:10805 Test Offset:-331 LT Test Station:10402 Test Offset:-328 LT Test Station:10861 Test Offset:-391 LT Test Station:10519 Test Offset:-458 LT Random numbers were generated by calculator. 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4395 Date Tested:11/4/2023 Standard Counts:DS 2424 MS 752 Production Date:11/4/2023 Material Description:Native Soil Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:100+50 To:109+75Sample Station and Offset: Offset:From:170 CL To:320 LT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 8 10 F 8 in.6 13.8 13.0 119.9 106.1 106.0 100 95 P STA / Location:101+16 LT 273 Module 8 subgrade north of center ditch 9 10 F 8 in.6 14.3 13.5 120.6 106.3 106.0 100 95 P STA / Location:102+10 LT 227 Module 8 subgrade north of center ditch 10 10 F 8 in.6 13.5 12.8 119.0 105.5 106.0 100 95 P STA / Location:103+90 LT 207 Module 8 subgrade north of center ditch 11 10 F 8 in.6 13.6 13.2 116.6 103.0 106.0 97 95 P STA / Location:104+87 LT 310 Module 8 subgrade north of center ditch 12 10 F 8 in.6 15.6 15.2 118.1 102.5 106.0 97 95 P STA / Location:106+08 LT 238 Module 8 subgrade north of center ditch 13 10 F 8 in.6 13.7 13.0 119.0 105.3 106.0 99 95 P STA / Location:108+12 LT 184 Module 8 subgrade north of center ditch 14 10 F 8 in.6 13.4 12.8 117.7 104.3 106.0 98 95 P STA / Location:109+02 LT 222 Module 8 subgrade north of center ditch Size of area being accepted: Continued Report 2 of 3 925' x 150' / 9 = 15,416.67 #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 2 Random Test Calculations Test #8 Test #12 Test #9 Test #13 Test #10 Test #14 Test #11 Beginning Station:10050 Beginning Offset:-320 Beginning Station:10578 Beginning Offset:-320 Ending Station:10182 Ending Offset:-170 Ending Station:10710 Ending Offset:-170 Distance Between:132 Distance Between:150 Distance Between:132 Distance Between:150 Random Number:0.502 Random Number:0.311 Random Number:0.228 Random Number:0.545 Beginning Station:10182 Beginning Offset:-320 Beginning Station:10710 Beginning Offset:-320 Ending Station:10314 Ending Offset:-170 Ending Station:10842 Ending Offset:-170 Distance Between:132 Distance Between:150 Distance Between:132 Distance Between:150 Random Number:0.209 Random Number:0.622 Random Number:0.775 Random Number:0.906 Beginning Station:10314 Beginning Offset:-320 Beginning Station:10842 Beginning Offset:-320 Ending Station:10446 Ending Offset:-170 Ending Station:10975 Ending Offset:-170 Distance Between:132 Distance Between:150 Distance Between:133 Distance Between:150 Random Number:0.574 Random Number:0.755 Random Number:0.453 Random Number:0.652 Beginning Station:10446 Beginning Offset:-320 Ending Station:10578 Ending Offset:-170 Distance Between:132 Distance Between:150 Random Number:0.313 Random Number:0.065 Test Station:10116 Test Offset:-273 LT Test Station:10608 Test Offset:-238 LT Test Station:10210 Test Offset:-227 LT Test Station:10812 Test Offset:-184 LT Test Station:10390 Test Offset:-207 LT Test Station:10902 Test Offset:-222 LT Test Station:10487 Test Offset:-310 LT Random numbers were generated by calculator. 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4395 Date Tested:11/4/2023 Standard Counts:DS 2424 MS 752 Production Date:11/4/2023 Material Description:Native Soil Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:100+50 To:109+75Sample Station and Offset: Offset:From:0 CL To:170 LT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 15 10 F 8 in.6 11.9 11.2 117.8 105.9 106.0 100 95 P STA / Location:101+01 LT 91 Module 8 subgrade north of center ditch 16 10 F 8 in.6 11.5 10.9 117.0 105.5 106.0 100 95 P STA / Location:102+66 LT 136 Module 8 subgrade north of center ditch 17 10 F 8 in.6 11.6 10.9 117.8 106.2 106.0 100 95 P STA / Location:103+58 LT 39 Module 8 subgrade north of center ditch 18 10 F 8 in.6 12.5 11.8 118.6 106.1 106.0 100 95 P STA / Location:104+68 LT 78 Module 8 subgrade north of center ditch 19 10 F 8 in.6 13.1 12.3 119.4 106.3 106.0 100 95 P STA / Location:106+20 LT 94 Module 8 subgrade north of center ditch 20 10 F 8 in.6 11.7 11.1 117.3 105.6 106.0 100 95 P STA / Location:108+20 LT 26 Module 8 subgrade north of center ditch 21 10 F 8 in.6 12.3 11.7 117.5 105.2 106.0 99 95 P STA / Location:108+90 LT 84 Module 8 subgrade north of center ditch Size of area being accepted: End Report 3 of 3 925' x 170' / 9 = 17,472.22 #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 2 Random Test Calculations Test #15 Test #19 Test #16 Test #20 Test #17 Test #21 Test #18 Beginning Station:10050 Beginning Offset:-170 Beginning Station:10578 Beginning Offset:-170 Ending Station:10182 Ending Offset:0 Ending Station:10710 Ending Offset:0 Distance Between:132 Distance Between:170 Distance Between:132 Distance Between:170 Random Number:0.384 Random Number:0.466 Random Number:0.317 Random Number:0.449 Beginning Station:10182 Beginning Offset:-170 Beginning Station:10710 Beginning Offset:-170 Ending Station:10314 Ending Offset:0 Ending Station:10842 Ending Offset:0 Distance Between:132 Distance Between:170 Distance Between:132 Distance Between:170 Random Number:0.640 Random Number:0.202 Random Number:0.832 Random Number:0.846 Beginning Station:10314 Beginning Offset:-170 Beginning Station:10842 Beginning Offset:-170 Ending Station:10446 Ending Offset:0 Ending Station:10975 Ending Offset:0 Distance Between:132 Distance Between:170 Distance Between:133 Distance Between:170 Random Number:0.337 Random Number:0.769 Random Number:0.360 Random Number:0.504 Beginning Station:10446 Beginning Offset:-170 Ending Station:10578 Ending Offset:0 Distance Between:132 Distance Between:170 Random Number:0.164 Random Number:0.541 Test Station:10101 Test Offset:-91 LT Test Station:10620 Test Offset:-94 LT Test Station:10266 Test Offset:-136 LT Test Station:10820 Test Offset:-26 LT Test Station:10358 Test Offset:-39 LT Test Station:10890 Test Offset:-84 LT Test Station:10468 Test Offset:-78 LT Random numbers were generated by calculator. 1 Field Density Test Report Project PIN:Project Number:Client:Salt Lake City Project Name:Salt Lake Valley Solid Waste Facility Module 8 Location:Salt Lake City, Utah Density Gauge:Model 3500 Serial Number 4396 Date Tested:5/16/2024 Standard Counts:DS 2493 MS 710 Production Date:5/16/2024 Material Description:Native Soil from on site Pit / Source:Native Placement Area Information Proctor Technician:Nate Hansen Sample Collected?Yes No N/A Station:From:100+50 To:109+70Sample Station and Offset: Offset:From:0 CL To:560 RT Moisture Sample Collected?Yes No N/A Square YardsSample Station and Offset: What is being tested? Roadway Excavation Granular Borrow Embankment MSE Select Backfill Backfill Placement Untreated Base Course Type Other:Native Subgrade Lab No.Max. Density (pcf)Optimum Moisture %Test Type Method Material Description 23A-37 106.0 14.1 Native Soil 1 10 F 8 in.6 12.7 12.1 117.5 104.8 106.0 99 95 P STA / Location:100+98 RT 315 Final subgrade 2 10 F 8 in.6 13.2 12.5 119.1 105.9 106.0 100 95 P STA / Location:102+57 RT 411 Final subgrade 3 10 F 8 in.6 12.8 12.6 114.2 101.4 106.0 96 95 P STA / Location:103+75 RT 230 Final subgrade 4 10 F 8 in.6 13.3 12.6 119.1 105.8 106.0 100 95 P STA / Location:104+72 RT 111 Final subgrade 5 10 F 8 in.6 13.9 13.1 120.1 106.2 106.0 100 95 P STA / Location:106+34 RT 343 Final subgrade 6 10 F 8 in.6 15.4 14.5 121.4 106.0 106.0 100 95 P STA / Location:107+49 RT 483 Final subgrade 7 10 F 8 in.6 13.2 12.6 118.1 104.9 106.0 99 95 P STA / Location:109+25 RT 172 Final subgrade Size of area being accepted: #Bid Item # Lift # Lift Thickness Probe Depth Moisture lbs/cf % Moisture Wet Density Dry Density Max Density % Compaction % Compaction Required Pass or Fail 920' x 560' / 9 = 57,244.44 2 Random Test Calculations Test #1 Test #5 Test #2 Test #6 Test #3 Test #7 Test #4 Beginning Station:10050 Beginning Offset:0 Beginning Station:10570 Beginning Offset:0 Ending Station:10180 Ending Offset:560 Ending Station:10700 Ending Offset:560 Distance Between:130 Distance Between:560 Distance Between:130 Distance Between:560 Random Number:0.373 Random Number:0.562 Random Number:0.492 Random Number:0.613 Beginning Station:10180 Beginning Offset:0 Beginning Station:10700 Beginning Offset:0 Ending Station:10310 Ending Offset:560 Ending Station:10830 Ending Offset:560 Distance Between:130 Distance Between:560 Distance Between:130 Distance Between:560 Random Number:0.593 Random Number:0.734 Random Number:0.378 Random Number:0.862 Beginning Station:10310 Beginning Offset:0 Beginning Station:10830 Beginning Offset:0 Ending Station:10440 Ending Offset:560 Ending Station:10970 Ending Offset:560 Distance Between:130 Distance Between:560 Distance Between:140 Distance Between:560 Random Number:0.502 Random Number:0.410 Random Number:0.681 Random Number:0.307 Beginning Station:10440 Beginning Offset:0 Ending Station:10570 Ending Offset:560 Distance Between:130 Distance Between:560 Random Number:0.249 Random Number:0.199 Test Station:10098 Test Offset:315 RT Test Station:10634 Test Offset:343 RT Test Station:10257 Test Offset:411 RT Test Station:10749 Test Offset:483 RT Test Station:10375 Test Offset:230 RT Test Station:10925 Test Offset:172 RT Test Station:10472 Test Offset:111 RT Random numbers were generated by calculator. 3.2.3 GSI’s Certificate of Acceptance of Subgrade 4.0 GEOSYNTHETIC CLAY LINER 4.1 Construction QC/QA Plan Geosynthetic Clay Liner Construction QC/QA Plan Introduction This document (Geosynthe c Clay Liner Construc on Quality Control/Quality Assurance Plan) is intended to generally document standard procedures u lized to verify a quality installa on. This document complements, and does not replace, applicable site-specific project plans and specifica ons. References: CETCO Bentomat Installa on Guidelines. Equipment Requirements CETCO GCLs are delivered in rolls typically 2,600-2,950 lbs (1180-1340 kg). Roll dimensions and weights will vary with the dimensions of the product ordered. It is necessary to support this weight using an appropriate core pipe, as indicated in Table 1. For any installa on, the core pipe must not deflect more than 3 inches (75 mm), as measured from end to midpoint when a full GCL roll is li<ed. Li<ing chains or straps appropriately rated should be used in combina on with a spreader bar made from an I-beam, as shown in Figure 1. The spreader bar ensures that li<ing chains or straps do not chafe against the ends of the GCL roll, allowing it to rotate freely during installa on. Spreader bar and core pipe kits are available through CETCO. A front end loader, backhoe, dozer, or other equipment can be u lized with the spreader bar and core pipe or slings. Alterna vely, a forkli< with a “s nger” a@achment may be used for on-site handling. A forkli< without a s nger a@achment should not be used to li< or handle the GCL rolls. S nger a@achments (Figures 2-4) are specially fabricated to fit various forkli< makes and models. When installing over certain geosynthe c materials, a 4 wheel, all-terrain vehicle (ATV) can be used to deploy the GCL. An ATV can be driven directly on the GCL provided that no sudden stops, starts, or turns are made. Addi onal equipment needed for installa on of CETCO GCLs includes: · U lity knife and spare blades (for cuDng the GCL) · Granular bentonite for end-of-roll GCL seams and for sealing around structures and details · Waterproof tarpaulins (for temporary cover on installed material as well as for stockpiled rolls) · Op onal flat-bladed vise grips (for posi oning the GCL panel by hand) The CETCO EASY ROLLER™ GCL Deployment System is a preferred method of installing geosynthe c clay liners. Use of the EASY ROLLER system eliminates the need for spreader bars and heavy core pipes. Installa on speed and worker safety are also significantly increased. For further details, contact CETCO. Shipping, Unloading, and Storage All lot and roll numbers should be recorded and compared to the packing list. Each roll of GCL should also be visually inspected during unloading to determine if any packaging has been damaged. Damage, whether obvious or suspected, should be recorded and the affected rolls marked. Major damage suspected to have occurred during transit should be reported to the carrier and to CETCO immediately. The nature of the damage should also be indicated on the bill of lading, with specific lot and roll numbers noted. Accumula on of some moisture within roll packaging is normal and does not damage the product. The party directly responsible for unloading the GCL should refer to this manual prior to shipment to ascertain the appropriateness of their unloading equipment and procedures. Unloading and on-site handling of the GCL should be supervised. In most cases, CETCO GCLs are delivered on flatbed trucks. There are three methods of unloading: core pipe and spreader bar, slings, or s nger bar. To unload the rolls from the flat-bed using a core pipe and spreader bar, first insert the core pipe through the core tube. Secure the li<ing chains or straps to each end of the core pipe and to the spreader bar mounted on the li<ing equipment. Hoist the roll straight up and make sure its weight is evenly distributed so that it does not lt or sway when li<ed. All CETCO GCLs are delivered with two 2’x 12’ (50 mm x 3.65 mm) Type V polyester endless slings on each roll. Before li<ing, check the posi on of the slings. Each sling should be ed off in the choke posi on, approximately one third (1/3) from the end of the roll. Hoist the roll straight up so that it does not lt or sway when li<ed. In some cases, GCL rolls will be stacked in three pyramids on flatbed trucks. If slings are not used, rolls will require unloading with a s nger bar and extendible boom fork li<. Spreader bars will not work in this situa on because of the limited access between the stacks of GCL. Three types of s ngers are available from CETCO, a hook mount, fork mount and pin mount (Figures 2-4). To unload, guide the s nger through the core tube before li<ing the GCL roll and removing the truck. An extendable boom fork li< with a s nger bar is required for unloading vans. Rolls in the nose and center of the van should first be carefully pulled toward the door using the slings provided on the rolls. Rolls should be stored at the job site away from high-traffic areas but sufficiently close to the ac ve work area to minimize handling. The designated storage area should be flat, dry, and stable. Moisture protec on of the GCL is provided by its packaging; however, based on expected weather condi ons, an addi onal tarpaulin or plas c sheet may be required for added protec on during prolonged outdoor storage. Rolls should be stacked in a manner that prevents them from sliding or rolling. This can be accomplished by chocking the bo@om layer of rolls. Rolls should be stacked no higher than the height at which they can be safely handled by laborers (typically no higher than four layers of rolls). Rolls should never be stacked on end. Subgrade Preparation Subgrade surfaces consis ng of granular soils or gravels are not acceptable due to their large void frac on and puncture poten al. When the GCL is placed over an earthen subgrade, the subgrade surface must be prepared in accordance with the project specifica ons. The engineer’s approval of the subgrade must be obtained prior to installa on. The finished surface should be firm and unyielding, without abrupt eleva on changes, voids, cracks, ice, or standing water. The subgrade surface must be smooth and free of vegeta on, sharp-edged rocks, stones, s cks, construc on debris, and other foreign ma@er that could contact the GCL. The subgrade should be rolled with a smooth-drum compactor to remove any wheel ruts greater than 1 inch in depth, footprints, or other abrupt grade changes. Furthermore, all protrusions extending more than 0.5 inch (12 mm) from the subgrade surface shall be removed, crushed, or pushed into the surface with a smooth-drum compactor. The GCL may be installed on a frozen subgrade, but the subgrade soil in the unfrozen state should meet the above requirements. Installation GCL rolls should be taken to the work area of the site in their original packaging. The orienta on of the GCL (i.e., which side faces up) may be important if the GCL has two different types of geosynthe cs. Check with the project engineer to determine if there is a preferred installa on orienta on for the GCL. If no specific orienta on is required, allow the roll to unwind from the bo@om rather than pulling from the top (Figure 5A). The arrow s cker on the plas c sleeve indicates the direc on that the GCL will naturally unroll when placed on the ground (Figure 6). Prior to deployment, the packaging should be carefully removed without damaging the GCL. Equipment which could damage the GCL should not be allowed to travel directly on it. Therefore, acceptable installa on may be accomplished whereby the GCL is unrolled in front of backwards-moving equipment (Figure 7). If the installa on equipment causes ruDng of the subgrade, the subgrade must be restored to its originally accepted condi on before placement con nues. If sufficient access is available, GCL may be deployed by suspending the roll at the top of the slope, with a group of laborers pulling the material off of the roll, and down the slope (Figure 8). GCL rolls should not be released on the slope and allowed to unroll freely by gravity. Care must be taken to minimize the extent to which the GCL is dragged across the subgrade to avoid damage to the bo@om surface of the GCL. Care must also be taken when adjus ng BENTOMAT CLT panels to avoid damage to the geotex le surface of one panel of GCL by the textured sheet of another panel of GCL. A temporary geosynthe c subgrade cover commonly known as a slip sheet or rub sheet may be used to reduce fric on damage during placement. The GCL should be placed so that seams are parallel to the direc on of the slope. End-of-panel seams should also be located at least 3 < (1 m) from the toe and crest of slopes steeper than 4H:1V. End-of-roll seams on slopes should be used only if the liner is not expected to be in tension. All GCL panels should lie flat, with no wrinkles or folds, especially at the exposed edges of the panels. When BENTOMAT geosynthe c clay liners with SUPERGROOVE® is reposi oned, it should be gripped inside the SUPERGROOVE by folding the edge. The GCL should not be installed in standing water or during rainy weather. Only as much GCL shall be deployed as can be covered at the end of the working day with soil, geomembrane, or a temporary waterproof tarpaulin. The GCL shall not be le< uncovered overnight. If the GCL is hydrated when no confining stress is present, it may be necessary to remove and replace the hydrated material. CETCO recommends that premature hydra on be evaluated on a case-by-case basis. The project engineer, CQA inspector, and CETCO TR-312 should be consulted for specific guidance if premature hydra on occurs. The type of GCL, dura on of exposure, degree of hydra on, loca on in the liner system, and expected bearing loads should all be considered. In many instances, a needle punch reinforced GCL may not require removal/replacement if the following are true: · The geotex les have not been separated, torn, or otherwise damaged · There is no evidence that the needle punching between the two geotex les has been compromised · The GCL does not leave deep indenta ons when stepped upon · Overlapped seams with bentonite enhancement are intact For the convenience of the installer, hash marks are placed on BENTOMAT goesynthe c clay liners every 5’ (1.5 m) of length. Anchorage If required by the project drawings, the end of the GCL roll should be placed in an anchor trench at the top of a slope. The front edge of the trench should be rounded to eliminate any sharp corners that could cause excessive stress on the GCL. Loose soil should be removed or compacted into the floor of the trench. If a trench is used for anchoring the end of the GCL, soil backfill should be placed in the trench to provide resistance against pullout. The size and shape of the trench, as well as the appropriate backfill procedures should be in accordance with the project drawings and specifica ons. Typical dimensions are shown in Figure 9. The GCL should be placed in the anchor trench such that it covers the en re trench floor but does not extend up the rear trench wall. Sufficient anchorage may alternately be obtained by extending the end of the GCL roll back from the crest of the slope and placing cover soil. The length of this “runout” anchor should be prepared in accordance with project drawings and specifica ons. Seaming GCL seams are constructed by overlapping adjacent panel edges and ends. Care should be taken to ensure that the overlap zone is not contaminated with loose soil or other debris. BENTOMAT 200R, BENTOMAT ST, BENTOMAT DN, and BENTOMAT FLW have SUPERGROOVE® which provides self-seaming capabili es in their longitudinal overlaps, and therefore do not require supplemental bentonite. However, for pond applica ons, supplemental bentonite must be used in longitudinal seams, regardless of the CETCO GCL. Longitudinal seams should be overlapped a minimum of 6 inches (150 mm) for BENTOMAT geosynthe c clay liners. For high-head applica ons (greater than 1 foot or 20.48 cm) involving BENTOMAT CL, BENTOMAT CLT, or BENTOMAT 600 CL, a minimum longitudinal seam overlap of 12 inches (300 mm) and supplemental bentonite is recommended. End-of-panel overlapped seams should be overlapped 24 inches (600 mm) for BENTOMAT geosynthe c clay liners. End-of-panel overlapped seams are constructed such that they are shingled in the direc on of the grade to prevent runoff from entering the overlap zone. End-of-panel seams on slopes are permissible, provided adequate slope stability analysis has been conducted (i.e., the GCL is not expected to be in tension). Bentonite-enhanced seams are required for all BENTOMAT end-of-panel over lapped seams. BENTOMAT end-of-panel, bentonite-enhanced, overlapped seams are constructed first by overlapping the adjacent panels, exposing the underlying panel, and then applying a con nuous bead or fillet of granular sodium bentonite 12” from the edge of the underlying panel (Figure 11). The minimum applica on rate at which the bentonite is applied is one-quarter pound per linear foot (0.4 kg/m). If longitudinal bentonite enhanced seams are required for BENTOMAT 200R, BENTOMAT ST, BENTOMAT DN, or BENTOMAT SDN, they are constructed by overlapping the adjacent panels a minimum 6 inches (150 mm), exposing the underlying edge, and applying a con nuous bead of granular bentonite approximately 3 inches (75 mm) from the edge. For pond applica ons involving BENTOMAT CL or BENTOMAT CLT, longitudinal seams are constructed by overlapping adjacent panels by 12 inches (300 mm), exposing the underlying edge, and applying a con nuous bead of bentonite approximately 6 inches (150 mm) from the edge. The minimum applica on rate for the granular bentonite is one quarter pound per linear foot (0.4 kg/m). Sealing Around Penetrations and Structures CuDng the GCL should be performed using a sharp u lity knife. Frequent blade changes are recommended to avoid irregular tearing of the geotex le components of the GCL during the cuDng process. The GCL should be sealed around penetra ons and structures embedded in the subgrade in accordance with Figures 12 through 14. Granular bentonite shall be used liberally (approximately 0.25 lbs/ln. <. or 0.4 kg/m) to seal the GCL to these structures. When the GCL is placed over a horizontal pipe penetra on, a “notch” should be excavated into the subgrade around the penetra on (Figure 12a). The notch should then be backfilled with granular bentonite. A secondary collar of GCL should be placed around the penetra on, as shown in Figure 12b. It is helpful to first trace an outline of the penetra on on the GCL and then cut a “star” pa@ern in the collar to enhance the collar’s fit to the penetra on. Granular bentonite should be applied between the primary GCL layer and the secondary GCL collar. Ver cal penetra ons are prepared by notching into the subgrade as shown in Figure 13a. The penetra on can be completed with two separate pieces of GCL as shown in Figure 13b. Alterna vely, a secondary collar can be placed as shown in Figure 12a or 12b. When the GCL is terminated at a structure or wall that is embedded into the subgrade on the floor of the containment area, the subgrade should be notched. The notch is filled with granular bentonite; the GCL should be placed over the notch and up against the structure (Figure 14). Connec on to the structure can be accomplished by placement of soil or stone backfill in this area. When structures or walls are at the top of a slope, addi onal detailing may be required. Damage Repair If the GCL is damaged (torn, punctured, perforated, etc.) during installa on, it may be possible to repair it by cuDng a patch to fit over the damaged area (Figure 15). The patch should be cut to size such that a minimum overlap of 12 inches (300 mm) is achieved around all parts of the damaged area. Granular bentonite should be applied around the damaged area prior to placement of the patch. It may be necessary to use an adhesive such as wood glue to affix the patch in place so that it is not displaced during cover placement. Smaller patches may be tucked under the damaged area to prevent patch movement. Cover Placement The final thickness of soil cover on the GCL varies with the applica on. A minimum cover layer must be at least 2 foot thick to provide confining stress to the GCL, eliminate the poten al for seam separa on and prevent damage by equipment, erosion, etc. Cover soils should be free of angular stones or other foreign ma@er that could damage the GCL. Cover soils should be approved by the engineer with respect to par cle size, uniformity, and chemical compa bility. Consult CETCO if cover soils have high concentra ons of calcium (e.g. limestone, dolomite, gypsum, seashell fragments). Recommended cover soils should have a par cle size distribu on ranging between fines and 1 inch (25 mm), unless a cushioning geotex le is specified. Soil cover shall be placed over the GCL using construc on equipment that minimizes stresses on the GCL. A minimum thickness of 2 feet of cover soil should be maintained between the equipment res/tracks and the GCL at all mes during the covering process. In high-traffic areas such as on roadways, a minimum thickness of 3 feet is required. Soil cover should be placed in a manner that prevents the soil from entering the GCL overlap zones. Soil cover should be pushed up on slopes, not down slopes, to minimize tensile forces on the GCL. When a textured geomembrane is installed over the GCL, a temporary geosynthe c covering known as a slip sheet or rub sheet should be used to minimize fric on during placement and to allow the textured geomembranes to be more easily moved into its final posi on. Cyclical weDng and drying of GCL covered only with geomembrane can cause overlap separa on. Soil cover should be placed promptly whenever possible. Geomembranes should be covered with a white geotex le and/or opera ons layer without delay to minimize the intensity of wet-dry cycling. If there is the poten al for unconfined cyclic weDng and drying over an extended period of me, the longitudinal seam overlaps should be increased based on the project engineer’s recommenda on. To avoid seam separa on, the GCL should not be put in excessive tension by the weight or movement of textured geomembrane on steep slopes. If there is the poten al for unconfined geomembrane expansion and contrac on over an extended period of me, the longitudinal seam overlaps should be increased based upon the project engineer’s recommenda on. Hydration Hydra on is usually accomplished by natural rainfall and/or absorp on of moisture from soil. However, in cases where the containment of non-aqueous liquid is required, it may be necessary to hydrate the covered GCL with water prior to use. If manual hydra on is necessary, water can be introduced by flooding the covered lined area or using a sprinkler system. If flooding, care must be taken to diffuse the energy of the water discharge so that the cover material is not displaced. If the GCL is hydrated when no confining stress is present, it may be necessary to remove and replace the hydrated material. In many instances a needle punch reinforced GCL may not require removal/replacement if the following are true: · The geotex les have not been separated, torn or otherwise damaged · There is no evidence that the needle punching between the two geotex les has been compromised · The GCL does not leave deep indenta ons when stepped upon · Any overlapped seams with bentonite enhancement are intact 4.2 Contractor Submittals PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER MANUFACTURER'S CLARIFICATION LETTER PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com July 20th, 2023 RE: Salt Lake Valley SWM Module 8 - GCL Vehicular Deployment To whom it may concern: CETCO® is often asked what equipment, if any, can be allowed to drive upon a placed geosynthetic clay liner (GCL) to assist with the deployment of geomembrane or other geosynthetics on top of the GCL. Using low ground pressure equipment for such activities is a common practice. Using low ground pressure machines for the installation of multiple layer geosynthetics often increases production rates and results in a much safer work environment. If there are additional concerns, we would recommend setting up a test plot to make a project-specific determination. This should entail driving over GCL placed over representative prepared subgrade and with the equipment being considered, and then observing the trafficked GCL for any induced damage (e.g., puncture, tearing, etc.). Of critical note, regardless of any equipment considered, abrupt starts, stops or turns when driving on a GCL should always be avoided as these actions could impart damage and create wrinkles in the liner system. Please call me if you have any further questions. Best regards, Rob Stafford Technical Sales Manager CETCO® Environmental Products 970-749-6118 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 1.5.A.1. MATERIAL DATA SHEET PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com BENTOMAT®DN CERTIFIED PROPERTIES CETCO® Bentomat® DN is a reinforced geosynthetic clay liner (GCL) consisting of a layer of sodium bentonite between two polypropylene nonwoven geotextiles, which are needle-punched together. MATERIAL PROPERT Y TEST METHOD TEST FREQUENCY CERTIFIED VALUES Nonwoven Base Geotextile Mass/Area1 ASTM D5261 200,000 ft2 (20,000 m2) 6.0 oz/yd2 (203 g/m2) min. Nonwoven Cap Geotextile Mass/Area1 ASTM D5261 200,000 ft2 (20,000 m2) 6.0 oz/yd2 (203 g/m2) min. Bentonite Swell Index2 ASTM D5890 1 per 50 tonnes 24 mL/2g min. Bentonite Fluid Loss2 ASTM D5891 1 per 50 tonnes 18 mL max. Bentonite Mass/Area3 ASTM D5993 40,000 ft2 (4,000 m2) 0.75 lb/ft2 (3.7 kg/m2) min. Total Mass/Area3 ASTM D5993 40,000 ft2 (4,000 m2) 0.83 lb/ft2 (4.1 kg/m2) min. GCL Moisture Content ASTM D5993 40,000 ft2 (4,000 m2) 35% max. GCL Grab Strength4 ASTM D6768 200,000 ft2 (20,000 m2) 50 lbs/in (8.8 kN/m) min. GCL Peel Strength ASTM D6496 40,000 ft2 (4,000 m2) 3.5 lbs/in (610 N/m) min. GCL Hydraulic Conductivity5 ASTM D5887 250,000 ft2 (25,000 m2) 5 x 10-11 m/s max. GCL Index Flux5 ASTM D5887 250,000 ft2 (25,000 m2) 1 x 10-8 m3/m2/s max. GCL Hydrated Internal Shear Strength6 ASTM D6243 1,000,000 ft2 (100,000 m2) 500 psf (24 kPa) typ.@ 200 psf (9.6 kPa) Notes: 1Geotextile property tests performed on the geotextile components before they are incorporated into the finished GCL product. 2Bentonite property tests performed before the bentonite is incorporated into the finished GCL product. 3Reported at 0% moisture content. 4All tensile strength testing is performed in the machine direction using ASTM D6768. 5Index flux and hydraulic conductivity testing with deaired distilled/deionized water at 80 psi (550 kPa) cell pressure, 77 psi (530 kPa) headwater pressure and 75 psi (515 kPa) tailwater pressure. 6Peak values measured at 200 psf (9.6 kPa) normal stress for a specimen hydrated for 48 hours. Site-specific materials, GCL products, and test conditions must be used to verify internal and interface strength of the proposed design. TR 401-BDN-3.5lb/in 06/2022 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 1.5.B.1. MANUFACTURER'S INSTALLATION MANUAL PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com LINING TECHNOLOGIES | REMEDIATION TECHNOLOGIES | DRILLING SYSTEMS | BUILDING ENVELOPE | CONTRACTING SERVICES BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS - 2 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 CONTENTS 1. Introduction 2. Equipment Requirements 3. Shipping, Unloading, and Storage 4. Subgrade Preparation 5. Installation 6. Anchorage 7. Seaming 8. Sealing Around Penetrations and Structures 9. Damage Repair 10. Cover Placement 11. Hydration Page 3 Page 3 Page 5 Page 5 Page 6 Page 8 Page 8 Page 9 Page 10 Page 12 Page 12 NOTICE: THIS DOCUMENT IS INTENDED FOR USE AS A GENERAL GUIDELINE FOR THE INSTALLATION OF CETCO GCLS. THE INFORMATION AND DATA CONTAINED HEREIN ARE BELIEVED TO BE ACCURATE AND RELIABLE. CETCO MAKES NO WARRANTY OF ANY KIND AND ACCEPTS NO RESPONSIBILITY FOR THE RESULTS OBTAINED THROUGH APPLICATION OF THIS INFORMATION. INSTALLATION GUIDELINES ARE SUBJECT TO PERIODIC CHANGES. PLEASE CONSULT OUR WEBSITE @ WWW.CETCO.COM/LT FOR THE MOST RECENT VERSION. www.CETCO.com SECTION 1 INTRODUCTION 1.1 This document provides procedures for the installation of CETCO GCLs in a manner that maximizes safety, efficiency, and the physical integrity of the GCL. 1.2 These guidelines are based upon many years of experience at a variety of sites and should be generally applicable to any type of lining project using CETCO GCLs. Variance from these guidelines is at the engineer’s discretion. 1.3 The performance of the GCL is wholly dependent on the quality of its installation. It is the installer’s responsibility to adhere to these guidelines, and to the project specifications and drawings as closely as possible. It is the engineer’s and owner’s responsibility to provide construction quality assurance (CQA) for the installation. This will ensure that the installation has been executed properly. This document covers only installation procedures. 1.4 For additional guidance, refer to ASTM D5888 (Standard Guide For Storage and Handling of Geosynthetic Clay Liners) and ASTM D 6102 (Standard Guide For Installation of Geosynthetic Clay Liners). SECTION 2 EQUIPMENT REQUIREMENTS 2.1 CETCO GCLs are delivered in rolls typically 2,600-2,950 lbs (1180-1340 kg). Roll dimensions and weights will vary with the dimensions of the product ordered. It is necessary to support this weight using an appropriate core pipe, as indicated in Table 1. For any installation, the core pipe must not deflect more than 3 inches (75 mm), as measured from end to midpoint when a full GCL roll is lifted. 2.2 Lifting chains or straps appropriately rated should be used in combination with a spreader bar made from an I-beam, as shown in Figure 1. 2.3 The spreader bar ensures that lifting chains or straps do not chafe against the ends of the GCL roll, allowing it to rotate freely during installation. Spreader bar and core pipe kits are available through CETCO. 2.4 A front end loader, backhoe, dozer, or other equipment can be utilized with the spreader bar and core pipe or slings. Alternatively, a forklift with a “stinger” attachment may be used for on-site handling. A forklift without a stinger attachment should not be used to lift or handle the GCL rolls. Stinger attachments (Figures 2-4) are specially fabricated to fit various forklift makes and models. Table 1: Core Requirements Product Nominal GCL Roll Size Lenth X Diameter Typical GCL Roll Weight Interior Core Size Core Pipe Length x Diameter Minimum Core Pipe Strength BENTOMAT DN, SDN 16’ x 24” (4.9 m x 610 mm)2,650 lbs. (1204 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH BENTOMAT ST 16’ x 24” (4.9 m x 610 mm)2,650 lbs. (1204 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH BENTOMAT STM 16’ x 32” (4.9 m x 814 mm)2,500 lbs. (1130 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH BENTOMAT 200R 16’ x 24” (4.9 m x 610 mm)2,650 lbs. (1204 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm) XXH BENTOMAT CLT 16’ x 26” (4.9 m x 660 mm)2,650 lbs. (1204 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH BENTOMAT CL 16’ x 25” (4.9 m x 635 mm)2,650 lbs. (1204 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH BENTOMAT 600 CL 16’ x 25” (4.9 m x 635 mm)2,700 lbs. (1227 kg)3 3/4“ (100 mm)20’ x 3.5” O.D. (6.1 m x 89 mm)XXH - 4 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 FIGURE 1 -SPREADER BAR ASSEMBLY 2.5 When installing over certain geosynthetic materials, a 4 wheel, all-terrain vehicle (ATV) can be used to deploy the GCL. An ATV can be driven directly on the GCL provided that no sudden stops, starts, or turns are made. 2.6 Additional equipment needed for installation of CETCO GCLs includes: ► Utility knife and spare blades (for cutting the GCL) ► Granular bentonite for end-of-roll GCL seams and for sealing around structures and details ► Waterproof tarpaulins (for temporary cover on installed material as well as for stockpiled rolls) ► Optional flat-bladed vise grips (for positioning the GCL panel by hand) 2.7 The CETCO EASY ROLLER™ GCL Deployment System is a preferred method of installing geosynthetic clay liners. Use of the EASY ROLLER system eliminates the need for spreader bars and heavy core pipes. Installation speed and worker safety are also significantly increased. For further details, contact CETCO. FIGURE 2 - HOOK MOUNT FIGURE 3 - FORK MOUNT (WITH FORK POCKETS) FIGURE 4 - PIN MOUNT www.CETCO.com SECTION 3 SHIPPING, UNLOADING, & STORAGE 3.1 All lot and roll numbers should be recorded and compared to the packing list. Each roll of GCL should also be visually inspected during unloading to determine if any packaging has been damaged. Damage, whether obvious or suspected, should be recorded and the affected rolls marked. 3.2 Major damage suspected to have occurred during transit should be reported to the carrier and to CETCO immediately. The nature of the damage should also be indicated on the bill of lading, with specific lot and roll numbers noted. Accumulation of some moisture within roll packaging is normal and does not damage the product. 3.3 The party directly responsible for unloading the GCL should refer to this manual prior to shipment to ascertain the appropriateness of their unloading equipment and procedures. Unloading and on-site handling of the GCL should be supervised. 3.4 In most cases, CETCO GCLs are delivered on flatbed trucks. There are three methods of unloading: core pipe and spreader bar, slings, or stinger bar. To unload the rolls from the flat-bed using a core pipe and spreader bar, first insert the core pipe through the core tube. Secure the lifting chains or straps to each end of the core pipe and to the spreader bar mounted on the lifting equipment. Hoist the roll straight up and make sure its weight is evenly distributed so that it does not tilt or sway when lifted. 3.5 All CETCO GCLs are delivered with two 2’x 12’ (50 mm x 3.65 mm) Type V polyester endless slings on each roll. Before lifting, check the position of the slings. Each sling should be tied off in the choke position, approximately one third (1/3) from the end of the roll. Hoist the roll straight up so that it does not tilt or sway when lifted. 3.6 In some cases, GCL rolls will be stacked in three pyramids on flatbed trucks. If slings are not used, rolls will require unloading with a stinger bar and extendible boom fork lift. Spreader bars will not work in this situation because of the limited access between the stacks of GCL. Three types of stingers are available from CETCO, a hook mount, fork mount and pin mount (Figures 2-4). To unload, guide the stinger through the core tube before lifting the GCL roll and removing the truck. 3.7 An extendable boom fork lift with a stinger bar is required for unloading vans. Rolls in the nose and center of the van should first be carefully pulled toward the door using the slings provided on the rolls. 3.8 Rolls should be stored at the job site away from high-traffic areas but sufficiently close to the active work area to minimize handling. The designated storage area should be flat, dry, and stable. Moisture protection of the GCL is provided by its packaging; however, based on expected weather conditions, an additional tarpaulin or plastic sheet may be required for added protection during prolonged outdoor storage. 3.9 Rolls should be stacked in a manner that prevents them from sliding or rolling. This can be accomplished by chocking the bottom layer of rolls. Rolls should be stacked no higher than the height at which they can be safely handled by laborers (typically no higher than four layers of rolls). Rolls should never be stacked on end. SECTION 4 SUBGRADE PREPARATION 4.1 Subgrade surfaces consisting of granular soils or gravels are not acceptable due to their large void fraction and puncture potential. In applications where the GCL is the only barrier, subgrade soils should have a particle-size distribution of at least 80 percent finer than the #60 sieve (0.25 mm). In other applications, subgrade soils should range between fines and 1 inch (25 mm). In high-head applications (greater than 1 foot or 30.48 cm), CETCO recommends a membrane-laminated GCL (BENTOMAT CLT, BENTOMAT CL, or BENTOMAT 600 CL). 4.2 When the GCL is placed over an earthen subgrade, the subgrade surface must be prepared in accordance with the project specifications. The engineer’s approval of the subgrade must be obtained prior to installation. The finished surface should be firm and unyielding, without abrupt elevation changes, voids, cracks, ice, or standing water. - 6 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 4.3 The subgrade surface must be smooth and free of vegetation, sharp-edged rocks, stones, sticks, construction debris, and other foreign matter that could contact the GCL. The subgrade should be rolled with a smooth-drum compactor to remove any wheel ruts greater than 1 inch in depth, footprints, or other abrupt grade changes. Furthermore, all protrusions extending more than 0.5 inch (12 mm) from the subgrade surface shall be removed, crushed, or pushed into the surface with a smooth- drum compactor. The GCL may be installed on a frozen subgrade, but the subgrade soil in the unfrozen state should meet the above requirements. SECTION 5 INSTALLATION 5.1 GCL rolls should be taken to the work area of the site in their original packaging. The orientation of the GCL (i.e., which side faces up) may be important if the GCL has two different types of geosynthetics. Check with the project engineer to determine if there is a preferred installation orientation for the GCL. If no specific orientation is required, allow the roll to unwind from the bottom rather than pulling from the top (Figure 5A). The arrow sticker on the plastic sleeve indicates the direction that the GCL will naturally unroll when placed on the ground (Figure 6). Prior to deployment, the packaging should be carefully removed without damaging the GCL. 5.2 Equipment which could damage the GCL should not be allowed to travel directly on it. Therefore, acceptable installation may be accomplished whereby the GCL is unrolled in front of backwards- moving equipment (Figure 7). If the installation equipment causes rutting of the subgrade, the subgrade must be restored to its originally accepted condition before placement continues. 5.3 If sufficient access is available, GCL may be deployed by suspending the roll at the top of the slope, with a group of laborers pulling the material off of the roll, and down the slope (Figure 8). 5.4 GCL rolls should not be released on the slope and allowed to unroll freely by gravity. FIGURE 5 A & B “NATURAL’ ORIENTATION (5A) TOP OF THE ROLL (5B) FIGURE 6 - DIRECTION TO UNROLL GCL ON GROUND PER FIGURE 5A www.CETCO.com FIGURE 8 - UNROLLING BENTOMAT 5.5 Care must be taken to minimize the extent to which the GCL is dragged across the subgrade to avoid damage to the bottom surface of the GCL. Care must also be taken when adjusting BENTOMAT CLT panels to avoid damage to the geotextile surface of one panel of GCL by the textured sheet of another panel of GCL. A temporary geosynthetic subgrade cover commonly known as a slip sheet or rub sheet may be used to reduce friction damage during placement. 5.6 The GCL should be placed so that seams are parallel to the direction of the slope. End-of-panel seams should also be located at least 3 ft (1 m) from the toe and crest of slopes steeper than 4H:1V. End-of-roll seams on slopes should be used only if the liner is not expected to be in tension. 5.7 All GCL panels should lie flat, with no wrinkles or folds, especially at the exposed edges of the panels. When BENTOMAT geosynthetic clay liners with SUPERGROOVE® is repositioned, it should be gripped inside the SUPERGROOVE by folding the edge. 5.8 The GCL should not be installed in standing water or during rainy weather. Only as much GCL shall be deployed as can be covered at the end of the working day with soil, geomembrane, or a temporary waterproof tarpaulin. The GCL shall not be left uncovered overnight. If the GCL is hydrated when no confining stress is present, it may be necessary to remove and replace the hydrated material. CETCO recommends that premature hydration be evaluated on a case-by-case basis. The project engineer, CQA inspector, and CETCO TR-312 should be consulted for specific guidance if premature hydration occurs. The type of GCL, duration of exposure, degree of hydration, location in the liner system, and expected bearing loads should all be considered. FIGURE 7 - TYPICAL BENTOMAT® INSTALLATION TECHNIQUE - 8 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 In many instances, a needlepunch reinforced GCL may not require removal/replacement if the following are true: ►The geotextiles have not been separated, torn, or otherwise damaged ►There is no evidence that the needlepunching between the two geotextiles has been compromised ►The GCL does not leave deep indentations when stepped upon ►Overlapped seams with bentonite enhancement (see Section 7) are intact 5.9 For the convenience of the installer, hash marks are placed on BENTOMAT goesynthetic clay liners every 5’ (1.5 m) of length. SECTION 6 ANCHORAGE 6.1 If required by the project drawings, the end of the GCL roll should be placed in an anchor trench at the top of a slope. The front edge of the trench should be rounded to eliminate any sharp corners that could cause excessive stress on the GCL. Loose soil should be removed or compacted into the floor of the trench. FIGURE 9 - TYPICAL ANCHOR TRENCH DESIGN Rounded Corner GCLVaries Compacted Soil Backll 18" (450 mm) Compacted Subgrade24 " ( 6 0 0 m m ) 6.2 If a trench is used for anchoring the end of the GCL, soil backfill should be placed in the trench to provide resistance against pullout. The size and shape of the trench, as well as the appropriate backfill procedures should be in accordance with the project drawings and specifications. Typical dimensions are shown in Figure 9. 6.3 The GCL should be placed in the anchor trench such that it covers the entire trench floor but does not extend up the rear trench wall. 6.4 Sufficient anchorage may alternately be obtained by extending the end of the GCL roll back from the crest of the slope, and placing cover soil. The length of this “runout” anchor should be prepared in accordance with project drawings and specifications. SECTION 7 SEAMING 7.1 GCL seams are constructed by overlapping adjacent panel edges and ends. Care should be taken to ensure that the overlap zone is not contaminated with loose soil or other debris. BENTOMAT 200R, BENTOMAT ST, BENTOMAT DN, and BENTOMAT FLW have SUPERGROOVE® which provides self-seaming capabilities in their longitudinal overlaps, and therefore do not require supplemental bentonite. However, for pond applications, supplemental bentonite must be used in longitudinal seams, regardless of the CETCO GCL. www.CETCO.com FIGURE 10 - SUPERGROOVE® 7.2 Longitudinal seams should be overlapped a minimum of 6 inches (150 mm) for BENTOMAT geosynthetic clay liners. For high-head applications (greater than 1 foot or 20.48 cm) involving BENTOMAT CL, BENTOMAT CLT, or BENTOMAT 600 CL, a minimum longitudinal seam overlap of 12 inches (300 mm) and supplemental bentonite (per Section 7.6) is recommended. 7.3 End-of-panel overlapped seams should be overlapped 24 inches (600 mm) for BENTOMAT geosynthetic clay liners. 7.4 End-of-panel overlapped seams are constructed such that they are shingled in the direction of the grade to prevent runoff from entering the overlap zone. End-of-panel seams on slopes are permissible, provided adequate slope stability analysis has been conducted (i.e., the GCL is not expected to be in tension). Bentonite-enhanced seams are required for all BENTOMAT end- of-panel overlapped seams. 7.5 BENTOMAT end-of-panel, bentonite-enhanced, overlapped seams are constructed first by overlapping the adjacent panels, exposing the underlying panel, and then applying a continuous bead or fillet of granular sodium bentonite 12” from the edge of the underlying panel (Figure 11). The minimum application rate at which the bentonite is applied is one-quarter pound per linear foot (0.4 kg/m). 7.6 If longitudinal bentonite enhanced seams are required for BENTOMAT 200R, BENTOMAT ST, BENTOMAT DN, or BENTOMAT SDN, they are constructed by overlapping the adjacent panels a minimum 6 inches (150 mm), exposing the underlying edge, and applying a continuous bead of granular bentonite approximately 3 inches (75 mm) from the edge. For pond applications involving BENTOMAT CL or BENTOMAT CLT, longitudinal seams are constructed by overlapping adjacent panels by 12 inches (300 mm), exposing the underlying edge, and applying a continuous bead of bentonite approximately 6 inches (150 mm) from the edge. The minimum application rate for the granular bentonite is one quarter pound per linear foot (0.4 kg/m). FIGURE 11 BENTOMAT END-OF-PANEL OVERLAPPED SEAM SECTION 8 SEALING AROUND PENETRATIONS AND STRUCTURES 8.1 Cutting the GCL should be performed using a sharp utility knife. Frequent blade changes are recommended to avoid irregular tearing of the geotextile components of the GCL during the cutting process. 8.2 The GCL should be sealed around penetrations and structures embedded in the subgrade in accordance with Figures 12 through 14. Granular bentonite shall be used liberally (approximately 0.25 lbs/ln. ft. or 0.4 kg/m) to seal the GCL to these structures. - 10 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 FIGURE 12 A CROSS-SECTION OF A HORIZONTAL PIPE PENETRATION FIGURE 12 B ISOMETRIC VIEW OF A COMPLETED HORIZONTAL PIPE PENETRATION FIGURE 13 A CROSS-SECTION OF A VERTICAL PENETRATION Granular Bentonite Primary GCL Layer SubgradeSecondary GCL Collar 1 ft. (300 mm. min. overlap) Primary GCL Layer Secondary GCL Collar Vertical Penetration Granular Bentonite 3" (75 mm) Typical 4" (100 mm) Typical www.CETCO.com FIGURE 13B ISOMETRIC VIEW OF THE COMPLETED VERTICAL PENETRATION FIGURE 14 CROSS-SECTION OF GCL SEAL AGAINST AN EMBEDDED STRUCTURE OR WALL Soil or Gravel Prepared Subgrade Granular Bentonite GCL 12 " ( 3 0 0 m m ) 4" (100 mm) Wall or Foundation 6" (150 mm) 3" (75 mm) - 12 - BENTOMAT® INSTALLATION GUIDELINES GEOSYNTHETIC CLAY LINERS 2870 Forbs Avenue Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 8.3 When the GCL is placed over a horizontal pipe penetration, a “notch” should be excavated into the subgrade around the penetration (Figure 12a). The notch should then be backfilled with granular bentonite. A secondary collar of GCL should be placed around the penetration, as shown in Figure 12b. It is helpful to first trace an outline of the penetration on the GCL and then cut a “star” pattern in the collar to enhance the collar’s fit to the penetration. Granular bentonite should be applied between the primary GCL layer and the secondary GCL collar. 8.4 Vertical penetrations are prepared by notching into the subgrade as shown in Figure 13a. The penetration can be completed with two separate pieces of GCL as shown in Figure 13b. Alternatively, a secondary collar can be placed as shown in Figure 12a or 12b. 8.5 When the GCL is terminated at a structure or wall that is embedded into the subgrade on the floor of the containment area, the subgrade should be notched, as described in Sections 8.3 and 8.4. The notch is filled with granular bentonite; the GCL should be placed over the notch and up against the structure (Figure 14). Connection to the structure can be accomplished by placement of soil or stone backfill in this area. When structures or walls are at the top of a slope, additional detailing may be required. Contact CETCO for specific guidance. SECTION 9 DAMAGE REPAIR 9.1 If the GCL is damaged (torn, punctured, perforated, etc.) during installation, it may be possible to repair it by cutting a patch to fit over the damaged area (Figure 15). The patch should be cut to size such that a minimum overlap of 12 inches (300 mm) is achieved around all parts of the damaged area. Granular bentonite should be applied around the damaged area prior to placement of the patch. It may be necessary to use an adhesive such as wood glue to affix the patch in place so that it is not displaced during cover placement. Smaller patches may be tucked under the damaged area to prevent patch movement. FIGURE 15 DAMAGE REPAIR BY PATCHING SECTION 10 COVER PLACEMENT 10.1 The final thickness of soil cover on the GCL varies with the application. A minimum cover layer must be at least 1 foot (300 mm) thick to provide confining stress to the GCL, eliminate the potential for seam separation and prevent damage by equipment, erosion, etc. 10.2 Cover soils should be free of angular stones or other foreign matter that could damage the GCL. Cover soils should be approved by the engineer with respect to particle size, uniformity, and chemical compatibility. Consult CETCO if cover soils have high concentrations of calcium (e.g. limestone, dolomite, gypsum, seashell fragments). 10.3 Recommended cover soils should have a particle size distribution ranging between fines and 1 inch (25 mm), unless a cushioning geotextile is specified. 10.4 Soil cover shall be placed over the GCL using construction equipment that minimizes stresses on the GCL. A minimum thickness of 1 foot (300 mm) of cover soil should be maintained between the equipment tires/tracks and the GCL at all times during the covering process. In high-traffic areas such as on roadways, a minimum thickness of 2 feet (600 mm) is required. www.CETCO.com 10.5 Soil cover should be placed in a manner that prevents the soil from entering the GCL overlap zones. Soil cover should be pushed up on slopes, not down slopes, to minimize tensile forces on the GCL. 10.6 When a textured geomembrane is installed over the GCL, a temporary geosynthetic covering known as a slip sheet or rub sheet should be used to minimize friction during placement and to allow the textured geomembranes to be more easily moved into its final position. 10.7 Cyclical wetting and drying of GCL covered only with geomembrane can cause overlap separation. Soil cover should be placed promptly whenever possible. Geomembranes should be covered with a white geotextile and/or operations layer without delay to minimize the intensity of wet-dry cycling. If there is the potential for unconfined cyclic wetting and drying over an extended period of time, the longitudinal seam overlaps should be increased based on the project engineer’s recommendation. 10.8 To avoid seam separation, the GCL should not be put in excessive tension by the weight or movement of textured geomembrane on steep slopes. If there is the potential for unconfined geomembrane expansion and contraction over an extended period of time, the longitudinal seam overlaps should be increased based upon the project engineer’s recommendation. SECTION 11 HYDRATION 11.1 Hydration is usually accomplished by natural rainfall and/ or absorption of moisture from soil. However, in cases where the containment of non-aqueous liquid is required, it may be necessary to hydrate the covered GCL with water prior to use. 11.2 If manual hydration is necessary, water can be introduced by flooding the covered lined area or using a sprinkler system. If flooding, care must be taken to diffuse the energy of the water discharge so that the cover material is not displaced. 11.3 If the GCL is hydrated when no confining stress is present, it may be necessary to remove and replace the hydrated material. As discussed in Section 5.8, in many instances a needlepunch reinforced GCL may not require removal/replacement if the following are true: ► The geotextiles have not been separated, torn or otherwise damaged ► There is no evidence that the needlepunching between the two geotextiles has been compromised ► The GCL does not leave deep indentations when stepped upon ► Any overlapped seams with bentonite enhancement (see Section 7) are intact CETCO, a wholly owned subsidiary of AMCOL International Corp. 2870 Forbs Avenue, Hoffman Estates, IL 60192 847.851.1800 | 800.527.9948 | cetco.com amcol.com AMCOL® INTERNATIONAL HEADQUARTERS Headquartered in Hoffman Estates, IL, AMCOL International Corporation (AMCOL) operates over 68 facilities in Africa, Asia, Australia, Europe, North America and South America. AMCOL employs more than 1,750 employees in 26 countries. The company, established in 1927, currently trades on the New York Stock Exchange under the symbol “ACO”. AMCOL produces and markets a wide range of specialty mineral products used for industrial, environmental and consumer-related applications. With more than 68 world-wide locations, AMCOL manages a global supply chain to deliver world-class quality. Our full range of products and services allow us to bring value to our customers, but ultimately, our commitment to understanding customer’s needs is what sets us apart in our industry. IMPORTANT: The information contained herein is believed to be accurate and reliable. This document supersedes all previous printed versions. For the most up-to-date information, please visit www.CETCO.com. CETCO accepts no responsibility for the results obtained throughout application of this product. CETCO reserves the right to update information without notice. © 2010 CETCO | PRINTED IN THE USA ON RECYCLED PAPER DECEMBER 2010 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 1.5.B.2 PROPOSED PANEL LAYOUT PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com GE O S Y N T H E T I C C L A Y L I N E R PR O P O S E D P A N E L L A Y O U T PL-1 SALT LAKEMOD 8 SA L T L A K E V A L L E Y SO L I D W A S T E F A C I L I T Y MO D U L E 8 1" = 0 ' - 6 0 " AL 72 3 0 2 7 L2 3 0 1 0 9 SA L T L A K E C I T Y , U T A H 07 / 1 6 / 2 3 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 1.6.A.1. INSTALLER'S PROJECT LIST PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Foxhole Landfill 721019 Project Name IPL Ash Pond Closure 721024 Phase 1 of 3 Location Charlotte, NC Location Petersburg, Indiana Continued on Row 41 Owner Mecklenburg County, N.C.Owner Indianapolis Power & LightAddress17131 Lancaster Highway Address 6925 North State Road 57 Engineer CDM Smith - Curtis Wilson & Aaron Weispfenning Engineer ATC Group Services LLC Client Triangle Grading & Paving Client Blankenerger Brothers, Inc. Contact Bryan Coley Contact Pat Blankenburger 1 Project Type LFCell 2 Project Type Ash PondProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose Vargas QC Technician Kamphone Sisoumphou QC Technician Tramaine Watts Start Date Nov-2021 Start Date Jul-2021 Completion Date Mar-2022 Completion Date Oct-2021 Cross Section GCL Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)602,331 Quantity (SF)609,219 Subgrade (SF)1,145,977 Quantity (SF)469,350 Cross Section 60 Mil Textured Cross Section 20 Mil Rain Cover Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)596,511 Quantity (SF)609,318 Quantity (SF)217,938 Quantity (SF)684,000 Project Name Harpers Ferry WWTP 721041 Project Name East St. Louis Auto Shredding 721050 Location Harpers Ferry, Iowa Location East St. Louis, IL Owner City of Harpers Ferry Owner St. Clair CountyAddress1009 Winfield Road Address 1299 N 1st Street Engineer Davy Engineering Engineer Andrews Engineering Client Wapasha Construction Client Kolb Grading Contact Pat Doyle Contact Adam Jenkins3 Project Type Wastewater Ponds & SAGR's 4 Project Type Landfill Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Dan Rodriquez QC Technician Khamphone Sisoumphou QC Technician Dan RodriquezStart Date Nov-2021 Start Date Oct-2022 Completion Date May-2022 Completion Date Nov-2022 Cross Section 60 Mil Smooth Cross Section Cross Section 60 Mil Smooth Cross Section 12 oz. GeotextileSubgrade (SF)96,511 Quantity (SF) Subgrade (SF)195,648 Quantity (SF)226,200 Cross Section Geotextile Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF)23,520 Quantity (SF) Quantity (SF)31,283 Quantity (SF) Project Name Ameren Peru 722042 Project Name Goodell WWTP 721053 Location Peru, IL Location Goodell, IowaOwnerAmerenOwnerCity of Goodell, Iowa Address 350 5th Street Address 107 Centennial Street (Fire Station) Engineer Environmental Resources Management, Inc. Alan Cork P.E.Engineer SEH Inc. Client O6 Environmental Client Cole ExcavatingContactCody Lonas Contact Jeremy Cole 5 Project Type Ameren Remediation Site 6 Project Type WWTP Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Robert ChandlerQC Technician Robert Chandler QC Technician Tramaine Watts Start Date Oct-2022 Start Date Jun-2022 Completion Date Oct-2022 Completion Date Jun-2022 Cross Section GCL Cross Section Geocomposite Cross Section 60 Mil HD Smooth Cross Section Subgrade (SF)52,875 Quantity (SF)52,875 Subgrade (SF)103,050 Quantity (SF) Cross Section 60 Mil Textured Cross Section 8 oz. Geotextile Cross Section Cross Section Quantity (SF)18,200 Quantity (SF)36,000 Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Continued on Row 545 Project Name La Cygne Upper AQC Closure T 721059 Location Nokomis, FL Location La Cygne, KS Owner Sarasota County, FL Owner Evergy Metro, Inc. Address 4000 Knights Trail Road Address 25166 East 2200 Road Engineer Jones Edmunds Dale E. Gerber Engineer AECOM Client Glover Construction Company, Inc.Client Kissick ConstructionContactMark Short Contact Mark Rigdon 7 Project Type Landfill Expansion 8 Project Type AQC Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Sep-2021 Completion Date Oct-2022 Completion Date Dec-2021 Cross Section GCL Cross Section 60 Mil Secondary Cross Section 40 Mil Micro Spike Cross Section Subgrade (SF)2,353,987 Quantity (SF)2,376,692 Subgrade (SF)1,437,480 Quantity (SF) Cross Section 60 Mil Primary Cross Section Primary Geocomposite Cross Section Closure Turf Cross Section Quantity (SF)2,365,547 Quantity (SF)2,142,058 Quantity (SF)1,437,480 Quantity (SF) Project Name Pleasant Prairie LF Closure 722003 Project Name Prince Specialty Products 722010 Location Pleasant Prairie, WI Location New Johnsonville, TN Owner WE Energies Owner Prince Specialty Products Address 8000 95th Street Address 795 Foote Lane Engineer GEI Consultants Engineer ARCADIS US, Inc.Client Edgerton Contractors, Inc.Client Vaughn Contractors, Inc. Contact Ryan Murphey Contact Kevin Little 9 Project Type Landfill Closure 10 Project Type Basin Project Manager Cesar Gonzalez Project Manager Steve BrothersSuperintendentVince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robare Long Start Date Oct-2022 Start Date Jul-2022 Completion Date Oct-2022 Completion Date Sep-2022 Page 1 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Cross Section 40 Mil LL Textured Cross Section Cross Section 60 Mil HDPE Tex/Smooth Cross SectionSubgrade (SF)143,520 Quantity (SF) Subgrade (SF)424,600 Quantity (SF) Cross Section Geocomposite Cross Section Cross Section 8oz. Geotextile Cross Section Quantity (SF)145,020 Quantity (SF) Quantity (SF)234,841 Quantity (SF) Project Name Williams Conway Brine 722005 Project Name Munger Landing Geotube Pad 722032 Location McPhereson, KS Location Duluth, MNOwnerWilliamsOwnerEPA, MPCA, US Army Corps of Engineers & WDNR Address 775 Landmark Road Address Clyde Ave Engineer Audubon Engineering Nicole Bruno Engineer US Army Corps of Engineers Client Prairie Landworks Inc.Client J.F. Brennan Company, Inc.Contact Tom Saffel Contact Casey Evensen 11 Project Type Pond 12 Project Type Geotube Pad Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Vince Sisoumphou Viruth Long Superintendent Vince Sisoumphou Raul NQC Technician Kamphone Sisoumphou Robare Long QC Technician Khamphone Sisoumphou Start Date Mar-2022 Start Date Aug-2022 Completion Date On-Going Completion Date Sep-2022 Cross Section 60 Mil Tex/Smooth Primary Cross Section Geocomposite Cross Section 40 Mil Cross Section Subgrade (SF)659,891 Quantity (SF)659,891 Subgrade (SF)435,561 Quantity (SF) Cross Section 60 Mil Tex/Smooth Secondary Cross Section Geonet Cross Section 8 oz. Geotextile Cross Section Quantity (SF)659,891 Quantity (SF)659,891 Quantity (SF)731,200 Quantity (SF) Project Name Alliant Energy Columbia PP 722011 Project Name Alliant Energy Lansing 722012 Location Pardeeville, WI Location Lansing, Iowa Owner Alliant Energy Owner Alliant Energy Address W8375 Murray Road Address 2320 Power Plant Drive Engineer SCS Engineers Zana Bajalan Engineer Infrastructure Alternatives, Inc. Client Ames Construction Client Ames Construction, Inc.Contact Brad Folczyk - Clint Berning Contact Andrew Reynolds 13 Project Type Pond Closure 14 Project Type Tube Laydown Pads Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Vince SisoumphouQC Technician Robert Chandler Dan Rodriguez QC Technician Kamphone Sisoumphou Start Date Oct-2022 Start Date Jul-2022 Completion Date Nov-2022 Completion Date Jul-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil HDPE Textured Cross Section Subgrade (SF)317,100 Quantity (SF)36,000 Subgrade (SF)308,947 Quantity (SF) Cross Section 60 Mil HDPE Textured Cross Section Cross Section Cross Section Quantity (SF)318,099 Quantity (SF) Quantity (SF) Quantity (SF) Project Name US Steel Granite City 722013 Project Name Ponds Behind Erie Pier 722014 T&M Repair Project Location Granite City, IL Location Duluth, MN Owner US Steel Owner EPA, MPCA, US Army Corps of Engineers & WDNR Address 2000 Edwardsville Road Address 199 S. 40th Avenue W Engineer Weaver Consultants Group John Bossert Engineer N/AClientDunnett Bay Construction Client EQM Contact Lucas Kessling Contact Gary Butcher 15 Project Type Cap & Landfill 16 Project Type Pond Project Manager Steve Brothers Project Manager Steve Brothers Allen BullockSuperintendentFrank Mata Superintendent Viruth Long QC Technicians Jesus Salazar, Saul Rivas, Frank Mata QC Technician Viruth Long Start Date Jun-2022 Start Date Apr-2022 Completion Date Sep-2022 Completion Date 4-112-22 Cross Section 40 & 60 Mil HDPE Cross Section Geocomposite & Textile Cross Section Liner Repair Only Cross Section Subgrade (SF)1,232,774 Quantity (SF)1,186,125 Subgrade (SF) Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Wisconsin Dells WWTP 722015 Project Name New Indy Pad 5 722016 T&M Project Location Wisconsin Dells, WI Location Catawba, SC Owner City of Wisconsin Dells Owner Dredge America Address 2 Bowman Road Address 5298 Cureton Ferry RoadEngineerMSA Professional Services, Inc.Engineer N/A Client Olympic Builders Client Dredge America Contact Justin Yahnke Contact Sam Robinson Jake Stockham 17 Project Type Digester Tank Liners 18 Project Type Tube PadsProject Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Raul Nieves QC Technician Robert Chandler QC Technician Raul Nieves Start Date Oct-2022 Start Date May-2022 Completion Date Dec-2022 Completion Date May-2022 Cross Section Cross Section 10 oz. Geotextile Cross Section N/A Cross Section Subgrade (SF) Quantity (SF)1,280 Subgrade (SF) Quantity (SF)Cross Section 30 Mil RPE Cross Section Cross Section Cross Section Quantity (SF)1,280 Quantity (SF) Quantity (SF) Quantity (SF) Page 2 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Gerald Gentlemen Station 722017 Project Name LASWA Phase IV Cell 2 722018 Part 1 of 3 Location Sutherland, NE Location Valentine, NE Phase 4 Cell 2 Owner Nebraska Public Power District Owner Lexington Area Solid Waste Agency Part 2 & 3 on Row 494AddressNE-25 Sutherland, NE Address 76460 Hwy 21 Engineer Golder Associates Engineer HDR Client Myers Construction Client Perrett Construction Ltd. Contact Josh Swift, Alecs Rummery Contact Rob Wemhoff 19 Project Type Supply Impoundment Area 20 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Frank Mata QC Technician Tramaine Watts Start Date Sep-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section GCL Cross Section 8 oz. GeotextileSubgrade (SF)148,810 Quantity (SF) Subgrade (SF)291,592 Quantity (SF)291,592 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Textured Cross Section Rain Cover R12BV Quantity (SF)143,780 Quantity (SF) Quantity (SF)291,592 Quantity (SF)251,860 Project Name Elkhart County LF 722019 Project Name Quad Cities Landfill Phase IV 722020 Location Elkhart, IN Location Milan, IL Owner Elkhart County LF Owner Millenium Waste Inc.Address 59530 Co. Rd 7 Address 13606 Knoxville Road Engineer IngenAE Engineer Weaver Consultants Group Client C & E Excavating, Inc.Client Millennium Waste Incorporated Contact Jeff Bonadies Contact Dominic Remmes21 Project Type Landfill 22 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Raul Nieves QC Technician Tramaine Watts QC Technician Raul NievesStart Date Nov-2022 Start Date Sep-2022 Completion Date Nov-2022 Completion Date Nov-2022 Cross Section 60 Mil HDT Cross Section 16 oz. Geotextile Cross Section 60 Mil Textured Cross Section RainflapSubgrade (SF)385,400 Quantity (SF)385,400 Subgrade (SF)182,000 Quantity (SF)23,230 Cross Section Geocomposite Cross Section Cross Section Geotextile Cross Section Quantity (SF)33,500 Quantity (SF) Quantity (SF)177,800 Quantity (SF) Project Name Northshore Mining VSF Cover 722021 Project Name Jeffrey Energy Center 722022 Location Babbit, MN Location St. Mary's, KansasOwnerCleveland -Cliffs Northshore Mine Owner Evergy, Inc. Address Country Road 70 Address 25905 Jeffrey Road Engineer WSP Golder Engineer SCS Engineers Client Hoover Construction Co.Client Schmidtlein Excavating, Inc.Contact Craig Spry Contact Jeremy Schmidtlein 23 Project Type Mine 24 Project Type Landfill Cell1C Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose VargasQC Technician Kamphone Sisoumphou QC Technician Saul Rivas Start Date Jun-2022 Start Date Sep-2022 Completion Date Jun-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section 40 Mil LLDPE Cross Section Subgrade (SF)363,868 Quantity (SF) Subgrade (SF)145,600 Quantity (SF) Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)145,600 Quantity (SF) Project Name Bonneville County Landfill 722023 Project Name ALCOA Bauxite Closure 722024 Part 1 of 3 Location Idaho Falls, ID Location Bryant, AR Phase 1 Owner Bonneville County Owner Alcoa USA Corp Brown Mud Lake Part 2 & 3 on Row 528 Address 9449 E. Sunnyside Road Address 2300 County Road 2 Engineer Great West Engineering Engineer Civil & Environmental Consultants, Inc. (CEC) Client Whitaker Construction Co., Inc.Client McGeorge Contracting Company, Inc.Contact Paul Christensen Contact Anthony Jones Kem McBride 25 Project Type Landfill 26 Project Type Closure Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Dan RodriquezQC Technician Saul Rivas QC Technician Dan Rodriquez Start Date Sep-2022 Start Date Aug-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil LLDPE Cross Section 60 Mil Subgrade (SF)814,138 Quantity (SF)828,000 Subgrade (SF)881,920 Quantity (SF)35,000 Cross Section 60 Mil HDPE Cross Section Cross Section Geocomposite Cross Section Quantity (SF)816,859 Quantity (SF) Quantity (SF)881,920 Quantity (SF) Page 3 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Grand Marais Water Basin 722025 Project Name NE Ottertail LF 722026 Location Grand Marais, MN Location New York Mills, MN Owner Minnesota Dept. of Natural Resources Owner Ottertail County Dept. Solid WasteAddress114 S 8th Ave Address 50356 Landfill Road Engineer MnDNR Jon Hendrickson Engineer FOTH Client KGM Contractors Inc.Client Hough Incorporated Contact Heath Line Contact Mike Hough & Bryce Moen 27 Project Type Basin 28 Project Type LandfillProject Manager Steve Brothers Project Manager Steve Brothers Superintendent Vince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robert Chandler Start Date Jul-2022 Start Date Oct-2022 Completion Date Jul-2022 Completion Date Oct-2022 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Tex & Smooth Cross SectionSubgrade (SF)11,077 Quantity (SF) Subgrade (SF)51,668 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Ameren Champaigne MGP 722038 T&M Project Project Name Polk County Landfill 722028 Location Edwardsville, IL Location Gentilly, MN Owner Ameren Champaigne MGP Owner Polk County , MNAddress470 West Union Street Address 15764 270th Street Engineer Environmental Resources Management Engineer Stantec Client 06 Environmental Client RJ Zavoral & Sons Contact Cody Lonas Contact Dan Zavoral & Nick Carlin29 Project Type Remediation 30 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Jose Vargas Superintendent Vince Sisoumphou QC Technician Saul Rivas QC Technician Khamphone SisoumphouStart Date Aug-2022 Start Date Jul-2022 Completion Date Aug-2022 Completion Date Aug-2022 Cross Section N/A Cross Section Cross Section 60 Mil & 40 Mil Cross SectionSubgrade (SF) Quantity (SF) Subgrade (SF)415,152 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Litchfield WWTP 722031 Project Name McAlester Equalization Basin 722048 Location Litchfield, IL Location McAlester, OKOwnerCity of Litchfield Owner City of McAlester Address 1350 E Ryder Street Address 1360 E. Krebs Ave Engineer City Engineer Plummer & Associates Client Korte & Luitjohan Client Downey Contracting, LLCContactGreg Korte Contact Dalton McCaskill 31 Project Type WWTP 32 Project Type Basin Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Viruth Long Superintendent Robert ChandlerQC Technician Robare Long QC Technician Robert Chandler Start Date Sep-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Nov-2022 Cross Section 45 Mil Duraskrim Cross Section Cross Section 60 Mil HD Cross Section Subgrade (SF)87,702 Quantity (SF) Subgrade (SF)148,882 Quantity (SF) Cross Section Cross Section Cross Section 10 oz. Geotextile Cross Section Quantity (SF) Quantity (SF) Quantity (SF)148,552 Quantity (SF) Page 4 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Blaines Farm & Fleet 722036 T&M Project Project Name Morgan County LF 722049 Location Rhinelander, WI Location Fort Morgan, CO Owner Blaines Farm & Fleet Owner Morgan County, ColoradoAddress1601 E Timber Drive Address 21448 Road 22 Engineer TRC Environmental Corp Engineer American Environmental Consulting (AEC) Client Musson Bros.Client Morgan County Contact Jeff Vandersanden Contact Cass Yearous 33 Project Type Pond 34 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Viruth Long QC Technician Robare Long QC Technician Tramaine Watts Start Date Oct-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Dec-2022 Cross Section 30 Mil Cross Section Cross Section GCL Cross SectionSubgrade (SF)59,400 Quantity (SF) Subgrade (SF)278,650 Quantity (SF) Cross Section Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF) Quantity (SF) Quantity (SF)280,368 Quantity (SF) Project Name Minnesota Boswell LF Closure 722039 Project Name MEC Walter Scott 722040 Location Cohasset, MN Location Council Bluffs, Iowa Owner Allete Inc.Owner Mid American Energy Address 1210 NW 3rd Street Address 7215 Navajo Street Engineer BARR Engineering Engineer HDR Client TNT Construction Group, LLC Client J.J. Westhoff Construction Co. Contact Dominic Ellison Contact Jerry Westhoff35 Project Type Ash Pond 36 Project Type Cap Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Frank Mata QC Technician Robare Long QC Technician Tramaine WattsStart Date Sep-2022 Start Date Oct-2022 Completion Date Sep-2022 Completion Date Oct-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section 60 Mil HDPE DT Cross Section Transnet 250-2-8Subgrade (SF)503,272 Quantity (SF) Subgrade (SF)369,341 Quantity (SF)221,980 Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)363,700 Quantity (SF) Page 5 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name LASWA Phase IV Cell 2 722018 Part 2 of 3 Project Name LASWA Phase IV Cell 2 722018 Part 3 of 3 Location Valentine, NE Partial Closure Phase 1&2 Location Valentine, NE Leahcate Pond Lining Owner Lexington Area Solid Waste Agency Owner Lexington Area Solid Waste AgencyAddress76460 Hwy 21 Address 76460 Hwy 21 Engineer HDR Engineer HDR Client Perrett Construction Ltd.Client Perrett Construction Ltd. Contact Rob Wemhoff Contact Rob Wemhoff 37 Project Type Landfill 38 Project Type LandfillProject Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Tramaine Watts QC Technician Tramaine Watts Start Date Jul-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section GCL Cross Section 12oz. NW GeotextileSubgrade (SF)278,793 Quantity (SF) Subgrade (SF)43,028 Quantity (SF)43,028 Cross Section Geocomposite Cross Section Cross Section 60 Mil HDPE Tex Cross Section Quantity (SF)278,793 Quantity (SF) Quantity (SF)43,028 Quantity (SF) Project Name IPL Ash Pond Closure 721024 Phase 2 of 3 Project Name IPL Ash Pond Closure 721024 Phase 3 of 3 Location Petersburg, Indiana Location Petersburg, Indiana Owner Indianapolis Power & Light Owner Indianapolis Power & LightAddress6925 North State Road 57 Address 6925 North State Road 57 Engineer ATC Group Services LLC Engineer ATC Group Services LLC Client Blankenerger Brothers, Inc.Client Blankenerger Brothers, Inc. Contact Pat Blankenburger Contact Pat Blankenburger39 Project Type Ash Pond 40 Project Type Ash Pond Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Jose Vargas QC Technician Tramaine Watts QC Technician Tramaine WattsStart Date Jul-2021 Start Date Jul-2021 Completion Date Oct-2021 Completion Date Oct-2021 Cross Section 40 Mil LLDPE Smooth Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)648,629 Quantity (SF)181,377 Subgrade (SF)429,343 Quantity (SF)98,623 Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)19,220 Quantity (SF)486,472 Quantity (SF)32,450 Quantity (SF)53,425 Project Name ALCOA Bauxite Closure 722024 Part 2 of 3 Project Name ALCOA Bauxite Closure 722024 Part 3 of 3 Location Bryant, AR Phase 2 Location Bryant, AR Phase 3OwnerAlcoa USA Corp Brown Mud Lake Owner Alcoa USA Corp Brown Mud Lake Address 2300 County Road 2 Address 2300 County Road 2 Engineer Civil & Environmental Consultants, Inc. (CEC)Engineer Civil & Environmental Consultants, Inc. (CEC) Client McGeorge Contracting Company, Inc.Client McGeorge Contracting Company, Inc.Contact Anthony Jones Kem McBride Contact Anthony Jones Kem McBride 41 Project Type Closure 42 Project Type Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas SuperintendentQC Technician Saul Rivas QC Technician Start Date Oct-2022 Start Date Jan-2023 Completion Date Nov-2022 Completion Date Cross Section 40 Mil LLDPE Cross Section Cross Section Cross Section Subgrade (SF)860,560 Quantity (SF) Subgrade (SF) Quantity (SF) Cross Section Geocomposite Cross Section Cross Section Cross Section Quantity (SF)860,560 Quantity (SF) Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Project Name Sarasota LF Phase III 721058 Location Nokomis, FL Location Nokomis, FL Owner Sarasota County, FL Owner Sarasota County, FL Address 4000 Knights Trail Road Address 4000 Knights Trail Road Engineer Jones Edmunds Dale E. Gerber Jones Edmunds Dale E. Gerber Client Glover Construction Company, Inc.Client Glover Construction Company, Inc.Contact Mark Short Contact Mark Short 43 Project Type Landfill Expansion 44 Project Type Landfill Expansion Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Jan-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section Cross Section Secondary Geocomposite Cross Section Cross Section Subgrade (SF) Quantity (SF)2,481,407 Subgrade (SF) Quantity (SF) Cross Section GCL Protective Cover Cross Section 160z. Geotextile Cross Section 40 Mil Tarp Cross Section Quantity (SF)271,928 Quantity (SF)337,484 Quantity (SF)2,083,267 Quantity (SF) Page 6 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 2.1. MANUFACTURER'S SOQ PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com July 20, 2023 RE: Salt Lake Valley SWM Module 8 (’23) CETCO Statement of Experience To whom it may concern: CETCO® has manufactured GCLs for over 30 years and is backed by 80 years of bentonite mining and manufacturing experience. As the world’s leading manufacturer of GCLs, CETCO® has the production capacity of greater than 500,000 square feet per day available to meet the projected delivery dates for this project. Our two manufacturing plants in the United States (Lovell, Wyoming and Cartersville, Georgia) have produced several hundred million square feet of GCL, which have been installed in numerous projects throughout North America. We appreciate your interest in CETCO® Environmental Products. Please call Rob Stafford at (970) 749-6118 if you have any further questions. Best Regards, Rob Stafford Technical Sales Manager CETCO® Environmental Products PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 20S GEOSYNTHETIC CLAY LINER 2.5.A.7 GCL INTERFACE FRICTION TEST PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Client:TRI Log #: Project: Note - Large Displacement Values Reported for 3.0 inches of Displacement %pcf Shear Stress Secant Angle 21.8 3,244 65 85 21.9 21.8 Cetco Bentomat DN GCL (5566) Hydrated under 250 psf for 48 hours Degrees psf Peak Friction Angle Y-intercept or Adhesion 18.3 18.4 506 Minimum Secant Angle Large Displacement 24.3 Wet - Loading applied and Interface flooded for a minimum of 16 hours prior to shear. Conditioning Interface Shear Strength of Geosynthetic Clay Liner by Direct Shear (ASTM D6243) Geo-Synthetics, Inc. (GSI)23-003061-1 Salt Lake Valley Module 8 Richard S. Lacey, P.E.9/25/2023 Analysis & Quality Review/Date -Specimen No.1 2 2,000 4,000 6,000 8,120 Soil - Subgrade vs. Cetco Bentomat DN GCL (5566) Upper Box Mohr-Coulomb Parameters psf Test Results, Linear Regression Lower Box Test Notes 23.4 1,732 21.5 2,364 459 Degrees 21.8 21.5 Test Conditions 2,4151,808 3 4 Soil - Subgrade w = 18.6 gd = 108.6 3,244 Shearing occurred at the interface at all stresses. 12 12 Normal Stress Bearing Slide Resistance Box Edge Dimension in Shearing Rate inches/minute 0.04 12 46 Peak psf deg. 12 27 1,205 31.1 lbs Large Displacement Shear Stress Secant Angle 30.9 1,197psf deg. 0 2,500 5,000 7,500 10,000 0 2,500 5,000 7,500 10,000 Sh e a r S t r e s s ( p s f ) Normal Stress (psf) Peak Large Displacement 0 1,000 2,000 3,000 4,000 0 0.5 1 1.5 2 2.5 3 Sh e a r S t r e s s ( p s f ) Displacement (inches) 2000 psf 4000 psf 6000 psf 8120 psf Page 1 of 1 Client:TRI Log #: Project: Note - Large Displacement Values Reported for 3.0 inches of Displacement Shear Stress Secant Angle Large Displacement Shear Stress Secant Angle 16.8 602psf deg. Peak psf deg. 12 27 1,082 28.4 lbs 2,703 Shearing occurred at the interface at all stresses. 12 12 Shearing Rate inches/minute 0.04 3 4 301 Cetco Bentomat DN GCL (5566) Hydrated under 250 psf for 48 hours Degrees 17.8 8.3 Test Conditions 1,9321,309 Normal Stress Bearing Slide Resistance Box Edge Dimension in Asperity Height, Avg. of 5 Meas.20 9.2 645 8.3 875 18 16 17mils Interface Shear Strength of Geosynthetic Clay Liner by Direct Shear (ASTM D6243) Geo-Synthetics, Inc. (GSI)23-003061-2 Salt Lake Valley Module 8 Richard S. Lacey, P.E.9/26/2023 Analysis & Quality Review/Date -Specimen No.1 2 2,000 4,000 6,000 8,120 Cetco Bentomat DN GCL (5566) vs. Solmax SSTXGM 60 mil HDPE (0105-213334)[textured surface] Upper Box Mohr-Coulomb Parameters psf Test Results, Linear Regression Lower Box Test Notes 65 85 17.8 18.4 Solmax SSTXGM 60 mil HDPE (0105- 213334)[textured surface] Degrees psf Peak Friction Angle Y-intercept or Adhesion 15.1 6.2 398 Minimum Secant Angle Large Displacement 18.1 Wet - Loading applied and Interface flooded for a minimum of 16 hours prior to shear. Conditioning 12 46 8.8 1,255 0 2,500 5,000 7,500 10,000 0 2,500 5,000 7,500 10,000 Sh e a r S t r e s s ( p s f ) Normal Stress (psf) Peak Large Displacement 0 500 1,000 1,500 2,000 2,500 3,000 0 0.5 1 1.5 2 2.5 3 Sh e a r S t r e s s ( p s f ) Displacement (inches) 2000 psf 4000 psf 6000 psf 8120 psf Page 1 of 1 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.: LDF20015 GSI Project No.: 723027 Section: 33 50 20S GEOSYNTHETIC CLAY LINER 1.5.A.3. MANUFACTURER'S MATERIAL WARRANTY PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com CETCO LIMITED WARRANTY Project Name: Salt Lake Valley SWM Module 8 Location: Salt Lake City, UT Owner: Salt Lake City 349 South 200 East, Suite 600 Salt Lake City, UT 84114 Certificate Number: 024008 Effective Date: 6/22/2024 LIMITED WARRANTY. Subject to the terms and conditions set forth below, Colloid Environmental Technologies Company (“CETCO”) warrants to the owner of the construction project identified above (Salt Lake Valley SWM Module 8) that the geosynthetic clay liner product supplied by CETCO (Bentomat® DN) will at the time of delivery by CETCO be free from defects in material. CLAIMS. The foregoing warranty shall remain in effect for a period of twenty (20) years from the “Effective Date“ specified above. During the Warranty Period, CETCO will replace or, at its option refund the purchase price for, any Products failing to meet the foregoing warranty. Any claim by Owner for any claimed defect hereunder for any cause shall be deemed waived by Owner unless submitted to CETCO in writing within thirty (30) days from the date Owner discovers, or should have discovered any claimed breach. EXCLUSIONS. CETCO shall have no liability for breach of the warranty caused by (A) accident, neglect, abuse or mishandling of the Product, including failure of Owner to use reasonable care in maintaining or storing the Product; or (B) natural occurrences and acts of God, including without limitation, earthquakes, floods, piercing hail, tornadoes or explosions. LIMITATIONS. THE FOREGOING WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES NOT EXPRESSLY SET FORTH HEREIN, WHETHER EXPRESSED OR IMPLIED BY OPERATION OF LAW OR OTHERWISE, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. CETCO does not authorize any person, including its representatives, to make any representations or warranty, condition or guaranty other than this warranty. Without limitation to the foregoing, any warranty concerning workmanship or non-CETCO materials provided by the installing contractor of the Product or any other subsequent contractor performing work on or to the Product is enforceable against such contractor, and is not provided by, and is not enforceable against, CETCO. Notwithstanding anything to the contrary, no requests, solicitations, or documentation submitted by owner or others, including but not limited to purchase orders, bid proposals, or specifications, may alter or take precedence over this Warranty. Any deviations from the terms of this Warranty are not effective unless separately and specifically negotiated and reduced to a writing signed by a CETCO official with authority to bind CETCO. UNDER NO CIRCUMSTANCES SHALL CETCO BE LIABLE FOR SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, LOSSES OR EXPENSES, WHETHER ARISING DIRECTLY OR INDIRECTLY FROM THE FAILURE OF ANY PRODUCT TO PERFORM AS WARRANTED OR FROM ANY OTHER CAUSE WHATSOEVER, WHETHER SUCH CLAIM IS BASED ON BREACH OF WARRANTY, BREACH OF CONTRACT, NEGLIGENCE, STRICT LIABILITY OR ANY OTHER LEGAL THEORY. CETCO’s LIABILITY HEREUNDER SHALL IN ANY CASE BE LIMITED TO THE COST OF REPLACEMENT (IN THE FORM ORIGINALLY SHIPPED) OF DEFECTIVE PRODUCTS, OR, AT CETCO’S ELECTION, THE REPAYMENT OF OR CREDITING TO OWNER OF AN AMOUNT EQUAL TO THE PURCHASE PRICE OF SUCH PRODUCTS. The foregoing states the sole and exclusive liability of CETCO and the sole and exclusive remedy of Owner. MISCELLANEOUS. CETCO’s failure at any time to enforce or rely upon any of the terms of conditions stated herein should not be construed to be a waiver of its rights hereunder. This warranty may not be assigned without the prior written approval of CETCO. This warranty shall be interpreted in accordance with the internal laws of the State of Illinois, without regard to the provisions concerning the conflicts of laws. CETCO PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.: LDF20015 GSI Project No.: 723027 Section: 33 50 20S GEOSYNTHETIC CLAY LINER 1.5.B.3. INSTALLATION WARRANTY PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Page 1 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com GEO-SYNTHETICS SYSTEMS TWO-YEAR INSTALLATION WARRANTY FOR GEO-SYNTHETICS SYSTEMS MEMBRANE LINERS PROJECT: Salt Lake Valley SWM Module 8 GSI Project ID No.: 723027 Subject to the terms and conditions set forth below, Geo-Synthetics Systems, warrants to Purchaser, Salta Lake Valley SWM Module 8 – that the Geosynthetic Clay Liner installed at the Salt Lake Valley Solid Waste facility in Salt Lake City, Utah was installed by Geo-Synthetics Systems, in accordance with specifications in a good and workmanlike manner and that the installation of the liner is free from defects in workmanship for a period of two (2) years effective from 06/22/2024. This warranty covers only defects in workmanship occurring during the installation of the liner. This warranty does not cover any damage to, or defects in the liner found to have been a result of misuse, abuse or conditions existing after it was installed, including, but not limited to, rough handling; malicious mischief; vandalism; sabotage; fire; acts of God; acts of the public enemy; acts of war, public rebellion, severe weather conditions of all types; damage due to ice; excessive stress from any source; floating debris; damage due to machinery; foreign objects or animals. Nor does this warranty cover any defects which are found to have been a result of improper or defective design or engineering unless the design or engineering was performed by Geo-Synthetics Systems. In the event circumstances are found to exist which purchaser believes may give rise to a claim under this warranty, the following procedure shall be followed. a) Purchaser shall give Geo-Synthetics Systems written notice of the facts and circumstances of said claim within ten (10) days of becoming aware of said facts and circumstances. Said notice shall be by registered or certified mail, return receipt requested, postage prepaid, addressed to Construction Manager, Geo-Synthetics Systems, 2401 Pewaukee Road, Waukesha, WI 53188. The words “WARRANTY CLAIM” shall be clearly marked on the face of envelope in the lower right hand corner. Said notice shall contain, at a minimum, the name and address of the owner, the name and address of the installation, the name and address of the installer, the date upon which the material was purchased and the facts known to Purchaser upon which the claim is based. Failure to strictly comply with all the requirements of this paragraph shall void this warranty. Page 2 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com b) Within twenty (20) days after receipt of the notice described in paragraph a., above, Geo- Synthetics Systems shall notify Purchaser either that it will send a representative to inspect the allegedly defective liner or that it does not wish to do so. Purchaser shall pay the expenses incurred by Geo-Synthetics Systems in making the inspection, including current per diem rates for personnel involved in making the inspection, in the event Geo-Synthetics Systems determines that the claim is not covered by this warranty. c) PURCHASER SHALL NOT REPAIR, REPLACE, REMOVE, ALTER OR DISTURB ANY LINER, NOR SHALL PURCHASER ALLOW ANYONE ELSE TO REPAIR, REPLACE, REMOVE, ALTER, OR DISTURB ANY LINER PRIOR TO SUCH INSPECTION OR RECEIPT OF GEO-SYNTHETICS SYSTEMS NOTICE THAT IT ELECTS NOT TO INSPECT. A FAILURE TO STRICTLY COMPLY WITH THIS PARAGRAPH SHALL VOID THIS WARRANTY OR MAY LEAD TO A DETERMINATION THAT THE ALLEGED DEFECTS ARE NOT WITHIN THE SCOPE OF THIS WARRANTY. d) If Geo-Synthetics Systems determines that the alleged defects are covered by this warranty, Geo-Synthetics Systems shall, in its sole discretion, either repair the defective liner or provide Purchaser with replacement liner. THE REMEDIES PROVIDED HEREIN ARE THE EXCLUSIVE REMEDIES AVAILABLE UNDER THIS WARRANTY. Any determination as to whether a particular defect is covered by this warranty will be made by Geo-Synthetics Systems in its sole and complete discretion. e) Purchaser agrees that it shall provide Geo-Synthetics Systems with clean, dry and unobstructed access to the liner in order for Geo-Synthetics Systems to perform the inspections and warranty work which may be required pursuant to this warranty. THE REMEDIES PROVIDED TO PURCHASER HEREIN ARE THE EXCLUSIVE REMEDIES AVAILABLE UNDER THIS WARRANTY AND ARE INTENDED FOR THE SOLE BENEFIT OF PURCHASER. NEITHER THIS WARRANTY NOR ANY RIGHTS HEREUNDER SHALL BE ASSIGNABLE. GEO-SYNTHETICS SYSTEMS SHALL HAVE NO LIABILITY UNDER THIS WARRANTY TO THIRD PARTIES OR STRANGERS TO THIS AGREEMENT. THE WARRANTY SET FORTH ABOVE IS THE ONLY WARRANTY APPLICABLE TO THE LINER AND ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL GEO-SYNTHETICS SYSTEMS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES FOR, RESULTING FROM, OR IN CONNECTION WITH, ANY LOSS RESULTING FROM THE USE OF THE LINER. IN THE EVENT THE EXCLUSIVE REMEDY PROVIDED HEREIN FAILS IN ITS ESSENTIAL PURPOSE, AND IN THAT EVENT ONLY, PURCHASER SHALL BE ENTITLED TO THE RETURN OF THE PURCHASE PRICE FOR SO MUCH OF THE MATERIAL AS GEO-SYNTHETICS SYSTEMS DETERMINES IN ITS SOLE DISCRETION, TO HAVE VIOLATED THE WARRANTY PROVIDED HEREIN. EXCEPT FOR THE WARRANTY SET FORTH ABOVE, NO REPRESENTATION OR WARRANTY MADE BY ANY SALES OR OTHER REPRESENTATIVE OF GEO-SYNTHETICS SYSTEMS, OR ANY OTHER PERSON, CONCERNING THE LINER SHALL BE BINDING UPON GEO-SYNTHETICS SYSTEMS. Page 3 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Any waiver of the terms and conditions of this warranty shall be in writing signed by GEO- SYNTHETICS SYSTEMS. The failure to insist upon strict compliance with any of the terms and conditions contained herein shall not act as a waiver of strict compliance with all of the remaining terms and conditions, or this warranty; and, shall not operate as a waiver as to any of the terms and conditions of this warranty, and to future claims under this warranty. GEO-SYNTHETICS SYSTEMS BY:________________________________ Frank Strnad / Construction Services Director I have read and agree to be bound by the terms and conditions of the foregoing warranty. Signed: ___________________________________ By: ______________________________________ Title: ____________________________________ Company: ________________________________ Date: ____________________________________ 5.0 HDPE LINER 5.1 Construction QC/QA Plan HDPE Liner Construction QC/QA Plan Introduction This document (HDPE Liner Construc on Quality Control/Quality Assurance Plan) is intended to generally document standard procedures u lized to verify a quality installa on. This document complements, and does not replace, applicable site-specific project plans and specifica ons. References: Project Manual Sec on 33 50 10S 60 Mil HDPE Liner. Geomembrane Materials New, uniform, unmodified high density polyethylene sheet containing no plas cizer, filters, reclaimed polymers or extenders and the product of only one manufacturer. Either black or white smooth surface on 1 side, textured black surface on other side. 1. White surface and black layer must be integral to the geomembrane. 2. No gaps in the white layer. 3. White layer must not delaminate during physical tes ng. 4. White layer thickness is Contractor’s op on. 5. White material must be made with the same resin, and stabilized with a non-carbon black ultra- violet stabilizer to meet warranty condi ons. 6. Edge Trim: 2 maximum. 7. Heat Stabilizers, An oxidants and Processing Aids in Resins: < 0.5. 8. No tears or defects. 9. Meet the requirements of Table 1 of Sec on 33 50 10S of the Project Manual. Extrudate formulated from the same high density polyethylene resin as the geomembrane. Sealant caulking, clamps, tape, and rubber pads per the geomembrane manufacturer’s recommenda ons. Perform the quality control tests at the frequencies shown in Table 1 of Sec on 33 50 10S of the Project Manual. Supply copies of tes ng to the Engineer. Material Delivery Approved geosynthe c materials shall be delivered to the project site, unloaded and stored in a prepared area protected from damage by puncture, ponding water, airborne contaminates or traffic. All materials shall be properly labeled and cross-referenced with packing slips. Any visible damage to roll goods delivered to the project site shall be documented. Rolls with significant damage shall be marked and stored separately on site for further evalua on. A complete material inventory shall be completed and kept up to date to ensure that sufficient quan ty of the required materials exists on site to fulfill the project requirements. Site Preparation The subgrade surface to receive geosynthe c materials shall be prepared and inspected in accordance with the project specifica ons. Surfaces shall be smooth and free of sharp rocks or debris. The subgrade surface shall be firm and unyielding, capable of providing a founda on for geosynthe c lining that does not rut when trafficked over by a forkli@ loaded with a roll of geosynthe c material. Instruct workers about protec ng geomembrane such as handling the material in high winds; handling of equipment; discard of u lity knife blades; cleanup of membrane cuCngs; shoes of all personnel walking on the membrane; smoking; ea ng or drinking; and placing heated equipment on the membrane. Roll surface of low permeability layer smooth and level. Round edges and grade changes to 12 inch radius minimum. Fill voids and cracks. Make surface free of stones or protrusions greater than 0.25-inch diameter, and free of organic and other deleterious material. Limit ruts on surface to a maximum depth of 1 inch. Repair damaged surface prior to installa on of geomembrane. Installation Deploy each panel in accordance with panel layout drawings and manufacturer’s recommenda ons. Provide sufficient material to allow for geomembrane expansion and contrac on. Install panels so overlapping panel is upgrade of the underlying panel. Do not fold the geomembrane. Geosynthe c materials shall be deployed using a spreader bar or carpet pole assembly aFached to a forkli@ or skit steer assisted by low pressure equipment. In general, panels will be deployed in a manner that minimizes risk of in-place damage and parallel to the line of maximum slope. Each panel deployed will be assigned a unique number that will be used to correlate specific roll data to the area of the project in which the roll was u lized. Adequate temporary loading (sandbags) shall be placed on deployed panels to prevent upli@ from wind. Personnel and equipment shall not damage geosynthe c materials during transporta on, handling, or deployment. Geosynthe c placement shall not proceed during precipita on or excess wind condi ons. Seaming A. General: 1. On slopes, seam perpendicular to the line of the slope (i.e. down and not across slope) to at least 6-feet away from the crest or toe of the slope. 2. On module floor, orient seams perpendicular to slope. 3. Minimize number of seams in corners, odd-shaped geometric loca ons, and outside corners. 4. Follow seam coding system. 5. Test Seam: Make test seams to verify that adequate condi ons exist for field searing to proceed. Produce a test seam at the beginning of each shi@ to determine the peel and tensile strength of the seam. Engineer may require a sample field seam be made at any me during seaming produc on to verify equipment. 6. Searing suspensions: If seaming opera on has been suspended for more than 1/2 hour or if the seaming equipment breaks down, produce a test seam prior to resuming of seaming opera ons. 7. Do not build in wrinkles during seaming. B. Qualifica on (Start-Up) Seaming: 1. Seaming samples shall be made for the purpose of qualifying each welding apparatus, welding technician and material type at a minimum of one every four hours. All coupons shall exceed the specified strength requirements before proceeding to produc on seaming. Quality Control must approve trial welds before any welding can be performed. 2. Should a start-up sample fail to meet the strength requirements of the specifica ons, the welding apparatus and welding technician shall not be accepted and shall not be used in produc on seaming un l the deficiencies have been remedied and a successful start-up sample is achieved. C. Produc on Seaming: 1. Personnel u lized in produc on seaming shall be experienced and properly trained. Each welding technician will qualify daily demonstra ng successful start-up seaming that must be approved by Quality Control. 2. Approved methods for field produc on seaming are Fusion or Extrusion. D. Fusion Welding: 1. Geomembrane seams shall have a finished overlap as called out in the specifica ons. Excess overlap shall be trimmed prior to welding. 2. Seam areas shall be wiped clean and inspected to verify that the area is free from moisture and contaminants. E. Extrusion Welding: 1. Geomembrane seams shall have a finished overlap as called out in the specifica ons. 2. Seam areas shall be wiped clean and inspected to verify that the area is free from moisture and contaminants. 3. Seam areas shall be temporarily tack welded together, u lizing a handheld air welder, to hold the patch in place prior to prepara on and extrusion welding. Field Quality Control and Inspection A. Geomembrane Tes ng Equipment: 1. Field Tensiometer: Accompanied by evidence of calibra on, used for on-site shear and peel tes ng of geomembrane seams. 2. Punch Press: Capable of cuCng specimens in accordance with ASTM D 4437. 3. Vacuum Box: Capable of inducing and holding 10 inches of mercury vacuum. 4. Other Tes ng Equipment: As needed by Contractor. B. Observa ons: Visually inspect the geomembrane sheets, seams, anchors, seals, and repairs for defects. Test each seam and repair using a vacuum box or air channel pressure. Perform tests in Engineer’s presence. 1. Fillet Weld, Extrusion Lap Weld, or Single Hot-Wedge Fusion Lap Weld: Use a vacuum box at 4 to 8 inches of mercury. 2. Double Hot-Wedge Seam Weld: Use the following air channel pressure test. a. Pump air into the air channel between the welds to 35 psi and hold for 5 minutes + 1 minute. b. At the end of the period, de-pressurize the seam by placing needle hole in the air space between the welds at the opposite end of the seam and observe the gage. c. At the end of 5 minutes if the seam maintains at least 30 psi during the test and the pressure drops within 30 seconds of de-pressuriza on, the seam is acceptable. d. If the pressure drops below 30 psi during test period, repair needle holes and retest the seam by the same procedure or perform a vacuum box test along the en re length of the seam. e. If the second air pressure test fails, perform a vacuum box test along the en re length of the seam. If no bubbles appear in the vacuum box, the lower weld will be considered defec ve and the upper seam is acceptable. if any bubbles appear in the vacuum box, each defec ve area shall be repaired by extrusion welding and tested again by vacuum box. f. Op on: As an op on to the vacuum box, apply a soap solu on to the exposed seam edge while maintaining the required air channel pressure test. If bubbles appear, mark and extrusion weld the defec ve area. If no bubbles appear and the test pressure cannot be maintained, the leak is judged to be in the boFom or second seam, and the length of the seam tested may be cap stripped. Repair the needle holes. 3. For Seams Where it will be Imprac cable to Perform a Vacuum Test: Insert copper wire for spark test, prior to welding. Place copper wire in the extrudate of the weld and at the edge of the top sheet. C. Seam Tes ng: Perform the tests and meet the quality control criteria of Table 2 in Sec on 33 50 10S of the Project Manual. All 5 shear and 5 peel tests must pass. If 1 does not and is an end sample (bone), remove 1 bone from each end of the sample. If field tensiometer shows a pass the Engineer may deem the seam passing. If the bone fails, proceed with repairs. D. Repairs: Correct the tested field seam as follows. 1. 1. Rerun the field weld test using a new sample. 2. 2. If that second test passes, the Engineer may assume an error was made in the first test 3. and accept the field seam. 4. 3. If that second test fails, either cap the field seam between any two previous passed 5. seam test loca ons that include the failed seam or take another sample on each side of 6. the failed seam loca on (10-feet minimum), and test both. 7. 4. If both pass, cap the field seam between the two loca ons. 8. 5. If either fails, repeat the process of taking samples for test. E. Acceptance of installed geomembrane shall not occur un l adequacy of field seams and repairs, including associated control tes ng is complete. Each field seam is bounded by 2 passes test loca ons. 5.2 Contractor Submittals PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.3.A.1. MATERIAL DATA SHEET PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com HDPE 60 mil Black Single Sided Textured ST TECHNICAL DATA SHEET PROPERTY(1)TEST METHOD FREQUENCY UNIT 1101450 Imperial SPECIFICATIONS Nominal Thickness Thickness (min. avg.) Lowest individual (10 values/10) ASTM D5994 - Every roll mils mils mils 60 60.0 54.0 Asperity Height (min. avg.) Textured side ASTM D7466 Every roll - mils 16 Bottom Resin Density Melt Index - 190°C/2.16 kg (max.) ASTM D1505 ASTM D1238 One per batch One per batch g/cc g/10 min > 0.932 1.0 Density Carbon Black Content Carbon Black Dispersion OIT - Standard (min. avg.) ASTM D792 ASTM D4218 ASTM D5596 ASTM D8117 Every 10 rolls Every 2 rolls Every 10 rolls One per batch g/cm³ % Category min ≥ 0.940 2.0 - 3.0 Cat. 1 & Cat. 2 100 Tensile Properties (min. avg) (2) Strength at Yield Elongation at Yield Strength at Break Elongation at Break ASTM D6693 Every 2 rolls lbs/in % ppi % 132 13 132 150 Tear Resistance (min. avg.) Puncture Resistance (min. avg.) ASTM D1004 ASTM D4833 Every 5 rolls Every 5 rolls lbf lbf 45 120 Dimensional Stability Stress Crack Resistance (SP-NCTL) Oven Aging - % retained after 90 days HP-OIT (min. avg.) UV Resistance - % retained after 1,600 hr HP-OIT (min. avg.) Low Temperature Brittleness ASTM D1204 ASTM D5397 ASTM D5721 ASTM D5885 ASTM D7238 ASTM D5885 ASTM D746 Certified One per batch Per formulation Per formulation Certified % hr % % °F ± 2 500 80 50 - 106 SUPPLY SPECIFICATIONS(Roll dimensions may vary ±1%) Roll Dimension - Width -ft 22.5 Roll Dimension - Length -ft 540 Area (Surface/Roll)-ft²12150 1. Testing frequency based on standard roll dimensions and one batch is approximately 180,000 lbs (or one railcar). 2. Machine Direction (MD) and Cross Machine Direction (XMD or TD) average values should be on the basis of 5 specimens each direction. * All values are nominal test results, except when specified as minimum or maximum. * The information contained herein is provided for reference purposes only and is not intended as a warranty or guarantee. Final determination of suitability for use contemplated is the sole responsibility of the user. SOLMAX assumes no liability in connection with the use of this information. Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. NOTES 31-May-2018Revision date SOLMAX.COMPage 1 of 1 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.3.B.2. PROPOSED PANEL LAYOUT PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 60 M I L H D P E T E X T U R E D PR O P O S E D P A N E L L A Y O U T PL-2 SALT LAKEMOD 8 SA L T L A K E V A L L E Y SO L I D W A S T E F A C I L I T Y MO D U L E 8 1" = 0 ' - 6 0 " AL 72 3 0 2 7 L2 3 0 1 0 9 SA L T L A K E C I T Y , U T A H 07 / 1 6 / 2 3 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.4.A.1.-3. INSTALLER'S SOQ PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com GEO-SYNTHETICS SYSTEMS, LLC Waukesha, WI Installation Services 2022 | STATEMENT OF QUALIFICATIONS Tel 800 444-5523 | Fax 262 524-7961 geo-synthetics.com TABLE OF CONTENTS 1.0 Introduction 2 2.0 Installation Services 3 3.0 Project Development 4 * Sales 4 * Estimating 5 * Contracts 5 * Procurement 5 * Management 6 * Safety 6 4.0 Key Personnel 9 5.0 Financial Strength 11 6.0 Insurance 12 7.0 Bonding & Warranties 13 8.0 Quality Control 14 9.0 Field Quality Control Procedures 15 *Key projects listing available on request via fax or e-mail. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 2 INTRODUCTION Geo-Synthetics Systems, LLC (GSI) is one of the nation’s largest independent installers of geosynthetic materials. As an independent installer, GSI can source specification compliant materials from select leading manufacturers. GSI has established solid working relationships with the industry’s leading suppliers and has positioned itself to be able to procure the most technically advanced geosynthetic materials currently available. Our 46 years + installation experience, refined installation techniques and materials purchasing expertise combine to offer our clients unmatched geosynthetic product solutions on a supplied and installed basis. Project references include successfully completed projects in all the following areas of geosynthetic application: * Landfill Closures * Solid Waste Landfills * Secondary Containment * Wastewater Containment * Industrial Lagoons * Decorative Ponds * Methane Barriers GSI is a well-known and well-respected installer of geosynthetics. We are involved in numerous industry associations including IAGI (the International Association of Geosynthetics Installers), in which we are instrumental in developing industry accepted specifications, including the IAGI HDPE Geomembrane Installation Specification (for high density polyethylene geomembrane liners). GSI’s client list has traditionally included general contracting firms, engineering companies, private owners, and government agencies at all levels, located coast to coast in the United States operating in a wide range of industries. We have provided installation services in all the following market areas: * Waste Management * Power and Energy * Civil Construction * Pulp and Paper * Oil and Gas * Aquaculture * Agriculture * Mining We are confident that upon review of this document, you will feel assured of the geosynthetic construction service capabilities of GSI. 01 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 3 INSTALLATION SERVICES GSI’s estimating, project management and construction operations are based in Waukesha, Wisconsin. Individual installation crews operate from locations across the country enabling GSI to provide competitive local service to markets coast to coast. As shown in our enclosed projects reference list, GSI can demonstrate installation experience coast to coast within the United States, working for private and public owners, general contractors, and engineering firms. GSI has the ability to procure and supply to site all required geosynthetic materials and to furnish all required site supervision, skilled technicians, in-house quality control technicians, site labor, deployment equipment and equipment operators, etc., related to the installation of the geosynthetic materials. Our primary requirements of an owner or general contractor are to unload a portion of the materials prior to our mobilization to site and to provide the prepared subgrade and related earthworks on site. Scopes of work will of course vary from project to project depending on the nature of the job, resources of the owner or general contractor and site labor conditions, etc. Our basic scope of work generally provides for the following: * Transportation of materials to site * Unloading (once GSI fully mobilized) * Deployment of all geosynthetic materials * Seaming (e.g. fusion and extrusion welding, etc.) * Quality control (per GSI in-house guidelines) GSI has extensive installation experience with a full range of geosynthetic materials: * HDPE and LLDPE Geomembrane Liners * PVC and Polypropylene Geomembrane Liners * Hypalon and XR-5 Geomembrane Liners * Geonets and Geocomposite Drainage Products * Geotextiles (Woven and Nonwoven) * Geosynthetic Clay Liners (GCL’s) * Erosion Control Materials * Paving Grade Materials Our geomembrane lining installation experience with HDPE, LLDPE, PVC, Polypropylene, Hypalon and XR-5 liners now exceeds over 900,000,000 square feet gathered on literally hundreds of projects over the past 46 years. 02 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 4 PROJECT DEVELOPMENT SALES COVERAGE AND SALES SERVICES GSI is somewhat unique in its approach to sales as an independent installation company in that it maintains a highly proactive regionally based sales force charged with the responsibility of seeking out and developing new sales opportunities. Although the skills set of each individual varies our basic approach to sales is to provide technical knowledge and assistance to the owner, designer, specifying engineer or contractor as required at either the permitting, design, specification, bid or construction phase of a project’s development. We wish to position ourselves to be primarily known as the recognized resource for geosynthetic installation solutions for more challenging projects where our expertise is best utilized. In addition to fulfilling our clients Requests for Proposal (RFP’s) or Requests for Quote (RFQ’s), our Regional Sales Managers can assist with all the following: * Materials Selection * Materials Specification * Specification Review * Budgetary Pricing * Design Details * Scheduling * Submittals * Credit GSI’s sales management is based in Waukesha, Wisconsin with Regional Sales Managers reporting to the Construction Services Director. Regional sales coverage operates from Waukesha as well as another location based in South Dakota. 03 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 5 ESTIMATING Estimating at GSI is a stand-alone function within the construction services group with the Senior Estimator reporting to the Construction Manager. Based in Waukesha, Wisconsin, the estimating group at GSI can perform take-off estimates on hundreds of projects annually (GSI consistently estimates over 400 projects annually with a total bid value in excess of $100,000,000 per year). GSI has developed its own “home grown” estimating package in an MS Excel spreadsheet format. The package allows for a large degree of flexibility in terms of respective scopes of work for GSI as well as the earth works contractor. AutoCad 2011 software is used for all drafting and quantity estimating requirements. All project estimates involve the generation of a preliminary panel layout drawing and bar chart schedule detailing expected workdays for project completion. Proposals are generated by the estimating department and may be communicated by e-mail if requested. CONTRACTS All contracts are reviewed and signed by the Construction Services Director of the Company. Key items within any GSI construction services contract will necessarily include well defined scopes of work consistent with GSI’s proposal, clearly established methodology of payment, payment terms, insurance, bonding, and warranty expectations. GSI site Superintendents are authorized to accept signed change orders although back-charges to GSI must be authorized by the Project Manager or the Construction Services Director to be duly accepted. PROCUREMENT Procurement of materials with associated manufacturing and shipment to site requires the establishment of an acceptable line of credit and formation of a signed contract (or accepted materials purchase order) with GSI. Purchase orders to GSI vendor firms are issued by GSI when a signed contract is fully executed. Within the geosynthetics industry vendor pricing is guaranteed for relatively brief periods of time due to the susceptibility of geosynthetic materials to resin price fluctuations (most geosynthetics are made from polyethylene or polypropylene resins, etc.). On rare occasions, Letters of Intent may be used to secure vendor pricing. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 6 PROJECT MANAGEMENT Reporting directly to the Construction Services Director of the Company, the Construction Manager, based in Waukesha, Wisconsin, has overall responsibility for all geomembrane related installation activities conducted by GSI. Project Managers reporting to the Construction Manager, are responsible for the scheduling of individual projects including the coordination of material deliveries to site and timely mobilization to site of GSI installation personnel. Achievement of project milestone dates is also the responsibility of the GSI Project Manager. These individuals possess extensive practical field experience and training in project management techniques. GSI field crews are generally comprised of a single site Superintendent, GSI trained full time welding technicians (at least one of which is qualified to operate site deployment equipment if necessary), a quality control technician and site laborers. Additional site laborers may be hired locally if necessary, depending on the nature of the project and materials to be installed. The site Superintendent has responsibility for day to day activities on site including coordination of activity with the earthwork’s contractor, third party inspection firm and safety as it relates to GSI personnel on site. GSI is active on 80 to 100 projects annually across the United States. SAFETY No work or service rendered by GSI employees shall become so important as to assume priority over the safety of an employee. All GSI site Superintendents and lead technicians are OSHA trained and certified. The site Superintendent generally has the responsibility for day to day safety activities on site. GSI has a written Safety Manual for field activities relating to geomembrane liner installation. The Manual, copies available upon request, provides guidelines not limited to all the following: DELIVERIES unloading vehicles fueling lifting and carrying lighting loading tie downs FIELD ACTIVITIES vehicle safety deployment electrical safety eye protection fire protection flammable and combustible materials forklift and loader safety head protection heat exhaustion lifting and carrying personal protective equipment (PPE) tool safety GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 7 SAFETY (CONTINUED) GENERAL VEHICLE SAFETY fueling lights seat belts severe weather tires transporting employees wipers defensive driving habits RECORD KEEPING accident reporting accident investigation OSHA 300 Log disciplinary action GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 8 SAFETY (CONTINUED) The following summarizes GSI response to key items common to typical contractor safety questionnaires: Do you certify that all individuals assigned to the projectwill be drug and alcohol free?YES Do you certify that all individuals assigned to the project will be fit for respiratory duty, if applicable? YES Do you certify that all individuals assigned to the project will be fit to safely perform the required tasks? YES Does your safety and health representative visit each site prior to the beginning of each project? YES Do job descriptions for supervisory staff and management include safety and health responsibilities? YES Does your organization have a program for reward and recognition of outstanding safety performance? YES Does your organization have a disciplinary system for unacceptable safety performance? YES Are workers encouraged to intervene when they observe a co-worker performing at risk? YES Are the safety and health hazards associated with job activities / tasks identified before they begin? YES Does your organization have a medical and first aid program?YES Does your organization have a substance abuse program?YES Are new employees trained in their craft prior to job placement?YES Are new employees given a company specific safety orientation?YES Do you provide CPR or First Aid training for your personnel?YES Do you maintain a record of all training provided to all employees?YES GSI is working diligently to continuously improve its safety programs and safety record, with the objective of becoming exemplary in our industry within the field of safety. GSI has established site specific safety programs with a view towards zero recordable incidents on any one specific project, including assignment of site specific safety officers if required (the GSI site Superintendent is generally responsible for all day to day safety activities on site). Documentation available upon request. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 9 KEY PERSONNEL CONSTRUCTION SERVICES DIRECTOR – FRANK A. STRNAD SR. Frank has 40 years’ experience in all facets of the construction industry, of those 40 years, 33 have been in Geosynthetic lining construction. Frank’s qualifications and experience include construction planning and scheduling, budget analysis, quality control management, vendor and materials management and job costing. He also manages and directs regional offices as well National accounts directing work across the US. Frank has a Bachelor Of Science degree from The University Of Redlands – Redlands, CA ASSISTANT CONTROLLER – JUSTIN SMOCKE Justin is a Certified Public Accountant with over 10 years of experience in both the public and private sector. He attended UW-Oshkosh where he received a Bachelor of Business Administration followed by a Master’s in Accounting and Financial Management from Keller Graduate School of Management. Justin joined GSI in June of 2019 as a Senior Accountant and was promoted to Assistant Controller in July 2021. DIRECTOR OF CONSTRUCTION SERVICES SALES – MARK DOWNS Mark Downs is Director of Construction Services Sales. Mark has been involved in the geosynthetic industry for over 25 years. He has been involved in all aspects of sales and sales management both in distribution and manufacturing, with an emphasis in geosynthetics products. Mark has been with GSI for 17 years as a Regional Sales Manager. Prior to GSI, Mark worked 6 years for Integra Plastics, fabricator of geosynthetic materials, with assignments as a Regional Salesperson and Sales Manager. He then worked 5 years for Raven Industries, manufacturer, and fabricator of geosynthetic materials, as the NE Regional Sales Representative and Midwest Sales Representative. Mark graduated from Dakota State University and has a degree in Business with an emphasis in Marketing and Management. SENIOR PROJECT MANAGER – CESAR GONZALEZ Cesar has been in the Flexible Membrane Liner industry for 26 years with extensive knowledge in field deployment, supervision, and project closures. Cesar is heavily involved in all aspects of GSI’s liner division; including but not limited to, a vast majority of planning and executing crew projects. He is the main point of contact for communication field supervisors and crews alike. GENERAL MANAGER – SHAWN S. CURRY Shawn joined GSI’s management team in 2021, with 16 years of operations management experience leading large service business units. Prior to joining GSI, Shawn worked for Halliburton Energy Services in in various technical, operational, and strategic roles before serving as Vice President for a global business unit. Shawn is a graduate from Purdue University with a Bachelor’s degree in mechanical engineering. ESTIMATOR – ROBERT TOLLIVER Robert has BS degrees in Mechanical Engineering and Petroleum Engineering from West Virginia University. Upon graduation, he worked in the Oil & Gas industry as a Field Engineer with Halliburton in Rock Springs, Wyoming — and later 04 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 10 Consol Energy in Jane Lew, West Virginia. Robert entered the industry in 2016 with Extreme Plastics Plus as an Estimator, moving to Project Manager and Operations Manager. His roles in costing and managing geosynthetics projects in oil & gas, mining, and landfills prepared him for joining GSI in March of 2021 as an Estimator. ESTIMATOR – BARRETT SAWATZKY Barrett has a Bachelor of Science Degree in Industrial Engineering from Oklahoma State University. Upon graduation he accepted a position as a Project Estimator with Matcor, Inc a Corrosion Control company out of Oklahoma City, OK. He spent 3 years estimating and managing construction projects from the Rocky Mountain area to the Midcon Region. Barrett has 5 years of experience in the geosynthetics industry. Barrett started with Extreme Plastics Plus, Inc in Oklahoma City, OK in 2017 where he served as a Project Estimator for 4 years estimating all types of geosynthetic projects throughout the United States. Barrett joined GSI in March of 2021 as a Project Estimator. ACCOUNT MANAGER – STEVE STORY With over thirty years in the liner industry, Steve has been a General Contractor in both Canada and the United States. Prior to joining GSI in late 2021, Steve was in the oil and gas industry, holding management roles for Conoco Phillips, Select Energy Services, and BHS Canada, as well as consulting for US Silica. Steve attended Colorado Mesa University and studied Geology. SAFETY AND QUALITY CONTROL MANAGER – ANNA LITHPRASEUTH Anna is responsible for training all Geo-Synthetics employees on the safety policy and procedures to ensure safe work habits throughout field projects, warehouses, and the office. She is involved in different aspects including language and document translation for crew members, logistics including DOT/Non-DOT compliance and oversees all field quality control personnel and has extensive knowledge in AutoCad. Anna is a graduate of the University of Wisconsin-Milwaukee and holds a BA. She is currently working on her second degree at Columbia Southern University. SAFETY TRAINING AND CERTIFICATIONS OSHA Occupational Safety and Health Standards for General Industry OSHA 510 Certification ASSP Corporate Safety Management ASSP Line Management Safety Leadership ASSP Essential Risk Assessment (ERA) HUMAN RESOURCES COORDINATOR – TAMMY OSTER Tammy has over 20 years of experience providing Human Resources and administrative support. Here at Geo-Synthetics Systems she is responsible for a wide range of Human Resource functions including scheduling pre-employment physicals and drug screenings, criminal background checks, onboarding of new and returning employees, ensuring all new-hire paperwork is completed, new hire orientation and benefits review, as well as submitting paperwork for various personnel changes and maintaining personnel files. She assists with various administrative duties such as office organization, ordering supplies, working with vendors, assisting with company state contractor license filings, distributing pay stubs, and providing support to on-site crew members when requested. Tammy holds a BA in HR Management from Concordia University. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 11 FINANCIAL STRENGTH GSI is a financially strong, profitable company. Geo-Synthetics Systems, LLC. is headquartered in Waukesha, Wisconsin. GSI would be pleased to provide a Financial Statement upon request. 05 2021 STATEMENT OF QUALIFICATIONS | 12 INSURANCE GSI is a capably insured company. Insurance will include General Liability Coverage for personal injury and property damage in the amount of $2,000,000 and Worker’s Compensation coverage in the amount required by law. General Liability insurance is on an Occurrence Basis. Umbrella Coverage up to $8,000,000 is available. We would be pleased to provide a sample Certificate of Insurance upon request. 06 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 13 BONDING & WARRANTIES GSI has a high capacity for bonding as evidenced by the size of projects listed herein. Performance bonding can typically be provided at an additional cost based on contract value. Warranty bonds for materials can sometimes be arranged in consultation with GSI’s supplying manufacturers. Warranty bonds for installation work performed by GSI can also be arranged at additional cost if requested. Warranties are always issued on a project specific basis. Warranties on materials will be per the warranty terms offered by GSI’s supplying manufacturers (typically five years on geomembrane materials). Warranties on installation will be consistent with industry norms, likely for one or two years depending on the nature of the project. All warranties offered on a prorated basis. 07 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 14 QUALITY CONTROL GSI has developed its own in-house Field Quality Control Manual with the intention of offering a consistently high standard of workmanship to our clientele. The Manual, (see reference document section), provides guidelines related to all aspects of geosynthetics installation not limited to the following: MATERIAL DELIVERY * verification of equipment capabilities * identification of any damaged materials * verification of adequate storage provisions * ensure that materials are properly identified and that labeling matches manufacturers quality control documentation and shipping bills of lading GEOMEMBRANE INSTALLATION * handling and placement * subgrade requirements and preparation * anchor trench requirements * panel layout preparation * field panel placement * field seaming (personnel & equipment) * weather conditions * seaming, seam preparation & trial welds * seam sampling * seam testing (destructive & non-destructive) * defect and repair procedures GEOTEXTILE INSTALLATION * handling and placement * seams and overlaps * repairs GEONETS & GEOCOMPOSITE INSTALLATION * handling and placement * seams and overlaps * repairs GEOSYNTHETIC CLAY LINER (GCL) INSTALLATION * handling and placement * seams and overlaps * repairs GSI installation guidelines are consistent with industry-accepted practice and conform to most recognized industry specifications (e.g. IAGI) 08 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 15 QUALITY CONTROL TECHNICIAN FIELD MANUAL | MARCH 2011 08 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 16 TABLE OF CONTENTS Introduction ....................................................................................................................................................16 Preparation .....................................................................................................................................................17 Pre-Project Preparation ..............................................................................................................................17 Daily Preparation ............................................................................................................................................19 Field Work .............................................................................................................................................20 Data Collection ..........................................................................................................................................20 Forms ..........................................................................................................................................................21 Inventory Form .......................................................................................................................................21 Parts of the Form: ..............................................................................................................................21 Filling Out the Form ..........................................................................................................................22 Panel Placement Form ..........................................................................................................................23 Parts of the Form: .............................................................................................................................23 Filling Out the Form ..........................................................................................................................24 Trial Weld Form ......................................................................................................................................25 Parts of the Form ..............................................................................................................................25 Filling Out the Form ..........................................................................................................................26 Panel Seaming Form..............................................................................................................................28 Parts of the Form ..............................................................................................................................28 Filling Out the Form ..........................................................................................................................29 Non-Destructive Testing Form ...............................................................................................................31 Parts of the Form ...............................................................................................................................31 Filling Out the Form ..........................................................................................................................32 Destructive Test Form ...........................................................................................................................35 Parts of the Form ..............................................................................................................................35 Filling Out the Form ..........................................................................................................................36 Tracking a Failed Destructive ............................................................................................................36 Repair Form ...........................................................................................................................................38 Parts of the Form ..............................................................................................................................38 Filling Out the Form ..........................................................................................................................39 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 17 Checking Data ................................................................................................................................................40 General .......................................................................................................................................................40 Material Inventory Form .............................................................................................................................40 General ..................................................................................................................................................40 Panel Placement Form ................................................................................................................................41 General ...................................................................................................................................................41 Trial Weld Form ..........................................................................................................................................42 General ..................................................................................................................................................42 Tracking a Failed Trial Seam ...................................................................................................................43 Panel Seaming Form ..................................................................................................................................45 General ..................................................................................................................................................45 Tracking Seaming ..................................................................................................................................46 Non-Destructive Testing Form ...................................................................................................................47 General ..................................................................................................................................................47 Tracking Seaming ..................................................................................................................................48 Destructive Test Form ................................................................................................................................49 General ..................................................................................................................................................49 Repair Form ................................................................................................................................................50 General ..................................................................................................................................................50 Record Drawing ...............................................................................................................................................51 Required Information ..................................................................................................................................51 Drafting Requirements ................................................................................................................................51 Tools ......................................................................................................................................................52 Drafting Standards ................................................................................................................................52 Sketches ...............................................................................................................................................53 APPENDIX .......................................................................................................................................................55 Formulas ...............................................................................................................................................55 Seam Failure Modes ..............................................................................................................................55 Field Forms ............................................................................................................................................55 A-Size Border ........................................................................................................................................55 GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 18 INTRODUCTION Quality control work is one of the most important requirements of our profession. Your work is not only reviewed by GSI QC Staff, but is used by project owners, engineers, and state regulatory agencies. It is of utmost importance that that your work be completed timely and accurately. This manual is to be used as a guide for the most common situations you will encounter in the field, however it will not cover every situation. If you follow the guidelines laid out in this manual you should be able to work through any situation you encounter. If you have any questions, please contact the office. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 19 PREPARATION As with all things in life, the amount of preparation you put into a project has a direct effect on the success of that project. Preparation for geosynthetic installation falls into two categories: Pre-Project Preparation and Daily Preparation. PRE-PROJECT PREPARATION The key to pre-project preparation is reading the project specifications and/or site quality control/quality assurance manuals. This should be done prior to arriving at a site. A good time to do this is while you are traveling between projects. As you read more specifications and QC manuals you will see that there are basically two types, ones that are written well and those that are written poorly. Well written specifications make it easier to obtain the information you need to do your job. The ones that are written poorly will require more of your attention to obtain the same information. Well written specifications are generally broken up into three or four sections. These sections include: • General Information such as project description, definitions, lines of authority, submittals, ect. • Products/Materials • Execution • Closeout Requirements (optional) Though you should read the entire specification, most of your efforts should be spent on the execution portion of the specification. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 20 There are several items that you should pay extreme attention to. These items include: • Can you use vehicles on the liner? • What are the requirements for fueling generators and rub sheets? • How far out from the slope do panels need to extend? • Are horizontal seams acceptable and when are they acceptable? • How often are Trial Seams needed? • How many test coupons are needed for Trial Seams? • What are the passing values for Trail Seams? • What are the Non-Destructive Test requirements? • How often are Destructive Samples to be taken? • Who marks out the Destructive Samples and who sends them to the lab? • How many test coupons are needed for field testing Destructive samples? • What amount of peel separation is acceptable? • How are repairs to be handled? • Any other information relevant to geosynthetics installation. If the project has multiple layers read all the specification sections provided. This is important because some projects require QC data on all the layers. As you are reading the specifications, note these items and anything that you feel is important. Prior to starting a project, talk to your superintendent about the specifications and make sure the other technicians are aware of what is required of them. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 21 DAILY PREPARATION Prior to going out in the field ask yourself, do I have everything that I need? It is amazing how many times equipment needed to do your job is left at the trailer, the truck, or at the hotel. Keep in mind that the following items are needed daily: • Hard Hat • Safety Vest • Safety glasses • Something to write on • Something to write with; (pen, or pencil), Pencils are preferred because they do not smear or run out of ink, they can be used out of position, it is easier to correct mistakes, and they can also be used for drafting • Eraser • Drafting supplies (Record Drawing section has details on drafting supplies) • Markers • Paint • Measuring wheel • Scientific Calculator with square root function • Scale • Field forms Carry the amount of field forms you will need for that work period. Do not carry too few as to run out or too many as to have an excessive amount of paper with you (that may sound contra productive, but with experience you will know the amount of paper work that you need). After lunch, ask do I need more supplies before heading back out. Remember, your field work time is the same as everyone else. When your crew is in the field, you are expected to be in the field. When your crew leaves for the day, you are expected to have your work complete and be prepared to leave the field with them. In conclusion, preparation prior to and throughout the project is vital to the success of the project. Please prepare accordingly. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 22 FIELD WORK DATA COLLECTION Collecting field data is the most fundamental part of your job. It is to be collected timely and accurately. There are seven Field Forms used by GSI. These forms include: • Complete Field Data Package • Material Inventory Form • PreWeld Report • Destructive Samples Report • Seam Control Report • Repair Report • Panel Placement Log These forms are not to be altered in any way or on a project by project basis. If you feel your job needs to have something added to the form, you must contact the office first. During most jobs, you may be working with a third-party inspector. Try to build good relations with the inspector. Collaborate with the inspector when necessary. However, You Are To Do Your Own Field Work. You are not to rely on the inspector’s information only. Collect your own field data. HELPFUL HINTS: Some specifications ask that you turn in a copy of your field data to the third-party Engineer daily. Give the third party a copy of your information, not your original information and ask that they return it to you with any comments within the same time period that you had to provide it to them. This will allow you to correct any mistakes there may be while still on site. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 23 FORMS COMPLETE FIELD DATA PACKAGE D/EW' ŽŵƉůĞƚĞ&ŝĞůĚĂƚĂŝƐƚŚĞŵĂŝŶƉĂŐĞŽĨƚŚĞĞŶƚŝƌĞƋƵĂůŝƚLJĐŽŶƚƌŽůĨŝĞůĚĚĂƚĂƉĂĐŬĂŐĞ͘dŚŝƐŵĂŝŶƉĂŐĞŝƐ ĨŽƌŵƵůĂƚĞĚƚŽĂƵƚŽĨŝůůĂůůƚŽƉƉŽƌƚŝŽŶƐŽĨĞĂĐŚůŽŐǁŝƚŚŝŶƚŚĞƉĂĐŬĂŐĞ͘tŚĞŶƚŚĞƋƵĂůŝƚLJĐŽŶƚƌŽůĨŝĞůĚ ĚĂƚĂŝƐĨŝŶĂůŝnjĞĚ͕ƚŚŝƐŝƐƚŚĞĨŝƌƐƚƉĂŐĞŽƵƌĐƵƐƚŽŵĞƌƐǁŝůůǀŝĞǁ͘ KŶĐĞƚŚĞĞŶƚŝƌĞĚŽĐƵŵĞŶƚŝƐĐŽŵƉůĞƚĞ͕ƚŚĞ>ŝŶĞĂƌ&ĞĞƚƚŽƚĂůǁŝůůĂƵƚŽŵĂƚŝĐĂůůLJĐĂůĐƵůĂƚĞĂŶĚĚŝƐƉůĂLJĞĚ ŽŶƚŚĞŵĂŝŶƉĂŐĞ͘ x:ŽďEĂŵĞʹdŚŝƐŝƐƚŚĞƉƌŽũĞĐƚŶĂŵĞŐŝǀĞŶďLJƚŚĞŽĨĨŝĐĞ͘ŽŶŽƚŵĂŬĞƵƉLJŽƵƌŽǁŶŶĂŵĞ͘&Žƌ ĞdžĂŵƉůĞ͕'ƌĂŶĚDĂƌĂŝƐtĂƚĞƌĐĐĞƐƐĂƐŝŶƐŝƐEKd'ƌĂŶĚDĂƌĂŝƐ͕DE͘ x:ŽďEŽ͘ʹƐƐŝŐŶĞĚďLJƚŚĞŽĨĨŝĐĞ͘ŽŶŽƚŵĂŬĞƵƉĂŶƵŵďĞƌ͘ x^ƵƉĞƌŝŶƚĞŶĚĞŶƚʹdŚĞŶĂŵĞŽĨLJŽƵƌƐƵƉĞƌŝŶƚĞŶĚĞŶƚĨŽƌƚŚŝƐƉƌŽũĞĐƚ͘ xYƵĂůŝƚLJŽŶƚƌŽůůĞƌʹzŽƵƌŶĂŵĞ͘ xDĂƚĞƌŝĂůdLJƉĞʹ/ŶĐůƵĚĞŵĂƚĞƌŝĂůƚLJƉĞ͕ƚŚŝĐŬŶĞƐƐ͕ƚĞdžƚƵƌŝŶŐĂŶĚĐŽůŽƌ;ŝĨĂƉƉůŝĐĂďůĞͿ͘džĂŵƉůĞƐ͗ ϲϬŵŝů,WdĞdžƚƵƌĞĚtŚŝƚĞ͕ϰϬŵŝů>>W^ŵŽŽƚŚůĂĐŬ͕ϴŽnj'ĞŽƚĞdžƚŝůĞ͕'ĞŽĐŽŵƉŽƐŝƚĞ͕ĞƚĐ͘ xKǁŶĞƌͲEĂŵĞŽĨƚŚĞKǁŶĞƌĨŽƌƚŚĞƉƌŽũĞĐƚ xŶŐŝŶĞĞƌʹEĂŵĞŽĨƚŚĞŶŐŝŶĞĞƌŽŵƉĂŶLJĨŽƌƚŚĞƉƌŽũĞĐƚ xŽŶƚƌĂĐƚŽƌʹEĂŵĞŽĨƚŚĞ'ĞŶĞƌĂůŽŶƚƌĂĐƚŽƌĨŽƌƚŚĞƉƌŽũĞĐƚ xWƌŝŵĂƌLJŽƌ^ĞĐŽŶĚĂƌLJʹŚĞĐŬŵĂƌŬŝĨůŽŐŝƐĨŽƌWƌŝŵĂƌLJŽƌ^ĞĐŽŶĚĂƌLJůĂLJĞƌ xWŽŶĚ͕Ğůů͕WĂĚŽƌKƚŚĞƌ;ŝ͘Ğ͘ůŽƐƵƌĞͿʹŚĞĐŬŵĂƌŬǁŚĂƚƚLJƉĞŽĨƉƌŽũĞĐƚƚŚŝƐŝƐ xĞƐĐƌŝƉƚŝŽŶʹWŚĂƐĞEƵŵďĞƌ͕ĞůůEƵŵďĞƌ͕WŽŶĚEƵŵďĞƌ͕ĞƚĐ͘ AB CDEFGH I J K L M N OPQ R S T U AB CDEFGH I J K L M N OPQ R S T U AB CDEFGH I J K L M N OPQ R S T U AB CDEFGH I J K L M N OPQ R S T U Complete Field Data is the main page of the entire quality control field data package. This main page is formulated to autofill all top portions of each log within the package. When the quality control field data is finalized, this is the first page our customers will view. Once the entire document is complete, the Linear Feet total will automatically calculate and displayed on the main page. PARTS OF THE FORM: A Job Name – This is the project name given by the office. Do not make up your own name. For example, Grand Marais Water Access Basins is NOT Grand Marais, MN. B Job No. – Assigned by the office. Do not make up a number. C Superintendent – The name of your superintendent for this project. D Quality Controller – Your name. E Material Type – Include material type, thickness, texturing and color (if applicable). Examples: 60mil HDPE Textured White, 40mil LLDPE Smooth Black, 8oz Geotextile, Geocomposite, etc. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 24 F Owner – Name of the Owner for the project G Engineer – Name of the Engineer Company for the project H Contractor – Name of the General Contractor for the project I Primary or Secondary – Check mark if log is for Primary or Secondary layer J Pond, Cell, Pad or Other (i.e. Closure) – Check mark what type of project this is K Description – Phase Number, Cell Number, Pond Number, etc. L Technician’s Names – Crewmen names responsible for welding on project M Machine Number – Machine associated with a listed technician responsible for it on project N Linear Feet – total linear feet welded by listed technician. Will automatically fill in as the rest of logs are filled in with data throughout the project. This number will constantly change until the entire package has been complete O PPI Peel FUSION – Passing Peel minimum value for FUSION to be obtained from the project specifications P PPI Peel EXTRUSION – Passing Peel minimum value for EXTRUSION to be obtained from the project specifications Q PPI SHEAR – Passing SHEAR minimum value for Fusion and Extrusion to be obtained from the project specifications R Air Pressure Test – PSI minimum obtained from the project specification S Air Pressure Hold Time – Test duration obtained from project specification T Allowable Air Pressure Loss – PSI for acceptable drop is obtained from the project specification U Notes – Additional information, if not, leave blank GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 25 MATERIAL INVENTORY FORM MATERIAL INVENTORY FORM Page 1 of 10 PROJECT NAME: PROJECT NO.:QC NAME: MATERIAL TYPE: ROLL NUMBER PANEL/ROLL SIZE SQUARE FOOT COMMENTS START Inventory Rev 190114 CONTROLLED DOCUMENT PARTS OF THE FORM: A Project Name — This is the project name given by the office. Do not make up your own name. For example, Ameren Duck Creek is Ameren Duck Creek NOT Canton IL. B Project Number — Assigned by the office. Do not make up a number. C Material Type — Examples 60 mil HD, 40 mil LLDPE, Composite (Include Material Type, Thickness, and Texturing) D Date E Name — Your Name F Page Number G Roll Number — Manufactures Roll Number found on the core or outer wrapping H Panel Roll Size — The dimension of the roll or panel. Example: A 60 mil GSE Textured HDPE roll is 22’ x 520. I Square Foot — The multiplication of the dimension. That is 22 x 520 = 11440 sf. J Comments — Any additional information. FILLING OUT THE FORM 1. Inventory Forms are to be filled out at the BEGINNING and END of the project. 2. File Completed Paperwork in a Completed Paperwork File. MATERIAL INVENTORY FORM Page 1 of 2 PROJECT NAME:(DATE)PROJECT NO.: MATERIAL TYPE: ROLL NUMBER PANEL/ROLL SIZE SQUARE FOOT COMMENTS END Inventory Rev 190114 CONTROLLED DOCUMENT GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 26 PREWELD REPORT WZt>ZWKZd ŽƵďůĞĐŚĞĐŬLJŽƵƌǁŽƌŬĂŶĚŵĂŬĞƐƵƌĞĂůůƐĞĐƚŝŽŶƐŽĨƚŚĞƚŽƉŽĨƚŚŝƐůŽŐŝƐƉƌĞͲĨŝůůĞĚĨƌŽŵƚŚĞD/E W'͘/ĨƚŚĞD/EW'ǁĂƐĨŝůůĞĚŽƵƌƉƌŽƉĞƌůLJ͕LJŽƵǁŽƵůĚŶŽƚŚĂǀĞƚŽĞĚŝƚĂŶLJŽĨƚŚĞƚŽƉƉŽƌƚŝŽŶ͘/Ĩ LJŽƵĨŝŶĚĂŶĞƌƌŽƌ͕ŐŽďĂĐŬƚŽƚŚĞŵĂŝŶƉĂŐĞƚŽŵĂŬĞĐŽƌƌĞĐƚŝŽŶƐͲƚŚŝƐǁŝůůĂƐƐƵƌĞƚŚĞƌĞƐƚŽĨLJŽƵƌ ĚŽĐƵŵĞŶƚƐŚĂǀĞƚŚĞĐŽƌƌĞĐƚŝŶĨŽƌŵĂƚŝŽŶ͘ xtĞůĚĂƚĞʹĂƚĞŽĨƚƌŝĂůƐĞĂŵ x>ŝŶĞƌdLJƉĞʹDĂƚĞƌŝĂůƚLJƉĞďĞŝŶŐǁĞůĚĞĚ;^ͬ^с^ŵŽŽƚŚƚŽ^ŵŽŽƚŚ͕^ͬdс^ŵŽŽƚŚƚŽdĞdžƚƵƌĞĚ͕ dͬdсdĞdžƚƵƌĞĚƚŽdĞdžƚƵƌĞĚͿ xdŝŵĞʹdŝŵĞŽĨƚƌŝĂůƐĞĂŵ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨKƉĞƌĂƚŽƌ;ƚŚŝƐŶĂŵĞƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞĨŽƌ ĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞŶƵŵďĞƌ;ƚŚŝƐŵĂĐŚŝŶĞŶƵŵďĞƌƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞ ĨŽƌĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿdžĂŵƉůĞƐ͗tͲϭϭϮ;ǁĞůĚͿyͲϵϳ;ĞdžƚƌƵƐŝŽŶͿ xDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚ xDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞ xŵďŝĞŶƚdĞŵƉ͘ʹKƵƚĚŽŽƌĐůŝŵĂƚĞƚĞŵƉĞƌĂƚƵƌĞĂƚƚŚĞƚŝŵĞŽĨƚƌŝĂůƐĞĂŵ xŽƵƉŽŶƐʹdŚĞŶƵŵďĞƌŽĨƐĂŵƉůĞƐĂƌĞƚŽďĞŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WŽƌ&Ϳ A B C D E F G H I J KA B C D E F G H I J KA B C D E F G H I J K PARTS OF THE FORM: A Weld Date – Date of trial seam B Liner Type – Material type being welded (S/S = Smooth to Smooth, S/T = Smooth to Textured, T/T = Textured to Textured) C Time – Time of trial seam D Operator Name – Name of Operator (this name should also be listed on the main page for accurate reporting) E Machine No. – Machine number (this machine number should also be listed on the main page for accurate reporting) Examples: W-112 (weld) X-97 (extrusion) F Machine Speed – Wedge speed G Machine Temp. – Wedge or Barrel temperatures H Preheat Temp. – Preheat temperature I Ambient Temp. – Outdoor climate temperature at the time of trial seam J Coupons – The number of samples are to be obtained from the project specification K Test Results – Pass or Fail (P or F) GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 27 FILLING OUT THE FORM 1. Have the technicians test their own trial seams whenever possible. Explain to the technicians in a morning meeting that they need a trial seam every X-Hours, X-number of peels, X-number of shears, the values required to pass the test, and that any incursion into the weld is a failure. Explain that a failed trial seams is not a “Big Thing.” A failed Destructive Test is a “Big Thing.” The Trial Seam is to make sure equipment is running right. 2. KNOW YOUR SPECIFICATION. Each specification deals with failed trial seams differently. Some specifications will require a retest until a passing test is obtained. Other specifications may require two consecutive passing trial seams for each failure. So once again: KNOW YOUR SPECIFICATION. 3. Collect Trial Seam Form at the end of every day 4. Place a new Trial Seam Form at the tensiometer every morning. 5. Start each day with Page 1. 6. Start each day with Trial Seam number one. 7. File Completed Paperwork In a Completed Paperwork File. 8. If a multilayer system is being installed (primary and secondary liners), keep trial seam separated by layer. Trial seams for the primary layer should be on separate forms from trial seams for the secondary layer. HELPFUL HINTS: Use Military Time when filling out the forms, this avoids the need to include am/pm and possible confusion from such. Midnight 12:00 am is 0000, Noon 12:00 pm is 1200, 7:00 am is 0700, 5:00 pm is 1700. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 28 DESTRUCTIVE SAMPLES REPORT /ĨƚŚĞƉƌŽũĞĐƚLJŽƵĂƌĞŽŶŚĂƐŵƵůƚŝƉůĞůĂLJĞƌƐ;ƐƵĐŚĂƐĂƉƌŝŵĂƌLJĂŶĚƐĞĐŽŶĚĂƌLJůŝŶĞƌͿƐƚĂƌƚĚĞƐƚƌƵĐƚ ŶƵŵďĞƌƐǁŝƚŚ^Ͳϭ͕^ͲϮ͕^ͲϯĂŶĚƐŽŽŶĂŶĚƐŽĨŽƌƚŚĨŽƌ^ĞĐŽŶĚĂƌLJ͘&ŽƌWƌŝŵĂƌLJůĂLJĞƌƐ͕ƐƚĂƌƚĚĞƐƚƌƵĐƚ ŶƵŵďĞƌƐǁŝƚŚWͲϭ͕WͲϮ͕WͲϯĂŶĚƐŽŽŶĂŶĚƐŽĨŽƌƚŚ͘ x͘^͘EŽ͘ʹĞƐƚƌƵĐƚŝǀĞ^ĂŵƉůĞƚĞƐƚŶƵŵďĞƌ x^ĞĂŵEŽ͘ʹWĂŶĞůŶƵŵďĞƌƐǁŚĞƌĞƚŚĞƐĂŵƉůĞǁĂƐƚĂŬĞŶĨƌŽŵ xtĞůĚĂƚĞʹĂƚĞƚŚĞƐĞĂŵǁĂƐǁĞůĚĞĚ xKƉĞƌĂƚŽƌEĂŵĞʹdĞĐŚŶŝĐŝĂŶǁŚŽƉĞƌĨŽƌŵĞĚƚŚĞƐĞĂŵďĞŝŶŐƚĞƐƚĞĚ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞƚŚĂƚƉĞƌĨŽƌŵĞĚƚŚĞƐĞĂŵďĞŝŶŐƚĞƐƚĞĚ xDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚ xDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞ xŽƵƉŽŶƐʹdŚĞŶƵŵďĞƌŽĨƐĂŵƉůĞƐĂƌĞƚŽďĞŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿ A B C D E F G H I JABCDEFGHIJABCDEFGHIJ PARTS OF THE FORM: A D.S. No. – Destructive Sample test number B Seam No. – Panel numbers where the sample was taken from C Weld Date – Date the seam was welded D Operator Name – Technician who performed the seam being tested E Machine No. – Machine that performed the seam being tested F Machine Speed – Wedge speed G Machine Temp. – Wedge or Barrel temperatures H Preheat Temp. – Preheat temperature I Coupons – The number of samples are to be obtained from the project specification J Test Results – Pass or Fail (P = Pass or F = Fail) GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 29 FILLING OUT THE FORM 1. Run form continuously and file when each page is completed. 2. If the project you are on has multiple layers (such as a primary and secondary liner) start destruct numbers with DS-1, DS-2, DS-3 and so on and so forth for Secondary. For Primary layers, start destruct numbers with DP-1, DP- 2, DP-3 and so on and so forth. 3. If the project you are on has multiple cells or ponds (for example Pond 1, Pond 2 and Pond 3) Start panel numbers at DP-1001 for pond 1, DP-2001 for Pond 2, and DP-3001 for Pond 3, or 1DP-001 for Pond 1, 2DP-001 for Pond 2, and 3DP-001 for Pond 3. TRACKING A FAILED DESTRUCTIVE Tracking a failed destructive test will be outlined in the project specifications. However, there are some fundamentals that must be followed. A failing destructive must be tracked each direction to passing destructive tests. These additional destructive tests may or may not be on the same seam as the original destructive test and possibly on a seam welded on different days. In the panel seaming section you were asked to place each welder on their own welding form and to keep up with seaming as it occurred. Tracking a failed destructive is easier if you follow this method. Locate the seaming form that contains the seam with the failed destructive. Follow the times that the welder performed each seam to track the weld path. By convention, the retest destructive tests will have an A and B component. The A component represents all welding that occurred after the destructive was placed. The B component represents all welding that occurred before the destructive was placed (A=After, B=Before). If the retest fails, the next test in the After direction will be A1and the retest in the B direction will be B1 If these test fail, the next test numbers will be A2 and B2. For example, if DP-002 fails the rest sequence will be DP-002A, DP-002A1, DP-002A3, DP-002B, DP-002B1, DP-002B2 ect. When tracking a failed destructive test, the seam segment between retest must be logged on the Repair Form. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 30 SEAM CONTROL REPORT ^ĞĂŵŽŶƚƌŽůĂŶĚEŽŶͲĞƐƚƌƵĐƚŝǀĞdĞƐƚZĞƉŽƌƚ ^ĞĂŵŽŶƚƌŽů xĂƚĞʹĂƚĞƐĞĂŵǁĂƐǁĞůĚĞĚ x^ĞĂŵEŽ͘ʹ^ĞĂŵŶƵŵďĞƌŝƐĂĐŽŵďŝŶĂƚŝŽŶŽĨƚǁŽǁĞůĚĞĚƉĂŶĞůƐ͘&ŽƌĞdžĂŵƉůĞ͕WĂŶĞůϭ;WϭͿ ǁĞůĚĞĚƚŽWĂŶĞůϮ;WϮͿǁŽƵůĚďĞWϭͬWϮ͘ůǁĂLJƐůŝƐƚƐŵĂůůĞƌŶƵŵďĞƌĨŝƌƐƚ͘ x^ĞĂŵ>ĞŶŐƚŚʹdŚĞůĞŶŐƚŚŽĨƚŚĞƐĞĂŵĂƚǁŚŝĐŚƚǁŽƉĂŶĞůƐĂƌĞǁĞůĚĞĚ͘dŚĞƐĞĂŵůĞŶŐƚŚŵĂLJ ďĞůŽŶŐĞƌƚŚĂŶƉĂŶĞůŝĨƚŚĞƉĂŶĞůŝƐŽĚĚƐŚĂƉĞĚĂŶĚŵĞĂƐƵƌĞĚŝŶƚŚĞŵŝĚĚůĞ͘ xdŝŵĞtĞůĚĞĚʹdŚĞƚŝŵĞƚŚĞǁĞůĚĞƌƐƚĂƌƚĞĚƚŚĞƐĞĂŵ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨƚŚĞŽƉĞƌĂƚŽƌƚŚĂƚǁĞůĚĞĚƚŚĞƐĞĂŵ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞŶƵŵďĞƌ;ƚŚŝƐŵĂĐŚŝŶĞŶƵŵďĞƌƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞ ĨŽƌĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿdžĂŵƉůĞƐ͗tͲϭϭϮ;ǁĞůĚͿyͲϵϳ;ĞdžƚƌƵƐŝŽŶͿ xDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚ xDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞƐ EŽŶͲĞƐƚƌƵĐƚŝǀĞdĞƐƚŝŶŐ xdĞƐƚĂƚĞʹĂƚĞŽĨƚĞƐƚŝŶŐ xdĞƐƚdLJƉĞʹŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ͕^ƉĂƌŬƚĞƐƚŝŶŐ͕ŝƌ>ĂŶĐĞƚĞƐƚŝŶŐ͕sĂĐƵƵŵƚĞƐƚŝŶŐ xddŝŵĞ/ŶͬW^//ŶʹdĞƐƚƐƚĂƌƚƚŝŵĞŽŶĂŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ xddŝŵĞKƵƚͬW^/KƵƚʹdĞƐƚĞŶĚƚŝŵĞŽŶĂŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ xW^/>ŽƐƐʹůůŽǁĂďůĞĂŝƌƉƌĞƐƐƵƌĞůŽƐƐŝƐŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶƐ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿ A B C D E F G H I J K L M N OABCDEFGHIJKLMNOABCDEFGHIJKLMNO PARTS OF THE FORM: SEAM CONTROL A Date – Date seam was welded B Seam No. – Seam number is a combination of two welded panels. For example, Panel 1 (P1) welded to Panel 2 (P2) would be P1/P2. Always list smaller number first. C Seam Length – The length of the seam at which two panels are welded. The seam length may be longer than panel if the panel is odd shaped and measured in the middle. D Time Welded – The time the welder started the seam E Operator Name – Name of the operator that welded the seam F Machine No. – Machine number (this machine number should also be listed on the main page for accurate reporting) Examples: W-112 (weld) X-97 (extrusion) G Machine Speed – Wedge speed H Machine Temp. – Wedge or Barrel temperatures I Preheat Temp. – Preheat temperatures NON-DESTRUCTIVE TESTING J Test Date – Date of testing K Test Type – Air pressure testing, Spark testing, Air Lance testing, Vacuum testing L AT Time In/PSI In – Test start time on air pressure testing M AT Time Out/PSI Out– Test end time on air pressure testing N PSI Loss – Allowable air pressure loss is obtained from the project specifications O Test Results – Pass or Fail (P = Pass or F = Fail) GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 31 FILLING OUT THE FORM 1. A seam Number is a combination of two welded panels. For example, Panel P-001 welded to P-002 would be seam P-001/002. Panel P-006 Welded to Panel P-165 would be P-006/165. If welding a combination of seams or a tie-in, COMBINING SEAMS IS NOT ACCEPTABLE. EACH SEAM MUST BE LOGGED INDIVIDUALLY! For example, if floor Panel P-001 is going to be welded to slope panels P-014, P-015, P-016, P-017, P-018, DO NOT log as P-001/1014-018. Each seam segment must be logged individually as P-001/014; P-001/015; P-001/016; P-001/017; and P-001/018. 2. Do not file form with completed paperwork until all areas have been filled out. 3. When Multiple Layers are being installed, start secondary panels with an S-prefix (S-001/002) and Primary panels with a P-prefix (P-001/002). 4. If doing multiple cells or ponds, Start panels with prefix and pond number (Pond 1 P-1001/002, Pond 2 P-001/002, Pond 3 P-3001/002). 5. Keep up with logging as welding happens. 6. Use separate forms for each welder. 7. Start new forms Daily and Start Page Numbers at 1 each day. 8. If two panels have never been welded before (including a tie-in to an existing liner), then the seam needs to be recorded on a Seaming Form. This includes extrusion welds. Do not log these seams as repairs because they are not repairs, they are seams. 9. If a seam has been welded before, then it is a repair and needs to be on the Repair Form. 10. ALWAYS LOG THE LOWER PANEL NUMBER FIRST. P-002/001 is incorrect. This should be P-001/002. Look to see what is around you, take a deep breath and log it right. 11. Occasionally a repair will need to be logged on a seaming log. This generally happens for a fusion repair. Remember to log the Panel first and then the REPAIR NUMBER. For example, Seam P-001/002 need a 15-foot cap (repair number R-15). This would be logged as P-001/R-15. Do not Forget to log the other side, P-002/R-15. 12. At a three or four panel intersection that you know will be capped or patched the seam between the panels does not have to be logged. If you do log the seam you will need to identify the repair in the comments section by Repair Number. HELPFUL HINTS: Keep each welder on his or her own set of seaming forms. This will make it easier to check against the other forms. Also, if a failed Destructive Tests needs to be tracked this will make that process easier. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 32 REPAIR REPORT ZW/ZZWKZd/E' xZĞƉĂŝƌEƵŵďĞƌʹdŽƌƵŶĐŽŶƐĞĐƵƚŝǀĞůLJ͘Zϭ͕ZϮ͕Zϯ͕ĞƚĐ͘ xĂŵĂŐĞŽĚĞʹĂŵĂŐĞĐŽĚĞƐƉƌŽǀŝĚĞĚĂĨƚĞƌƚŝƚůĞƉŽƌƚŝŽŶŽĨĚŽĐƵŵĞŶƚ͘hƐĞ ĂĐĐŽƌĚŝŶŐůLJ x^ĞĂŵEƵŵďĞƌʹ^ĞĂŵŶƵŵďĞƌŝƐĂĐŽŵďŝŶĂƚŝŽŶŽĨƚǁŽǁĞůĚĞĚƉĂŶĞůƐ͘&ŽƌĞdžĂŵƉůĞ͕ WĂŶĞůϭ;WϭͿǁĞůĚĞĚƚŽWĂŶĞůϮ;WϮͿ͘ůǁĂLJƐůŝƐƚƚŚĞƐŵĂůůĞƌŶƵŵďĞƌĨŝƌƐƚ͘ xWĂŶĞůEƵŵďĞƌʹWĂŶĞůŶƵŵďĞƌĂƚǁŚŝĐŚƚŚĞƌĞƉĂŝƌŚĂƐďĞĞŶŵĂĚĞ x>ŽĐĂƚŝŽŶʹŽŵƉĂƐƐĚŝƌĞĐƚŝŽŶĂƚǁŚŝĐŚƚŚĞƌĞƉĂŝƌŝƐůŽĐĂƚĞĚ͘džĂŵƉůĞ͗ϭϯϲ͛E;EŽƌƚŚͿΘ ϭϭ͛;ĂƐƚͿ xZĞƉĂŝƌdLJƉĞʹWсWĂƚĐŚ͕сĂƉ͕сŽŽƚ xWĂƚĐŚ;&ĞĞƚͿʹdŚĞƐŝnjĞŽĨƚŚĞƌĞƉĂŝƌŝŶĨĞĞƚ͘džĂŵƉůĞ͗ϮyϮ͕Ϯyϰ͕ϯyϮϲ͕ĞƚĐ͘ x^&dŽƚĂůʹ^ƋƵĂƌĞĨĞĞƚƚŽƚĂůŽĨƌĞƉĂŝƌ͘dŚŝƐǁŝůůĂƵƚŽŵĂƚŝĐĂůůLJĨŝůůŝŶŽŶĐĞƚŚĞƉĂƚĐŚƐŝnjĞ ŚĂƐďĞĞŶĞŶƚĞƌĞĚ͘ xĂƚĞtĞůĚĞĚʹĂƚĞƌĞƉĂŝƌǁĂƐŵĂĚĞ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨƚĞĐŚŶŝĐŝĂŶƚŚĂƚƉĞƌĨŽƌŵĞĚƚŚĞƌĞƉĂŝƌ xĂƚĞŽŵƉůĞƚĞĚʹĂƚĞƚŚĞƌĞƉĂŝƌǁĂƐĐŽŵƉůĞƚĞĚ xdĞƐƚdLJƉĞʹŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ͕^ƉĂƌŬƚĞƐƚŝŶŐ͕ŝƌ>ĂŶĐĞƚĞƐƚŝŶŐ͕sĂĐƵƵŵƚĞƐƚŝŶŐ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐͬ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿĨŽƌƌĞͲƚĞƐƚ xĂƚĞŽĨZĞͲdĞƐƚʹĂƚĞŽĨǁŚŝĐŚƚŚĞƌĞͲƚĞƐƚǁĂƐƉĞƌĨŽƌŵĞĚ͕ŝĨĂƉƉůŝĐĂďůĞ AA B C D E F G H I J K L M NABCDEFGHIJKLMN PARTS OF THE FORM: A Repair Number – To run consecutively. R1, R2, R3, etc. B Damage Code – Damage codes provided after title portion of document. Use accordingly C Seam Number – Seam number is a combination of two welded panels. For example, Panel 1 (P1) welded to Panel 2 (P2). Always list the smaller number first. D Panel Number – Panel number at which the repair has been made E Location – Compass direction at which the repair is located. Example: 136’ N (North) & 11’ E (East) F Repair Type – P = Patch, C = Cap, B = Boot G Patch (Feet) – The size of the repair in feet. Example: 2X2, 2X4, 3X26, etc. H SF Total – Square feet total of repair. This will automatically fill in once the patch size has been entered. I Date Welded – Date repair was made J Operator Name – Name of technician that performed the repair K Date Completed – Date the repair was completed L Test Type – Air pressure testing, Spark testing, Air Lance testing, Vacuum testing M Test Results – Pass/Fail (P = Pass or F = Fail) for re-test N Date of Re-Test – Date of which the re-test was performed, if applicable GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 33 FILLING OUT THE FORM 1. Keep the form in the field until sheet is filled out. 2. Patch is any repair that is less than half a roll width in any direction. 3. Cap is greater than half a roll width in any direction. 4. Marking Repair Locations: Multiple Panel Intersection – Easiest to locate. In Seam/Panel No. list the panels that intersect in panel ascending order. P-001/002/003/004 not P-001/003/004/002. In location section write Intersection. Repairs on a seam – Must have a N, S, E or W component. List N, S, E or W component as the direction of travel. That is a repair on seam P-001/002 45 N indicates you started at the south end of the seam and went 45 feet to the north. Remember panels zero out at a cross seam. Repairs on panels – The most difficult to log. Must have a N/S and an E/W component. A repair on panel P-003 100 N, 10 E indicates you went 100 ft from the south end of the panel and 10 feet east. Do not log a repair on a panel with a seam number. That is if the repair is on panel P-003 100 N , 10 E DO NOT WRITE P-003/004 100 N, 10 E (this is a seam repair). 5. Repairs on weld log should be marked as “See Weld Log + Date of Weld Log”. HELPFUL HINTS: A patch is any repair that is less than half a roll width in any direction A cap is greater than half a roll width in any direction When marking repair locations: Multiple Panel Intersection – Easiest way to locate is to list the panels that intersect in panel ascending order. For example: P1/ P2/P3/P4, in the LOCATION section, type out “INTERSECTION” instead of listing the cross intersected panels. Repairs on a seam – Must have a N, S, E, or W component. List N, S, E, or W component as the direction of travel. Example: There is a repair on seam P1/P2 45’ N. That indicates you started at the south end of the seam and went up 45 feet to the north. Remember panels zero out at cross seams. Repairs on panels – The most difficult to log. Must have a N/S and an E/W component. For example: a repair on panel P3 100’ N, 10’ E indicates you went 100 feet from the south end of the panel and then 10 feet east. Do not log a repair on a panel with a seam number if the repair is on a panel. Try to record Repair locations starting on one side of the site. Always try to measure in the same direction. This makes it easier for others looking at our information to follow how the work progressed. Jumping from one direction to another at different areas of the job site will cause confusion in your logs that you may not be aware of. Remember that other people, that are not on the jobsite with you daily, have to review your paperwork (i.e. engineers). GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 34 PANEL PLACEMENT LOG WE>W>DEd xWĂŶĞůEƵŵďĞƌʹWĂŶĞůŶƵŵďĞƌŝŶƐĞƋƵĞŶĐĞŽĨǁŚĂƚŚĂƐďĞĞŶĚĞƉůŽLJĞĚ xZŽůůEƵŵďĞƌʹDĂŶƵĨĂĐƚƵƌĞƌ͛ƐƌŽůůŶƵŵďĞƌƉƌŽǀŝĚĞĚŽŶƚŚĞŵĂƚĞƌŝĂů x/ŶƐƚĂůůĂƚŝŽŶĂƚĞʹĂƚĞŽĨǁŚŝĐŚƚŚĞŵĂƚĞƌŝĂůǁĂƐůĂŝĚ;ƚŚŝƐŝƐŝŵƉŽƌƚĂŶƚƚŽŵĂŬĞƐƵƌĞƚŚĞĚĂŝůLJ ƚŽƚĂůƐĐŽŝŶĐŝĚĞǁŝƚŚŽƚŚĞƌĂĚŵŝŶŝƐƚƌĂƚŝǀĞƌĞƉŽƌƚƐͿ xDĂƚĞƌŝĂůdLJƉĞʹDĂƚĞƌŝĂůďĞŝŶŐŝŶƐƚĂůůĞĚ;ŝŶĐůƵĚĞŵĂƚĞƌŝĂůƚLJƉĞ͕ƚŚŝĐŬŶĞƐƐĂŶĚƚĞdžƚƵƌŝŶŐͿ xtŝĚƚŚʹtŝĚƚŚŽĨƚŚĞƉĂŶĞů x>ĞŶŐƚŚʹ>ĞŶŐƚŚŽĨƚŚĞƉĂŶĞů x^ƋƵĂƌĞ&ŽŽƚĂŐĞʹtŝůůĂƵƚŽŵĂƚŝĐĂůůLJĐĂůĐƵůĂƚĞǁŚĞŶƚŚĞǁŝĚƚŚĂŶĚůĞŶŐƚŚĂƌĞĞŶƚĞƌĞĚ xĂŝůLJdŽƚĂůƐʹtŝůůĂƵƚŽŵĂƚŝĐĂůůLJĐĂůĐƵůĂƚĞǁŚĞŶƚŚĞǁŝĚƚŚ͕ůĞŶŐƚŚĂŶĚƐƋƵĂƌĞĨŽŽƚĂŐĞĂƌĞ ĞŶƚĞƌĞĚ WĂŶĞůŵƵƐƚŚĂǀĞĂŶĂƉƉƌŽdžŝŵĂƚĞĚŝŵĞŶƐŝŽŶŽĨĂƚůĞĂƐƚŚĂůĨĂƌŽůůǁŝĚƚŚŝŶďŽƚŚĚŝƌĞĐƚŝŽŶƐ;ϭϬĨĞĞƚyϭϬĨĞĞƚͿ͘dŚĞ ĂƌĞĂŽĨĂƐƋƵĂƌĞŽƌƌĞĐƚĂŶŐůĞŝƐǁŝĚƚŚdžůĞŶŐƚŚ͘dŚĞĂƌĞĂŽĨĂƌŝŐŚƚƚƌŝĂŶŐůĞŝƐЪǁŝĚƚŚdžůĞŶŐƚŚ͘DŽƐƚŽĚĚͲƐŚĂƉĞĚ ƉĂŶĞůƐĐĂŶďĞƌĞĚƵĐĞĚƚŽĂƐĞƌŝĞƐŽĨƌĞĐƚĂŶŐůĞƐ;ƐƋƵĂƌĞƐͿŽƌƌŝŐŚƚƚƌŝĂŶŐůĞƐ͘/ĨůĞƐƐƚŚĂŶŚĂůĨĂƌŽůůǁŝĚƚŚ͕ĐĂůůŝƚĂĐĂƉ ŽƌĂŶĞdžƚĞŶƐŝŽŶĂŶĚůŽŐŝƚŽŶƚŚĞZĞƉĂŝƌ&Žƌŵ͘ZĞŵĞŵďĞƌĂƉĂŶĞůŵĂLJďĞĂĨƵůůƌŽůůŽƌĂƉŽƌƚŝŽŶŽĨĂƌŽůů͘/ĨƚŚĞĨƵůů ƌŽůůŝƐŶŽƚƵƐĞĚ͕ŵĂŬĞƐƵƌĞƚŚĞƌĞŵĂŝŶŝŶŐƉĂƌƚŝĂůƌŽůůŝƐŵĂƌŬĞĚǁŝƚŚƚŚĞƌŽůůŶƵŵďĞƌ͘DĞĂƐƵƌĞŽĚĚƐŚĂƉĞƉĂŶĞůƐ ƚŚƌŽƵŐŚƚŚĞĐĞŶƚĞƌŽĨƚŚĞƉĂŶĞůĂŶĚŶŽƚƚŚĞĞĚŐĞƐ͘ /ĨƚŚĞƉƌŽũĞĐƚLJŽƵĂƌĞŽŶŚĂƐŵƵůƚŝƉůĞůĂLJĞƌƐ;ƐƵĐŚĂƐƉƌŝŵĂƌLJĂŶĚƐĞĐŽŶĚĂƌLJůŝŶĞƌͿƐƚĂƌƚĂŶĞǁƉůĂĐĞŵĞŶƚůŽŐĨŽƌ ĞĂĐŚůĂLJĞƌ͘Wϭ;WĂŶĞůϭͲƉƌŝŵĂƌLJůĂLJĞƌͿƐŚŽƵůĚďĞƚŚĞƐƚĂƌƚĨŽƌůŽŐŐŝŶŐƚŚĞƉƌŝŵĂƌLJůĂLJĞƌ͘^Ϯ;WĂŶĞůϮͲƐĞĐŽŶĚĂƌLJ ůĂLJĞƌͿƐŚŽƵůĚďĞƚŚĞƐƚĂƌƚĨŽƌůŽŐŐŝŶŐƚŚĞƐĞĐŽŶĚĂƌLJůĂLJĞƌ͘ <ĞĞƉŝŶŵŝŶĚƚŚĂƚƉůĂĐĞƉĂŶĞůƐĐĂŶďĞĐƵƚĂŶĚƚŚĞĐƵƚƐĞĐƚŝŽŶŵĂLJďĞƐĐƌĂƉƉĞĚŽƌƵƐĞĚŝŶĂŶŽƚŚĞƌůŽĐĂƚŝŽŶ͕ƐƵĐŚĂƐ ĂĐŽƌŶĞƌ͘zŽƵDh^dĂĐĐŽƵŶƚĨŽƌƚŚŽƐĞĐƵƚƐĞĐƚŝŽŶƐ͘hŶůĞƐƐĂƉĂŶĞůŝƐĐƵƚ͕ƚŚĞǁŝĚƚŚǁŝůůŶŽƚĐŚĂŶŐĞ͘ A B C D E F G H PARTS OF THE FORM: A Panel Number – Panel number in sequence of what has been deployed B Roll Number – Manufacturer’s roll number provided on the material C Installation Date – Date of which the material was laid (this is important to make sure the daily totals coincide with other administrative reports) D Material Type – Material being installed (include material type, thickness and texturing) E Width – Width of the panel F Length – Length of the panel G Square Footage – Will automatically calculate when the width and length are entered H Daily Totals – Will automatically calculate when the width, length and square footage are entered FILLING OUT THE FORM 1. Start a NEW FORM DAILY. 2. Page Number Starts at 1 EACH DAY. 3. A Panel Must Have an Approximate Dimension of at Least Half a Roll Width in Both Directions (~11 feet x 11’ feet). If Less Than Half a Roll Width, Call it a Cap or an Extension and Log it on the Repair Form. 4. Remember a Panel may be a full roll or a portion of a roll. If the full roll is not used make sure the remaining partial is marked with the ROLL NUMBER. 5. If the project you are on has multiple layers (such as a primary and secondary liner) start panel numbers S-001 for secondary and P-001 for Primary Liners. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 35 6. If the project you are on has multiple cells or ponds (for example Pond 1, Pond 2 and Pond 3) Start panel numbers at P-1001 for pond 1, P-2001 for Pond 2, and P-3001 for Pond 3, or 1P-001 for Pond 1, 2P-001 for Pond 2, and 3P-001 for Pond 3. 7. Keep in mind that place panels can be cut, and the cut section may be scrapped or used in another location such as a corner. You must account for those cut sections. 8. Unless a panel is cut, the width will not change. 9. The area of a square or rectangle is width x length. 10. The Area of a right triangle is ½ width x length. 11. Most odd shaped panels can be reduced to a series of rectangles (squares) or right triangles. 12. Measure odd shape panels through the center of the panel and not the edges. 13. File Completed Paperwork in a Completed Paperwork File. HELPFUL HINTS: A Panel must have an approximate dimension of at least half a roll width in both directions (10 feet X 10 feet). The area of a square or rectangle is width x length. The area of a right triangle is ½ width x length. Most odd-shaped panels can be reduced to a series of rectangles (squares) or right triangles. If less than half a roll width, call it a cap or an extension and log it on the Repair Form. Remember a panel may be a full roll or a portion of a roll. If the full roll is not used, make sure the remaining partial roll is marked with the roll number. Measure odd shape panels through the center of the panel and not the edges. If the project you are on has multiple layers (such as primary and secondary liner) start a new placement log for each layer. P1 (Panel 1-primary layer) should be the start for logging the primary layer. S2 (Panel 2-secondary layer) should be the start for logging the secondary layer. Keep in mind that place panels can be cut and the cut section may be scrapped or used in another location, such as a corner. You MUST account for those cut sections. Unless a panel is cut, the width will not change. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 36 CHECKING DATA GENERAL As mentioned earlier, collection of the field data is the most fundamental part of your job. However, checking the data is probably the most important part. Inaccurate or erroneous data is useless. You are required to check your data daily. Do not assume that everything you have done in the field is completely correct. Everyone makes mistakes. It is better to correct these mistakes while you are in the field rather than when your data arrives in the office. The field forms have been setup with redundancies to assist with checking the data. If you find a mistake while you are onsite it will be easier to go and look at the liner and correct your mistake. The following sections outline what data checks should be made. MATERIAL INVENTORY FORM GENERAL 1. Are Sections A – F filled out? 2. Are Sections G – I filled out? GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 37 PREWELD FORM WZt>ZWKZd ŽƵďůĞĐŚĞĐŬLJŽƵƌǁŽƌŬĂŶĚŵĂŬĞƐƵƌĞĂůůƐĞĐƚŝŽŶƐŽĨƚŚĞƚŽƉŽĨƚŚŝƐůŽŐŝƐƉƌĞͲĨŝůůĞĚĨƌŽŵƚŚĞD/E W'͘/ĨƚŚĞD/EW'ǁĂƐĨŝůůĞĚŽƵƌƉƌŽƉĞƌůLJ͕LJŽƵǁŽƵůĚŶŽƚŚĂǀĞƚŽĞĚŝƚĂŶLJŽĨƚŚĞƚŽƉƉŽƌƚŝŽŶ͘/Ĩ LJŽƵĨŝŶĚĂŶĞƌƌŽƌ͕ŐŽďĂĐŬƚŽƚŚĞŵĂŝŶƉĂŐĞƚŽŵĂŬĞĐŽƌƌĞĐƚŝŽŶƐͲƚŚŝƐǁŝůůĂƐƐƵƌĞƚŚĞƌĞƐƚŽĨLJŽƵƌ ĚŽĐƵŵĞŶƚƐŚĂǀĞƚŚĞĐŽƌƌĞĐƚŝŶĨŽƌŵĂƚŝŽŶ͘ xtĞůĚĂƚĞʹĂƚĞŽĨƚƌŝĂůƐĞĂŵ x>ŝŶĞƌdLJƉĞʹDĂƚĞƌŝĂůƚLJƉĞďĞŝŶŐǁĞůĚĞĚ;^ͬ^с^ŵŽŽƚŚƚŽ^ŵŽŽƚŚ͕^ͬdс^ŵŽŽƚŚƚŽdĞdžƚƵƌĞĚ͕ dͬdсdĞdžƚƵƌĞĚƚŽdĞdžƚƵƌĞĚͿ xdŝŵĞʹdŝŵĞŽĨƚƌŝĂůƐĞĂŵ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨKƉĞƌĂƚŽƌ;ƚŚŝƐŶĂŵĞƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞĨŽƌ ĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞŶƵŵďĞƌ;ƚŚŝƐŵĂĐŚŝŶĞŶƵŵďĞƌƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞ ĨŽƌĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿdžĂŵƉůĞƐ͗tͲϭϭϮ;ǁĞůĚͿyͲϵϳ;ĞdžƚƌƵƐŝŽŶͿ xDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚ xDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞ xŵďŝĞŶƚdĞŵƉ͘ʹKƵƚĚŽŽƌĐůŝŵĂƚĞƚĞŵƉĞƌĂƚƵƌĞĂƚƚŚĞƚŝŵĞŽĨƚƌŝĂůƐĞĂŵ xŽƵƉŽŶƐʹdŚĞŶƵŵďĞƌŽĨƐĂŵƉůĞƐĂƌĞƚŽďĞŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WŽƌ&Ϳ A B C D E F G H I J KA B C D E F G H I J KA B C D E F G H I J K GENERAL 1. Are Sections A – X filled out? If Air Temp and Material Type (Column P and Column Q) are not required, Place an NA in the top box and line to the bottom of the column. 2. Renumber Column M in Time Ascending Order. PREWELD FORM CHANGE TO PRE WELD FORM Trial No. Date of Trial Time of Trial Trial No.Date of Trial Time of Trial 1 12/31/09 850 3 12/31/09 850 2 12/31/09 830 2 12/31/09 830 3 12/31/09 815 1 12/31/09 815 4 12/31/09 900 4 12/31/09 900 3. Use Military Time. 4. Are Trial Seams within the time limits indicated in Column H. If the specification requires Trial Seams every 4 hours, are the trial seams for each welder within that 4-hour limit (exclude lunch time). 5. Are the tested Peel Values (Column V) greater than or equal to the specified values (Column J and K)? 6. Are the tested Shear Values (Column W) greater than or equal to the specified values (Column L)? 7. Do all the values pass? 8. Start a new Trial Weld Form Each Day. 9. Start at Trial Seam No 1 each Day. TRACKING A FAILED TRIAL SEAM Tracking a failed trial seam is dependent on the project specifications. It is not uncommon to have specifications that allow for retesting of a failed trial seam until passing tests are obtained. It is also common to allow for one retest and if this retest fails two passing retests are required. Additionally, some specifications will require two passing trial seams for each failure. Once again KNOW YOUR SPECIFICATION. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 38 Failed trial seams must be tracked to passing trial seams. This is easy to do if you follow the subsequent convention: Technician XX Fails Trial Seam No. 2. He retests. This test number is now 2R1. 2R1 fails and now XX needs two passing trial seams. These retests would be 2R2 and 2R3. TRIAL WELD FORM Trial No.Date of Trial Pass/Fail 2 12/31/09 F 2R1 12/31/09 F 2R2 12/31/09 P 2R3 12/31/09 P DESTRUCTIVE TEST FORM /ĨƚŚĞƉƌŽũĞĐƚLJŽƵĂƌĞŽŶŚĂƐŵƵůƚŝƉůĞůĂLJĞƌƐ;ƐƵĐŚĂƐĂƉƌŝŵĂƌLJĂŶĚƐĞĐŽŶĚĂƌLJůŝŶĞƌͿƐƚĂƌƚĚĞƐƚƌƵĐƚ ŶƵŵďĞƌƐǁŝƚŚ^Ͳϭ͕^ͲϮ͕^ͲϯĂŶĚƐŽŽŶĂŶĚƐŽĨŽƌƚŚĨŽƌ^ĞĐŽŶĚĂƌLJ͘&ŽƌWƌŝŵĂƌLJůĂLJĞƌƐ͕ƐƚĂƌƚĚĞƐƚƌƵĐƚ ŶƵŵďĞƌƐǁŝƚŚWͲϭ͕WͲϮ͕WͲϯĂŶĚƐŽŽŶĂŶĚƐŽĨŽƌƚŚ͘ x͘^͘EŽ͘ʹĞƐƚƌƵĐƚŝǀĞ^ĂŵƉůĞƚĞƐƚŶƵŵďĞƌx^ĞĂŵEŽ͘ʹWĂŶĞůŶƵŵďĞƌƐǁŚĞƌĞƚŚĞƐĂŵƉůĞǁĂƐƚĂŬĞŶĨƌŽŵ xtĞůĚĂƚĞʹĂƚĞƚŚĞƐĞĂŵǁĂƐǁĞůĚĞĚ xKƉĞƌĂƚŽƌEĂŵĞʹdĞĐŚŶŝĐŝĂŶǁŚŽƉĞƌĨŽƌŵĞĚƚŚĞƐĞĂŵďĞŝŶŐƚĞƐƚĞĚ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞƚŚĂƚƉĞƌĨŽƌŵĞĚƚŚĞƐĞĂŵďĞŝŶŐƚĞƐƚĞĚxDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚxDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞ xŽƵƉŽŶƐʹdŚĞŶƵŵďĞƌŽĨƐĂŵƉůĞƐĂƌĞƚŽďĞŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿ A B C D E F G H I JABCDEFGHIJABCDEFGHIJ GENERAL 1. Are Sections A – 5 filled out? 2. Do Columns M, N, and P on the Destructive Test Form correspond to Columns J, H, and I on the Panel Seaming Form? 3. Do Columns M and S on the Destructive Test Form correspond to Columns H and I on the Repair Form? 4. Do the vales in Column P of the Destructive Test Form meet or exceed the values of H or Column I on the Destructive Test Form? 5. Do the vales in Column O of the Destructive Test Form meet or exceed the values of K on the Destructive Test Form? 6. Consecutively number Sample I.D. (Column M on the Destructive Test Form. File the completed page when all information on the sheet has been filed out. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 39 SEAM CONTROL FORM ^ĞĂŵŽŶƚƌŽůĂŶĚEŽŶͲĞƐƚƌƵĐƚŝǀĞdĞƐƚZĞƉŽƌƚ ^ĞĂŵŽŶƚƌŽů xĂƚĞʹĂƚĞƐĞĂŵǁĂƐǁĞůĚĞĚ x^ĞĂŵEŽ͘ʹ^ĞĂŵŶƵŵďĞƌŝƐĂĐŽŵďŝŶĂƚŝŽŶŽĨƚǁŽǁĞůĚĞĚƉĂŶĞůƐ͘&ŽƌĞdžĂŵƉůĞ͕WĂŶĞůϭ;WϭͿǁĞůĚĞĚƚŽWĂŶĞůϮ;WϮͿǁŽƵůĚďĞWϭͬWϮ͘ůǁĂLJƐůŝƐƚƐŵĂůůĞƌŶƵŵďĞƌĨŝƌƐƚ͘ x^ĞĂŵ>ĞŶŐƚŚʹdŚĞůĞŶŐƚŚŽĨƚŚĞƐĞĂŵĂƚǁŚŝĐŚƚǁŽƉĂŶĞůƐĂƌĞǁĞůĚĞĚ͘dŚĞƐĞĂŵůĞŶŐƚŚŵĂLJ ďĞůŽŶŐĞƌƚŚĂŶƉĂŶĞůŝĨƚŚĞƉĂŶĞůŝƐŽĚĚƐŚĂƉĞĚĂŶĚŵĞĂƐƵƌĞĚŝŶƚŚĞŵŝĚĚůĞ͘ xdŝŵĞtĞůĚĞĚʹdŚĞƚŝŵĞƚŚĞǁĞůĚĞƌƐƚĂƌƚĞĚƚŚĞƐĞĂŵ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨƚŚĞŽƉĞƌĂƚŽƌƚŚĂƚǁĞůĚĞĚƚŚĞƐĞĂŵ xDĂĐŚŝŶĞEŽ͘ʹDĂĐŚŝŶĞŶƵŵďĞƌ;ƚŚŝƐŵĂĐŚŝŶĞŶƵŵďĞƌƐŚŽƵůĚĂůƐŽďĞůŝƐƚĞĚŽŶƚŚĞŵĂŝŶƉĂŐĞ ĨŽƌĂĐĐƵƌĂƚĞƌĞƉŽƌƚŝŶŐͿdžĂŵƉůĞƐ͗tͲϭϭϮ;ǁĞůĚͿyͲϵϳ;ĞdžƚƌƵƐŝŽŶͿ xDĂĐŚŝŶĞ^ƉĞĞĚʹtĞĚŐĞƐƉĞĞĚ xDĂĐŚŝŶĞdĞŵƉ͘ʹtĞĚŐĞŽƌĂƌƌĞůƚĞŵƉĞƌĂƚƵƌĞƐ xWƌĞŚĞĂƚdĞŵƉ͘ʹWƌĞŚĞĂƚƚĞŵƉĞƌĂƚƵƌĞƐ EŽŶͲĞƐƚƌƵĐƚŝǀĞdĞƐƚŝŶŐ xdĞƐƚĂƚĞʹĂƚĞŽĨƚĞƐƚŝŶŐ xdĞƐƚdLJƉĞʹŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ͕^ƉĂƌŬƚĞƐƚŝŶŐ͕ŝƌ>ĂŶĐĞƚĞƐƚŝŶŐ͕sĂĐƵƵŵƚĞƐƚŝŶŐ xddŝŵĞ/ŶͬW^//ŶʹdĞƐƚƐƚĂƌƚƚŝŵĞŽŶĂŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ xddŝŵĞKƵƚͬW^/KƵƚʹdĞƐƚĞŶĚƚŝŵĞŽŶĂŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ xW^/>ŽƐƐʹůůŽǁĂďůĞĂŝƌƉƌĞƐƐƵƌĞůŽƐƐŝƐŽďƚĂŝŶĞĚĨƌŽŵƚŚĞƉƌŽũĞĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶƐ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐŽƌ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿ A B C D E F G H I J K L M N OABCDEFGHIJKLMNOABCDEFGHIJKLMNO GENERAL 1. Are Sections A – Q filled out? 2. Seaming Date (Column G) cannot be before panel placement date (Column I on the Panel Placement Form) 3. Place Trial Seam Number (Column M on Trial Seam Form) that corresponds to the seaming time in Column O on Panel Seaming Form. Trial No.Date of Trial Time of Trial Technicians Initials Welder Type Wedge Barrel Speed Preheat 1 12/31/09 800 XX F-85 750 6 Seam No Date Time Seam Length Seamer Int Machine No Wedge Barrel Speed Preheat Trial No. P-001/002 12/31/09 830 150 XX F-85 750 6 1 1. Is the time on the Panel Seaming Form (Column K) earlier or later than the time in Column O of the Trial Seam Form? If the time on the Panel Seaming Form is earlier than the time on the Trial Seam Form YOU HAVE A PROBLEM. 2. Does the Tech and Machine number (Columns H & I on the Panel Seaming Form) match the Technician Initials and. and Welder Type (Columns R & S) in the Trial Seam Form? 3. Place Destructive Test Number in Comments section (Column P) on the Panel Seaming form if applicable. 4. Non-Destructive Testing Completed (Column Q on the Panel Seaming Form) will be discussed in the next section Non- Destructive Testing Form. 5. File Panel Seaming Form in a “Completed Field Work” file when all the columns, Including Column Q have been completed. 6. Start a New Panel Seaming Form per Welder Each Day and restart page number (Column F on the Panel Seaming Form) at 1 each day. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 40 TRACKING SEAMING Periodically copy your Field Drawing. Take a highlighter and highlight the seams “AS THEY APPEAR ON YOUR PANEL SEAMING FORM. Do not assume that you have logged all seams. Check each seam individually. Any area that is not highlighted at the end of this exercise has not been logged on the Panel Seaming Form. Go back out to the field and log the missing seams. NON-DESTRUCTIVE TESTING GENERAL 1. Are Sections A – U filled out? 2. Is Test Date (Column M on the Non-Destructive Testing Form) before the weld date (Column H on the Panel Seaming form)? 3. Is psi start (Column P) equal to or greater than Start Pressure (Column G)? 4. Is psi start (Column P) minus psi end(Column Q) less than or equal to Accept. Drop (Column I)? IF NOT, YOU HAVE PROBLEMS! (P - Q) ≤ I 5. Is Time End (Column S) minus Time Start (Column R) greater than or equal to Test Time (Column H)? IF NOT, YOU HAVE PROBLEM(S – R) ≥ H 6. Remember tracking format from Filling Out in the Non-Destructive Testing Field Work section: ELOS is Entire Length of Seam and seam segments must be in the form of SEOS-100, 100-250, 250-275 Capped by R15, 467-NEOS. 7. Check Seam Number (Column L) against Test Location (Column U). If the Seam is Completed, find corresponding seam on the Panel Seaming Form and place the completion date in the Non-Destructive Testing Complete (Column Q) on the Panel Seaming Form. 8. Do not assume that, “We welded today and we air tested to day so all the seams we welded are air tested”. Go through each non-destructive test individually. 9. When Column Q on the Panel Seaming Form is completed, file the form in a Completed Field Work file. 10. Remember a partially tested seam may possibly complete the Panel Seaming Form. For example: If seam P-001/002 is 500 ft and tech XX welded from the SEOS to 250 N, and welder YY welded from 250 N to NEOS and nondestructive testing was completed form 250 N to NEOS, this section can be logged on the Panel Seaming Form for that corresponding seam segment. If that completes that Panel seaming Form, file it. However, the seam segment from the SEOS to 250 N is not completed and the form needs to stay in the field. 11. File completed Non-Destructive Form in a Completed Field Work file. 12. Start a new Non-Destructive Testing Form daily and start at page number 1. TRACKING SEAMING Periodically copy your Field Drawing. Take a highlighter and highlight the seams “AS THEY APPEAR ON YOUR NON-DESTRUCTIVE TESTING FORM. Do not assume that you have logged all seams. Check each seam individually. Any area that is not highlighted at the end of this exercise has not been logged on the Non-destructive Testing Form. Go back out to the field and log the missing seams. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 41 REPAIR FORM ZW/ZZWKZd/E' xZĞƉĂŝƌEƵŵďĞƌʹdŽƌƵŶĐŽŶƐĞĐƵƚŝǀĞůLJ͘Zϭ͕ZϮ͕Zϯ͕ĞƚĐ͘xĂŵĂŐĞŽĚĞʹĂŵĂŐĞĐŽĚĞƐƉƌŽǀŝĚĞĚĂĨƚĞƌƚŝƚůĞƉŽƌƚŝŽŶŽĨĚŽĐƵŵĞŶƚ͘hƐĞĂĐĐŽƌĚŝŶŐůLJ x^ĞĂŵEƵŵďĞƌʹ^ĞĂŵŶƵŵďĞƌŝƐĂĐŽŵďŝŶĂƚŝŽŶŽĨƚǁŽǁĞůĚĞĚƉĂŶĞůƐ͘&ŽƌĞdžĂŵƉůĞ͕WĂŶĞůϭ;WϭͿǁĞůĚĞĚƚŽWĂŶĞůϮ;WϮͿ͘ůǁĂLJƐůŝƐƚƚŚĞƐŵĂůůĞƌŶƵŵďĞƌĨŝƌƐƚ͘ xWĂŶĞůEƵŵďĞƌʹWĂŶĞůŶƵŵďĞƌĂƚǁŚŝĐŚƚŚĞƌĞƉĂŝƌŚĂƐďĞĞŶŵĂĚĞ x>ŽĐĂƚŝŽŶʹŽŵƉĂƐƐĚŝƌĞĐƚŝŽŶĂƚǁŚŝĐŚƚŚĞƌĞƉĂŝƌŝƐůŽĐĂƚĞĚ͘džĂŵƉůĞ͗ϭϯϲ͛E;EŽƌƚŚͿΘϭϭ͛;ĂƐƚͿ xZĞƉĂŝƌdLJƉĞʹWсWĂƚĐŚ͕сĂƉ͕сŽŽƚxWĂƚĐŚ;&ĞĞƚͿʹdŚĞƐŝnjĞŽĨƚŚĞƌĞƉĂŝƌŝŶĨĞĞƚ͘džĂŵƉůĞ͗ϮyϮ͕Ϯyϰ͕ϯyϮϲ͕ĞƚĐ͘ x^&dŽƚĂůʹ^ƋƵĂƌĞĨĞĞƚƚŽƚĂůŽĨƌĞƉĂŝƌ͘dŚŝƐǁŝůůĂƵƚŽŵĂƚŝĐĂůůLJĨŝůůŝŶŽŶĐĞƚŚĞƉĂƚĐŚƐŝnjĞŚĂƐďĞĞŶĞŶƚĞƌĞĚ͘xĂƚĞtĞůĚĞĚʹĂƚĞƌĞƉĂŝƌǁĂƐŵĂĚĞ xKƉĞƌĂƚŽƌEĂŵĞʹEĂŵĞŽĨƚĞĐŚŶŝĐŝĂŶƚŚĂƚƉĞƌĨŽƌŵĞĚƚŚĞƌĞƉĂŝƌ xĂƚĞŽŵƉůĞƚĞĚʹĂƚĞƚŚĞƌĞƉĂŝƌǁĂƐĐŽŵƉůĞƚĞĚ xdĞƐƚdLJƉĞʹŝƌƉƌĞƐƐƵƌĞƚĞƐƚŝŶŐ͕^ƉĂƌŬƚĞƐƚŝŶŐ͕ŝƌ>ĂŶĐĞƚĞƐƚŝŶŐ͕sĂĐƵƵŵƚĞƐƚŝŶŐ xdĞƐƚZĞƐƵůƚƐʹWĂƐƐͬ&Ăŝů;WсWĂƐƐŽƌ&с&ĂŝůͿĨŽƌƌĞͲƚĞƐƚ xĂƚĞŽĨZĞͲdĞƐƚʹĂƚĞŽĨǁŚŝĐŚƚŚĞƌĞͲƚĞƐƚǁĂƐƉĞƌĨŽƌŵĞĚ͕ŝĨĂƉƉůŝĐĂďůĞ AA B C D E F G H I J K L M NABCDEFGHIJKLMN GENERAL 1. Are Sections A – P filled out? 2. Check Repair Tech (Column K on Repair Form) with Technicians Initials (Column R on Trial Weld Form). 3. Is Test Date(Column N on Repair Form) before Repair Date (Column J on Repair Form? 4. Run Page Number Consecutively. 5. File Form when all fields have been completed. PANEL PLACEMENT FORM WE>W>DEd xWĂŶĞůEƵŵďĞƌʹWĂŶĞůŶƵŵďĞƌŝŶƐĞƋƵĞŶĐĞŽĨǁŚĂƚŚĂƐďĞĞŶĚĞƉůŽLJĞĚ xZŽůůEƵŵďĞƌʹDĂŶƵĨĂĐƚƵƌĞƌ͛ƐƌŽůůŶƵŵďĞƌƉƌŽǀŝĚĞĚŽŶƚŚĞŵĂƚĞƌŝĂů x/ŶƐƚĂůůĂƚŝŽŶĂƚĞʹĂƚĞŽĨǁŚŝĐŚƚŚĞŵĂƚĞƌŝĂůǁĂƐůĂŝĚ;ƚŚŝƐŝƐŝŵƉŽƌƚĂŶƚƚŽŵĂŬĞƐƵƌĞƚŚĞĚĂŝůLJ ƚŽƚĂůƐĐŽŝŶĐŝĚĞǁŝƚŚŽƚŚĞƌĂĚŵŝŶŝƐƚƌĂƚŝǀĞƌĞƉŽƌƚƐͿ xDĂƚĞƌŝĂůdLJƉĞʹDĂƚĞƌŝĂůďĞŝŶŐŝŶƐƚĂůůĞĚ;ŝŶĐůƵĚĞŵĂƚĞƌŝĂůƚLJƉĞ͕ƚŚŝĐŬŶĞƐƐĂŶĚƚĞdžƚƵƌŝŶŐͿ xtŝĚƚŚʹtŝĚƚŚŽĨƚŚĞƉĂŶĞů x>ĞŶŐƚŚʹ>ĞŶŐƚŚŽĨƚŚĞƉĂŶĞůx^ƋƵĂƌĞ&ŽŽƚĂŐĞʹtŝůůĂƵƚŽŵĂƚŝĐĂůůLJĐĂůĐƵůĂƚĞǁŚĞŶƚŚĞǁŝĚƚŚĂŶĚůĞŶŐƚŚĂƌĞĞŶƚĞƌĞĚ xĂŝůLJdŽƚĂůƐʹtŝůůĂƵƚŽŵĂƚŝĐĂůůLJĐĂůĐƵůĂƚĞǁŚĞŶƚŚĞǁŝĚƚŚ͕ůĞŶŐƚŚĂŶĚƐƋƵĂƌĞĨŽŽƚĂŐĞĂƌĞĞŶƚĞƌĞĚ WĂŶĞůŵƵƐƚŚĂǀĞĂŶĂƉƉƌŽdžŝŵĂƚĞĚŝŵĞŶƐŝŽŶŽĨĂƚůĞĂƐƚŚĂůĨĂƌŽůůǁŝĚƚŚŝŶďŽƚŚĚŝƌĞĐƚŝŽŶƐ;ϭϬĨĞĞƚyϭϬĨĞĞƚͿ͘dŚĞĂƌĞĂŽĨĂƐƋƵĂƌĞŽƌƌĞĐƚĂŶŐůĞŝƐǁŝĚƚŚdžůĞŶŐƚŚ͘dŚĞĂƌĞĂŽĨĂƌŝŐŚƚƚƌŝĂŶŐůĞŝƐЪǁŝĚƚŚdžůĞŶŐƚŚ͘DŽƐƚŽĚĚͲƐŚĂƉĞĚ ƉĂŶĞůƐĐĂŶďĞƌĞĚƵĐĞĚƚŽĂƐĞƌŝĞƐŽĨƌĞĐƚĂŶŐůĞƐ;ƐƋƵĂƌĞƐͿŽƌƌŝŐŚƚƚƌŝĂŶŐůĞƐ͘/ĨůĞƐƐƚŚĂŶŚĂůĨĂƌŽůůǁŝĚƚŚ͕ĐĂůůŝƚĂĐĂƉ ŽƌĂŶĞdžƚĞŶƐŝŽŶĂŶĚůŽŐŝƚŽŶƚŚĞZĞƉĂŝƌ&Žƌŵ͘ZĞŵĞŵďĞƌĂƉĂŶĞůŵĂLJďĞĂĨƵůůƌŽůůŽƌĂƉŽƌƚŝŽŶŽĨĂƌŽůů͘/ĨƚŚĞĨƵůů ƌŽůůŝƐŶŽƚƵƐĞĚ͕ŵĂŬĞƐƵƌĞƚŚĞƌĞŵĂŝŶŝŶŐƉĂƌƚŝĂůƌŽůůŝƐŵĂƌŬĞĚǁŝƚŚƚŚĞƌŽůůŶƵŵďĞƌ͘DĞĂƐƵƌĞŽĚĚƐŚĂƉĞƉĂŶĞůƐƚŚƌŽƵŐŚƚŚĞĐĞŶƚĞƌŽĨƚŚĞƉĂŶĞůĂŶĚŶŽƚƚŚĞĞĚŐĞƐ͘ /ĨƚŚĞƉƌŽũĞĐƚLJŽƵĂƌĞŽŶŚĂƐŵƵůƚŝƉůĞůĂLJĞƌƐ;ƐƵĐŚĂƐƉƌŝŵĂƌLJĂŶĚƐĞĐŽŶĚĂƌLJůŝŶĞƌͿƐƚĂƌƚĂŶĞǁƉůĂĐĞŵĞŶƚůŽŐĨŽƌĞĂĐŚůĂLJĞƌ͘Wϭ;WĂŶĞůϭͲƉƌŝŵĂƌLJůĂLJĞƌͿƐŚŽƵůĚďĞƚŚĞƐƚĂƌƚĨŽƌůŽŐŐŝŶŐƚŚĞƉƌŝŵĂƌLJůĂLJĞƌ͘^Ϯ;WĂŶĞůϮͲƐĞĐŽŶĚĂƌLJůĂLJĞƌͿƐŚŽƵůĚďĞƚŚĞƐƚĂƌƚĨŽƌůŽŐŐŝŶŐƚŚĞƐĞĐŽŶĚĂƌLJůĂLJĞƌ͘ <ĞĞƉŝŶŵŝŶĚƚŚĂƚƉůĂĐĞƉĂŶĞůƐĐĂŶďĞĐƵƚĂŶĚƚŚĞĐƵƚƐĞĐƚŝŽŶŵĂLJďĞƐĐƌĂƉƉĞĚŽƌƵƐĞĚŝŶĂŶŽƚŚĞƌůŽĐĂƚŝŽŶ͕ƐƵĐŚĂƐ ĂĐŽƌŶĞƌ͘zŽƵDh^dĂĐĐŽƵŶƚĨŽƌƚŚŽƐĞĐƵƚƐĞĐƚŝŽŶƐ͘hŶůĞƐƐĂƉĂŶĞůŝƐĐƵƚ͕ƚŚĞǁŝĚƚŚǁŝůůŶŽƚĐŚĂŶŐĞ͘ A B C D E F G H GENERAL 1. Are Sections A – F filled out? 2. Are Sections G – I filled out? 3. Sum roll lengths (Column J) for each corresponding roll in Column H and place and date total in column J of the Material Inventory Form. Example: Roll 5838 is 520 feet long. Roll 5838 was used for panels P-001 (100 ft), P-002 (200), and P-003 (160 ft) 100+200+160=460 ft. 520-460=60 ft In Comments Section (J) of Material Inventory Form write 60’ remaining 12/31/10. 4. Remember to use a new form Panel Placement Form daily. 5. File completed paperwork in a “Completed Paperwork File”. This check will prevent using too much material off any roll. If your tally is larger than the roll length, you may possibly have the wrong roll number on a panel. For instance, if panels P-001+P-002+P-003=570 ft, something is wrong. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 42 RECORD DRAWING The third aspect of your position, in addition to collecting and checking the field data, is to create a field record drawing of the project that is required by most specifications. This record drawing needs to accurately reflect the panels, seams, and repairs and their relationship to each other. As you know a picture is worth a thousand words. This record drawing is used by GSI QC Staff in double checking the field data and is often submitted to the Project Owner to be meet regulatory requirements. REQUIRED INFORMATION Because the record drawing is so important it needs to accurately reflect how the material was installed, tested, and repaired. This means it needs to be done to scale and include all the information collected on the field forms. Information that needs to be included on the record drawing includes: • Panel Numbers • Seams drawn to the correct Length • Seam Orientation, especially important in corners • Destructive Test Locations • Repair Types and Locations • Site Orientation, which way is North. This may not always be the same, ask the Third-Party Engineer or the General Contactor if there is a site-specific North. The outlines that are created in the office for your use most times have a North arrow on them, but you need to verify that this is correct • Any Changes to the Layout of the Site. Sometimes the outlines and panel layouts you are provided may be different from what is being built. If this occurs, you need to track this on your record drawing. This is necessary to determine if the project got bigger or smaller so adjustments can be made to make sure GSI gets paid for the work we have done. • The correct name and location of the project and the material used. This is often also provided on panel layouts and outlines, but if it is not you need to obtain this information so company records can be updated • Information about the drawing and who completed the drawing. Note what layer and material is shown and include your name as the person who prepared the record drawing DRAFTING REQUIREMENTS To produce an accurate and complete record drawing requires some drafting skills. These skills are basic and can be aided by the proper equipment. The idea is to take something complicated and make it easier to understand. Too much information on a drawing can be as bad as too little information. Using symbols and abbreviations makes this possible. TOOLS The tools necessary to create a record drawing do not have to be complex. A piece of paper, pencil, and a simple ruler is all that would be needed to create a basic record drawing. Because not all record drawings are basic the following list of tools is recommended: GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 43 • Three sided Engineer’s Scale with 20, 30, 40, 50 and 60 feet to the inch scales • A mechanical pencil and eraser • Drafting Triangles with 30, 45, 60, and 90 degree angles • Multi-function calculator with Square Root function • T-Square or straight-edge • Drawing Board or other similar hard surface • Paper large enough to draw the project at an appropriate scale • Compass • Protractor Some people think that it is necessary to have a computer program to create an accurate record drawing. This is not true because if the information that was collected is not accurate the drawing will not be accurate either. THE COMPUTER CANNOT MAKE A GOOD DRAWING FROM BAD INFORMATION. The tools listed above are a complete list of what you should have. If you do not have all these tools that is not an excuse for poor record drawings, because most drawings can be completed with three basic tools listed in the first paragraph. DRAFTING STANDARDS For your record drawing to accurately reflect the installation it must conform to some basic standards. Some of these standards are universal and some are company specific. • Scale: Use one of the Common Engineering Scale (20, 30, 40, 50, or 60). 40 and 50 scale are the most common for the projects we do. With 60 scale it becomes too difficult to write the necessary information on the drawing because the panels are too small. 20 and 30 scale are fine for small projects and allow room for more information. You need to decide based on the size of the project and the paper you have what scale to use. 40 scale would work well in the field because every quarter inch is 10 feet if you do not have a 3-sided scale with you a regular tape measure would work. • Text should read from left to right and top to bottom without turning the sheet. Try to orient your panel numbers this way it makes it much easier to read. Not all information will be able to be placed this way due to space restrictions. • Straight, Perpendicular, and Parallel. These three concepts make drawings much easier to read. • Straight: When completing your record drawing to send to the office utilize your straight edge to make your lines straight. Do not freehand at this point, it can make drawings distorted • Perpendicular: While our panels do not always create right angles to each other, when they do it is important to draw as such. If this standard is not followed the error is multiplied across the drawing and the panels will not line-up as they do in the field • Parallel: Every roll is 22 feet wide for its entire length. So, unless a panel is trimmed to fit each panel should be parallel to the one next to it. Panels should not be drawn as 18 feet wide on the South end and 23 feet wide on the North end GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 44 • Symbols and Text. GSI has its own set of symbols to indicate different types of repairs and seams. Abbreviations are also used to identify Panels, Repairs and Destructive Tests • Patches are symbolized by a filled circle. These circles should approximate the size of the repairs • Cap Patches are symbolized by filled rectangles. Draw the rectangles the size of the repairs • Boots are symbolized by a circle with an X inside. Each pipe should be marked as a boot • Extrusion Welds are designated by a zig-zag line. This should be for the entire length of the weld • Fusion Welds are designated by a straight line • Panel Numbers should be written as described in previous sections to match the designation on the Field Forms • Repairs should be numbered as R## the same as on the Field Forms. If repairs are numbered on the Repair Forms, they need to be numbered on the Record Drawing and vice versa. Repairs do not have to be numbered unless required by the specification. Numbering does make it easier to track repairs. • Destructive Tests should be written the same as on the Field Forms as described in previous sections. Destructive Tests are symbolized as an open square followed by the Destructive Test Number. SKETCHES One of the most helpful things you can do is to create sketches of areas of the liner to be incorporated in your record drawing. Make sketches of complicated areas: corners, toe to slope tie-ins, new to old tie-ins, and any areas with multiple repairs in proximity. These sketches can be aided by pictures. If you are having trouble drawing an area take many pictures to help the drafters in the office create the record drawing. Sketches also keep your record drawing clean because it does not have to be in the field with you. Sketch the work completed each day and then add it to your record drawing. Drawing a liner installation is not always the easiest task because you are taking a three-dimensional thing and trying to represent it in two dimensions. This is especially difficult in corners and other areas where the grade change is extreme. Whatever the difficulty the drawing needs to be representative of the field data, you should not change the field data to make a drawing look better. GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 45 APPENDIX Information that may be useful to you in the field: FORMULAS L=Length W=Width R=Radius D=Diameter = R x 2 C=Circumference A=Area B=Base Length of a Right Triangle H=Height of a Right Triangle Area of a Rectangle A = L x W Area of a Right Triangle A = (B x H)/2 Length of the Long Side of a Right Triangle L = √(B2+H2) Area of a Circle A = 3.14 x R2 Circumference of a Circle C = 2 x R x 3.14 SEAM FAILURE MODES Pages 53 and 54 QC TECHNICIANS QUICK REFERENCE GUIDE Pages 55 and 56 A-SIZE BORDER WITH DRAFTING SYMBOLS Attached FIELD FORMS Attached GEO-SYNTHETICS, LLC.FIELD QUALITY CONTROL MANUAL Attached GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 46 QC TECHNICIAN QUICK REFERENCE GUIDE Panel Placement 1. Is the paperwork filled out? Trial welds 1. Is the paperwork filled out? 2. Do all the tests meet the required passing values 3. Are test within the proper time intervals Welding 1. Is the paperwork filled out? 2. Are all panels welded on the day that they were placed? 3. Do trial seams match the tech and welding machine used that day 4. Are trial seams within the proper time interval Nondestructive Testing 1. Is the paperwork filled out? 2. Do all the tests pass 3. Are the test within the proper time interval 4. Do tests correlate to welded seams and dates Destructive Testing 1. Is the paperwork filled out? 2. Do all the tests meet the required passing values 3. Does the tech and machine correlate to the tech and machine on the seaming log 4. Does the destructive location correlate to the repair location? 5. If the destructive failed, was it tracked properly Repairs 1. Is the paperwork filled out? 2. Does the repair tech have a trial seam? 3. Are Repairs located correctly on the drawing 4. Does the repair location correlate to the destructive location? GEO-SYNTHETICS SYSTEMS | 2022 STATEMENT OF QUALIFICATIONS | 47 QC TECHNICIAN QUICK REFERENCE GUIDE Drawing 1. Is your drawing up to date 2. Do repair locations and destructive locations on drawing match the repair logs Drafting Symbols 2022 Completed Projects List Project Name Foxhole Landfill 721019 Project Name IPL Ash Pond Closure 721024 Phase 1 of 3 Location Charlotte, NC Location Petersburg, Indiana Continued on Row 41 Owner Mecklenburg County, N.C.Owner Indianapolis Power & LightAddress17131 Lancaster Highway Address 6925 North State Road 57 Engineer CDM Smith - Curtis Wilson & Aaron Weispfenning Engineer ATC Group Services LLC Client Triangle Grading & Paving Client Blankenerger Brothers, Inc. Contact Bryan Coley Contact Pat Blankenburger 1 Project Type LFCell 2 Project Type Ash PondProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose Vargas QC Technician Kamphone Sisoumphou QC Technician Tramaine Watts Start Date Nov-2021 Start Date Jul-2021 Completion Date Mar-2022 Completion Date Oct-2021 Cross Section GCL Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)602,331 Quantity (SF)609,219 Subgrade (SF)1,145,977 Quantity (SF)469,350 Cross Section 60 Mil Textured Cross Section 20 Mil Rain Cover Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)596,511 Quantity (SF)609,318 Quantity (SF)217,938 Quantity (SF)684,000 Project Name Harpers Ferry WWTP 721041 Project Name East St. Louis Auto Shredding 721050 Location Harpers Ferry, Iowa Location East St. Louis, IL Owner City of Harpers Ferry Owner St. Clair CountyAddress1009 Winfield Road Address 1299 N 1st Street Engineer Davy Engineering Engineer Andrews Engineering Client Wapasha Construction Client Kolb Grading Contact Pat Doyle Contact Adam Jenkins3 Project Type Wastewater Ponds & SAGR's 4 Project Type Landfill Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Dan Rodriquez QC Technician Khamphone Sisoumphou QC Technician Dan RodriquezStart Date Nov-2021 Start Date Oct-2022 Completion Date May-2022 Completion Date Nov-2022 Cross Section 60 Mil Smooth Cross Section Cross Section 60 Mil Smooth Cross Section 12 oz. GeotextileSubgrade (SF)96,511 Quantity (SF) Subgrade (SF)195,648 Quantity (SF)226,200 Cross Section Geotextile Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF)23,520 Quantity (SF) Quantity (SF)31,283 Quantity (SF) Project Name Ameren Peru 722042 Project Name Goodell WWTP 721053 Location Peru, IL Location Goodell, IowaOwnerAmerenOwnerCity of Goodell, Iowa Address 350 5th Street Address 107 Centennial Street (Fire Station) Engineer Environmental Resources Management, Inc. Alan Cork P.E.Engineer SEH Inc. Client O6 Environmental Client Cole ExcavatingContactCody Lonas Contact Jeremy Cole 5 Project Type Ameren Remediation Site 6 Project Type WWTP Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Robert ChandlerQC Technician Robert Chandler QC Technician Tramaine Watts Start Date Oct-2022 Start Date Jun-2022 Completion Date Oct-2022 Completion Date Jun-2022 Cross Section GCL Cross Section Geocomposite Cross Section 60 Mil HD Smooth Cross Section Subgrade (SF)52,875 Quantity (SF)52,875 Subgrade (SF)103,050 Quantity (SF) Cross Section 60 Mil Textured Cross Section 8 oz. Geotextile Cross Section Cross Section Quantity (SF)18,200 Quantity (SF)36,000 Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Continued on Row 545 Project Name La Cygne Upper AQC Closure T 721059 Location Nokomis, FL Location La Cygne, KS Owner Sarasota County, FL Owner Evergy Metro, Inc. Address 4000 Knights Trail Road Address 25166 East 2200 Road Engineer Jones Edmunds Dale E. Gerber Engineer AECOM Client Glover Construction Company, Inc.Client Kissick ConstructionContactMark Short Contact Mark Rigdon 7 Project Type Landfill Expansion 8 Project Type AQC Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Sep-2021 Completion Date Oct-2022 Completion Date Dec-2021 Cross Section GCL Cross Section 60 Mil Secondary Cross Section 40 Mil Micro Spike Cross Section Subgrade (SF)2,353,987 Quantity (SF)2,376,692 Subgrade (SF)1,437,480 Quantity (SF) Cross Section 60 Mil Primary Cross Section Primary Geocomposite Cross Section Closure Turf Cross Section Quantity (SF)2,365,547 Quantity (SF)2,142,058 Quantity (SF)1,437,480 Quantity (SF) Project Name Pleasant Prairie LF Closure 722003 Project Name Prince Specialty Products 722010 Location Pleasant Prairie, WI Location New Johnsonville, TN Owner WE Energies Owner Prince Specialty Products Address 8000 95th Street Address 795 Foote Lane Engineer GEI Consultants Engineer ARCADIS US, Inc.Client Edgerton Contractors, Inc.Client Vaughn Contractors, Inc. Contact Ryan Murphey Contact Kevin Little 9 Project Type Landfill Closure 10 Project Type Basin Project Manager Cesar Gonzalez Project Manager Steve BrothersSuperintendentVince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robare Long Start Date Oct-2022 Start Date Jul-2022 Completion Date Oct-2022 Completion Date Sep-2022 Page 1 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Cross Section 40 Mil LL Textured Cross Section Cross Section 60 Mil HDPE Tex/Smooth Cross SectionSubgrade (SF)143,520 Quantity (SF) Subgrade (SF)424,600 Quantity (SF) Cross Section Geocomposite Cross Section Cross Section 8oz. Geotextile Cross Section Quantity (SF)145,020 Quantity (SF) Quantity (SF)234,841 Quantity (SF) Project Name Williams Conway Brine 722005 Project Name Munger Landing Geotube Pad 722032 Location McPhereson, KS Location Duluth, MNOwnerWilliamsOwnerEPA, MPCA, US Army Corps of Engineers & WDNR Address 775 Landmark Road Address Clyde Ave Engineer Audubon Engineering Nicole Bruno Engineer US Army Corps of Engineers Client Prairie Landworks Inc.Client J.F. Brennan Company, Inc.Contact Tom Saffel Contact Casey Evensen 11 Project Type Pond 12 Project Type Geotube Pad Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Vince Sisoumphou Viruth Long Superintendent Vince Sisoumphou Raul NQC Technician Kamphone Sisoumphou Robare Long QC Technician Khamphone Sisoumphou Start Date Mar-2022 Start Date Aug-2022 Completion Date On-Going Completion Date Sep-2022 Cross Section 60 Mil Tex/Smooth Primary Cross Section Geocomposite Cross Section 40 Mil Cross Section Subgrade (SF)659,891 Quantity (SF)659,891 Subgrade (SF)435,561 Quantity (SF) Cross Section 60 Mil Tex/Smooth Secondary Cross Section Geonet Cross Section 8 oz. Geotextile Cross Section Quantity (SF)659,891 Quantity (SF)659,891 Quantity (SF)731,200 Quantity (SF) Project Name Alliant Energy Columbia PP 722011 Project Name Alliant Energy Lansing 722012 Location Pardeeville, WI Location Lansing, Iowa Owner Alliant Energy Owner Alliant Energy Address W8375 Murray Road Address 2320 Power Plant Drive Engineer SCS Engineers Zana Bajalan Engineer Infrastructure Alternatives, Inc. Client Ames Construction Client Ames Construction, Inc.Contact Brad Folczyk - Clint Berning Contact Andrew Reynolds 13 Project Type Pond Closure 14 Project Type Tube Laydown Pads Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Vince SisoumphouQC Technician Robert Chandler Dan Rodriguez QC Technician Kamphone Sisoumphou Start Date Oct-2022 Start Date Jul-2022 Completion Date Nov-2022 Completion Date Jul-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil HDPE Textured Cross Section Subgrade (SF)317,100 Quantity (SF)36,000 Subgrade (SF)308,947 Quantity (SF) Cross Section 60 Mil HDPE Textured Cross Section Cross Section Cross Section Quantity (SF)318,099 Quantity (SF) Quantity (SF) Quantity (SF) Project Name US Steel Granite City 722013 Project Name Ponds Behind Erie Pier 722014 T&M Repair Project Location Granite City, IL Location Duluth, MN Owner US Steel Owner EPA, MPCA, US Army Corps of Engineers & WDNR Address 2000 Edwardsville Road Address 199 S. 40th Avenue W Engineer Weaver Consultants Group John Bossert Engineer N/AClientDunnett Bay Construction Client EQM Contact Lucas Kessling Contact Gary Butcher 15 Project Type Cap & Landfill 16 Project Type Pond Project Manager Steve Brothers Project Manager Steve Brothers Allen BullockSuperintendentFrank Mata Superintendent Viruth Long QC Technicians Jesus Salazar, Saul Rivas, Frank Mata QC Technician Viruth Long Start Date Jun-2022 Start Date Apr-2022 Completion Date Sep-2022 Completion Date 4-112-22 Cross Section 40 & 60 Mil HDPE Cross Section Geocomposite & Textile Cross Section Liner Repair Only Cross Section Subgrade (SF)1,232,774 Quantity (SF)1,186,125 Subgrade (SF) Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Wisconsin Dells WWTP 722015 Project Name New Indy Pad 5 722016 T&M Project Location Wisconsin Dells, WI Location Catawba, SC Owner City of Wisconsin Dells Owner Dredge America Address 2 Bowman Road Address 5298 Cureton Ferry RoadEngineerMSA Professional Services, Inc.Engineer N/A Client Olympic Builders Client Dredge America Contact Justin Yahnke Contact Sam Robinson Jake Stockham 17 Project Type Digester Tank Liners 18 Project Type Tube PadsProject Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Raul Nieves QC Technician Robert Chandler QC Technician Raul Nieves Start Date Oct-2022 Start Date May-2022 Completion Date Dec-2022 Completion Date May-2022 Cross Section Cross Section 10 oz. Geotextile Cross Section N/A Cross Section Subgrade (SF) Quantity (SF)1,280 Subgrade (SF) Quantity (SF)Cross Section 30 Mil RPE Cross Section Cross Section Cross Section Quantity (SF)1,280 Quantity (SF) Quantity (SF) Quantity (SF) Page 2 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Gerald Gentlemen Station 722017 Project Name LASWA Phase IV Cell 2 722018 Part 1 of 3 Location Sutherland, NE Location Valentine, NE Phase 4 Cell 2 Owner Nebraska Public Power District Owner Lexington Area Solid Waste Agency Part 2 & 3 on Row 494AddressNE-25 Sutherland, NE Address 76460 Hwy 21 Engineer Golder Associates Engineer HDR Client Myers Construction Client Perrett Construction Ltd. Contact Josh Swift, Alecs Rummery Contact Rob Wemhoff 19 Project Type Supply Impoundment Area 20 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Frank Mata QC Technician Tramaine Watts Start Date Sep-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section GCL Cross Section 8 oz. GeotextileSubgrade (SF)148,810 Quantity (SF) Subgrade (SF)291,592 Quantity (SF)291,592 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Textured Cross Section Rain Cover R12BV Quantity (SF)143,780 Quantity (SF) Quantity (SF)291,592 Quantity (SF)251,860 Project Name Elkhart County LF 722019 Project Name Quad Cities Landfill Phase IV 722020 Location Elkhart, IN Location Milan, IL Owner Elkhart County LF Owner Millenium Waste Inc.Address 59530 Co. Rd 7 Address 13606 Knoxville Road Engineer IngenAE Engineer Weaver Consultants Group Client C & E Excavating, Inc.Client Millennium Waste Incorporated Contact Jeff Bonadies Contact Dominic Remmes21 Project Type Landfill 22 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Raul Nieves QC Technician Tramaine Watts QC Technician Raul NievesStart Date Nov-2022 Start Date Sep-2022 Completion Date Nov-2022 Completion Date Nov-2022 Cross Section 60 Mil HDT Cross Section 16 oz. Geotextile Cross Section 60 Mil Textured Cross Section RainflapSubgrade (SF)385,400 Quantity (SF)385,400 Subgrade (SF)182,000 Quantity (SF)23,230 Cross Section Geocomposite Cross Section Cross Section Geotextile Cross Section Quantity (SF)33,500 Quantity (SF) Quantity (SF)177,800 Quantity (SF) Project Name Northshore Mining VSF Cover 722021 Project Name Jeffrey Energy Center 722022 Location Babbit, MN Location St. Mary's, KansasOwnerCleveland -Cliffs Northshore Mine Owner Evergy, Inc. Address Country Road 70 Address 25905 Jeffrey Road Engineer WSP Golder Engineer SCS Engineers Client Hoover Construction Co.Client Schmidtlein Excavating, Inc.Contact Craig Spry Contact Jeremy Schmidtlein 23 Project Type Mine 24 Project Type Landfill Cell1C Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose VargasQC Technician Kamphone Sisoumphou QC Technician Saul Rivas Start Date Jun-2022 Start Date Sep-2022 Completion Date Jun-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section 40 Mil LLDPE Cross Section Subgrade (SF)363,868 Quantity (SF) Subgrade (SF)145,600 Quantity (SF) Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)145,600 Quantity (SF) Project Name Bonneville County Landfill 722023 Project Name ALCOA Bauxite Closure 722024 Part 1 of 3 Location Idaho Falls, ID Location Bryant, AR Phase 1 Owner Bonneville County Owner Alcoa USA Corp Brown Mud Lake Part 2 & 3 on Row 528 Address 9449 E. Sunnyside Road Address 2300 County Road 2 Engineer Great West Engineering Engineer Civil & Environmental Consultants, Inc. (CEC) Client Whitaker Construction Co., Inc.Client McGeorge Contracting Company, Inc.Contact Paul Christensen Contact Anthony Jones Kem McBride 25 Project Type Landfill 26 Project Type Closure Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Dan RodriquezQC Technician Saul Rivas QC Technician Dan Rodriquez Start Date Sep-2022 Start Date Aug-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil LLDPE Cross Section 60 Mil Subgrade (SF)814,138 Quantity (SF)828,000 Subgrade (SF)881,920 Quantity (SF)35,000 Cross Section 60 Mil HDPE Cross Section Cross Section Geocomposite Cross Section Quantity (SF)816,859 Quantity (SF) Quantity (SF)881,920 Quantity (SF) Page 3 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Grand Marais Water Basin 722025 Project Name NE Ottertail LF 722026 Location Grand Marais, MN Location New York Mills, MN Owner Minnesota Dept. of Natural Resources Owner Ottertail County Dept. Solid WasteAddress114 S 8th Ave Address 50356 Landfill Road Engineer MnDNR Jon Hendrickson Engineer FOTH Client KGM Contractors Inc.Client Hough Incorporated Contact Heath Line Contact Mike Hough & Bryce Moen 27 Project Type Basin 28 Project Type LandfillProject Manager Steve Brothers Project Manager Steve Brothers Superintendent Vince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robert Chandler Start Date Jul-2022 Start Date Oct-2022 Completion Date Jul-2022 Completion Date Oct-2022 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Tex & Smooth Cross SectionSubgrade (SF)11,077 Quantity (SF) Subgrade (SF)51,668 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Ameren Champaigne MGP 722038 T&M Project Project Name Polk County Landfill 722028 Location Edwardsville, IL Location Gentilly, MN Owner Ameren Champaigne MGP Owner Polk County , MNAddress470 West Union Street Address 15764 270th Street Engineer Environmental Resources Management Engineer Stantec Client 06 Environmental Client RJ Zavoral & Sons Contact Cody Lonas Contact Dan Zavoral & Nick Carlin29 Project Type Remediation 30 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Jose Vargas Superintendent Vince Sisoumphou QC Technician Saul Rivas QC Technician Khamphone SisoumphouStart Date Aug-2022 Start Date Jul-2022 Completion Date Aug-2022 Completion Date Aug-2022 Cross Section N/A Cross Section Cross Section 60 Mil & 40 Mil Cross SectionSubgrade (SF) Quantity (SF) Subgrade (SF)415,152 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Litchfield WWTP 722031 Project Name McAlester Equalization Basin 722048 Location Litchfield, IL Location McAlester, OKOwnerCity of Litchfield Owner City of McAlester Address 1350 E Ryder Street Address 1360 E. Krebs Ave Engineer City Engineer Plummer & Associates Client Korte & Luitjohan Client Downey Contracting, LLCContactGreg Korte Contact Dalton McCaskill 31 Project Type WWTP 32 Project Type Basin Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Viruth Long Superintendent Robert ChandlerQC Technician Robare Long QC Technician Robert Chandler Start Date Sep-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Nov-2022 Cross Section 45 Mil Duraskrim Cross Section Cross Section 60 Mil HD Cross Section Subgrade (SF)87,702 Quantity (SF) Subgrade (SF)148,882 Quantity (SF) Cross Section Cross Section Cross Section 10 oz. Geotextile Cross Section Quantity (SF) Quantity (SF) Quantity (SF)148,552 Quantity (SF) Page 4 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Blaines Farm & Fleet 722036 T&M Project Project Name Morgan County LF 722049 Location Rhinelander, WI Location Fort Morgan, CO Owner Blaines Farm & Fleet Owner Morgan County, ColoradoAddress1601 E Timber Drive Address 21448 Road 22 Engineer TRC Environmental Corp Engineer American Environmental Consulting (AEC) Client Musson Bros.Client Morgan County Contact Jeff Vandersanden Contact Cass Yearous 33 Project Type Pond 34 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Viruth Long QC Technician Robare Long QC Technician Tramaine Watts Start Date Oct-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Dec-2022 Cross Section 30 Mil Cross Section Cross Section GCL Cross SectionSubgrade (SF)59,400 Quantity (SF) Subgrade (SF)278,650 Quantity (SF) Cross Section Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF) Quantity (SF) Quantity (SF)280,368 Quantity (SF) Project Name Minnesota Boswell LF Closure 722039 Project Name MEC Walter Scott 722040 Location Cohasset, MN Location Council Bluffs, Iowa Owner Allete Inc.Owner Mid American Energy Address 1210 NW 3rd Street Address 7215 Navajo Street Engineer BARR Engineering Engineer HDR Client TNT Construction Group, LLC Client J.J. Westhoff Construction Co. Contact Dominic Ellison Contact Jerry Westhoff35 Project Type Ash Pond 36 Project Type Cap Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Frank Mata QC Technician Robare Long QC Technician Tramaine WattsStart Date Sep-2022 Start Date Oct-2022 Completion Date Sep-2022 Completion Date Oct-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section 60 Mil HDPE DT Cross Section Transnet 250-2-8Subgrade (SF)503,272 Quantity (SF) Subgrade (SF)369,341 Quantity (SF)221,980 Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)363,700 Quantity (SF) Page 5 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name LASWA Phase IV Cell 2 722018 Part 2 of 3 Project Name LASWA Phase IV Cell 2 722018 Part 3 of 3 Location Valentine, NE Partial Closure Phase 1&2 Location Valentine, NE Leahcate Pond Lining Owner Lexington Area Solid Waste Agency Owner Lexington Area Solid Waste AgencyAddress76460 Hwy 21 Address 76460 Hwy 21 Engineer HDR Engineer HDR Client Perrett Construction Ltd.Client Perrett Construction Ltd. Contact Rob Wemhoff Contact Rob Wemhoff 37 Project Type Landfill 38 Project Type LandfillProject Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Tramaine Watts QC Technician Tramaine Watts Start Date Jul-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section GCL Cross Section 12oz. NW GeotextileSubgrade (SF)278,793 Quantity (SF) Subgrade (SF)43,028 Quantity (SF)43,028 Cross Section Geocomposite Cross Section Cross Section 60 Mil HDPE Tex Cross Section Quantity (SF)278,793 Quantity (SF) Quantity (SF)43,028 Quantity (SF) Project Name IPL Ash Pond Closure 721024 Phase 2 of 3 Project Name IPL Ash Pond Closure 721024 Phase 3 of 3 Location Petersburg, Indiana Location Petersburg, Indiana Owner Indianapolis Power & Light Owner Indianapolis Power & LightAddress6925 North State Road 57 Address 6925 North State Road 57 Engineer ATC Group Services LLC Engineer ATC Group Services LLC Client Blankenerger Brothers, Inc.Client Blankenerger Brothers, Inc. Contact Pat Blankenburger Contact Pat Blankenburger39 Project Type Ash Pond 40 Project Type Ash Pond Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Jose Vargas QC Technician Tramaine Watts QC Technician Tramaine WattsStart Date Jul-2021 Start Date Jul-2021 Completion Date Oct-2021 Completion Date Oct-2021 Cross Section 40 Mil LLDPE Smooth Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)648,629 Quantity (SF)181,377 Subgrade (SF)429,343 Quantity (SF)98,623 Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)19,220 Quantity (SF)486,472 Quantity (SF)32,450 Quantity (SF)53,425 Project Name ALCOA Bauxite Closure 722024 Part 2 of 3 Project Name ALCOA Bauxite Closure 722024 Part 3 of 3 Location Bryant, AR Phase 2 Location Bryant, AR Phase 3OwnerAlcoa USA Corp Brown Mud Lake Owner Alcoa USA Corp Brown Mud Lake Address 2300 County Road 2 Address 2300 County Road 2 Engineer Civil & Environmental Consultants, Inc. (CEC)Engineer Civil & Environmental Consultants, Inc. (CEC) Client McGeorge Contracting Company, Inc.Client McGeorge Contracting Company, Inc.Contact Anthony Jones Kem McBride Contact Anthony Jones Kem McBride 41 Project Type Closure 42 Project Type Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas SuperintendentQC Technician Saul Rivas QC Technician Start Date Oct-2022 Start Date Jan-2023 Completion Date Nov-2022 Completion Date Cross Section 40 Mil LLDPE Cross Section Cross Section Cross Section Subgrade (SF)860,560 Quantity (SF) Subgrade (SF) Quantity (SF) Cross Section Geocomposite Cross Section Cross Section Cross Section Quantity (SF)860,560 Quantity (SF) Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Project Name Sarasota LF Phase III 721058 Location Nokomis, FL Location Nokomis, FL Owner Sarasota County, FL Owner Sarasota County, FL Address 4000 Knights Trail Road Address 4000 Knights Trail Road Engineer Jones Edmunds Dale E. Gerber Jones Edmunds Dale E. Gerber Client Glover Construction Company, Inc.Client Glover Construction Company, Inc.Contact Mark Short Contact Mark Short 43 Project Type Landfill Expansion 44 Project Type Landfill Expansion Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Jan-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section Cross Section Secondary Geocomposite Cross Section Cross Section Subgrade (SF) Quantity (SF)2,481,407 Subgrade (SF) Quantity (SF) Cross Section GCL Protective Cover Cross Section 160z. Geotextile Cross Section 40 Mil Tarp Cross Section Quantity (SF)271,928 Quantity (SF)337,484 Quantity (SF)2,083,267 Quantity (SF) Page 6 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.4.A.4. INSTALLATION MANUAL PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 1 GEO-SYNTHETICS, LLC. HDPE AND LLDPE GEOMEMBRANE FIELD QUALITY CONTROL MANUAL 2 1.0 INTRODUCTION ............................................................................................................................................................. 3 1.1 Purpose ............................................................................................................................................................................................... 3 1.2 Scope .................................................................................................................................................................................................. 3 1.3 Reference ……………………………………………………………………………………………………………………...….. 3 2.0 MATERIAL DELIVERY .................................................................................................................................................... 3 2.1 Unloading ........................................................................................................................................................................................... 3 2.2 Storing and Stacking .......................................................................................................................................................................... 3 2.3 Documentation of Material Delivery ................................................................................................................................................. 3 3.0 EARTH WORK ................................................................................................................................................................. 4 3.1 Standard Responsibilities ................................................................................................................................................................... 4 3.2 Minimum QC Guidelines ................................................................................................................................................................... 4 3.3 Crest Anchorage System .................................................................................................................................................................... 4 4.0 FIELD PANEL PLACEMENT ........................................................................................................................................... 4 4.1. Panel Layout ..................................................................................................................................................................................... 4 4.2 Identification ...................................................................................................................................................................................... 4 4.3 Documentation of Panel Placement ................................................................................................................................................... 5 4.4 Method of Placement ......................................................................................................................................................................... 5 4.5 Damage Repairs ................................................................................................................................................................................. 5 5.0 GEOMEMBRANE FIELD SEAMING ............................................................................................................................... 5 5.1 General Requirements ........................................................................................................................................................................ 5 5.1.1 Layout ........................................................................................................................................................................................ 5 5.1.2 Personnel .................................................................................................................................................................................... 6 5.1.3 Equipment .................................................................................................................................................................................. 6 5.2 Seam Preparation ............................................................................................................................................................................... 6 5.2.1 Fusion Welding .......................................................................................................................................................................... 6 5.2.2 Extrusion Fillet Welding ............................................................................................................................................................ 6 5.3 Seaming Procedures ........................................................................................................................................................................... 7 5.4 Seaming Documentation .................................................................................................................................................................... 7 6.0 GEOMEMBRANE SEAM TESTING ................................................................................................................................ 8 6.1 Trial Welds ......................................................................................................................................................................................... 8 6.1.1 General ....................................................................................................................................................................................... 8 6.1.2 Trial Weld Length ...................................................................................................................................................................... 8 6.1.3 Sample Procedure ...................................................................................................................................................................... 8 6.1.4 Trial weld documentation .......................................................................................................................................................... 8 6.2 Air Pressure Testing ........................................................................................................................................................................... 9 6.2.1 Concept ...................................................................................................................................................................................... 9 6.2.2 Equipment for Air Testing ......................................................................................................................................................... 9 6.2.3 Procedure for Air Testing .......................................................................................................................................................... 9 6.2.4 Procedures for Non-Complying Tests ..................................................................................................................................... 10 6.2.5 Air Pressure Testing Documentation ....................................................................................................................................... 10 6.3 Vacuum Testing ............................................................................................................................................................................... 10 6.3.1 Concept .................................................................................................................................................................................... 10 6.3.2 Equipment for Vacuum Testing ............................................................................................................................................... 10 6.3.3 Procedure for Vacuum Testing ................................................................................................................................................ 10 6.3.4 Procedure for Non-Complying Test ........................................................................................................................................ 11 6.3.5 Vacuum Testing Documentation ............................................................................................................................................. 11 6.4 Destructive Testing .......................................................................................................................................................................... 11 6.4.1 Concept .................................................................................................................................................................................... 11 6.4.2 Procedure for Destructive Testing ........................................................................................................................................... 11 6.4.3 Procedure in the event of Destructive Test Failure ................................................................................................................. 12 7.0 DEFECTS AND REPAIRS ............................................................................................................................................. 13 7.1 Superintendent’s Review ................................................................................................................................................................. 13 7.2 Technician’s Responsibilities .......................................................................................................................................................... 13 7.3 Repair Procedures ............................................................................................................................................................................ 13 7.4 Verification of Repairs ..................................................................................................................................................................... 13 8.0 ATTACHMENT DETAIL ................................................................................................................................................. 13 3 1.0 INTRODUCTION 1.1 Purpose This manual addresses the Quality Control Program developed and utilized by Geo- Synthetics Systems, LLC. Installation personnel are present to assure the quality of workmanship and the installation integrity of geomembranes and other Geosynthetic products. It should be noted that a Site-Specific Quality Control Plan will Take Precedence Over This Manual. 1.2 Scope This manual addresses the installation of HDPE and LLDPE geomembrane. Geo- Synthetics Systems, LLC. recognizes that careful and specific documentation of the installation is required to substantiate this Quality Control Program. 1.3 Reference GM-13 Test Methods, Test Properties and Testing Frequency for HDPE Smooth and Textured Geomembranes Standards, Revision 15: 09, September 2019, or latest approved version. 2.0 MATERIAL DELIVERY 2.1 Unloading Proper safe handling methods including appropriate equipment and experienced personnel should be used to unload geomembrane products. Geosynthetic materials should be unloaded with equipment that will not damage the rolls. Fabric straps, spreader bars or stinger bars should be used for handling geosynthetic rolls. 2.2 Storing and Stacking Each roll delivered to the site shall be labeled by the fabricator. The label or marking shall have manufacturers name, material thickness, roll identification roll dimensions, weight. Geosynthetic materials should be stored in a well-drained area adjacent to the work area. Synthetic materials may be stacked but should not be stacked to a height that would damage the roll cores. Stacking procedures are based upon the manufacturer’s specification guidelines; in addition to any company/site-specific written requirements. 2.3 Documentation of Material Delivery A QAQC Technician shall be present, whenever possible, to observe and assist in material delivery and unloading on site. The QAQC Technician shall: - Verify that the equipment used on site is adequate and does not risk damage to the geomembrane or other materials. - Mark rolls or portions of rolls, which appear to be in “good” and deployable condition with a white “X” mark. - Mark rolls or portions of rolls, which appear, damaged with a RED dot. Isolate the damaged material from the “good rolls.” - Verify that storage of materials ensures adequate protections against dirt, theft, vandalism and passage of vehicles. - Ensure that rolls are properly labeled and that labeling corresponds with Quality Control documentation and Shipping Bills of Lading. 4 - Assist Third Party QA Representative, if present, with material sampling or record keeping. - Maintains Material Delivery Checklist, to include roll numbers, date, truck number, bill of lading number, roll size, storage method and any damage noted. 3.0 EARTH WORK 3.1 Standard Responsibilities The general and/or earthwork contractor shall be responsible for preparing and maintaining the subgrade in a condition suitable for installation of the liner unless specifically agreed otherwise. 3.2 Minimum QC Guidelines In cases where no site-specific earthwork quality control guidelines exist, the following guidelines shall be followed. - Surfaces to be lined shall be smooth and free of debris, roots, angular or sharp rocks, and rocks larger than one half (1/2”) inch diameter. All fill shall consist of well-graded material free of organics, trash, clay balls, or other deleterious material that may cause damage to the liner. The subgrade shall be compacted in accordance with design specifications but in no event less than is required to provide a firm unyielding foundation sufficient to permit the movement of vehicles and welding equipment over the subgrade without causing rutting or other deleterious effects. The subgrade shall have no sudden or abrupt changes in grade. - The earthwork contractor shall protect the subgrade from desiccation, flooding and freezing. Protection, if required, may consist of a thin plastic protective cover (or other material as approved by the engineer) installed over the completed subgrade. 3.3 Crest Anchorage System The anchor trench shall be excavated by the general or earthwork contractor to lines and widths shown on the design drawing prior to geomembrane placement. Corners in the anchor trench shall be slightly rounded where the geomembrane adjoins the trench to minimize sharp bends in the geomembrane. 4.0 FIELD PANEL PLACEMENT 4.1. Panel Layout Prior to commencement of liner deployment, layout drawings shall be produced to indicate the panel configuration and approximate location of seams for the project to be approved by the project engineer. Geo-Synthetics, LLC. will attempt to install field panels at the location indicated on the layout drawing. If the panels are deployed in a location other than that indicated on the drawing, the revised location shall be noted in the field as an “as-built” drawing, which will be modified at the completion of the project to reflect actual panel locations. GSI and or third party QA consultants as determined on a site-specific basis will maintain as-Built drawings. 4.2 Identification Each panel used for the installation shall be given a numeric or alphanumeric identifier consistent with the layout drawing 5 4.3 Documentation of Panel Placement Information relating to geomembrane panel placement including date, time, panel number, panel dimensions and location will be maintained on the Panel Placement form. If a portion of a roll is set back to be used at another time, the roll number will be written on the remainder of the roll in several places on the outside of the roll and at least once on the inside to prevent numbers from being scraped off during shipment. 4.4 Method of Placement Geomembrane deployment will generally not be done during any precipitation, in the presence of excessive moisture (i.e. fog, dew), in an area of standing water or during high winds. Rolls should only be transported from the storage area using appropriate equipment as outlined in Section 2. Method and equipment used to deploy the panels must not damage the geomembrane or the supporting subgrade surface. No personnel working on the geomembrane will wear shoes that can damage the geomembrane or engage in action that could result in damage to the geomembrane. Adequate temporary loading and / or anchoring, (i.e. sand bags, tires) which will not damage the liner, will be placed to prevent uplift by wind. Rolls should be supported during installation so that the fabric intended for the upper surface is a away from the installation vehicle. Geomembrane rolls can be installed by either manually pulling geomembrane panels in to place or by backing the transportation equipment over the suitable subgrade. Geomembrane panels should be installed in a relaxed condition free of wrinkles and folds. Whenever possible, geomembrane panels should be installed beginning at the high elevation and proceeding to the lowest elevation. Only the amount of geomembrane that can be seamed in one day should be installed at any given time. Equipment traveling on the geomembrane for installation of overlying geosynthetics should be limited to lightweight ATVs with a maximum bearing capacity of 8 psi. 4.5 Damage Repairs Any damage to a panel of geomembrane will be repaired in accordance with Section 7 5.0 GEOMEMBRANE FIELD SEAMING 5.1 General Requirements 5.1.1 Layout In general, seams shall be oriented parallel to the slope, i.e., oriented along, not across the slope for any slope greater than 10 to 1. Whenever possible, horizontal seams should be located on the base of the cell, not less than five (5) feet from the toe of the slope. Each seam made in the field shall be numbered in a manner that is compatible with the panel layout drawing. Seaming information to include seam number, welder ID, machine number, temperature setting and weather conditions will be maintained on GSI Panel Seaming form. 6 5.1.2 Personnel All personnel performing seaming operations shall be trained in the operation of the specific seaming equipment being used and will qualify by successfully welding a test seam as described in Section 6.1. The project superintendent or master seamer will provide direct supervision of all personnel seaming to verify proper welding procedures are followed. 5.1.3 Equipment Fusion Welding Fusion welding consists of placing a heated wedge, mounted on a self-propelled vehicular unit, between two (2) overlapped sheets which are heated above the polyethylene’s melting point. After being heated by the wedge, the overlapped panels pass through a set of preset pressure wheels which compress the two (2) panels together to form a weld. The fusion welder is equipped with a temperature readout device that continuously monitors the temperature of the wedge. Extrusion Fillet Welding Extrusion fillet welding consists of introducing a ribbon of molten resin along the edge if the seam overlap of the two (2) sheets to be welded. A hot air preheat and a molten polymer causes some of the material of each sheet to be liquefied resulting in a homogeneous bond between the molten weld bead and the surfaces of the sheets. The extrusion welder is equipped with gauges giving the temperature in the apparatus and the preheat temperature at the nozzle. 5.2 Seam Preparation 5.2.1 Fusion Welding Overlap the panels of geomembrane approximately four (4) to six (6) inches prior to welding. Adjust the panels so seams are aligned with the fewest possible number of wrinkles. A protective layer may be used, at the discretion of the GSI Project Superintendent, directly below the overlap of geomembrane that is to be seamed. Clean the seam area prior to seaming to assure the area is clean and free of moisture, dust, dirt, and debris of any kind. No grinding is required for fusion welding. 5.2.2 Extrusion Fillet Welding Overlap the panels of geomembrane a minimum of three (3) inches. Temporarily bond the panels of geomembrane to be welded taking care not to damage the geomembrane. Clean seam area prior to seaming to assure the area is clean and free of moisture, dust, dirt, and debris of any kind. Grind seam overlap prior to welding within one (1) hour of the welding operation in a manner that does not damage the membrane. Grind marks should be covered with extrudate whenever possible. In all cases grinding should not extend more than one quarter(1/4”) inch past the edge of the area covered by the extrudate during welding. 7 Purge the extruder prior to beginning the seam to remove all heat-degraded extrudate from the barrel. The purged extrudate will be placed on scrap material so as to prevent contact with good liner. Keep welding rods clean and dry. 5.3 Seaming Procedures Seaming shall extend to the outside edge of panels to be placed in the anchor trench. While welding a seam, monitor and maintain the proper overlap. Inspect seam area to assure area is clean and free of moisture, dust, dirt and debris of any kind. Welding technicians will check operating temperature and speed as needed. Align panels at the seam overlap to minimize wrinkles. Fish mouths or wrinkles at seam overlaps that cannot be welded through shall be cut along the ridge in order to achieve a flat overlap. The cut fish mouth or wrinkles shall be patched with an oval or round patch of the same geomembrane extending a minimum of six (6) inches beyond the cut in all directions. All seams between two (2) rows of seamed panels shall be welded during the coolest time of the day to allow for contraction of the geomembrane. Prior to welding seams, the top and bottom overlap of intersecting fusion welded seams will be trimmed six (6) inches. Intersecting extrusion fillet welded seams will be ground to flatten the extrusion bead prior to welding butt seams. All “T” joints produced as a result of cross / butt seams shall be extrusion fillet welded. Overlap on each “leg” of the “T” joint will be trimmed back six (6) inches. Then grind four- (4) inches minimum on each of the three legs of the “T” and extrusion weld all of the area prepared by grinding. Welding technicians will cut a test strip at the beginning and end of every seam. Prior to welding the next seam, the test strip will be tested for peel. These results are to be logged on the Panel Seaming form (FTB or NFTB). The QAQC Technician will observe all test strips and may request additional test strips, based on observations. In the event failing seam test strips are encountered, the welding machine will be taken out of service until a passing trial weld is obtained, and additional test strips will be taken to localize the flaw. The QAQC Technician may, after consulting with GSI’s Project Superintendent, take destructive samples from any seam, if defects are suspected. 5.4 Seaming Documentation The QAQC Coordinator or a designated assistant will document all seaming operations. Welding technicians will mark on the liner with a permanent marker at the start and end of all seams the information regarding date, time, welder initials, machine number and set temperature. QAQC technician or assistant will record date, time, seam number welder ID, machine ID, set temperature, weather conditions and speed as determined from trial welds on the Seaming Information Form. 8 Welding technicians will check operating temperature and speed as needed and mark the information along the seam. QAQC Technician will make periodic checks on welding operations to verify overlap, cleanliness, etc. 6.0 GEOMEMBRANE SEAM TESTING 6.1 Trial Welds 6.1.1 General Welding technicians prior to each seaming period shall conduct trial welds, every five - (5) hours as weather conditions dictate or as requested by QAQC Technicians if welding problems are suspected. Trial welds will be conducted at the start of the day, before initial deployment; again at the start of the afternoon work and/or per the discretion of the QAQC Site Manager. All trial welds will be conducted under the same conditions as will be encountered during actual seaming for each mil thickness. Unless authorized, once qualified by a passing trial weld, welding technicians will not change parameters (temperature, speed, and wheel adjustment). Re-tests due to changing atmospheric conditions follows the guidelines of the GRI GM-13 Standard. 6.1.2 Trial Weld Length The trial weld shall be at least five (5) feet long for extrusion welders and fifteen (15) feet long for fusion welder and should be made by joining two (2) pieces of geomembrane at least nine (9) inches in width. 6.1.3 Sample Procedure Visually inspect the seam for squeeze out, footprints, pressure and general appearance. Cut three (3) one-inch wide specimens, one from the middle of the seam. The specimens shall then be tested in peel using a field tensiometer and shall exhibit a film-tearing bond (FTB). If any specimen fails, the entire procedure shall be repeated. In the case of double track fusion welded seams, both welds must exhibit a FTB in order to be considered passing. If repeat tests performed utilizing reasonable sets of welding parameters also fails, the seaming apparatus shall not be accepted and shall not be used for seaming until the deficiencies are corrected and a passing test seam is achieved. 6.1.4 Trial weld documentation QAQC Technician and / or assistant will be present during peel testing and will record date, time, operator, machine number, ambient and operating temperatures, speed setting, peel values and pass / repair designation. All test result records shall be maintained on GSI’s Trail Weld form. The GSI’s QAQC Technician will give final approval to proceed with welding after observing trial welds. 9 6.2 Air Pressure Testing 6.2.1 Concept The welded seam created by the fusion welding process is composed of a primary seam and a secondary track that creates an unwelded channel. The presence of an unwelded channel permits GSI fusion seams to be tested by inflating the sealed channel with air to a predetermined pressure and observing the stability of the pressurized channel over time. 6.2.2 Equipment for Air Testing An air pump (manual or motor driven) capable of generating and sustaining a pressure between 25 to 35 psi. A rubber hose with fittings and connections. A sharp, hollow needle or other approved pressure feed device with a pressure gauge capable of reading and sustaining a pressure between 25 to 30 psi. 6.2.3 Procedure for Air Testing Seal both ends of the seam to be tested. Insert needle or other approved pressure feed device into the sealed channel created by the fusion weld. Inflate the test channel to a pressure of approximately 30-psi, and maintain the pressure with the range listed in Initial Pressure Schedule. Close valve, observe and record initial pressure after approximately 2 minutes. Observe and record the air pressure five (5) minutes after “relaxing period” ends and initial pressure setting is recorded. If loss of pressure does not stabilize, locate faulty area and repair in accordance with Section 7.. At the conclusion of the pressure test, the end of the air-channel opposite the pressure gauge is cut. A decrease in gauge pressure must be observed or the air channel will be considered “blocked” and the test will have to be repeated from the point of the blockage. If the point of blockage cannot be found cut the air channel In the middle of the seam and treat each half as a separate test. INITIAL PRESSURE SCHEDULE * MATERIAL (MIL) MIN. PSI MAX. PSI 40 24 30 60 27 35 80 30 35 100 30 35 *Initial pressure settings are read after a two-minute “relaxing period.” The purpose of this “relaxing period” is to permit the air temperature and pressure to stabilize. MAXIMUM PERMISSIBLE DIFFERENTIAL AFTER 5 MINUTES – HDPE MATERIAL (MIL) PRESSURE DIFF. 40 4 psi 10 60 3 psi 80 2 psi 100 2 psi 6.2.4 Procedures for Non-Complying Tests In the event of a Non-Complying Air Pressure Test, the following procedure shall be followed: Check seam and re-test seams. If a seam will not maintain the specified pressure, the seam should be visually inspected to localize the flaw. If this method is unsuccessful, cut one (1) inch samples from each end of the seam. Perform destructive peel tests on the samples using the field tensiometer. If all samples pass destructive peel testing, remove the overlap left by the wedge welder and vacuum test the entire length of seam in accordance with Section 6.3. If a leak is located by the vacuum test, repair by extrusion fillet welding. Test the repair by vacuum testing. If vacuum testing discovers no leak, the seam will be considered as passing non-destructive testing. If one or more samples fail the destructive peel test, additional samples will be taken in accordance with Section 6.4.3 or at the Site Superintendents discretion. When two (2)-passing samples are located, the seam between these two (2) locations will be considered non-complying. The overlap left by the wedge welder will be heat tacked in place along the entire length of seam and the non- complying portion of seam will be extrusion fillet welded and test vacuum testing in accordance with Section 6.3. 6.2.5 Air Pressure Testing Documentation All information regarding air-pressure testing (date, initial time and pressure, final time and pressure, pass / repair designation and technicians initials) will be written at both ends of the seam or portion of seam tested. All of the above information will also be logged on the GSI Non-Destructive Testing form. 6.3 Vacuum Testing 6.3.1 Concept This test is used when the geometry of the weld makes air pressure testing impossible or impractical or when attempting to locate the precise location of a defect believed to exist after air pressure testing. 6.3.2 Equipment for Vacuum Testing Vacuum box assembly consisting of a rigid housing, a transparent viewing window, soft neoprene gasket attached to the bottom, port hole or valve assembly and a vacuum gauge. A rubber pressure / vacuum hose with fittings and connections. A bucket and means to apply a soapy solution. A soapy solution. 6.3.3 Procedure for Vacuum Testing Trim excess overlap from the seam, if any. 11 Turn on the vacuum pump to reduce the vacuum box to a maximum of 5-psi. Apply a generous amount of a strong solution of liquid detergent and water to the area to be tested. Place the vacuum box over the area to be tested and apply sufficient downward pressure to “seat” the seal strip against the liner. Close the bleed valve and open the vacuum valve. Apply a minimum of 4 inches of mercury vacuum to the area as indicated by the gauge on the vacuum box. Ensure that a leak tight seal is created. Observe area for leaks, close the vacuum valve and open the bleed valve, move the box over the next adjoining area with a minimum of three (3) inch overlap and repeat the process. 6.3.4 Procedure for Non-Complying Test Mark all areas where soap bubbles appear and repair the marked areas in accordance with Section 7. Re-test repaired areas. 6.3.5 Vacuum Testing Documentation Vacuum testing crew will use a permanent marker to write on liner indicating tester’s initials, date and pass / repair designation on all areas tested. The QAQC Technician or testing crew on GSI Non-destructive Testing form will maintain records of vacuum testing. 6.4 Destructive Testing 6.4.1 Concept The purpose of destructive testing is to determine and evaluate seam strength. These tests require direct sampling and thus subsequent patching. Therefore, destructive testing should be held to a minimum to reduce the amount of repairs to the geomembrane. 6.4.2 Procedure for Destructive Testing Destructive Test samples shall be marked and cut out randomly at a minimum average frequency of one test location every 500 feet of seam length. Location of destructive samples will be selected by QAQC Technician (or third party QA), with samples to be cut by GSI construction personnel. Destructive samples should be taken and tested as soon as possible after the seams are welded in order to detect possible problems in a timely manner. QAQC Technician will observe all destructive testing and record date, time, seam number, location, and test results on GSI Destructive Testing form. 12 All destructive test locations with pass / repair designation will be marked on liner with a permanent markers. The destructive samples should be twelve (12) inches wide with a seam eighteen (18) inches long centered lengthwise in the sample. The sample may be increased in size to accommodate independent laboratory testing by the owner’s request or by specific project specifications. A one- (1) inch specimen shall be cut from each end of the test seam for field- testing. The two one- (1) inches wide specimens shall be tested in the field on a tensiometer for peel. If either field specimen fails to pass, it will be assumed the sample fails destructive testing. The procedure outlined in Section 6.4.3 shall be followed to locate passing samples to send to the laboratory. Independent Laboratory Destructive samples will be tested for “Shear Strength” and “Peel Adhesion” in accordance with the current revision of GRI GM 19. Four (4) of Five (5) specimens must meet or exceed the required seam strength while the 5th specimen must meet or exceed 80% of the specified value. In addition, peel separation should not exceed 25% to pass the destructive test. Minimum Weld Properties for Standard HDPE Geomembranes (1)(2) Property Test Method 40 60 80 100 Peel Strength ppi (fusion) ASTM D 6392 60 91 121 151 Peel Strength ppi (extrusion) ASTM D 6392 52 78 104 130 Shear Strength ppi (fusion & extrusion)ASTM D 6392 80 120 160 200 (1) These values apply to both co extruded and flat cast produced geomembranes and white – surfaced and conductive products. (2) Tested at 2 inches / minute. Minimum Weld Properties for Standard LLDPE Geomembranes (1)(2) Property Test Method 40 60 80 100 Peel Strength ppi (fusion) ASTM D 6392 50 75 100 125 Peel Strength ppi (extrusion) ASTM D 6392 44 66 88 114 Shear Strength ppi (fusion & extrusion)ASTM D 6392 60 90 120 150 (1) These values apply to both co extruded and flat cast produced geomembranes and white – surfaced and conductive products. (2) Tested at 2 inches / minute. 6.4.3 Procedure in the event of Destructive Test Failure Cut additional field samples for testing. In the case of a field production seam, the samples must lay a minimum of ten (10) feet in each direction from the location of the failed seam sample. Perform a field test for peel strength. If these field samples pass, then laboratory samples can be cut and forwarded to the laboratory for full testing. If the laboratory samples pass, reconstruct the seam between the two - (2) passing sample locations according to procedures detailed in Section 7 If either of the samples fail, then additional samples are taken in accordance with the above procedure until two (2) passing samples are found to establish the zone in which the seam should be reconstructed. 13 All passing seams must be bounded by two (2) locations from which samples passing laboratory destructive tests have been taken. In cases of reconstructed seam exceed 150 feet, a destructive samples must be taken and pass destructive testing from within the zone in which the seam has been reconstructed. 7.0 DEFECTS AND REPAIRS 7.1 Superintendent’s Review Geo-Synthetics, LLC. QAQC Technician and Project Superintendent shall conduct a detailed walk through and visually check all seams and non-seam areas of the geomembrane for defects, holes, blisters and signs of damage during installation. 7.2 Technician’s Responsibilities All other Geo-Synthetics, LLC. installation personnel shall, at all times, be on the lookout for damaged areas. Damaged areas shall be marked and repaired. 7.3 Repair Procedures Any portions of the geomembrane or geomembrane seam showing a flaw, or failing a destructive or non-destructive test shall be repaired. Several procedures exist for repair and GSI Project Superintendent shall make the decision as to the appropriate repair procedure. Procedures available for repair: Patching used to repair large holes, tears and destructive sample locations. All patched shall extend at least six (6) inches beyond the edges of the defect and all corners of the patches shall be rounded. Grinding and welding - used to repair sections of extruded fillet seams. Spot-welding or seaming - used to repair small tears, pinholes or other minor localized flaws. Capping - used to repair lengths of failed extrusion of fusion welded seams. Extrude overlap along the length of failed fusion welded seams. Removal of a bad seam and replacement with a strip of new material seamed into place. 7.4 Verification of Repairs Every repair shall be non-destructively tested using the methods set out in Section 6.3 which pass the non-destructive test, shall be deemed adequate. Repairs in excess of 150 feet require a destructive test. Repair test results shall be logged on GSI Repair Report form. The repair location shall be recorded on an as-built drawing. 8.0 ATTACHMENT DETAIL Geomembrane should be installed around penetrations, pipes structures and other appurtenances according to the engineer’s design and contract drawings. Geomembrane may be secured with use of stainless steel battens or clamps, or engineer designed and approved mechanical fasteners. 14 The procedures described herein are those in effect as of March 30, 2020. Geo-Synthetics Systems, LLC. reserves the right to deviate from these procedures in order to keep abreast of changes in technology. PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.4.A.5. MANUFACTURER'S APPROVAL LETTER PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com To Whom It May Concern: Geo-Synthetics Systems, Inc. (GSI) has been provided with a copy of Solmax’s proprietary product manual containing the data sheets of all Solmax’s products and the Solmax Field Installation Quality Assurance Manual. As a result, GSI is recognized as an authorized installer of HDPE and LLDPE smooth Geomembrane, textured Geomembrane, GCL, Geonet, Geocomposite and Geotextile products. Solmax does not warrant or guarantee the work of any approved installer as installers. They are independent contractors which provide specific installation services and do not act as agents or representatives of Solmax. Sincerely, Larry D Lydick Larry D Lydick Sales Manager, Environmental Infrastructure, Americas 832-392-5770 May 25, 2023 Approved Installer Confirmation – Geo-Synthetics Systems, Inc. te PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 2.1 MANUFACTURER'S SOQ PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Let’s build infrastructure better In this decisive decade, the construction industry must lead the way in decarbonizing civil and environmental infrastructure. At Solmax, we are more than ready. SOLMAX Let’s build infrastructure better. Infrastructure empowers communities. Climate change is redefining the way it’s built. Traditional materials like gravel, steel and concrete are being succeeded by geosynthetics, which are proven to be more resilient and less harmful to the environment. As the world leader in geosynthetics, our decades of engineering experience is being built-in to every sustainable project we enable. In this critical time for the planet, we will keep challenging conventions and pioneering new solutions, because to make the world a better place, we have to build infrastructure better. WHY SOLMAX? Sustainable performance We are driven by the sustainability of geosynthetics and the resilience of high-performance engineering. Our strength comes from our engineering heritage, the talent in our people and our belief in collaboration. Innovating for tomorrow We pioneer sustainable construction materials with fearless and focused determination, to make tomorrow’s world a better place. OUR BRANDS The Solmax brand portfolio is a collection of familiar and respected names from across the geosynthetics industry, now under one roof. Each brand offers a range of category-leading products. Together they are the best of the best. PROPEX® MIRAFI® GEOTUBE® GSE® BENTOLINER® MIRAGRID® FABRINET® GEOTUBE containment technology is engineered to provide innovative solutions for the marine protection and environmental remediation markets. These customized systems are used for shoreline erosion protection, land reclamation, island and wetlands creation, construction platforms, revetments, dykes, groynes and offshore structures in the marine market. They are also used for effective dewatering of various sludge, waste or dredge materials to consolidate, reduce volume and optimize management of the dewatered material. MIRAFI geotextiles are high-performance, engineered solutions including woven, nonwoven, paving and specialty geotextiles used in civil engineering and environmental applications. MIRAFI solutions enhance infrastructure performance and longevity while reducing project and installation costs. GSE geomembranes are a workhorse barrier material for the most demanding containment systems. Decades of service, advanced formulations, innovative options, and rigorous quality standards come together to make them the go-to barrier material for demanding solid waste storage, mining, wastewater, energy, potable water, and aquaculture applications all around the world. BENTOLINER combines the dimensional stability and increased internal shear strength of reinforced geotextiles with the high swelling capacity and low permeability of sodium bentonite, these geosynthetic clay liners have a high sealing effect and outstanding mechanical properties that can be used on steep slopes and in high load applications where increased internal shear strength is required. FABRINET drainage products are built around biplanar, triplanar, and triaxial in-plane drainage structures. These are available as geonets or laminated with nonwoven and advanced specialty filter geotextiles to replace and outperform aggregates with much faster installation and superior filter performance. MIRAGRID geogrids are advanced soil reinforcement products for mechanically stabilized earth (MSE) applications, including walls, slopes, embankments and berms. MIRAGRID provides proven vertical grade change solutions with extensive performance testing to deliver cost effective design solutions. PROPEX erosion control and slope stabilization systems offer innovative solutions that are more sustainable and cost effective than traditional hard armoring materials. Our engineered solutions stabilize the earth, extending the life of levees, dams, channels, shorelines and other key infrastructure. SOLUTIONEERS We are engineers that build solutions for sustainable infrastructure construction. We also build long-term relationships with our customers, enabling them to meet their own sustainability goals and delivering the reassurance of world-class product performance and customer service. About us Solmax is a world leader in sustainable construction solutions, for civil and environmental infrastructure. Its pioneering products separate, contain, filter, drain and reinforce essential applications in a more sustainable way – making the world a better place. The company was founded in 1981, and has grown through the acquisition of GSE, TenCate and Propex. It is now the largest geosynthetics company in the world, empowered by more than 2,000 talented people. Solmax is headquartered in the province of Quebec, Canada, with subsidiaries and operations across the globe. Setting standards Solmax works with governments to draw up industry regulations, collaborates with stakeholders worldwide to raise environmental requirements, and enhances technical designs for projects. Groundbreaking products brought to market by Solmax and its wholly owned companies include the first HDPE geomembranes, textured liners, geosynthetic clay liners (GCLs), white reflective geomembranes, conductive geomembranes, and high-flow and pressure-resistant drainage solutions. Uncompromised quality Our products are manufactured to strict international quality standards. All our products are tested and verified at our dedicated and comprehensive laboratories which maintain numerous accreditations. We offer our partners a wide scope of testing according to published standards to ensure products delivered to sites meet specified quality requirements. Let’s build infrastructure better SOLMAX.COM Solmax is not a design or engineering professional and has not performed any such design services to determine if Solmax’s goods comply with any project plans or specifications, or with the application or use of Solmax’s goods to any particular system, project, purpose, installation, or specification. ® Registered trademark of SOLMAX in many countries of the world. REV 0223 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 33 50 10S 60MIL HDPE LINER 1.3.A.2. MATERIAL CERTIFICATION PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : ROLL NUMBER RESIN LOT NUMBER MANUFACT. DATE RESIN MELT INDEX 190/2.16 g/10 min D1238 RESIN DENSITY g/cc D1505 OIT min D8117 HPOIT min D5885 ESCR SP-NCTL hours D5397 Product Code : 1101450 HDPE 60 mil Black Single Sided Textured ST 1.0 > 0.932 100 500 0105-213316 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213317 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213318 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213319 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213320 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213321 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213322 PQF820200 2023-08-06 0.10 0.937 120 >500 Certified 0101-209565 0105-213323 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213324 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213325 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213326 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213327 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213328 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213329 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 1 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213330 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213333 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213334 PQF820200 2023-08-07 0.10 0.937 120 >500 Certified 0101-209565 0105-213335 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213336 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213337 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213338 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213339 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213340 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213342 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213343 PQF820200 2023-08-08 0.10 0.937 120 >500 Certified 0101-209565 0105-213344 PQE821700 2023-08-08 0.10 0.937 120 >500 Certified 0101-209650 0105-213345 PQE821700 2023-08-08 0.10 0.937 120 >500 Certified 0101-209650 0105-213346 PQE821700 2023-08-08 0.10 0.937 120 >500 Certified 0101-209650 0105-213347 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213349 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213350 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213351 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 2 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213353 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213355 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213356 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213357 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213358 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213359 PQE821700 2023-08-09 0.10 0.937 120 >500 Certified 0101-209650 0105-213360 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213361 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213362 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213363 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213364 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213365 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213366 PQE821700 2023-08-10 0.10 0.937 120 >500 Certified 0101-209650 0105-213367 PQE821680 2023-08-10 0.10 0.938 120 >500 Certified 0101-209757 0105-213368 PQE821680 2023-08-10 0.10 0.938 120 >500 Certified 0101-209757 0105-213369 PQE821680 2023-08-10 0.10 0.938 120 >500 Certified 0101-209757 0105-213370 PQE821680 2023-08-10 0.10 0.938 120 >500 Certified 0101-209757 0105-213372 PQE821680 2023-08-10 0.10 0.938 120 >500 Certified 0101-209757 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 3 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213373 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213374 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213375 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213376 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213377 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213378 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213379 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213380 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213381 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213382 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213383 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213384 PQE821680 2023-08-11 0.10 0.938 120 >500 Certified 0101-209757 0105-213385 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213386 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213387 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213388 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213389 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213390 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 4 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213391 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213392 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213393 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213394 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213395 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213396 PQE821680 2023-08-12 0.10 0.938 120 >500 Certified 0101-209757 0105-213397 PQE821680 2023-08-13 0.10 0.938 120 >500 Certified 0101-209757 0105-213398 PQE821680 2023-08-13 0.10 0.938 120 >500 Certified 0101-209757 0105-213399 PQE821680 2023-08-13 0.10 0.938 120 >500 Certified 0101-209757 0105-213400 PQE821680 2023-08-13 0.10 0.938 120 >500 Certified 0101-209757 0105-213401 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213402 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213403 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213404 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213405 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213406 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213407 PQE821670 2023-08-13 0.10 0.939 120 >500 Certified 0101-209791 0105-213408 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 5 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213409 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213410 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213411 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213412 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213413 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213414 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213415 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213416 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213417 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213418 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213419 PQE821670 2023-08-14 0.10 0.939 120 >500 Certified 0101-209791 0105-213420 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213421 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213423 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213424 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213425 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213426 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213427 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 6 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213428 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213429 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213430 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213431 PQE821670 2023-08-15 0.10 0.939 120 >500 Certified 0101-209791 0105-213432 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213433 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213434 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213435 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213436 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213437 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213438 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213439 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213440 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213441 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213442 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213443 PQE821670 2023-08-16 0.10 0.939 120 >500 Certified 0101-209791 0105-213444 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213445 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 7 of 8 LIST OF GEOMEMBRANE ROLLS PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-2 SALT LAKE VALLEY MOD 8PROJECT NAME : 0105-213446 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213447 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213448 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213449 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213451 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213452 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213453 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213454 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213455 PQE821670 2023-08-17 0.10 0.939 120 >500 Certified 0101-209791 0105-213456 PQE821670 2023-08-18 0.10 0.939 120 >500 Certified 0101-209791 QUANTITY (ROLLS):132 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 18 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. Page 8 of 8 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : PRODUCT: HDPE 60 mil Black Single Sided Textured ST 1101450 Properties Thickness ave/min. GeoM Density Carbon Black Content Carbon Black Dispersion Tensile Yield Break Strength Elong. Strength Elong. Tear Resist. Puncture Resist. Dimension Stability Asperity Height In/Out Unit mils g/cc %Cat 1 and 2 ppi %ppi %lbs lbs %mils Test Method D5994 D792 D4218 D5596 D6693 D1004 D4833 D1204 D7466 Frequency Each roll Every 10 rolls Every 2 rolls Every 10 rolls Every 2 rolls Every 5 rolls Every 5 rolls Every roll Specification 60.0 / 54.0 ≥ 0.940 2.0 - 3.0 Cat. 1 & Cat. 2 132 13 132 150 45 120 16 / 16 0105-213316 MD 61.0 / 57.0 0.942 2.26 10/10 views 148.5 20.9 241 599 49 139 / 33.1 XD 154.4 18.7 223 586 50 0105-213317 MD 60.6 / 55.5 0.942 2.26 10/10 views 148.5 20.9 241 599 49 139 / 37.7 XD 154.4 18.7 223 586 50 0105-213318 MD 61.4 / 59.0 0.942 2.21 10/10 views 152.3 20.4 258 629 49 139 / 33.5 XD 152.7 18.0 231 592 50 0105-213319 MD 63.2 / 59.5 0.942 2.21 10/10 views 152.3 20.4 258 629 49 139 / 33.7 XD 152.7 18.0 231 592 50 0105-213320 MD 61.2 / 57.0 0.942 2.23 10/10 views 154.0 20.4 255 609 49 139 / 32.8 XD 158.3 18.8 244 607 50 0105-213321 MD 61.2 / 56.5 0.942 2.23 10/10 views 154.0 20.4 255 609 52 137 / 37.1 XD 158.3 18.8 244 607 51 0105-213322 MD 60.3 / 57.5 0.942 2.30 10/10 views 160.2 19.7 260 628 52 137 / 30.6 XD 167.4 17.6 244 608 51 0105-213323 MD 63.4 / 59.5 0.942 2.30 10/10 views 160.2 19.7 260 628 52 137 / 27.9 XD 167.4 17.6 244 608 51 0105-213324 MD 64.2 / 59.0 0.942 2.30 10/10 views 137.2 19.7 229 611 52 137 / 26.5 XD 146.9 16.2 213 580 51 0105-213325 MD 62.2 / 60.5 0.942 2.30 10/10 views 137.2 19.7 229 611 52 137 / 24.4 XD 146.9 16.2 213 580 51 0105-213326 MD 61.0 / 59.0 0.941 2.47 10/10 views 144.5 18.7 235 624 54 136 / 26.7 XD 155.7 15.6 229 610 54 0105-213327 MD 61.1 / 54.0 0.941 2.47 10/10 views 144.5 18.7 235 624 54 136 / 24.3 XD 155.7 15.6 229 610 54 0105-213328 MD 62.6 / 59.0 0.941 2.38 10/10 views 140.2 19.8 217 604 54 136 / 25.5 XD 133.4 16.9 213 611 54 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 1 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213329 MD 61.0 / 59.0 0.941 2.38 10/10 views 140.2 19.8 217 604 54 136 / 26.3 XD 133.4 16.9 213 611 54 0105-213330 MD 62.0 / 59.0 0.941 2.38 10/10 views 138.2 19.0 231 618 54 136 / 27.6 XD 145.0 15.5 210 584 54 0105-213333 MD 62.5 / 57.5 0.941 2.31 10/10 views 155.5 19.8 279 660 48 138 / 20.9 XD 170.1 15.9 237 669 51 0105-213334 MD 62.9 / 60.5 0.941 2.31 10/10 views 155.5 19.8 279 660 48 138 / 27.0 XD 170.1 15.9 237 669 51 0105-213335 MD 60.3 / 59.0 0.941 2.31 10/10 views 155.5 19.8 279 660 48 138 / 25.3 XD 170.1 15.9 237 669 51 0105-213336 MD 61.4 / 59.5 0.943 2.48 10/10 views 141.4 20.2 254 646 55 139 / 23.8 XD 143.2 17.5 226 607 50 0105-213337 MD 60.3 / 55.5 0.943 2.48 10/10 views 141.4 20.2 254 646 55 139 / 26.6 XD 143.2 17.5 226 607 50 0105-213338 MD 60.2 / 59.0 0.943 2.44 10/10 views 139.9 19.9 222 615 55 139 / 26.7 XD 141.2 16.9 203 579 50 0105-213339 MD 60.2 / 54.5 0.943 2.44 10/10 views 139.9 19.9 222 615 55 139 / 26.7 XD 141.2 16.9 203 579 50 0105-213340 MD 63.0 / 60.0 0.943 2.44 10/10 views 138.3 20.2 230 632 55 139 / 28.4 XD 137.5 16.6 217 614 50 0105-213342 MD 60.3 / 57.5 0.943 2.25 10/10 views 140.5 20.1 247 632 52 134 / 23.2 XD 150.0 17.7 223 603 48 0105-213343 MD 60.8 / 57.0 0.943 2.25 10/10 views 140.5 20.1 247 632 52 134 / 22.6 XD 150.0 17.7 223 603 48 0105-213344 MD 60.1 / 58.5 0.943 2.25 10/10 views 143.6 19.5 248 645 52 134 / 20.9 XD 153.1 17.6 229 610 48 0105-213345 MD 60.5 / 58.5 0.943 2.25 10/10 views 143.6 19.5 248 645 52 134 / 20.0 XD 153.1 17.6 229 610 48 0105-213346 MD 60.3 / 56.5 0.943 2.34 10/10 views 159.1 20.7 267 622 49 144 / 18.9 XD 168.0 17.3 241 610 51 0105-213347 MD 63.1 / 58.5 0.943 2.34 10/10 views 159.1 20.7 267 622 49 144 36.8 / XD 168.0 17.3 241 610 51 0105-213349 MD 62.6 / 59.0 0.943 2.33 10/10 views 149.5 21.1 284 680 49 144 / 20.5 XD 158.9 18.3 237 593 51 0105-213350 MD 60.9 / 58.0 0.943 2.33 10/10 views 149.5 21.1 284 680 49 144 / 18.7 XD 158.9 18.3 237 593 51 0105-213351 MD 60.6 / 55.5 0.943 2.14 10/10 views 146.6 21.2 260 645 49 144 / 19.1 XD 161.6 18.3 250 633 51 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 2 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213353 MD 61.6 / 56.5 0.943 2.14 10/10 views 146.6 21.2 260 645 50 140 / 20.8 XD 161.6 18.3 250 633 51 0105-213355 MD 60.1 / 57.5 0.943 2.23 10/10 views 149.5 18.8 237 598 50 140 / 23.8 XD 153.7 17.0 223 629 51 0105-213356 MD 61.3 / 57.0 0.943 2.08 10/10 views 149.4 19.5 261 641 50 140 / 23.3 XD 155.6 17.5 240 621 51 0105-213357 MD 62.1 / 59.0 0.943 2.08 10/10 views 149.4 19.5 261 641 50 140 / 21.2 XD 155.6 17.5 240 621 51 0105-213358 MD 60.2 / 58.0 0.941 2.16 10/10 views 161.2 19.5 271 639 50 141 / 20.6 XD 166.4 17.7 232 581 52 0105-213359 MD 63.8 / 58.5 0.941 2.16 10/10 views 161.2 19.5 271 639 50 141 / 21.8 XD 166.4 17.7 232 581 52 0105-213360 MD 62.8 / 59.0 0.941 2.20 10/10 views 143.3 20.2 264 652 50 141 / 20.5 XD 154.3 17.2 246 614 52 0105-213361 MD 63.4 / 60.5 0.941 2.20 10/10 views 143.3 20.2 264 652 50 141 / 18.7 XD 154.3 17.2 246 614 52 0105-213362 MD 61.1 / 56.5 0.941 2.18 10/10 views 155.7 21.1 279 647 50 141 / 19.7 XD 162.7 17.6 253 628 52 0105-213363 MD 60.9 / 56.5 0.941 2.18 10/10 views 155.7 21.1 279 647 51 140 / 20.2 XD 162.7 17.6 253 628 48 0105-213364 MD 60.2 / 57.0 0.941 2.28 10/10 views 147.7 22.8 282 682 51 140 / 23.0 XD 152.5 17.6 226 594 48 0105-213365 MD 60.4 / 58.5 0.941 2.28 10/10 views 147.7 22.8 282 682 51 140 / 22.7 XD 152.5 17.6 226 594 48 0105-213366 MD 60.3 / 55.0 0.941 2.31 10/10 views 152.9 20.8 266 629 51 140 / 32.9 XD 165.2 17.7 250 661 48 0105-213367 MD 61.5 / 58.5 0.941 2.31 10/10 views 152.9 20.8 266 629 51 140 / 28.9 XD 165.2 17.7 250 661 48 0105-213368 MD 61.3 / 57.5 0.940 2.13 10/10 views 164.4 19.8 272 646 50 141 / 22.6 XD 161.3 18.9 249 624 53 0105-213369 MD 61.1 / 57.0 0.940 2.13 10/10 views 164.4 19.8 272 646 50 141 / 20.2 XD 161.3 18.9 249 624 53 0105-213370 MD 62.9 / 59.5 0.940 2.44 10/10 views 167.6 20.2 276 631 50 141 / 25.3 XD 183.2 17.6 246 592 53 0105-213372 MD 61.5 / 59.0 0.940 2.44 10/10 views 167.6 20.2 276 631 50 141 / 20.3 XD 183.2 17.6 246 592 53 0105-213373 MD 61.6 / 59.0 0.940 2.34 10/10 views 154.2 18.8 215 595 50 141 / 21.7 XD 146.6 16.5 213 585 53 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 3 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213374 MD 60.2 / 58.0 0.940 2.34 10/10 views 154.2 18.8 215 595 50 138 / 19.9 XD 146.6 16.5 213 585 48 0105-213375 MD 62.5 / 59.5 0.940 2.37 10/10 views 137.1 18.3 221 613 50 138 / 23.4 XD 142.8 16.6 206 583 48 0105-213376 MD 60.9 / 59.0 0.940 2.37 10/10 views 137.1 18.3 221 613 51 136 / 23.1 XD 142.8 16.6 206 583 49 0105-213377 MD 60.6 / 54.0 0.940 2.25 10/10 views 135.3 19.7 233 630 51 136 / 21.2 XD 143.1 16.1 208 563 49 0105-213378 MD 61.5 / 59.5 0.940 2.25 10/10 views 135.3 19.7 233 630 51 136 / 22.4 XD 143.1 16.1 208 563 49 0105-213379 MD 60.6 / 58.5 0.942 2.37 10/10 views 157.3 20.4 379 657 46 134 / 25.9 XD 169.3 16.5 243 604 47 0105-213380 MD 61.0 / 58.5 0.942 2.37 10/10 views 157.3 20.4 379 657 46 134 / 27.6 XD 169.3 16.5 243 604 47 0105-213381 MD 63.6 / 61.0 0.942 2.34 10/10 views 169.6 20.1 291 636 46 134 / 27.1 XD 174.6 17.0 346 909 47 0105-213382 MD 60.9 / 58.5 0.942 2.34 10/10 views 169.6 20.1 291 636 46 134 / 25.4 XD 174.6 17.0 346 909 47 0105-213383 MD 60.9 / 57.0 0.942 2.21 10/10 views 136.0 19.5 194 618 46 134 / 34.0 XD 163.4 17.6 298 579 47 0105-213384 MD 63.0 / 59.0 0.942 2.21 10/10 views 136.0 19.5 194 618 54 141 / 19.6 XD 163.4 17.6 298 579 52 0105-213385 MD 61.8 / 59.5 0.942 2.43 10/10 views 146.4 19.3 246 650 54 141 / 22.5 XD 149.6 16.2 213 577 52 0105-213386 MD 61.4 / 59.0 0.942 2.43 10/10 views 146.4 19.3 246 650 54 141 / 21.3 XD 149.6 16.2 213 577 52 0105-213387 MD 61.9 / 60.5 0.942 2.43 10/10 views 146.2 18.3 231 620 54 141 / 21.8 XD 148.5 16.5 220 609 52 0105-213388 MD 62.8 / 60.0 0.942 2.43 10/10 views 146.2 18.3 231 620 54 141 / 24.8 XD 148.5 16.5 220 609 52 0105-213389 MD 62.0 / 58.0 0.940 2.44 10/10 views 137.7 18.8 222 605 52 138 / 24.0 XD 143.8 16.4 212 611 50 0105-213390 MD 60.0 / 59.0 0.940 2.44 10/10 views 137.7 18.8 222 605 52 138 / 21.6 XD 143.8 16.4 212 611 50 0105-213391 MD 60.8 / 58.5 0.940 2.34 10/10 views 148.2 19.6 248 630 52 138 / 24.0 XD 157.5 17.6 226 595 50 0105-213392 MD 61.0 / 58.0 0.940 2.34 10/10 views 148.2 19.6 248 630 52 138 / 26.3 XD 157.5 17.6 226 595 50 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 4 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213393 MD 61.2 / 59.0 0.940 2.25 10/10 views 152.5 19.0 253 625 52 138 / 26.4 XD 161.8 17.8 242 615 50 0105-213394 MD 62.3 / 60.0 0.940 2.25 10/10 views 152.5 19.0 253 625 59 149 / 22.3 XD 161.8 17.8 242 615 55 0105-213395 MD 62.7 / 60.5 0.940 2.50 10/10 views 154.8 18.9 261 642 59 149 / 21.0 XD 159.2 17.6 237 612 55 0105-213396 MD 62.3 / 59.0 0.940 2.50 10/10 views 154.8 18.9 261 642 59 149 / 35.7 XD 159.2 17.6 237 612 55 0105-213397 MD 62.4 / 58.5 0.940 2.41 10/10 views 146.1 21.4 245 652 59 149 / 34.6 XD 145.2 20.6 223 624 55 0105-213398 MD 61.0 / 56.5 0.940 2.41 10/10 views 146.1 21.4 245 652 59 149 / 29.4 XD 145.2 20.6 223 624 55 0105-213399 MD 61.1 / 56.5 0.941 2.39 10/10 views 138.3 18.4 238 636 53 140 / 31.1 XD 142.1 17.8 218 604 49 0105-213400 MD 60.4 / 57.5 0.941 2.39 10/10 views 138.3 18.4 238 636 53 140 / 31.2 XD 142.1 17.8 218 604 49 0105-213401 MD 61.1 / 55.5 0.941 2.33 10/10 views 141.7 18.1 232 616 53 140 / 28.2 XD 141.6 17.0 215 605 49 0105-213402 MD 60.0 / 58.0 0.941 2.33 10/10 views 141.7 18.1 232 616 53 140 / 20.1 XD 141.6 17.0 215 605 49 0105-213403 MD 60.4 / 57.5 0.941 2.26 10/10 views 149.9 18.7 240 617 53 140 / 25.4 XD 154.5 17.2 235 626 49 0105-213404 MD 61.0 / 59.0 0.941 2.26 10/10 views 149.9 18.7 240 617 56 145 / 24.0 XD 154.5 17.2 235 626 59 0105-213405 MD 61.6 / 58.0 0.941 2.44 10/10 views 155.9 18.5 253 630 56 145 / 21.7 XD 161.6 16.7 235 614 59 0105-213406 MD 63.8 / 58.5 0.941 2.44 10/10 views 155.9 18.5 253 630 56 145 / 21.7 XD 161.6 16.7 235 614 59 0105-213407 MD 61.0 / 58.0 0.941 2.44 10/10 views 141.9 20.6 248 626 56 145 / 21.5 XD 152.4 17.8 230 601 59 0105-213408 MD 62.9 / 61.0 0.941 2.44 10/10 views 141.9 20.6 248 626 56 145 / 25.9 XD 152.4 17.8 230 601 59 0105-213409 MD 61.3 / 57.0 0.942 2.35 10/10 views 166.2 18.1 294 681 59 142 / 28.5 XD 161.5 17.8 237 587 62 0105-213410 MD 60.9 / 58.5 0.942 2.35 10/10 views 166.2 18.1 294 681 59 142 / 26.2 XD 161.5 17.8 237 587 62 0105-213411 MD 61.2 / 59.5 0.942 2.29 10/10 views 138.2 18.4 241 646 59 142 / 24.7 XD 135.5 17.9 210 590 62 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 5 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213412 MD 60.4 / 54.5 0.942 2.29 10/10 views 138.2 18.4 241 646 59 142 / 22.7 XD 135.5 17.9 210 590 62 0105-213413 MD 60.7 / 58.5 0.942 2.41 10/10 views 149.5 21.4 233 667 59 142 / 22.3 XD 140.3 20.1 214 624 62 0105-213414 MD 60.1 / 58.0 0.942 2.41 10/10 views 149.5 21.4 233 667 55 143 / 25.4 XD 140.3 20.1 214 624 52 0105-213415 MD 60.0 / 56.5 0.942 2.36 10/10 views 150.9 18.6 248 628 55 143 / 23.9 XD 157.9 17.8 211 555 52 0105-213416 MD 62.3 / 59.0 0.942 2.36 10/10 views 150.9 18.6 248 628 55 143 / 20.9 XD 157.9 17.8 211 555 52 0105-213417 MD 62.6 / 58.5 0.942 2.51 10/10 views 148.1 19.8 247 611 55 143 / 21.3 XD 160.6 17.7 236 604 52 0105-213418 MD 61.2 / 58.5 0.942 2.51 10/10 views 148.1 19.8 247 611 55 143 / 21.2 XD 160.6 17.7 236 604 52 0105-213419 MD 60.7 / 55.5 0.942 2.41 10/10 views 163.5 19.0 287 665 53 145 / 23.5 XD 172.8 17.7 239 585 52 0105-213420 MD 63.0 / 60.0 0.942 2.41 10/10 views 163.5 19.0 287 665 53 145 / 34.4 XD 172.8 17.7 239 585 52 0105-213421 MD 60.0 / 58.5 0.942 2.83 10/10 views 138.5 18.6 253 666 53 145 / 28.7 XD 132.7 17.5 207 573 52 0105-213423 MD 61.3 / 57.0 0.942 2.83 10/10 views 138.5 18.6 253 666 53 145 / 26.2 XD 132.7 17.5 207 573 52 0105-213424 MD 61.0 / 58.0 0.942 2.41 10/10 views 133.3 21.0 234 608 53 145 / 32.2 XD 142.1 18.1 227 573 52 0105-213425 MD 60.5 / 55.0 0.942 2.41 10/10 views 133.3 21.0 234 608 48 140 / 33.3 XD 142.1 18.1 227 573 48 0105-213426 MD 61.0 / 54.0 0.942 2.42 10/10 views 158.8 19.6 272 648 48 140 / 23.4 XD 162.4 17.9 248 628 48 0105-213427 MD 61.0 / 58.5 0.942 2.42 10/10 views 158.8 19.6 272 648 48 140 / 30.0 XD 162.4 17.9 248 628 48 0105-213428 MD 61.0 / 57.0 0.942 2.38 10/10 views 155.4 20.4 267 637 48 140 / 30.4 XD 157.0 19.6 236 571 48 0105-213429 MD 62.0 / 56.5 0.942 2.38 10/10 views 155.4 20.4 267 637 48 140 / 23.4 XD 157.0 19.6 236 571 48 0105-213430 MD 61.0 / 56.5 0.941 2.33 10/10 views 153.4 20.9 286 662 49 138 / 30.6 XD 160.7 19.9 247 597 52 0105-213431 MD 60.9 / 56.0 0.941 2.33 10/10 views 153.4 20.9 286 662 49 138 / 29.6 XD 160.7 19.9 247 597 52 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 6 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213432 MD 61.5 / 59.5 0.941 2.51 10/10 views 135.3 20.1 243 629 49 138 / 23.6 XD 138.0 16.9 234 623 52 0105-213433 MD 62.4 / 58.5 0.941 2.51 10/10 views 135.3 20.1 243 629 49 138 / 24.2 XD 138.0 16.9 234 623 52 0105-213434 MD 61.6 / 60.0 0.941 2.44 10/10 views 137.4 19.5 219 589 49 138 / 22.0 XD 141.5 16.6 216 594 52 0105-213435 MD 61.1 / 58.5 0.941 2.44 10/10 views 137.4 19.5 219 589 51 139 / 21.8 XD 141.5 16.6 216 594 49 0105-213436 MD 62.0 / 60.0 0.941 2.59 10/10 views 147.6 18.5 232 610 51 139 / 24.2 XD 147.9 16.6 229 619 49 0105-213437 MD 61.0 / 58.5 0.941 2.59 10/10 views 147.6 18.5 232 610 51 139 / 22.7 XD 147.9 16.6 229 619 49 0105-213438 MD 60.9 / 58.5 0.941 2.50 10/10 views 151.4 20.6 266 642 51 139 / 25.3 XD 155.4 18.5 245 614 49 0105-213439 MD 60.6 / 56.0 0.941 2.50 10/10 views 151.4 20.6 266 642 51 139 / 25.9 XD 155.4 18.5 245 614 49 0105-213440 MD 61.9 / 58.5 0.944 2.42 10/10 views 175.6 19.5 297 651 49 142 / 22.9 XD 176.3 17.6 236 644 48 0105-213441 MD 60.2 / 57.0 0.944 2.42 10/10 views 175.6 19.5 297 651 49 142 / 18.1 XD 176.3 17.6 236 644 48 0105-213442 MD 60.7 / 58.5 0.944 2.37 10/10 views 160.2 20.5 292 674 49 142 / 23.5 XD 169.7 18.6 236 561 48 0105-213443 MD 60.6 / 57.5 0.944 2.37 10/10 views 160.2 20.5 292 674 49 142 / 20.1 XD 169.7 18.6 236 561 48 0105-213444 MD 62.4 / 59.0 0.944 2.40 10/10 views 135.9 19.3 234 611 49 142 / 22.9 XD 139.7 16.5 216 573 48 0105-213445 MD 61.2 / 59.5 0.944 2.40 10/10 views 135.9 19.3 234 611 49 140 / 20.0 XD 139.7 16.5 216 573 48 0105-213446 MD 61.4 / 59.5 0.944 2.44 10/10 views 142.5 19.6 237 635 49 140 / 22.1 XD 139.4 16.5 215 579 48 0105-213447 MD 61.1 / 57.0 0.944 2.44 10/10 views 142.5 19.6 237 635 49 140 / 20.0 XD 139.4 16.5 215 579 48 0105-213448 MD 62.2 / 60.5 0.944 2.49 10/10 views 140.4 20.2 235 615 49 140 / 23.6 XD 145.0 17.0 217 576 48 0105-213449 MD 62.7 / 59.5 0.944 2.49 10/10 views 140.4 20.2 235 615 49 140 / 20.9 XD 145.0 17.0 217 576 48 0105-213451 MD 61.2 / 56.5 0.941 2.34 10/10 views 153.7 20.4 270 654 50 137 / 22.7 XD 160.8 17.4 234 592 48 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 7 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-2 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : 0105-213452 MD 62.0 / 59.0 0.941 2.34 10/10 views 153.4 19.0 259 649 50 137 / 22.3 XD 165.0 17.7 232 586 48 0105-213453 MD 60.2 / 57.5 0.941 2.34 10/10 views 153.4 19.0 259 649 50 137 / 20.8 XD 165.0 17.7 232 586 48 0105-213454 MD 61.5 / 58.5 0.941 2.57 10/10 views 142.5 20.2 263 647 50 137 / 20.3 XD 153.3 17.3 243 621 48 0105-213455 MD 61.0 / 56.5 0.941 2.57 10/10 views 142.5 20.2 263 647 55 145 / 20.8 XD 153.3 17.3 243 621 54 0105-213456 MD 63.7 / 60.5 0.941 2.42 10/10 views 133.8 21.4 259 657 55 145 / 27.7 XD 148.3 17.6 233 615 54 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Page 8 of 8 SOLMAX.COM Solmax Geosynthetics LLC 18 Aug 2023 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.: LDF20015 GSI Project No.: 723027 Section: 33 50 10S 60 MIL HDPE LINER 1.3.A.3 MANUFACTURER'S MATERIAL WARRANTY PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Owner:Salt Lake Valley Solid Waste Facility PROJECT:Salt Lake Valley Landfill Mod 8 Project Address:6030 California Ave, Salt Lake City, Utah, 84104 Warranty Number:GSI-07-07-24 Product(s): Effective Date:June 22, 2024 WHEREAS pursuant to the Sales Purchase Order referenced herein e WHEREAS the Project was designed exclusively by the Owner and/or its general contractor, professionals (such as engineers, WHEREAS the Warrantor is not a design professional nor did the Warrantor participate in the design/conception of the Project; NOW, THEREFORE, in consideration of the foregoing, and subject to the terms and conditions of this Limited Warranty, the Warrantor hereby represents and warrants to the Owner that as of the date of sale of the Product to the Purchaser for the said Project, the Product specifications and that the Product will be free from manufacturing defects which or negligent use of the Product as well as damages caused by acts of God, natural disasters such as earthquakes, floods, piercing hail, t include usage for which the Product was not designed or intended, faulty design and/or construction of the facility into which the Product is installed, failure to install the Product in compliance with sure of the Product to harmful chemicals. Chemical resistance performance is the responsibility of the Owner since it has cont oduction/ design/composition and The Warrantor shall not be held liable or responsible to the Owner nor be deemed to have defaulted under or breached this Limited Warranty for failure or delay in fulfilling or performing any term of this Limited Warranty when such failure or delay is caused by or results from causes beyond the reasonable control of the Warrantor, including but not limited to fire, floods, embargoes, war, acts of war (whether war is declared or not), insurrections, riots, civil commotions, the existence or administration of any laws, rules or regulations, strikes, lockouts or other labor disturbances, acts of God or acts, omissions or delays in acting by any governmental 20 years from the Effective Date Sales Order N°: WARRANTY TERM: WARRANTOR: WARRANTOR ADDRESS: LIMITATIONS AND DISCLAIMERS THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO ANY WARRANTY OF MERCHANTABILITY, HABITABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WHICH ARE EXPRESSLY EXCLUDED under is the sole and exclusive obligation of Warrantor with regard to the Product. Warrantor shall have no liability for any claim except as specified hereunder. Warrantor shall not be liable for labor or any other costs incurred in connection with the use, repair, removal, installation or replacement of any Product covered by this Limited Warranty, or for any direct or indirect damages, labor, removal, installation, incidental or consequential damages, loss of profits or sales, injury to property or any other damages, losses or contingencies due to or arising out of the Product, whether under alleged breach of contract, tort, personal injury, property damage, environmental liability or otherwise, regardless of whether or not the Product is subject to a defect. authority; provided, however, that the Warrantor shall use reasonable commercial efforts to avoid or remove such causes of non- performance, and shall continue performance hereunder with reasonable dispatch whenever such causes are removed. This Limited Warranty does not cover damages or defects resulting from normal wear and tear, faulty installation, maintenance or repair, misuse LIMITED WARRANTY 1101450 HDPE 60 mil Black Single Sided Textured ST SO-095742, Solmax Geosynthetics, LLC 19103 Gundle Road, Houston, Texas, 77073 Page 1 of 2GSI-07-07-24, Salt Lake Valley Landfill Mod 8, MF-VEN-04, Rev.10, 2021-09 p1 = 7.4 7.9 9.1 preparation or covering materials; existing conditions, including, but not limited to, subsurface conditions beneath the geosynthetic product such as a settlement of the ground, cave-in, etc., excessive pressures or stresses from any source or improper application. There shall be no intended or incidental third-party beneficiary hereof. In no event shall Warrantor have any liability for any patent defects or discrepancies which were or could have been discovered prior to the installation of the Product. Subject to the terms and conditions hereof, after receipt of a timely valid claim hereunder, Warrantor will have the right to inspect and determine the cause of any alleged defect in the Product and if coverage is confirmed, then Warrantor shall have the option, in its sole discretion, to repair the affected area of the Product or to ship replacement product reasonably equivalent to the affected area of the Product proven to be subject to the covered defect. Warrantor is not a design professional and has not performed any design services for the Project and disclaims any alleged design liability regarding use of the Product at or for the Project, it being ed to perform repairs or replacements under this Limited Warranty until the area to be repaired or replaced is clean, dry and unencumbered, including, without limitation, the area having been made available for repair and/or replacement free from all water, dirt, sludge, residuals and liquids of any kind. If Warrantor determines that a claim is invalid, Owner shall reimburse Warrantor for its inspection and analysis costs. Notwithstanding any contrary provision hereof, in no event shall any liability of Warrantor hereunder exceed the actual per square foot cost of the Product required to repair e shall, starting on the first (1st) anniversary of the Effective Date, be reduced each year during the Warranty Term by a calculated fraction, where the numerator corresponds to the expired number of years in the Warranty Term prior to Warrantor corresponds to the Warranty Term. Any claim for any alleged defect under this Limited Warranty must be made in writing, by certified mail, to Warrantor at the e within ten (10) business days of the Owner becoming aware of the alleged defect. Any failure to timely issue such notice shall void any warranty coverage. Warrantor makes no representations, expressed or implied, not specified herein. No representative, agent or employee of Warrantor, or any other person, including the Buyer, is authorized to assume for Warrantor any additional liability or responsibility except as described above. In the event any term or provision of this Limited Warranty is inconsistent with or in conflict with any writing, purchase order, representations, statements, contract, or any other document, then, to the extent such inconsistency or conflict exists, the terms and conditions of this Limited Warranty shall control in all respects. The Limited Warranty is valid only for the original Owner and is not assignable or transferable under any circumstances. The terms hereof shall be governed by the laws provided in the contract or Sales Order entered into between the Warrantor and the Buyer and any dispute arising out and in connection with this Limited Warranty shall be settled in accordance with the provisions of the said contract or Sales Order. If it is determined and adjudicated that the exclusive remedy provided herein fails in its essential purpose, then in that event only, Owner shall be entitled to a return of that portion of the purchase price equal to the Liability Limit (as reduced as provided above) for so much of the Product as Warrantor determines to be defective. If any provision of this Limited Warranty is held to be invalid or unenforceable, such provision shall be deemed to be modified to the extent necessary for the balance hereof to be enforceable, and this Limited Warranty shall be enforced to the maximum extent permittable. NOTWITHSTANDING ANY CONTRARY PROVISION HEREOF, AN EXPRESS CONDITION PRECEDENT TO ANY AND ALL OBLIGATION OF RECEIPT OF FULL PAYMENT FOR THE PRODUCT. exposure conditions (including chemicals, concentration, time and temperature). As such, any proposed product, including the Product, should be thoroughly evaluated for its intended application by m e Product by machinery, equipment, people, animals; improper site Page 2 of 2GSI-07-07-24, Salt Lake Valley Landfill Mod 8, MF-VEN-04, Rev.10, 2021-09 p1 = 7.4 7.9 9.1 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.: LDF20015 GSI Project No.: 723027 Section: 33 50 10S 60 MIL HDPE LINER 1.3.B.1. INSTALLER'S INSTALLATION WARRANTY PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Page 1 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com GEO-SYNTHETICS SYSTEMS TWO-YEAR INSTALLATION WARRANTY FOR GEO-SYNTHETICS SYSTEMS MEMBRANE LINERS PROJECT: Salt Lake Valley SWM Module 8 GSI Project ID No.: 723027 Subject to the terms and conditions set forth below, Geo-Synthetics Systems, warrants to Purchaser, Salta Lake Valley SWM Module 8 – that the 60 mil Geomembrane installed at the Salt Lake Valley Solid Waste facility in Salt Lake City, Utah was installed by Geo-Synthetics Systems, in accordance with specifications in a good and workmanlike manner and that the installation of the liner is free from defects in workmanship for a period of two (2) years effective from 06/22/2024. This warranty covers only defects in workmanship occurring during the installation of the liner. This warranty does not cover any damage to, or defects in the liner found to have been a result of misuse, abuse or conditions existing after it was installed, including, but not limited to, rough handling; malicious mischief; vandalism; sabotage; fire; acts of God; acts of the public enemy; acts of war, public rebellion, severe weather conditions of all types; damage due to ice; excessive stress from any source; floating debris; damage due to machinery; foreign objects or animals. Nor does this warranty cover any defects which are found to have been a result of improper or defective design or engineering unless the design or engineering was performed by Geo-Synthetics Systems. In the event circumstances are found to exist which purchaser believes may give rise to a claim under this warranty, the following procedure shall be followed. a) Purchaser shall give Geo-Synthetics Systems written notice of the facts and circumstances of said claim within ten (10) days of becoming aware of said facts and circumstances. Said notice shall be by registered or certified mail, return receipt requested, postage prepaid, addressed to Construction Manager, Geo-Synthetics Systems, 2401 Pewaukee Road, Waukesha, WI 53188. The words “WARRANTY CLAIM” shall be clearly marked on the face of envelope in the lower right hand corner. Said notice shall contain, at a minimum, the name and address of the owner, the name and address of the installation, the name and address of the installer, the date upon which the material was purchased and the facts known to Purchaser upon which the claim is based. Failure to strictly comply with all the requirements of this paragraph shall void this warranty. Page 2 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com b) Within twenty (20) days after receipt of the notice described in paragraph a., above, Geo- Synthetics Systems shall notify Purchaser either that it will send a representative to inspect the allegedly defective liner or that it does not wish to do so. Purchaser shall pay the expenses incurred by Geo-Synthetics Systems in making the inspection, including current per diem rates for personnel involved in making the inspection, in the event Geo-Synthetics Systems determines that the claim is not covered by this warranty. c) PURCHASER SHALL NOT REPAIR, REPLACE, REMOVE, ALTER OR DISTURB ANY LINER, NOR SHALL PURCHASER ALLOW ANYONE ELSE TO REPAIR, REPLACE, REMOVE, ALTER, OR DISTURB ANY LINER PRIOR TO SUCH INSPECTION OR RECEIPT OF GEO-SYNTHETICS SYSTEMS NOTICE THAT IT ELECTS NOT TO INSPECT. A FAILURE TO STRICTLY COMPLY WITH THIS PARAGRAPH SHALL VOID THIS WARRANTY OR MAY LEAD TO A DETERMINATION THAT THE ALLEGED DEFECTS ARE NOT WITHIN THE SCOPE OF THIS WARRANTY. d) If Geo-Synthetics Systems determines that the alleged defects are covered by this warranty, Geo-Synthetics Systems shall, in its sole discretion, either repair the defective liner or provide Purchaser with replacement liner. THE REMEDIES PROVIDED HEREIN ARE THE EXCLUSIVE REMEDIES AVAILABLE UNDER THIS WARRANTY. Any determination as to whether a particular defect is covered by this warranty will be made by Geo-Synthetics Systems in its sole and complete discretion. e) Purchaser agrees that it shall provide Geo-Synthetics Systems with clean, dry and unobstructed access to the liner in order for Geo-Synthetics Systems to perform the inspections and warranty work which may be required pursuant to this warranty. THE REMEDIES PROVIDED TO PURCHASER HEREIN ARE THE EXCLUSIVE REMEDIES AVAILABLE UNDER THIS WARRANTY AND ARE INTENDED FOR THE SOLE BENEFIT OF PURCHASER. NEITHER THIS WARRANTY NOR ANY RIGHTS HEREUNDER SHALL BE ASSIGNABLE. GEO-SYNTHETICS SYSTEMS SHALL HAVE NO LIABILITY UNDER THIS WARRANTY TO THIRD PARTIES OR STRANGERS TO THIS AGREEMENT. THE WARRANTY SET FORTH ABOVE IS THE ONLY WARRANTY APPLICABLE TO THE LINER AND ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL GEO-SYNTHETICS SYSTEMS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES FOR, RESULTING FROM, OR IN CONNECTION WITH, ANY LOSS RESULTING FROM THE USE OF THE LINER. IN THE EVENT THE EXCLUSIVE REMEDY PROVIDED HEREIN FAILS IN ITS ESSENTIAL PURPOSE, AND IN THAT EVENT ONLY, PURCHASER SHALL BE ENTITLED TO THE RETURN OF THE PURCHASE PRICE FOR SO MUCH OF THE MATERIAL AS GEO-SYNTHETICS SYSTEMS DETERMINES IN ITS SOLE DISCRETION, TO HAVE VIOLATED THE WARRANTY PROVIDED HEREIN. EXCEPT FOR THE WARRANTY SET FORTH ABOVE, NO REPRESENTATION OR WARRANTY MADE BY ANY SALES OR OTHER REPRESENTATIVE OF GEO-SYNTHETICS SYSTEMS, OR ANY OTHER PERSON, CONCERNING THE LINER SHALL BE BINDING UPON GEO-SYNTHETICS SYSTEMS. Page 3 of 3 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Any waiver of the terms and conditions of this warranty shall be in writing signed by GEO- SYNTHETICS SYSTEMS. The failure to insist upon strict compliance with any of the terms and conditions contained herein shall not act as a waiver of strict compliance with all of the remaining terms and conditions, or this warranty; and, shall not operate as a waiver as to any of the terms and conditions of this warranty, and to future claims under this warranty. GEO-SYNTHETICS SYSTEMS BY:________________________________ Frank Strnad / Construction Services Director I have read and agree to be bound by the terms and conditions of the foregoing warranty. Signed: ___________________________________ By: ______________________________________ Title: ____________________________________ Company: ________________________________ Date: ____________________________________ PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.: LDF20015 GSI Project No.: 723027 Section: 33 50 10S 60 MIL HDPE LINER 1.3.B.3. FIELD QUALITY CONTROL DATA PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 5.3 Pre-Weld Test Reports 12/17/24 Page 1 of 13 Job: 723027 Salt Lake SWMF Mod 8 4 86010/23/2023 S To T 3.5 86010/23/2023 S To S 3.5 86010/23/2023 S To T 55010/24/2023 S To S 3.5 86010/25/2023 S To T 3.0 86010/25/2023 S To T Preweld Test Report Job Number: 723027 Job Name: Salt Lake SWMF Mod 8 Superintendent: Jose VargasLayer: Primary Material: Solmax 60 Mil HDPE Textured (White) Peel Test Extrusion Miniumum: 78 PPI Peel Test Fusion Miniumum: 92 PPI Shear Test Miniumum: 120 PPI QC Technician: Saul Rivas Shear Shear Shear Shear Shear Shear 10:44 am 188 187 1 65 11:02 am 183 171 2 65 1:37 pm 196 185 3 65 9:30 am 180 177 550 4 49 8:00 am 188 170 5 50 8:45 am 177 171 6 50 Max Incursion Percentage: 25 % Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Blas Rivas Francisco Perez Jr Jose Martinez Dionicio Ledezma Francisco Perez Blas Rivas Powered By: Geo-Synthetics Systems, LLC. Liner Type Peel Peel Peel Peel Peel Peel 185 187 188 184 174 00 148 188 00 175 173 00 169 181 182 179 177 173 Machine Number Coupon 2 A B Coupon 5 A B W123 W124 W120 X105 W124 W123 151 150 145 151 158 154 150 145 139 FTB FTB FTB FTB FTB FTB FTB FTB FTB 139 140 114 148 121 120 115 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 135 127 138 145 129 129 129 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 135 00 00 151 00 140 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 164 154 148 168 159 175 167 164 157 FTB FTB FTB FTB FTB FTB FTB FTB FTB 157 149 160 167 162 161 158 165 157 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 156 136 141 144 144 163 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB 12/17/24 Page 2 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86010/23/2023 S To T 3.0 86010/25/2023 S To T 3.5 86010/30/2023 S To T 3.5 86010/30/2023 S To T 3.5 86010/30/2023 S To T 3.5 86010/31/2023 S To T 55010/30/2023 S To S 3.5 86010/31/2023 S To T 3.5 86010/31/2023 S To T 3.5 86010/31/2023 S To T 3.5 86010/31/2023 S To T Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 2:00 pm 173 170 7 66 10:45 am 180 177 8 56 11:10 am 202 187 9 45 11:11 am 189 202 10 45 11:12 am 202 189 11 45 9:45 am 189 192 12 47 1:57 pm 168 174 550 13 55 9:25 am 189 202 14 46 9:46 am 201 212 15 46 12:49 pm 187 202 16 54 12:44 pm 202 201 17 56 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Francisco Perez Blas Rivas Jr Jose Martinez Francisco Perez Blas Rivas Dionicio Ledezma Jr Jose Martinez Francisco Perez Blas Rivas Francisco Perez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 179 169 166 187 201 00 141 169 00 205 200 0- 196 206 00 192 202 00 181 184 00 206 197 00 199 201 00 197 193 00 187 195 00 Machine Number Coupon 2 A B Coupon 5 A B W124 W124 W123 W120 W124 W123 X105 W120 W124 W123 W124 159 152 153 166 161 168 161 172 171 FTB FTB FTB FTB FTB FTB FTB FTB FTB 168 166 169 128 141 125 149 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 131 131 136 128 118 129 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 128 151 149 144 187 141 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 152 141 132 136 144 141 149 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 125 131 131 141 138 152 146 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 00 00 122 00 134 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 155 149 141 145 149 139 148 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 139 148 139 117 151 138 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 143 132 118 137 141 132 138 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 155 133 136 148 134 142 143 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 162 171 128 145 147 134 129 139 134 126 123 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 3 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86010/31/2023 S To T 55011/01/2023 S To S 55011/01/2023 S To S 3.5 86011/01/2023 S To S 3.5 86011/01/2023 S To S 3 85011/01/2023 S To S 3.5 86011/01/2023 S To S 3.5 86011/02/2023 S To S 3.5 86011/02/2023 S To S 3.5 86011/02/2023 S To S 3 86011/02/2023 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 12:43 pm 202 200 860 18 56 8:00 am 202 197 550 19 44 12:39 pm 186 192 550 20 50 12:50 pm 202 199 21 50 12:52 pm 200 190 22 50 7:00 am 156 157 23 70 2:21 pm 184 172 24 50 10:15 am 217 120 25 55 10:20 am 209 202 26 50 10:20 am 198 193 27 50 3:12 pm 188 162 28 55 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Jr Jose Martinez Dionicio Ledezma Dionicio Ledezma Francisco Perez Blas Rivas Blas Rivas Jr Jose Martinez Francisco Perez Jr Jose Martinez Blas Rivas Blas Rivas Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 187 186 00 195 201 00 171 182 00 206 197 00 188 189 00 156 154 153 188 179 182 219 209 00 211 211 00 198 196 00 166 164 00 Machine Number Coupon 2 A B Coupon 5 A B W120 X105 X105 W124 W123 W118 W120 W124 W120 W123 W123 125 116 144 144 132 138 136 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 154 00 00 147 00 165 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 139 00 00 132 00 129 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 140 133 138 127 141 139 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 138 132 127 147 127 135 122 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 112 123 124 122 123 121 128 124 121 FTB FTB FTB FTB FTB FTB FTB FTB FTB 109 107 117 124 140 119 133 112 133 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 136 148 160 151 156 147 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 138 155 133 159 169 147 142 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 136 129 142 136 145 126 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 150 142 140 127 148 132 140 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 141 143 141 135 130 124 110 148 162 136 131 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 4 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86011/02/2023 S To S 3 86011/02/2023 S To S 3.5 86011/03/2023 S To S 3.5 86011/03/2023 S To S 3.5 86011/03/2023 S To S 3 86011/03/2023 S To S 3.5 86011/03/2023 S To S 3.5 86011/04/2023 S To S 3.5 86011/04/2023 S To S 3.5 86011/04/2023 S To S 3 86011/04/2023 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 3:24 pm 201 188 29 55 3:11 pm 179 167 30 55 9:20 am 213 211 31 50 9:49 am 228 227 32 50 8:59 am 222 224 33 50 1:08 pm 156 157 34 55 2:55 pm 202 187 35 55 9:45 am 211 216 36 48 9:50 am 224 217 37 48 9:45 am 220 204 38 48 3:08 pm 201 196 39 55 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Jr Jose Martinez Francisco Perez Jr Jose Martinez Blas Rivas Jr Jose Martinez Francisco Perez Blas Rivas Francisco Perez Jr Jose Martinez Jr Jose Martinez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 194 190 00 158 169 00 214 205 00 218 220 00 229 218 00 155 160 150 185 189 184 208 210 00 211 208 00 206 199 00 206 189 190 Machine Number Coupon 2 A B Coupon 5 A B W124 W120 W124 W120 W123 W120 W124 W123 W124 W120 W120 145 136 136 159 164 152 136 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 164 155 161 144 132 142 133 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 153 157 147 149 142 147 144 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 155 144 146 159 141 149 137 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 133 132 152 149 143 135 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 140 127 128 155 150 126 138 143 144 FTB FTB FTB FTB FTB FTB FTB FTB FTB 137 150 137 153 170 153 154 145 161 FTB FTB FTB FTB FTB FTB FTB FTB FTB 137 127 129 123 132 144 148 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 122 123 137 137 142 137 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 160 144 138 159 144 164 151 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 164 158 140 140 136 129 140 131 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 137 137 149 139 148 156 142 141 142 149 118 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 5 of 13 Job: 723027 Salt Lake SWMF Mod 8 55011/06/2023 S To S 55011/06/2023 S To S 55011/06/2023 S To S 3.5 86011/10/2023 S To S 3.5 86011/10/2023 S To S 3.5 86011/10/2023 S To S 3.5 86011/11/2023 S To S 3.5 86011/11/2023 S To S 3.5 86011/11/2023 S To S 3.5 86011/10/2023 S To S 3.5 86011/12/2023 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 7:36 am 156 00 550 40 50 7:33 am 158 00 550 41 50 7:43 am 145 00 550 42 49 10:10 am 228 229 43 45 10:30 am 230 230 44 45 10:49 am 187 187 45 45 9:35 am 242 239 46 45 9:40 am 210 213 47 45 9:55 am 230 230 48 45 1:49 pm 209 216 49 53 8:36 am 245 248 50 45 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Dionicio Ledezma Blas Rivas Jr Jose Martinez Blas Rivas Francisco Perez Jr Jose Martinez Blas Rivas Jr Jose Martinez Francisco Perez Blas Rivas Blas Rivas Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 00 00 00 00 00 00 00 00 00 224 226 00 236 228 00 189 188 00 240 240 00 212 209 00 225 235 00 202 222 00 250 243 00 Machine Number Coupon 2 A B Coupon 5 A B X105 X92 X115 W123 W124 W120 W123 W120 W124 W123 W123 112 00 00 00 00 00 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 123 00 00 00 00 00 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 111 00 00 00 00 00 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 127 125 134 120 126 135 125 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 156 146 129 154 158 147 139 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 141 124 124 144 122 152 134 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 135 137 148 144 127 150 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 134 133 146 135 143 143 142 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 136 135 158 156 130 155 154 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 134 139 146 129 133 134 129 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 135 142 154 152 147 142 152 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 00 00 00 135 140 153 149 139 160 143 141 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 6 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86011/12/2023 S To S 3.5 86011/12/2023 S To S 4 86011/12/2023 S To S 3 86011/12/2023 S To S 55011/13/2023 S To S 55011/13/2023 S To S 3.5 86011/14/2023 S To S 3.5 86011/14/2023 S To S 3.5 86011/14/2023 S To S 3.5 86011/14/2023 S To S 3.5 86011/14/2023 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 8:50 am 243 254 51 45 9:01 am 241 247 52 45 1:25 pm 168 157 53 50 12:51 pm 154 163 54 55 7:52 am 175 178 550 55 45 7:45 am 177 151 550 56 45 8:17 am 230 229 57 48 8:20 am 212 210 58 48 9:20 am 218 218 59 48 12:50 pm 208 202 60 52 12:51 pm 197 192 61 52 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Jr Jose Martinez Francisco Perez Blas Rivas Jr Jose Martinez Jr Jose Martinez Dionicio Ledezma Blas Rivas Jr Jose Martinez Francisco Perez Jr Jose Martinez Blas Rivas Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 246 242 00 241 242 00 171 155 00 169 167 00 149 157 00 144 152 00 211 218 00 211 204 00 221 220 00 198 201 00 199 187 00 Machine Number Coupon 2 A B Coupon 5 A B W120 W124 W123 W120 X92 X105 W123 W120 W124 W120 W123 158 158 141 173 163 144 142 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 153 143 144 193 171 145 146 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 120 126 116 121 134 125 126 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 137 117 144 132 145 131 147 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 129 00 00 131 00 133 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 00 00 134 00 136 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 136 135 145 155 140 139 122 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 136 147 161 136 157 157 152 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 149 145 139 137 139 142 144 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 131 137 163 132 140 134 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 144 128 129 137 120 143 129 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 145 136 124 150 132 126 139 143 133 130 126 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 7 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86011/14/2023 S To S 3.5 86011/15/2023 S To S 3.5 86011/15/2023 S To S 3.5 86011/15/2023 S To S 3.5 86011/15/2023 S To S 3.5 86011/15/2023 S To S 3.5 86011/15/2023 S To S 55011/15/2023 S To S 55011/15/2023 S To S 55011/17/2023 S To S 4.5 86005/24/2024 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 1:10 pm 204 200 62 52 8:35 am 255 249 63 45 9:05 am 252 254 64 45 8:39 am 254 249 65 45 1:10 pm 189 166 66 52 1:17 pm 158 162 67 52 1:10 pm 197 188 68 52 1:15 pm 179 170 550 69 52 2:37 pm 168 164 550 70 55 1:25 pm 166 159 550 71 55 12:05 pm 211 213 72 55 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Blas Rivas Jr Jose Martinez Francisco Perez Jr Jose Martinez Blas Rivas Francisco Perez Dionicio Ledezma Blas Rivas Dionicio Ledezma Francisco Perez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 205 200 00 245 239 00 252 244 00 239 244 00 175 177 00 166 164 00 184 159 00 174 166 00 170 166 00 155 163 00 212 213 211 Machine Number Coupon 2 A B Coupon 5 A B W124 W123 W120 W124 W120 W123 W124 X105 X92 X105 W122 166 146 131 142 146 131 147 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 152 150 166 147 146 159 163 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 174 162 148 155 167 153 147 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 174 146 151 149 145 185 184 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 136 122 128 133 139 134 121 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 122 129 131 124 128 126 129 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 126 134 133 131 136 141 134 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 135 00 00 129 00 135 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 155 00 00 124 00 129 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 126 00 00 132 00 139 00 00 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 152 131 166 149 146 164 160 145 157 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 130 159 168 192 121 130 134 141 112 134 154 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 8 of 13 Job: 723027 Salt Lake SWMF Mod 8 4.5 86005/24/2024 S To S 4.5 86005/24/2024 S To S 4.5 86005/24/2024 S To T 4.5 86005/24/2024 S To T 3.5 86005/25/2024 S To T 4.5 86005/28/2024 S To S 4.5 86005/28/2024 S To T 4.5 86005/28/2024 S To S 4.5 86005/28/2024 S To T 4.5 86005/28/2024 S To S 3.5 86005/28/2024 S To T Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 12:02 pm 198 209 73 55 12:06 pm 202 201 74 55 12:02 pm 200 205 75 55 12:50 pm 209 200 76 55 7:00 am 208 200 77 50 12:10 pm 198 190 78 70 12:14 pm 185 196 79 70 12:18 pm 200 187 80 70 12:20 pm 187 190 81 70 12:31 pm 200 184 82 70 4:12 pm 187 191 83 76 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Blas Rivas Sr Jose Martinez Blas Rivas Francisco Perez Sr Jose Martinez Blas Rivas Blas Rivas Francisco Perez Francisco Perez Sr Jose Martinez Sr Jose Martinez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 194 214 199 198 200 199 200 197 199 202 199 205 158 205 202 193 202 187 200 184 189 190 184 197 182 192 202 194 188 187 174 180 194 Machine Number Coupon 2 A B Coupon 5 A B W123 W120 W123 W124 W120 W123 W123 W122 W122 W120 W120 133 154 152 159 147 143 157 143 152 FTB FTB FTB FTB FTB FTB FTB FTB FTB 150 151 161 145 139 151 143 133 157 FTB FTB FTB FTB FTB FTB FTB FTB FTB 145 153 141 133 144 168 124 133 141 FTB FTB FTB FTB FTB FTB FTB FTB FTB 144 148 141 124 139 144 136 151 148 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 142 136 133 141 139 155 149 134 FTB FTB FTB FTB FTB FTB FTB FTB FTB 144 128 142 125 133 140 152 130 147 FTB FTB FTB FTB FTB FTB FTB FTB FTB 133 141 141 124 129 131 130 133 137 FTB FTB FTB FTB FTB FTB FTB FTB FTB 136 128 131 119 133 124 141 133 128 FTB FTB FTB FTB FTB FTB FTB FTB FTB 141 132 133 133 127 143 136 125 137 FTB FTB FTB FTB FTB FTB FTB FTB FTB 139 134 128 136 131 133 136 129 131 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 147 128 121 117 117 132 133 147 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 148 114 136 138 128 139 122 120 129 124 131 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 9 of 13 Job: 723027 Salt Lake SWMF Mod 8 5.5 86005/29/2024 S To S 4.5 86005/29/2024 S To S 4.5 86005/29/2024 S To T 4.5 86005/29/2024 S To S 4 86005/29/2024 S To T 4.5 86005/30/2024 S To S 4.5 86005/30/2024 S To S 4.5 86005/30/2024 S To S 4.5 86005/30/2024 S To T 4 86005/30/2024 S To S 3.5 86005/30/2024 S To T Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 10:39 am 189 175 84 67 10:57 am 167 174 85 67 10:58 am 188 181 86 67 1:03 pm 155 157 87 72 2:48 pm 148 141 88 76 10:06 am 177 179 89 68 10:06 am 177 179 90 68 10:38 am 158 162 91 67 9:50 am 185 175 92 67 2:00 pm 155 150 93 76 3:12 pm 145 149 94 77 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Blas Rivas Blas Rivas Sr Jose Martinez Francisco Perez Blas Rivas Blas Rivas Francisco Perez Francisco Perez Sr Jose Martinez Blas Rivas Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 179 182 174 169 181 175 175 172 164 164 171 174 154 151 155 172 182 180 172 182 180 185 180 168 164 159 166 148 144 148 151 150 147 Machine Number Coupon 2 A B Coupon 5 A B W122 W123 W123 W120 W122 W123 W123 W122 W122 W120 W123 125 131 134 134 124 127 126 134 121 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 124 131 131 129 121 127 120 131 FTB FTB FTB FTB FTB FTB FTB FTB FTB 134 130 133 136 124 129 131 131 121 FTB FTB FTB FTB FTB FTB FTB FTB FTB 119 124 131 121 124 131 126 118 141 FTB FTB FTB FTB FTB FTB FTB FTB FTB 119 114 132 127 118 122 133 129 127 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 141 129 132 122 141 119 134 138 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 141 129 132 122 141 119 134 138 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 129 136 122 128 119 132 124 120 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 141 122 127 120 122 128 120 123 FTB FTB FTB FTB FTB FTB FTB FTB FTB 120 128 124 124 129 117 125 118 126 FTB FTB FTB FTB FTB FTB FTB FTB FTB 122 118 127 119 124 131 134 131 117 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 119 127 124 116 124 127 127 141 131 111 114 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 10 of 13 Job: 723027 Salt Lake SWMF Mod 8 4 86005/31/2024 S To S 4 86005/31/2024 S To T 4.5 86005/31/2024 S To S 4 86005/31/2024 S To S 4 86005/31/2024 S To T 3.3 86006/01/2024 S To T 4.5 86006/03/2024 S To S 4.5 86006/03/2024 S To T 3.3 86006/03/2024 S To S 3.3 86006/03/2024 S To T 4 86006/03/2024 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 10:36 am 167 159 95 68 10:14 am 188 178 96 69 11:06 am 160 158 97 70 11:30 am 161 160 98 72 12:07 pm 160 159 99 75 7:46 am 170 164 100 66 9:50 am 166 155 101 72 9:37 am 160 149 102 72 10:28 am 169 174 103 72 10:30 am 172 169 104 72 12:01 pm 162 179 105 79 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Francisco Perez Blas Rivas Sr Jose Martinez Sr Jose Martinez Blas Rivas Francisco Perez Francisco Perez Blas Rivas Blas Rivas Sr Jose Martinez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 168 174 181 177 171 169 166 164 176 167 137 167 174 164 177 174 189 178 165 161 158 163 154 158 160 174 149 166 172 175 175 179 172 Machine Number Coupon 2 A B Coupon 5 A B W122 W122 W118 W120 W120 W118 W122 W122 W118 W118 W120 122 139 124 127 143 119 121 132 127 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 141 114 126 138 117 129 132 131 FTB FTB FTB FTB FTB FTB FTB FTB FTB 126 134 114 131 129 114 122 126 139 FTB FTB FTB FTB FTB FTB FTB FTB FTB 121 139 134 124 128 124 138 115 139 FTB FTB FTB FTB FTB FTB FTB FTB FTB 121 138 122 126 111 128 121 135 129 FTB FTB FTB FTB FTB FTB FTB FTB FTB 121 138 111 124 121 114 134 138 134 FTB FTB FTB FTB FTB FTB FTB FTB FTB 127 119 123 114 120 123 119 116 116 FTB FTB FTB FTB FTB FTB FTB FTB FTB 127 104 123 119 123 116 129 115 123 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 134 129 128 135 110 123 131 113 FTB FTB FTB FTB FTB FTB FTB FTB FTB 119 121 132 133 128 149 133 121 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 117 128 133 123 127 114 125 114 129 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 143 131 131 123 104 138 130 107 133 140 134 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 11 of 13 Job: 723027 Salt Lake SWMF Mod 8 3.5 86006/03/2024 S To T 4.5 86006/05/2024 S To S 3.5 86006/05/2024 S To T 3.3 86006/05/2024 S To S 3.3 86006/05/2024 S To T 4 86006/05/2024 S To S 4 86006/05/2024 T To S 4 86006/05/2024 S To T 4.5 86006/06/2024 S To S 4 86006/06/2024 S To S 4.5 86006/07/2024 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 2:21 pm 146 144 106 88 10:18 am 161 159 107 76 10:24 am 162 170 108 78 10:29 am 160 157 109 78 10:30 am 176 167 110 78 2:09 pm 160 164 111 88 2:12 pm 162 160 112 88 3:21 pm 145 144 113 90 11:00 am 160 168 114 78 11:02 am 168 171 115 78 10:58 am 160 162 116 80 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Francisco Perez Francisco Perez Francisco Perez Blas Rivas Blas Rivas Sr Jose Martinez Sr Jose Martinez Francisco Perez Francisco Perez Blas Rivas Francisco Perez Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 155 162 160 162 159 145 147 166 164 162 154 162 167 161 169 166 169 164 162 161 157 148 152 150 166 168 170 161 161 160 158 161 162 Machine Number Coupon 2 A B Coupon 5 A B W122 W122 W122 W118 W118 W120 W120 W122 W122 W120 W122 114 121 121 122 129 118 132 121 120 FTB FTB FTB FTB FTB FTB FTB FTB FTB 126 121 104 123 118 129 120 130 125 FTB FTB FTB FTB FTB FTB FTB FTB FTB 120 124 116 127 123 132 127 130 117 FTB FTB FTB FTB FTB FTB FTB FTB FTB 115 123 124 129 141 114 122 133 125 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 133 136 121 127 120 129 134 129 FTB FTB FTB FTB FTB FTB FTB FTB FTB 121 111 129 128 124 115 129 123 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 112 119 126 119 119 124 128 123 111 FTB FTB FTB FTB FTB FTB FTB FTB FTB 111 108 115 132 119 124 120 123 123 FTB FTB FTB FTB FTB FTB FTB FTB FTB 123 120 129 126 129 119 132 121 128 FTB FTB FTB FTB FTB FTB FTB FTB FTB 111 125 132 124 110 120 121 121 134 FTB FTB FTB FTB FTB FTB FTB FTB FTB 131 124 129 124 129 132 121 121 128 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 119 122 132 131 127 119 124 116 124 119 124 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 12 of 13 Job: 723027 Salt Lake SWMF Mod 8 4 86006/07/2024 S To S 4 86006/07/2024 S To T 4 86006/07/2024 S To S 4 86006/07/2024 S To T 4.5 86006/07/2024 S To T 3.5 86006/08/2024 S To S 3.5 86006/08/2024 T To S 4 86006/10/2024 S To S 55006/01/2024 S To S 55006/01/2024 S To S 55006/01/2024 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 12:32 pm 162 152 117 84 12:34 pm 162 157 118 80 1:34 pm 149 151 119 84 1:30 pm 158 160 120 82 3:00 pm 145 151 121 88 7:35 am 165 164 122 74 7:38 am 158 155 123 74 9:09 am 155 159 124 76 7:24 am 145 149 550 125 69 7:19 am 158 157 550 126 69 12:40 pm 160 158 550 127 89 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Blas Rivas Blas Rivas Sr Jose Martinez Sr Jose Martinez Francisco Perez Blas Rivas Blas Rivas Blas Rivas Dionicio Ledezma Blas Rivas Blas Rivas Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 158 160 158 154 161 157 150 155 149 161 158 155 150 149 151 160 158 161 150 158 154 158 157 158 151 149 149 160 158 160 154 155 158 Machine Number Coupon 2 A B Coupon 5 A B W127 W127 W120 W120 W122 W127 W127 W127 X105 X92 X92 121 120 126 121 126 132 128 118 122 FTB FTB FTB FTB FTB FTB FTB FTB FTB 122 118 124 124 123 111 128 130 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 119 124 111 121 128 131 120 127 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 120 128 124 132 124 121 116 111 FTB FTB FTB FTB FTB FTB FTB FTB FTB 110 116 119 117 118 118 121 120 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 144 140 133 141 128 132 130 135 128 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 129 128 125 139 131 133 131 134 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 130 132 119 124 125 111 122 124 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 00 00 124 00 132 00 129 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 00 00 133 00 122 00 127 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 00 00 122 00 129 00 124 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 118 118 124 120 115 139 141 123 122 128 119 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB 12/17/24 Page 13 of 13 Job: 723027 Salt Lake SWMF Mod 8 55006/01/2024 S To S 55006/04/2024 S To S 55006/04/2024 S To S 55006/08/2024 S To S 55006/08/2024 S To S 55006/10/2024 S To S 55006/10/2024 S To S 55006/11/2024 S To S 55006/11/2024 S To S 55006/12/2024 S To S Shear Shear Shear Shear Shear Shear Shear Shear Shear Shear 12:38 pm 145 140 550 128 86 7:13 am 158 155 550 129 72 7:22 am 158 160 550 130 70 7:47 am 160 164 550 131 70 8:36 am 164 160 550 132 74 3:13 pm 160 158 550 133 88 3:26 am 158 155 550 134 88 7:37 am 155 158 550 135 74 7:46 am 160 158 550 136 74 3:56 pm 144 147 550 137 90 Mach. Speed Coupon 1 A B Preheat Temp Mach. Temp Operator Name Test Results Preweld ID Coupon 4 A B Weld Time Weld Date Ambient Temp Dionicio Ledezma Dionicio Ledezma Blas Rivas Dionicio Ledezma Blas Rivas Blas Rivas Dionicio Ledezma Blas Rivas Dionicio Ledezma Dionicio Ledezma Powered By: Liner Type Peel Peel Peel Peel Peel Peel Peel Peel Peel Peel 149 148 149 158 151 152 158 162 165 160 157 158 158 162 159 160 145 158 158 160 148 157 158 158 160 158 158 145 150 151 Machine Number Coupon 2 A B Coupon 5 A B X105 X115 X92 X115 X105 X105 X115 X105 X115 X115 122 00 00 111 00 123 00 116 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 00 00 119 00 122 00 124 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 132 00 00 131 00 124 00 139 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 123 00 00 129 00 124 00 126 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 126 00 00 124 00 129 00 131 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 128 00 00 127 00 129 00 122 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 124 00 00 124 00 129 00 127 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 129 00 00 127 00 133 00 130 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 130 00 00 128 00 132 00 129 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB 115 00 00 112 00 119 00 128 00 FTB FTB FTB FTB FTB FTB FTB FTB FTB Coupon 3 A B 118 126 130 128 120 130 126 124 131 110 PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % PassInc % FTB FTB FTB FTB FTB FTB FTB FTB FTB FTB Page1 of 1 Job No. : Primary X PPI Secondary X PPI Other PPI Operator Mach Mach Mach Preheat Ambient Test am pm Name/ ID No. Speed Temp Temp Temp A B A B A B A B A B Results 16 20 Peel 120 117 119 117 118 114 113 116 123 118 S TO S Shear 17 00 Peel 98 96 100 104 110 T TO T Shear 740 Peel 124 123 126 128 131 T TO T Shear 800 Peel 134 135 132 136 135 142 142 128 143 132 S TO S Shear 12 00 Peel 128 132 135 135 137 T TO T Shear Peel TO Shear 500 80 161 167 Pond Cell Shear Test Minimum Pass Pass Pass 9/5/24 Aron Ramirez X-112 78 LUIS ESPINAL724046 Peel Test Extrusion Minimum Superintendent: Material Type: Project Name:SALT LAKE VALLEY SOLID WASTE MANAGEMENT Job Description: 60MIL HDPE TEXTURED 132 146 141 144 148 166 168 167 160 164 79 79550 500 500 9/6/24 Angel Balderas W-145 6 5509/6/24 Aron Ramirez X-112 860 Pass156 172 154 152 157 68 Pass152 153 150 153 152 5509/6/24 Aron Ramirez X-112 68 Angel Balderas W-145 Coupon 5Coupon 2 1536 PREWELD REPORT Coupon 1 Coupon 3 Coupon 4 Quality Controller: Peel Test Fusion Minimum Weld Date 166 Liner Type Time 9/5/24 860 157 91 120PadT&M REPAIRS Liner Types S = Smooth T = Textured SG = Super Grip MS= Microspike MD= MicroDrain FRANCISCO GONZALEZ Preweld Report Geo-Synthetics Systems, LLC. Confidential-Rev. 240314 5.4 Destructive Sample Reports Date: 2023-11-03 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:79632 Material(s) Tested:(20) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, sigfile geolab Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-1 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)143 164 142 146 138 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 138 129 153 141 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)170 189 185 192 191 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-2 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)134 145 138 141 134 138 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)151 132 154 140 153 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 191 192 194 195 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-3 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 148 154 149 149 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)159 156 158 159 159 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 192 192 195 194 193 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-4 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)140 162 143 141 144 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 150 156 157 162 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 191 188 181 189 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-5 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 144 138 148 144 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)170 176 170 175 172 173 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 186 187 193 191 188 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-6 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 148 159 155 148 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)163 168 158 171 165 165 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 193 191 181 197 191 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-7 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 153 159 155 159 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)151 155 151 150 157 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 193 193 195 197 194 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-8 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 149 148 144 151 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)169 136 166 135 170 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)193 196 193 201 198 196 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-9 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)143 139 137 146 144 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)153 157 154 154 155 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)190 190 192 192 194 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-10 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 140 141 147 145 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 154 161 141 161 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)186 187 185 189 191 188 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-11 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 157 151 152 157 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)173 158 164 167 148 162 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 198 195 198 200 197 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-13 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 147 146 148 151 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)173 159 169 161 168 166 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 190 193 200 200 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-14 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)155 153 151 156 161 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)161 158 169 179 160 165 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 189 190 191 186 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-15 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)101 146 143 142 143 135 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 149 140 142 146 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 185 186 189 189 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-16 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 165 138 169 164 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 164 142 152 161 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 188 188 192 189 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-17 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)155 150 148 153 150 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)165 146 171 167 169 164 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)196 196 200 201 201 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 9 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-18 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)159 154 151 147 157 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)153 164 152 168 152 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 191 196 198 198 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-19 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 156 153 156 163 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)167 166 161 168 147 162 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)193 189 195 198 198 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 10 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79632 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-20 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 153 151 148 151 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)168 174 175 172 172 172 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)198 198 195 203 202 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-21 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 139 146 150 145 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)155 158 154 163 155 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 193 196 200 203 198 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 11 of 11 Date: 2023-11-06 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:79647 Material(s) Tested:(12) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, Nicole Saucedo Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-22 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)126 131 131 133 124 129 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)154 161 154 160 155 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 182 180 183 181 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-23 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)145 146 142 147 147 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)135 168 138 166 170 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 192 192 195 194 193 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-24 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)169 165 163 163 162 164 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)149 149 145 165 151 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)200 200 200 203 203 201 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-25 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)155 151 156 157 153 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)158 155 149 154 165 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)198 199 199 200 200 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-26 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 148 153 149 149 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)164 168 166 171 163 166 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)195 197 195 197 198 196 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-27 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)163 164 164 171 159 164 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)148 150 151 145 150 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 191 191 192 192 191 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-28 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)139 143 145 145 141 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 143 142 143 144 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 188 188 192 191 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-29 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)158 156 166 162 157 160 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 152 168 145 146 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 201 201 205 204 202 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-30 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 154 157 157 153 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)152 160 155 154 153 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 187 189 188 189 188 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-31 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 147 147 152 145 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 146 138 141 140 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 186 186 187 188 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 7 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:79647 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-32 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)154 152 152 152 149 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 143 140 167 169 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 193 192 196 196 194 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-33 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 159 159 158 154 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)162 167 161 146 170 161 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)198 196 197 196 199 197 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 7 Date: 2023-11-10 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:79707 Material(s) Tested: (16) Heat Fusion Weld Seam(s) Test(s) Requested: SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, sigfile Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-34 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)155 156 156 154 155 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)148 143 146 148 146 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 199 198 199 200 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-35 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 149 154 156 146 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)152 147 148 149 165 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)193 192 191 192 193 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-36 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)141 141 137 141 142 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)156 155 159 157 152 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)172 161 159 166 167 165 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-37 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)170 161 163 169 170 167 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)157 160 154 157 170 160 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)202 204 201 204 204 203 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-38 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)160 162 156 159 159 159 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)150 146 147 144 149 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)206 201 202 203 204 203 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-39 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 154 152 159 154 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)158 147 166 145 142 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)200 203 201 203 204 202 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-40 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 152 148 154 152 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)161 142 139 158 159 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)202 205 205 201 204 203 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-41 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)160 159 183 162 161 165 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)150 149 164 146 152 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)202 202 200 201 202 201 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-42 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)152 151 156 145 148 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)151 153 158 144 145 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)169 166 168 163 171 167 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-43 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)170 166 175 153 153 163 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)147 147 164 155 152 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 200 198 200 202 200 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-44 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 150 166 159 154 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 152 177 165 153 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)200 198 199 197 199 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-45 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)152 151 149 150 161 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)171 169 173 178 170 172 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 196 194 195 196 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-46 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 148 155 142 146 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)145 146 148 145 146 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 199 200 202 204 201 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-47 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)152 152 148 148 155 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)148 144 149 150 152 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)197 199 197 198 199 198 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79707 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-48 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 160 146 150 143 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 141 142 147 153 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)197 199 200 198 200 199 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-49 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 154 154 149 153 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)158 156 164 158 158 159 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 193 190 193 192 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 9 of 9 Date: 2023-11-14 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:79717 Material(s) Tested: (23) Heat Fusion Weld Seam(s) Test(s) Requested: SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, sigfile Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-50 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 158 144 157 159 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)134 133 132 134 132 133 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 183 181 182 182 183 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-51 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 133 149 150 152 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)147 139 146 149 147 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)182 180 181 181 180 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-52 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)143 143 143 139 139 141 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)139 131 137 138 139 137 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)181 178 181 180 178 180 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-53 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 142 146 144 145 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)152 155 157 155 157 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)179 180 180 176 176 178 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-54 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)143 142 144 143 144 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 138 141 138 158 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)181 181 182 181 180 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-55 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 146 147 145 138 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)150 158 143 160 147 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)176 181 180 179 178 179 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-56 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)148 147 146 149 150 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)140 143 135 131 128 135 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)182 182 183 181 181 182 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-57 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 139 142 147 148 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 138 135 140 142 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 180 180 159 172 174 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-58 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)145 147 144 151 147 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)140 141 141 140 139 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)177 176 178 179 179 178 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-59 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 146 145 140 143 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)140 144 142 142 142 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 179 188 188 187 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-60 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 145 146 145 143 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)160 162 161 162 162 161 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 184 190 189 191 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-61 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)139 137 141 143 144 141 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)159 155 149 148 142 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)184 187 185 183 182 184 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-62 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 168 141 163 146 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 145 147 141 142 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 186 185 183 184 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-63 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 143 146 148 162 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)167 162 162 163 165 164 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 192 189 190 189 190 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-64 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)145 146 140 149 144 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)157 150 156 157 155 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 181 183 178 180 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-65 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 142 143 146 146 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)139 148 148 138 137 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)182 181 180 181 180 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 9 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-66 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 149 144 144 143 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)158 161 162 160 166 161 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 187 186 186 185 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-67 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)143 141 139 140 144 141 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)145 150 147 147 154 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 186 187 185 186 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 10 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-68 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 149 149 148 151 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)156 154 151 143 147 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)186 188 186 184 184 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-69 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 152 146 148 144 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 157 143 140 141 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)184 182 185 186 187 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 11 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-70 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 168 165 150 149 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)165 166 141 143 144 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)190 190 188 191 188 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-71 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)133 131 137 139 129 134 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 152 143 145 148 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)161 157 164 168 166 163 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 12 of 13 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79717 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-72 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)135 130 133 131 129 132 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 138 147 142 149 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)167 161 167 168 173 167 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 13 of 13 Date: 2023-11-20 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:79776 Material(s) Tested: (13) Heat Fusion Weld Seam(s) Test(s) Requested: SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, sigfile geolab Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-73 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 149 157 163 153 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 155 158 151 154 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)194 195 194 196 195 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-74 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)148 147 149 148 149 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 147 158 143 157 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)190 193 192 194 194 193 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-75 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 152 151 152 157 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)144 167 155 147 149 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)193 192 193 196 196 194 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-76 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 158 154 144 157 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)142 150 166 148 147 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 191 189 188 188 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-77 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 147 152 147 148 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)134 159 134 133 161 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 192 190 194 194 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-78 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 147 148 143 151 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 145 142 142 139 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 187 190 192 194 191 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-79 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 146 144 148 149 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 142 143 145 145 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 192 193 192 191 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-80 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)140 136 156 150 145 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)149 158 154 156 165 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 189 187 190 182 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-81 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)161 161 159 164 158 161 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)130 121 132 130 127 128 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)171 174 168 171 172 171 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-82 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)140 140 133 137 136 137 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)140 142 143 144 139 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)166 164 164 161 164 164 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-83 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)141 144 148 140 142 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)142 146 151 142 140 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 184 186 184 191 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID: DS-84 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 146 145 147 146 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)159 159 149 147 153 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 188 191 185 191 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: GSI Project: Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 79776 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID: DS-85 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)167 150 162 151 155 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)147 144 143 149 149 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)197 197 196 198 197 197 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 8 Date: 2024-06-04 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI 72307 e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:80697 Material(s) Tested:(19) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, Kendall Villarreal Project Manager Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-86 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)154 159 162 148 149 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 146 160 139 145 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)190 194 208 193 195 196 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-87 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 143 150 139 137 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)163 146 158 150 150 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)195 196 202 195 199 197 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-88 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 155 170 152 158 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)153 151 177 155 141 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)199 196 209 198 198 200 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-89 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 148 183 151 152 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)131 133 170 144 167 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 187 189 185 188 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-90 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)161 156 166 155 162 160 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)138 148 163 142 146 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 191 199 190 192 193 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-91 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)158 145 158 156 150 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)137 128 149 140 131 137 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)181 183 201 183 182 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-92 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 151 171 153 154 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)139 146 172 141 160 152 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 185 203 187 186 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-93 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 152 159 141 154 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)151 149 165 150 150 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 189 192 191 192 190 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-94 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)140 138 155 134 142 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 136 152 131 133 139 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)191 188 190 188 190 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-95 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)148 148 158 146 146 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)153 154 166 155 152 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 183 200 182 185 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-96 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 140 157 143 157 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)150 159 174 148 158 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)181 185 201 184 188 188 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-97 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)145 144 147 145 145 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)162 172 186 163 156 168 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 186 196 178 186 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-98 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)139 138 187 141 138 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)141 140 156 169 148 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)197 194 186 194 194 193 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-99 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 143 145 148 146 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)157 154 155 158 156 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 185 186 188 187 186 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-100 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)149 151 146 155 151 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 142 148 151 142 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)179 184 181 184 185 183 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-101 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)138 135 139 146 135 139 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)161 161 153 157 156 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 187 183 186 184 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 9 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-102 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 169 162 166 163 161 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)160 167 175 157 166 165 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)176 187 184 185 188 184 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-103 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)150 147 164 149 147 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)147 145 164 150 143 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)175 174 192 185 182 182 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 10 of 11 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80697 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-104 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)155 140 137 163 156 150 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)157 143 194 166 157 163 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 193 216 191 195 197 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 11 of 11 Date: 2024-06-06 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI 72307 e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:80709 Material(s) Tested:(14) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, Kendall Villarreal Project Manager Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-106 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 154 150 152 147 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)155 151 146 161 158 154 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 187 185 188 187 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-107 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)148 150 148 147 142 147 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)150 164 158 158 158 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 185 182 185 186 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-108 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)170 157 153 156 151 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)157 153 153 156 166 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)195 196 193 197 194 195 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-109 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)160 150 147 160 150 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)166 147 152 166 152 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 188 186 188 187 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-110 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)139 135 138 142 137 138 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)169 165 165 163 171 167 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)188 188 185 187 186 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-111 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 143 155 137 149 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)146 144 139 147 143 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 188 189 188 187 187 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-112 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)152 173 164 170 174 167 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)149 148 145 155 149 149 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 192 186 189 189 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-113 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)119 147 121 125 129 128 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)152 157 153 155 156 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)189 189 186 190 189 189 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-114 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)128 134 119 118 132 126 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 142 142 145 151 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)150 162 151 155 157 155 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-115 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)137 139 134 137 134 136 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)161 162 162 164 160 162 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)176 176 176 177 177 176 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-116 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)167 170 163 167 164 166 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)167 173 159 169 167 167 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 182 179 183 181 182 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-117 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 143 140 144 141 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)160 160 157 160 158 159 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)187 184 182 186 184 185 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 8 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80709 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-118 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)137 146 155 159 157 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)145 146 141 146 144 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)165 168 165 166 165 166 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-105 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)154 161 142 152 145 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)155 176 152 158 160 160 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)192 191 191 192 192 192 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 8 Date: 2024-06-12 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI 72307 e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:80764 Material(s) Tested:(15) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, Kendall Villarreal Project Manager Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-119 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)142 138 140 141 141 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)155 154 156 151 157 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 184 181 183 184 183 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-120 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)130 127 127 128 133 129 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)135 143 152 134 144 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 181 179 180 178 180 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-121 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 142 143 143 144 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)164 150 154 174 158 160 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 182 179 182 181 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-122 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)134 130 122 125 125 127 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)155 150 156 150 152 153 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 181 178 171 180 179 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-123 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)152 153 147 152 153 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)147 138 140 144 135 141 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)183 181 178 176 182 180 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-124 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)140 141 136 142 143 140 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)160 148 168 141 156 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 184 182 185 185 184 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 4 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-125 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)145 153 155 147 138 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)133 132 132 132 132 132 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)174 172 171 173 172 172 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-126 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)146 143 148 150 143 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)159 158 155 151 155 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)185 184 180 182 183 183 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 5 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-127 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)147 144 142 147 142 144 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)154 148 153 114 148 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)154 152 157 155 150 154 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-128 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)141 142 134 142 137 139 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)152 170 155 149 154 156 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)178 180 178 177 179 178 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 6 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-129 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)144 142 141 142 143 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)156 160 156 155 159 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 182 177 181 179 180 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-130 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)136 126 138 125 127 130 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 142 142 142 143 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)182 181 178 182 180 181 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 7 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-131 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)135 141 136 134 136 136 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)129 131 133 134 134 132 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)146 142 141 149 148 145 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-132 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)156 164 154 156 153 157 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)138 166 171 163 170 162 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)175 179 178 179 175 177 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 8 of 9 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80764 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-133 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)158 149 140 152 154 151 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)158 162 158 156 157 158 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 179 176 179 177 178 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 9 of 9 Date: 2024-06-13 Mail To:Bill To: Steve Brothers GSI 2401 Pewaukee Road Waukesha , Wi , GSI 72307 e-mail: sbrothers@geosynthetics.com jvargas@geosynthetics.com Dear Mr. Brothers, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF TRI Job Reference Number:80775 Material(s) Tested:(4) Heat Fusion Weld Seam(s) Test(s) Requested:SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD Adhesion Failure (100% Peel) BRK Break in sheeting away from Seam edge. SE Break in sheeting at edge of seam. AD-BRK Break in sheeting after some adhesion failure - partial peel. SIP Separation in the plane of the sheet (leaving the bond intact). FTB Film tearing bond (all non "AD" failures). NON-FTB 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, Kendall Villarreal Project Manager Geosynthetic Services Division http://www.geosyntheticstestinc.com Page: 1 of 3 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80775 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-134 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)153 137 160 137 139 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)139 146 167 144 145 148 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)180 178 196 179 181 183 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-135 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)141 138 152 142 137 142 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)143 142 153 142 146 145 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)178 177 196 178 179 182 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 2 of 3 DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client:GSI Project:Salt Lake Valley Solid Waste Facility Module 8/Salt Lake City LF Material:60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#:80775 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 MEAN Sample ID:DS-136 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)151 146 171 159 150 155 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)139 140 154 142 142 143 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)177 177 195 175 177 180 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Sample ID:DS-137 | Weld: Heat Fusion Side: A Peel A Peel Strength (ppi)134 151 155 145 147 146 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel B Peel Strength (ppi)125 134 135 123 138 131 Peel Incursion (%)<5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Shear Strength (ppi)165 164 180 163 166 168 Shear Elongation @ Break (%)>50 >50 >50 >50 >50 Page: 3 of 3 Page1 of 1 Job No. : Primary XX PPI Secondary PPI Other PPI D.S. Weld Operator Mach Mach Mach Preheat Test No. Date Name/ ID No. Speed Temp Temp ABABABABABResults Peel 134 135 145 149 153 156 157 162 160 146 Shear Peel 135 145 146 148 137 Shear Peel Shear DS2 Angel Balderas W-145 6 172 550 Pass160162168 179 Pass860178 172 500 156 120PadT&MFRANCISCO GONZALEZQuality Controller: DS1 2 3 9/5/24 162 167 Aron Ramirez X-112P2 R1 9/5/24 DESTRUCTIVE SAMPLES REPORT Seam No. Coupon 1 Coupon 3 Coupon 4 Coupon 5 78 91 Coupon 2 Shear Test Minimum SALT LAKE VALLEY SOLID WASTE MANAGEMENT 60MIL HDPE TEXTURED REPAIRS Superintendent:Project Name: Peel Test Extrusion Minimum Peel Test Fusion Minimum Cell Pond LUIS ESPINAL Material Type: Job Description: 724046 DS Report Geo-Synthetics Systems, LLC. Confidential-Rev.240314 5.5 Seam Control Forms 12/17/24 Page 1 of 31 533 0 22 0 532 0 21 0 22 0 540 0 21 0 21 0 539 0 Seam Control Form Job Number: 723027 Job Name: Salt Lake SWMF Mod 8 Superintendent: Jose Vargas Layer: Primary Material: Solmax 60 Mil HDPE Textured (White) Combined LF Weld Total:Extrusion LF Weld Total:Fusion LF Weld Total: QC Technician: Saul Rivas Air Pressure Test: 30 PSI Air Pressure Hold Time: 5 Min Allowable Air Pressure Loss: 2 PSI 01:11 PM 860 04:12 PM 860 01:53 PM 860 03:28 PM 860 04:14 PM 860 01:42 PM 860 03:37 PM 860 04:16 PM 860 08:35 AM 860 10/23/23 10/24/23 30 30 10/23/23 10/24/23 30 30 10/23/23 10/24/23 30 30 11/2/23 11/3/23 30 30 10/23/23 10/24/23 30 30 10/23/23 10/24/23 30 30 11/2/23 11/3/23 30 30 10/23/23 10/24/23 30 30 10/25/23 10/30/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 1/EXL Blas Rivas W123 4 09:10 AM 09:15 AM Pass 1/EXL Francisco Perez W124 3.5 09:13 AM 09:18 AM Pass 1/2 Francisco Perez W124 3.5 09:22 AM 09:27 AM Pass 1/22 Jr Jose Martinez W120 3 10:40 AM 10:45 AM Pass 2/EXL Francisco Perez W124 3.5 09:37 AM 09:42 AM Pass 2/3 Jr Jose Martinez W120 3.5 09:35 AM 09:40 AM Pass 2/23 Jr Jose Martinez W120 3 10:40 AM 10:45 AM Pass 3/EXL Francisco Perez W124 3.5 09:42 AM 09:47 AM Pass 3/4 Francisco Perez W124 3.5 02:24 PM 02:29 PM Pass Powered By: 68,165 73 68,092 Geo-Synthetics Systems, LLC. Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 2 of 31 22 0 22 0 538 0 22 0 21 0 541 0 21 0 21 0 540 0 22 0 22 0 540 0 22 0 22 0 540 0 22 0 03:43 PM 860 10:59 AM 860 09:33 AM 860 03:49 PM 860 11:04 AM 860 03:45 PM 860 03:58 PM 860 05:18 PM 550 11:22 AM 860 04:07 PM 860 05:26 PM 550 11:38 AM 860 04:12 PM 860 05:33 PM 550 02:34 PM 860 04:17 PM 860 11/2/23 11/3/23 30 30 10/25/23 10/30/23 30 30 10/25/23 10/30/23 30 30 11/2/23 11/3/23 30 30 10/25/23 10/30/23 30 30 10/30/23 11/1/23 30 30 11/2/23 11/3/23 30 30 10/30/23 11/1/23 30 0 10/30/23 10/30/23 30 30 11/2/23 11/3/23 30 30 10/30/23 11/1/23 30 0 10/30/23 10/31/23 30 30 11/2/23 11/3/23 30 30 10/30/23 11/1/23 30 0 10/30/23 10/30/23 30 30 11/2/23 11/3/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 3/24 Jr Jose Martinez W120 3 11:40 AM 11:45 AM Pass 4/EXL Francisco Perez W124 3.5 02:22 PM 02:27 PM Pass 4/5 Blas Rivas W123 3.0 02:26 PM 02:31 PM Pass 4/25 Jr Jose Martinez W120 3 11:42 AM 11:47 AM Pass 5/EXL Francisco Perez W124 3.5 02:34 PM 02:39 PM Pass 5/6 Blas Rivas W123 3.5 08:20 AM 08:25 AM Pass 5/26 Jr Jose Martinez W120 3 11:50 AM 11:55 AM Pass 6/EXL Dionicio Ledezma X105 550 Pass 6/7 Jr Jose Martinez W120 3.5 02:54 PM 02:59 PM Pass 6/27 Jr Jose Martinez W120 3 12:30 PM 12:35 PM Pass 7/EXL Dionicio Ledezma X105 550 Pass 7/8 Blas Rivas W123 3.5 03:00 PM 03:05 PM Pass 7/28 Jr Jose Martinez W120 3 12:32 PM 12:37 PM Pass 8/EXL Dionicio Ledezma X105 550 Pass 8/9 Francisco Perez W124 3.5 04:12 PM 04:17 PM Pass 8/29 Jr Jose Martinez W120 3 12:34 PM 12:39 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Vacuum Air Pressure Air Pressure 12/17/24 Page 3 of 31 24 0 539 0 21 0 22 0 541 0 22 0 22 0 540 0 21 0 22 0 539 0 22 0 21 0 538 0 21 0 22 0 04:14 PM 860 02:07 PM 860 04:23 PM 860 04:19 PM 860 02:20 PM 860 04:28 PM 860 04:23 PM 860 02:53 PM 860 04:34 PM 860 04:29 PM 860 03:57 PM 860 04:40 PM 860 04:34 PM 860 10:12 AM 860 03:12 PM 860 04:39 PM 860 10/31/23 10/31/23 30 30 10/30/23 10/30/23 30 30 11/2/23 11/3/23 30 30 10/31/23 10/31/23 30 30 10/30/23 10/30/23 30 30 11/2/23 11/3/23 30 30 10/31/23 11/1/23 30 30 10/30/23 10/31/23 30 30 11/2/23 11/3/23 30 30 10/31/23 11/1/23 30 30 10/30/23 10/31/23 30 30 11/2/23 11/3/23 30 30 10/31/23 11/1/23 30 30 10/31/23 10/31/23 30 30 11/3/23 11/6/23 30 30 10/31/23 11/1/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 9/EXL Francisco Perez W124 3.5 05:10 PM 05:15 PM Pass 9/10 Blas Rivas W123 3.5 05:30 PM 05:35 PM Pass 9/30 Jr Jose Martinez W120 3 12:40 PM 12:45 PM Pass 10/EXL Francisco Perez W124 3.5 05:15 PM 05:20 PM Pass 10/11 Jr Jose Martinez W120 3.5 05:31 PM 05:36 PM Pass 10/31 Jr Jose Martinez W120 3 12:42 PM 12:47 PM Pass 11/EXL Francisco Perez W124 3.5 08:40 AM 08:45 AM Pass 11/12 Francisco Perez W124 3.5 03:35 PM 03:40 PM Pass 11/32 Jr Jose Martinez W120 3 12:42 PM 12:47 PM Pass 12/EXL Francisco Perez W124 3.5 08:35 AM 08:40 AM Pass 12/13 Jr Jose Martinez W120 3.5 03:40 PM 03:45 PM Pass 12/33 Jr Jose Martinez W120 3 12:52 PM 12:57 PM Pass 13/EXL Francisco Perez W124 3.5 08:30 AM 08:35 AM Pass 13/14 Blas Rivas W123 3.5 03:55 PM 04:00 PM Pass 13/34 Francisco Perez W124 3.5 07:59 AM 08:04 AM Pass 14/EXL Francisco Perez W124 3.5 09:00 AM 09:05 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 4 of 31 538 0 21 0 21 0 540 0 22 0 22 0 546 0 21 0 22 0 545 0 21 0 22 0 546 0 21 0 20 0 544 0 10:21 AM 860 03:18 PM 860 04:44 PM 860 10:42 AM 860 03:21 PM 860 04:49 PM 860 12:52 PM 860 03:24 PM 860 04:53 PM 860 01:03 PM 860 03:27 PM 860 04:58 PM 860 01:24 PM 860 07:10 AM 860 05:04 PM 860 02:57 PM 860 10/31/23 10/31/23 30 30 11/3/23 11/4/23 30 30 10/31/23 11/1/23 30 30 10/31/23 10/31/23 30 30 11/3/23 11/4/23 30 30 10/31/23 11/1/23 30 30 10/31/23 10/31/23 30 30 11/3/23 11/4/23 30 30 10/31/23 11/1/23 30 30 10/31/23 10/31/23 30 30 11/3/23 11/4/23 30 30 10/31/23 11/1/23 30 30 10/31/23 10/31/23 30 30 5/25/24 5/29/24 30 30 10/31/23 11/1/23 30 30 11/1/23 11/1/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 14/15 Jr Jose Martinez W120 3.5 04:00 PM 04:05 PM Pass 14/35 Francisco Perez W124 3.5 03:02 PM 03:07 PM Pass 15/EXL Francisco Perez W124 3.5 09:02 AM 09:07 AM Pass 15/16 Francisco Perez W124 3.5 04:05 PM 04:10 PM Pass 15/36 Francisco Perez W124 3.5 03:04 PM 03:09 PM Pass 16/EXL Francisco Perez W124 3.5 09:05 AM 09:10 AM Pass 16/17 Blas Rivas W123 3.5 04:20 PM 04:25 PM Pass 16/37 Francisco Perez W124 3.5 03:06 PM 03:11 PM Pass 17/EXL Francisco Perez W124 3.5 09:15 AM 09:20 AM Pass 17/18 Jr Jose Martinez W120 3.5 04:25 PM 04:30 PM Pass 17/38 Francisco Perez W124 3.5 03:10 PM 03:15 PM Pass 18/EXL Francisco Perez W124 3.5 09:17 AM 09:22 AM Pass 18/19 Francisco Perez W124 3.5 04:30 PM 04:35 PM Pass 18/102 Sr Jose Martinez W120 3.5 02:48 PM 02:53 PM Pass 19/EXL Francisco Perez W124 3.5 09:20 AM 09:25 AM Pass 19/20 Blas Rivas W123 3.5 07:45 AM 07:50 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 5 of 31 21 0 22 0 544 0 22 0 22 0 539 0 22 1 539 0 533 0 21 0 538 0 22 0 538 0 21 0 538 0 22 0 07:14 AM 860 05:08 PM 860 03:09 PM 860 07:19 AM 860 05:14 PM 860 10:14 AM 860 07:24 AM 860 03:25 PM 860 01:34 PM 860 04:01 PM 860 02:12 PM 860 03:53 PM 860 03:06 PM 860 03:47 PM 860 03:48 PM 860 03:42 PM 860 5/25/24 5/29/24 30 30 10/31/23 11/1/23 30 30 10/31/23 11/1/23 30 30 5/25/24 5/29/24 30 30 10/31/23 11/1/23 30 30 11/4/23 11/6/23 30 30 5/25/24 5/29/24 30 29 11/2/23 11/3/23 30 30 11/1/23 11/3/23 30 30 11/3/23 11/4/23 30 30 11/1/23 11/3/23 30 30 11/3/23 11/4/23 30 30 11/1/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/1/23 11/3/23 30 30 11/3/23 11/6/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 19/105 Sr Jose Martinez W120 3.5 02:55 PM 03:00 PM Pass 20/EXL Francisco Perez W124 3.5 09:26 AM 09:31 AM Pass 20/21 Jr Jose Martinez W120 3.5 07:50 AM 07:55 AM Pass 20/106 Sr Jose Martinez W120 3.5 03:00 PM 03:05 PM Pass 21/EXL Francisco Perez W124 3.5 09:33 AM 09:38 AM Pass 21/40 Blas Rivas W123 3.5 09:35 AM 09:40 AM Pass 21/109 Sr Jose Martinez W120 3.5 03:31 PM 03:36 PM Pass 22/EXL Blas Rivas W123 3 10:35 AM 10:40 AM Pass 22/23 Blas Rivas W123 3.5 08:30 AM 08:35 AM Pass 22/39 Jr Jose Martinez W120 3 03:00 PM 03:05 PM Pass 23/24 Francisco Perez W124 3.5 08:15 AM 08:20 AM Pass 23/39 Jr Jose Martinez W120 3 03:07 PM 03:12 PM Pass 24/25 Jr Jose Martinez W120 3.5 08:20 AM 08:25 AM Pass 24/39 Jr Jose Martinez W120 3 07:40 AM 07:45 AM Pass 25/26 Blas Rivas W123 3.5 08:50 AM 08:55 AM Pass 25/39 Jr Jose Martinez W120 3 07:42 AM 07:47 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 6 of 31 536 0 21 0 537 0 22 1 539 0 22 0 538 0 21 0 538 0 21 0 538 0 22 0 539 0 21 0 531 0 22 0 10:27 AM 860 03:37 PM 860 10:35 AM 860 03:31 PM 860 10:48 AM 860 03:25 PM 860 01:10 PM 860 03:19 PM 860 01:20 PM 860 03:16 PM 860 01:39 PM 860 03:09 PM 860 03:40 PM 860 03:03 PM 860 09:29 AM 860 02:58 PM 860 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 29 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/2/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/3/23 30 30 11/3/23 11/6/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 26/27 Blas Rivas W123 3.5 09:05 AM 09:10 AM Pass 26/39 Jr Jose Martinez W120 3 07:50 AM 07:55 AM Pass 27/28 Jr Jose Martinez W120 3.5 09:20 AM 09:25 AM Pass 27/39 Jr Jose Martinez W120 3 07:52 AM 07:57 AM Pass 28/29 Francisco Perez W124 3.5 09:25 AM 09:30 AM Pass 28/39 Jr Jose Martinez W120 3 07:54 AM 07:59 AM Pass 29/30 Blas Rivas W123 3.5 09:30 AM 09:35 AM Pass 29/39 Jr Jose Martinez W120 3 07:56 AM 08:01 AM Pass 30/31 Jr Jose Martinez W120 3.5 09:40 AM 09:45 AM Pass 30/39 Jr Jose Martinez W120 3 07:58 AM 08:03 AM Pass 31/32 Francisco Perez W124 3.5 09:45 AM 09:50 AM Pass 31/39 Jr Jose Martinez W120 3 08:00 AM 08:05 AM Pass 32/33 Francisco Perez W124 3.5 10:00 AM 10:05 AM Pass 32/39 Jr Jose Martinez W120 3 08:02 AM 08:07 AM Pass 33/34 Blas Rivas W123 3.5 01:05 PM 01:10 PM Pass 33/39 Jr Jose Martinez W120 3 08:05 AM 08:10 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 7 of 31 531 0 22 0 531 0 21 0 530 0 21 0 530 0 22 0 21 0 518 0 11 0 15 0 22 0 539 0 22 0 22 0 09:39 AM 860 02:52 PM 860 10:33 AM 860 02:47 PM 860 11:33 AM 860 02:49 PM 860 01:45 PM 860 02:36 PM 860 02:28 PM 860 01:26 PM 860 01:23 PM 860 01:09 PM 860 03:22 PM 860 09:57 AM 860 04:25 PM 860 03:32 PM 860 11/3/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/3/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/6/23 30 30 11/3/23 11/6/23 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 11/4/23 11/6/23 30 30 11/4/23 11/6/23 30 30 5/28/24 5/29/24 30 30 11/4/23 11/6/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 34/35 Francisco Perez W124 3.5 01:10 PM 01:15 PM Pass 34/39 Jr Jose Martinez W120 3 08:07 AM 08:12 AM Pass 35/36 Jr Jose Martinez W120 3.5 01:20 PM 01:25 PM Pass 35/39 Jr Jose Martinez W120 3 08:10 AM 08:15 AM Pass 36/37 Blas Rivas W123 3.5 08:23 AM 08:28 AM Pass 36/39 Jr Jose Martinez W120 3 08:12 AM 08:17 AM Pass 37/38 Francisco Perez W124 3.5 08:25 AM 08:30 AM Pass 37/39 Jr Jose Martinez W120 3 08:15 AM 08:20 AM Pass 38/39 Jr Jose Martinez W120 3 08:17 AM 08:22 AM Pass 38/102 Blas Rivas W123 4.5 02:46 PM 02:51 PM Pass 38/103 Blas Rivas W123 4.5 04:05 PM 04:10 PM Pass 39/103 Blas Rivas W123 4.5 04:15 PM 04:20 PM Pass 40/EXL Jr Jose Martinez W120 3 10:00 AM 10:05 AM Pass 40/41 Jr Jose Martinez W120 3.5 09:35 AM 09:40 AM Pass 40/111 Sr Jose Martinez W120 3.5 03:41 PM 03:46 PM Pass 41/EXL Jr Jose Martinez W120 3 10:02 AM 10:07 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 8 of 31 538 0 22 1 22 0 536 0 22 0 22 0 537 0 22 0 22 0 536 0 22 0 22 0 534 0 22 0 22 0 531 0 11:29 AM 860 04:28 PM 860 03:37 PM 860 12:54 PM 860 04:31 PM 860 03:42 PM 860 01:15 PM 860 04:37 PM 860 03:48 PM 860 01:35 PM 860 03:05 PM 860 03:53 PM 860 02:44 PM 860 03:08 PM 860 04:00 PM 860 10:39 AM 860 11/4/23 11/6/23 30 30 5/28/24 5/29/24 30 29 11/4/23 11/6/23 30 30 11/4/23 11/6/23 30 30 5/28/24 5/29/24 30 30 11/4/23 11/6/23 30 30 11/4/23 11/6/23 30 30 5/28/24 5/29/24 30 30 11/4/23 11/6/23 30 30 11/4/23 11/6/23 30 30 5/29/24 6/30/24 30 30 11/4/23 11/6/23 30 30 11/4/23 11/6/23 30 30 5/29/24 6/30/24 30 30 11/4/23 11/6/23 30 30 11/10/23 11/11/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 41/42 Francisco Perez W124 3.5 09:40 AM 09:45 AM Pass 41/112 Sr Jose Martinez W120 3.5 04:00 PM 04:05 PM Pass 42/EXL Jr Jose Martinez W120 3 10:08 AM 10:13 AM Pass 42/43 Blas Rivas W123 3.5 10:15 AM 10:20 AM Pass 42/115 Sr Jose Martinez W120 3.5 04:13 PM 04:18 PM Pass 43/EXL Jr Jose Martinez W120 3 10:45 AM 10:50 AM Pass 43/44 Jr Jose Martinez W120 3.5 10:20 AM 10:25 AM Pass 43/116 Sr Jose Martinez W120 3.5 02:06 PM 02:11 PM Pass 44/EXL Jr Jose Martinez W120 3 10:48 AM 10:53 AM Pass 44/45 Francisco Perez W124 3.5 10:25 AM 10:30 AM Pass 44/119 Francisco Perez W122 4 02:20 PM 02:25 PM Pass 45/EXL Jr Jose Martinez W120 3 10:50 AM 10:55 AM Pass 45/46 Blas Rivas W123 3.5 11:00 AM 11:05 AM Pass 45/120 Francisco Perez W122 4 02:35 PM 02:40 PM Pass 46/EXL Jr Jose Martinez W120 3 10:53 AM 10:58 AM Pass 46/47 Blas Rivas W123 3.5 02:20 PM 02:25 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 9 of 31 22 0 22 0 528 0 22 0 22 0 534 0 22 0 22 0 535 0 22 0 22 0 532 0 21 0 21 0 531 0 22 0 03:11 PM 860 01:25 PM 860 10:56 AM 860 03:14 PM 860 01:26 PM 860 11:17 AM 860 860 01:30 PM 860 01:21 PM 860 03:25 PM 860 01:34 PM 860 01:40 PM 860 03:30 PM 860 01:40 PM 860 02:10 PM 860 03:35 PM 860 5/29/24 6/30/24 30 30 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/29/24 6/30/24 30 30 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/30/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/30/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/30/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/30/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 46/123 Francisco Perez W122 4 02:45 PM 02:50 PM Pass 47/EXL Blas Rivas W123 4 07:35 AM 07:40 AM Pass 47/48 Jr Jose Martinez W120 3.5 02:28 PM 02:33 PM Pass 47/124 Francisco Perez W122 4 03:00 PM 03:05 PM Pass 48/EXL Blas Rivas W123 4 07:36 AM 07:41 AM Pass 48/49 Francisco Perez W124 3.5 02:32 PM 02:37 PM Pass 48/127 Blas Rivas W123 3.5 11:55 AM 12:00 PM Pass 49/EXL Blas Rivas W123 4 07:38 AM 07:43 AM Pass 49/50 Blas Rivas W123 3.5 02:35 PM 02:40 PM Pass 49/128 Blas Rivas W123 3.5 11:10 AM 11:15 AM Pass 50/EXL Blas Rivas W123 4 07:45 AM 07:50 AM Pass 50/51 Jr Jose Martinez W120 3.5 02:40 PM 02:45 PM Pass 50/131 Blas Rivas W123 3.5 11:20 AM 11:25 AM Pass 51/EXL Blas Rivas W123 4 07:48 AM 07:53 AM Pass 51/52 Francisco Perez W124 3.5 02:55 PM 03:00 PM Pass 51/132 Blas Rivas W123 3.5 11:25 AM 11:30 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 10 of 31 22 0 530 0 22 0 22 0 526 0 22 0 22 0 528 0 22 0 21 0 527 0 22 0 22 0 527 0 21 0 22 0 01:44 PM 860 03:03 PM 860 03:40 PM 860 01:47 PM 860 09:39 AM 860 08:21 AM 860 01:52 PM 860 09:55 AM 860 08:26 AM 860 01:56 PM 860 10:02 AM 860 08:31 AM 860 02:00 PM 860 12:17 PM 860 08:37 AM 860 02:04 PM 860 11/12/23 11/13/23 30 30 11/10/23 11/11/23 30 30 5/30/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 52/EXL Blas Rivas W123 4 07:55 AM 08:00 AM Pass 52/53 Blas Rivas W123 3.5 03:20 PM 03:25 PM Pass 52/135 Blas Rivas W123 3.5 11:36 AM 11:41 AM Pass 53/EXL Blas Rivas W123 4 08:02 AM 08:07 AM Pass 53/54 Blas Rivas W123 3.5 03:35 PM 03:40 PM Pass 53/136 Blas Rivas W118 3.3 12:48 PM 12:53 PM Pass 54/EXL Blas Rivas W123 4 08:04 AM 08:09 AM Pass 54/55 Jr Jose Martinez W120 3.5 03:37 PM 03:42 PM Pass 54/138 Blas Rivas W118 3.3 02:37 PM 02:42 PM Pass 55/EXL Blas Rivas W123 4 08:06 AM 08:11 AM Pass 55/56 Francisco Perez W124 3.5 03:40 PM 03:45 PM Pass 55/141 Blas Rivas W118 3.3 02:35 PM 02:40 PM Pass 56/EXL Blas Rivas W123 4 08:12 AM 08:17 AM Pass 56/57 Blas Rivas W123 3.5 03:45 PM 03:50 PM Pass 56/142 Blas Rivas W118 3.3 02:45 PM 02:50 PM Pass 57/EXL Blas Rivas W123 4 08:14 AM 08:19 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 11 of 31 527 0 22 0 22 0 525 0 22 0 22 0 523 0 22 0 22 0 522 0 22 0 21 0 523 0 22 0 22 0 524 0 12:36 PM 860 08:42 AM 860 02:09 PM 860 12:53 PM 860 08:47 AM 860 02:16 PM 860 02:14 PM 860 08:53 AM 860 02:20 PM 860 02:25 PM 860 02:35 PM 860 02:24 PM 860 08:40 AM 860 02:39 PM 860 02:38 PM 860 08:50 AM 860 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/11/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/12/23 30 30 6/1/24 6/1/24 30 30 11/12/23 11/13/23 30 30 11/11/23 11/12/23 30 30 6/3/24 6/4/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 6/3/24 6/4/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 57/58 Jr Jose Martinez W120 3.5 03:45 PM 03:50 PM Pass 57/145 Blas Rivas W118 3.3 02:55 PM 03:00 PM Pass 58/EXL Blas Rivas W123 4 08:16 AM 08:21 AM Pass 58/59 Francisco Perez W124 3.5 03:55 PM 04:00 PM Pass 58/147 Blas Rivas W118 3.3 03:04 PM 03:09 PM Pass 59/EXL Blas Rivas W123 4 08:20 AM 08:25 AM Pass 59/60 Blas Rivas W123 3.5 11:50 AM 11:55 AM Pass 59/148 Blas Rivas W118 3.3 03:17 PM 03:22 PM Pass 60/EXL Blas Rivas W123 4 08:22 AM 08:27 AM Pass 60/61 Jr Jose Martinez W120 3.5 11:35 AM 11:40 AM Pass 60/151 Francisco Perez W122 3.5 08:13 AM 08:18 AM Pass 61/EXL Blas Rivas W123 4 08:26 AM 08:31 AM Pass 61/62 Blas Rivas W123 3.5 01:00 PM 01:05 PM Pass 61/152 Francisco Perez W122 3.5 08:22 AM 08:27 AM Pass 62/EXL Blas Rivas W123 4 08:30 AM 08:35 AM Pass 62/63 Jr Jose Martinez W120 3.5 01:06 PM 01:11 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 12 of 31 22 0 21 0 524 0 21 0 22 0 521 0 0 0 22 0 22 0 520 0 0 0 21 0 21 0 516 0 0 0 21 0 02:44 PM 860 02:40 PM 860 09:12 AM 860 02:48 PM 860 02:10 PM 860 10:36 AM 860 02:54 PM 860 02:54 PM 860 02:16 PM 860 10:45 AM 860 03:30 PM 860 03:30 PM 860 02:21 PM 860 11:15 AM 860 03:34 PM 860 03:34 PM 860 6/3/24 6/4/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 6/3/24 6/4/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 6/5/24 6/8/24 30 0 6/5/24 6/8/24 30 30 11/12/23 11/13/23 30 30 11/12/23 11/12/23 30 30 6/5/24 6/8/24 30 0 6/5/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 62/155 Francisco Perez W122 3.5 08:35 AM 08:40 AM Pass 63/EXL Blas Rivas W123 4 08:35 AM 08:40 AM Pass 63/64 Francisco Perez W124 3.5 01:15 PM 01:20 PM Pass 63/156 Francisco Perez W122 3.5 04:05 PM 04:10 PM Pass 64/EXL Jr Jose Martinez W120 3 08:40 AM 08:45 AM Pass 64/65 Blas Rivas W123 3.5 01:35 PM 01:40 PM Pass 64/156 Francisco Perez W122 3.5 04:08 PM 04:13 PM Pass 64/158 Francisco Perez W122 3.5 09:10 AM 09:15 AM Pass 65/EXL Jr Jose Martinez W120 3 08:42 AM 08:47 AM Pass 65/66 Jr Jose Martinez W120 3.5 01:38 PM 01:43 PM Pass 65/158 Francisco Perez W122 4 Pass 65/160 Francisco Perez W122 4 07:38 AM 07:43 AM Pass 66/EXL Jr Jose Martinez W120 3 08:45 AM 08:50 AM Pass 66/67 Francisco Perez W124 3.5 01:45 PM 01:50 PM Pass 66/160 Francisco Perez W122 4 Pass 66/163 Francisco Perez W122 4 07:45 AM 07:50 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Vacuum Air Pressure 12/17/24 Page 13 of 31 22 0 514 0 1 0 21 0 22 0 511 0 1 0 21 0 21 0 508 0 1 0 20 0 22 0 510 0 20 0 22 0 02:27 PM 860 08:56 AM 860 03:34 PM 860 03:39 PM 860 01:33 PM 860 09:31 AM 860 03:39 PM 860 03:43 PM 860 01:49 PM 860 10:46 AM 860 03:43 PM 860 03:48 PM 860 01:54 PM 860 10:55 AM 860 04:35 PM 860 02:01 PM 860 11/12/23 11/13/23 30 30 11/14/23 11/14/23 30 30 6/5/24 6/8/24 30 0 6/5/24 6/8/24 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 6/5/24 6/8/24 30 0 6/5/24 6/8/24 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 6/5/24 6/8/24 30 0 6/5/24 6/8/24 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 6/7/24 6/8/24 30 30 11/15/23 11/15/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 67/EXL Jr Jose Martinez W120 3 08:55 AM 09:00 AM Pass 67/68 Blas Rivas W123 3.5 03:00 PM 03:05 PM Pass 67/163 Francisco Perez W122 4 Pass 67/164 Francisco Perez W122 4 08:04 AM 08:09 AM Pass 68/EXL Blas Rivas W123 3.5 02:05 PM 02:10 PM Pass 68/69 Francisco Perez W124 3.5 03:02 PM 03:07 PM Pass 68/164 Francisco Perez W122 4 Pass 68/167 Francisco Perez W122 4 08:06 AM 08:11 AM Pass 69/EXL Blas Rivas W123 3.5 02:07 PM 02:12 PM Pass 69/70 Jr Jose Martinez W120 3.5 03:05 PM 03:10 PM Pass 69/167 Francisco Perez W122 4 Pass 69/168 Francisco Perez W122 4 10:30 AM 10:35 AM Pass 70/EXL Blas Rivas W123 3.5 02:10 PM 02:15 PM Pass 70/71 Blas Rivas W123 3.5 03:25 PM 03:30 PM Pass 70/196 Francisco Perez W122 4.5 10:40 AM 10:45 AM Pass 71/EXL Blas Rivas W123 3.5 02:15 PM 02:20 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 14 of 31 465 0 47 0 21 0 407 0 54 0 21 0 22 0 93 0 20 0 95 0 90 0 21 0 87 0 22 0 82 0 22 0 11:17 AM 860 11:04 AM 860 03:38 PM 860 09:33 AM 860 11:35 AM 860 11:15 AM 860 04:41 PM 860 01:03 PM 860 03:07 PM 860 11:10 AM 860 01:05 PM 860 03:01 PM 860 01:16 PM 860 02:55 PM 860 01:39 PM 860 02:51 PM 860 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 6/7/24 6/8/24 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 6/7/24 6/8/24 30 30 11/14/23 11/14/23 30 30 11/15/23 11/17/23 30 30 6/6/24 6/8/24 30 30 11/14/23 11/14/23 30 30 11/15/23 11/17/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/17/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/17/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 71/72 Francisco Perez W124 3.5 03:28 PM 03:33 PM Pass 71/93 Francisco Perez W124 3.5 12:40 PM 12:45 PM Pass 71/197 Francisco Perez W122 4.5 10:48 PM 10:53 PM Pass 72/91 Blas Rivas W123 3.5 01:30 PM 01:35 PM Pass 72/92 Francisco Perez W124 3.5 01:15 PM 01:20 PM Pass 72/93 Francisco Perez W124 3.5 01:00 PM 01:05 PM Pass 72/198 Francisco Perez W122 4.5 10:50 AM 10:55 AM Pass 73/74 Blas Rivas W123 3.5 03:45 PM 03:50 PM Pass 73/91 Jr Jose Martinez W120 3.5 01:20 PM 01:25 PM Pass 73/170 Francisco Perez W122 4.5 11:05 AM 11:10 AM Pass 74/75 Jr Jose Martinez W120 3.5 03:47 PM 03:52 PM Pass 74/91 Jr Jose Martinez W120 3.5 01:15 PM 01:20 PM Pass 75/76 Francisco Perez W124 3.5 03:50 PM 03:55 PM Pass 75/91 Jr Jose Martinez W120 3.5 01:10 PM 01:15 PM Pass 76/77 Blas Rivas W123 3.5 04:00 PM 04:05 PM Pass 76/91 Jr Jose Martinez W120 3.5 01:05 PM 01:10 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 15 of 31 80 0 22 0 70 0 22 0 70 0 22 0 66 0 22 0 65 0 22 0 63 0 8 0 13 0 58 0 22 0 56 0 01:46 PM 860 02:45 PM 860 01:55 PM 860 02:39 PM 860 02:16 PM 860 02:34 PM 860 02:21 PM 860 02:29 PM 860 02:28 PM 860 02:24 PM 860 02:48 PM 860 02:22 PM 860 02:19 PM 860 02:51 PM 860 02:12 PM 860 03:05 PM 860 11/14/23 11/14/23 30 30 11/15/23 11/17/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 77/78 Jr Jose Martinez W120 3.5 04:02 PM 04:07 PM Pass 77/94 Jr Jose Martinez W120 3.5 01:00 PM 01:05 PM Pass 78/79 Francisco Perez W124 3.5 04:09 PM 04:14 PM Pass 78/94 Jr Jose Martinez W120 3.5 04:20 PM 04:25 PM Pass 79/80 Blas Rivas W123 3.5 04:15 PM 04:20 PM Pass 79/94 Jr Jose Martinez W120 3.5 04:15 PM 04:20 PM Pass 80/81 Jr Jose Martinez W120 3.5 04:17 PM 04:22 PM Pass 80/94 Jr Jose Martinez W120 3.5 04:03 PM 04:08 PM Pass 81/82 Francisco Perez W124 3.5 04:25 PM 04:30 PM Pass 81/94 Jr Jose Martinez W120 3.5 04:00 PM 04:05 PM Pass 82/83 Blas Rivas W123 3.5 04:28 PM 04:33 PM Pass 82/94 Jr Jose Martinez W120 3.5 03:58 PM 04:03 PM Pass 82/96 Jr Jose Martinez W120 3.5 03:55 PM 04:00 PM Pass 83/84 Jr Jose Martinez W120 3.5 04:30 PM 04:35 PM Pass 83/96 Jr Jose Martinez W120 3.5 03:53 PM 03:58 PM Pass 84/85 Francisco Perez W124 3.5 04:35 PM 04:40 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 16 of 31 22 0 51 0 22 0 46 0 22 0 37 0 12 0 3 0 6 0 32 0 23 0 27 0 23 0 17 0 19 0 4 0 02:08 PM 860 03:15 PM 860 02:02 PM 860 03:23 PM 860 01:57 PM 860 08:45 AM 860 01:54 PM 860 01:53 PM 860 01:52 PM 860 08:52 AM 860 01:45 PM 860 09:02 AM 860 01:40 PM 860 03:02 PM 860 01:35 PM 860 03:07 PM 860 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/14/23 11/14/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/17/23 30 0 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 84/96 Jr Jose Martinez W120 3.5 03:46 PM 03:51 PM Pass 85/86 Blas Rivas W123 3.5 04:40 PM 04:45 PM Pass 85/96 Jr Jose Martinez W120 3.5 03:44 PM 03:49 PM Pass 86/87 Jr Jose Martinez W120 3.5 04:50 PM 04:55 PM Pass 86/96 Jr Jose Martinez W120 3.5 03:42 PM 03:47 PM Pass 87/88 Francisco Perez W124 3.5 03:35 PM 03:40 PM Pass 87/96 Jr Jose Martinez W120 3.5 03:38 PM 03:43 PM Pass 87/97 Jr Jose Martinez W120 3.5 Pass 87/99 Jr Jose Martinez W120 3.5 03:36 PM 03:41 PM Pass 88/89 Francisco Perez W124 3.5 03:30 PM 03:35 PM Pass 88/99 Jr Jose Martinez W120 3.5 03:32 PM 03:37 PM Pass 89/90 Francisco Perez W124 3.5 03:22 PM 03:27 PM Pass 89/99 Jr Jose Martinez W120 3.5 03:23 PM 03:28 PM Pass 90/98 Francisco Perez W124 3.5 03:12 PM 03:17 PM Pass 90/99 Jr Jose Martinez W120 3.5 03:20 PM 03:25 PM Pass 90/101 Francisco Perez W124 3.5 03:11 PM 03:16 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 17 of 31 22 0 321 0 21 0 45 0 58 0 40 0 22 0 22 0 115 0 144 0 22 0 40 0 20 0 21 0 181 0 103 0 11:34 AM 860 11:09 AM 860 02:15 PM 860 11:54 AM 860 12:07 PM 860 12:33 PM 860 02:07 PM 860 11:23 AM 860 12:20 PM 860 11:50 AM 860 02:21 PM 860 11:39 AM 860 11:31 AM 860 02:26 PM 860 01:05 PM 860 02:02 PM 860 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 91/92 Francisco Perez W124 3.5 01:20 PM 01:25 PM Pass 91/94 Blas Rivas W123 3.5 01:32 PM 01:37 PM Pass 92/EXL Blas Rivas W123 3.5 02:40 PM 02:45 PM Pass 92/93 Francisco Perez W124 3.5 12:42 PM 12:47 PM Pass 92/94 Blas Rivas W123 3.5 01:17 PM 01:22 PM Pass 92/95 Blas Rivas W123 3.5 12:45 PM 12:50 PM Pass 93/EXL Blas Rivas W123 3.5 02:22 PM 02:27 PM Pass 94/95 Francisco Perez W124 3.5 01:02 PM 01:07 PM Pass 94/96 Jr Jose Martinez W120 3.5 01:45 PM 01:50 PM Pass 94/97 Jr Jose Martinez W120 3.5 01:35 PM 01:40 PM Pass 95/EXL Blas Rivas W123 3.5 02:42 PM 02:47 PM Pass 95/97 Jr Jose Martinez W120 3.5 01:30 PM 01:35 PM Pass 96/97 Jr Jose Martinez W120 3.5 01:48 PM 01:53 PM Pass 97/EXL Blas Rivas W123 3.5 02:45 PM 02:50 PM Pass 97/99 Francisco Perez W124 3.5 01:55 PM 02:00 PM Pass 98/99 Francisco Perez W124 3.5 02:58 PM 03:03 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 18 of 31 68 0 37 0 8 0 4 0 22 0 479 0 39 0 25 0 21 0 458 0 47 0 39 0 21 0 433 0 64 0 49 0 02:33 PM 860 02:47 PM 860 03:11 PM 550 02:22 PM 860 12:54 PM 860 02:09 PM 860 03:15 PM 860 01:58 PM 860 01:42 PM 860 03:15 PM 860 03:02 PM 860 04:25 PM 860 02:56 PM 860 03:36 PM 860 04:43 PM 860 03:24 PM 860 11/15/23 11/15/23 30 30 11/15/23 11/15/23 30 30 11/15/23 11/17/23 30 0 11/15/23 11/15/23 30 30 5/24/24 5/29/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/30/24 30 30 5/24/24 5/29/24 30 30 5/24/24 5/30/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 98/100 Francisco Perez W124 3.5 03:02 PM 03:07 PM Pass 98/101 Francisco Perez W124 3.5 03:10 PM 03:15 PM Pass 99/EXL Blas Rivas X92 550 Pass 100/101 Francisco Perez W124 3.5 03:05 PM 03:10 PM Pass 102/103 Blas Rivas W123 4.5 04:10 PM 04:15 PM Pass 102/104 Francisco Perez W124 4.5 03:40 PM 03:45 PM Pass 102/105 Francisco Perez W124 4.5 03:15 PM 03:20 PM Pass 103/104 Francisco Perez W124 4.5 04:17 PM 04:22 PM Pass 104/105 Francisco Perez W124 4.5 03:20 PM 03:25 PM Pass 104/106 Blas Rivas W123 4.5 04:00 PM 04:05 PM Pass 104/107 Blas Rivas W123 4.5 04:20 PM 04:25 PM Pass 105/106 Blas Rivas W123 4.5 03:22 PM 03:27 PM Pass 106/107 Blas Rivas W123 4.5 04:22 PM 04:27 PM Pass 106/108 Sr Jose Martinez W120 4.5 04:30 PM 04:35 PM Pass 106/109 Sr Jose Martinez W120 4.5 03:29 PM 03:34 PM Pass 107/108 Sr Jose Martinez W120 4.5 04:25 PM 04:30 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 19 of 31 21 0 458 0 24 0 64 0 21 0 359 0 97 0 90 0 21 0 338 0 111 0 97 0 22 0 316 0 119 0 111 0 03:20 PM 860 12:41 PM 860 02:04 PM 860 02:07 PM 860 12:50 PM 860 01:02 PM 860 12:55 PM 860 01:54 PM 860 12:40 PM 860 01:59 PM 860 02:48 PM 860 01:42 PM 860 02:16 PM 860 02:51 PM 860 02:35 PM 860 03:43 PM 860 5/24/24 5/30/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 5/29/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 5/29/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 5/29/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 108/109 Francisco Perez W124 4.5 04:32 PM 04:37 PM Pass 108/110 Blas Rivas W123 4.5 07:54 PM 07:59 PM Pass 108/111 Blas Rivas W123 4.5 07:13 AM 07:18 AM Pass 109/111 Blas Rivas W123 4.5 03:38 PM 03:43 PM Pass 110/111 Francisco Perez W122 4.5 07:20 AM 07:25 AM Pass 110/112 Francisco Perez W122 4.5 07:26 AM 07:31 AM Pass 110/113 Francisco Perez W122 4.5 08:13 AM 08:18 AM Pass 111/112 Francisco Perez W122 4.5 03:57 PM 04:02 PM Pass 112/113 Francisco Perez W122 4.5 08:10 AM 08:15 AM Pass 112/114 Sr Jose Martinez W120 4.5 08:22 AM 08:27 AM Pass 112/115 Sr Jose Martinez W120 4.5 04:06 PM 04:11 PM Pass 113/114 Sr Jose Martinez W120 4.5 08:15 AM 08:20 AM Pass 114/115 Francisco Perez W122 4.5 08:27 AM 08:32 AM Pass 114/116 Blas Rivas W123 4.5 08:30 AM 08:35 AM Pass 114/117 Blas Rivas W123 4.5 08:45 AM 08:50 AM Pass 115/116 Blas Rivas W123 4.5 02:04 PM 02:09 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 20 of 31 22 0 291 0 137 0 119 0 22 0 231 0 181 0 136 0 22 0 168 0 200 0 181 0 21 0 134 0 214 0 203 0 02:32 PM 860 03:48 PM 860 04:08 PM 860 03:22 PM 860 04:03 PM 860 11:17 AM 860 10:42 AM 860 12:05 PM 860 11:01 AM 860 11:43 AM 860 12:07 PM 860 11:15 AM 860 11:38 AM 860 01:47 PM 860 01:20 PM 860 02:06 PM 860 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/28/24 5/30/24 30 30 5/28/24 6/1/24 30 30 5/28/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 116/117 Blas Rivas W123 4.5 08:48 AM 08:53 AM Pass 116/118 Francisco Perez W122 4.5 08:34 AM 08:39 AM Pass 116/119 Blas Rivas W123 4.5 09:04 AM 09:09 AM Pass 117/118 Francisco Perez W122 4.5 08:25 AM 08:30 AM Pass 118/119 Blas Rivas W123 4.5 09:04 AM 09:09 AM Pass 118/120 Francisco Perez W122 5.5 10:13 AM 10:18 AM Pass 118/121 Francisco Perez W122 5.5 10:17 AM 10:22 AM Pass 119/120 Francisco Perez W122 5.5 09:07 AM 09:12 AM Pass 120/121 Blas Rivas W123 4.5 10:15 AM 10:20 AM Pass 120/122 Blas Rivas W123 4.5 09:13 AM 09:18 AM Pass 120/123 Blas Rivas W123 4.5 02:32 PM 02:37 PM Pass 121/122 Blas Rivas W123 4.5 10:19 AM 10:24 AM Pass 122/123 Blas Rivas W123 4.5 10:05 AM 10:10 AM Pass 122/124 Francisco Perez W122 5.5 10:42 AM 10:47 AM Pass 122/125 Francisco Perez W122 5.5 10:40 AM 10:45 AM Pass 123/124 Francisco Perez W122 5.5 02:50 PM 02:55 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 21 of 31 22 0 103 0 237 0 214 0 22 0 251 0 116 0 22 0 29 0 269 0 252 0 22 0 281 0 264 0 6 0 22 0 01:17 PM 860 01:49 PM 860 02:28 PM 860 01:20 PM 860 02:22 PM 860 10:11 AM 860 11:20 AM 860 09:57 AM 860 11:30 AM 860 11:38 AM 860 10:42 AM 860 10:17 AM 860 01:01 PM 860 01:43 PM 860 01:26 PM 860 01:07 PM 860 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/29/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 124/125 Sr Jose Martinez W120 4.5 10:25 AM 10:30 AM Pass 124/126 Sr Jose Martinez W120 4.5 10:29 AM 10:34 AM Pass 124/127 Sr Jose Martinez W120 4.5 03:05 PM 03:10 PM Pass 125/126 Sr Jose Martinez W120 4.5 10:31 AM 10:36 AM Pass 126/127 Sr Jose Martinez W120 4.5 10:50 PM 10:55 PM Pass 126/129 Blas Rivas W123 4.5 01:15 PM 01:20 PM Pass 127/128 Blas Rivas W123 4.5 11:00 AM 11:05 AM Pass 128/129 Francisco Perez W122 4.5 01:05 PM 01:10 PM Pass 128/130 Francisco Perez W122 4.5 01:07 PM 01:12 PM Pass 128/131 Francisco Perez W122 4.5 11:28 AM 11:33 AM Pass 129/130 Francisco Perez W122 4.5 01:17 PM 01:22 PM Pass 130/131 Francisco Perez W122 4.5 01:20 PM 01:25 PM Pass 130/133 Blas Rivas W123 4.5 01:25 PM 01:30 PM Pass 131/132 Blas Rivas W123 4.5 01:45 PM 01:50 PM Pass 131/133 Blas Rivas W123 4.5 01:26 PM 01:31 PM Pass 132/133 Francisco Perez W122 4.5 01:30 PM 01:35 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 22 of 31 264 0 249 0 38 0 22 0 248 0 229 0 74 0 22 0 213 0 15 0 322 0 22 0 213 0 195 0 140 0 22 0 02:36 PM 860 01:59 PM 860 02:27 PM 860 01:40 PM 860 02:32 PM 860 03:23 PM 860 03:12 PM 860 02:20 PM 860 11:47 AM 860 11:43 AM 860 10:53 AM 860 10:23 AM 860 12:51 PM 860 11:20 AM 860 12:24 PM 860 11:41 AM 860 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/30/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 132/135 Francisco Perez W122 4.5 12:40 PM 12:45 PM Pass 133/134 Francisco Perez W122 4.5 01:40 PM 01:45 PM Pass 133/135 Francisco Perez W122 4.5 01:31 PM 01:36 PM Pass 134/135 Francisco Perez W122 4.5 01:35 PM 01:40 PM Pass 134/137 Sr Jose Martinez W120 4 01:42 PM 01:47 PM Pass 135/136 Sr Jose Martinez W120 4 12:45 PM 12:50 PM Pass 135/137 Sr Jose Martinez W120 4 01:48 PM 01:53 PM Pass 136/137 Sr Jose Martinez W120 4 01:55 PM 02:00 PM Pass 136/138 Francisco Perez W122 4 12:55 PM 01:00 PM Pass 136/139 Francisco Perez W122 4 02:24 PM 02:29 PM Pass 137/139 Francisco Perez W122 4 02:15 PM 02:20 PM Pass 138/139 Francisco Perez W122 4 02:20 PM 02:25 PM Pass 138/141 Blas Rivas W118 4.5 02:30 PM 02:35 PM Pass 139/140 Blas Rivas W118 4.5 04:00 PM 04:05 PM Pass 139/141 Blas Rivas W118 4.5 03:25 PM 03:30 PM Pass 140/141 Sr Jose Martinez W120 4 04:06 PM 04:11 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 23 of 31 195 0 183 0 171 0 22 0 183 0 165 0 201 0 22 0 151 0 14 0 384 0 22 0 151 0 139 0 259 0 22 0 12:22 PM 860 01:29 PM 860 01:01 PM 860 01:02 PM 860 02:41 PM 860 01:36 PM 860 01:57 PM 860 01:22 PM 860 02:04 PM 860 02:33 PM 860 02:36 PM 860 02:19 PM 860 02:50 PM 860 03:34 PM 860 03:21 PM 860 03:22 PM 860 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 5/31/24 6/1/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 140/143 Sr Jose Martinez W120 4 04:04 PM 04:09 PM Pass 141/142 Sr Jose Martinez W120 4 02:43 PM 02:48 PM Pass 141/143 Sr Jose Martinez W120 4 02:32 PM 02:37 PM Pass 142/143 Francisco Perez W122 4 03:35 PM 03:40 PM Pass 142/145 Francisco Perez W122 4 02:50 PM 02:55 PM Pass 143/144 Francisco Perez W122 4 04:15 PM 04:20 PM Pass 143/145 Francisco Perez W122 4 03:38 PM 03:43 PM Pass 144/145 Francisco Perez W122 4 04:17 PM 04:22 PM Pass 144/146 Blas Rivas W118 4.5 04:21 PM 04:26 PM Pass 144/147 Blas Rivas W118 4.5 04:20 PM 04:25 PM Pass 145/147 Blas Rivas W118 4.5 03:00 PM 03:05 PM Pass 146/147 Sr Jose Martinez W120 4 04:25 PM 04:30 PM Pass 146/149 Sr Jose Martinez W120 4 04:28 PM 04:33 PM Pass 147/148 Francisco Perez W122 4 03:10 PM 03:15 PM Pass 147/149 Sr Jose Martinez W120 4 03:59 PM 04:04 PM Pass 148/149 Francisco Perez W122 4 03:43 PM 03:48 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 24 of 31 140 0 43 0 366 0 22 0 17 0 26 0 507 0 21 0 510 0 13 0 26 0 22 0 509 0 27 0 13 0 22 0 11:21 AM 860 10:01 AM 860 10:07 AM 860 09:39 AM 860 10:39 AM 860 10:34 AM 860 10:45 AM 860 10:06 AM 860 12:39 PM 860 01:47 PM 860 12:33 PM 860 12:02 PM 860 01:02 PM 860 12:56 PM 860 02:09 PM 860 12:50 PM 860 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 148/151 Francisco Perez W122 4.5 08:30 AM 08:35 AM Pass 149/150 Francisco Perez W122 4.5 09:55 AM 10:00 AM Pass 149/151 Francisco Perez W122 4.5 09:10 AM 09:15 AM Pass 150/151 Francisco Perez W122 4.5 09:57 AM 10:02 AM Pass 150/152 Blas Rivas W118 3.3 09:59 AM 10:04 AM Pass 150/153 Blas Rivas W118 3.3 10:04 AM 10:09 AM Pass 151/152 Blas Rivas W118 3.3 08:33 AM 08:38 AM Pass 152/153 Francisco Perez W122 4.5 10:01 AM 10:06 AM Pass 152/154 Sr Jose Martinez W120 4 08:50 AM 08:55 AM Pass 152/155 Sr Jose Martinez W120 4 08:42 AM 08:47 AM Pass 153/154 Sr Jose Martinez W120 4 10:05 AM 10:10 AM Pass 154/155 Blas Rivas W118 3.3 08:45 AM 08:50 AM Pass 154/156 Francisco Perez W122 4.5 09:02 AM 09:07 AM Pass 154/157 Francisco Perez W122 4.5 10:17 AM 10:22 AM Pass 155/156 Francisco Perez W122 4.5 08:57 AM 09:02 AM Pass 156/157 Francisco Perez W122 4.5 10:13 AM 10:18 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 25 of 31 504 0 17 0 28 0 23 0 487 0 13 0 45 0 22 0 415 0 73 0 60 0 22 0 380 0 94 0 75 0 22 0 01:29 PM 860 01:24 PM 860 01:17 PM 860 01:10 PM 860 10:40 AM 860 10:35 AM 860 10:28 AM 860 10:36 AM 860 10:52 AM 860 12:12 PM 860 10:40 AM 860 11:40 AM 860 01:25 PM 860 01:09 PM 860 02:32 PM 860 12:57 PM 860 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/3/24 6/4/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 156/158 Blas Rivas W118 3.3 09:07 AM 09:12 AM Pass 156/159 Blas Rivas W118 3.3 10:11 AM 10:16 AM Pass 157/159 Blas Rivas W118 3.3 10:21 AM 10:26 AM Pass 158/159 Blas Rivas W118 3.3 10:10 AM 10:15 AM Pass 158/160 Francisco Perez W122 4.5 07:35 AM 07:40 AM Pass 158/161 Francisco Perez W122 4.5 09:13 AM 09:18 AM Pass 159/161 Francisco Perez W122 4.5 07:35 AM 07:40 AM Pass 160/161 Blas Rivas W118 3.3 09:15 AM 09:20 AM Pass 160/162 Blas Rivas W118 3.3 10:52 AM 10:57 AM Pass 160/163 Blas Rivas W118 3.3 07:43 AM 07:48 AM Pass 161/162 Blas Rivas W118 3.3 09:21 AM 09:26 AM Pass 162/163 Francisco Perez W122 3.5 08:30 AM 08:35 AM Pass 162/164 Francisco Perez W122 4.5 08:40 AM 08:45 AM Pass 162/165 Francisco Perez W122 4.5 09:24 AM 09:29 AM Pass 163/164 Francisco Perez W122 4.5 08:00 AM 08:05 AM Pass 164/165 Blas Rivas W118 3.3 09:26 AM 09:31 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 26 of 31 349 0 108 0 94 0 22 0 306 0 136 0 110 0 22 0 419 0 119 0 15 0 101 0 21 0 101 0 21 0 38 0 01:14 PM 860 02:50 PM 860 01:01 PM 860 02:51 PM 860 02:49 PM 860 02:25 PM 860 03:28 PM 860 02:11 PM 860 11:56 AM 860 11:36 AM 860 09:07 AM 860 11:25 AM 860 01:45 PM 860 11:15 AM 860 01:50 PM 860 12:42 PM 860 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/5/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 164/166 Blas Rivas W118 3.3 08:44 AM 08:49 AM Pass 164/167 Blas Rivas W118 3.3 08:12 PM 08:17 PM Pass 165/166 Blas Rivas W118 3.3 09:28 AM 09:33 AM Pass 166/167 Blas Rivas W118 3.3 08:46 AM 08:51 AM Pass 166/168 Sr Jose Martinez W120 4 09:03 PM 09:08 PM Pass 166/169 Sr Jose Martinez W120 4 09:52 AM 09:57 AM Pass 167/168 Sr Jose Martinez W120 4 03:28 PM 03:33 PM Pass 168/169 Sr Jose Martinez W120 4 09:45 AM 09:50 AM Pass 168/196 Francisco Perez W122 4.5 09:47 AM 09:52 AM Pass 169/196 Francisco Perez W122 4.5 09:49 AM 09:54 AM Pass 169/208 Blas Rivas W127 3.5 09:58 AM 10:03 AM Pass 170/171 Francisco Perez W122 4.5 11:00 AM 11:05 AM Pass 170/198 Sr Jose Martinez W120 4 10:58 AM 11:03 AM Pass 171/172 Blas Rivas W120 4 11:03 AM 11:08 AM Pass 171/198 Sr Jose Martinez W120 4 11:10 AM 11:15 AM Pass 172/173 Francisco Perez W122 4.5 11:19 AM 11:24 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 27 of 31 62 0 21 0 21 0 37 0 16 0 5 0 60 0 93 0 22 0 88 0 22 0 83 0 22 0 71 0 7 0 19 0 12:33 PM 860 01:54 PM 860 11:48 AM 860 12:39 PM 860 01:59 PM 860 04:12 PM 860 12:21 PM 860 12:55 PM 860 04:08 PM 860 12:50 PM 860 04:05 PM 860 01:11 PM 860 04:02 PM 860 01:22 PM 860 01:29 PM 860 03:59 PM 860 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 172/174 Francisco Perez W122 4.5 11:12 AM 11:17 AM Pass 172/198 Sr Jose Martinez W120 4 11:21 AM 11:26 AM Pass 173/174 Blas Rivas W120 4 11:27 AM 11:32 AM Pass 173/175 Blas Rivas W120 4 11:33 AM 11:38 AM Pass 173/198 Sr Jose Martinez W120 4 11:21 AM 11:26 AM Pass 173/205 Francisco Perez W122 4.5 11:30 AM 11:35 AM Pass 174/175 Blas Rivas W120 4 11:28 PM 11:33 PM Pass 175/176 Francisco Perez W122 4.5 11:38 AM 11:43 AM Pass 175/205 Francisco Perez W122 4.5 11:35 AM 11:40 AM Pass 176/177 Blas Rivas W120 4 11:45 AM 11:50 AM Pass 176/205 Francisco Perez W122 4.5 11:40 AM 11:45 AM Pass 177/178 Blas Rivas W120 4 12:50 PM 12:55 PM Pass 177/205 Francisco Perez W122 4.5 11:50 AM 11:55 AM Pass 178/179 Francisco Perez W122 4.5 11:12 AM 11:17 AM Pass 178/180 Francisco Perez W122 4.5 12:55 PM 01:00 PM Pass 178/202 Francisco Perez W122 4.5 12:25 PM 12:30 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 28 of 31 3 0 22 0 69 0 2 0 22 0 68 0 22 0 63 0 17 0 4 0 59 0 22 0 55 0 22 0 50 0 22 0 04:01 PM 860 01:37 PM 860 01:42 PM 860 01:49 PM 860 03:56 PM 860 01:50 PM 860 03:53 PM 860 02:15 PM 860 03:50 PM 860 03:52 PM 860 02:13 PM 860 03:47 PM 860 02:33 PM 860 03:44 PM 860 02:22 PM 860 03:41 PM 860 6/7/24 6/8/24 30 0 6/6/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/6/24 6/8/24 30 0 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 0 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 178/205 Francisco Perez W122 4.5 Pass 179/180 Blas Rivas W120 4 01:00 PM 01:05 PM Pass 179/181 Blas Rivas W120 4 01:20 PM 01:25 PM Pass 180/181 Blas Rivas W120 4 Pass 180/202 Francisco Perez W122 4.5 01:14 PM 01:19 PM Pass 181/182 Francisco Perez W122 4.5 01:30 PM 01:35 PM Pass 181/202 Francisco Perez W122 4.5 01:22 PM 01:27 PM Pass 182/183 Francisco Perez W122 4.5 01:47 PM 01:52 PM Pass 182/200 Francisco Perez W122 4.5 01:44 PM 01:49 PM Pass 182/202 Francisco Perez W122 4.5 Pass 183/184 Blas Rivas W120 4 01:48 PM 01:53 PM Pass 183/200 Francisco Perez W122 4.5 01:45 PM 01:50 PM Pass 184/185 Francisco Perez W122 4.5 01:57 PM 02:02 PM Pass 184/200 Francisco Perez W122 4.5 01:50 PM 01:55 PM Pass 185/186 Blas Rivas W120 4 02:00 PM 02:05 PM Pass 185/200 Francisco Perez W122 4.5 01:55 PM 02:00 PM Pass Powered By: Operator Name PSI In PSI Out Vacuum Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Vacuum Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 29 of 31 46 0 15 0 6 0 41 0 22 0 37 0 22 0 32 0 22 0 28 0 10 0 12 0 22 0 22 0 17 0 21 0 02:53 PM 860 03:39 PM 860 03:41 PM 860 02:55 PM 860 03:36 PM 860 03:05 PM 860 03:33 PM 860 03:04 PM 860 03:30 PM 860 03:38 PM 860 03:27 PM 860 03:29 PM 860 03:43 PM 860 03:25 PM 860 03:50 PM 860 03:21 PM 860 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/10/24 30 30 6/6/24 6/8/24 30 30 6/7/24 6/10/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 186/187 Francisco Perez W122 4.5 02:20 PM 02:25 PM Pass 186/199 Francisco Perez W122 4.5 02:10 PM 02:15 PM Pass 186/200 Francisco Perez W122 4.5 02:04 PM 02:09 PM Pass 187/188 Blas Rivas W120 4 02:25 PM 02:30 PM Pass 187/199 Francisco Perez W122 4.5 02:22 PM 02:27 PM Pass 188/189 Francisco Perez W122 4.5 02:30 PM 02:35 PM Pass 188/199 Francisco Perez W122 4.5 02:28 PM 02:33 PM Pass 189/190 Blas Rivas W120 4 02:45 PM 02:50 PM Pass 189/199 Francisco Perez W122 4.5 02:38 PM 02:43 PM Pass 190/191 Francisco Perez W122 4.5 02:40 PM 02:45 PM Pass 190/195 Francisco Perez W122 4.5 02:53 PM 02:58 PM Pass 190/199 Francisco Perez W122 4.5 02:47 PM 02:52 PM Pass 191/192 Blas Rivas W120 4 02:48 PM 02:53 PM Pass 191/195 Francisco Perez W122 4.5 07:24 AM 07:29 AM Pass 192/193 Francisco Perez W122 4.5 02:34 PM 02:39 PM Pass 192/195 Francisco Perez W122 4.5 07:26 AM 07:31 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 30 of 31 9 0 23 0 66 0 141 0 515 0 22 0 22 0 514 0 21 0 183 0 148 0 54 0 74 0 12 0 22 0 186 0 11:06 AM 860 03:18 PM 860 11:20 AM 860 02:04 PM 860 12:51 PM 860 08:52 AM 860 09:01 AM 860 01:43 PM 860 08:47 AM 860 08:07 AM 860 04:02 PM 860 04:31 PM 860 04:41 PM 860 08:10 AM 860 08:31 AM 860 02:59 PM 860 6/7/24 6/10/24 30 30 6/7/24 6/10/24 30 30 6/7/24 6/10/24 30 30 6/7/24 6/10/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/7/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 193/194 Francisco Perez W122 4.5 07:28 AM 07:33 AM Pass 193/195 Francisco Perez W122 4.5 07:27 AM 07:32 AM Pass 194/195 Francisco Perez W122 4.5 07:36 AM 07:41 AM Pass 195/199 Sr Jose Martinez W120 4 02:50 PM 02:55 PM Pass 196/197 Blas Rivas W127 4 10:01 AM 10:06 AM Pass 196/207 Blas Rivas W127 3.5 10:04 AM 10:09 AM Pass 196/208 Blas Rivas W127 3.5 10:07 AM 10:12 AM Pass 197/198 Francisco Perez W122 4.5 10:08 AM 10:13 AM Pass 197/207 Blas Rivas W127 3.5 10:12 AM 10:17 AM Pass 198/202 Blas Rivas W127 3.5 10:24 AM 10:29 AM Pass 198/203 Sr Jose Martinez W120 4 01:35 PM 01:40 PM Pass 198/204 Sr Jose Martinez W120 4 01:05 PM 01:10 PM Pass 198/205 Sr Jose Martinez W120 4 11:43 AM 11:48 AM Pass 198/206 Blas Rivas W127 3.5 10:21 AM 10:26 AM Pass 198/207 Blas Rivas W127 3.5 10:17 AM 10:22 AM Pass 199/200 Sr Jose Martinez W120 4 02:33 PM 02:38 PM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure 12/17/24 Page 31 of 31 49 0 21 0 275 0 50 0 148 0 53 0 5 0 16 0 7 0 9 0 16 0 16 0 02:50 PM 860 02:37 PM 860 02:55 PM 860 02:42 PM 860 03:57 PM 860 04:24 PM 860 03:50 PM 860 08:15 AM 860 03:46 PM 860 03:51 PM 860 08:36 AM 860 08:55 AM 860 6/7/24 6/10/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/10/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/7/24 6/8/24 30 30 6/8/24 6/8/24 30 30 6/8/24 6/8/24 30 30 Machine Speed Preheat Temp AT Time In Machine Number Test Type Test Results Test Date Weld Date Seam Number Seam Length Weld Time Machine Temp PSI Loss AT Time Out 199/201 Sr Jose Martinez W120 4 02:33 PM 02:38 PM Pass 200/201 Sr Jose Martinez W120 4 02:30 PM 02:35 PM Pass 200/202 Blas Rivas W127 4 01:40 PM 01:45 PM Pass 201/202 Blas Rivas W127 4 07:42 AM 07:47 AM Pass 202/203 Blas Rivas W127 4 01:33 PM 01:38 PM Pass 202/204 Blas Rivas W127 4 01:03 PM 01:08 PM Pass 202/205 Blas Rivas W127 4 01:01 PM 01:06 PM Pass 202/206 Blas Rivas W127 3.5 10:22 AM 10:27 AM Pass 203/204 Blas Rivas W127 4 01:08 PM 01:13 PM Pass 204/205 Blas Rivas W127 4 12:58 PM 01:03 PM Pass 206/207 Blas Rivas W127 3.5 10:20 AM 10:25 AM Pass 207/208 Blas Rivas W127 3.5 10:30 AM 10:35 AM Pass Powered By: Operator Name PSI In PSI Out Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Air Pressure Page1 of 2 Primary X Cell X Secondary Pond Other Pad Weld Seam Operator Mach Mach Mach Preheat PSI Test Date Length Name/ ID No. Speed Temp Temp Loss Results 16 25 16 35 16 40 16 34 16 42 16 47 17 05 17 28 17 38 17 44 17 51 10 00 10 15 10 20 10 10 10 15 10 20 10 17 10 07 953 13 00 12 40 1 550 500 9/6/24 30 30 6 860 9/5/24 Aron Ramirez X-112 W-145 860 Pass 9/6/24 Vacuum 550 Air Pressure Pass Pass Pass 50 AT Time Out PSI OUT Pass Pass EL 30 9/5/24 2 EL 25 Aron Ramirez X-112 550 9/5/24 3 EL 16 Aron Ramirez 9/5/24 2 3 53 Angel Balderas 9/5/24 X-112 550 500 9/6/24 Vacuum 9/5/24 3 EL 10 Aron Ramirez X-112 550 500 9/6/24 Vacuum 9/5/24 2 EL 10 Aron Ramirez X-112 9/6/24 3 4 60 Angel Balderas W-145 6 860 9/6/24 Air Pressure 30 30 Pass 9/6/24 4 5 43 Angel Balderas W-145 6 860 9/6/24 Air Pressure 30 30 Pass 9/6/24 1 EL 17 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 2 EL 22.5 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 3 EL 63 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 4 EL 22.5 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 5 EL 22.5 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass Quality Controller:FRANCISCO GONZALEZ T&M Air Pressure Welded 9/6/24 Vacuum Vacuum 500 No. 1 Air Pressure Test 501 PSI INType AT Time InSeam Date Test 5REPAIRS 2 30 SEAM CONTROL REPORT SALT LAKE VALLEY SOLID WASTE MANAGEMENT Job No. : Superintendent:LUIS ESPINALProject Name:724046 PSI Minutes PSI Pass 30 3 181 Total LF of Welding to Date Combined Material Type: 9/5/24 Job Description: Allowable Air Pressure Loss Test Air Pressure Hold Time W-145Angel Balderas 30 60MIL HDPE TEXTURED Time 25 9/5/246 Fusion LF Weld Total To Date:Extrusion LF Weld Total To Date 320 Seam Control Geo-Synthetics Systems, LLC. Confidential-Rev.240314 Page2 of 2 Primary X Cell X Secondary Pond Other Pad Weld Seam Operator Mach Mach Mach Preheat PSI Test Date Length Name/ ID No. Speed Temp Temp Loss Results AT Time Out PSI OUT Quality Controller:FRANCISCO GONZALEZ T&M WeldedNo. Air Pressure Test 501 PSI INType AT Time InSeam Date Test 5REPAIRS SEAM CONTROL REPORT SALT LAKE VALLEY SOLID WASTE MANAGEMENT Job No. : Superintendent:LUIS ESPINALProject Name:724046 PSI Minutes PSI 30 3 181 Total LF of Welding to Date Combined Material Type: Job Description: Allowable Air Pressure Loss Test Air Pressure Hold Time 60MIL HDPE TEXTURED Time Fusion LF Weld Total To Date:Extrusion LF Weld Total To Date 320 12 23 12 36 11 01 10 56 10 52 9/6/24 5 EL 23.5 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 5 EL 25 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 4 EL 20 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 4 EL 8 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass 9/6/24 4 EL 5 Aron Ramirez X-112 550 500 9/6/24 Vacuum Pass Seam Control Geo-Synthetics Systems, LLC. Confidential-Rev.240314 5.6 Repair Reports Page1 of 1 Project Name: X X Pad Material Type: Job Description: Damage Codes BO --Burn Out PB CF SF Patch Material Test Type Abbrv. CR FS --Failed Seam MatD LL Vacuum *S=South DS WR --Wrinkle WS MD Air Pressure *N=North SI --Subgrade Irregularity AV --Air Vent RW DO LF Welded Spark *W=West SJ AO --Add On FM CS 150.00 Air Lance *E=East Repair Damage Seam Panel Repair Date Time Date Test Test Date of Number Code Number Number Type Welded Welded Completed Type Results Re-test R1 SJ 1/2/EL C 2 X 7 9/5/24 5:26:00 PM Aron Ramirez 09/06/24 Vacuum Pass R2 WS 2/EL P 2 X 2 9/5/24 5:36:00 PM Aron Ramirez 09/06/24 Vacuum Pass R3 SJ 2/3/EL P 2 X 2 9/5/24 5:43:00 PM Aron Ramirez 09/06/24 Vacuum Pass R4 LL 3/EL P 2 X 2 9/5/24 5:54:00 PM Aron Ramirez 09/06/24 Vacuum Pass R5 DS1 2/3 P 2 X 5 9/6/24 9:00:00 AM Aron Ramirez 09/06/24 Vacuum Pass R6 DS2 P2/R1 P 2 X 5 9/6/24 8:55:00 AM Aron Ramirez 09/06/24 Vacuum Pass R7 SJ 1/2/EL P 2 X 2 9/6/24 10:16:00 AM Aron Ramirez 09/06/24 Vacuum Pass R8 SJ 2/3/EL P 2 X 2 9/6/24 10:06:00 AM Aron Ramirez 09/06/24 Vacuum Pass R9 SJ 3/4/EL P 2 X 2 9/6/24 1:20:00 PM Aron Ramirez 09/06/24 Vacuum Pass R10 SJ 4/5/EL P 2 X 2 9/6/24 12:59:00 PM Aron Ramirez 09/06/24 Vacuum Pass R11 WS 5/EL P 2 X 2 9/6/24 12:39:00 PM Aron Ramirez 09/06/24 Vacuum Pass R12 SJ 4/5/EL P 2 X 2 9/6/24 12:22:00 PM Aron Ramirez 09/06/24 Vacuum Pass R13 WS 4/EL P 2 X 2 9/6/24 11:00:00 AM Aron Ramirez 09/06/24 Vacuum Pass R14 WS 4/EL P 2 X 2 9/6/24 10:55:00 AM Aron Ramirez 09/06/24 Vacuum Pass R15 SJ 3/4/EL P 2 X 2 9/6/24 10:50:00 AM Aron Ramirez 09/06/24 Vacuum Pass R16 WS 5/EL P 2 X 2 9/6/24 12:35:00 PM Aron Ramirez 09/06/24 Vacuum Pass 4 10 10 Total SF 14 4 Operator Name 4 4 4 4 End of Seam Intersection 10' North from South 5' North from South Intersection 25' NW from SE 4 4 4 4 4 4 Quality Controller: Pond 10' NE from NW Intersection Intersection Intersection --Seam Joint --Material Defect REPAIRS 60MIL HDPE TEXTURED --Crease --Destruct Sample --Pipe Boot Primary Secondary --Welder Restart Cell Repair Types--Custom Fit C--Cap Strip P--Patch * if aplicable (Feet) --Lost Lap --Damage By Others Patch --Concrete Structure --Mechanical Damage 4 --Roller Wrinkle Intersection Location Intersection 25' E from W 37' E from W Intersection Intersection --Fishmouth T&M SALT LAKE VALLEY SOLID WASTE MANAGEMENT Other 724046Superintendent:LUIS ESPINAL Job No.:FRANCISCO GONZALEZ REPAIR REPORT 86 Repair Report Geo-Synthetics Systems, LLC. Confidential-Rev.240314 5.7 Panel Placement Summary Page1 of 1 Project: Owner: Engineer: Contractor: Installation Supervisor: Panel Number Width Length Square Footage Daily Totals P1 17 12.5 212.5 P2 23 39 897 P3 23 76 1748 2857.5 P4 23 52 1196 P5 23 21.5 494.5 1690.5 0 0105-213374 9/6/2024 60MIL HDPE TEXTURED 0105-213374 9/6/2024 60MIL HDPE TEXTURED Quality Controller: Materials: LUIS ESPINAL FRANCISCO GONZALEZ 60MIL HDPE TEXTURED Panel Placement Log SALT LAKE CITY CORPORATION SALT LAKE VALLEY SOLID WASTE MANAGEMENT 0105-213374 9/5/2024 60MIL HDPE TEXTURED 0105-213374 9/5/2024 60MIL HDPE TEXTURED Roll Number Installation Date Material Type 0105-213374 9/5/2024 60MIL HDPE TEXTURED Panel Placement Geo-Synthetics Systems, LLC. Confidential-Rev.240314 5.8 Liner As-Built Drawings MOD 8 RD-1 60 M I L H D P E T E X T U R E D PR I M A R Y L A Y E R RE C O R D D R A W I N G SR 1'' = 4 0 ' - 0 ' ' 72 3 0 2 7 L2 3 0 1 0 9 06 / 3 0 / 2 0 2 4 SALT LAKE SA L T L A K E V A L L E Y S O L I D W A S T E F A C I L I T Y MO D U L E 8 SA L T L A K E C I T Y , U T A H AL 07 / 2 2 / 2 0 2 4 MOD 8 RD-1 60 M I L H D P E T E X T U R E D PR I M A R Y L A Y E R RE C O R D D R A W I N G FL A P / W A L L SR 1'' = 4 0 ' - 0 ' ' 72 3 0 2 7 L2 3 0 1 0 9 06 / 3 0 / 2 0 2 4 SALT LAKE SA L T L A K E V A L L E Y S O L I D W A S T E F A C I L I T Y MO D U L E 8 SA L T L A K E C I T Y , U T A H AL 07 / 2 2 / 2 0 2 4 SR 06/30/24 1'' = 20'-0'' 723027 L230109 SALT LAKE MOD 8 RD-1 60MIL HDPE TEXTURED RECORD DRAWING LEACHATE COLLECTION SUMP SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8-SUMP SALT LAKE CITY, UTAH AL 07/22/24 FG 09/06/24 1'' = 20'-0'' 724046 L240129 SALT LAKE T&M RD-1 60MIL HDPE TEXTURED T&M RECORD DRAWING SALT LAKE CITY, UT AL 09/30/24 6.0 GEONET DRAINAGE LAYER 6.1 Construction QC/QA Plan Geonet Construction QC/QA Plan Introduction This document (Geonet Construc on Quality Control/Quality Assurance Plan) is intended to generally document standard procedures u lized to ensure a quality installa on. This document complements, and does not replace, applicable site-specific project plans and specifica ons. References: Project Manual Sec on 31 05 20S Geonet Drainage Layer. Qualifications The Manufacturer shall have manufactured a minimum of 10,000,000 square feet of polyethylene geonet material during the last year. The Installer shall have installed a minimum of 1,000,000 square feet of geonet during the 5 last years. The Installer shall have worked in a similar capacity on at least 5 projects similar in complexity to the project described in the contract documents, and with at least 100,000 square feet of geonet installa on on each project. The Installa on Supervisor shall have worked in a similar capacity on projects similar in size and complexity to the project described in the Contract Documents. Material Labeling, Deliver, Storage and Handling Labeling – Each roll of geomembrane delivered to the site shall be labeled by the manufacturer. The label will iden fy: 1. Manufacturer’s Name 2. Product Iden fica on 3. Length 4. Width 5. Roll Number Delivery – Rolls of geonet will be prepared to ship by appropriate means to prevent damage to the material and to facilitate off-loading. Storage – The on-site storage loca on of the geonet, provided by the Contractor to protect the geonet from abrasions, excessive dirt and moisture shall have the following characteris cs: 1. Level (no wooden pallets) 2. Smooth 3. Protected from the= and vandalism 4. Adjacent to the area being lined Handling – Materials are to be handled so as to prevent damage. 1. The Contractor and Installer shall handle all geonet in such a manner as to ensure it is not damaged in any way. 2. The Installer shall take any necessary precau ons to prevent damage to the underlying layers during placement of the geonet. Approved geosynthe c materials shall be delivered to the project site, unloaded and stored in a prepared secure area protected from damage by: puncture, ponding water, airborne contaminates or traffic. All materials shall be properly labeled and cross-referenced with packing slips and the project approved roll list. Any visible damage to roll goods delivered to the project site shall be documented. Rolls with significant damage shall be marked and stored separately on site for further evalua on by the ECA Superintendent. A complete material inventory shall be completed and kept up to date to veri=y that sufficient quan ty of the required materials exists on site to fulfill the project requirements. Geocomposite rolls should be li=ed off the ground when moving. Dragging of geocomposite rolls against ground surface is not recommended. Opera on of heavy equipment directly on the geocomposite should be avoided. Site Preparation The subgrade surface to receive geocomposite materials shall be prepared and inspected in accordance with the project specifica ons. Surfaces shall be smooth and free of sharp rocks or debris. Installation The geonet roll should be installed in the direc on of the slope and in the intended direc on of fow unless otherwise specified by the Engineer. If the project contains long, steep slopes, special care should be taken so that only full-length rolls are used at the top of the slope. In the presence of wind, all geonets shall be weighted down with sandbags or the equivalent. Such sandbags shall be used during placement and remain un l replaced with cover material. If the project includes an anchor trench at the top of the slopes, the geonet shall be properly anchored to resist sliding. Anchor trench compac ng equipment shall not come into direct contact with the geonet. Any rips, tears, or damaged areas on the deployed geonet shall be removed and patched. The patch shall be secured to the original geonet by tying every 6 inches with the approved tying devices. If the area to be repaired is more than 50 percent of the width of the panel, the damaged area shall be cut out and the two por ons of the geonet shall be joined. In applying fill material, no equipment can drive directly across the geonet. The specified fill material shall be placed and spread u lizing vehicles with a low ground pressure. The cover soil shall be placed in the geonet in a manner that prevents damage to the geonet. Placement of the cover soil shall proceed immediately following the placement and inspec on of the geonet. Each component of the geonet will be secured to the like component at overlaps. Adjacent edges along the length of the geonet roll shall be overlapped a minimum of 6” or as recommended by the engineer. The overlapped edges shall be joined by tying the geonet structure with cable es. These es shall be spaced every 5 feet along the roll length. Adjoining rolls across the roll width should be shingled down in the direc on of the slope and joined together with cable es spaced every foot along the roll width. Inspection Prior to implemen ng any of the work in the sec on to be lined, the Installer shall carefully inspect the installed work of all other sec ons and verify that all work is complete to the point where the installa on of the sec on may properly commence without adverse impact. Prior to covering the deployed geonet, each roll shall be inspected for damage resul ng from construc on. If the Installer has any concerns regarding the installed work of other sec ons, he shall no fy the Project Engineer. 6.2 Contractor Submittals PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 31 05 20S GEONET DRAINAGE LAYER 1.4.A. MANUFACTURER'S PROJECT LIST PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Project RefeRence Fabrinet® - americas PrOJect name cOUntrY Year PrODUct sQFt sQmt South Dade Landfill USA 2018 FabriNet® 4,449,960 413,415 Leon County Solid Waste USA 2018 FabriNet® 3,144,000 292,087 MSLA 1-D Landfill Closure Project USA 2018 FabriNet® 2,606,400 242,142 Fresh Kills Landfill USA 2019 FabriNet® 2,584,050 240,066 Brookhaven Landfill USA 2018 FabriNet® 2,513,140 233,478 McCommas Bluff Landfill USA 2018 FabriNet® 2,390,850 222,117 Exxon Mobil Blade Project USA 2018 FabriNet® 2,174,400 202,008 El Paso Landfill USA 2017 FabriNet® 1,816,964 168,801 CDF Slurry Wall Landfill Closure USA 2019 FabriNet® 1,620,000 150,503 Neal South Energy CCR USA 2018 FabriNet® 1,600,965 148,735 D.E. Karn Landfill USA 2019 FabriNet® 1,505,700 139,884 Cefe Valenzuela Sector 3C USA 2018 FabriNet® 1,368,900 127,175 Heritage Landfill Cell USA 2017 FabriNet® 1,304,100 121,155 Labadie Energy Utility USA 2016 FabriNet® 1,297,065 120,501 Simi Valley USA 2018 FabriNet® 1,279,200 118,842 Prairie State Near Field CCR Closure USA 2018 FabriNet® 1,257,054 116,784 Blackfoot Mine Cap & Cover USA 2017 FabriNet® 1,244,580 115,625 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: 31 05 19 GEOTEXTILES 1.4.A.2. TECHNICAL DATA SHEET PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com Mirafi® 180N - Geotextile TECHNICAL DATA SHEET PROPERTY(1)TEST METHOD FREQUENCY UNIT 1116770 Imperial SPECIFICATIONS Grab Tensile Properties (min. avg) Strength (MD) Elongation (MD) Elongation (CMD) Trapezoidal Tear Strength (MD) Trapezoidal Tear Strength (CMD) Puncture Resistance (CBR) ASTM D4632 ASTM D4533 ASTM D4533 ASTM D6241 60,000 yd² 60,000 yd² 60,000 yd² 360,000 yd² lbf % % lbf lbf lbf 205 50 50 80 80 500 Apparent Opening Size (AOS) Permittivity Water Flow Rate UV Resistance-% retained after 500 hrs ASTM D4751 ASTM D4491 ASTM D4491 ASTM D4355 360,000 yd² 120,000 yd² 120,000 yd² 1/Formulation/Year U.S. Sieve sec⁻¹ gpm/ft² % 80 1.4 95 70 SUPPLY SPECIFICATIONS(Roll dimensions may vary ±1%) Roll Dimension - Width -ft 15.0 Roll Dimension - Length -ft 300 Area (Surface/Roll)-ft²4500 * The information contained herein is provided for reference purposes only and is not intended as a warranty or guarantee. Final determination of suitability for use contemplated is the sole responsibility of the user. SOLMAX assumes no liability in connection with the use of this information. Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. NOTES 11-Jul-2023Revision date SOLMAX.COMPage 1 of 1 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 31 05 20S GEONET DRAINAGE LAYER 1.4.B.1.-2. INSTALLER'S PROJECT LIST PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Foxhole Landfill 721019 Project Name IPL Ash Pond Closure 721024 Phase 1 of 3 Location Charlotte, NC Location Petersburg, Indiana Continued on Row 41 Owner Mecklenburg County, N.C.Owner Indianapolis Power & LightAddress17131 Lancaster Highway Address 6925 North State Road 57 Engineer CDM Smith - Curtis Wilson & Aaron Weispfenning Engineer ATC Group Services LLC Client Triangle Grading & Paving Client Blankenerger Brothers, Inc. Contact Bryan Coley Contact Pat Blankenburger 1 Project Type LFCell 2 Project Type Ash PondProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose Vargas QC Technician Kamphone Sisoumphou QC Technician Tramaine Watts Start Date Nov-2021 Start Date Jul-2021 Completion Date Mar-2022 Completion Date Oct-2021 Cross Section GCL Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)602,331 Quantity (SF)609,219 Subgrade (SF)1,145,977 Quantity (SF)469,350 Cross Section 60 Mil Textured Cross Section 20 Mil Rain Cover Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)596,511 Quantity (SF)609,318 Quantity (SF)217,938 Quantity (SF)684,000 Project Name Harpers Ferry WWTP 721041 Project Name East St. Louis Auto Shredding 721050 Location Harpers Ferry, Iowa Location East St. Louis, IL Owner City of Harpers Ferry Owner St. Clair CountyAddress1009 Winfield Road Address 1299 N 1st Street Engineer Davy Engineering Engineer Andrews Engineering Client Wapasha Construction Client Kolb Grading Contact Pat Doyle Contact Adam Jenkins3 Project Type Wastewater Ponds & SAGR's 4 Project Type Landfill Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Dan Rodriquez QC Technician Khamphone Sisoumphou QC Technician Dan RodriquezStart Date Nov-2021 Start Date Oct-2022 Completion Date May-2022 Completion Date Nov-2022 Cross Section 60 Mil Smooth Cross Section Cross Section 60 Mil Smooth Cross Section 12 oz. GeotextileSubgrade (SF)96,511 Quantity (SF) Subgrade (SF)195,648 Quantity (SF)226,200 Cross Section Geotextile Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF)23,520 Quantity (SF) Quantity (SF)31,283 Quantity (SF) Project Name Ameren Peru 722042 Project Name Goodell WWTP 721053 Location Peru, IL Location Goodell, IowaOwnerAmerenOwnerCity of Goodell, Iowa Address 350 5th Street Address 107 Centennial Street (Fire Station) Engineer Environmental Resources Management, Inc. Alan Cork P.E.Engineer SEH Inc. Client O6 Environmental Client Cole ExcavatingContactCody Lonas Contact Jeremy Cole 5 Project Type Ameren Remediation Site 6 Project Type WWTP Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Robert ChandlerQC Technician Robert Chandler QC Technician Tramaine Watts Start Date Oct-2022 Start Date Jun-2022 Completion Date Oct-2022 Completion Date Jun-2022 Cross Section GCL Cross Section Geocomposite Cross Section 60 Mil HD Smooth Cross Section Subgrade (SF)52,875 Quantity (SF)52,875 Subgrade (SF)103,050 Quantity (SF) Cross Section 60 Mil Textured Cross Section 8 oz. Geotextile Cross Section Cross Section Quantity (SF)18,200 Quantity (SF)36,000 Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Continued on Row 545 Project Name La Cygne Upper AQC Closure T 721059 Location Nokomis, FL Location La Cygne, KS Owner Sarasota County, FL Owner Evergy Metro, Inc. Address 4000 Knights Trail Road Address 25166 East 2200 Road Engineer Jones Edmunds Dale E. Gerber Engineer AECOM Client Glover Construction Company, Inc.Client Kissick ConstructionContactMark Short Contact Mark Rigdon 7 Project Type Landfill Expansion 8 Project Type AQC Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Sep-2021 Completion Date Oct-2022 Completion Date Dec-2021 Cross Section GCL Cross Section 60 Mil Secondary Cross Section 40 Mil Micro Spike Cross Section Subgrade (SF)2,353,987 Quantity (SF)2,376,692 Subgrade (SF)1,437,480 Quantity (SF) Cross Section 60 Mil Primary Cross Section Primary Geocomposite Cross Section Closure Turf Cross Section Quantity (SF)2,365,547 Quantity (SF)2,142,058 Quantity (SF)1,437,480 Quantity (SF) Project Name Pleasant Prairie LF Closure 722003 Project Name Prince Specialty Products 722010 Location Pleasant Prairie, WI Location New Johnsonville, TN Owner WE Energies Owner Prince Specialty Products Address 8000 95th Street Address 795 Foote Lane Engineer GEI Consultants Engineer ARCADIS US, Inc.Client Edgerton Contractors, Inc.Client Vaughn Contractors, Inc. Contact Ryan Murphey Contact Kevin Little 9 Project Type Landfill Closure 10 Project Type Basin Project Manager Cesar Gonzalez Project Manager Steve BrothersSuperintendentVince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robare Long Start Date Oct-2022 Start Date Jul-2022 Completion Date Oct-2022 Completion Date Sep-2022 Page 1 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Cross Section 40 Mil LL Textured Cross Section Cross Section 60 Mil HDPE Tex/Smooth Cross SectionSubgrade (SF)143,520 Quantity (SF) Subgrade (SF)424,600 Quantity (SF) Cross Section Geocomposite Cross Section Cross Section 8oz. Geotextile Cross Section Quantity (SF)145,020 Quantity (SF) Quantity (SF)234,841 Quantity (SF) Project Name Williams Conway Brine 722005 Project Name Munger Landing Geotube Pad 722032 Location McPhereson, KS Location Duluth, MNOwnerWilliamsOwnerEPA, MPCA, US Army Corps of Engineers & WDNR Address 775 Landmark Road Address Clyde Ave Engineer Audubon Engineering Nicole Bruno Engineer US Army Corps of Engineers Client Prairie Landworks Inc.Client J.F. Brennan Company, Inc.Contact Tom Saffel Contact Casey Evensen 11 Project Type Pond 12 Project Type Geotube Pad Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Vince Sisoumphou Viruth Long Superintendent Vince Sisoumphou Raul NQC Technician Kamphone Sisoumphou Robare Long QC Technician Khamphone Sisoumphou Start Date Mar-2022 Start Date Aug-2022 Completion Date On-Going Completion Date Sep-2022 Cross Section 60 Mil Tex/Smooth Primary Cross Section Geocomposite Cross Section 40 Mil Cross Section Subgrade (SF)659,891 Quantity (SF)659,891 Subgrade (SF)435,561 Quantity (SF) Cross Section 60 Mil Tex/Smooth Secondary Cross Section Geonet Cross Section 8 oz. Geotextile Cross Section Quantity (SF)659,891 Quantity (SF)659,891 Quantity (SF)731,200 Quantity (SF) Project Name Alliant Energy Columbia PP 722011 Project Name Alliant Energy Lansing 722012 Location Pardeeville, WI Location Lansing, Iowa Owner Alliant Energy Owner Alliant Energy Address W8375 Murray Road Address 2320 Power Plant Drive Engineer SCS Engineers Zana Bajalan Engineer Infrastructure Alternatives, Inc. Client Ames Construction Client Ames Construction, Inc.Contact Brad Folczyk - Clint Berning Contact Andrew Reynolds 13 Project Type Pond Closure 14 Project Type Tube Laydown Pads Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Vince SisoumphouQC Technician Robert Chandler Dan Rodriguez QC Technician Kamphone Sisoumphou Start Date Oct-2022 Start Date Jul-2022 Completion Date Nov-2022 Completion Date Jul-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil HDPE Textured Cross Section Subgrade (SF)317,100 Quantity (SF)36,000 Subgrade (SF)308,947 Quantity (SF) Cross Section 60 Mil HDPE Textured Cross Section Cross Section Cross Section Quantity (SF)318,099 Quantity (SF) Quantity (SF) Quantity (SF) Project Name US Steel Granite City 722013 Project Name Ponds Behind Erie Pier 722014 T&M Repair Project Location Granite City, IL Location Duluth, MN Owner US Steel Owner EPA, MPCA, US Army Corps of Engineers & WDNR Address 2000 Edwardsville Road Address 199 S. 40th Avenue W Engineer Weaver Consultants Group John Bossert Engineer N/AClientDunnett Bay Construction Client EQM Contact Lucas Kessling Contact Gary Butcher 15 Project Type Cap & Landfill 16 Project Type Pond Project Manager Steve Brothers Project Manager Steve Brothers Allen BullockSuperintendentFrank Mata Superintendent Viruth Long QC Technicians Jesus Salazar, Saul Rivas, Frank Mata QC Technician Viruth Long Start Date Jun-2022 Start Date Apr-2022 Completion Date Sep-2022 Completion Date 4-112-22 Cross Section 40 & 60 Mil HDPE Cross Section Geocomposite & Textile Cross Section Liner Repair Only Cross Section Subgrade (SF)1,232,774 Quantity (SF)1,186,125 Subgrade (SF) Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Wisconsin Dells WWTP 722015 Project Name New Indy Pad 5 722016 T&M Project Location Wisconsin Dells, WI Location Catawba, SC Owner City of Wisconsin Dells Owner Dredge America Address 2 Bowman Road Address 5298 Cureton Ferry RoadEngineerMSA Professional Services, Inc.Engineer N/A Client Olympic Builders Client Dredge America Contact Justin Yahnke Contact Sam Robinson Jake Stockham 17 Project Type Digester Tank Liners 18 Project Type Tube PadsProject Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Robert Chandler Superintendent Raul Nieves QC Technician Robert Chandler QC Technician Raul Nieves Start Date Oct-2022 Start Date May-2022 Completion Date Dec-2022 Completion Date May-2022 Cross Section Cross Section 10 oz. Geotextile Cross Section N/A Cross Section Subgrade (SF) Quantity (SF)1,280 Subgrade (SF) Quantity (SF)Cross Section 30 Mil RPE Cross Section Cross Section Cross Section Quantity (SF)1,280 Quantity (SF) Quantity (SF) Quantity (SF) Page 2 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Gerald Gentlemen Station 722017 Project Name LASWA Phase IV Cell 2 722018 Part 1 of 3 Location Sutherland, NE Location Valentine, NE Phase 4 Cell 2 Owner Nebraska Public Power District Owner Lexington Area Solid Waste Agency Part 2 & 3 on Row 494AddressNE-25 Sutherland, NE Address 76460 Hwy 21 Engineer Golder Associates Engineer HDR Client Myers Construction Client Perrett Construction Ltd. Contact Josh Swift, Alecs Rummery Contact Rob Wemhoff 19 Project Type Supply Impoundment Area 20 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Frank Mata QC Technician Tramaine Watts Start Date Sep-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section GCL Cross Section 8 oz. GeotextileSubgrade (SF)148,810 Quantity (SF) Subgrade (SF)291,592 Quantity (SF)291,592 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Textured Cross Section Rain Cover R12BV Quantity (SF)143,780 Quantity (SF) Quantity (SF)291,592 Quantity (SF)251,860 Project Name Elkhart County LF 722019 Project Name Quad Cities Landfill Phase IV 722020 Location Elkhart, IN Location Milan, IL Owner Elkhart County LF Owner Millenium Waste Inc.Address 59530 Co. Rd 7 Address 13606 Knoxville Road Engineer IngenAE Engineer Weaver Consultants Group Client C & E Excavating, Inc.Client Millennium Waste Incorporated Contact Jeff Bonadies Contact Dominic Remmes21 Project Type Landfill 22 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Raul Nieves QC Technician Tramaine Watts QC Technician Raul NievesStart Date Nov-2022 Start Date Sep-2022 Completion Date Nov-2022 Completion Date Nov-2022 Cross Section 60 Mil HDT Cross Section 16 oz. Geotextile Cross Section 60 Mil Textured Cross Section RainflapSubgrade (SF)385,400 Quantity (SF)385,400 Subgrade (SF)182,000 Quantity (SF)23,230 Cross Section Geocomposite Cross Section Cross Section Geotextile Cross Section Quantity (SF)33,500 Quantity (SF) Quantity (SF)177,800 Quantity (SF) Project Name Northshore Mining VSF Cover 722021 Project Name Jeffrey Energy Center 722022 Location Babbit, MN Location St. Mary's, KansasOwnerCleveland -Cliffs Northshore Mine Owner Evergy, Inc. Address Country Road 70 Address 25905 Jeffrey Road Engineer WSP Golder Engineer SCS Engineers Client Hoover Construction Co.Client Schmidtlein Excavating, Inc.Contact Craig Spry Contact Jeremy Schmidtlein 23 Project Type Mine 24 Project Type Landfill Cell1C Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Vince Sisoumphou Superintendent Jose VargasQC Technician Kamphone Sisoumphou QC Technician Saul Rivas Start Date Jun-2022 Start Date Sep-2022 Completion Date Jun-2022 Completion Date Sep-2022 Cross Section GCL Cross Section Cross Section 40 Mil LLDPE Cross Section Subgrade (SF)363,868 Quantity (SF) Subgrade (SF)145,600 Quantity (SF) Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)145,600 Quantity (SF) Project Name Bonneville County Landfill 722023 Project Name ALCOA Bauxite Closure 722024 Part 1 of 3 Location Idaho Falls, ID Location Bryant, AR Phase 1 Owner Bonneville County Owner Alcoa USA Corp Brown Mud Lake Part 2 & 3 on Row 528 Address 9449 E. Sunnyside Road Address 2300 County Road 2 Engineer Great West Engineering Engineer Civil & Environmental Consultants, Inc. (CEC) Client Whitaker Construction Co., Inc.Client McGeorge Contracting Company, Inc.Contact Paul Christensen Contact Anthony Jones Kem McBride 25 Project Type Landfill 26 Project Type Closure Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Dan RodriquezQC Technician Saul Rivas QC Technician Dan Rodriquez Start Date Sep-2022 Start Date Aug-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section GCL Cross Section 16 oz. Geotextile Cross Section 40 Mil LLDPE Cross Section 60 Mil Subgrade (SF)814,138 Quantity (SF)828,000 Subgrade (SF)881,920 Quantity (SF)35,000 Cross Section 60 Mil HDPE Cross Section Cross Section Geocomposite Cross Section Quantity (SF)816,859 Quantity (SF) Quantity (SF)881,920 Quantity (SF) Page 3 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Grand Marais Water Basin 722025 Project Name NE Ottertail LF 722026 Location Grand Marais, MN Location New York Mills, MN Owner Minnesota Dept. of Natural Resources Owner Ottertail County Dept. Solid WasteAddress114 S 8th Ave Address 50356 Landfill Road Engineer MnDNR Jon Hendrickson Engineer FOTH Client KGM Contractors Inc.Client Hough Incorporated Contact Heath Line Contact Mike Hough & Bryce Moen 27 Project Type Basin 28 Project Type LandfillProject Manager Steve Brothers Project Manager Steve Brothers Superintendent Vince Sisoumphou Superintendent Robert Chandler QC Technician Khamphone Sisoumphou QC Technician Robert Chandler Start Date Jul-2022 Start Date Oct-2022 Completion Date Jul-2022 Completion Date Oct-2022 Cross Section 60 Mil HDPE Cross Section Cross Section 60 Mil Tex & Smooth Cross SectionSubgrade (SF)11,077 Quantity (SF) Subgrade (SF)51,668 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Ameren Champaigne MGP 722038 T&M Project Project Name Polk County Landfill 722028 Location Edwardsville, IL Location Gentilly, MN Owner Ameren Champaigne MGP Owner Polk County , MNAddress470 West Union Street Address 15764 270th Street Engineer Environmental Resources Management Engineer Stantec Client 06 Environmental Client RJ Zavoral & Sons Contact Cody Lonas Contact Dan Zavoral & Nick Carlin29 Project Type Remediation 30 Project Type Landfill Project Manager Cesar Gonzalez Project Manager Steve Brothers Superintendent Jose Vargas Superintendent Vince Sisoumphou QC Technician Saul Rivas QC Technician Khamphone SisoumphouStart Date Aug-2022 Start Date Jul-2022 Completion Date Aug-2022 Completion Date Aug-2022 Cross Section N/A Cross Section Cross Section 60 Mil & 40 Mil Cross SectionSubgrade (SF) Quantity (SF) Subgrade (SF)415,152 Quantity (SF) Cross Section Cross Section Cross Section Cross Section Quantity (SF) Quantity (SF) Quantity (SF) Quantity (SF) Project Name Litchfield WWTP 722031 Project Name McAlester Equalization Basin 722048 Location Litchfield, IL Location McAlester, OKOwnerCity of Litchfield Owner City of McAlester Address 1350 E Ryder Street Address 1360 E. Krebs Ave Engineer City Engineer Plummer & Associates Client Korte & Luitjohan Client Downey Contracting, LLCContactGreg Korte Contact Dalton McCaskill 31 Project Type WWTP 32 Project Type Basin Project Manager Steve Brothers Project Manager Steve Brothers Superintendent Viruth Long Superintendent Robert ChandlerQC Technician Robare Long QC Technician Robert Chandler Start Date Sep-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Nov-2022 Cross Section 45 Mil Duraskrim Cross Section Cross Section 60 Mil HD Cross Section Subgrade (SF)87,702 Quantity (SF) Subgrade (SF)148,882 Quantity (SF) Cross Section Cross Section Cross Section 10 oz. Geotextile Cross Section Quantity (SF) Quantity (SF) Quantity (SF)148,552 Quantity (SF) Page 4 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name Blaines Farm & Fleet 722036 T&M Project Project Name Morgan County LF 722049 Location Rhinelander, WI Location Fort Morgan, CO Owner Blaines Farm & Fleet Owner Morgan County, ColoradoAddress1601 E Timber Drive Address 21448 Road 22 Engineer TRC Environmental Corp Engineer American Environmental Consulting (AEC) Client Musson Bros.Client Morgan County Contact Jeff Vandersanden Contact Cass Yearous 33 Project Type Pond 34 Project Type LandfillProject Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Viruth Long QC Technician Robare Long QC Technician Tramaine Watts Start Date Oct-2022 Start Date Nov-2022 Completion Date Oct-2022 Completion Date Dec-2022 Cross Section 30 Mil Cross Section Cross Section GCL Cross SectionSubgrade (SF)59,400 Quantity (SF) Subgrade (SF)278,650 Quantity (SF) Cross Section Cross Section Cross Section 60 Mil Textured Cross Section Quantity (SF) Quantity (SF) Quantity (SF)280,368 Quantity (SF) Project Name Minnesota Boswell LF Closure 722039 Project Name MEC Walter Scott 722040 Location Cohasset, MN Location Council Bluffs, Iowa Owner Allete Inc.Owner Mid American Energy Address 1210 NW 3rd Street Address 7215 Navajo Street Engineer BARR Engineering Engineer HDR Client TNT Construction Group, LLC Client J.J. Westhoff Construction Co. Contact Dominic Ellison Contact Jerry Westhoff35 Project Type Ash Pond 36 Project Type Cap Project Manager Steve Brothers Project Manager Cesar Gonzalez Superintendent Raul Neives Superintendent Frank Mata QC Technician Robare Long QC Technician Tramaine WattsStart Date Sep-2022 Start Date Oct-2022 Completion Date Sep-2022 Completion Date Oct-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section 60 Mil HDPE DT Cross Section Transnet 250-2-8Subgrade (SF)503,272 Quantity (SF) Subgrade (SF)369,341 Quantity (SF)221,980 Cross Section Cross Section Cross Section Geocomposite Cross Section Quantity (SF) Quantity (SF) Quantity (SF)363,700 Quantity (SF) Page 5 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com 2022 Completed Projects List Project Name LASWA Phase IV Cell 2 722018 Part 2 of 3 Project Name LASWA Phase IV Cell 2 722018 Part 3 of 3 Location Valentine, NE Partial Closure Phase 1&2 Location Valentine, NE Leahcate Pond Lining Owner Lexington Area Solid Waste Agency Owner Lexington Area Solid Waste AgencyAddress76460 Hwy 21 Address 76460 Hwy 21 Engineer HDR Engineer HDR Client Perrett Construction Ltd.Client Perrett Construction Ltd. Contact Rob Wemhoff Contact Rob Wemhoff 37 Project Type Landfill 38 Project Type LandfillProject Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Frank Mata Superintendent Frank Mata QC Technician Tramaine Watts QC Technician Tramaine Watts Start Date Jul-2022 Start Date Jul-2022 Completion Date Sep-2022 Completion Date Sep-2022 Cross Section 40 Mil LLDPE Cross Section Cross Section GCL Cross Section 12oz. NW GeotextileSubgrade (SF)278,793 Quantity (SF) Subgrade (SF)43,028 Quantity (SF)43,028 Cross Section Geocomposite Cross Section Cross Section 60 Mil HDPE Tex Cross Section Quantity (SF)278,793 Quantity (SF) Quantity (SF)43,028 Quantity (SF) Project Name IPL Ash Pond Closure 721024 Phase 2 of 3 Project Name IPL Ash Pond Closure 721024 Phase 3 of 3 Location Petersburg, Indiana Location Petersburg, Indiana Owner Indianapolis Power & Light Owner Indianapolis Power & LightAddress6925 North State Road 57 Address 6925 North State Road 57 Engineer ATC Group Services LLC Engineer ATC Group Services LLC Client Blankenerger Brothers, Inc.Client Blankenerger Brothers, Inc. Contact Pat Blankenburger Contact Pat Blankenburger39 Project Type Ash Pond 40 Project Type Ash Pond Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas Superintendent Jose Vargas QC Technician Tramaine Watts QC Technician Tramaine WattsStart Date Jul-2021 Start Date Jul-2021 Completion Date Oct-2021 Completion Date Oct-2021 Cross Section 40 Mil LLDPE Smooth Cross Section Geocomposite Cross Section 40 Mil LLDPE Smooth Cross Section GeocompositeSubgrade (SF)648,629 Quantity (SF)181,377 Subgrade (SF)429,343 Quantity (SF)98,623 Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Cross Section 40 Mil LLDPE Textured Cross Section Geotextile Quantity (SF)19,220 Quantity (SF)486,472 Quantity (SF)32,450 Quantity (SF)53,425 Project Name ALCOA Bauxite Closure 722024 Part 2 of 3 Project Name ALCOA Bauxite Closure 722024 Part 3 of 3 Location Bryant, AR Phase 2 Location Bryant, AR Phase 3OwnerAlcoa USA Corp Brown Mud Lake Owner Alcoa USA Corp Brown Mud Lake Address 2300 County Road 2 Address 2300 County Road 2 Engineer Civil & Environmental Consultants, Inc. (CEC)Engineer Civil & Environmental Consultants, Inc. (CEC) Client McGeorge Contracting Company, Inc.Client McGeorge Contracting Company, Inc.Contact Anthony Jones Kem McBride Contact Anthony Jones Kem McBride 41 Project Type Closure 42 Project Type Closure Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Vargas SuperintendentQC Technician Saul Rivas QC Technician Start Date Oct-2022 Start Date Jan-2023 Completion Date Nov-2022 Completion Date Cross Section 40 Mil LLDPE Cross Section Cross Section Cross Section Subgrade (SF)860,560 Quantity (SF) Subgrade (SF) Quantity (SF) Cross Section Geocomposite Cross Section Cross Section Cross Section Quantity (SF)860,560 Quantity (SF) Quantity (SF) Quantity (SF) Project Name Sarasota LF Phase III 721058 Project Name Sarasota LF Phase III 721058 Location Nokomis, FL Location Nokomis, FL Owner Sarasota County, FL Owner Sarasota County, FL Address 4000 Knights Trail Road Address 4000 Knights Trail Road Engineer Jones Edmunds Dale E. Gerber Jones Edmunds Dale E. Gerber Client Glover Construction Company, Inc.Client Glover Construction Company, Inc.Contact Mark Short Contact Mark Short 43 Project Type Landfill Expansion 44 Project Type Landfill Expansion Project Manager Cesar Gonzalez Project Manager Cesar Gonzalez Superintendent Jose Valverde Superintendent Jose ValverdeQC Technician Martin Villegas QC Technician Martin Villegas Start Date Jan-2022 Start Date Jan-2022 Completion Date Oct-2022 Completion Date Oct-2022 Cross Section Cross Section Secondary Geocomposite Cross Section Cross Section Subgrade (SF) Quantity (SF)2,481,407 Subgrade (SF) Quantity (SF) Cross Section GCL Protective Cover Cross Section 160z. Geotextile Cross Section 40 Mil Tarp Cross Section Quantity (SF)271,928 Quantity (SF)337,484 Quantity (SF)2,083,267 Quantity (SF) Page 6 of 6 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 31 05 20S GEONET DRAINAGE LAYER 2.1. MATERIAL DATA SHEET PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com HyperNet 200 mils / 5.00 mm TECHNICAL DATA SHEET PROPERTY(1)TEST METHOD FREQUENCY UNIT 1106474-44031-5 Imperial SPECIFICATIONS GEONET CORE (2) Thickness (min. avg.) Transmissivity Load / Seat Time / Gradient Boundary Conditions Density (min.) Carbon Black Content Tensile Stength (MD) ASTM D5199 ASTM D4716 ASTM D792 ASTM D4218 ASTM D7179 - 50,000 ft² 500,000 ft² 50,000 ft² 50,000 ft² 50,000 ft² mils m²/sec psf/min/- g/cm³ % lbf/in 200 2x10⁻³ 10000/15/0.1 Steel plates 0.94 2.0 45 SUPPLY SPECIFICATIONS(Roll dimensions may vary ±1%) Roll Dimension - Width -ft 15 Roll Dimension - Length -ft 330 Area (Surface/Roll)-ft²4950 2. Component properties prior to lamination. * The information contained herein is provided for reference purposes only and is not intended as a warranty or guarantee. Final determination of suitability for use contemplated is the sole responsibility of the user. SOLMAX assumes no liability in connection with the use of this information. Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. NOTES 25-May-2023Revision date SOLMAX.COMPage 1 of 1 PROJECT NAME: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 Wall Consultant Group Project No.:LDF20015 ; GSI Project No.:723027 Section: DOCUMENT 31 05 20S GEONET DRAINAGE LAYER 2.2 MANUFACTURING QUALITY CONTROL PROVIDED IN THIS SUBMITTAL 2401 PEWAUKEE ROAD • WAUKESHA, WI 53188-6904 • 262-524-7979 • Fax: 262-524-7961 • 800-444-5523 • www.geo-synthetics.com MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: ROLL NUMBER MANUFACT. DATE RESIN LOT NUMBER Product Code : 1106474- 44031-5 HyperNet 200 mils / 5.00 mm None Required 0116-041078 2023-08-06 23F1161 0116-041079 2023-08-06 23F1161 0116-041080 2023-08-06 23F1161 0116-041081 2023-08-06 23F1161 0116-041082 2023-08-06 23F1161 0116-041083 2023-08-06 23F1161 0116-041084 2023-08-06 23F1161 0116-041085 2023-08-06 23F1161 0116-041086 2023-08-06 23F1161 0116-041087 2023-08-06 23F1161 0116-041088 2023-08-06 23F1161 0116-041089 2023-08-06 23F1161 0116-041090 2023-08-06 23F1161 0116-041091 2023-08-06 23F1161 0116-041092 2023-08-06 23F1161 0116-041093 2023-08-06 23F1161 0116-041094 2023-08-06 23F1161 0116-041095 2023-08-06 23F1161 0116-041096 2023-08-06 23F1161 0116-041097 2023-08-06 23F1161 0116-041098 2023-08-06 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041099 2023-08-06 23F1161 0116-041100 2023-08-06 23F1161 0116-041101 2023-08-06 23F1161 0116-041102 2023-08-06 23F1161 0116-041103 2023-08-06 23F1161 0116-041104 2023-08-06 23F1161 0116-041105 2023-08-06 23F1161 0116-041106 2023-08-06 23F1161 0116-041107 2023-08-06 23F1161 0116-041108 2023-08-06 23F1161 0116-041109 2023-08-06 23F1161 0116-041110 2023-08-06 23F1161 0116-041111 2023-08-06 23F1161 0116-041112 2023-08-06 23F1161 0116-041113 2023-08-06 23F1161 0116-041114 2023-08-06 23F1161 0116-041115 2023-08-06 23F1161 0116-041116 2023-08-06 23F1161 0116-041117 2023-08-06 23F1161 0116-041118 2023-08-06 23F1161 0116-041119 2023-08-06 23F1161 0116-041120 2023-08-06 23F1161 0116-041121 2023-08-06 23F1161 0116-041122 2023-08-06 23F1161 0116-041123 2023-08-06 23F1161 0116-041124 2023-08-06 23F1161 0116-041125 2023-08-06 23F1161 0116-041126 2023-08-06 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041127 2023-08-06 23F1161 0116-041128 2023-08-06 23F1161 0116-041129 2023-08-06 23F1161 0116-041130 2023-08-06 23F1161 0116-041131 2023-08-06 23F1161 0116-041132 2023-08-06 23F1161 0116-041133 2023-08-06 23F1161 0116-041134 2023-08-06 23F1161 0116-041135 2023-08-06 23F1161 0116-041136 2023-08-06 23F1161 0116-041137 2023-08-06 23F1161 0116-041138 2023-08-07 23F1161 0116-041139 2023-08-07 23F1161 0116-041140 2023-08-07 23F1161 0116-041141 2023-08-07 23F1161 0116-041142 2023-08-07 23F1161 0116-041143 2023-08-07 23F1161 0116-041144 2023-08-07 23F1161 0116-041145 2023-08-07 23F1161 0116-041146 2023-08-07 23F1161 0116-041147 2023-08-07 23F1161 0116-041148 2023-08-07 23F1161 0116-041149 2023-08-07 23F1161 0116-041150 2023-08-07 23F1161 0116-041151 2023-08-07 23F1161 0116-041152 2023-08-07 23F1161 0116-041153 2023-08-07 23F1161 0116-041154 2023-08-07 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041155 2023-08-07 23F1161 0116-041156 2023-08-07 23F1161 0116-041157 2023-08-07 23F1161 0116-041158 2023-08-07 23F1161 0116-041159 2023-08-07 23F1161 0116-041160 2023-08-07 23F1161 0116-041161 2023-08-07 23F1161 0116-041163 2023-08-07 23F1161 0116-041164 2023-08-07 23F1161 0116-041165 2023-08-07 23F1161 0116-041166 2023-08-07 23F1161 0116-041167 2023-08-07 23F1161 0116-041168 2023-08-07 23F1161 0116-041169 2023-08-07 23F1161 0116-041170 2023-08-07 23F1161 0116-041171 2023-08-07 23F1161 0116-041172 2023-08-07 23F1161 0116-041173 2023-08-07 23F1161 0116-041174 2023-08-07 23F1161 0116-041175 2023-08-07 23F1161 0116-041176 2023-08-07 23F1161 0116-041177 2023-08-07 23F1161 0116-041178 2023-08-07 23F1161 0116-041179 2023-08-07 23F1161 0116-041180 2023-08-07 23F1161 0116-041181 2023-08-07 23F1161 0116-041182 2023-08-07 23F1161 0116-041183 2023-08-07 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041184 2023-08-07 23F1161 0116-041185 2023-08-07 23F1161 0116-041186 2023-08-07 23F1161 0116-041187 2023-08-07 23F1161 0116-041188 2023-08-07 23F1161 0116-041189 2023-08-07 23F1161 0116-041190 2023-08-07 23F1161 0116-041191 2023-08-07 23F1161 0116-041192 2023-08-07 23F1161 0116-041193 2023-08-07 23F1161 0116-041194 2023-08-07 23F1161 0116-041195 2023-08-07 23F1161 0116-041196 2023-08-07 23F1161 0116-041197 2023-08-07 23F1161 0116-041198 2023-08-07 23F1161 0116-041199 2023-08-07 23F1161 0116-041200 2023-08-07 23F1161 0116-041201 2023-08-07 23F1161 0116-041202 2023-08-07 23F1161 0116-041203 2023-08-07 23F1161 0116-041204 2023-08-07 23F1161 0116-041205 2023-08-07 23F1161 0116-041206 2023-08-07 23F1161 0116-041207 2023-08-07 23F1161 0116-041208 2023-08-07 23F1161 0116-041209 2023-08-07 23F1161 0116-041210 2023-08-07 23F1161 0116-041211 2023-08-07 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041212 2023-08-07 23F1161 0116-041213 2023-08-07 23F1161 0116-041214 2023-08-07 23F1161 0116-041215 2023-08-07 23F1161 0116-041216 2023-08-07 23F1161 0116-041217 2023-08-07 23F1161 0116-041218 2023-08-07 23F1161 0116-041219 2023-08-07 23F1161 0116-041220 2023-08-07 23F1161 0116-041221 2023-08-07 23F1161 0116-041222 2023-08-07 23F1161 0116-041223 2023-08-07 23F1161 0116-041224 2023-08-08 23F1161 0116-041225 2023-08-08 23F1161 0116-041226 2023-08-08 23F1161 0116-041227 2023-08-08 23F1161 0116-041228 2023-08-08 23F1161 0116-041229 2023-08-08 23F1161 0116-041230 2023-08-08 23F1161 0116-041231 2023-08-08 23F1161 0116-041232 2023-08-08 23F1161 0116-041233 2023-08-08 23F1161 0116-041234 2023-08-08 23F1161 0116-041235 2023-08-08 23F1161 0116-041236 2023-08-08 23F1161 0116-041237 2023-08-08 23F1161 0116-041238 2023-08-08 23F1161 0116-041239 2023-08-08 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041240 2023-08-08 23F1161 0116-041241 2023-08-08 23F1161 0116-041242 2023-08-08 23F1161 0116-041243 2023-08-08 23F1161 0116-041244 2023-08-08 23F1161 0116-041245 2023-08-08 23F1161 0116-041246 2023-08-08 23F1161 0116-041247 2023-08-08 23F1161 0116-041248 2023-08-08 23F1161 0116-041249 2023-08-08 23F1161 0116-041250 2023-08-08 23F1161 0116-041251 2023-08-08 23F1161 0116-041252 2023-08-08 23F1161 0116-041253 2023-08-08 23F1161 0116-041254 2023-08-08 23F1161 0116-041255 2023-08-08 23F1161 0116-041256 2023-08-08 23F1161 0116-041257 2023-08-08 23F1161 0116-041258 2023-08-08 23F1161 0116-041259 2023-08-08 23F1161 0116-041260 2023-08-08 23F1161 0116-041261 2023-08-08 23F1161 0116-041262 2023-08-08 23F1161 0116-041263 2023-08-08 23F1161 0116-041264 2023-08-08 23F1161 0116-041265 2023-08-08 23F1161 0116-041266 2023-08-08 23F1161 0116-041267 2023-08-08 23F1161 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041268 2023-08-08 23F1161 0116-041269 2023-08-08 23F1161 0116-041270 2023-08-08 23F1161 0116-041271 2023-08-08 23F1123 0116-041272 2023-08-08 23F1123 0116-041273 2023-08-08 23F1123 0116-041274 2023-08-08 23F1123 0116-041275 2023-08-08 23F1123 0116-041276 2023-08-08 23F1123 0116-041277 2023-08-08 23F1123 0116-041278 2023-08-08 23F1123 0116-041279 2023-08-08 23F1123 0116-041280 2023-08-08 23F1123 0116-041281 2023-08-08 23F1123 0116-041282 2023-08-08 23F1123 0116-041283 2023-08-08 23F1123 0116-041284 2023-08-08 23F1123 0116-041285 2023-08-08 23F1123 0116-041286 2023-08-08 23F1123 0116-041287 2023-08-08 23F1123 0116-041288 2023-08-08 23F1123 0116-041289 2023-08-08 23F1123 0116-041290 2023-08-08 23F1123 0116-041291 2023-08-08 23F1123 0116-041292 2023-08-08 23F1123 0116-041293 2023-08-08 23F1123 0116-041294 2023-08-08 23F1123 0116-041295 2023-08-08 23F1123 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041296 2023-08-08 23F1123 0116-041297 2023-08-08 23F1123 0116-041298 2023-08-08 23F1123 0116-041299 2023-08-08 23F1123 0116-041301 2023-08-09 23F1123 0116-041302 2023-08-09 23F1123 0116-041303 2023-08-09 23F1123 0116-041304 2023-08-09 23F1123 0116-041305 2023-08-09 23F1123 0116-041306 2023-08-09 23F1123 0116-041307 2023-08-09 23F1123 0116-041308 2023-08-09 23F1123 0116-041309 2023-08-09 23F1123 0116-041310 2023-08-09 23F1123 0116-041311 2023-08-09 23F1123 0116-041312 2023-08-09 23F1123 0116-041313 2023-08-09 23F1123 0116-041314 2023-08-09 23F1123 0116-041315 2023-08-09 23F1123 0116-041316 2023-08-09 23F1123 0116-041317 2023-08-09 23F1123 0116-041318 2023-08-09 23F1123 0116-041319 2023-08-09 23F1123 0116-041320 2023-08-09 23F1123 0116-041321 2023-08-09 23F1123 0116-041322 2023-08-09 23F1123 0116-041323 2023-08-09 23F1123 0116-041324 2023-08-09 23F1123 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041325 2023-08-09 23F1123 0116-041326 2023-08-09 23F1123 0116-041327 2023-08-09 23F1123 0116-041328 2023-08-09 23F1123 0116-041329 2023-08-09 23F1123 0116-041330 2023-08-09 23F1123 0116-041331 2023-08-09 23F1123 0116-041332 2023-08-09 23F1123 0116-041333 2023-08-09 23F1123 0116-041334 2023-08-09 23F1123 0116-041335 2023-08-09 23F1123 0116-041336 2023-08-09 23F1123 0116-041337 2023-08-09 23F1123 0116-041338 2023-08-09 23F1123 0116-041339 2023-08-09 23F1123 0116-041340 2023-08-09 23F1123 0116-041341 2023-08-09 23F1123 0116-041342 2023-08-09 23F1123 0116-041343 2023-08-09 23F1123 0116-041344 2023-08-09 23F1123 0116-041345 2023-08-09 23F1123 0116-041346 2023-08-09 23F1123 0116-041347 2023-08-09 23F1123 0116-041348 2023-08-09 23F1123 0116-041349 2023-08-09 23F1123 0116-041350 2023-08-09 23F1123 0116-041351 2023-08-09 23F1123 0116-041352 2023-08-09 23F1123 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041353 2023-08-09 23F1123 0116-041354 2023-08-09 23F1123 0116-041355 2023-08-09 23F1123 0116-041356 2023-08-09 23F1123 0116-041357 2023-08-09 23F1123 0116-041358 2023-08-09 23F1123 0116-041362 2023-08-09 23F1123 0116-041363 2023-08-09 23F1123 0116-041364 2023-08-09 23F1123 0116-041365 2023-08-09 23F1123 0116-041366 2023-08-09 23F1123 0116-041367 2023-08-09 23F1123 0116-041368 2023-08-09 23F1123 0116-041369 2023-08-09 23F1123 0116-041370 2023-08-09 23F1123 0116-041371 2023-08-09 23F1123 0116-041372 2023-08-09 23F1123 0116-041373 2023-08-10 23F1123 0116-041374 2023-08-10 23F1123 0116-041375 2023-08-10 23F1123 0116-041376 2023-08-10 23F1123 0116-041377 2023-08-10 23F1123 0116-041379 2023-08-10 23F1123 0116-041380 2023-08-10 23F1123 0116-041381 2023-08-10 23F1123 0116-041382 2023-08-10 23F1123 0116-041383 2023-08-10 23F1123 0116-041384 2023-08-10 23F1123 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. MANUFACTURING QUALITY CONTROL PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: G723027.01 SO-095742 Pre-SO-095742-1 SALT LAKE VALLEY MOD 8PROJECT NAME: 0116-041385 2023-08-10 23F1123 0116-041386 2023-08-10 23F1123 0116-041387 2023-08-10 23F1123 0116-041388 2023-08-10 23F1123 0116-041389 2023-08-10 23F1123 0116-041390 2023-08-10 23F1123 0116-041391 2023-08-10 23F1123 0116-041392 2023-08-10 23F1123 0116-041393 2023-08-10 23F1123 0116-041394 2023-08-10 23F1123 0116-041395 2023-08-10 23F1123 0116-041396 2023-08-10 23F1123 QUANTITY (ROLLS):313 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 Solmax Geosynthetics LLC SOLMAX.COM 11 Aug 2023 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : PRODUCT: HyperNet 200 mils / 5.00 mm 1106474-44031-5 Rolls Test Property Direction Test Method Frequency Unit 1 Thickness (min. avg.)ASTM D5199 50,000 ft²mils 2 Carbon Black Content ASTM D4218 50,000 ft²% 3 Density (min.)ASTM D792 50,000 ft²g/cm³ 4 Tensile Stength (MD)MD ASTM D7179 50,000 ft²lbf/in 5 Geonet Transmissivity (x10⁻³)ASTM D4716 500,000 ft²m²/sec Test 1 2 3 4 5 SPECIFICATIONS 200 2.0 0.94 45 2 0116-041078 224.00 2.48 0.958 74 7.68 0116-041079 224.00 2.48 0.958 74 7.68 0116-041080 224.00 2.48 0.958 74 7.68 0116-041081 224.00 2.48 0.958 74 7.68 0116-041082 235.60 2.47 0.959 73 7.68 0116-041083 235.60 2.47 0.959 73 7.68 0116-041084 235.60 2.47 0.959 73 7.68 0116-041085 235.60 2.47 0.959 73 7.68 0116-041086 235.60 2.47 0.959 73 7.68 0116-041087 226.00 2.38 0.959 73 7.68 0116-041088 226.00 2.38 0.959 73 7.68 0116-041089 226.00 2.38 0.959 73 7.68 0116-041090 226.00 2.38 0.959 73 7.68 0116-041091 226.00 2.38 0.959 73 7.68 0116-041092 233.80 2.41 0.958 70 7.68 0116-041093 233.80 2.41 0.958 70 7.68 0116-041094 233.80 2.41 0.958 70 7.68 0116-041095 233.80 2.41 0.958 70 7.68 0116-041096 233.80 2.41 0.958 70 7.68 0116-041097 227.00 2.41 0.958 70 5.7268 0116-041098 227.00 2.41 0.958 70 5.727 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041099 227.00 2.41 0.958 70 5.727 0116-041100 227.00 2.41 0.958 70 5.727 0116-041101 227.00 2.41 0.958 70 5.727 0116-041102 232.40 2.31 0.952 69 5.727 0116-041103 232.40 2.31 0.952 69 5.727 0116-041104 232.40 2.31 0.952 69 5.727 0116-041105 232.40 2.31 0.952 69 5.727 0116-041106 232.40 2.31 0.952 69 5.727 0116-041107 232.90 2.31 0.952 69 5.727 0116-041108 232.90 2.31 0.952 69 5.727 0116-041109 232.90 2.31 0.952 69 5.727 0116-041110 232.90 2.31 0.952 69 5.727 0116-041111 232.90 2.31 0.952 69 5.727 0116-041112 231.50 2.37 0.950 73 5.727 0116-041113 231.50 2.37 0.950 73 5.727 0116-041114 231.50 2.37 0.950 73 5.727 0116-041115 231.50 2.37 0.950 73 5.727 0116-041116 231.50 2.37 0.950 73 5.727 0116-041117 234.30 2.37 0.950 73 5.727 0116-041118 234.30 2.37 0.950 73 5.727 0116-041119 234.30 2.37 0.950 73 5.727 0116-041120 234.30 2.37 0.950 73 5.727 0116-041121 234.30 2.37 0.950 73 5.727 0116-041122 238.10 2.33 0.951 71 5.727 0116-041123 238.10 2.33 0.951 71 5.727 0116-041124 238.10 2.33 0.951 71 5.727 0116-041125 238.10 2.33 0.951 71 5.727 0116-041126 238.10 2.33 0.951 71 5.727 0116-041127 232.00 2.33 0.951 71 5.727 0116-041128 232.00 2.33 0.951 71 5.727 0116-041129 232.00 2.33 0.951 71 5.727 0116-041130 232.00 2.33 0.951 71 5.727 0116-041131 232.00 2.33 0.951 71 5.727 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041132 226.00 2.22 0.949 69 5.727 0116-041133 226.00 2.22 0.949 69 5.727 0116-041134 226.00 2.22 0.949 69 5.727 0116-041135 226.00 2.22 0.949 69 5.727 0116-041136 226.00 2.22 0.949 69 5.727 0116-041137 218.00 2.15 0.961 69 5.727 0116-041138 218.00 2.15 0.961 69 5.727 0116-041139 218.00 2.15 0.961 69 5.727 0116-041140 218.00 2.15 0.961 69 5.727 0116-041141 218.00 2.15 0.961 69 5.727 0116-041142 230.20 2.50 0.960 68 7.66 0116-041143 230.20 2.50 0.960 68 7.66 0116-041144 230.20 2.50 0.960 68 7.66 0116-041145 230.20 2.50 0.960 68 7.66 0116-041146 230.20 2.50 0.960 68 7.66 0116-041147 222.60 2.45 0.960 68 7.66 0116-041148 222.60 2.45 0.960 68 7.66 0116-041149 222.60 2.45 0.960 68 7.66 0116-041150 222.60 2.45 0.960 68 7.66 0116-041151 222.60 2.45 0.960 68 7.66 0116-041152 222.00 2.51 0.959 67 7.66 0116-041153 222.00 2.51 0.959 67 7.66 0116-041154 222.00 2.51 0.959 67 7.66 0116-041155 222.00 2.51 0.959 67 7.66 0116-041156 222.00 2.51 0.959 67 7.66 0116-041157 217.80 2.48 0.959 67 7.66 0116-041158 217.80 2.48 0.959 67 7.66 0116-041159 217.80 2.48 0.959 67 7.66 0116-041160 217.80 2.48 0.959 67 7.66 0116-041161 217.80 2.48 0.959 67 7.66 0116-041163 225.80 2.34 0.959 68 7.66 0116-041164 225.80 2.34 0.959 68 7.66 0116-041165 225.80 2.34 0.959 68 7.66 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041166 225.80 2.34 0.959 68 7.66 0116-041167 219.00 2.52 0.959 68 7.66 0116-041168 219.00 2.52 0.959 68 7.66 0116-041169 219.00 2.52 0.959 68 7.66 0116-041170 219.00 2.52 0.959 68 7.66 0116-041171 219.00 2.52 0.959 68 7.66 0116-041172 224.40 2.69 0.956 65 7.66 0116-041173 224.40 2.69 0.956 65 7.66 0116-041174 224.40 2.69 0.956 65 7.66 0116-041175 224.40 2.69 0.956 65 7.66 0116-041176 224.40 2.69 0.956 65 7.66 0116-041177 216.00 2.35 0.956 65 7.66 0116-041178 216.00 2.35 0.956 65 7.66 0116-041179 216.00 2.35 0.956 65 7.66 0116-041180 216.00 2.35 0.956 65 7.66 0116-041181 216.00 2.35 0.956 65 7.66 0116-041182 222.60 2.11 0.952 66 5.24 0116-041183 222.60 2.11 0.952 66 5.24 0116-041184 222.60 2.11 0.952 66 5.24 0116-041185 222.60 2.11 0.952 66 5.24 0116-041186 222.60 2.11 0.952 66 5.24 0116-041187 223.10 2.11 0.952 66 5.24 0116-041188 223.10 2.11 0.952 66 5.24 0116-041189 223.10 2.11 0.952 66 5.24 0116-041190 223.10 2.11 0.952 66 5.24 0116-041191 223.10 2.11 0.952 66 5.24 0116-041192 219.10 2.34 0.955 67 5.24 0116-041193 219.10 2.34 0.955 67 5.24 0116-041194 219.10 2.34 0.955 67 5.24 0116-041195 219.10 2.34 0.955 67 5.24 0116-041196 219.10 2.34 0.955 67 5.24 0116-041197 220.30 2.34 0.955 67 5.24 0116-041198 220.30 2.34 0.955 67 5.24 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041199 220.30 2.34 0.955 67 5.24 0116-041200 220.30 2.34 0.955 67 5.24 0116-041201 220.30 2.34 0.955 67 5.24 0116-041202 224.90 2.17 0.953 69 5.24 0116-041203 224.90 2.17 0.953 69 5.24 0116-041204 224.90 2.17 0.953 69 5.24 0116-041205 224.90 2.17 0.953 69 5.24 0116-041206 224.90 2.17 0.953 69 5.24 0116-041207 227.90 2.17 0.953 69 5.24 0116-041208 227.90 2.17 0.953 69 5.24 0116-041209 227.90 2.17 0.953 69 5.24 0116-041210 227.90 2.17 0.953 69 5.24 0116-041211 227.90 2.17 0.953 69 5.24 0116-041212 226.00 2.18 0.954 69 5.24 0116-041213 226.00 2.18 0.954 69 5.24 0116-041214 226.00 2.18 0.954 69 5.24 0116-041215 226.00 2.18 0.954 69 5.24 0116-041216 226.00 2.18 0.954 69 5.24 0116-041217 227.70 2.18 0.954 69 5.24 0116-041218 227.70 2.18 0.954 69 5.24 0116-041219 227.70 2.18 0.954 69 5.24 0116-041220 227.70 2.18 0.954 69 5.24 0116-041221 227.70 2.18 0.954 69 5.24 0116-041222 229.60 2.14 0.951 67 5.24 0116-041223 229.60 2.14 0.951 67 5.24 0116-041224 229.60 2.14 0.951 67 5.24 0116-041225 229.60 2.14 0.951 67 5.24 0116-041226 229.60 2.14 0.951 67 5.24 0116-041227 217.60 2.28 0.961 67 5.24 0116-041228 217.60 2.28 0.961 67 5.24 0116-041229 217.60 2.28 0.961 67 5.24 0116-041230 217.60 2.28 0.961 67 5.24 0116-041231 217.60 2.28 0.961 67 5.24 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041232 228.20 2.20 0.961 68 8.2 0116-041233 228.20 2.20 0.961 68 8.2 0116-041234 228.20 2.20 0.961 68 8.2 0116-041235 228.20 2.32 0.961 68 8.2 0116-041236 228.20 2.32 0.961 68 8.2 0116-041237 218.40 2.39 0.961 68 8.2 0116-041238 218.40 2.39 0.961 68 8.2 0116-041239 218.40 2.39 0.961 68 8.2 0116-041240 218.40 2.39 0.961 68 8.2 0116-041241 218.40 2.39 0.961 68 8.2 0116-041242 227.20 2.35 0.960 69 8.2 0116-041243 227.20 2.35 0.960 69 8.2 0116-041244 227.20 2.35 0.960 69 8.2 0116-041245 227.20 2.35 0.960 69 8.2 0116-041246 227.20 2.35 0.960 69 8.2 0116-041247 215.80 2.48 0.960 69 8.2 0116-041248 215.80 2.48 0.960 69 8.2 0116-041249 215.80 2.48 0.960 69 8.2 0116-041250 215.80 2.48 0.960 69 8.2 0116-041251 215.80 2.48 0.960 69 8.2 0116-041252 223.20 2.48 0.959 69 8.2 0116-041253 223.20 2.48 0.959 69 8.2 0116-041254 223.20 2.48 0.959 69 8.2 0116-041255 223.20 2.48 0.959 69 8.2 0116-041256 223.20 2.48 0.959 69 8.2 0116-041257 219.20 2.44 0.959 69 8.2 0116-041258 219.20 2.44 0.959 69 8.2 0116-041259 219.20 2.44 0.959 69 8.2 0116-041260 219.20 2.44 0.959 69 8.2 0116-041261 219.20 2.44 0.959 69 8.2 0116-041262 225.20 2.47 0.958 66 8.2 0116-041263 225.20 2.47 0.958 66 8.2 0116-041264 225.20 2.47 0.958 66 8.2 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041265 225.20 2.47 0.958 66 8.2 0116-041266 225.20 2.47 0.958 66 8.2 0116-041267 230.00 2.42 0.958 66 5.47 0116-041268 230.00 2.42 0.958 66 5.47 0116-041269 230.00 2.42 0.958 66 5.47 0116-041270 230.00 2.42 0.958 66 5.47 0116-041271 230.00 2.42 0.958 66 5.47 0116-041272 227.00 2.44 0.953 67 5.47 0116-041273 227.00 2.44 0.953 67 5.47 0116-041274 227.00 2.44 0.953 67 5.47 0116-041275 227.00 2.44 0.953 67 5.47 0116-041276 227.00 2.44 0.953 67 5.47 0116-041277 232.60 2.50 0.953 67 5.47 0116-041278 232.60 2.50 0.953 67 5.47 0116-041279 232.60 2.50 0.953 67 5.47 0116-041280 232.60 2.50 0.953 67 5.47 0116-041281 232.60 2.50 0.953 67 5.47 0116-041282 230.60 2.50 0.953 68 5.47 0116-041283 230.60 2.50 0.953 68 5.47 0116-041284 230.60 2.50 0.953 68 5.47 0116-041285 230.60 2.50 0.953 68 5.47 0116-041286 230.60 2.50 0.953 68 5.47 0116-041287 229.60 2.52 0.953 68 5.47 0116-041288 229.60 2.52 0.953 68 5.47 0116-041289 229.60 2.52 0.953 68 5.47 0116-041290 229.60 2.52 0.953 68 5.47 0116-041291 229.60 2.52 0.953 68 5.47 0116-041292 240.40 2.68 0.952 79 5.47 0116-041293 240.40 2.68 0.952 79 5.47 0116-041294 240.40 2.68 0.952 79 5.47 0116-041295 240.40 2.68 0.952 79 5.47 0116-041296 240.40 2.68 0.952 79 5.47 0116-041297 237.20 2.53 0.952 79 5.47 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041298 237.20 2.53 0.952 79 5.47 0116-041299 237.20 2.53 0.952 79 5.47 0116-041301 237.20 2.53 0.952 79 5.47 0116-041302 237.20 2.53 0.952 79 5.47 0116-041303 232.80 2.52 0.949 78 13.7 0116-041304 232.80 2.52 0.949 78 13.7 0116-041305 232.80 2.52 0.949 78 13.7 0116-041306 232.80 2.52 0.949 78 13.7 0116-041307 232.80 2.52 0.949 78 13.7 0116-041308 232.80 2.52 0.949 78 13.7 0116-041309 232.80 2.52 0.949 78 13.7 0116-041310 232.80 2.52 0.949 78 13.7 0116-041311 232.80 2.52 0.949 78 13.7 0116-041312 232.80 2.52 0.949 78 13.7 0116-041313 235.40 2.66 0.948 74 13.7 0116-041314 235.40 2.66 0.948 74 13.7 0116-041315 235.40 2.66 0.948 74 13.7 0116-041316 235.40 2.66 0.948 74 13.7 0116-041317 235.40 2.66 0.948 74 13.7 0116-041318 235.40 2.66 0.948 74 13.7 0116-041319 235.40 2.66 0.948 74 13.7 0116-041320 235.40 2.66 0.948 74 13.7 0116-041321 235.40 2.66 0.948 74 13.7 0116-041322 235.40 2.66 0.948 74 13.7 0116-041323 236.60 2.48 0.946 74 13.7 0116-041324 236.60 2.48 0.946 74 13.7 0116-041325 236.60 2.48 0.946 74 13.7 0116-041326 236.60 2.48 0.946 74 13.7 0116-041327 236.60 2.48 0.946 74 13.7 0116-041328 236.40 2.53 0.946 74 6.19 0116-041329 236.40 2.53 0.946 74 6.19 0116-041330 236.40 2.53 0.946 74 6.19 0116-041331 236.40 2.53 0.946 74 6.19 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041332 236.40 2.53 0.946 74 6.19 0116-041333 235.20 2.40 0.952 71 6.19 0116-041334 235.20 2.40 0.952 71 6.19 0116-041335 235.20 2.40 0.952 71 6.19 0116-041336 235.20 2.40 0.952 71 6.19 0116-041337 235.20 2.40 0.952 71 6.19 0116-041338 226.80 2.56 0.952 71 6.19 0116-041339 226.80 2.56 0.952 71 6.19 0116-041340 226.80 2.56 0.952 71 6.19 0116-041341 226.80 2.56 0.952 71 6.19 0116-041342 226.80 2.56 0.952 71 6.19 0116-041343 227.40 2.56 0.951 67 6.19 0116-041344 227.40 2.56 0.951 67 6.19 0116-041345 227.40 2.56 0.951 67 6.19 0116-041346 227.40 2.56 0.951 67 6.19 0116-041347 227.40 2.56 0.951 67 6.19 0116-041348 225.80 2.42 0.951 67 6.19 0116-041349 225.80 2.42 0.951 67 6.19 0116-041350 225.80 2.42 0.951 67 6.19 0116-041351 225.80 2.42 0.951 67 6.19 0116-041352 225.80 2.42 0.951 67 6.19 0116-041353 230.20 2.50 0.950 68 6.19 0116-041354 230.20 2.50 0.950 68 6.19 0116-041355 230.20 2.50 0.950 68 6.19 0116-041356 230.20 2.50 0.950 68 6.19 0116-041357 230.20 2.50 0.950 68 6.19 0116-041358 233.20 2.82 0.950 68 6.19 0116-041362 232.20 2.53 0.950 70 6.19 0116-041363 232.20 2.53 0.950 70 6.19 0116-041364 232.20 2.53 0.950 70 6.19 0116-041365 232.20 2.53 0.950 70 6.19 0116-041366 232.20 2.53 0.950 70 6.19 0116-041367 232.20 2.53 0.950 70 6.19 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : Test 1 2 3 4 5 0116-041368 230.00 2.54 0.950 70 6.19 0116-041369 230.00 2.54 0.950 70 6.19 0116-041370 230.00 2.54 0.950 70 6.19 0116-041371 230.00 2.54 0.950 70 6.19 0116-041372 230.00 2.54 0.950 70 6.19 0116-041373 235.80 2.50 0.952 76 13.44 0116-041374 235.80 2.50 0.952 76 13.44 0116-041375 235.80 2.50 0.952 76 13.44 0116-041376 235.80 2.50 0.952 76 13.44 0116-041377 235.80 2.50 0.952 76 13.44 0116-041379 235.80 2.50 0.952 76 13.44 0116-041380 235.80 2.50 0.952 76 13.44 0116-041381 235.80 2.50 0.952 76 13.44 0116-041382 235.80 2.50 0.952 76 13.44 0116-041383 240.80 2.24 0.950 76 13.44 0116-041384 240.80 2.50 0.950 76 13.44 0116-041385 240.80 2.50 0.950 76 13.44 0116-041386 240.80 2.50 0.950 76 13.44 0116-041387 240.80 2.50 0.950 76 13.44 0116-041388 240.80 2.50 0.950 76 13.44 0116-041389 240.80 2.50 0.950 76 13.44 0116-041390 240.80 2.50 0.950 76 13.44 0116-041391 240.80 2.50 0.950 76 13.44 0116-041392 240.80 2.50 0.950 76 13.44 0116-041393 247.60 2.59 0.950 79 13.44 0116-041394 247.60 2.59 0.950 79 13.44 0116-041395 247.60 2.59 0.950 79 13.44 0116-041396 247.60 2.59 0.950 79 13.44 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC TEST RESULTS G723027.01 SO-095742 Pre-SO-095742-1 MANUFACTURING QUALITY CONTROL SALT LAKE VALLEY MOD 8 PROJECT NUMBER: SALES ORDER: PACKING SLIP NUMBER: PROJECT NAME : PRODUCT: HyperNet 200 mils / 5.00 mm 1106474-44031-5 Test Property Direction Test Method Frequency Unit 1 Melt Index - 190°C/2.16 kg (max.)ASTM D1238 One per batch g/10 min 2 Density (min.)ASTM D1505 One per batch g/cm³ Test 1 2 Specification 0.40 0.940 23F1123 23F1161 Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. 19103 GUNDLE RD,, HOUSTON, TX, UNITED STATES, 77073 SOLMAX.COM Solmax Geosynthetics LLC 7.0 LEACHATE COLLECTION AND REMOVAL SYSTEM 7.1 Contractor Submittals 7.1.1 Precast Headwall Page 1 of 6 7559 Elmwood St Littleton, CO 80125 303-667-4433 Design and Analysis of Retaining Walls 0 0.5 1 1.5 2 2.5 3 3.5 4 0 1 2 3 4 5 6 7 © Burke Enigineering 8/25/2023 8/25/2023 Project: Structure Name:Page 2 of 6 Precaster: Structure Geometry Wall Design Height ft OD Width ft Heel Width ft OD Height ft Toe Width ft Wall lb/ft Wall Thickness in Bot Slab lb/ft Bottom Slab Thickness in Total lb/ft Toe Soil Height ft Loading Loading Code Vertical Surcharge Loading psf starting ft from wall psf to ft Lateral load Soil Load Soil unit weight (gs)pcf Backfill Soil (ff)deg.Lateral soil coefficient =psf Toe Soil (ft)deg.Passive Soil coeff =psf Base - soil angle (fb)deg.Base Soil Type m reduced Wall - soil int. angle (d)deg. Soil incination angle (b)deg. Addtl. soil h.at end ft Wall incination angle (a)deg. Nominal Bearing Res. (qn)psf Seismic lateral static pressure (linear)psf @ grade to psf at bottom (kh)g Materials Concrete Strength (f'c)psi Ec psi Reinf. yield strength (fy)psi Es psi Conc. unit weight (gw)pcf l Whitney Stress Block (b1)ecu Design Variables Design Code Edition exposure Load Cases LL Surch Seismic Case 1 Max Lateral, Min Vert Case 2 Max Lateral, Max Vert Case 3 Seismic Resistance Bearing Sliding Passive Shear Moment Reference phi AASHTO LRFD 11.5.7-1 phi Seismic0.9 1 0.9 0 0 5000 4286826 4000 Salt Lake Valley Pipe Headwall Geneva Pipe 0 6 3.5 8 12 5.33333 1150 AASHTO LRFD 250 900 2.5 150 Normal / Class 1 Weights 0 Rectangular surcharge Load 0 3.5 60000 29000000 120 0.36312 43.5738 90 Toe Soil 295.67 15 25 Vert Soil Horiz Soil 0 2.46391 0.46631 0.37305 0 1.01 0.5 1 1 1 1.5 1.25 0.9 1.75 0.9 1.5 0.9 0.0 1 Soil DL 0.003 AASHTO LRFD 2017 0.9 1.75 1.35 0.90.90.50.90.45 0.0 0.8 2 0 25 25 0 © Burke Enigineering 8/25/2023 Stability Analysis Salt Lake Valley Pipe Headwall page 3 of 6 Load Summary Seismic Units Sliding (Case 3) AASHTO LRFD 11.6.5 Total Sliding Force lb/ft Factored Resisting Force lb/ft Overdesign Bearing (Case 3) AASHTO LRFD 11.6.5 ecc ft max stress psf Bearing Resistance psf Overdesign Sliding (Case 1) AASHTO LRFD 10.6.3.4 Total Sliding Force lb/ft Factored Resisting Force lb/ft Overdesign Overturning (Case 1) AASHTO LRFD 11.6.3.3 Total Overturning ecc ft Resisting ecc max ft Bearing (Case 2) AASHTO LRFD 11.6.3.2 ecc ft Soil Moment of Inertia max stress psf ft^4 Bearing Resistance psf Overdesign 3600 1944% lb/ft Case 3 300.762 0 49.2783 0 0 1416.67 2700 0 0 414.457 ft-lb/ft 0 Case 3 257.796 0 147.835 0 0 250 900Base Concrete 1800 257.796 483.212 87% 0.51056 176.095 0.34608 2 478% 18 434.891 386.694 12% ft-lb/ft ft-lb/ft 0 0 714% 257.796 1.16667 0 250 900 6 5.66667 3 0 4122.36 814% 0.46141 221.117 451.142 0 0 lb/ft lb/ft lb/ft 0 44.3504 0 Case 2Case 1 1.75 ft ft-lb/ft 0 2.66667 0 300.762 0 1416.67 2700 147.835 0.33333133.051 133.051 49.2783 0 0 1.16667 0 0 69.0761 Ho r i z Ve r t .2430 3375810 1125 Wall Concrete Rect. Soil Weight 0 Lateral Soil LLS Horiz 559.517 Passive Soil 451.142 451.142 0 0 1275 1770.83 386.694 386.694 0 0 225 Toe Soil Vert. of h. soil LL Surch (vert.) Triang. Soil Wt. 0 0 0 6 0 0 69.076 62.1685 93.2528 6 414.457 373.011 0 0 0 7 0 0 0 44.3504 Load Case1 Case 2 312.5 0 0 Mom.ArmLoad 0 Soil Retaining Wall LL Surcharge Lat. Soil Bearing © Burke Enigineering 8/25/2023 Wall Reinforcing Design Salt Lake Valley Pipe Headwall page 4 of 6 Member Design Loading Bottom Pressure (soil) psf Reinforcing size Surcharege load psf Spacing (s) in Span ft Clearance (Cl) in V soil lb/ft Diameter of steel (dia) in V Surcharge lb/ft Area of steel (As)in2 Vu lb/ft Approximate (As Req)in2 M soil ft-lb Comp. face to cent. (d) in M Surcharge ft-lb Member Thickness in Mu ksf Shear Stirrup Area (Av) per b in2 Stirrup spacing (Sv)in2 Steel shear strength (Vs)kip Conc. Shear strength (Vc)kip AASHTO LRFD 5.7.3.3 Resistance fact. (fv)AASHTO LRFD 5.5.4.2 Fact. shear strength (fVn)kip Fact. shear force (Vu)kip M at shear loc (Mu @ Vu) ft-kip Overstrength percent Moment steel strain epsilon s in/in Resistance fact. (fb)AASHTO LRFD 5.5.4.2 Moment strength (Mn)ft-kipAASHTO LRFD 5.6.3 Fact. Mom. strength (fMn)ft-kip Fact. applied Moment (Mu)ft-kip Overstrength percent Servicability Ms ft-kip c Service in Max service stress (fs max)ksi Steel service stress (fs)ksi Overdesign percent Max spacing (s max) in 5.10.3.2, 5.6.7, 5.10.6 Actual spacing (s) in Overdesign percent As Min in2 LRFD 5.6.3.3 As Temp in2 LRFD 5.10.6 As Provided in2 Overdesign percent 90 degree hook development length 0 113.474 0 170.21 2.5 0 0 0 0 108.935 0 136.168 204.252 Horiz. 4 0.3068 0.19635 0.17 0.00 4330% 100% 0.11347 0.00 4178% 100% 12 18 12 12 0% 50% 0.192 0 0.11 0.11 0.03482 0.05025 0.9 0.9 1.24029 0.96021 36 36 0.84155 0 60% 100% 8.37847 4.88972 7.54062 4.40075 0.20 0.00 0.17021 0.00 9765% 100% 0 0 22.3885 23.4432 0.9 0.9 20.1496 21.0989 8 12 2.625 0.5 0.19635 0 5.125 8 Vert 5 12 2 0.625 0.3068 0.00666 5.6875 0.2304 0 0.5 1 1.5 2 2.5 3 0 5 10 15 20 25 Vu (kip)fVn (kip) Mu (ft-kip)fMn (ft-kip) © Burke Enigineering 8/25/2023 Toe Reinforcing Design Salt Lake Valley Pipe Headwall page 5 of 6 Member Design Loading Bearing Pressure (fact) psf Reinforcing size Span ft Spacing (s) in Vu lb/ft Clearance (Cl) in Ms Diameter of steel (dia) in Mu ft-lb/ft Area of steel (As)in2 Approximate (As Req)in2 Comp. face to cent. (d) in Member Thickness in Shear Stirrup Area (Av) per b in2 Stirrup spacing (Sv)in2 Steel shear strength (Vs)kip Conc. Shear strength (Vc)kip AASHTO LRFD 5.7.3.3 Resistance fact. (fv)AASHTO LRFD 5.5.4.2 Fact. shear strength (fVn)kip Fact. shear force (Vu)kip M at shear loc (Mu @ Vu) ft-kip Overstrength percent Moment steel strain epsilon s in/in Resistance fact. (fb)AASHTO LRFD 5.5.4.2 Moment strength (Mn)ft-kipAASHTO LRFD 5.6.3 Fact. Mom. strength (fMn)ft-kip Fact. applied Moment (Mu)ft-kip Overstrength percent Servicability Ms ft-kip c Service in Max service stress (fs max)ksi Steel service stress (fs)ksi Overdesign percent Max spacing (s max) in 5.10.3.2, 5.6.7, 5.10.6 Actual spacing (s) in Overdesign percent As Min in2 LRFD 5.6.3.3 As Temp in2 LRFD 5.10.6 As Provided in2 Overdesign percent 90 degree hook development length 18 2.50847 Main Transv.221.117 5 4 12 12 5.33333 2 2.625 1965.49 0.625 0.5 0.3068 0.19635 1179.29 26.9826 36.6687 0.9 0.9 24.2843 33.0018 3144.78 0 0 0 0 0 0 0.07246 0 9.6875 9.125 12 12 1.18 0.00 3.14478 0.00 1959% 100% 0.06142 0.09181 0.9 0.9 14.5144 8.81671 13.063 7.93504 3.14 0.00 315% 100% 1.96549 0.00 7% 100% 12 12 50% 50% 0.288 0 0.11 0.11 0.3068 0.19635 1.66577 1.31492 36 36 8.41829 0 328% 100% 18 © Burke Enigineering 8/25/2023 Design Summary Salt Lake Valley Pipe Headwall page 6 of 6 Design Assumptions - Concrete Strength f'c = 5000 psi - Heel Length = 0 ft - Steel Yield Strength fy = 60000 psi - Toe Length = 5.33333333333333 ft - Wall Thickness = 8'' - Base Thickness = 12'' Retaining Wall #4 @ 12'' @ 2'' CLR #5 @ 12'' @ 2'' CLR #4 @ 12'' @ 2'' CLR #4 @ 12'' O.C. © Burke Enigineering 8/25/2023 ISOMETRIC VIEW 6 4 " 8 " 6" 7 2 " 144" 156" 6" 39" 39" 2 3 14" 1 5 " 0 180 27 0 90 A A (4) 6CA67 PLAN VIEW 1 2 " 1 2 " 1 8 " 4 2 " 3 0 " (661 2") 90 ELEVATION VIEW 1 2 " 3 0 " 1412" 25" 5" 25" 5" 25" 5" 25" 1412" 4 2 " (4) 25" HOLEFOR 18" HDPE(FLUSH w/ FLOOR) 0 ELEVATION VIEW 2 " CL R 2" CLR 2" CLR 2 " CL R SECTION A-A REINFORCING DETAIL(SCALE 1 : 24) #4@12"#5@12" NOTES:PRODUCT DESIGNED PER ACI 318 DESIGN CODE AND THE FOLLOWING CRITERIA:DESIGN LOADING: ACCORDING TO SHEET DT-3 OF CIVIL •PLANSCONCRETE 28 DAY COMPRESSIVE STRENGTH = 5,000 psi•STEEL REINFORCEMENT:•GRADE 60 ASTM A615 / 706 REBAR•GRADE 80 ASTM A1064 WELDED WIRE FABRIC•CEMENT = ASTM C150 / C595• ADDITIONAL REINFORCING NOTES:ADD (1) #4 DIAGONAL BAR AROUND EACH SIDE OF ALL •HOLESADD (2) #4 VERTICAL BAR (FULL LENGTH) BETWEEN •EACH HOLE LIFTING NOTES:WEIGHT = 14972.81 LBS•DO NOT LIFT UNTIL CONCRETE STRENGTH REACHES •2,500 PSILIFT WITH MINIMUM SLING LENGTHS OF 7'-2" LONG• BILL OF MATERIALS MATERIAL / ITEM VOLUME / QUANTITY 5,000 psi CONCRETE 3.70 yd3 CONAC A-ANCHOR 6CA67 4 REV. #:DRAWN BY:DATE: B DMANNING ALL DIMENSIONS ARE ROUNDED TO NEAREST ¼" U.O.N. SCALE:SHEET SIZE: TITAN #:PC: 1:42 B 46840ROBERT PALMER PROJECT: STRUCTURE: SECTION: CONTRACTOR: LOCATION:SHEET: HS-10LOADING:CHECKED BY: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 HEADWALL - WHITAKER CONSTRUCTION SALT LAKE CITY 1 of 1W:\ E n g i n e e r i n g \ C u s t o m P r o j e c t s \ 2 0 2 3 \ S a l t L a k e V a l l e y S o l i d W a s t e F a c i l i t y M o d u l e 8 - W h i t a k e r C o n s t r u c t i o n ( 4 6 8 4 0 ) \ H e a d w a l l \ A s s e m b l y . S L D D R W 8/24/2023 DDM PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF GENEVA PIPE & PRECAST. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN CONSENT OF GENEVA PIPE & PRECAST IS PROHIBITED. 8/25/2023 7.1.2 Leachate Pipe *SUBMITTALS* PROJECT: SALT LAKE VALLEY SOLID WASTE FACILITY MODULE 8 CONTRACTOR: WHITAKER CONSTRUCTION Trent Ashby 801-663-8456 trent.ashby@coreandmain.com LETTER OF TRANSMITTAL TO:Date:May 23, 2023 Submittal No.:#1 Project: ATTN:PAUL CHRISTENSEN FROM:Approved as Submitted Approved as Noted 2457 1620 W Returned for Corrections OGDEN, UT 84401 801-621-6668 Rejected Other The following items are hereby submitted: COPIES SPEC. AND PARA NO.PAGE NUMBER MANUFACTURER SECTION SUBMITTAL CODE No Yes NA 3-4 WL PLASTICS NA NA 5 TITAN INDUSTRIES X NA NA 6 TITAN INDUSTRIES X NA NA 7 TITAN INDUSTRIES X NA NA 8-17 INTEGRITY FUSION X NA NA 18 INTEGRITY FUSION X NA NA 19-24 INFINITY PLASTICS X NA NA 25-26 PACIFIC COAST BOLT X NA NA 27-28 UTILITY COATINGS X NA NA 29 D&L SUPPLY X NA VARIATION TO 10" AND 18" LEACHATE SUMP BOTTOMS HDPE PIPE HDPE PIPE PERFORATED 4" AND 6" LEACHATE COLLECTION HDPE ELECTROFUSION COUPLINGS H-8020 CLEANOUT 10" AND 18" LEACHATE SUMP BOTTOMS RODENT SCREENS HDPE MOLDED FITTINGS HDPE FABRICATED FITTINGS FLANGE BOLT KITS WHITAKER CONSTRUCTION PO BOX 430 BRIGHAM CITY, UTAH UT- SALT LAKE VALLEY SOLID WASTE 84302 FACILITY MODULE 8 DESCRIPTION O FITEM SUBMITED TRENT ASHBY CORE AND MAIN trent.ashby@coreandmain.com WL106066 PE47100 PIPE COMPOUND WL106-0617 Rev June 2017 Supersedes all previous editions © 2017 WL Plastics Corp •www.wlplastics.com Page 1 of 1 SALES: wlsales@wlplastics.com ● TECHNICAL: wltechnical@wlplastics.com x WL Plastics PE4710 pipe is manufactured from pressure rated PE4710 polyethylene compounds that meet or exceed ASTM D3350 requirements and Cell Classification PE445574C. WL Plastics PE4710 compound meets or exceed ASTM D3350 requirements and Cell Classification PE345464C and material code designations PE3608 and PE3408. x WL Plastics PE4710 polyethylene pipe compounds are Listed by PPI in TR-4 and are stress rated for pressure pipe with PPI HDS ratings for water at 73°F (23ºC) and PPI HDB ratings at 73°F (23°C) and 140°F (60ºC). x WL Plastics PE4710 exceeds PPI TR-3 and ASTM D3350 SCG resistance requirements per ASTM F1473 (PENT). WL Plastics PE4710 ductility is substantiated with greater than 438,300 hours (50 years) at 73ºF (23ºC) before the onset of SCG. x For potable water service, WL Plastics PE4710 black polyethylene compounds are certified to NSF-61 Physical Property Test Method Typical Value(1) Cell classification (black compound)ASTM D3350 PE445574C Melt Index (190/2.16)ASTM D1238 0.1 g/10 min High Load Melt Index(2)(190/21.6)ASTM D1238 4 –20 g/10 min Density natural resin (73°F/23°C)ASTM D792/D1505 0.941-0.959 g/cm3 Density with 2% minimum carbon black (73°F/23°C)ASTM D792/D1505 0.960 g/cm3 Tensile strength at yield (2 in/min; 73°F/23°C)ASTM D638 3500 –4000 psi Tensile elongation (2 in/min; 73°F/23°C)ASTM D638 >400% Flexural modulus (73°F/23°C)ASTM D790 >120,000 psi SCG Resistance, PENT (80°C, 2.4 MPa)ASTM F1473 > 500 h Thermal stability ASTM D3350 >428ºF (> 220°C) Brittleness temperature ASTM D746 <-103°F (<-75ºC) Thermal expansion coefficient ASTM D696 8x 10-5 in/in/°F HDB(3)at 73°F (23ºC)ASTM D2837/PPI TR-3 1600 psi (11.0 MPa) HDB(3)at 140°F (60ºC)ASTM D2837/PPI TR-3 1000 psi (6.9 MPa) HDS(3)for water at 73°F (23ºC)ASTM D2837/PPI TR-3 1000 psi (6.9 MPa) HDS for water at 140ºF (60ºC)ASTM D2837/PPI TR-3 630 psi (4.3 MPa) RCP Resistance, Critical Pressure at 32ºF (0ºC)ISO 13477 >174 psi (>1.2 MPa)(4) RCP Resistance, Critical Temp. at 72.5 psi (0.5 MPa)ISO 13477 <2ºF (<-17ºC)(4) Contact WL Plastics Customer Service for availability.(1)Typical values determined from laboratory tests of samples of compounds (resins) prepared as plaque specimens in accordance with industry standard test methods. Values determined on samples prepared from pipe may vary. The typical values presented herein are for PE4710 polyethylene pipe compounds (resins) but do not constitute engineering properties for pipe. (2)Overall range of HLMI values for all compounds from all WL Plastics compound suppliers; HLMI variation for an individual compound will be well within the overall range. (3)Listed HDB and HDS ratings in accordance with ASTM D 2837 and PPI TR-3 are published in PPI TR-4 by the compound manufacturer (independent listing) and by WL Plastics (dependent listing). WL Plastics dependent listing compounds are identified by a compound code for the supplier: C (Chevron-Phillips); D (Dow);E (Lyondell Basell); S (Ineos). (4)RCP data not available for compound code C. This publication is intended for use as a piping system guide. It should not be used in place of a professional engineer’s judgment or advice and it is not intended as installation instructions. The information in this publication does not constitute a guarantee or warranty for piping installations and cannot be guaranteed because the conditions of use are beyond our control. The user of this information assumes all risk associated with its use. WL Plastics Corporation has made every reasonable effort to ensure accuracy, but the information in this publication may not be complete, especially for special or unusual applications. Changes to this publication may occur from time to time without notice. Contact WL Plastics Corporation to determine if you have the most current edition. Publication duplication permitted. WL102 –IPS PIPE SIZES AND PRESSURE CLASS WL102-0118 Jan 2018 Supersedes all previous editions ©2018 WL Plastics Corp.●www.wlplastics.com Page 1 of 2 SALES: wlsales@wlplastics.com ●TECHNICAL: wltechnical@wlplastics.com PE4710 PCB , psi 335 320 250 200 160 140 125 100 80 65 IPS SIZEA AVG OD, in DR 7 7.3 9 11 13.5 15.5 17 21 26 32.5 Min wall, in 0.150 0.144 0.117 0.095 3/4 1.050 Avg IDC, in 0.732 0.745 0.803 0.848 Weight, lb/ft 0.187 0.177 0.148 0.124 Min wall, in 0.188 0.180 0.146 0.120 1 1.315 Avg IDC, in 0.917 0.933 1.005 1.062Weight, lb/ft 0.288 0.278 0.232 0.195 Min wall, in 0.237 0.227 0.184 0.151 1 1/4 1.660 Avg IDC, in 1.157 1.178 1.269 1.340 Weight, lb/ft 0.459 0.442 0.369 0.310 Min wall, in 0.271 0.260 0.211 0.173 1 1/2 1.900 Avg IDC, in 1.325 1.348 1.452 1.534 Weight, lb/ft 0.600 0.580 0.485 0.406 Min wall, in 0.339 0.325 0.264 0.216 0.176 0.153 0.140 2 2.375 Avg IDC, in 1.656 1.685 1.816 1.917 2.002 2.050 2.079 Weight, lb/ft 0.939 0.906 0.758 0.634 0.526 0.462 0.425 Min wall, in 0.411 0.394 0.319 0.261 0.213 0.185 0.169 2 ½2.875 Avg IDC, in 2.004 2.040 2.198 2.321 2.424 2.482 2.516 Weight, lb/ft 1.377 1.329 1.109 0.928 0.771 0.677 0.622 Min wall, in 0.500 0.479 0.389 0.318 0.259 0.226 0.206 0.167 3 3.500 Avg IDC, in 2.440 2.484 2.676 2.825 2.950 3.021 3.064 3.147 Weight, lb/ft 2.040 1.968 1.646 1.376 1.141 1.006 0.923 0.757 Min wall, in 0.643 0.616 0.500 0.409 0.333 0.290 0.265 0.214 0.173 0.138 4 4.500 Avg IDC, in 3.137 3.193 3.440 3.633 3.793 3.885 3.939 4.046 4.133 4.206Weight, lb/ft 3.372 3.253 2.720 2.275 1.887 1.660 1.526 1.247 1.018 0.819 Min wall, in 0.795 0.762 0.618 0.506 0.412 0.359 0.327 0.265 0.214 0.171 5 5.563 Avg IDC, in 3.878 3.947 4.253 4.491 4.689 4.802 4.869 5.001 5.109 5.200 Weight, lb/ft 5.154 4.975 4.156 3.479 2.886 2.540 2.328 1.909 1.557 1.254 Min wall, in 0.946 0.908 0.736 0.602 0.491 0.427 0.390 0.315 0.255 0.204 6 6.625 Avg IDC, in 4.619 4.701 5.064 5.348 5.585 5.719 5.799 5.956 6.085 6.193 Weight, lb/ft 7.305 7.059 5.894 4.930 4.095 3.599 3.307 2.703 2.209 1.781 Min wall, in 1.232 1.182 0.958 0.784 0.639 0.556 0.507 0.411 0.332 0.265 8 8.625 Avg IDC, in 6.013 6.120 6.593 6.963 7.271 7.445 7.549 7.754 7.922 8.062 Weight, lb/ft 12.385 11.963 9.988 8.359 6.939 6.100 5.597 4.591 3.744 3.012 Min wall, in 1.536 1.473 1.194 0.977 0.796 0.694 0.632 0.512 0.413 0.331 10 10.750 Avg IDC, in 7.494 7.628 8.218 8.678 9.062 9.280 9.409 9.665 9.873 10.049 Weight, lb/ft 19.245 18.581 15.515 12.983 10.774 9.490 8.695 7.128 5.805 4.689 Min wall, in 1.821 1.747 1.417 1.159 0.944 0.823 0.750 0.607 0.490 0.392 12 12.750 Avg IDC, in 8.889 9.047 9.747 10.293 10.748 11.006 11.160 11.463 11.710 11.918 Weight, lb/ft 27.062 26.138 21.837 18.267 15.155 13.348 12.238 10.023 8.169 6.587 Min wall, in 2.000 1.918 1.556 1.273 1.037 0.903 0.824 0.667 0.538 0.431 14 14.000 Avg IDC, in 9.760 9.934 10.702 11.302 11.801 12.085 12.254 12.587 12.858 13.087Weight, lb/ft 32.635 31.511 26.329 22.030 18.279 16.082 14.763 12.093 9.848 7.952 4 4.500 Min /ft wall, in gWeight,lb//in, gAvg IDCC, 6 6.625 Min wall, in Avg IDCC, in Weight,lb/ft 200 11 0.409 3.633 2.275 8 8.625 Min wall, in Avg IDCC, ing Weight,lb/ft 0.602 5.348 4.930 0.784 6.963 8.359 10 10.750 in Weight,lb/f Min wall, i 0.977 8.678 12.983 CC,Avg ID UT-SLVSW MODULE 8 PERF. PIPE DATA SHEET 4” & 6” LEACHATE COLLECTION Date: 05/22/2023 Ship Date: Pipe Size & SDR: 4” & 6” SDR11 Rows: 5 Hole Diameter: 1/4” Spacing: 60 DEGREES O.C. Dimension: 12” Notes: NOT STAGGERED DETAIL 3/DT-5 UT-SLVSW MODULE 8 PERF. PIPE DATA SHEET 10” LEACHATE COLLECTION Date: 05/22/2023 Ship Date: Pipe Size & SDR: 10” SDR11 Rows: 5 Hole Diameter: 1/2” Spacing: 60 DEGREES O.C. Dimension: 12” Notes: NOT STAGGERED DETAIL 3/DT-5 WƌŽĚƵĐƚ^ƉĞĐŝĨŝĐĂƚŝŽŶ^ŚĞĞƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ϮϳϬWĂƌŬĂĚĞŽƵƌƚ WĞĂĐŚƚƌĞĞŝƚLJ͕'ϯϬϮϲϵ W,͗ϴϴϴ͘ϳϳϬ͘ϲϯϯϬǁǁǁ͘ŝŶƚĞŐƌŝƚLJĨƵƐŝŽŶ͘ĐŽŵ DŽůĚĞĚWϯϰϬϴͬWϰϳϭϬͬWϭϬϬ ,W&ŝƚƚŝŶŐƐ DŽůĚĞĚ,W&ŝƚƚŝŶŐƐ ŵĂŶƵĨĂĐƚƵƌĞĚďLJ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ͕ĂƌĞĂůůͲƉƵƌƉŽƐĞ͕ŝŶũĞĐƚŝŽŶŵŽůĚĞĚ ,ŝŐŚͲĞŶƐŝƚLJWŽůLJĞƚŚLJůĞŶĞ &ŝƚƚŝŶŐƐ ƚŚĂƚĂƌĞĚĞƐŝŐŶĞĚĂŶĚŵĂŶƵĨĂĐƚƵƌĞĚĨŽƌƵƐĞŝŶĂƉƉůŝĐĂƚŝŽŶƐ ƚŚĂƚŝŶĐůƵĚĞ͕ďƵƚ ĂƌĞŶŽƚůŝŵŝƚĞĚƚŽ͗ x KŝůĂŶĚŐĂƐƉƌŽĚƵĐƚŝŽŶ x EĂƚƵƌĂůŐĂƐĚŝƐƚƌŝďƵƚŝŽŶ x DƵŶŝĐŝƉĂůƉŽƚĂďůĞ ǁĂƚĞƌĚŝƐƚƌŝďƵƚŝŽŶĂŶĚƐĞƌǀŝĐĞůŝŶĞƐ x tĂƐƚĞǁĂƚĞƌ ĐŽŶǀĞLJĂŶĐĞ x ^ƚŽƌŵǁĂƚĞƌĐŽŶǀĞLJĂŶĐĞ x ƌĂŝŶĂŐĞ x /ƌƌŝŐĂƚŝŽŶx /ŶĚƵƐƚƌŝĂů ƉŝƉŝŶŐĂƉƉůŝĐĂƚŝŽŶƐ x DŝŶŝŶŐ x >ĂŶĚĨŝůů x ĂďůĞx dĞůĞĐŽŵŽŶĚƵŝƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ŵĂŶƵĨĂĐƚƵƌĞƐ DŽůĚĞĚ,W&ŝƚƚŝŶŐƐŝŶĂǀĂƌŝĞƚLJŽĨƐŝnjĞƐ͕ĐŽŶĨŝŐƵƌĂƚŝŽŶƐĂŶĚ^Z͛Ɛ ƚŚĂƚ ĂƌĞ ƉƌŽĚƵĐĞĚ ĨƌŽŵ ǀŝƌŐŝŶ͕ƉƌĞͲďůĞŶĚĞĚ͕ďŝͲŵŽĚĂů ďůĂĐŬŚŝŐŚĚĞŶƐŝƚLJƉŽůLJĞƚŚLJůĞŶĞƌĞƐŝŶƚŚĂƚŚĂƐĂĐĞůůĐůĂƐƐŝĨŝĐĂƚŝŽŶŽĨ ϰϰϱϱϳϰͲϯ ƚŚĂƚĐŽŶĨŽƌŵƐƚŽ ^dDϯϯϱϬ ĂŶĚŝƐƌĞĐŽŐŶŝnjĞĚ ďLJƚŚĞWůĂƐƚŝĐWŝƉĞ/ŶƐƚŝƚƵƚĞ ĂƐŚĂǀŝŶŐĂWϯϰϬϴͬWϰϳϭϬͬWϭϬϬ ƌĂƚŝŶŐ ǁŝƚŚ ĂŶ,;,LJĚƌŽƐƚĂƚŝĐĞƐŝŐŶĂƐŝƐͿŽĨϭϲϬϬƉƐŝΛϳϯŽ&͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ĂƌĞŵĂŶƵĨĂĐƚƵƌĞĚ͕ƚĞƐƚĞĚ͕ĐĞƌƚŝĨŝĞĚ͕ ĂŶĚůŝƐƚĞĚ ŝŶĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚ ƐƚĂŶĚĂƌĚƐĂŶĚƌĞƋƵŝƌĞŵĞŶƚƐƚŚĂƚ ŵĞĞƚĂǁŝĚĞƌĂŶŐĞŽĨƉƌŽũĞĐƚƌĞƋƵŝƌĞŵĞŶƚƐ ƚŚĂƚŝŶĐůƵĚĞ͗ ^dDϮϱϭϯ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌdŚĞƌŵŽƉůĂƐƚŝĐ'ĂƐWƌĞƐƐƵƌĞWŝƉĞ͕dƵďŝŶŐĂŶĚ&ŝƚƚŝŶŐƐ ^dDϯϯϱϬ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌWŽůLJĞƚŚLJůĞŶĞWůĂƐƚŝĐWŝƉĞƐĂŶĚ&ŝƚƚŝŶŐƐDĂƚĞƌŝĂůƐ ^dDϯϮϲϭ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌƵƚƚ,ĞĂƚ&ƵƐŝŽŶWŽůLJĞƚŚLJůĞŶĞ;WͿWůĂƐƚŝĐ&ŝƚƚŝŶŐƐĨŽƌWŽůLJĞƚŚLJůĞŶĞ;WͿWŝƉĞĂŶĚdƵďŝŶŐ ^dD&ϳϭϰ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶƐĨŽƌ,WWŝƉĞŝŵĞŶƐŝŽŶƐ ttϵϬϭ Ͳ WŽůLJĞƚŚLJůĞŶĞ;WĞͿWƌĞƐƐƵƌĞWŝƉĞĂŶĚdƵďŝŶŐ͕ϯͬϰ/Ŷ͘dŚƌŽƵŐŚϯ/Ŷ͘&ŽƌtĂƚĞƌ^ĞƌǀŝĐĞ ttϵϬϲ Ͳ WŽůLJĞƚŚLJůĞŶĞ;WĞͿWƌĞƐƐƵƌĞWŝƉĞĂŶĚdƵďŝŶŐ͕ϰ/Ŷ͘dŚƌŽƵŐŚϲϱ/Ŷ͘&ŽƌtĂƚĞƌtŽƌŬƐ &Dϭϲϭϯ Ͳ ƉƉƌŽǀĂů^ƚĂŶĚĂƌĚ͗WůĂƐƚŝĐWŝƉĞĂŶĚ&ŝƚƚŝŶŐƐĨŽƌhŶĚĞƌŐƌŽƵŶĚ&ŝƌĞWƌŽƚĞĐƚŝŽŶ^ĞƌǀŝĐĞ E^/ͬE^&ϲϭ Ͳ WůĂƐƚŝĐWŝƉŝŶŐ^LJƐƚĞŵŽŵƉŽŶĞŶƚƐΘZĞůĂƚĞĚDĂƚĞƌŝĂůƐ ^dD&ϮϴϴϬ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌůĂƉͲ:ŽŝŶƚdLJƉĞ&ůĂŶŐĞĚĂƉƚĞƌƐĨŽƌƵƐĞŽŶWŽůLJĞƚŚLJůĞŶĞWƌĞƐƐƵƌĞWŝƉĞ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ/ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĂƌĞƚĞƐƚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ ƚŚĞĨŽůůŽǁŝŶŐƐƚĂŶĚĂƌĚ^dDƚĞƐƚ ŵĞƚŚŽĚƐ͘ ^dDϭϱϵϴ ͲdŝŵĞͲƚŽͲ&ĂŝůƵƌĞŽĨWůĂƐƚŝĐWŝƉĞhŶĚĞƌŽŶƐƚĂŶƚ/ŶƚĞƌŶĂůWƌĞƐƐƵƌĞ͘ ^dDϭϱϵϵ Ͳ^ŚŽƌƚͲdĞƌŵ,LJĚƌĂƵůŝĐWƌĞƐƐƵƌĞ&ĂŝůƵƌĞŽĨWůĂƐƚŝĐWŝƉĞ͕dƵďŝŶŐĂŶĚ&ŝƚƚŝŶŐƐ͘ ^dDϮϭϮϮ ͲdĞƐƚŵĞƚŚŽĚĨŽƌĞƚĞƌŵŝŶŝŶŐŝŵĞŶƐŝŽŶƐŽĨdŚĞƌŵŽƉůĂƐƚŝĐWŝƉĞĂŶĚ&ŝƚƚŝŶŐƐ͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐĐĂŶďĞŚĞĂƚĨƵƐĞĚƚŽĂŶLJWƉŝƉĞ͕ŵŽůĚĞĚĨŝƚƚŝŶŐ͕ŽƌĨĂďƌŝĐĂƚĞĚ ĨŝƚƚŝŶŐŵĂŶƵĨĂĐƚƵƌĞĚĨƌŽŵŵĂƚĞƌŝĂůŵĂĚĞĨƌŽŵWϯϰϬϴͬWϰϳϭϬͬWϭϬϬƌĞƐŝŶƚŚĂƚĐŽŵƉůŝĞƐǁŝƚŚ^dDϯϯϱϬ͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ĂƌĞĚĞƐŝŐŶĞĚĨŽƌƵƐĞŽŶ,WƉƌĞƐƐƵƌĞƉŝƉĞĂƉƉůŝĐĂƚŝŽŶƐƚŚĂƚ ĐŽŶĨŽƌŵƚŽ^dD&ϳϭϰ͕ϮϱϭϯĂŶĚϯϯϱϬĂŶĚĂƌĞƉƌĞƐƐƵƌĞ ƌĂƚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚŝŶĚƵƐƚƌLJŐƵŝĚĞůŝŶĞƐĨŽƌŶĂƚƵƌĂůŐĂƐĂŶĚ ǁĂƚĞƌĂƉƉůŝĐĂƚŝŽŶƐ͘ WƌĞƐƐƵƌĞZĂƚŝŶŐŽĨ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐDŽůĚĞĚWϰϳϭϬ&ŝƚƚŝŶŐƐ ĂƐĞĚŽŶ^Z ^Z ;^ƚĂŶĚĂƌĚŝŵĞŶƐŝŽŶZĂƚŝŽŶͿ DKW ;DĂdžŝŵƵŵůůŽǁĂďůĞKƉĞƌĂƚŝŶŐWƌĞƐƐƵƌĞͿ ϳ ϯϯϯ ϵϮϱϬ ϭϭ ϮϬϬ ϭϳ ϭϲϬ Ϯϭ ϭϬϬ ϯϮ͘ϱ ϲϯ EKd͗WƌĞƐƐƵƌĞƌĂƚŝŶŐƐĂƌĞďĂƐĞĚŽŶĂŶŽƉĞƌĂƚŝŶŐƚĞŵƉĞƌĂƚƵƌĞŽĨƵƉ ƚŽϳϯŽĂŵďŝĞŶƚƚĞŵƉĞƌĂƚƵƌĞĂŶĚǁŝůůŶĞĞĚƚŽďĞƌĞĚƵĐĞĚĨŽƌŚŝŐŚĞƌ ƚĞŵƉĞƌĂƚƵƌĞƐĂŶĚĐĞƌƚĂŝŶĂƉƉůŝĐĂƚŝŽŶƐ͘ ϭϭ ϮϬϬ WƌŽĚƵĐƚ^ƉĞĐŝĨŝĐĂƚŝŽŶ^ŚĞĞƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ϮϳϬWĂƌŬĂĚĞŽƵƌƚ WĞĂĐŚƚƌĞĞŝƚLJ͕'ϯϬϮϲϵ W,͗ϴϴϴ͘ϳϳϬ͘ϲϯϯϬǁǁǁ͘ŝŶƚĞŐƌŝƚLJĨƵƐŝŽŶ͘ĐŽŵ dŚĞDĂdžŝŵƵŵůůŽǁĂďůĞKƉĞƌĂƚŝŶŐWƌĞƐƐƵƌĞƐ;DKWͿ ĨŽƌŵŽůĚĞĚWϰϳϭϬĨŝƚƚŝŶŐƐ ŵƵƐƚĚĞͲƌĂƚĞĚĨŽƌĞůĞǀĂƚĞĚƚĞŵƉĞƌĂƚƵƌĞƐ ŝŶĂůůƐĞƌǀŝĐĞĂƉƉůŝĐĂƚŝŽŶƐ͕ŝŶĐůƵĚŝŶŐKŝůΘ'ĂƐ'ĂƚŚĞƌŝŶŐ^LJƐƚĞŵƐ ŝŶƐƚĂůůĞĚŝŶůĂƐƐϭŽƌůĂƐƐϮůŽĐĂƚŝŽŶƐ;ůŽǁƉŽƉƵůĂƚŝŽŶĂƌĞĂƐŶŽƚ ƐƵďũĞĐƚƚŽKd&ZdŝƚůĞϰϵWĂƌƚϭϵϮƌĞŐƵůĂƚŝŽŶƐͿŽƌǁŚĞƌĞ&ĞĚĞƌĂů ŽĚĞƐ ĚŽ ŶŽƚ ĂƉƉůLJ͘/ŶĐůƵĚŝŶŐ tĂƚĞƌ͕ ƌŝŶĞ͕ ƌLJ EĂƚƵƌĂů 'ĂƐ ĂƉƉůŝĐĂƚŝŽŶƐǁŝƚŚEKĂƐƐŽĐŝĂƚĞĚŚLJĚƌŽĐĂƌďŽŶƐ͘ W/^ƉĞĐŝĨŝĐĂƚŝŽŶϭϱ>;ϭϵϵϱͿƐƚĂƚĞƐ͞/ŶŵŽƐƚĐŝƌĐƵŵƐƚĂŶĐĞƐ͕ƚŚĞ,ŽďƚĂŝŶĞĚĂƚ ϳϯŽ &ĐĂŶďĞƵƐĞĚĨŽƌĂƉƉůŝĐĂƚŝŽŶƐƵƉƚŽϭϬϬŽ &ǁŝƚŚŽƵƚĨƵƌƚŚĞƌĚĞƌĂƚŝŶŐ͟sĂůƵĞƐ ƐƚĂƚĞĚŝŶƚŚŝƐƚĂďůĞ ƵƐĞĂŵĂƚĞƌŝĂůĚĞƐŝŐŶĨĂĐƚŽƌŽĨ͘ϲϯĂŶĚĂ&ůƵŝĚ^ĞƌǀŝĐĞ&ĂĐƚŽƌ ŽĨϭ͘Ϭ dŚĞŵĂdžŝŵƵŵŽƉĞƌĂƚŝŶŐƚĞŵƉĞƌĂƚƵƌĞ ŽĨ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶ WƌŽĚƵĐƚƐWϰϳϭϬDŽůĚĞĚ&ŝƚƚŝŶŐƐƐŚŽƵůĚŶŽƚĞdžĐĞĞĚϭϰϬŽ &͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ŚĂǀĞĂƐƚƌŽŶŐƌĞƐŝƐƚĂŶĐĞƚŽŵĂŶLJĐŚĞŵŝĐĂůĐŽŵƉŽƵŶĚƐ͘&Žƌ ŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶŽŶƚŚĞĐŚĞŵŝĐĂůƌĞƐŝƐƚĂŶĐĞŽĨWϰϳϭϬƌĞƐŝŶ͕ƉůĞĂƐĞƌĞĨĞƌĞŶĐĞWW/dĞĐŚŶŝĐĂůZĞƉŽƌƚdZͲϭϵ͘ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚ/ŶũĞĐƚŝŽŶDŽůĚĞĚůĂĐŬ,WĨŝƚƚŝŶŐƐ ĐĂŶďĞƐƚŽƌĞĚŽƵƚĚŽŽƌƐďƵƚŝƚŝƐŚŝŐŚůLJƌĞĐŽŵŵĞŶĚĞĚƚŚĂƚ ƚŚĞLJ ďĞƐƚŽƌĞĚŝŶĚŽŽƌƐ͘ůĂĐŬ,WĨŝƚƚŝŶŐƐƐƚŽƌĞĚƉƌŽƉĞƌůLJŝŶĚŽŽƌƐŚĂǀĞĂŶƵŶůŝŵŝƚĞĚƐŚĞůĨůŝĨĞ͘ &ŝƚƚŝŶŐDKWZĂŶŐĞďLJ^ZĂŶĚKƉĞƌĂƚŝŶŐdĞŵƉĞƌĂƚƵƌĞ ^Z ϳϯ͘ϰŽ&ϭϬϬŽ&ϭϮϬŽ&ϭϰϬŽ& ϳ ϯϯϯƉƐŝ ϮϲϬƉƐŝ ϮϭϬƉƐŝ ϭϲϲƉƐŝ ϵϮϱϬƉƐŝ ϭϵϱƉƐŝ ϭϱϴƉƐŝ ϭϮϱƉƐŝ ϭϭ ϮϬϬƉƐŝ ϭϱϲƉƐŝ ϭϮϲƉƐŝ ϭϬϬƉƐŝ ϭϳ ϭϮϲƉƐŝ ϵϴƉƐŝ ϳϵƉƐŝ ϲϯƉƐŝ ϭϭ ϮϬϬƉƐŝ ϭϱϲƉƐŝ ϭϮϲƉƐŝ ϭϬϬƉƐŝ WƌŽĚƵĐƚ^ƉĞĐŝĨŝĐĂƚŝŽŶ^ŚĞĞƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ϮϳϬWĂƌŬĂĚĞŽƵƌƚ WĞĂĐŚƚƌĞĞŝƚLJ͕'ϯϬϮϲϵ W,͗ϴϴϴ͘ϳϳϬ͘ϲϯϯϬǁǁǁ͘ŝŶƚĞŐƌŝƚLJĨƵƐŝŽŶ͘ĐŽŵ DŽůĚĞĚWϯϰϬϴͬWϰϳϭϬͬWϭϬϬ ,W&ŝƚƚŝŶŐƐ DŽůĚĞĚ,W&ŝƚƚŝŶŐƐ ŵĂŶƵĨĂĐƚƵƌĞĚďLJ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ͕ĂƌĞĂůůͲƉƵƌƉŽƐĞ͕ŝŶũĞĐƚŝŽŶŵŽůĚĞĚ ,ŝŐŚͲĞŶƐŝƚLJWŽůLJĞƚŚLJůĞŶĞ &ŝƚƚŝŶŐƐ ƚŚĂƚĂƌĞĚĞƐŝŐŶĞĚĂŶĚŵĂŶƵĨĂĐƚƵƌĞĚĨŽƌƵƐĞŝŶĂƉƉůŝĐĂƚŝŽŶƐ ƚŚĂƚŝŶĐůƵĚĞ͕ďƵƚ ĂƌĞŶŽƚůŝŵŝƚĞĚƚŽ͗ x KŝůĂŶĚŐĂƐƉƌŽĚƵĐƚŝŽŶ x EĂƚƵƌĂůŐĂƐĚŝƐƚƌŝďƵƚŝŽŶ x DƵŶŝĐŝƉĂůƉŽƚĂďůĞ ǁĂƚĞƌĚŝƐƚƌŝďƵƚŝŽŶĂŶĚƐĞƌǀŝĐĞůŝŶĞƐ x tĂƐƚĞǁĂƚĞƌ ĐŽŶǀĞLJĂŶĐĞ x ^ƚŽƌŵǁĂƚĞƌĐŽŶǀĞLJĂŶĐĞ x ƌĂŝŶĂŐĞ x /ƌƌŝŐĂƚŝŽŶx /ŶĚƵƐƚƌŝĂů ƉŝƉŝŶŐĂƉƉůŝĐĂƚŝŽŶƐ x DŝŶŝŶŐ x >ĂŶĚĨŝůů x ĂďůĞx dĞůĞĐŽŵŽŶĚƵŝƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ŵĂŶƵĨĂĐƚƵƌĞƐ DŽůĚĞĚ,W&ŝƚƚŝŶŐƐŝŶĂǀĂƌŝĞƚLJŽĨƐŝnjĞƐ͕ĐŽŶĨŝŐƵƌĂƚŝŽŶƐĂŶĚ^Z͛Ɛ ƚŚĂƚ ĂƌĞ ƉƌŽĚƵĐĞĚ ĨƌŽŵ ǀŝƌŐŝŶ͕ƉƌĞͲďůĞŶĚĞĚ͕ďŝͲŵŽĚĂů ďůĂĐŬŚŝŐŚĚĞŶƐŝƚLJƉŽůLJĞƚŚLJůĞŶĞƌĞƐŝŶƚŚĂƚŚĂƐĂĐĞůůĐůĂƐƐŝĨŝĐĂƚŝŽŶŽĨ ϰϰϱϱϳϰͲϯ ƚŚĂƚĐŽŶĨŽƌŵƐƚŽ ^dDϯϯϱϬ ĂŶĚŝƐƌĞĐŽŐŶŝnjĞĚ ďLJƚŚĞWůĂƐƚŝĐWŝƉĞ/ŶƐƚŝƚƵƚĞ ĂƐŚĂǀŝŶŐĂWϯϰϬϴͬWϰϳϭϬͬWϭϬϬ ƌĂƚŝŶŐ ǁŝƚŚ ĂŶ,;,LJĚƌŽƐƚĂƚŝĐĞƐŝŐŶĂƐŝƐͿŽĨϭϲϬϬƉƐŝΛϳϯŽ&͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ĂƌĞŵĂŶƵĨĂĐƚƵƌĞĚ͕ƚĞƐƚĞĚ͕ĐĞƌƚŝĨŝĞĚ͕ ĂŶĚůŝƐƚĞĚ ŝŶĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚ ƐƚĂŶĚĂƌĚƐĂŶĚƌĞƋƵŝƌĞŵĞŶƚƐƚŚĂƚ ŵĞĞƚĂǁŝĚĞƌĂŶŐĞŽĨƉƌŽũĞĐƚƌĞƋƵŝƌĞŵĞŶƚƐ ƚŚĂƚŝŶĐůƵĚĞ͗ ^dDϮϱϭϯ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌdŚĞƌŵŽƉůĂƐƚŝĐ'ĂƐWƌĞƐƐƵƌĞWŝƉĞ͕dƵďŝŶŐĂŶĚ&ŝƚƚŝŶŐƐ ^dDϯϯϱϬ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌWŽůLJĞƚŚLJůĞŶĞWůĂƐƚŝĐWŝƉĞƐĂŶĚ&ŝƚƚŝŶŐƐDĂƚĞƌŝĂůƐ ^dDϯϮϲϭ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌƵƚƚ,ĞĂƚ&ƵƐŝŽŶWŽůLJĞƚŚLJůĞŶĞ;WͿWůĂƐƚŝĐ&ŝƚƚŝŶŐƐĨŽƌWŽůLJĞƚŚLJůĞŶĞ;WͿWŝƉĞĂŶĚdƵďŝŶŐ ^dD&ϳϭϰ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶƐĨŽƌ,WWŝƉĞŝŵĞŶƐŝŽŶƐ ttϵϬϭ Ͳ WŽůLJĞƚŚLJůĞŶĞ;WĞͿWƌĞƐƐƵƌĞWŝƉĞĂŶĚdƵďŝŶŐ͕ϯͬϰ/Ŷ͘dŚƌŽƵŐŚϯ/Ŷ͘&ŽƌtĂƚĞƌ^ĞƌǀŝĐĞ ttϵϬϲ Ͳ WŽůLJĞƚŚLJůĞŶĞ;WĞͿWƌĞƐƐƵƌĞWŝƉĞĂŶĚdƵďŝŶŐ͕ϰ/Ŷ͘dŚƌŽƵŐŚϲϱ/Ŷ͘&ŽƌtĂƚĞƌtŽƌŬƐ &Dϭϲϭϯ Ͳ ƉƉƌŽǀĂů^ƚĂŶĚĂƌĚ͗WůĂƐƚŝĐWŝƉĞĂŶĚ&ŝƚƚŝŶŐƐĨŽƌhŶĚĞƌŐƌŽƵŶĚ&ŝƌĞWƌŽƚĞĐƚŝŽŶ^ĞƌǀŝĐĞ E^/ͬE^&ϲϭ Ͳ WůĂƐƚŝĐWŝƉŝŶŐ^LJƐƚĞŵŽŵƉŽŶĞŶƚƐΘZĞůĂƚĞĚDĂƚĞƌŝĂůƐ ^dD&ϮϴϴϬ Ͳ ^ƉĞĐŝĨŝĐĂƚŝŽŶĨŽƌůĂƉͲ:ŽŝŶƚdLJƉĞ&ůĂŶŐĞĚĂƉƚĞƌƐĨŽƌƵƐĞŽŶWŽůLJĞƚŚLJůĞŶĞWƌĞƐƐƵƌĞWŝƉĞ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ/ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĂƌĞƚĞƐƚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ ƚŚĞĨŽůůŽǁŝŶŐƐƚĂŶĚĂƌĚ^dDƚĞƐƚ ŵĞƚŚŽĚƐ͘ ^dDϭϱϵϴ ͲdŝŵĞͲƚŽͲ&ĂŝůƵƌĞŽĨWůĂƐƚŝĐWŝƉĞhŶĚĞƌŽŶƐƚĂŶƚ/ŶƚĞƌŶĂůWƌĞƐƐƵƌĞ͘ ^dDϭϱϵϵ Ͳ^ŚŽƌƚͲdĞƌŵ,LJĚƌĂƵůŝĐWƌĞƐƐƵƌĞ&ĂŝůƵƌĞŽĨWůĂƐƚŝĐWŝƉĞ͕dƵďŝŶŐĂŶĚ&ŝƚƚŝŶŐƐ͘ ^dDϮϭϮϮ ͲdĞƐƚŵĞƚŚŽĚĨŽƌĞƚĞƌŵŝŶŝŶŐŝŵĞŶƐŝŽŶƐŽĨdŚĞƌŵŽƉůĂƐƚŝĐWŝƉĞĂŶĚ&ŝƚƚŝŶŐƐ͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐĐĂŶďĞŚĞĂƚĨƵƐĞĚƚŽĂŶLJWƉŝƉĞ͕ŵŽůĚĞĚĨŝƚƚŝŶŐ͕ŽƌĨĂďƌŝĐĂƚĞĚ ĨŝƚƚŝŶŐŵĂŶƵĨĂĐƚƵƌĞĚĨƌŽŵŵĂƚĞƌŝĂůŵĂĚĞĨƌŽŵWϯϰϬϴͬWϰϳϭϬͬWϭϬϬƌĞƐŝŶƚŚĂƚĐŽŵƉůŝĞƐǁŝƚŚ^dDϯϯϱϬ͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ĂƌĞĚĞƐŝŐŶĞĚĨŽƌƵƐĞŽŶ,WƉƌĞƐƐƵƌĞƉŝƉĞĂƉƉůŝĐĂƚŝŽŶƐƚŚĂƚ ĐŽŶĨŽƌŵƚŽ^dD&ϳϭϰ͕ϮϱϭϯĂŶĚϯϯϱϬĂŶĚĂƌĞƉƌĞƐƐƵƌĞ ƌĂƚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚŝŶĚƵƐƚƌLJŐƵŝĚĞůŝŶĞƐĨŽƌŶĂƚƵƌĂůŐĂƐĂŶĚ ǁĂƚĞƌĂƉƉůŝĐĂƚŝŽŶƐ͘ WƌĞƐƐƵƌĞZĂƚŝŶŐŽĨ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐDŽůĚĞĚWϰϳϭϬ&ŝƚƚŝŶŐƐ ĂƐĞĚŽŶ^Z ^Z ;^ƚĂŶĚĂƌĚŝŵĞŶƐŝŽŶZĂƚŝŽŶͿ DKW ;DĂdžŝŵƵŵůůŽǁĂďůĞKƉĞƌĂƚŝŶŐWƌĞƐƐƵƌĞͿ ϳ ϯϯϯ ϵϮϱϬ ϭϭ ϮϬϬ ϭϳ ϭϲϬ Ϯϭ ϭϬϬ ϯϮ͘ϱ ϲϯ EKd͗WƌĞƐƐƵƌĞƌĂƚŝŶŐƐĂƌĞďĂƐĞĚŽŶĂŶŽƉĞƌĂƚŝŶŐƚĞŵƉĞƌĂƚƵƌĞŽĨƵƉ ƚŽϳϯŽĂŵďŝĞŶƚƚĞŵƉĞƌĂƚƵƌĞĂŶĚǁŝůůŶĞĞĚƚŽďĞƌĞĚƵĐĞĚĨŽƌŚŝŐŚĞƌ ƚĞŵƉĞƌĂƚƵƌĞƐĂŶĚĐĞƌƚĂŝŶĂƉƉůŝĐĂƚŝŽŶƐ͘ ϭϭ ϮϬϬ WƌŽĚƵĐƚ^ƉĞĐŝĨŝĐĂƚŝŽŶ^ŚĞĞƚ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ϮϳϬWĂƌŬĂĚĞŽƵƌƚ WĞĂĐŚƚƌĞĞŝƚLJ͕'ϯϬϮϲϵ W,͗ϴϴϴ͘ϳϳϬ͘ϲϯϯϬǁǁǁ͘ŝŶƚĞŐƌŝƚLJĨƵƐŝŽŶ͘ĐŽŵ dŚĞDĂdžŝŵƵŵůůŽǁĂďůĞKƉĞƌĂƚŝŶŐWƌĞƐƐƵƌĞƐ;DKWͿ ĨŽƌŵŽůĚĞĚWϰϳϭϬĨŝƚƚŝŶŐƐ ŵƵƐƚĚĞͲƌĂƚĞĚĨŽƌĞůĞǀĂƚĞĚƚĞŵƉĞƌĂƚƵƌĞƐ ŝŶĂůůƐĞƌǀŝĐĞĂƉƉůŝĐĂƚŝŽŶƐ͕ŝŶĐůƵĚŝŶŐKŝůΘ'ĂƐ'ĂƚŚĞƌŝŶŐ^LJƐƚĞŵƐ ŝŶƐƚĂůůĞĚŝŶůĂƐƐϭŽƌůĂƐƐϮůŽĐĂƚŝŽŶƐ;ůŽǁƉŽƉƵůĂƚŝŽŶĂƌĞĂƐŶŽƚ ƐƵďũĞĐƚƚŽKd&ZdŝƚůĞϰϵWĂƌƚϭϵϮƌĞŐƵůĂƚŝŽŶƐͿŽƌǁŚĞƌĞ&ĞĚĞƌĂů ŽĚĞƐ ĚŽ ŶŽƚ ĂƉƉůLJ͘/ŶĐůƵĚŝŶŐ tĂƚĞƌ͕ ƌŝŶĞ͕ ƌLJ EĂƚƵƌĂů 'ĂƐ ĂƉƉůŝĐĂƚŝŽŶƐǁŝƚŚEKĂƐƐŽĐŝĂƚĞĚŚLJĚƌŽĐĂƌďŽŶƐ͘ W/^ƉĞĐŝĨŝĐĂƚŝŽŶϭϱ>;ϭϵϵϱͿƐƚĂƚĞƐ͞/ŶŵŽƐƚĐŝƌĐƵŵƐƚĂŶĐĞƐ͕ƚŚĞ,ŽďƚĂŝŶĞĚĂƚ ϳϯŽ &ĐĂŶďĞƵƐĞĚĨŽƌĂƉƉůŝĐĂƚŝŽŶƐƵƉƚŽϭϬϬŽ &ǁŝƚŚŽƵƚĨƵƌƚŚĞƌĚĞƌĂƚŝŶŐ͟sĂůƵĞƐ ƐƚĂƚĞĚŝŶƚŚŝƐƚĂďůĞ ƵƐĞĂŵĂƚĞƌŝĂůĚĞƐŝŐŶĨĂĐƚŽƌŽĨ͘ϲϯĂŶĚĂ&ůƵŝĚ^ĞƌǀŝĐĞ&ĂĐƚŽƌ ŽĨϭ͘Ϭ dŚĞŵĂdžŝŵƵŵŽƉĞƌĂƚŝŶŐƚĞŵƉĞƌĂƚƵƌĞ ŽĨ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶ WƌŽĚƵĐƚƐWϰϳϭϬDŽůĚĞĚ&ŝƚƚŝŶŐƐƐŚŽƵůĚŶŽƚĞdžĐĞĞĚϭϰϬŽ &͘ /ŶũĞĐƚŝŽŶDŽůĚĞĚ,W&ŝƚƚŝŶŐƐĨƌŽŵ/ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚƐ ŚĂǀĞĂƐƚƌŽŶŐƌĞƐŝƐƚĂŶĐĞƚŽŵĂŶLJĐŚĞŵŝĐĂůĐŽŵƉŽƵŶĚƐ͘&Žƌ ŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶŽŶƚŚĞĐŚĞŵŝĐĂůƌĞƐŝƐƚĂŶĐĞŽĨWϰϳϭϬƌĞƐŝŶ͕ƉůĞĂƐĞƌĞĨĞƌĞŶĐĞWW/dĞĐŚŶŝĐĂůZĞƉŽƌƚdZͲϭϵ͘ /ŶƚĞŐƌŝƚLJ&ƵƐŝŽŶWƌŽĚƵĐƚ/ŶũĞĐƚŝŽŶDŽůĚĞĚůĂĐŬ,WĨŝƚƚŝŶŐƐ ĐĂŶďĞƐƚŽƌĞĚŽƵƚĚŽŽƌƐďƵƚŝƚŝƐŚŝŐŚůLJƌĞĐŽŵŵĞŶĚĞĚƚŚĂƚ ƚŚĞLJ ďĞƐƚŽƌĞĚŝŶĚŽŽƌƐ͘ůĂĐŬ,WĨŝƚƚŝŶŐƐƐƚŽƌĞĚƉƌŽƉĞƌůLJŝŶĚŽŽƌƐŚĂǀĞĂŶƵŶůŝŵŝƚĞĚƐŚĞůĨůŝĨĞ͘ &ŝƚƚŝŶŐDKWZĂŶŐĞďLJ^ZĂŶĚKƉĞƌĂƚŝŶŐdĞŵƉĞƌĂƚƵƌĞ ^Z ϳϯ͘ϰŽ&ϭϬϬŽ&ϭϮϬŽ&ϭϰϬŽ& ϳ ϯϯϯƉƐŝ ϮϲϬƉƐŝ ϮϭϬƉƐŝ ϭϲϲƉƐŝ ϵϮϱϬƉƐŝ ϭϵϱƉƐŝ ϭϱϴƉƐŝ ϭϮϱƉƐŝ ϭϭ ϮϬϬƉƐŝ ϭϱϲƉƐŝ ϭϮϲƉƐŝ ϭϬϬƉƐŝ ϭϳ ϭϮϲƉƐŝ ϵϴƉƐŝ ϳϵƉƐŝ ϲϯƉƐŝ ϭϭ ϮϬϬƉƐŝ ϭϱϲƉƐŝ ϭϮϲƉƐŝ ϭϬϬƉƐŝ SDR 17 IPS (Standard Dimension Ratio) 125 PSI (Working Pressure at 73.4˚ F) The difference MOLDED Makes Molded 45 elbows from Integrity Fusion Products offer performance, availability, and value that eliminate the need for fabricated fittings. The molded difference includes: • No inner fusion beads • Fully Pressure Rated • Wall thickness remains consistent throughout IntegriFuse fittings are manufactured from 100% Virgin Resin with black high density bimodal polyethylene copolymer designed for use in, but not limited to, potable water, natural gas, industrial, landfill, oil & gas, and mining applications. *ntegriFuse fittings meet ASTM-D2513 & ASTM-D3261 requirements XIFSF BQQMJDBCMF #utt fusion, electrofusion, and transition fittings meet AWWA C-901/C-906, NSF "/4*$"/BOE/4'"/4* XIFSF BQQMJDBCMF . IntegriFuse fittings are manufactured with resin having a material designation code of PE 3408, PE3608, PE 4710, and PE 100. FM Approved. Integrity Fusion Products, Inc. 270 Parkade Court Peachtree City, GA 30269 Phone 770.632.7530 | Fax 770.632.7540 www.IntegrityFusion.com Call Toll Free at 888.770.6330 2” IPS 3.23” 2.64” 0.140” 2.375” 6.38” 0.3 lbs. 100002 3” IPS 4.72” 3.86” 0.206” 3.500” 9.33” 0.9 lbs. 100006 4” IPS 5.31” 4.21” 0.265” 4.500” 10.63” 1.7 lbs. 100010 6” IPS 6.89” 5.35” 0.390” 6.625” 14.09” 4.4 lbs. 100014 8” IPS 8.46” 6.54” 0.507” 8.625” 17.48” 9.8 lbs. 100018 10” IPS 10.04” 7.64” 0.632” 10.750” 20.94” 14.9 lbs. 100022 12” IPS 10.63” 7.80” 0.750” 12.750” 22.64” 22.1 lbs. 100024 SDR 11 (Standard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) 2” IPS 3.23” 2.64” 0.216” 2.375” 6.38” 0.4 lbs. 100001 FM 200 3” IPS 4.72” 3.86” 0.318” 3.500” 9.33” 1.2 lbs. 100005 FM 200 4” IPS 5.31” 4.21” 0.409” 4.500” 10.63” 2.1 lbs. 100009 FM 200 6” IPS 6.89” 5.35” 0.602” 6.625” 14.09” 6.1 lbs. 100013 FM 200 8” IPS 8.46” 6.54” 0.784” 8.625” 17.48” 12.6 lbs. 100017 FM 200 10” IPS 10.04” 7.64” 0.977” 10.750” 20.94” 21.3 lbs. 100021 FM 200 12” IPS 10.63” 7.80” 1.159” 12.750” 22.64” 31.4 lbs. 100023 FM 200 B D CE A 45° BENDS Nominal Size A B C D E Weight Item Code Nominal Size A B C D E Weight Item Code Notes 10.04” 7.64” 0.977” 10.750” 20.94” 21.3 lb10” IPS 10.04” 7.64” 0.977” 10.750” 20.94” 21.3 lbs. 100021 FM 200 New Angles Covered Molded 22.5° Bends are now available from Integrity Fusion Products. These fully pressure rated fittings are available in SDR 11 for 2" to 8" IPS sizes. This new solution will improve the quality and availability of fittings for your project and replace the fabricated fittings typically used. These fittings truly are "Molded for your Industry". The molded difference includes: • No inner fusion beads • Fully pressure rated • Wall thickness remains consistent throughout IntegriFuse fittings are manufactured with black high density bimodal polyethylene (HDPE) copolymer designed for use in, but not limited to, potable water, natural gas, industrial, landfill, oil & gas, and mining applications. All IntegriFuse fittings meet ASTM-D2513 & ASTM-D3261 Requirements. All butt fusion fittings meet AWWA C-901/C-906, NSF"/4*$"/-61, and NSF"/4*-372 XIFSFBQQMJDBCMF . IntegriFuse fittings are manufactured with resin having a material designation code of PE 3408, PE 3608, PE 4710, and PE 100. Integrity Fusion Products, Inc. Mailing/Shipping: 270 Parkade Court, Peachtree City, GA 30269 TOLL FREE 1-888-770-6330 P: 770-632-7530 • F: 770-632-7540 • E: Info@IntegrityFusion.com SDR 11 (Standard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) Nominal Size A B C D Weight. Item Code 2” IPS 2.”4.5” 0.2” 2.3” lbs. 100050 3” IPS 3.5” 4.” 0.3” 3.5”1. lbs. 100052 4” IPS 3.3”” 0.4” 4.5” lbs. 100054 6” IPS 4.25” 6.” 0.6” 6.6”lbs. 100056 8” IPS ””0.” 8.6” lbs. 100058 % $ C DD % D $$ DD CCCCC DDD 4” IPS 3.33”” 0.44” 4.55” lbs. 100054 6” IPS 4.25” 6..” 0.66” 6.66”lbs. 100056 SDR 17 IPS (Standard Dimension Ratio) 125 PSI (Working Pressure at 73.4˚ F) Nominal Size A B C D E Weight Item Code FM Nominal Size A B C D E Weight Item Code The difference MOLDED Makes Molded 90 elbows from Integrity Fusion Products offer performance, availability, and value that eliminate the need for fabricated fittings. The molded difference includes: • No inner fusion beads • Fully Pressure Rated • Wall thickness remains consistent throughout IntegriFuse fittings are manufactured from 100% Virgin Resin with black high density bimodal polyethylene copolymer designed for use in, but not limited to, potable water, natural gas, industrial, landfill, oil & gas, and mining applications. IntegriFuse fittings meet ASTM-D2513 & ASTM-D3261 requirements XIFSF BQQMJDBCMF . #Vtt fusion, electrofusion, and transition fittings meet AWWA C-901/C-906, NSF "/4*$"/-61, and NSF"/4*-372 XIFSF BQQMJDBCMF . IntegriFuse fittings are manufactured with resin having a material designation code of PE 3408, PE3608, PE 4710, and PE 100. Integrity Fusion Products, Inc. 270 Parkade Court Peachtree City, GA 30269 Phone 770.632.7530 | Fax 770.632.7540 www.IntegrityFusion.com Call Toll Free at 888.770.6330 E B A D C 2” IPS 4.36” 2.64” 0.140” 2.375” 5.63” 0.4 lbs. 100106 3” IPS 5.85” 3.50” 0.206” 3.500” 7.73” 1.1 lbs. 100110 4” IPS 6.85” 3.80” 0.265” 4.500” 9.21” 2.0 lbs. 100114 6” IPS 8.94” 4.75” 0.390” 6.625” 12.40” 5.4 lbs. 100118 8” IPS 11.81” 7.20” 0.507” 8.625” 16.13” 12.5 lbs. 100122 10” IPS 13.78” 8.27” 0.632” 10.750” 19.15” 22.0 lbs. 100126 12” IPS 14.96” 8.46” 0.750” 12.750” 21.33” 36.7 lbs. 100128 SDR 11 (Standard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) 90° BENDS ¾” IPS 3.19” 2.14” 0.095” 1.050” 3.82” 0.1 lbs. 100100 - 1” IPS 3.31” 2.18” 0.120” 1.315” 4.06” 0.2 lbs. 100101 - 1 ¼” IPS 3.48” 2.15” 0.151” 1.660” 4.41” 0.3 lbs. 100102 - 1 ½” IPS 3.92” 2.37” 0.173” 1.900” 5.00” 0.4 lbs. 100103 - 2” IPS 4.36” 2.64” 0.216” 2.375” 5.63” 0.5 lbs. 100105 FM 200 3” IPS 5.85” 3.50” 0.318” 3.500” 7.73” 1.6 lbs. 100109 FM 200 4” IPS 6.85” 3.80” 0.409” 4.500” 9.21” 2.8 lbs. 100113 FM 200 6” IPS 8.94” 4.75” 0.602” 6.625” 12.40” 7.7 lbs. 100117 FM 200 8” IPS 11.81” 7.20” 0.784” 8.625” 16.13” 17.3 lbs. 100121 FM 200 10” IPS 13.78” 8.27” 0.977” 10.750” 19.15” 30.1 lbs. 100125 FM 200 12” IPS 14.96” 8.46” 1.159” 12.750” 21.33” 49.9 lbs. 100127 FM 200 Nominal Size A B C D E Weight Item Code Nominal Size A B C D E Weight Item Code Notes SDR 111 (Standard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) 6” IPS 8.94” 4.75” 0.602” 6.625” 12.40” 7.7 lbs. 100117 FM 200 Molded Caps from Integrity Fusion Products offer performance, availability, and value that eliminate the need for fabricated fittings. The molded difference includes: • No inner fusion beads • Fully Pressure Rated • Wall thickness remains consistent throughout IntegriFuse fittings are manufactured from 100% Virgin Resin with black high density bimodal polyethylene copolymer designed for use in, but not limited to, potable water, natural gas, industrial, landfill, oil & gas, and mining applications. All IntegriFuse fittings meet ASTM-D2513 & ASTM-D3261 requirements. All butt fusion, electrofusion, and transition fittings meet "88"$$ /4' "/4*$"/ BOE/4'"/4* XIFSF BQQMJDBCMF IntegriFuse fittings are manufactured with resin having a material designation code of PE 3408, PE3608, PE 4710, and PE 100. FM Approved. Integrity Fusion Products, Inc. 270 Parkade Court Peachtree City, GA 30269 Phone 770.632.7530 | Fax 770.632.7540 www.IntegrityFusion.com Call Toll Free at 888.770.6330 CAPS The difference MOLDED Makes SDR 17 IPS (Standard Dimension Ratio) 125 PSI (Working Pressure at 73.4˚ F) 2” IPS 3.23” 0.140” 2.375” 2.52” 0.1 lbs. 100306 3” IPS 4.72” 0.206” 3.500” 3.70” 0.4 lbs. 100310 4” IPS 5.31” 0.264” 4.500” 3.98” 0.7 lbs. 100314 6” IPS 6.89” 0.390” 6.625” 4.84” 2.0 lbs. 100318 8” IPS 8.66” 0.507” 8.625” 5.83” 4.2 lbs. 100322 10” IPS 9.84” 0.633” 10.750” 6.30” 7.5 lbs. 100326 12” IPS 11.77” 0.750” 12.750” 7.52” 12.4 lbs. 100328 SDR 11 (Standard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) ¾” IPS 2.55” 0.095” 1.050” 2.18” 0.1 lbs. 100300 - 1” IPS 2.64” 0.120” 1.315” 2.18” 0.1 lbs. 100302 - 1 ¼” IPS 2.77” 0.151” 1.660” 2.18” 0.1 lbs. 100303 - 1 ½” IPS 3.10” 0.173” 1.900” 2.42” 0.7 lbs. 100304 - 2” IPS 3.23” 0.216” 2.375” 2.52” 0.8 lbs. 100305 FM 200 3” IPS 4.72” 0.318” 3.500” 3.70” 0.9 lbs. 100309 FM 200 4” IPS 5.31” 0.409” 4.500” 3.98” 1.1 lbs. 100313 FM 200 6” IPS 6.89” 0.603” 6.625” 4.84” 2.9 lbs. 100317 FM 200 8” IPS 8.66” 0.785” 8.625” 5.83” 6.3 lbs. 100321 FM 200 10” IPS 9.84” 0.978” 10.750” 6.30” 10.9 lbs. 100325 FM 200 12” IPS 11.77” 1.160” 12.750” 7.52” 18.4 lbs. 100327 FM 200 Nominal Size A B C D Weight Item Code Nominal Size A B C D Weight Item Code Notes tandard Dimension Ratio) 200 PSI (Working Pressure at 73.4˚ F) Nominal Size A B C D Weight SDR 11 (St 4” IPS 5.31” 0.409” 4.500” 3.98” 1.1 lbs. 100313 FM 200 4.84” 2.9 lbs. 6” IPS 6.89” 0.603” 6.625” 4.84” 2.9 lbs. 100317 FM 200 6.30” 10.9 lbs. 10” IPS 9.84” 0.978” 10.750” 6.30” 10.9 lbs. 100325 FM 200 IPS-SDR 17 - 125 PSI (Working Pressure at 73.4˚ F) Nominal Size A B C D E Weight Item Code PS SDR PSI (W ki P The dierence MOLDED .PMEFE5FFTGSPN*OUFHSJUZ'VTJPO 1SPEVDUTBSFUIFNBSLFUMFBEFSGPSCVUU GVTJPOUFFT5IFTFGJUUJOHTPGGFS QFSGPSNBODF BWBJMBCJMJUZ BOEWBMVFUIBU FMJNJOBUFUIFOFFEGPSGBCSJDBUFEGJUUJOHT 5IF.PMEFEEJGGFSFODFJODMVEFT v /PJOOFSGVTJPOCFBE v 'VMMZQSFTTVSFSBUFE v 8BMMUIJDLOFTTSFNBJOTDPOTJTUFOU UISPVHIPVU IntegriFuse EF Fittings are manufactured from the highest quality 7JSHJOblack high density bimodal polyethylene copolymer resin designed for use in, but not limited to, potable water, natural gas, industrial, landfill, oil & gas, and mining applications. All IntegriFuse fittings meet ASTM –D2513 & ASTM D3261(where applicable). #VUUGVTJPO FMFDUSPGVTJPO BOEUSBOTJUJPO GJUUJOHTNFFU"88"$$ /4' "/4*$"/ BOE/4'"/4* XIFSF BQQMJDBCMF *OUSHSJ'VTFGJUUJOHTBSF NBOVGBDUVSFEXJUISFTJOIBWJOHB NBUFSJBMEFTJHOBUJPODPEFPG1& 1& 1& BOE1& Integrity Fusion Products, Inc. 270 Parkade Court Peachtree City, GA 30269 P: 1-888-770-6330 • P: 770-632-7530 F: 770-632-7540 E D A C B 3" IPS 11.81" 5.91" 0.206" 3.500" 3.54" 1.5 lbs. 100709 4" IPS 13.78" 6.89" 0.264" 4.500" 3.94" 2.8 lbs. 100713 6" IPS 18.11" 9.06" 0.390" 6.625" 4.72" 7.5 lbs. 100717 8" IPS 23.62" 11.81" 0.507" 8.625" 5.71" 17.5 lbs. 100721 10" IPS 27.56" 13.78" 0.632" 10.750" 6.30" 28.3 lbs. 100725 12" IPS 31.57" 15.97" 0.750" 12.750" 7.52" 47.5 lbs. 100727 IPS-SDR 11 - 200 PSI (Working Pressure at 73.4˚ F) Nominal Size A B C D E Weight Item Code ¾" IPS 6.38" 3.19" 0.095" 1.050" 2.14" 0.2 lbs. 100700 - 1" IPS 6.62" 3.31" 0.120" 1.315" 2.18" 0.2 lbs. 100701 - 1 ¼" IPS 6.97" 3.48" 0.151" 1.660" 2.15" 0.4 lbs. 100702 - 1 ½" IPS 7.84" 3.92" 0.173" 1.900" 2.37" 0.6 lbs. 100704 - 2" IPS 8.66" 4.33" 0.216" 2.375" 2.48" 1.0 lbs. 100705 FM 200 3" IPS 11.81" 5.91" 0.318" 3.500" 3.54" 1.5 lbs. 100708 FM 200 4" IPS 13.78" 6.89" 0.409" 4.500" 3.94" 3.9 lbs. 100712 FM 200 6" IPS 18.11" 9.06" 0.602" 6.625" 4.72" 10.5 lbs. 100716 FM 200 8" IPS 23.62" 11.81" 0.784" 8.625" 5.71" 23.2 lbs. 100720 FM 200 10" IPS 27.56" 13.78" 0.977" 10.750" 6.30" 39.4 lbs. 100724 FM 200 12" IPS 31.57" 15.97" 1.159" 12.750" 7.52" 66.3 lbs. 100726 FM 200 Nominal Size A B C D E Weight Item Code Notes IPS-SDR 11 - 200 PSI (Working Pressure at 73.4˚ F) 6" IPS 18.11" 9.06" 0.602" 6.625" 4.72" 10.5 lbs. 100716 FM 200 10" IPS 27.56" 13.78" 0.977" 10.750" 6.30" 39.4 lbs. 100724 FM 200 The difference MOLDED Makes Since 2007 Integrity Fusion Products have been known for their impressive product line of Electrofusion fittings. We continue to grow and innovate more products than ever before! The IntegriFuse Difference: • Large Diameter Electrofusion Couplers Improved technology eliminating the need for pre-heating procedures • Utilizes higher Amperage (105A) to create more heat, allowing the pipe to expand to help reduce any gaps between pipe and coupler • Higher amperage allows for larger gaps to start fusion process • Higher amperage also results in deeper melt penetration • Wider fusion zones for increased surface melt • Wider cold zones allowing for more flexibility in pipe stab depth • fittings created with traceability bar codes • All couplers through 54" are injection molded (not fabricated out of pipe or billet as other brands) • Pop up melt indicators • Cooling time listed on coupler indicates when the fitting joint can be fully pressure tested, eliminating the need for guesswork • Backed by 30+ years of experience in designing, developing and producing electrofusion fittings & equipment with strict quality management standards • FM Approved • AWWA C906 NSF/ANSI 61 •.BOVGBDUVSFEJOBDDPSEBODFUP"45. •All IntegriFuse Electrofusion fittings must be installed by a qualified and experienced technician. L D d/2 L D L d INTEGRIFUSE SDR 11 IPS ELECTROFUSION COUPLERS Water 200 PSI(ASTM / 232 PSI (ISO) - Gas 100 PSI @73° F Sustainable Operating Pressure Suitable for use on IPS SDR 9 to SDR 17 HDPE Pipe.BOVGBDUVSFEGSPNNBUFSJBMNBEFGSPN1&1&1&SFTJOUIBU DPNQMJFTXJUI"45.%'VTJOHUP4%3UP4%3NBZSFRVJSFTQFDJBMCBSDPEF NOMINAL SIZE E*%D L WEIGHT ITEM CODE NOTES 1"IPS 1.315" 1.7" 3.4" 0.1 lbs. 200302 1 ¼" IPS 1.660" 2.2" 3.7" 0.2 lbs. 200303 1 ½" IPS 1.900" 2.7" 3.9" 0.4 lbs. 200304 2" IPS 2.375" 3.2" 4.6" 0.5 lbs. 200305 3" IPS 3.500" 4.4" 5.0" 0.9 lbs. 200307 FM 200 / FM 232 4" IPS 4.500" 5.9" 5.9" 1.7 lbs. 200310 FM 200 / FM 232 5" IPS 5.563" 6.9" 6.5" 2.5 lbs. 200312 FM 200 / FM 232 6" IPS 6.625" 8.7" 7.9" 4.6 lbs. 200314 FM 200 / FM 232 8" IPS 8.625" 10.7" 8.9" 8.4 lbs. 200317 FM 200 / FM 232 10" IPS 10.750" 13.3" 9.8" 14.9 lbs. 200320 FM 200 / FM 232 12" IPS 12.750" 15.9" 11.4" 24.5 lbs. 200323 FM 200 / FM 232 14" IPS 14.000" 17.2" 11.8" 27.0 lbs. 200326 FM 200 / FM 232 16" IPS 16.000" 19.8" 13.9" 32.0 lbs. 200329 FM 200 / FM 232 18" IPS (1) 18.000" 22.3" 16.7" 75.0 lbs. 200332 FM 200 / FM 232 20" IPS (1) 20.000" 24.8" 18.0" 97.0 lbs. 200335 FM 200 / FM 232 22" IPS (1) 22.000" 27.4" 19.5" 123.0 lbs. 200336 FM 200 / FM 232 24" IPS (1) 24.000" 30.6" 19.8" 157.0 lbs. 200338 FM 200 / FM 232 (1)Dual fusion zones (2) Requires the I Fuse 105 EF Processor for fusion $PVQMFSDBOCFGVTFEUP4%3QJQF CVUJTPOMZQSFTTVSFSBUFEUP4%3/PUUPCFVTFEJO4%3GVMMZQSFTTVSF SBUFEBQQMJDBUJPOT Integrity Fusion Products, Inc. 270 Parkade Court . Peachtree City, GA 30269 P: 1-888-770-6330 • P: 770-632-7530 • F: 770-632-7540 E: Info@IntegrityFusion.com 4" IPS 4.500" 5.9" 5.9" 1.7 lbs. 200310 FM 200 / FM 232 18" IPS (1) 18.000" 22.3" 16.7" 75.0 lbs. 200332 FM 200 / FM 232 10" IPS 10.750" 13.3" 9.8" 14.9 lbs. 200320 FM 200 / FM 232 6" IPS 6.625" 8.7" 7.9" 4.6 lbs. 200314 FM 200 / FM 232 INFINITY PLASTICS “Where Fabricated HDPE Fittings Are Endless” PRODUCT SPECIFICATIONS High Density Polyethylene (HDPE) Fabricated Fittings, Manholes, Storage Tanks and Custom Fabrications Infinity Plastics manufactures and supplies Distributors with High Density Polyethylene (HDPE) Fabricated Fittings that meet or exceed these standards: ASTM F714 Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR), based on outside diameter. ASTM D1248 Standard Specification for Polyethylene Plastic Molding and Extrusion ASTM D3350 Standard Specification for Polyethylene Plastic Pipe and Fittings Materials. ASTM D3035 Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR), based on controlled outside diameter. ASTM D2513-06 Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings intended for use in the distribution of natural gas. HDPE Fabricated Fittings supplied by Infinity Plastics are designed to meet AWWA C901/C906 fitting requirements and are manufactured from PPI and NSF listed resins in accordance with the material specifications listed in ASTM D3350 with a cell classification . Suitable for butt welding to pipe manufactured to ASTM D2513, D3035, F714 with similar resins. Thank you for the opportunity to supply your HDPE project needs! - Andy Zipperer INFINITY PLASTICS 1124 Horicon St., Mayville, WI 53050 P 920-387-0200 / F 920-387-0300 / infinityplastics@sbcglobal.net of 445474C. INFINITY PLASTICS “Where Fabricated HDPE Fittings Are Endless” IPS Fabricated 45° Lateral Wye, Unreinforced (Dimensions in Inches) PLEASE NOTE !! - SPECIFICATIONS Dimensions and appearance are subject to change without notice due to design, production modifications or other various factors affecting production. Dimensions are approximate. Reduced Laterals may be multiple steps. Angle tolerance for fabricated elbows is +/- 2 degrees. All fittings are subject to Infinity Plastics “Standard Terms and Conditions.” A copy of this drawing must accompany all purchase orders for this fitting. All other dimensions are to tolerances of +/- 1.0”. HDPE Fabricated Fittings supplied by Infinity Plastics are designed to meet AWWA C901/C906 fitting requirements and are manufactured from PPI and NSF listed resins in accordance with the material specifications listed in ASTM D3350 with a cell classification of 345464C. Suitable for butt welding to pipe manufactured to ASTM D2513, D3035, F714 with similar resins. NOTE: Fabricated HDPE (PE 4710) fittings are available through Infinity Plastics upon request. INFINITY PLASTICS 1124 Horicon St., Mayville, WI 53050 P 920-387-0200 / F 920-387-0300 / infinityplastics@sbcglobal.net IPS Fabricated 45° Lateral Wye, Unreinforced INFINITY PLASTICS “Where Fabricated HDPE Fittings Are Endless” IPS 30° 2 Segment Elbow Fabricated (Dimensions in Inches) HDPE Fabricated Fittings supplied by Infinity Plastics are designed to meet AWWA C901/C906 fitting requirements and are manufactured from PPI and NSF listed resins in accordance with the material specifications listed in ASTM D3350 with a cell classification . Suitable for butt welding to pipe manufactured to ASTM D2513, D3035, F714 with similar resins. INFINITY PLASTICS 1124 Horicon St., Mayville, WI 53050 P 920-387-0200 / F 920-387-0300 / infinityplastics@sbcglobal.net E RX IPS 30° 2 Segment Elbow Fabricatedg (Dimensions in Inches) of 445474C INFINITY PLASTICS “Where Fabricated HDPE Fittings Are Endless” IPS Machined End Caps 4” – 63” 40psi Est. Pressure Applications (Dimensions in Inches) ~ OTHER SIZES, PRESSURE RATINGS & DR’s NOT LISTED ARE AVAILABLE. CALL FOR A QUOTE. Field fusion of machined end caps may require the use of a stub end holder. Sufficient length of pipe may be fused to end cap to eliminate the use of a stub end holder. Call for a Quote on this fabricated option. HDPE Fabricated Fittings supplied by Infinity Plastics are designed to meet AWWA C901/C906 fitting requirements and are manufactured from PPI and NSF listed resins in accordance with the material specifications listed in ASTM D3350 with a cell classification of 445474C. Suitable for butt welding to pipe manufactured to ASTM D2513, D3035, F714 with similar resins. INFINITY PLASTICS 1124 Horicon St., Mayville, WI 53050 P 920-387-0200 / F 920-387-0300 / infinityplastics@sbcglobal.net Page 1 of 1 IPS Nominal Size T (min) OAL (in) DR Pressure Rating 4” IPS 1.4 2.0 7 – 32.5 Low Pressure 6” IPS 1.4 2.0 7 – 32.5 Low Pressure 8” IPS 1.4 2.0 7 – 32.5 Low Pressure 10” IPS 1.4 2.0 7 – 32.5 Low Pressure 12” IPS 1.4 2.0 7 – 32.5 Low Pressure 14” IPS 1.4 2.0 7 – 32.5 Low Pressure 16” IPS 1.4 2.0 7 – 32.5 Low Pressure 18” IPS 1.4 2.0 7 – 32.5 Low Pressure 20” IPS 1.4 2.0 7 – 32.5 Low Pressure 22” IPS 1.4 2.0 9 – 32.5 Low Pressure 24” IPS 1.4 2.0 9 – 32.5 Low Pressure 26” IPS 1.4 2.0 9 – 32.5 Low Pressure 28” IPS 1.4 2.0 9 – 32.5 Low Pressure 30” IPS 1.4 2.0 9 – 32.5 Low Pressure 32” IPS 1.4 2.0 9 – 32.5 Low Pressure 34” IPS 1.4 2.0 11 – 32.5 Low Pressure 36” IPS 1.4 2.0 11 – 32.5 Low Pressure 54” IPS 1.4 2.0 11 – 32.5 Low Pressure 63” IPS 1.4 2.0 11 – 32.5 Low Pressure “Where Fabricated HDPE Fittings Are Endless” g IPS Machined End Caps 4” – 63”p 40psi Est. Pressure Applications 18” IPS 1.4 2.0 7 – 32.5 Low Pressure INFINITY PLASTICS “Where Fabricated HDPE Fittings Are Endless” IPS SDR-11 HDPE Cleanout Adapters, Fabricated (Dimensions in Inches) ~ Fabricated from SDR-11 HDPE PE3408 Industrial Pipe supplied by quality manufacturers. ~ Furnished complete with threaded inside caps. ~ Inside caps are one solid piece made of HDPE and will accommodate a 2” square drive. ~ Thread spacing on both the cap and pipe is 8 threads per inch for a strong tapered fit. ~ Other sizes are available upon request and may require a minimum order. ~ Cleanouts are rated for Gravity or Low Pressure (6” & down) Service. PLEASE NOTE !! - SPECIFICATIONS Dimensions and appearance are subject to change without notice due to design, production modifications or other various factors affecting production. Dimensions are approximate. Angle tolerance for fabricated elbows is +/- 2 degrees. All fittings are subject to Infinity Plastics “Standard Terms and Conditions.” A copy of this drawing must accompany all purchase orders for this fitting. All other dimensions are to tolerances of +/- 1.0” HDPE Fabricated Fittings supplied by Infinity Plastics are designed to meet AWWA C901/C906 fitting requirements and are manufactured from PPI and NSF listed resins in accordance with the material specifications listed in ASTM D3350 with a cell classification . Suitable for butt welding to pipe manufactured to ASTM D2513, D3035, F714 with similar resins. NOTE: Fabricated HDPE (PE 4710) fittings are available through Infinity Plastics upon request. INFINITY PLASTICS 1124 Horicon St., Mayville, WI 53050 P 920-387-0200 / F 920-387-0300 / infinityplastics@sbcglobal.net IPS Size Pipe O.D. (in) SDR L (in)Weight (lbs) 2” 2.375 11 4.50 1 3” 3.500 11 4.50 1.5 4” 4.500 11 4.50 2 6” 6.625 11 4.50 3 8” 8.625 11 4.50 5 10” 10.750 11 4.50 8 12” 12.750 11 11.50 11 4” 4.500 11 4.50 2 IPS SDR-11 HDPE Cleanout Adapters, Fabricatedp (Dimensions in Inches) 7.1.3 Nonwoven Geotextile 365 South Holland Drive Tel +1 706 693 2226 Pendergrass, GA 30567 www.tencategeo.us Mirafi® 180N Disclaimer: TenCate assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice. Mirafi® is a registered trademark of Nicolon Corporation. Copyright © 2021 Nicolon Corporation. All Rights Reserved FGS000760 ETQR85 Mirafi® 180N is a nonwoven geotextile composed of polypropylene fibers, which are formed into a stable network such that the fibers retain their relative position. Mirafi® 180N is inert to biological degradation and resists naturally encountered chemicals, alkalis, and acids. Mirafi® 180N meets AASHTO M288 Class 1, 2, & 3, with elongation >50%. TenCate Geosynthetics Americas Laboratories are accredited by Geosynthetic Accreditation Institute – Laboratory Accreditation Program (GAI‐LAP). NTPEP Listed MECHANICAL PROPERTIES TEST METHOD UNIT MINIMUM AVERAGE ROLL VALUE MD CD Grab Tensile Strength ASTM D4632 lbs (N) 205 (912) 205 (912) Grab Tensile Elongation ASTM D4632 % 50 50 Trapezoid Tear Strength ASTM D4533 lbs (N) 80 (356) 80 (356) CBR Puncture Strength ASTM D6241 lbs (N) 500 (2224) MAXIMUM OPENING SIZE Apparent Opening Size (AOS) ASTM D4751 U.S. Sieve (mm) 80 (0.18) MECHANICAL PROPERTIES TEST METHOD UNIT MINIMUM ROLL VALUE Permittivity ASTM D4491 sec‐1 1.4 Flow Rate ASTM D4491 gal/min/ft² (l/min/m²) 95 (3870) MINIMUM TEST VALUE UV Resistance (at 500 hours) ASTM D4355 % strength retained 70 PHYSICAL PROPERTIES UNIT ROLL SIZE Roll Dimensions (width x length) ft (m) 12.5 x 360 (3.8 x 110) 15 x 300 (4.57 x 91.4) Roll Area yd2 (m2) 500 (418) Roll Weight lbs (kg) 239 (108) Label Color Disclaimer: We warrants that at the time of delivery the product furnished hereunder shall conform to the speci- fication stated herein. We assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. We disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice. 8oz Nonwoven Fabric N180 PROPERTY TEST METHOD UNIT N180 ASTM D 5261 ASTM D 4632 ASTM D 4632 ASTM D 4533 ASTM D 6241 ASTM D 4491 ASTM D 4491 ASTM D 4751 ASTM D 4355 1 8 205 50 80 500 1.4 95 80 70 oz/yd2 lbs % lbs lbs sec-1 gpm/�2 US Sieve % AASHTO Class M288 Weight (2) Grab Tensile (1) Grab Elonga�on (1) Trapezoid Tear Strength (1) CBR Puncture Resistance (1) Permi�vity (4) Water Flow (4) AOS (3) UV Resistance at 500hrs (2) 7.1.4 Sewer Rock Optional Page 1 Footer Text Date: Tuesday, August 15th, 2023 To: Project File, Procore From: Gary Horton, P.E. Subject: Salt Lake Valley Landfill Module 8; Sewer Rock Size 4 Memo This memo is regarding the 1.5-inch sewer rock from Kilgore’s pit located in Stockton, Utah. The attached sieve analysis report shows 89 percent of the material passing the 1.5-inch sieve. Although it meets the supplier’s target (85-100 percent passing), it is just outside of the allowable tolerance (90-100 percent passing) per ASTM D448 for Size 4 material. The test results were shared with the owner and contractor and discussed in weekly progress meetings. After further discussions with the project team, it was decided that the material would still meet the intent of the design; therefore, the material is suitable for use on the project. Report of Physical Properties and Aggregate Target Submittal www.kilgorecompanies.com | o. 801.250.0132 | f. 801.250.0671 |7057 W 2100 S, Salt Lake City, Utah 84128 | P.O. Box 869, Magna, Utah 84044 Submittal Date: 8/1/2023 Job Name: Type Job Name Product Code: 21-03014 - 1 1/2" x 3/4" (#4) Washed rock Job Number: Type Job Number Pit Code: 020323 - Stockton Test Results Standard Physical Properties Result Test Spec. ASTM C29 AASHTO T19 Unit Weight Unit Weight (lbs./cu.ft.) 100 100 Voids (%) 100 100 ☐Loose ☒Rodded 100 100 ASTM D1557 AASHTO T180 Modified Proctor Max Density (lbs./cu.ft.) 100 100 Optimum Moisture (%) 100 100 ASTM D698 AASHTO T99 Standard Proctor Max Density (lbs./cu.ft.) 100 100 Optimum Moisture (%) 100 100 ASTM C1883 AASHTO T193 CBR Surcharge=10 lbs. CBR@0.1” 100 100 CBR@0.2” 100 100 ASTM C131 AASHTO T96 L.A. Abrasion Small Coarse Loss (%) 20 100 Grading/Revolutions B 500 100 Large Coarse Loss (%) 100 100 Grading/ Revolutions 100 100 ASTM C88 AASHTO T104 Coarse Soundness Coarse Soundness Loss (%) 0 100 Sodium No. of Cycles 5 100 Fine Soundness Fine Soundness Loss (%) 100 100 Sodium No. of Cycles 100 100 ASTM D4318 AASHTO T89/T90 Liquid Limit Plastic Limit Plasticity Index Liquid Limit 100 100 Plastic Limit 100 100 Plastic Index 100 100 ASTM C142 AASHTO T112 Clay lumps Friable Particles Coarse Aggregate (%) 100 100 Fine Aggregate (%) 100 100 ASTM C40 AASHTO T21 Organic Impurities Coarse Aggregate (%) <Plate 1 100 Fine Aggregate (%) 100 100 ASTM D2419 AASHTO T176 Sand Equivalency 100 100 Sand Equivalent (%) 100 100 ASTM C1252 AASHTO T304 Fine Aggregate Angularity 100 100 Uncompacted Voids (%) 100 100 ASTM D5821 TP – 61 Fractured Face % w/1 Fractured Face 100 100 % w/2 Fractured Faces 100 100 ASTM C123 AASHTO T113 Lightweight Pieces Coarse Aggregate (%) 100 100 Fine Aggregate (%) 100 100 ASTM C128 AASHTO T84 Fine Specific Gravity & Absorption Bulk Specific Gravity (Dry) 100 100 Bulk Specific Gravity (SSD) 100 100 Apparent Specific Gravity 100 100 Absorption (%) 100 100 ASTM C127 AASHTO T85 Coarse Specific Gravity & Absorption Bulk Specific Gravity (Dry) 100 100 Bulk Specific Gravity (SSD) 100 100 Apparent Specific Gravity 100 100 Absorption (%) 100 100 ASTM D2487 Soil Classification Group Symbol 100 Group Name 100 ASTM D2488 Soil Description & identification Group Symbol 100 Group Name 100 Sieve Analysis ASTM C136 AASHTO T27 Sieve Size Target % Passing Spec. LL Spec. UL 600 mm 24” 100 100 100 550 mm 22” 100 100 100 500 mm 20” 100 100 100 450 mm 18” 100 100 100 400 mm 16” 100 100 100 350 mm 14” 100 100 100 300 mm 12” 100 100 100 250 mm 10” 100 100 100 225 mm 9” 100 100 100 200 mm 8” 100 100 100 150 mm 6” 100 100 100 125 mm 5” 100 100 100 100 mm 4” 100 100 100 75 mm 3” 100 100 100 63.0 mm 2-1/2” 100 100 100 50.0 mm 2” 100 100 100 37.5 mm 1-1/2” 86 85 100 25.0 mm 1” 39 20 55 19.0 mm 3/4” 10 0 15 12.5 mm 1/2” 2 100 100 9.5 mm 3/8” 2 0 5 6.3 mm 1/4” 100 100 100 4.75 mm No. 4 1 100 100 2.36 mm No. 8 1 100 100 2.00 mm No. 10 100 100 100 1.18 mm No. 16 1 100 100 0.600 mm No. 30 1 100 100 0.425 mm No.40 100 100 100 0.300 mm No. 50 1 100 100 0.180 mm No. 80 100 100 100 0.150 mm No. 100 1 100 100 0.075 mm No. 200 0.83 100 100 ASTM C 1567 Alkali Reactivity 100 100 100 100 100 100 ASTM C 227 Alkali Reactivity 100 100 100 100 100 100 ASTM C136 AASHTO T27 Fineness Modulus 100 100 100 100 100 100 ASTM D4791 Flat & Elongated 100 100 100 100 100 100 AGGREGATE GRADATION TEST RESULTS PROJECT NAME:WCG LAB NUMBER: PROJECT PIN NO.:WCG PROJECT NO.: MATERIAL TYPE: MATERIAL SOURCE: SAMPLE STATION: ITEM NUMBER(s): ASTM D3282 50 mm (2")A = DRY WT. (g) 37.5 mm (1 1/2")B = CALIB. FLASK WT. (g) 25 mm (1")S = S.S.D. SAMPLE WT. (g) 19.0 mm (3/4")C = SAMPLE IN H2O WT. (g) 12.5 mm (1/2")BULK SP GR. 9.5 mm (3/8")SSD BULK SP GR. 4.75 mm (#4)APPARENT SP GR. 2.36 mm (#8)UNIT WEIGHT (lbs/ft3) 2.00 mm (#10) 1.18 mm (#16) 425 m (#40)A = DRY WT. (g) 300 m (#50)B = S.S.D. SAMPLE WT. (g) 75 m (#200)C = SAMPLE IN H2O WT. (g) - #200 BULK SP GR. TOTAL SSD BULK SP GR. APPARENT SP GR. #1 WET WT. (g)UNIT WEIGHT (lbs/ft3) #2 DRY WT. (g)FRACTURED (1 FACE) #3 H2O WT. (g)FRACTURED (2 FACES) % H2O FLAT, ELONGATED SAND EQUIVALENT TEST #:NON FLATS SAND READINGS @ 20 MINUTES:L.A. WEAR: CLAY READINGS @ 20 MINUTES:RETAINED ON #12: AMOUNT OF WEAR: L.L.PASS/FAIL: P.L. P.I. TESTED BY: COARSE AGG.FINE AGG. SAMPLED BY: LAB MANAGER: REMARKS: SLC Landfill Module 8 23A-27 23-298 Sewer Drain Rock Kilgore Stockton Belt Sample 8,12 DATE SAMPLED:8/1/23 0.0 -100 100 823.8 11.1%89%90 -100 3815.9 62.4%38%20 -55 2145.9 91.2%9%0 -15 420.7 96.9%3% 54.3 97.6%2%0 -5 41.5 98.2%2% 5.6 98.2%2% 0.8 98.3%2% 2.0 98.3%2% 6.1 98.4%2% 5.2 98.4%2% 72.6 99.4%0.6% 44.1 0.6%0.10% 7438.6 7438.6 7438.6 7474.1 7438.6 0 35.5 1 2 3 Felipe Ocampo Nate Hansen Chelsea Richards SIEVE SIZE ACCUM. WT. RETAINED (g) %%FINE AGGREGATE SP. GR. INFORMATIONRETAINEDPASSINGTARGET /TOLERANCE COARSE AGGREGATE SP. GR. INFORMATION UNIT WEIGHT MOISTURE DATA AVG. UNIT WEIGHT (lbs/cu. ft.)0.6 SAND EQUIVALENT AVG.: 0 AASHTO MATERIAL CLASS:0 0 ABSORPTION (Target Date): µ µ µ BEFORE SIEVE WT. (g)AFTER SIEVE WT. (g) ASTM D448 Size 4 AVG.#1 #2 #3 This does NOT meet the requirements for Size 4 8.0 Protective Soil Cover 8.1 Construction QC/QA Plan Protective Soil Cover Construction QC/QA Plan Introduction This document (Protec ve Soil Cover Construc on Quality Control/Quality Assurance Plan) is intended to generally document standard procedures u lized to verify a quality installa on. This document complements, and does not replace, applicable site-specific project specifica ons. References: CETCO Bentomat Installa on Guidelines and the 2017 APWA Manual of Standard Specifica ons Sec on 31 23 16. Material Recommended cover soils should have a par cle size distribu on ranging between fines and 1 inch (25 mm), unless a cushioning geotex le is specified. Placement The final thickness of soil cover on the GCL varies with the applica on. A minimum cover layer must be at least 1 foot (300 mm) thick to provide confining stress to the GCL, eliminate the poten al for seam separa on and prevent damage by equipment, erosion, etc. Cover soils should be free of angular stones or other foreign ma;er that could damage the GCL. Cover soils should be approved by the engineer with respect to par cle size, uniformity, and chemical compa bility. Consult CETCO if cover soils have high concentra ons of calcium (e.g. limestone, dolomite, gypsum, seashell fragments). Soil cover shall be placed over the GCL using construc on equipment that minimizes stresses on the GCL. A minimum thickness of 2 foot of cover soil should be maintained between the equipment res/tracks and the GCL at all mes during the covering process. In high-traffic areas such as on roadways, a minimum thickness of 3 feet is required. Soil cover should be placed in a manner that prevents the soil from entering the GCL overlap zones. Soil cover should be pushed up on slopes, not down slopes, to minimize tensile forces on the GCL. When a textured geomembrane is installed over the GCL, a temporary geosynthe c covering known as a slip sheet or rub sheet should be used to minimize fric on during placement and to allow the textured geomembranes to be more easily moved into its final posi on. Cyclical we=ng and drying of GCL covered only with geomembrane can cause overlap separa on. Soil cover should be placed promptly whenever possible. Geomembranes should be covered with a white geotex le and/or opera ons layer without delay to minimize the intensity of wet-dry cycling. If there is the poten al for unconfined cyclic we=ng and drying over an extended period of me, the longitudinal seam overlaps should be increased based on the project engineer’s recommenda on. To avoid seam separa on, the GCL should not be put in excessive tension by the weight or movement of textured geomembrane on steep slopes. If there is the poten al for unconfined geomembrane expansion and contrac on over an extended period of me, the longitudinal seam overlaps should be increased based upon the project engineer’s recommenda on. 9.0 RISER 5 ABANDONMENT 20231730.001A/SLC24L170232 Page 1 of 1 July 18, 2024 © 2024 Kleinfelder www.kleinfelder.com 849 West Levoy Drive, Suite 200 Salt Lake City, UT 84123-2964 p | 801.261.3336 Salt Lake Valley Solid Waste Management Facility Module 5 Leachate Riser Abandonment Construction Quality Control / Construction Quality Assurance Plan Introduction This document is intended to document the procedures that will be utilized for quality control and quality assurance during the Salt Lake Valley Solid Waste Management Facility (SLVSWMF, or Site) Module 5 leachate riser abandonment activities. Materials • Three quarter-inch washed rock will be sourced by the contractor and used to fill the void space inside the inner riser, and the annular space between the inner and outer risers. • A geotextile filter fabric (Mirafi N-series or equivalent) will be used to cover the surface of the riser and the rock used to fill the void spaces. • Fine grained soils (primarily silt and clay) will be used to cover the riser and geotextile. The SLVSWMF will provide soil on-Site for the contractor to use. Riser Removal The 36-inch outer and 24-inch inner high-density polyethylene (HDPE) risers shall be cut using mechanical methods flush with the surrounding ground surface. The cut riser materials shall be removed from the immediate area of the abandonment activities and disposed of at a location specified by the SLVSWMF. Material Placement After the inner and outer risers have been removed, the contractor shall place the ¾-inch rock into the inner riser in approximately 12-inch lifts. The ¾-inch rock will also be placed in the annular space between the inner and outer risers in approximately 6-inch lifts. Following each lift, the contractor shall measure the depth to the rock at each of the cardinal directions to verify that bridging of the rock has not occurred. If bridging is evident, the contractor shall clear the blockage to eliminate the bridged material before resuming placement of the next lift. Once the riser pipes have been filled with rock, the contractor will prepare the ground surface surrounding the riser for placement of the geotextile over the risers. Sharp rocks, trash, and other debris shall be removed from the ground surface. The engineer’s approval of the prepared surface must be obtained prior to placement of the geotextile. Next, the geotextile filter fabric shall be placed over the risers, extending at least three feet beyond the risers in each cardinal direction. The geotextile filter fabric will be inspected and if found to be torn or otherwise damaged, the damaged material will be removed and replaced. Stakes will be driven through each of the four corners of the geotextile filter fabric to prevent shifting during the remainder of the construction activities. Following placement of the geotextile, the contractor shall place two-feet of clay over the geotextile in eight-inch lifts. The contractor shall place the clay material using a method that prevents damage or displacement of the geotextile filter fabric. Each lift shall be wheel compacted. The clay shall extend past the geotextile and be graded to match the surrounding ground surface. Compaction No formal compaction testing is required for the soil placed over the geotextile. 9.1 Sewer Rock P.O. Box 869 * Magna, UT * 84044 * P:(801) 250‐0132 * F:(801) 252‐2170 Submittal Date: Tuesday, January 1, 2020 21‐03014 ‐ 1 1/2" x #4(#4) Washed Rock 020323‐Stockton Unit Weight, lbs./cu.ft. = Voids,%= Loose Rodded Max Density, lbs./cu.ft.= Optimum Moisture %= Max Density, lbs./cu.ft.= Optimum Moisture %= Surcharge = 10Lbs CBR@0.1"= Swell%=0.0% CBR @0.2"= Small Coarse loss % = Grading/Revolutions = Large Coarse loss % = Grading/Revolutions = Coarse Soundness loss, % = Magnesium No. of Cycles Fine Soundness loss, %= Magnesium No. of Cycles Liquid Limit = Plastic limit = Plasticity Index = Coarse Aggregate, % = Fine Aggregate, %= Coarse Aggregate, % = Fine Aggregate, %= Sand Equivelant % = Uncompacted Voids, % = 1 or 2 Faces = Fractured Face, % = Coarse Aggregate, % = Fine Aggregate, %= Bulk Specific Gravity (dry) = Bulk Specific Gravity (SSD) = Apparent Specific Gravity = Absorption % = Bulk Specific Gravity (dry) = Bulk Specific Gravity (SSD) = Apparent Specific Gravity = Absorption % = Group Symbol = Group Name = Group Symbol = Group Name = ASTM C136 AASHTO T27 Standard Physical Properties Result Test Spec. Sieve Size Target % Passing Spec. LL Spec. UL ASTM C29 AASHTO T19 Aggregate Submittal Report of Physical Properties and Aggregate Target Submittal Product Code: Pit Code: Sieve Analysis Test Results 250 mm 10" 300 mm 12"ASTM D1557 AASHTO T180 Modified Proctor Unit Weight 98.0 37 125 mm 5" 150 mm 6"ASTM C1883 AASHTO T193 CBR 200 mm 8" 225 mm 9"ASTM D698 AASHTO T99 Standard Proctor 50.0 mm 2"100 63.0 mm 2‐1/2"ASTM C131 AASHTO T96 L.A. Abrasion 21.8 75 mm 3"B 500 100 mm 4"ASTM C131 AASHTO T96 L.A. Abrasion Soundness 12.5 mm 1/2"1 0.3 25.0 mm 1"35 5 37.5 mm 1‐1/2"94 ASTM C88 AASHTO T104 Soundness 19.0 mm 3/4"4 2.36 mm No. 8 ASTM C142 AASHTO T112 Clay lumps / Friable Particles 0.1 6.3 mm 1/4" 9.5 mm 3/8"1 ASTM D4318 AASHTO T89/90 Liquid limit Plastic limit Plasticity Index4.75 mm No. 4 0.600 mm No. 30 1.18 mm No.16 ASTM C40 AASHTO T21 Organic Impurities 2.00 mm No. 10 0.150 mm No. 100 0.180 mm No. 80 ASTM C1252 AASHTO T304 Fine Aggregate Angularity 0.300 mm No. 50 0.425 mm No. 40 ASTM D2419 AASHTO T176 Sand Equivelancy 0.0 ASTMC566 AASHTOT255 Hydrometer =ASTM C123 AASHTO T113 Lightweight Pieces 1 2 ASTM D422 48 33 0.075 mm No. 200 0 ASTM D5821 TP ‐ 61 Fractured Face AASHTO M145 ASTM C136 AASHTO T27 Moisture Content, %= ASTM C 128 AASHTO T84 Fine Specific Gravity & AbsorptionFineness Modulus (FM)= ASTM D2488 Soil description & Identificaiton 2.576 1.2 ASTM D2487 Soil Classification 2.501 ASTM D4791 2.53 Classification of Soils = ASTM C 127 AASHTO T85 Coarse Specific Gravity & AbsorptionFlat & Elongated, %= AGGREGATE GRADATION TEST RESULTS PROJECT NAME:WCG LAB NUMBER: PROJECT PIN NO.:WCG PROJECT NO.: MATERIAL TYPE: MATERIAL SOURCE: SAMPLE STATION: ITEM NUMBER(s): ASTM D3282 50 mm (2")A = DRY WT. (g) 37.5 mm (1 1/2")B = CALIB. FLASK WT. (g) 25 mm (1")S = S.S.D. SAMPLE WT. (g) 19.0 mm (3/4")C = SAMPLE IN H2O WT. (g) 12.5 mm (1/2")BULK SP GR. 9.5 mm (3/8")SSD BULK SP GR. 4.75 mm (#4)APPARENT SP GR. 2.36 mm (#8)UNIT WEIGHT (lbs/ft3) 2.00 mm (#10) 1.18 mm (#16) 425 m (#40)A = DRY WT. (g) 300 m (#50)B = S.S.D. SAMPLE WT. (g) 75 m (#200)C = SAMPLE IN H2O WT. (g) - #200 BULK SP GR. TOTAL SSD BULK SP GR. APPARENT SP GR. #1 WET WT. (g)UNIT WEIGHT (lbs/ft3) #2 DRY WT. (g)FRACTURED (1 FACE) #3 H2O WT. (g)FRACTURED (2 FACES) % H2O FLAT, ELONGATED SAND EQUIVALENT TEST #:NON FLATS SAND READINGS @ 20 MINUTES:L.A. WEAR: CLAY READINGS @ 20 MINUTES:RETAINED ON #12: AMOUNT OF WEAR: L.L.PASS/FAIL: P.L. P.I. TESTED BY: COARSE AGG.FINE AGG. SAMPLED BY: LAB MANAGER: REMARKS: SLC Landfill Module 8 23A-27 23-298 Sewer Drain Rock Kilgore Stockton Belt Sample 8,12 DATE SAMPLED:8/1/23 0.0 -100 100 823.8 11.1%89%90 -100 3815.9 62.4%38%20 -55 2145.9 91.2%9%0 -15 420.7 96.9%3% 54.3 97.6%2%0 -5 41.5 98.2%2% 5.6 98.2%2% 0.8 98.3%2% 2.0 98.3%2% 6.1 98.4%2% 5.2 98.4%2% 72.6 99.4%0.6% 44.1 0.6%0.10% 7438.6 7438.6 7438.6 7474.1 7438.6 0 35.5 1 2 3 Felipe Ocampo Nate Hansen Chelsea Richards SIEVE SIZE ACCUM. WT. RETAINED (g) %%FINE AGGREGATE SP. GR. INFORMATIONRETAINEDPASSINGTARGET /TOLERANCE COARSE AGGREGATE SP. GR. INFORMATION UNIT WEIGHT MOISTURE DATA AVG. UNIT WEIGHT (lbs/cu. ft.)0.6 SAND EQUIVALENT AVG.: 0 AASHTO MATERIAL CLASS:0 0 ABSORPTION (Target Date): µ µ µ BEFORE SIEVE WT. (g)AFTER SIEVE WT. (g) ASTM D448 Size 4 AVG.#1 #2 #3 This does NOT meet the requirements for Size 4 Optional Page 1 Footer Text Date: Tuesday, August 15th, 2023 To: Project File, Procore From: Gary Horton, P.E. Subject: Salt Lake Valley Landfill Module 8; Sewer Rock Size 4 Memo This memo is regarding the 1.5-inch sewer rock from Kilgore’s pit located in Stockton, Utah. The attached sieve analysis report shows 89 percent of the material passing the 1.5-inch sieve. Although it meets the supplier’s target (85-100 percent passing), it is just outside of the allowable tolerance (90-100 percent passing) per ASTM D448 for Size 4 material. The test results were shared with the owner and contractor and discussed in weekly progress meetings. After further discussions with the project team, it was decided that the material would still meet the intent of the design; therefore, the material is suitable for use on the project. Nate Hansen <nate.hansen@wcg.us> Riser 5 2 messages John Ioannou <JIoannou@slco.org>Mon, Aug 5, 2024 at 4:46 PM To: Wade Hess <wadehess@utah.gov> Cc: Tom Burrup <TBurrup@slco.org>, Nate Hansen <nate.hansen@wcg.us>, "john.coyle@slcgov.com" <john.coyle@slcgov.com>, Gary Horton <gary.horton@wcg.us> Hi Wade, Thanks for taking my call today. We will use 1.5 inch minus vs ¾. For fill and It will be reflected in the as built Thank you, John (Yianni) Ioannou Director, Solid Waste Management (801)-381-3467 Nate Hansen <nate.hansen@wcg.us>Mon, Aug 5, 2024 at 5:16 PM To: "Whitaker: Winn Lindsey" <winn.lindsey@whitcon.com> Cc: Richard Jessop <richard.jessop@whitcon.com>, "Taylor, Darwin" <darwin.taylor@slcgov.com>, Gary Horton <gary.horton@wcg.us>, "Coyle, John" <john.coyle@slcgov.com>, Tom Burrup <tburrup@slco.org>, Procore <com-inbound-slvswmf- -module-8-h2m5zk23ex@procoretech.com>, "jioannou@slco.org" <jioannou@slco.org>, Curt Ridgeway <CRidgeway@slco.org> Winn, We are good to move forward with the abandonment of riser 5 following Kleinfelder's design and CQC/CQA Plan (see attached). The sewer rock size 4 (3/4" to 1.5") that you have on site can be used instead of 3/4" rock (see Yianni's email below). Let's discuss this in the meeting tomorrow. Nate Hansen Wall Consultant Group 801-362-2523 2139 S. 1260 W., Salt Lake City, UT 84119 nate.hansen@wcg.us | www.wcg.us The content of this email (including all attachments and photos) is the confidential property of Wall Consultant Group and should not be copied, modified, re- transmitted, or used for any purpose without the authorization of Wall Consultant Group. If you are not the intended recipient of this message, you are hereby notified that the copying, use or distribution of any information or materials transmitted in or with this message is strictly prohibited, please delete all copies. [Quoted text hidden] 2 attachments Kleinfelder Riser 5 Design.pdf 887K Kleinfelder Riser 5 Abandonment CQC-CQA Plan.pdf 140K 9.2 Nonwoven Geotextile Mirafi® 180N - Geotextile TECHNICAL DATA SHEET PROPERTY(1)TEST METHOD FREQUENCY UNIT 1116770 Imperial SPECIFICATIONS Grab Tensile Properties (min. avg) Strength (MD) Elongation (MD) Elongation (CMD) Trapezoidal Tear Strength (MD) Trapezoidal Tear Strength (CMD) Puncture Resistance (CBR) ASTM D4632 ASTM D4533 ASTM D4533 ASTM D6241 60,000 yd² 60,000 yd² 60,000 yd² 360,000 yd² lbf % % lbf lbf lbf 205 50 50 80 80 500 Apparent Opening Size (AOS) Permittivity Water Flow Rate UV Resistance-% retained after 500 hrs ASTM D4751 ASTM D4491 ASTM D4491 ASTM D4355 360,000 yd² 120,000 yd² 120,000 yd² 1/Formulation/Year U.S. Sieve sec⁻¹ gpm/ft² % 80 1.4 95 70 SUPPLY SPECIFICATIONS(Roll dimensions may vary ±1%) Roll Dimension - Width -ft 15.0 Roll Dimension - Length -ft 300 Area (Surface/Roll)-ft²4500 * The information contained herein is provided for reference purposes only and is not intended as a warranty or guarantee. Final determination of suitability for use contemplated is the sole responsibility of the user. SOLMAX assumes no liability in connection with the use of this information. Solmax is not a design professional and has not performed any design services to determine if Solmax's goods comply with any project plans or specifications, or with the application or use of Solmax's goods to any particular system, project, purpose, installation or specification. NOTES 11-Jul-2023Revision date SOLMAX.COMPage 1 of 1 9.3 Photos