HomeMy WebLinkAboutDERR-2024-005004Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name UTAH STATE FUEL NETWORK
Address 4315 S 2700 W
SALT LAKE CITY, UT 84129
Contact UTAH STATE FUEL NETWORK
Phone
Email brettgurney@utah.gov
TANK LOCATION
Name COTTONWOOD UDOT STA. # 233
Address 6601 S 3000 E
SALT LAKE CITY, UT 84121
A Operator None
Phone None
B Operator SAME
Phone SAME
Facility ID: 4001397 Inspection Date: 03/13/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Diesel Yes Steel Flex in Sump None None Yes No None None
2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None
TANK DETAILS
Tank ID/Alt ID 3 / 1
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 13, 1995 / 5200 /
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG Veeder Root / TLS-4
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
Aboveground Catchment /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG / TankTightness
PipeLineTightness /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 2
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 13, 1995 / 5200 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG Veeder Root / TLS-4
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
Aboveground Catchment /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG / TankTightness
PipeLineTightness /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
2024-03-13 Page 1 of 5
None
2024-03-13 Page 2 of 5
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 1 ATG/IM
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 2 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 2 ATG/IM
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
DISPENSER RESPONSES
2024-03-13 Page 3 of 5
Dispenser 3/4
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24
Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 4 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-03-13 Page 4 of 5
Prepared by fueloperator.com
Inspection Information
Inspector:Ottley, Melissa
Record
Created:
March 13, 2024, 9:42
a.m.
Inspection
Date:March 13, 2024
2024-03-13 Page 5 of 5