Loading...
HomeMy WebLinkAboutDERR-2024-005004Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name UTAH STATE FUEL NETWORK Address 4315 S 2700 W SALT LAKE CITY, UT 84129 Contact UTAH STATE FUEL NETWORK Phone Email brettgurney@utah.gov TANK LOCATION Name COTTONWOOD UDOT STA. # 233 Address 6601 S 3000 E SALT LAKE CITY, UT 84121 A Operator None Phone None B Operator SAME Phone SAME Facility ID: 4001397 Inspection Date: 03/13/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Diesel Yes Steel Flex in Sump None None Yes No None None 2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None TANK DETAILS Tank ID/Alt ID 3 / 1 E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 13, 1995 / 5200 / Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG Veeder Root / TLS-4 LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery Aboveground Catchment / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG / TankTightness PipeLineTightness / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 4 / 2 E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 13, 1995 / 5200 / Substance Stored Gasoline / Regular Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG Veeder Root / TLS-4 LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery Aboveground Catchment / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG / TankTightness PipeLineTightness / PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS 2024-03-13 Page 1 of 5 None 2024-03-13 Page 2 of 5 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 1 ATG/IM ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 2 ATG/IM ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes DISPENSER RESPONSES 2024-03-13 Page 3 of 5 Dispenser 3/4 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 4 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-03-13 Page 4 of 5 Prepared by fueloperator.com Inspection Information Inspector:Ottley, Melissa Record Created: March 13, 2024, 9:42 a.m. Inspection Date:March 13, 2024 2024-03-13 Page 5 of 5