Loading...
HomeMy WebLinkAboutDERR-2024-013111 SITE VISIT REPORT DATE: 12/16/24 SITE: Redwood Road Dump SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR) Nancy Saunders (Terracon) ARRIVAL TIME: 10:30 AM - DEPARTURE TIME: 11:00 AM Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: DERR met with Terracon on-site to oversee the installation of two VIMS installs for units 102 & 103, and 127 & 128. During the visit, DERR observed crews measuring the 20 mil vapor barrier, placing the barrier over the foam and gravel aggregate, cutting the barrier around piping and other obstacles, and sealing the gaps with tape. Nancy with Terracon stayed on the site after the DERR left to oversee the installation. She was also planning to come back later in the afternoon. Crews were also starting to fill in the sidewalks to the north. PHOTO LOG: Photo 1: Crews measuring the 20-mil vapor barrier before laying it over the gravel aggregate and foam layer. Photo 2: 20-mil vapor barrier is placed over the foam (pink). Photo 3: Vapor barrier is sealed with some overlap. Photo 4: Taping for units 102 and 103. Photo 5: Sidewalks for northernmost section of homes.