SITE VISIT REPORT
DATE: 12/16/24
SITE: Redwood Road Dump
SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT
PREPARED BY: Allison Stanley
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
195 North 1950 West
Salt Lake City, UT 84116
ATTENDEES: Allison Stanley (DERR)
Nancy Saunders (Terracon)
ARRIVAL TIME: 10:30 AM - DEPARTURE TIME: 11:00 AM
Is the work being performed in a manner consistent with the accepted workplan? Yes
SUMMARY: DERR met with Terracon on-site to oversee the installation of two VIMS installs
for units 102 & 103, and 127 & 128. During the visit, DERR observed crews measuring the 20
mil vapor barrier, placing the barrier over the foam and gravel aggregate, cutting the barrier
around piping and other obstacles, and sealing the gaps with tape. Nancy with Terracon stayed
on the site after the DERR left to oversee the installation. She was also planning to come back
later in the afternoon. Crews were also starting to fill in the sidewalks to the north.
PHOTO LOG:
Photo 1: Crews measuring the 20-mil vapor barrier before laying it over the gravel aggregate and
foam layer.
Photo 2: 20-mil vapor barrier is placed over the foam (pink).
Photo 3: Vapor barrier is sealed with some overlap.
Photo 4: Taping for units 102 and 103.
Photo 5: Sidewalks for northernmost section of homes.