SITE VISIT REPORT
DATE: 12/13/24
SITE: Redwood Road Dump
SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT
PREPARED BY: Allison Stanley
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
195 North 1950 West
Salt Lake City, UT 84116
ATTENDEES: Allison Stanley (DERR)
ARRIVAL TIME: 9:45 AM - DEPARTURE TIME: 10:15 AM
Is the work being performed in a manner consistent with the accepted workplan? Yes
SUMMARY: This was a routine visit by the DERR to check on the status of the site. Weather
was snowy and approximately 30 degrees Fahrenheit. There are still four locations on the
northern half that will need a vapor barrier. Installation was currently today but was pushed to
the following week due to the weather. These locations are all covered with a tarp. Another row
of homes are installed, with about a quarter more to go on the northern half. The four slab-on-
grade foundations that were installed during the last few weeks are covered with concrete. Some
sections of sidewalk are finished in the northwest corner, but most have not been filled. All
sidewalk paths are covered with a tarp.
PHOTO LOG:
Photo 1: The four slab-on-grade foundations that were installed during the last few weeks have
been covered with concrete (image shows units 203 and 204).
Photo 2: Sidewalks are planned for the northernmost row of homes. Some sections have been
filled with concrete. All planned areas are covered with a tarp.
Photo 3: Some sections of sidewalk are finished and covered with a tarp.
Photo 4: Another row of tiny homes are in.