Loading...
HomeMy WebLinkAboutDDW-2024-014670 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801-536-4211 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Tim Davis Director March 21, 2023 Ryan Johnson White City WID 999 East Galena Drive Sandy, Utah 84094 Subject: Plan Approval, Installation of 10000 S Water Transmission Line, System #18019, File #13305 Dear Ryan Johnson: The Division of Drinking Water (the Division) received the plans and specifications for the proposed 12 to 18-inch diameter ductile iron (DI) transmission line installation on 10000 S roadway from your consultant Angela Xia of Sunrise Engineer on March 08, 2023. The Division staff received the updates on the details of the installation on March 15, 2023. Our understanding of the project is that the White City ID has proposed the Harston 2MG Tank (ST005) for better assurance of water supply to its customers. The tank is located near 2650 E 9900 S, Sandy, Utah. In order to supply water to the White City distribution system, 6,251 feet of 18-inch diameter DI (Class 350) and 1,793 feet of 12-inch diameter DI (Class 350) pipe will be installed mostly along the 10000 South roadway in Sandy. This transmission line will have two connections to the distribution pipeline, one at the intersection of 9800 S and Highland Drive where it connects to a 16-inch diameter DI pipeline, and the other at the intersection of Roseboro Road and Gyrfalcon Drive where it connects to the White City 8-inch diameter DI distribution pipeline immediately serving the service connections. The 2MG tank gets water from the two wells of White City and supplies it through 18-inch diameter transmission mains. We have completed our review of the plans and specifications, stamped, and signed by Hui Xia, P.E., and dated March 08, 2023, and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the Installation of the 10000 S Water Transmission Line are hereby approved. Ryan Johnson Page 2 of 2 March 21, 2023 This approval pertains to construction only. An Operating Permit must be obtained from the Director before the 10000 S Water Transmission Line may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information. Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, a notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter. If you have any questions regarding this approval, please contact Nagendra Dev, of this office, at (801) 680-5296, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Engineering Manager ND/mrn/mdb Enclosure ─ Operating Permit Checklist cc: Mathias Neville, Salt Lake County Health Department, mmeville@slco.org Fuaad Hararah, Salt Lake County Health Department, fhararah@slco.org Ryan Johnson, White City WID, ryan.johnson@wcwid.org Cliff Linford, Sunrise Engineering, clinford@sunrise-eng.com Hui Xia, Sunrise Engineering, angela.xia@sunrise-eng.com Nagendra Dev, Division of Drinking Water, ndev@utah.gov DDW-2023-004547       Utah Division of Drinking Water ― Checklist for Issuing Operating Permits Water System Name: System Number: Project Description: File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below. ☐ 1. Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550 ☐ 2. As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction) ☐ 3. Confirmation that as-built or record drawings have been received by the water system ☐ 4. Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water Mains Two consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch) ☐ ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage Facilities One or more samples, none positive ☐ ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment Plants Two consecutive samples per unit, none positive, no less than 30 minutes apart ☐ ANSI/AWWA C654-13 AWWA Standard for Disinfection of Wells Two consecutive samples, none positive, no less than 30 minutes apart ☐ 5. Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.] ☐ 6. If applicable, all other documentation that may have been required during the plan review process ☐ 7. If applicable, confirmation that the water system owner has received the O&M manual for the new facility ☐ 8. If applicable, location data of new storage tank, treatment facility, or source