Loading...
HomeMy WebLinkAboutDDW-2024-014606 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801-536-4211 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF DRINKING WATER Marie E. Owens, P.E. Director November 15, 2018 Jack Taylor Public Services Director Santa Clara City 2603 Santa Clara Drive Santa Clara, UT 84765 Subject: Approval of 2018 Water Line Installation Standards per R309-500-7; Santa Clara City, System #27016, File #11366 This Approval expires on December 31, 2023. Dear Mr. Taylor: The Division of Drinking Water (the Division) received the following documents on November 5, 2018: 1. The 2018 water line installation drawings and specifications for Santa Clara City, stamped and signed by Marvin J. Wilson, P.E., and dated October 12, 2016. 2. The completed application form signed by Jack Taylor and dated October 25, 2018, which formally designates: • Marvin J. Wilson, P.E., as the Professional Engineer (PE) having direct responsibility for the design of the entire water, and • Marvin J. Wilson, P.E., as the PE responsible for oversight of the hydraulic analysis of the entire water system. We completed our review of the 2018 water line installation drawings and specifications, and find they basically comply with the applicable portions of Utah's Rules for Public Drinking Water Systems in R309-550. On this basis, Santa Clara City 2018 water line installation drawings and specifications are hereby approved. Santa Clara City has met the criteria in R309-500-7 to install water lines up to 16 inches in diameter and is not required to obtain Plan Approval or an Operating Permit for the qualified water line projects. Please note the following restrictions to this approval: 1. This approval does not apply to booster pump stations. Jack Taylor Page 2 of 2 November 14, 2018 2. If minimum separation between water and sewer lines cannot meet the requirements in R309-550-8, an exception must be obtained prior to water line construction. 3. Revisions to Utah Code 19-4 made by the 2018 legislature (H.B. 303) include the following requirements: • All Community Water Systems serving more than 3,300 people must submit at least three most-recent years of water use data to the state by March 1, 2019. Nothing in this approval exempts a water system from meeting this requirement. • The Division must establish system-specific source and storage minimum sizing requirements for Community Water Systems serving more than 3,300 people when plans are submitted to the Division for substantial addition to or alteration of the water system. Since your water system may install water lines up to 16 inches in diameter for a period of five years without submitting plans to the Division, such projects do not trigger the submittal of the water use data to the Division before the required deadline of March 1, 2019. This Approval expires on December 31, 2023. You must notify the Division if there is a change to standard installation drawings and specifications or to the designated PE for design or hydraulic analysis during the term of this Approval. To continue using standard installation drawings and specifications for water transmission and distribution lines after the expiration date, you must submit a complete renewal application to the Division. Please maintain a copy of this letter with your permanent records for future reference. If you have any question regarding this letter, please contact J. Paul Wright, P.E., Southwest District Engineer, at (435) 986-2590, or Nathan Lunstad, Engineering Manager, at (385) 239- 5974. Sincerely, Nathan Lunstad, P.E. Engineering Manager JPW/nl/hb cc: Robert Beers, Env. Health Director, Southwest Utah Public Health Dept., rbeers@utah.gov Marvin J. Wilson, P.E., Sunrise Engineering, mwilson@sunrise-eng.com Steven Hall, P.E., Sunrise Enginering, shall@sunrise-eng.com Jack Taylor, Santa Clara City jtaylor@sccity.org J. Paul Wright, P.E., DEQ Southwest District Engineer, pwright@utah.gov DDW-2018-012923