Loading...
HomeMy WebLinkAboutDERR-2024-004949Tanks Installed. Use additional pages as needed.Tank No.Tank No.Tank No.Tank No. New Installation or Upgrade UL Number Material of construction (FRP, Steel, Composite, etc.) Double walled - dry or brine filled Substance to be stored Capacity Date installed Pre-installation pressure test date or vacuum date (dry interstice) Reading of pressure or vacuum for pre-installation test (dry interstice) Type of overfill prevention device (shutoff or alarm) Overfill alarm has sign and is visible and audible to driver (RP100) Type of spill prevention device (single or dw spill bucket, sump, etc) Amount of tank deflection readings (initial) Amount of tank deflection readings (hold down straps) Amount of tank deflection readings (backfill top of tank) Piping Information Material of construction (Flex plastic, FRP, etc) Type (Pressure, Suction, Safe Suction, Gravity) Date pre-installation air test passed Pressure for pre-installation air test Installation Specifications Do you have a copy of the tank manufacturer's installation manual and PEI RP100 with you Yes No NA Certified tank installer Cert. #: TL Exp. Date: Certified Installation Company Cert. #: IC Visual inspection of tank(s) reveals it is free from damage Yes No NA Visual inspection reveals no brine on either the inside or outside of the tank(s) (from interstitial space of brine tank) Yes No NA Damaged components have been repaired by the manufacturer Yes No NA Tank and piping excavations are free of debris Yes No NA Depth of backfill bedding for tank(s) (must be at least one foot) Type of backfill material (clean, free flowing, etc.) (Sieve report should match installation manual): Geotextile fabric used along sides of excavation (recommended) Yes No NA Geotextile fabric separates any secondary backfill (required) Yes No NA Estimated depth to groundwater Tank(s) are placed at sufficient depth for traffic requirements, groundwater conditions (check installation manual) Yes No NA Tanks are outside the shadow of the 45 degree factor of a structure's footing (PEI RP100 Fig 4-2) Yes No NA Distance from tank(s) to nearest property line:Distance from tank(s) to nearest structure: Anchoring method is adequate for groundwater considerations. Note method here: Yes No NA Hold-down straps are in place according to manufacturer's specifications (check installation manual if clamps are used) Yes No NA Tank spacing is at least 18" between tank(s) and excavation wall (stable wall) or 18" between tank(s) and 1/2 times tank diameter excavation wall (unstable wall) Yes No NA Tank is level or sloped toward interstitial monitor probe Yes No NA Backfill has been adequately compacted for full suport along tank length at 5 and 7 o'clock Yes No NA Date of pressure test after backfill to top of tank (before piping is installed) I (name) certify that I inspected the above-named facility on (date): Inspector's Signature: Cert.#: TI Ver. 10/5/2018 Page 1 of ___Utah Department of Environmental Quality 1000804 UST Installation Inspection Ownership of Tanks Location of Tanks MAVERIK, INC.MAVERIK #736 185 SOUTH STATE STREET, STE 800 85 W 800 N SALT LAKE CITY UT 84057 OREM UT 84057 Page 2 of ___Utah Department of Environmental Quality 1000804 UST Facility Site Plat NORTH Show locations of all buildings, streets, tanks, piping, and dispenser islands. Indicate the product in each tank. Show locations of tank manways and identify each: submersible pump (S), tank fill (F), ATG probe (A), interstitial probe (I), vapor recovery (V), capped plug (C), other (specify). Comments: