Loading...
HomeMy WebLinkAboutDERR-2024-012989Stantec Consulting Services Inc. 2890 East Cottonwood Parkway Suite 300 Salt Lake City UT 84121-7283 December 11, 2024 Project/File: 238000430 David Bird Division of Environmental Response and Remediation 195 N 1950 W Salt Lake City, UT 84116 Dear David, Reference: Airport West VCP Phase I Area RAP Shotgun Shooting Range Stantec is attaching information regarding the XRF results of scrape soil within the lead (Pb) impacted areas within Phase I of the Airport West VCP remediation from the former shotgun shooting range. This information is being provided to address the Pb impacted surface soils associated with the former shotgun shooting range. Please review and provide any comments, questions, or acceptance of these remedial actions. Thank You, STANTEC CONSULTING SERVICES INC. David Cline P. E. Sr. Environmental Engineer Phone: (801) 519-4257 Mobile: 385-315-3864 david.cline@stantec.com cc Gary McEntee – NT Development Eric Rice – NT Development Lead Scrape Cleanup Final Summary Report Final results of the NTL lead scrape cleanup action December 10, 2024 Prepared for: NT Development Prepared by: David Cline Project/File: 238000430 Lead Scrape Cleanup Final Summary Report Project: 238000430 The conclusions in the Report titled Lead Scrape Cleanup Final Summary Report are Stantec’s professional opinion, as of the time of the Report, and concerning the scope described in the Report. The opinions in the document are based on conditions and information existing at the time the scope of work was conducted and do not take into account any subsequent changes. The Report relates solely to the specific project for which Stantec was retained and the stated purpose for which the Report was prepared. The Report is not to be used or relied on for any variation or extension of the project, or for any other project or purpose, and any unauthorized use or reliance is at the recipient’s own risk. Stantec has assumed all information received from NT Development (the “Client”) and third parties in the preparation of the Report to be correct. While Stantec has exercised a customary level of judgment or due diligence in the use of such information, Stantec assumes no responsibility for the consequences of any error or omission contained therein. This Report is intended solely for use by the Client in accordance with Stantec’s contract with the Client. While the Report may be provided by the Client to applicable authorities having jurisdiction and to other third parties in connection with the project, Stantec disclaims any legal duty based upon warranty, reliance or any other theory to any third party, and will not be liable to such third party for any damages or losses of any kind that may result. Approved by Signature David K. Cline Printed Name Lead Scrape Cleanup Final Summary Report Table of Contents Project: 238000430 i Table of Contents 1 Lead Scrape Sampling Results .................................................................................................... 1 1.1 Background ...................................................................................................................................... 1 1.2 Shotgun Shooting Range Scrape Efforts and Confirmation Sampling Results. .............................. 1 1.2.1 Laboratory Confirmation Testing ...................................................................................................... 2 1.2.2 Method 6200 Comparability Analysis ............................................................................................... 2 1.3 Conclusions ...................................................................................................................................... 3 List of Appendices Appendix A Figures and Tables A.1 Figures A.1.1 Tables Appendix B Laboratory Analytical Reports B.1 PACE National L1627639 B.2 PACE National L1642211 Lead Scrape Cleanup Final Summary Report Lead Scrape Sampling Results Project: 238000430 1 1 Lead Scrape Sampling Results 1.1 Background The approved Airport West VCP Phase I Remedial Action Plan (Phase I RAP) identified a soil scrape of impacted areas as a means to address the lead (Pb) contamination from the site of the former Shotgun Shooting Range within the Phase I area. The RAP identified areas within Phase I to be included in the scrape based upon the revised Former Sporting Shotgun Shooting Range Remedial Investigation Report (Report) dated April 26, 2010, which was submitted by CDM to the UDERR and the SLVHD. (Figure 1) In preparation of the RAP, the XRF data (in-situ field samples and collected bulk samples) along with the bulk sample laboratory confirmation data, that were collected and presented in the 2010 Report, (Table 3 – Lead Shot Content, XRF and Analytical Summary) identify the approximate locations of the Pb shot scape areas. The RAP also acknowledged that prior to initiating the remedial activities UDERR and Stantec representatives would conduct a site visit and visual reconnaissance of the area to determine the actual extent of the necessary soil scrape. The site reconnaissance was conducted on May 11, 2023 by UDERR, Stantec and NT Development. Prior to the planned site reconnaissance, the Utah Division of Environmental Remediation and Response (UDERR) requested Stantec review the Report data and evaluate the amount of Pb shot mass to the dry weight of the bulk soil sample as an alternative means to identify the areas requiring Pb soil scrape. UDERR had previously identified an action level of 800 mg/kg for the intended Pb soil scrape based on the EPA RSL value for non-carcinogenic screening level for industrial soil as 800 mg/kg. Stantec provided UDERR with an evaluation showing the relationship of the laboratory data for Pb shot pellets in the soil, reported as a percentage of the mass weight of the Pb pellets to the dry weight of the bulk soil sample (ppm). A linear regression analysis was shown and plotted on the graph. For a percent weight (Pb pellets to dry soil) of 800 ppm, the mass of Pb shot pellets equates to an approximate amount of 3000 mg. With the corresponding bulk sample laboratory XRF data and confirmation analytical results below the 800 mg/kg, it was proposed to remove the areas where Pb shot pellets were above the 3000 mg. In preparation for the site reconnaissance Stantec produced figures which were shared with UDERR to show the locations where test samples were measured in the laboratory as over 3000 mg. These figures and locations were reviewed on site as part of the May 11, 2023 site reconnaissance and subsequently incorporated into the Stantec Airport West VCP – Phase I Area – Shotgun Shooting Range Scrape Plan dated June 7, 2023 which was submitted to UDERR outlining the planned approach for the Pb scrape portion of the site remediation efforts. UDERR issued their June 28,2023 letter accepting the Scrape Plan under the VCP with the revised stipulation that areas exceeding the Pb shot pellet percent weight of 800 ppm were to be expanded into the proposed scrape areas. DERR’s rationale was that the entire mass weight of Pb shot could fully leach into the soil over time. 1.2 Shotgun Shooting Range Scrape Efforts and Confirmation Sampling Results. Approximately 36 acres within the Phase I area were scraped (Figure 2). The scraped areas north of the former Brighton Canal were approximately 14 acres. The scraped areas south of the former Brighton Canal were approximately 20 acres and the areas located in the southeast area total approximately 2 acres combined. The surface soil (a minimum of 4 inches) within the defined areas was scraped and collected into small individual piles to Lead Scrape Cleanup Final Summary Report Lead Scrape Sampling Results Project: 238000430 2 allow for confirmation testing. Each soil pile was then tested in accordance with the procedures set forth in the June 7, 2023 Scrape Plan. The XRF testing results of the scraped piles are presented in Table 2 (attached). Table 2 identifies the XRF testing conducted on a total of 247 scrape piles. A total of 78 scrape piles south of the Brighton Canal were tested for Pb, by XRF, with an average of 92 ppm. The XRF testing for Pb conducted on the 169 scrape piles, located east of the Bonneville Pile and those in the southeast area, recorded an average of 134 ppm. 1.2.1 Laboratory Confirmation Testing A total of 16 laboratory confirmation tests (EPA SW-846 Method 6020), were completed to confirm the XRF readings with the laboratory analysis and are presented in Table 2. The average Pb concentration of the 6 lab samples for the 78 scrape piles south of the Brighton Canal is 73.3 mg/kg per dry weight basis. The moisture content of the 6 lab samples averaged 8.8 %. The average Pb concentrations of the 10 lab samples for the 169 scraped piles east of the Bonneville Pile and areas in the southeast area is 202.3 mg/kg per dry weight basis. The moisture content of the 10 lab samples averaged 1.2 %. The drier the XRF sample, the more accurate are the results when comparing field XRF measurements to laboratory dry weight results. When the moisture content is between 5 and 20 percent the overall error from moisture may be minimal (EPA SW-846 Method 6200). The soil dry weight values are considered an actual representation of the concentration of the metal within the solid media and is the basis for the regulatory action levels. However, there will exist a difference between the field concentration and the laboratory dry weight basis due to the difference in moisture content. The laboratory dry weight result is considered a higher concentration and therefore a more accurate value. 1.2.2 Method 6200 Comparability Analysis For Method 6200 data precision, multiple readings were taken on various samples. The relative standard deviation (RSD) average for the precision sample readings was 2.2%. For field portable XRF (FPXRF) data to be considered adequately precise, the RSD should not be greater than 20 percent. For Method 6200 comparability analysis was determined by submitting a total of sixteen FPXRF analyzed samples for laboratory analysis (shown in Table 1 below). The FPXRF samples were submitted from the middle range of concentrations. A log-transformed data set was used due to the range of data ranging greater than an order of magnitude. A linear regression analysis was performed on the log-transformed data. The correlation coefficient (r) for the results was 0.86. The correlation coefficient (r) for the results should be 0.7 or greater for the FPXRF data to be considered screening level data. If the (r) is 0.9 or greater and inferential statistics indicate the FPXRF data and the confirmatory data are statistically equivalent at a 99 percent confidence level, the data could potentially meet definitive level data criteria. TABLE 1 - Comparability Analysis Table Soil Pile Groups Avg. Soil Pile Group XRF Measurement (ppm) Sample ID. (Soil Pile ID shown in parentheses) XRF Measurement (ppm) Laboratory Result (mg/kg) dry weight Relative Percent Difference South 1-10 147.9 SSR1-(10) 80 93.0 16 South 11-20 96.5 SSR1-(20) 94 71.0 -24 Lead Scrape Cleanup Final Summary Report Lead Scrape Sampling Results Project: 238000430 3 Soil Pile Groups Avg. Soil Pile Group XRF Measurement (ppm) Sample ID. (Soil Pile ID shown in parentheses) XRF Measurement (ppm) Laboratory Result (mg/kg) dry weight Relative Percent Difference South 21-30 81.6 SSR1-(30) 53 62.1 17 South 31-40 84.6 SSR1-(40) 52 89.3 72 South 41-57 82.4 - South 100-110 90.8 SSR1-(105) 35 49.3 41 South 111-120 69.8 SSR1-(1)15 73 87.0 19 South2 1-22 68.7 AW COMP 1-22(11) 63 48.1 27 East 23-39 83.9 AW COMP 23-39(27) 74 36.3 -68 East 40-65 106.7 AW COMP 40-65(58) 101 559 139 Southeast 66-73 45.5 AW COMP 66-73(69) 77 103 29 East 74-76 40.3 AW COMP 74-76(74) 56 80.6 36 East 77-113 252.1 AW COMP 77-113(98) 170 184 8 East 114-135 81.0 AW COMP 114- 135(124) 112 67 -50 East 136-146 38.8 AW COMP 136- 146(142) 65 94.8 37 East 148-159 222.2 AW COMP 148- 159(158) 109 366 108 East 160-169 209.6 AW COMP 160- 169(161) 97 484 133 AVERAGE 106.02 82.7 154.7 34 1.3 Conclusions Upon completion of the analytical testing the individual scrape piles were consolidated and staged into a windrow pile located east of the existing Bonneville waste pile, to be placed into the future on-site repository as part of the accepted Phase I Area RAP. Over an area approximately 36 acres, soil was scraped into 247 soil separate piles. Each pile was sampled by collecting 3 sub-samples into a single composite sample. The composite sample was measured by XRF for Pb. A split sample from a portion of the composite samples were analyzed for Pb in a State of Utah certified laboratory. All samples were below the Project Action level (PAL) of 800 mg/kg. The XRF sample average submitted for the Lead Scrape Cleanup Final Summary Report Lead Scrape Sampling Results Project: 238000430 4 corresponding lab results was 82.7 ppm. The corresponding laboratory sample average was 154.7 mg/kg. The laboratory sample results were compared to their corresponding XRF composite sample. The relative percent difference average was 34. The laboratory quality control matrix spike and matrix spike duplicate limits were at +/-25 % recovery and </= 20% RPD for EPA method 6020. The RSD was computed to be 2.2%. For the FPXRF data to be considered adequately precise, the RSD should not be greater than 20 percent. The linear regression analysis (r) value determined the FPXRF data to meet the screening level data criteria. The samples are all below the PAL of 800 mg/kg. The Pb impacted soil was initially identified within the top several inches. The impacted topsoil material has been removed and stockpiled. The levels of Pb in the soil are below the EPA’s Regional Screening Level of 800 mg/kg for industrial soil, as per the screening level in the Phase I Area RAP. Lead Scrape Cleanup Final Summary Report Project: 238000430 APPENDICES Lead Scrape Cleanup Final Summary Report Appendix A Figures and Tables Project: 238000430 A-1 Appendix A Figures and Tables A.1 Figures Figure 1 – Site Logistics Plan (Site Plan) Figure 2 - Sampling Locations – Overview Map A.2 Tables Table 2 Lead Scraped Soil Stockpiles – XRF Measurements. N DISCLAIMER: THIS PLAN IS INTENDED ONLY FOR CONCEPTUAL USE. IT DOES NOT REFLECT THE EXACT LOCATION OF UTILITIES OR ANY STRUCTURES. THIS DRAWING IS NOT INTENDED FOR USE IN PERMITTING OR CONSTRUCTION. THIS CONCEPT PLAN IS PROPERTY OF ET ENVIRONMENTAL. 0 300'1200'600' 1" = 300' 1500' ORIGINAL SHEET SIZE 22" X 34" vision d solutions value •• esign |build SM ET 05-ET1668 A-11 SA L T L A K E C I T Y , U T 8 4 1 1 6 CONCEPTUAL PHASE 4-7-2022FIGURE 1 SHEET NUMBER SI T E L O G I S T I C S P L A N NO R T H T E M P L E L A N D F I L L R E M E D I A T I O N ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW #*#* #* #* #* #*#* #*#* XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XWXW XW XW XW XW XWXW XWXW XW XW XW XW XW XW XWXW XW XW XW XW XWXWXWXWXWXW XW XW !( !( !( !( !( !(!(!(!( !( !( !( !( !( !(!( Entry Shed Area of Possible Temporary Trap Station Temporary Soil Stockpile Ra m p Ra m p W ads, Cla y, S he lls Wads, Clay, Shells Wads, Clay, Shells Wads, Clay, S he lls Platform SED-4 SED-8 SED- 1 SED- 5SED-2 SED-3 SED- 6 SED-7 SED-9 3NR5 8NR9 2NR9 10NR10 3.5TS4 4.5TS6 7TS47TS37TS2 BA8 BA6 5TS1 3TS3 1TS4 1TS6 12NR2 7TS10 3NR2 2NR2 1NR2 FEB4 E8.5 E10 GFE0 F9 3 3NRC 1NR9 7NR1 10NR1 3NRA 10NRA10NRB 1TS9 6TS9 7TS9 1TS8 3TS8 4TS8 5TS8 7TS8 1TS7 2TS7 5TS7 3TS6 1TS5 4TS5 2TS4 5TS4 1TS3 6TS3 1TS2 4TS2 1TS1 2TS1 BA5 BA9 BA10 BA11 BA12 BA7 BA3 BA4 7TS5 7TS7 7TS7TS1 7TS11 10NRC 3NRB BA2BA1 6.5TS10 GFC2 GFB3 GFE2 GFC0 F9A GFBA 5.5TS8 3NRD 10NRD E11E9E9.5 E10.5 FED5 8TS8 10NR6 2.5TS2 GFD1 3NR10 7NR10 3NR9 4NR9 5NR9 6NR9 7NR9 9NR9 10NR9 11NR9 12NR9 7NR8 10NR8 3NR7 7NR7 10NR7 3NR6 7NR6 2TS8 1NR5 2NR5 4NR5 5NR5 6NR5 7NR5 8NR5 9NR5 10NR5 11NR5 3NR4 7NR4 10NR4 12NR5 3NR3 7NR3 10NR3 4NR2 5NR2 3NR1 JI4.5 JI6.5 F5 I11 F8 E8 E9 F9 G9 G10 F10 E10 I6 I7 I8 H2 G8 E3 E11 F2 F3 F11 G2 G11 H1 H3 H11 I1 I2 I3 J2 J3 J4 J5 J6 J7 J8 J9 J10 K2 K3 K4 K5 E4 E5 F4 G3G2.5 I5 H5 J11 H4 I4 GH4GH3 H10 I9 H9 ED6 GH5 IH4.5IH3.5 JI3.5 ED7ED6.5ED5.5ED5 H8 E5.5 E6.5 FE7FE6.5FE6FE5 F5.5 F6.5 GF7GF6.5GF6GF5.5GF5 E7E6 F7 FE5.5 SL-2 SL-3 SL-4 SL-5 SL-6 SL-7 SL-8 SL-9 SL-10 SL-11 SL-12 SL-14 SL-16 SL-1 SL-13 SL-15 ±0 500 Feet SLR/NTL Former Sporting Clay Shooting Area Salt Lake City, Utah Data Sources: Images from http://terraserver-usa.com/ Figure 2 Sampling Locations - Overview Map See Figure 3 and 6 See Figure 4 and 7 See Figure 5 and 8  June 2009 XRF Ex Situ Sediment Sample Locations Legend J7 March 2008 Field XRF Surface Soil Sample Locations June 2009 Soil Sample Locations SED-1 #* Metal Post Approximate February 2006 UTEX Sample Locations (140) ") XY October 2008 Soil Sample Locations SL-11 !( 2NR4 TABLE 2 Lead Scraped Soil Stockpiles XRF/Lab Measurements Shotgun Shooting Range Airport West VCP 10/12/2023 Stockpile Sample XRF ID ppm Total Solids % SOUTH BONNEVILLE PILE 1 197 2 303 3 107 474 5 121 6 197 7 280 857 963 10 80 88.0%93.0 11 89 12 101 13 149 14 109 15 120 16 65 17 86 18 59 19 93 20 94 91.9%71.0 21 86 22 90 23 65 24 83 25 92 26 130 27 54 28 84 29 79 30 53 89.4%62.1 31 37 32 74 33 74 34 73 35 117 36 71 37 120 38 156 39 72 40 52 86.9%89.3 41 52 42 49 43 97 44 95 45 55 46 87 47 83 48 149 49 146 50 38 51 206 52 97 53 55 54 58 55 43 56 50 57 40 100 271 101 130 102 86 103 73 104 197 105 35 95.6%49.3 106 60 107 15 108 16 109 70 110 46 111 0 112 43 SOUTHEAST BONNEVILLE PILE XRF Summary 247 samples 238000430.005 Laboratory Results (mg/kg) dry weight Lab Sample ID SSR1-10 SSR1-20 SSRI-30 SSR1-40 SSR1-105 Lead Scraped Soil Stockpiles XRF/Lab Measurements Shotgun Shooting Range Airport West VCP 10/12/2023 Stockpile Sample XRF Total Solids Lab Dry Weight ID ppm % mg/kg 113 55 114 61 115 73 95.6%87.0 116 0 117 29 118 33 119 372 120 32 SOUTH BONNEVILLE PILE 175 269 381 445 589 6ND 750 8 143 981 10 74 11 63 99.1%48.1 12 143 13 66 14 65 15 57 16 34 17 50 18 81 19 95 20 80 21 48 22 22 EAST BONNEVILLE PILE 23 50 24 15 25 243 26 501 27 74 98.7%36.3 28 304 29 24 30 28 31 39 32 36 33 ND 34 25 35 ND 36 ND 37 31 38 44 39 12 40 22 41 14 42 18 43 17 44 44 45 25 46 61 47 71 48 87 49 92 50 64 51 47 52 73 53 47 54 383 55 132 56 286 57 153 58 101 98.5%559 59 101 60 249 61 332 62 177 XRF Summary 247 samples 238000430.005 SSR1-115 AW-COMP 1-22 AW-COMP 23-39 AW-COMP 40-65 Lead Scraped Soil Stockpiles XRF/Lab Measurements Shotgun Shooting Range Airport West VCP 10/12/2023 Stockpile Sample XRF Total Solids Lab Dry Weight ID ppm % mg/kg 63 58 64 69 65 51 SOUTHEAST SHOOTING RANGE AREA 66 52 67 46 68 49 69 77 99.0%103 70 39 EAST BONNEVILLE PILE 71 42 72 37 73 22 74 56 99.1%80.6 75 48 76 17 77 66 78 132 79 57 80 461 81 359 82 39 83 24 84 187 85 49 86 198 87 143 88 228 89 238 90 384 91 187 92 338 93 111 94 188 95 107 96 211 97 461 98 170 99.0%184 99 318 100 684 101 746 102 579 103 503 104 63 105 91 106 369 107 248 108 567 109 725 110 20 111 21 112 56 113 ND 114 191 115 77 116 163 117 195 118 120 119 251 120 ND 121 63 122 25 123 87 124 112 98.9%67 125 37 126 26 127 18 128 101 129 46 130 23 131 38 132 55 XRF Summary 247 samples 238000430.005 AW-COMP 66-73 AW-COMP 74-76 AW-COMP 77-113 AW-COMP 114-135 Lead Scraped Soil Stockpiles XRF/Lab Measurements Shotgun Shooting Range Airport West VCP 10/12/2023 Stockpile Sample XRF Total Solids Lab Dry Weight ID ppm % mg/kg 133 16 134 85 135 52 136 94 137 17 138 49 139 30 140 44 141 20 142 65 98.4%94.8 143 3 144 20 145 44 146 41 147 810 148 42 149 174 150 249 151 120 152 177 153 219 154 211 155 423 156 149 157 61 158 109 98.5%366 159 144 160 189 161 97 98.8%484 162 265 163 292 164 231 165 198 166 51 167 268 168 124 169 381 RED indicates Brighton Canal Piles XRF Summary 247 samples 238000430.005 AW-COMP 136-146 AW-COMP 148-159 AW-COMP 160-169 Lead Scrape Cleanup Final Summary Report Appendix B Laboratory Analytical Reports Project: 238000430 B-2 Appendix B Laboratory Analytical Reports B.1 PACE National L1627639 Samples Received – 05/16/2023 B.2 PACE National L1642211 Samples Received – 08/03/2023 ANALYTICAL REPORT June 26, 2023 Stantec Consulting Corp - UT Sample Delivery Group:L1627639 Samples Received:05/16/2023 Project Number:238000430.005A Description:Airport West VCP SSR Site:AIRPORT WEST VCP Report To:David Cline 2890 East Cottonwood Parkway Suite 300 Salt Lake City, UT 84121 Entire Report Reviewed By: June 26, 2023 [Preliminary Report] Chris Ward Project Manager Results relate only to the items tested or calibrated and are reported as rounded values. This test report shall not be reproduced, except in full, without written approval of the laboratory. Where applicable, sampling conducted by Pace Analytical National is performed per guidance provided in laboratory standard operating procedures ENV-SOP-MTJL-0067 and ENV-SOP-MTJL-0068. Where sampling conducted by the customer, results relate to the accuracy of the information provided, and as the samples are received. Pace Analytical National 12065 Lebanon Rd Mount Juliet, TN 37122 615-758-5858 800-767-5859 www.pacenational.com 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 1 of 16 June 27, 2023 Jason Romer Project Manager ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 1 of 16 TABLE OF CONTENTS Cp: Cover Page 1 Tc: Table of Contents 2 Ss: Sample Summary 3 Cn: Case Narrative 4 Sr: Sample Results 5 SSR1-10 L1627639-01 5 SSR1-20 L1627639-02 6 SSR1-30 L1627639-03 7 SSR1-40 L1627639-04 8 SSR1-105 L1627639-05 9 SSR1-115 L1627639-06 10 Qc: Quality Control Summary 11 Total Solids by Method 2540 G-2011 11 Metals (ICPMS) by Method 6020 12 Gl: Glossary of Terms 13 Al: Accreditations & Locations 14 Sc: Sample Chain of Custody 15 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 2 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 2 of 16 SAMPLE SUMMARY Collected by Collected date/time Received date/time SSR1-10 L1627639-01 Solid Tom Garden 05/05/23 10:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:11 LD Mt. Juliet, TN Collected by Collected date/time Received date/time SSR1-20 L1627639-02 Solid Tom Garden 05/05/23 00:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:14 LD Mt. Juliet, TN Collected by Collected date/time Received date/time SSR1-30 L1627639-03 Solid Tom Garden 05/05/23 14:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:18 LD Mt. Juliet, TN Collected by Collected date/time Received date/time SSR1-40 L1627639-04 Solid Tom Garden 05/05/23 16:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:30 LD Mt. Juliet, TN Collected by Collected date/time Received date/time SSR1-105 L1627639-05 Solid Tom Garden 05/05/23 18:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:33 LD Mt. Juliet, TN Collected by Collected date/time Received date/time SSR1-115 L1627639-06 Solid Tom Garden 05/05/23 20:00 05/16/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2061549 1 05/18/23 11:55 05/18/23 12:07 MAS Mt. Juliet, TN Metals (ICPMS) by Method 6020 WG2084335 5 06/26/23 08:50 06/26/23 18:37 LD Mt. Juliet, TN 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 3 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 3 of 16 CASE NARRATIVE All sample aliquots were received at the correct temperature, in the proper containers, with the appropriate preservatives, and within method specified holding times, unless qualified or notated within the report. Where applicable, all MDL (LOD) and RDL (LOQ) values reported for environmental samples have been corrected for the dilution factor used in the analysis. All Method and Batch Quality Control are within established criteria except where addressed in this case narrative, a non-conformance form or properly qualified within the sample results. By my digital signature below, I affirm to the best of my knowledge, all problems/anomalies observed by the laboratory as having the potential to affect the quality of the data have been identified by the laboratory, and no information or data have been knowingly withheld that would affect the quality of the data. [Preliminary Report] Chris Ward Project Manager 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 4 of 16 Jason Romer Project Manager ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 4 of 16 SAMPLE RESULTS - 01 L1627639 SSR1-10 Collected date/time: 05/05/23 10:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 88.8 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 93.0 0.111 2.25 5 06/26/2023 18:11 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 5 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 5 of 16 SAMPLE RESULTS - 02 L1627639 SSR1-20 Collected date/time: 05/05/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 91.9 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 71.0 0.108 2.18 5 06/26/2023 18:14 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 6 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 6 of 16 SAMPLE RESULTS - 03 L1627639 SSR1-30 Collected date/time: 05/05/23 14:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 89.4 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 62.1 0.111 2.24 5 06/26/2023 18:18 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 7 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 7 of 16 SAMPLE RESULTS - 04 L1627639 SSR1-40 Collected date/time: 05/05/23 16:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 86.9 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 89.3 0.114 2.30 5 06/26/2023 18:30 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 8 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 8 of 16 SAMPLE RESULTS - 05 L1627639 SSR1-105 Collected date/time: 05/05/23 18:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 95.6 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 49.3 0.104 2.09 5 06/26/2023 18:33 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 9 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 9 of 16 SAMPLE RESULTS - 06 L1627639 SSR1-115 Collected date/time: 05/05/23 20:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 95.6 1 05/18/2023 12:07 WG2061549 Metals (ICPMS) by Method 6020 Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 87.0 0.104 2.09 5 06/26/2023 18:37 WG2084335 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 10 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 10 of 16 QUALITY CONTROL SUMMARYWG2061549 Total Solids by Method 2540 G-2011 L1627639-01,02,03,04,05,06 Method Blank (MB) (MB) R3926829-1 05/18/23 12:07 MB Result MB Qualifier MB MDL MB RDL Analyte %%% Total Solids 0.00100 L1616879-06 Original Sample (OS) • Duplicate (DUP) (OS) L1616879-06 05/18/23 12:07 • (DUP) R3926829-3 05/18/23 12:07 Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits Analyte %%%% Total Solids 94.2 95.1 1 0.991 10 Laboratory Control Sample (LCS) (LCS) R3926829-2 05/18/23 12:07 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte %%%% Total Solids 50.0 50.0 100 85.0-115 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 11 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 11 of 16 QUALITY CONTROL SUMMARYWG2084335 Metals (ICPMS) by Method 6020 L1627639-01,02,03,04,05,06 Method Blank (MB) (MB) R3941487-1 06/26/23 17:00 MB Result MB Qualifier MB MDL MB RDL Analyte mg/kg mg/kg mg/kg Lead 0.0269 J 0.0198 0.400 Laboratory Control Sample (LCS) (LCS) R3941487-2 06/26/23 17:03 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte mg/kg mg/kg %% Lead 100 88.8 88.8 80.0-120 L1625164-01 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD) (OS) L1625164-01 06/26/23 17:07 • (MS) R3941487-5 06/26/23 17:17 • (MSD) R3941487-6 06/26/23 17:20 Spike Amount (dry) Original Result (dry)MS Result (dry)MSD Result (dry)MS Rec.MSD Rec.Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits Analyte mg/kg mg/kg mg/kg mg/kg %%%%% Lead 101 3.51 94.9 97.4 90.8 93.3 1 75.0-125 2.60 20 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 12 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 12 of 16 GLOSSARY OF TERMS Guide to Reading and Understanding Your Laboratory Report The information below is designed to better explain the various terms used in your report of analytical results from the Laboratory. This is not intended as a comprehensive explanation, and if you have additional questions please contact your project representative. Results Disclaimer - Information that may be provided by the customer, and contained within this report, include Permit Limits, Project Name, Sample ID, Sample Matrix, Sample Preservation, Field Blanks, Field Spikes, Field Duplicates, On-Site Data, Sampling Collection Dates/Times, and Sampling Location. Results relate to the accuracy of this information provided, and as the samples are received. Abbreviations and Definitions (dry)Results are reported based on the dry weight of the sample. [this will only be present on a dry report basis for soils]. MDL Method Detection Limit. MDL (dry)Method Detection Limit. RDL Reported Detection Limit. RDL (dry)Reported Detection Limit. Rec.Recovery. RPD Relative Percent Difference. SDG Sample Delivery Group. Analyte The name of the particular compound or analysis performed. Some Analyses and Methods will have multiple analytes reported. Dilution If the sample matrix contains an interfering material, the sample preparation volume or weight values differ from the standard, or if concentrations of analytes in the sample are higher than the highest limit of concentration that the laboratory can accurately report, the sample may be diluted for analysis. If a value different than 1 is used in this field, the result reported has already been corrected for this factor. Limits These are the target % recovery ranges or % difference value that the laboratory has historically determined as normal for the method and analyte being reported. Successful QC Sample analysis will target all analytes recovered or duplicated within these ranges. Original Sample The non-spiked sample in the prep batch used to determine the Relative Percent Difference (RPD) from a quality control sample. The Original Sample may not be included within the reported SDG. Qualifier This column provides a letter and/or number designation that corresponds to additional information concerning the result reported. If a Qualifier is present, a definition per Qualifier is provided within the Glossary and Definitions page and potentially a discussion of possible implications of the Qualifier in the Case Narrative if applicable. Result The actual analytical final result (corrected for any sample specific characteristics) reported for your sample. If there was no measurable result returned for a specific analyte, the result in this column may state “ND” (Not Detected) or “BDL” (Below Detectable Levels). The information in the results column should always be accompanied by either an MDL (Method Detection Limit) or RDL (Reporting Detection Limit) that defines the lowest value that the laboratory could detect or report for this analyte. Uncertainty (Radiochemistry)Confidence level of 2 sigma. Case Narrative (Cn) A brief discussion about the included sample results, including a discussion of any non-conformances to protocol observed either at sample receipt by the laboratory from the field or during the analytical process. If present, there will be a section in the Case Narrative to discuss the meaning of any data qualifiers used in the report. Quality Control Summary (Qc) This section of the report includes the results of the laboratory quality control analyses required by procedure or analytical methods to assist in evaluating the validity of the results reported for your samples. These analyses are not being performed on your samples typically, but on laboratory generated material. Sample Chain of Custody (Sc) This is the document created in the field when your samples were initially collected. This is used to verify the time and date of collection, the person collecting the samples, and the analyses that the laboratory is requested to perform. This chain of custody also documents all persons (excluding commercial shippers) that have had control or possession of the samples from the time of collection until delivery to the laboratory for analysis. Sample Results (Sr) This section of your report will provide the results of all testing performed on your samples. These results are provided by sample ID and are separated by the analyses performed on each sample. The header line of each analysis section for each sample will provide the name and method number for the analysis reported. Sample Summary (Ss)This section of the Analytical Report defines the specific analyses performed for each sample ID, including the dates and times of preparation and/or analysis. Qualifier Description J The identification of the analyte is acceptable; the reported value is an estimate. 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 13 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 13 of 16 Pace Analytical National 12065 Lebanon Rd Mount Juliet, TN 37122 Alabama 40660 Nebraska NE-OS-15-05 Alaska 17-026 Nevada TN000032021-1 Arizona AZ0612 New Hampshire 2975 Arkansas 88-0469 New Jersey–NELAP TN002 California 2932 New Mexico ¹TN00003 Colorado TN00003 New York 11742 Connecticut PH-0197 North Carolina Env375 Florida E87487 North Carolina ¹DW21704 Georgia NELAP North Carolina ³41 Georgia ¹923 North Dakota R-140 Idaho TN00003 Ohio–VAP CL0069 Illinois 200008 Oklahoma 9915 Indiana C-TN-01 Oregon TN200002 Iowa 364 Pennsylvania 68-02979 Kansas E-10277 Rhode Island LAO00356 Kentucky ¹ ⁶KY90010 South Carolina 84004002 Kentucky ²16 South Dakota n/a Louisiana AI30792 Tennessee ¹ ⁴2006 Louisiana LA018 Texas T104704245-20-18 Maine TN00003 Texas ⁵LAB0152 Maryland 324 Utah TN000032021-11 Massachusetts M-TN003 Vermont VT2006 Michigan 9958 Virginia 110033 Minnesota 047-999-395 Washington C847 Mississippi TN00003 West Virginia 233 Missouri 340 Wisconsin 998093910 Montana CERT0086 Wyoming A2LA A2LA – ISO 17025 1461.01 AIHA-LAP,LLC EMLAP 100789 A2LA – ISO 17025 ⁵1461.02 DOD 1461.01 Canada 1461.01 USDA P330-15-00234 EPA–Crypto TN00003 ACCREDITATIONS & LOCATIONS ¹ Drinking Water ² Underground Storage Tanks ³ Aquatic Toxicity ⁴ Chemical/Microbiological ⁵ Mold ⁶ Wastewater n/a Accreditation not applicable * Not all certifications held by the laboratory are applicable to the results reported in the attached report. * Accreditation is only applicable to the test methods specified on each scope of accreditation held by Pace Analytical. 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/26/23 22:15 14 of 16 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT 238000430.005A L1627639 06/27/23 10:11 14 of 16 ANALYTICAL REPORT August 13, 2023 Stantec Consulting Corp - UT Sample Delivery Group:L1642211 Samples Received:08/03/2023 Project Number: Description:Airport West-Gun Range Report To:David Cline 2890 East Cottonwood Parkway Suite 300 Salt Lake City, UT 84121 Entire Report Reviewed By: August 13, 2023 [Preliminary Report] Chris Ward Project Manager Results relate only to the items tested or calibrated and are reported as rounded values. This test report shall not be reproduced, except in full, without written approval of the laboratory. Where applicable, sampling conducted by Pace Analytical National is performed per guidance provided in laboratory standard operating procedures ENV-SOP-MTJL-0067 and ENV-SOP-MTJL-0068. Where sampling conducted by the customer, results relate to the accuracy of the information provided, and as the samples are received. Pace Analytical National 12065 Lebanon Rd Mount Juliet, TN 37122 615-758-5858 800-767-5859 www.pacenational.com 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 1 of 22 August 14, 2023 Chris Ward Project Manager ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 1 of 22 TABLE OF CONTENTS Cp: Cover Page 1 Tc: Table of Contents 2 Ss: Sample Summary 3 Cn: Case Narrative 5 Sr: Sample Results 6 AW-COMP 1-22 L1642211-01 6 AW-COMP 23-39 L1642211-02 7 AW-COMP 40-65 L1642211-03 8 AW-COMP 66-73 L1642211-04 9 AW-COMP 74-76 L1642211-05 10 AW-COMP 77-113 L1642211-06 11 AW-COMP 114-135 L1642211-07 12 AW-COMP 136-146 L1642211-08 13 AW-COMP 148-159 L1642211-09 14 AW-COMP 160-169 L1642211-10 15 Qc: Quality Control Summary 16 Total Solids by Method 2540 G-2011 16 Metals (ICP) by Method 6010B 18 Gl: Glossary of Terms 20 Al: Accreditations & Locations 21 Sc: Sample Chain of Custody 22 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 2 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 2 of 22 SAMPLE SUMMARY Collected by Collected date/time Received date/time AW-COMP 1-22 L1642211-01 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:14 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 23-39 L1642211-02 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:17 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 40-65 L1642211-03 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:20 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 66-73 L1642211-04 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:29 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 74-76 L1642211-05 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:32 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 77-113 L1642211-06 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:35 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 114-135 L1642211-07 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107944 1 08/04/23 15:46 08/04/23 16:01 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:38 ZSA Mt. Juliet, TN 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 3 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 3 of 22 SAMPLE SUMMARY Collected by Collected date/time Received date/time AW-COMP 136-146 L1642211-08 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107948 1 08/04/23 15:27 08/04/23 15:44 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:41 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 148-159 L1642211-09 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107948 1 08/04/23 15:27 08/04/23 15:44 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107745 1 08/04/23 12:52 08/07/23 17:44 ZSA Mt. Juliet, TN Collected by Collected date/time Received date/time AW-COMP 160-169 L1642211-10 Solid Tom Gordon 07/29/23 00:00 08/03/23 08:00 Method Batch Dilution Preparation Analysis Analyst Location date/time date/time Total Solids by Method 2540 G-2011 WG2107948 1 08/04/23 15:27 08/04/23 15:44 KDW Mt. Juliet, TN Metals (ICP) by Method 6010B WG2107965 1 08/04/23 16:47 08/11/23 20:02 ZSA Mt. Juliet, TN 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 4 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 4 of 22 CASE NARRATIVE All sample aliquots were received at the correct temperature, in the proper containers, with the appropriate preservatives, and within method specified holding times, unless qualified or notated within the report. Where applicable, all MDL (LOD) and RDL (LOQ) values reported for environmental samples have been corrected for the dilution factor used in the analysis. All Method and Batch Quality Control are within established criteria except where addressed in this case narrative, a non-conformance form or properly qualified within the sample results. By my digital signature below, I affirm to the best of my knowledge, all problems/anomalies observed by the laboratory as having the potential to affect the quality of the data have been identified by the laboratory, and no information or data have been knowingly withheld that would affect the quality of the data. [Preliminary Report] Chris Ward Project Manager 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 5 of 22 Chris Ward Project Manager ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 5 of 22 SAMPLE RESULTS - 01 L1642211 AW-COMP 1-22 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 99.1 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 48.1 0.210 0.505 1 08/07/2023 17:14 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 6 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 6 of 22 SAMPLE RESULTS - 02 L1642211 AW-COMP 23-39 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.7 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 36.3 0.211 0.507 1 08/07/2023 17:17 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 7 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 7 of 22 SAMPLE RESULTS - 03 L1642211 AW-COMP 40-65 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.5 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 559 0.211 0.508 1 08/07/2023 17:20 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 8 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 8 of 22 SAMPLE RESULTS - 04 L1642211 AW-COMP 66-73 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 99.0 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 103 0.210 0.505 1 08/07/2023 17:29 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 9 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 9 of 22 SAMPLE RESULTS - 05 L1642211 AW-COMP 74-76 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 99.1 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 80.6 0.210 0.504 1 08/07/2023 17:32 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 10 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 10 of 22 SAMPLE RESULTS - 06 L1642211 AW-COMP 77-113 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 99.0 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 184 0.210 0.505 1 08/07/2023 17:35 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 11 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 11 of 22 SAMPLE RESULTS - 07 L1642211 AW-COMP 114-135 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.9 1 08/04/2023 16:01 WG2107944 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 67.0 0.210 0.506 1 08/07/2023 17:38 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 12 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 12 of 22 SAMPLE RESULTS - 08 L1642211 AW-COMP 136-146 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.4 1 08/04/2023 15:44 WG2107948 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 94.8 0.211 0.508 1 08/07/2023 17:41 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 13 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 13 of 22 SAMPLE RESULTS - 09 L1642211 AW-COMP 148-159 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.5 1 08/04/2023 15:44 WG2107948 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 366 0.211 0.508 1 08/07/2023 17:44 WG2107745 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 14 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 14 of 22 SAMPLE RESULTS - 10 L1642211 AW-COMP 160-169 Collected date/time: 07/29/23 00:00 Total Solids by Method 2540 G-2011 Result Qualifier Dilution Analysis Batch Analyte %date / time Total Solids 98.8 1 08/04/2023 15:44 WG2107948 Metals (ICP) by Method 6010B Result (dry)Qualifier MDL (dry)RDL (dry)Dilution Analysis Batch Analyte mg/kg mg/kg mg/kg date / time Lead 484 J3 V 0.211 0.506 1 08/11/2023 20:02 WG2107965 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 15 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 15 of 22 QUALITY CONTROL SUMMARYWG2107944 Total Solids by Method 2540 G-2011 L1642211-01,02,03,04,05,06,07 Method Blank (MB) (MB) R3957216-1 08/04/23 16:01 MB Result MB Qualifier MB MDL MB RDL Analyte %%% Total Solids 0.00100 L1642211-06 Original Sample (OS) • Duplicate (DUP) (OS) L1642211-06 08/04/23 16:01 • (DUP) R3957216-3 08/04/23 16:01 Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits Analyte %%%% Total Solids 99.0 99.1 1 0.148 10 Laboratory Control Sample (LCS) (LCS) R3957216-2 08/04/23 16:01 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte %%%% Total Solids 50.0 50.0 100 85.0-115 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 16 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 16 of 22 QUALITY CONTROL SUMMARYWG2107948 Total Solids by Method 2540 G-2011 L1642211-08,09,10 Method Blank (MB) (MB) R3957215-1 08/04/23 15:44 MB Result MB Qualifier MB MDL MB RDL Analyte %%% Total Solids 0.000 L1642211-09 Original Sample (OS) • Duplicate (DUP) (OS) L1642211-09 08/04/23 15:44 • (DUP) R3957215-3 08/04/23 15:44 Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits Analyte %%%% Total Solids 98.5 98.7 1 0.171 10 Laboratory Control Sample (LCS) (LCS) R3957215-2 08/04/23 15:44 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte %%%% Total Solids 50.0 50.0 100 85.0-115 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 17 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 17 of 22 QUALITY CONTROL SUMMARYWG2107745 Metals (ICP) by Method 6010B L1642211-01,02,03,04,05,06,07,08,09 Method Blank (MB) (MB) R3957869-1 08/07/23 16:18 MB Result MB Qualifier MB MDL MB RDL Analyte mg/kg mg/kg mg/kg Lead U 0.208 0.500 Laboratory Control Sample (LCS) (LCS) R3957869-2 08/07/23 16:21 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte mg/kg mg/kg %% Lead 100 90.1 90.1 80.0-120 L1640455-01 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD) (OS) L1640455-01 08/07/23 16:24 • (MS) R3957869-5 08/07/23 16:33 • (MSD) R3957869-6 08/07/23 16:36 Spike Amount Original Result MS Result MSD Result MS Rec.MSD Rec.Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits Analyte mg/kg mg/kg mg/kg mg/kg %%%%% Lead 100 1.00 95.9 97.8 94.9 96.8 1 75.0-125 1.89 20 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 18 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 18 of 22 QUALITY CONTROL SUMMARYWG2107965 Metals (ICP) by Method 6010B L1642211-10 Method Blank (MB) (MB) R3959948-1 08/11/23 19:56 MB Result MB Qualifier MB MDL MB RDL Analyte mg/kg mg/kg mg/kg Lead U 0.208 0.500 Laboratory Control Sample (LCS) (LCS) R3959948-2 08/11/23 19:59 Spike Amount LCS Result LCS Rec.Rec. Limits LCS Qualifier Analyte mg/kg mg/kg %% Lead 100 86.5 86.5 80.0-120 L1642211-10 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD) (OS) L1642211-10 08/11/23 20:02 • (MS) R3959948-5 08/11/23 20:11 • (MSD) R3959948-6 08/11/23 20:14 Spike Amount (dry) Original Result (dry)MS Result (dry)MSD Result (dry)MS Rec.MSD Rec.Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits Analyte mg/kg mg/kg mg/kg mg/kg %%%%% Lead 101 484 409 666 0.000 180 1 75.0-125 V J3 V 47.9 20 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 19 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 19 of 22 GLOSSARY OF TERMS Guide to Reading and Understanding Your Laboratory Report The information below is designed to better explain the various terms used in your report of analytical results from the Laboratory. This is not intended as a comprehensive explanation, and if you have additional questions please contact your project representative. Results Disclaimer - Information that may be provided by the customer, and contained within this report, include Permit Limits, Project Name, Sample ID, Sample Matrix, Sample Preservation, Field Blanks, Field Spikes, Field Duplicates, On-Site Data, Sampling Collection Dates/Times, and Sampling Location. Results relate to the accuracy of this information provided, and as the samples are received. Abbreviations and Definitions (dry)Results are reported based on the dry weight of the sample. [this will only be present on a dry report basis for soils]. MDL Method Detection Limit. MDL (dry)Method Detection Limit. RDL Reported Detection Limit. RDL (dry)Reported Detection Limit. Rec.Recovery. RPD Relative Percent Difference. SDG Sample Delivery Group. U Not detected at the Reporting Limit (or MDL where applicable). Analyte The name of the particular compound or analysis performed. Some Analyses and Methods will have multiple analytes reported. Dilution If the sample matrix contains an interfering material, the sample preparation volume or weight values differ from the standard, or if concentrations of analytes in the sample are higher than the highest limit of concentration that the laboratory can accurately report, the sample may be diluted for analysis. If a value different than 1 is used in this field, the result reported has already been corrected for this factor. Limits These are the target % recovery ranges or % difference value that the laboratory has historically determined as normal for the method and analyte being reported. Successful QC Sample analysis will target all analytes recovered or duplicated within these ranges. Original Sample The non-spiked sample in the prep batch used to determine the Relative Percent Difference (RPD) from a quality control sample. The Original Sample may not be included within the reported SDG. Qualifier This column provides a letter and/or number designation that corresponds to additional information concerning the result reported. If a Qualifier is present, a definition per Qualifier is provided within the Glossary and Definitions page and potentially a discussion of possible implications of the Qualifier in the Case Narrative if applicable. Result The actual analytical final result (corrected for any sample specific characteristics) reported for your sample. If there was no measurable result returned for a specific analyte, the result in this column may state “ND” (Not Detected) or “BDL” (Below Detectable Levels). The information in the results column should always be accompanied by either an MDL (Method Detection Limit) or RDL (Reporting Detection Limit) that defines the lowest value that the laboratory could detect or report for this analyte. Uncertainty (Radiochemistry)Confidence level of 2 sigma. Case Narrative (Cn) A brief discussion about the included sample results, including a discussion of any non-conformances to protocol observed either at sample receipt by the laboratory from the field or during the analytical process. If present, there will be a section in the Case Narrative to discuss the meaning of any data qualifiers used in the report. Quality Control Summary (Qc) This section of the report includes the results of the laboratory quality control analyses required by procedure or analytical methods to assist in evaluating the validity of the results reported for your samples. These analyses are not being performed on your samples typically, but on laboratory generated material. Sample Chain of Custody (Sc) This is the document created in the field when your samples were initially collected. This is used to verify the time and date of collection, the person collecting the samples, and the analyses that the laboratory is requested to perform. This chain of custody also documents all persons (excluding commercial shippers) that have had control or possession of the samples from the time of collection until delivery to the laboratory for analysis. Sample Results (Sr) This section of your report will provide the results of all testing performed on your samples. These results are provided by sample ID and are separated by the analyses performed on each sample. The header line of each analysis section for each sample will provide the name and method number for the analysis reported. Sample Summary (Ss)This section of the Analytical Report defines the specific analyses performed for each sample ID, including the dates and times of preparation and/or analysis. Qualifier Description J3 The associated batch QC was outside the established quality control range for precision. V The sample concentration is too high to evaluate accurate spike recoveries. 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 20 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 20 of 22 Pace Analytical National 12065 Lebanon Rd Mount Juliet, TN 37122 Alabama 40660 Nebraska NE-OS-15-05 Alaska 17-026 Nevada TN000032021-1 Arizona AZ0612 New Hampshire 2975 Arkansas 88-0469 New Jersey–NELAP TN002 California 2932 New Mexico ¹TN00003 Colorado TN00003 New York 11742 Connecticut PH-0197 North Carolina Env375 Florida E87487 North Carolina ¹DW21704 Georgia NELAP North Carolina ³41 Georgia ¹923 North Dakota R-140 Idaho TN00003 Ohio–VAP CL0069 Illinois 200008 Oklahoma 9915 Indiana C-TN-01 Oregon TN200002 Iowa 364 Pennsylvania 68-02979 Kansas E-10277 Rhode Island LAO00356 Kentucky ¹ ⁶KY90010 South Carolina 84004002 Kentucky ²16 South Dakota n/a Louisiana AI30792 Tennessee ¹ ⁴2006 Louisiana LA018 Texas T104704245-20-18 Maine TN00003 Texas ⁵LAB0152 Maryland 324 Utah TN000032021-11 Massachusetts M-TN003 Vermont VT2006 Michigan 9958 Virginia 110033 Minnesota 047-999-395 Washington C847 Mississippi TN00003 West Virginia 233 Missouri 340 Wisconsin 998093910 Montana CERT0086 Wyoming A2LA A2LA – ISO 17025 1461.01 AIHA-LAP,LLC EMLAP 100789 A2LA – ISO 17025 ⁵1461.02 DOD 1461.01 Canada 1461.01 USDA P330-15-00234 EPA–Crypto TN00003 ACCREDITATIONS & LOCATIONS ¹ Drinking Water ² Underground Storage Tanks ³ Aquatic Toxicity ⁴ Chemical/Microbiological ⁵ Mold ⁶ Wastewater n/a Accreditation not applicable * Not all certifications held by the laboratory are applicable to the results reported in the attached report. * Accreditation is only applicable to the test methods specified on each scope of accreditation held by Pace Analytical. 1 Cp 2 Tc 3 Ss 4 Cn 5 Sr 6 Qc 7 Gl 8 Al 9 Sc ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/13/23 16:52 21 of 22 ACCOUNT:PROJECT:SDG:DATE/TIME:PAGE: Stantec Consulting Corp - UT L1642211 08/14/23 12:37 21 of 22 Stantec is a global leader in sustainable engineering, architecture, and environmental consulting. The diverse perspectives of our partners and interested parties drive us to think beyond what’s previously been done on critical issues like climate change, digital transformation, and future-proofing our cities and infrastructure. We innovate at the intersection of community, creativity, and client relationships to advance communities everywhere, so that together we can redefine what’s possible.