Loading...
HomeMy WebLinkAboutDERR-2024-012949j 1 J i : J : I DEPARTMENT OF HEALTH DTVISION OF ENVIRONMENTAL HEALTH Bureau of Environmental Resoonse and Remedration 288 Nonh 1460 West. P.O. Box 16690 salt Lake ciry, utah 84116-0690 (801 ) s38-6338 Norman H. Bangerter Suzanne Dandoy, M.D., M.P.H. :) Y *. iFi9-"r, i i ! '...-,-'; C6vemot Executive Diretor Kenneth L. A.lkema Dir6tor CERTIFIED MAIL RETURN RECEIPT JUL 1 5 1991 RBOUESTED Rulon Hymas Premium Oil Company 2005 s. 300 w. Salt Lake City, UT 84115 Re: Release Site AGUP, Cash Saver, 305 W. Main St., Richfield, Utah Facility Identification No. 2000223 Reporting and Remediation Schedule Dear Mr. Hvmas: A reiease from an underground storage tank (UST) at the above-referenced site was reported on 5l13l91to the Bureau of Environmental Response and Remediation (BERR) (formeriy part of the Bnreau of Solid and Hazardous Waste). According to Federal rule Title 40 Code of Federal Regulations (40 CFR) Part 280 Subparts E and F, and State rule R450-202, the release must be reported, controlled and abated, characterized and remediated, and the fuli extent and degree of contamination must be defined. These regulations require that specific reports addressing each aspect of the release be prepared and submitted to the Executive Secretary ruST) of the Utah Solid and Hazardous Wastes Committee within the specific times following a release. The Project Manager assigned to this site is PauI Zahn, and your site is identified in our recorfls as leaking underground storage tank (LUST) site AGUP. The attached Reporting and Remediation Schedule is issued in order to assist UST owners and operators in evaluating and remediating releases from USTs, and enable owners and operators to meet the requirements of applicable State and Federal reguiations. The Remediation Schedule identifies the specific reports required for evaluating a site rvhere a release has occurred, and the time you have for submitting those reports. The time frame is shown in the column labeled "Compliance Day Required." The column labeled "Actual Compliance Dates" is for your convenience in planning due dates. Aithough Federal regulations require UST owners and operators to submit the reports rvithin specific times following a release, the compliance dates for submitting the applicable reports may begin when you receive this Reporting and Remediation Schedule. For example, you must submit an Abatement and Site Check Report within 20 days of receipt of this Schedule. The "Response Dates" are the actual dates in which you must submit the corresponding reports. This column is also for your convenience to assist in tracking your compliance dates. ft t/r/q, 63 E )-8-7 t