HomeMy WebLinkAboutDDW-2024-014364State of Utah
GARY R, HERBERT
Governor
GREG BELL
Lieutenant Go|ernor
Department of
Environmental Quality
Amanda Smith
Exetutive D{recter
DIVISION OF DRINKING Vr'ATER
Kenneth H. Bousheld, P.E.
DIfetIor
Drinking Water Board
Paul Hansen, P.8., Chalr
Ken Bassett, Vit e-Chair
Terry Beebe
Russell Donoghue
Daniel Fleming
Heather Jackson
Betty Naylor
PetJa Rust
Amanda Smith
David Stevens, Ph.D.
Ron Thompson
Kenneth H. Bousfield, P.E.
Executive Secretary
May 19, 201I
Rick Stewart, Water System Director
Roosevelt City
255 South State Street
Roosevelt, Utah 84066
Dear Mr. Stewafi:
Subject: Plan Approval, Roosevelt City 2011 Main Street Waterline Replacement Project,
System #07OO4, File #08664
On May 6,2}ll, the Division of Drinking Water (the Division) received the plans and
specifications for the replacement of water mains in Main Street from your consultant, Horrocks
Engineers.
Our understanding of the project is installation of 3,055 linear feet of new 8-inch PVC water line,
along with valves, fittings and other appurtenances. These facilities replace older and smaller
piping in the existing distribution system.
We have completed our review of the plans and specifications, stamped and signed by Chuck
Richins, PE and dated May 18, 2011,-and find they basically comply with the applicable poftions
of Utah's Administrative Rules for Public Drinking Water Systems in R309. On this basis, the
plans for the 2011 Waterline Replacement Project in Main Street are hereby approved.
This approval perlains to construction only. An operating permit must be obtained from the
Executive Secretary before the new piping facilities may be put in service. A checklist
outlining the items required for operating permit issuance is enclosed for your information.
Approvals or permits by local authority or county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as
any change affecting the quantity or quality of the delivered water, must be submitted to the
Division. We may also conduct interim and final inspections of this project. Please notify us
when actual construction begins so that these inspections can be scheduled.
195 North 1950 Wesr . Salt t ake City, UT
Mailiog Address: P.O. Box 144830 . Salt lake City, UT 84114-4830
Telephone (801) 536-4200 . Fax (801-536-421I . T.D.D. (801) 5364414
www.deq.utah.gov
hinred on 100% recycled paper
Rick Steward
Page 2
May 19,2011
This approval must be renewed if construction has not begun or if substantial equipment has not
been ordered within one year of the date of this letter.
If you have any questions regarding this letter, please contact Russ Topham, of this office, at
(801) 536-0095, or Ying-Ying Macauley, Engineering Section Manager, of this office. ar (801)
536-4188.
Sincerelv.
GWATER BOARD
o/\
H. Bousfield, P.E.
RJT
Enclosure - Operating Permit Checklist
cc: Chuck Richins, PE, Horrocks Engineers, PO Box 562, Roosevelt, UT 84066
Darrin Brown, Environmental Director, Tri-county Health Dept., 133 South 500 East, Vernal, UT 84078
Scott Hacking, P.E., Tricounty District Engineer, Tricounty District Office, 281 E. 200 N., Roosevelr, UT 84066
Keith J. Burnett, Community Impact Board, 324 South State St., Suite 500, Salt Lake City, UT 84111
Michael B. Georgeson, PE, Division of Drinking Water
Russell J. Topham. PE, Division of Drinking Water
DDW-201 I -011405.doc
DIVISION OF DRINKING WATER
Checklist for Operating Permit (per Utah Administrative Code R309-500-9)
The following items must be submitted and found to be acceptable for all projects for operating
permit issuance with the exception of distribution lines and distribution lines with booster pumps
and pressure-reducing valves. [Distribution system projects may be placed into semice prior to submittal of all
items or issuance of operating permit if a water system has fficially designated a professional engineer responsible
for the entire water system and {thk designated engineer has received a Certfication of Rule Conformance by a P.E.
and proof of sotisfactory bacteliological tesult. In this case, a public water system will submit all items needed for
obtaining an ope/ating permit for specific distribution system project even after the new waterlines has been placed
into service as daermined fu the water system's designated professional engineer.l
n Utah Registered Engineer's Certification of Rule Conformance that all conditions of plan
approval (including conditions set forth by the Executive Secretary in any conditional
approval letter) have been accomplished.
tr Utah Registered Engineer's statement of what plan changes, if any, were necessary
during construction and a Certification of Rule Conformance tlnt all of these changes
were in accordanee with applicable Utah Administrative Code, R309-500 through R309-
550, Drinking lltater Facility, Construction, Design, and Operation Rules.
n As-built drawings have been received at the DMsion (unless no changes were made to
the previously submitted and approved pre-conshuction drawings).
n Confirmation that as-built drawings have been received by the water system (r'nless no
changes were made to the previously submitted and approved pre-construction
drawings).
U Evidence ofproper flushing and disinfection in accordance with the appropriate
ANSVAWWA Standards.
o ANSVAWWA C65l-05 AWWA Standard for Disinfecting Water Mains. Two consecutive sample sets (each 1200 feet, end-of-line, each branch, etc.), none positive,
at least 24 hours apart.
o ANSI/AWW A C652-02 AWWA Standard for Disinfection of Water-Storase Facilities. One ot more samples, none positive.
o ANSVAWWA C653-03 AWWA Standard for Disinfection of Water Treatrnent Plants. Two consecutive samples per unit, none positive, no less than 30 minutes apart.
o ANSVAW-WA C654-03 AWWA Standard for Disinfection of WellsI Two consecutive samples, none positive, no less than 30 minutes apart.
tr Water quality data, where appropriate. fGuidance: Storage tank water should be analyzedfor
residual volotile organic compounds after tank interior painting or coating.J
tr Confirmation that water system owner has been provided with O&M manuals for any
new facilities.
n Location data ofnew storage tank, treaftnent facility, or source, if applicable.