Loading...
HomeMy WebLinkAboutDAQ-2024-012013 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-1190-24 Site 14068 (B1) Jeffery Cowlishaw Staker Parson Companies 2350 South 1900 West Ogden, Utah 84401 Dear Mr. Cowlishaw: Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Uintah County Your Notice of Intent dated November 22, 2024, to relocate portable aggregate equipment to the temporary project located at 4268 South Vernal Avenue, Vernal, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Astec/4250 track mounted impactor with 328 kW generator This equipment has been permitted for portable operation in the State of Utah by the Goodfellow Corporation portable Approval Order (AO) DAQE-AN140680003-18, dated April 18, 2018. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. Approval is subject to the conditions of the dust control plan submitted for this location and the above portable AO. Hours of operation for this equipment shall be held to 13 hours each day. The maximum production rate shall be held to the requested 500 tons per hour. Emissions for this project have been estimated at the following: Pollutant gram/sec lbs/hr lbs/24 hr tons/yr PM10 1.97 15.67 156.71 12.22 SOx 0.78 6.16 61.56 4.80 NOx 5.15 40.91 409.11 31.91 CO 1.36 10.75 107.54 8.39 VOC 0.21 1.68 16.83 1.31 " " * " / Ú Ù Û Ù Û Ý DAQC-1190-24 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted temporary relocation form cc: TriCounty Health Department 4 * - - $ . — H v A ? A C @ C w A G ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Fri, Nov 22, 2024 at 4:20 PM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2024-11-22 16:20:22 MST IP: 165.225.10.107 ResponseID: R_12JS7iz1V6AofT0 Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/ ew6pkard1BzB4njpUiEUK8cvuywd6aZiMf0nFz59NRu9ammSs3kmxW3fvjPOVCBUXYfUR8cHTwIEM32wX4ip8RkmrB nQm0A7X5eKuGGLJy4NV2q5JOjpJqNMZxaHbasgYJgX0ytBEXbCp4nb8%2EINihLklcMQf6k6bwj% 2ErCk7tGwDE1JAz3luyd3f842jn-ZHRoSeK-ikhbHnNrXRdgWYitxBaFp5sCQgjfFwhyGyBHZge5vbhNGCftJOktMv30Gd46 tRSzhUBIWOlIxof1p0V2niW8LUjutZp5eK063-Qs9M7b-36Wt52tn9qHS0YG%2Ep-q81Xc7MwDgSaZC0PTybVA Response Summary: Please fill out the information below: Contact Person: Jeffery Cowlishaw Company Name: Staker Parson Companies Mailing Address: 2350 S 1900 W City: Ogden Zip: 84401 Phone Number: 3854054315 Email: jeffery.cowlishaw@stakerparson.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... No All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... B22F38EAC9 Briefly give directions to the site and/or physical address: 4268 S Vernal Avenue, Vernal 84078 Proposed Relocation Information: Closest City Vernal County Uintah UTM X Coordinates 2,230,307.612 N UTM Y Coordinates 666,771.495 E Approximate distance to the nearest house/business 0.21 miles UTM X Coordinates to nearest house/business 2,230,629.595 N UTM Y Coordinates to nearest house/business 666,969.071 E Does this site currently have a permit with DAQ? No 11/25/24, 11:36 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1816466692403511604%7Cmsg-f:1816466692403511604&s…1/2 Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) Goodfellows Rental Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Track Mounted Impactor Make/Model Astec/4250 Serial or ID# 420111 Manufactured Date 2023 Design Capacity 500 tph/328kW Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2ErQnfmYzjVat1E Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... Yes If Yes, please list all other local and state agencies that have issued any other permits Uintah County Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 13 Starting time of operation (am/pm) 6am Ending time of operation (am/pm) 7pm Maximum hourly production rate for project 500TPH Expected startup date 12/02/2024 Expected completion date 02/28/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_25Sieuk6OOTLU6D Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1Q0KPFGwMzYp3x1 11/25/24, 11:36 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1816466692403511604%7Cmsg-f:1816466692403511604&s…2/2