Loading...
HomeMy WebLinkAboutDDW-2024-006533 BACTERIOLOGICAL SAMPLE SITE PLAN As part of the Revised Total Coliform Rule, the location from which samples are taken is to be varied. All water systems are required to maintain a current bacteriological sample siting plan. The plan shows the locations of all sample sites from which bacteriological tests are taken. Sample sites are to be representative of all pressure zones and each water source of the distribution system. The sample plan should be revised regularly and following any major construction project impacting the distribution system. WATER SYSTEM INFORMATION System Name: _______________________________________________ System #: UTAH[ ][ ][ ][ ][ ] Street Address: ______________________________________________ Phone #: _________________ Mailing Address: ____________________________________________ Email: ___________________ Service Connections: ___________ Population Served: _________ SAMPLE COLLECTION Samples collected by: __________________________________________________________________ Name of Laboratory: ____________________________________________________________________ Mailing Address: _______________________________________________________________________ State Lab Code: ______________ Phone #: ____________________ Fax #: ____________________ The Laboratory was sent a copy of this plan on: _______________________________________________ Utah Division of Drinking Water was sent a copy of this plan on:___________________________________ Seasonal Systems Is the water operated seasonally? [ ] YES [ ] NO Dates of operation: Open:________________________ Close:______________________________________ Systems, which operate seasonally, are required to take an investigative sample prior to opening to the public. Where will that sample be taken? Location_______________________________________ Date sampled: _____________________________ MAP OF SYSTEM Have you enclosed\attached a map of the distribution system showing the source (well, spring, etc.), storage tanks, treatment facilities, distribution piping, routine sample locations, and follow-up (repeat) map? [ ] Yes [ ] No PO Box 144830 Salt Lake City, UT 84114-4830 Phone: (801) 536-4100 Fax: (801) 536-4211 Email: ddwreports@utah.gov www.drinkingwater.utah.gov SAMPLE LOCATIONS The following describes each routine sample location, what months the location will be sampled, and where follow-up (repeat) samples will be taken in the event of a “positive” routine sample. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Report Prepared by: ___________________________________________________________________ Signature and Title: ______________________________________________ Date: ______________ SAMPLE LOCATIONS The following describes each routine sample location, what months the location will be sampled, and where follow-up (repeat) samples will be taken in the event of a “positive” routine sample. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. SAMPLE LOCATIONS The following describes each routine sample location, what months the location will be sampled, and where follow-up (repeat) samples will be taken in the event of a “positive” routine sample. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. Routine Sample Location: Follow-up (repeat) Sample Locations: 1. ____________________________________ (location name or address) 1. ______________________________________ (routine sample location name or address) Description: ____________________________ (hose bib, sink faucet, etc.) 2. ______________________________________ (location name or address up-stream) Water samples will be collected from this location during the months of (circle): 3. ______________________________________ (location name or address down-stream) 1st Qtr: Jan. Feb. Mar. 4. ______________________________________ 2nd Qtr: Apr. May Jun. 3rd Qtr: Jul. Aug. Sep. (source) 4th Qtr: Oct. Nov. Dec. 72 North Main - P.O. Box 129 Garland, UT 84312 (435)257-3118 Garland City Water System Site Sampling Plan Garland City System# 02009 Population Served, 2400 Required Samples Per Month, 2 Generated 9/29/2017 Plan Maintained by Matthew Cutler Phone: 435-257-3118 Email: matt@garlandutah.org Sample Map Site Locations Location 1 Harris Market, 86 South Main. Sample from sink faucet. Location chosen because it is connected to the 10 inch main line that connects the north and south distribution line. Also because of the ease of access during business hours. Location 2 Pie Dump, 20 West 1400 South Sample from sink faucet. Location chosen because it is connected to the main south distribution line from the pump house. Also because of the ease of access during business hours. Location 3 Bear River Natatorium, 1500 South Main Sample from sink faucet. Location chosen because of the proximity to the main south distribution line from the pump house. Also chosen because of ease of access during business hours. Location 4 Garland City Inc, 72 North Main Sample from sink faucet. Location chosen because of the proximity to the main north distribution line from the pump house. Also chosen because of the ease of access during business hours. Repeat Sample Instructions Repeat sample at original site where violation happened. Also sample from a connection 5 service lines upstream and downstream from the repeat location site. Please repeat sample same day as the violation and notify the contact of the site sample plan, located at the top. A Family Community 72 North Main - P.O. Box 129 Garland, UT 84312 (435)257-3118 A Family Community