Loading...
HomeMy WebLinkAboutDERR-2024-004830 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144840 • Salt Lake City, UT 84114-4840 Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION Brent H. Everett Director ERRP-098-24 March 11, 2024 John Jenkins Rally Stop #13 P.O. Box 190 Cedar City, Utah 84721 Re: Notice of Approval to Remove Delivery Prohibition Tag Rally Stop #13, located at 750 South Bluff Street, St. George, Utah Facility Identification No. 6000208 Dear Mr. Jenkins: The Division of Environmental Response and Remediation (DERR) has received all the documentation necessary to issue the attached certificate of compliance for the 20,000-gallon unleaded and 12,000/8,000-gallon compartmented diesel/premium unleaded tanks at this facility. This notice satisfies the requirement for written authorization to remove the delivery prohibition tags in accordance with Utah Admin. Code R311-206-8(6). Please remove and discard any tags that were attached to the fill for these tanks during installation. If you have any questions, please contact the DERR project manager, identified on the red tag, at (801) 536-4100. Sincerely, Brent H. Everett, Director Division of Environmental Response and Remediation BHE/RTS/ta Enclosure: Certificate of Compliance cc: Jeremy Roberts, Environmental Health Director, Southwest Utah Public Health Department Paul Wright, District Engineer, Utah Department of Environmental Quality UST Red Tag Removal Letter – CoC Issuance Sign-Off Sheet ERRU#____________ Author Subject File Name on Google Drive Enclosures Attached CoC Attached Tank Data Sheet(internal use only – do not mail) Payment of Fees Confirmed? Priority CC’s Special Instructions Draft Approval Process Project Manager Section Manager Final Approval Process Section Secretary Author Branch Secretary Administrative Secretary Section Secretary Scan # Certified Mail Enclosures Included CC’s Mailed Mailed By CoC Tank Data Sheet Rush 03/11/2024 Yes Red Tag Removal Yes 6000208.NTR Richard Saathoff  03/11/2024 03/11/2024 T TA 098-24 03/11/2024 03/11/2024 SS 03/11/2024 03/11/2024 MIKE@fueltecllc.com, kurtis@rallystops.com, johnjenkins@rallystops.com 2024 UST CERTIFICATE OF COMPLIANCE ISSUED TO:LOCATION OF TANKS: Rally Stop #13 Rally Stop #13 750 S BLUFF PO Box 190 SAINT GEORGE UT 84770 CEDAR CITY, UT 84721 Facility ID: 6000208 Tank #Capacity Substance Desc Compliance Financial Assurance Mechanism 7 20000 Gasoline Yes PST Fund 8A 12000 Diesel Yes PST Fund 8B 8000 Gasoline Yes PST Fund This certificate will automatically lapse if any of the required fees are not paid. It may also be revoked for failure to comply with state and federal UST regulations. Possession of this certificate does not signify coverage under the Utah PST Fund. Cleanup requirements may be obtained from the Division of Environmental Response and Remediation. UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY Underground Storage Tank Inspection Verification Form Facility ID:6000208 Owner Name:Rally Stop #13 Facility Name:Rally Stop #13 Owner Address:PO Box 190 Street Address:750 S BLUFF CEDAR CITY, UT 84721 SAINT GEORGE, UT 84770 Operator A:KURTIS L. MAXWELL / (435) 586-1101 / 1/1/2027 Operator B:KURTIS L. MAXWELL / (435) 586-1101 / 1/1/2027 Owner Email:andy@jenkinsoil.com UTM Coordinates X/Y:270076 / 4108582 Disp ID/Alt ID Substance UDC Pipe Flex Loc Install Date UDC Install Date Fire Valve Sat Present UDC Test Disp Flex CP Test 9 - 1/2 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023 10 - 3/4 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023 11 - 5/6 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023 12 - 7/8 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023 Tank ID/Alt ID:7 / 7 EGen/AST/Stat e: No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled Siphon/Compart:No / No PVV/StageI:Yes Pipe Type/STP Cont:Pressurized / Yes Tank Status:Currently In Use Two point STP Flex Connectors:Steel Flex in Sump Installed/Cap/Loc:6/7/2023 / 20000 / South LLD Model:Vaporless LD2000 Substance Stored:Gasoline / Regular Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes / ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023 ATG Test:3/4/2024 Overfill Test:3/4/2024 LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test: Tank ID/Alt ID:8 / 8A EGen/AST/Stat e: No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled Siphon/Compart:No / No PVV/StageI:No Pipe Type/STP Cont:Pressurized / Yes Tank Status:Currently In Use None STP Flex Connectors:Steel Flex in Sump Installed/Cap/Loc:6/7/2023 / 12000 / Center LLD Model:Vaporless LD2000 Substance Stored:Diesel / Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes / ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023 ATG Test:3/4/2024 Overfill Test:3/4/2024 LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test: Tank ID/Alt ID:9 / 8B EGen/AST/Stat e: No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled Siphon/Compart:No / No PVV/StageI:Yes Pipe Type/STP Cont:Pressurized / Yes Tank Status:Currently In Use Two point STP Flex Connectors:Steel Flex in Sump Installed/Cap/Loc:6/7/2023 / 8000 / North LLD Model:Vaporless LD2000 Substance Stored:Gasoline / Premium Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes / ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023 ATG Test:3/4/2024 Overfill Test:3/4/2024 LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test: 3/11/2024 Page 1 of 1