HomeMy WebLinkAboutDERR-2024-004830
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144840 • Salt Lake City, UT 84114-4840
Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D. (801) 536-4284
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF ENVIRONMENTAL
RESPONSE AND REMEDIATION
Brent H. Everett
Director
ERRP-098-24
March 11, 2024
John Jenkins
Rally Stop #13
P.O. Box 190
Cedar City, Utah 84721
Re: Notice of Approval to Remove Delivery Prohibition Tag
Rally Stop #13, located at 750 South Bluff Street, St. George, Utah
Facility Identification No. 6000208
Dear Mr. Jenkins:
The Division of Environmental Response and Remediation (DERR) has received all the
documentation necessary to issue the attached certificate of compliance for the 20,000-gallon
unleaded and 12,000/8,000-gallon compartmented diesel/premium unleaded tanks at this facility.
This notice satisfies the requirement for written authorization to remove the delivery prohibition
tags in accordance with Utah Admin. Code R311-206-8(6). Please remove and discard any tags that
were attached to the fill for these tanks during installation. If you have any questions, please contact
the DERR project manager, identified on the red tag, at (801) 536-4100.
Sincerely,
Brent H. Everett, Director
Division of Environmental Response and Remediation
BHE/RTS/ta
Enclosure: Certificate of Compliance
cc: Jeremy Roberts, Environmental Health Director, Southwest Utah Public Health Department
Paul Wright, District Engineer, Utah Department of Environmental Quality
UST Red Tag Removal Letter – CoC Issuance Sign-Off Sheet
ERRU#____________
Author
Subject
File Name on Google Drive
Enclosures
Attached CoC
Attached Tank Data
Sheet(internal use only – do
not mail)
Payment of Fees Confirmed?
Priority
CC’s
Special Instructions
Draft Approval Process
Project Manager
Section Manager
Final Approval Process
Section Secretary
Author
Branch Secretary
Administrative Secretary
Section Secretary
Scan #
Certified Mail
Enclosures Included
CC’s Mailed
Mailed By
CoC
Tank Data Sheet
Rush
03/11/2024
Yes
Red Tag Removal
Yes
6000208.NTR
Richard Saathoff
03/11/2024
03/11/2024
T
TA
098-24
03/11/2024
03/11/2024
SS
03/11/2024
03/11/2024
MIKE@fueltecllc.com, kurtis@rallystops.com,
johnjenkins@rallystops.com
2024
UST CERTIFICATE
OF
COMPLIANCE
ISSUED TO:LOCATION OF TANKS:
Rally Stop #13
Rally Stop #13 750 S BLUFF
PO Box 190 SAINT GEORGE UT 84770
CEDAR CITY, UT 84721 Facility ID: 6000208
Tank #Capacity Substance Desc Compliance Financial Assurance Mechanism
7 20000 Gasoline Yes PST Fund
8A 12000 Diesel Yes PST Fund
8B 8000 Gasoline Yes PST Fund
This certificate will automatically lapse if any of the required fees are not paid. It may also be revoked for failure to
comply with state and federal UST regulations. Possession of this certificate does not signify coverage under the Utah
PST Fund. Cleanup requirements may be obtained from the Division of Environmental Response and Remediation.
UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY
Underground Storage Tank Inspection Verification Form
Facility ID:6000208
Owner Name:Rally Stop #13 Facility Name:Rally Stop #13
Owner Address:PO Box 190 Street Address:750 S BLUFF
CEDAR CITY, UT 84721 SAINT GEORGE, UT 84770
Operator A:KURTIS L. MAXWELL / (435) 586-1101 / 1/1/2027 Operator B:KURTIS L. MAXWELL / (435) 586-1101 / 1/1/2027
Owner Email:andy@jenkinsoil.com UTM Coordinates X/Y:270076 / 4108582
Disp ID/Alt
ID
Substance UDC Pipe Flex Loc Install Date UDC Install Date Fire
Valve
Sat
Present
UDC Test Disp Flex CP
Test
9 - 1/2 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023
10 - 3/4 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023
11 - 5/6 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023
12 - 7/8 Gas/Diesel Yes Steel Flex in Sump 09/27/2023 09/27/2023 Yes No 10/30/2023
Tank ID/Alt ID:7 / 7 EGen/AST/Stat
e:
No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled
Siphon/Compart:No / No PVV/StageI:Yes Pipe Type/STP Cont:Pressurized / Yes
Tank Status:Currently In Use Two point STP Flex Connectors:Steel Flex in Sump
Installed/Cap/Loc:6/7/2023 / 20000 / South LLD Model:Vaporless LD2000
Substance Stored:Gasoline / Regular Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No
Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes /
ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD
ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023
ATG Test:3/4/2024 Overfill Test:3/4/2024
LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test:
Tank ID/Alt ID:8 / 8A EGen/AST/Stat
e:
No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled
Siphon/Compart:No / No PVV/StageI:No Pipe Type/STP Cont:Pressurized / Yes
Tank Status:Currently In Use None STP Flex Connectors:Steel Flex in Sump
Installed/Cap/Loc:6/7/2023 / 12000 / Center LLD Model:Vaporless LD2000
Substance Stored:Diesel / Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No
Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes /
ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD
ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023
ATG Test:3/4/2024 Overfill Test:3/4/2024
LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test:
Tank ID/Alt ID:9 / 8B EGen/AST/Stat
e:
No / No / No Pipe Material-Mod:Flexible Plastic - Double-Walled
Siphon/Compart:No / No PVV/StageI:Yes Pipe Type/STP Cont:Pressurized / Yes
Tank Status:Currently In Use Two point STP Flex Connectors:Steel Flex in Sump
Installed/Cap/Loc:6/7/2023 / 8000 / North LLD Model:Vaporless LD2000
Substance Stored:Gasoline / Premium Spill/Overfill/Sm deliv:5 gal. Spill Bucket / Overfill alarm / No
Tank Material-Mod:Fiberglass Reinforced Plastic - Double-Walled PST Fund/Other Type:Yes /
ATG:Veeder Root / TLS-350 Interstitial Monitor Tank/Pipe Rel Det:Interstitial DW / Interstitial DW / ALD
ATG Specs: / / Liquid Status STP Sump Test:10/30/2023 Spill Bk Test:10/30/2023
ATG Test:3/4/2024 Overfill Test:3/4/2024
LTT Test:LLD Test:03/04/2024 CP Tank Test:CP Pipe Test:
3/11/2024 Page 1 of 1