HomeMy WebLinkAboutDAQ-2024-006718' RtOTintO Rio rinto Kennecott utah copper, LLc
4700 Daybreak Parkway
South Jordan, Utah 84009
Mr. Bryce Bird - Director tfrAH DEPARTMENT OF
Depariment of Environmental Quality EIWIRONMENTAL OIJ'AUTY
Division of Air Quality
P.O. Box 144820
Salt Lake City, Utah 84114-4820 FEB 20 2024
F*,1 D-liv6<J
DIVISION OF AIH QUAUTY
February 19,2024
Attn: Joe Randolph
Dear Mr. Bird
RE: Smelter Monthlv Report - Januarv 2024
Rio Tinto Kennecott Utah Copper LLC (KUC) is submitting this letter in
compliance with Approval Order (AO) number DAQE-ANO103460062-23
and Title V Operating Permit (Title V) Number 3500030004. lncluded
herein is the monthly KUC Smelter monthly report for January 2024.
The following sections present data related to the Holman Boiler, Main
Stack particulate and lead emissions, and Main Stack gas flow.
Holman Boiler
The Holman Boiler 30-day average NOx emissions are measured as
outlined in the most recently approved monitoring plan in accordance with
AO condition ll.B.2.b and Title V condition 11.8.23.b.1. The information
provided in Table 1 is required to be reported monthly.
Table 1: Holman Boiler Datar sum
Were the 30-day average NOx emissions greater than 9.34
lbs/hr durino the period?N/A
Were the 30-day average 02 levels greater than 3.3% during
the oeriod?
N/A**
Were the Holman Boiler data recovery requirements met during
the period?.N/A*
Rio Tinto Kennecott Utah Copper, LLC. 4700 Oaybreak Parkway, South Jordan, Utah 84009.
REVIEWED
Initials JBR Date 3/18/2024
Comp Status Meets
File # 10346 Blue 2
one period pm exceedance. Detailed i
in Dev report . NFA
' RiOTintO Rio rinto Kennecott utah copper, LLc
4700 Daybreak Parkway
South Jordan, Utah 84009
Main Stack Particutate Matter (PMl0) and Lead (Pb) Emissions
and Lead Emissi
Notes:* For compliance with data recovery requirements, a minimum of 75% of the
operating hours in each operating day must be achieved in at least 22 of 30
successive operating daYs.
** The planned Holman burner replacement is still ongoing. Once the burner
replacement project is complete, KUC will complete stack testing to determine a
new en limit for the new burner system.
Table 2: Main Stack Daily Particulate ons
Date Main Stack Particulate
(lbs/hr)
Main Stack Lead
(lbs/hr)
1t1t2024 ac.B o.g
1t2t2024 2q.2 o.2
1t3t2024 66.s o.7
1t4t2024 4\.7 o.8
1t5t2024 aa.l 1.1
1t6t2024 6z.o o.q
1t7t2024 zo.8 o.8
1t8t2024 zt.8 o.B
1t9t2024 rB.z o.4
1t10t2024 24.3 o.g
1t11t2024 *o.6"
1t12t2024 *o.6*
1113t2024 24.4 1.O
1t14t2024 16.B o.4
1t15t2024 .q6.8 o.5
1t1612024 40.t o.5
1t17t2024 tg.2 o.B
1t18t2024 8o.z 1.q
1t19t2024 6z.t o.8
1t20t2024 25.9 o.B
1t21t2024 ora 1.O
1t22t2024 8.8 o.3
1t23t2024 20.o o.6
1t24t2024 aL4 o.7
1t25t2024 10.2 o.1
1t26t2024 ro.8 o.6
1t27t2024 B.o o.1
Rio Tinto Kenne@tt Utah Copper, LLC. 4700 Daybreak Parkway, South Jordan, Utah 84009
RioTinto Rio Tinto Kennecoft Utah Copper, LLC
4700 Daybreak Parkway
South Jordan, Utah 84009
Particulate and lead emissions are measured and calculated in
accordance with the most recently approved monitoring plan. Table 2
summarizes the daily particulate and lead emissions data. The daily main
stack particulate emissions are to be compared with the permit limit of
89.5 lbs/hr as set forth in AO condition ll.B.1.a (H) and Title V condition
ll.B.24.a (i).
Table 3 summarizes the Main Stack particulate and lead emissions
annual data calculations. This includes recovery percentages for
particulate and lead emissions samples and the annual average lead
emissions. The lead annual average emissions are to be compared with
the permit limit of 1.3 lbs/hr as set forth in AO condition ll.B.1.a (H) and
Title V condition 11.8.24.d.
Table 3: Main Stack Annual A
Main Stack Gas Flow
ln accordance with AO condition 11.8.3.a.6, main stack gas flow may be
estimated in the event that temperature and velocity measurements
malfunction. Table 4 summarizes the instances when main stack gas flow
was estimated.
Table 4: Main Stack Gas Flow Estimates
Number of instances when main stack gas
flow was estimated during the period:Zero (0)
1t28t2024 15.2 o.1
1t29t2024 l^6.r o.4
1t30t2024 LE.2 o.4
1t31t2024 L4.6 o.B
\otes: Two samples were invalidated for particulate and lead emissions for the
nonth: January 11th and 12th were invalidated due to procedural errors (per
;ection 6.6.3 of the Monitoring Plan). The monthly average value for lead is
substituted on these days for calculating the annual average per the plan.
January Sth was over the 89.5 lb/hr PMro limit. A deviation letter was submitted
rn February 8th.
a
Particulate Emissions Data Recovery*84.2o/o
Lead Emissions (Annual Average)0.2 lbsihr
Lead Emissions Data Recovery"83.5%
Notes:
+ - Data recovery percentages are to be compared with the 80% data recovery
reouirement outlined in the most recentlv apDroved monitorinq plan.
Rio Tinto Kennecott Utah Copper, LLC. 4700 Daybreak Parkway, Soulh Jordan, Utah 84009
RioTinto Rlo Tlnto Kennecott Utah Coppor, LLC
4700 Daybreak Parl<way
South Jodan, Utah 84009
Based on information and belief formed after reasonable inquiry, the
statements and information in this document are true, accurate, and
complete (R307-41 5-5d).
lf you have any questions regarding this report, please contact me or Sean
Daly at 801-204-2563.
Yours sincerely,
o */,
Jerome Dozol
General Manager - Metals
Rio Thto lGnn€cott Utah Copper, LLC. 4700 Daybr€ak Part$vay, SoL{h Jordan, Utah &4009,