7400 Skyline Drive East, Suite A • Columbus, OH 43235 • (614) 923-0154 • Fax: (614) 923-0111
www.ustankalliance.com
March 12, 2024
Kim Viehweg
State of Utah Dept. of Environmental Quality
Division of Environmental Response & Remediation
Underground Storage Tank Compliance Section
195 North 1950 West
Salt Lake City, Utah 84116
kviehweg@utah.gov
Dear Regulator:
Please find the attached copies of recent UST test results for the following locations:
Site # Address Date of Test Test (s) performed
Pilot # 0743
Facility # 2000678
County: Juab
1597 S. Main Street
Nephi, UT 84648
3/4/2024 COMPLIANCE –
Overfill Prevention Device
Operability Inspection.
Official Test Report(s) Included
If there has been a change in personnel, address or you do not require test reports to be sent, or if you
would like for the reports to be emailed please let us know.
Should you have any questions or require additional information at this time, please do not hesitate
to call (614)923-0154.
Thank you,
Sue Pelphrey
Special Projects Admin. Assist.
US Tank Alliance, Inc.
spelphrey@ustankalliance.com
SERVICE ORDER SUMMARY
US TANK ALLIANCE, INC.
7400 Skyline Drive E., Suite A
Columbus, OH 43235
Phone:(614) 923-0154 Fax:(614) 923-0111
Invoice #:0407540
Service Order #0407540 Test Date:3/4/2024
Customer:
Pilot Travel Centers, LLC
5508 Lonas Road
Attention: Environmental Department
Knoxville, TN
Attn: Joey Cupp
Customer PO #:
Location:
Pilot # 0743
1597 S. Main Street
Facility ID 2000678
Nephi, UT
Dispatched For:
COMPLIANCE - Overfill Prevention Device Operability Inspection.
Notes/Comments:
The DSL-W, DSL-Center, DSL-E, RUL-W, RUL-E & PUL Overfill Prevention Device Operability Inspections Passed.
Test Technician:
Tested by: Precision Testing Technologies, Inc. Tech: Saxon Usher UT-0420.
37909 84648-2014
Customer Phone:(865) 588-7488 ext.Facility Phone:(435) 623-2400 ext.
Attn: Manager
Other:
COMPLIANCETest Purpose:
Reviewed By:
Tank
Line/LD/Impacts
ATG Certification
Cath. Protect.CP Survey
Pressure Decay
Air-to-Liquid
Blockage
PV Vent Cap
Healy
GPM / Flow Rate
Helium Pinpoint Test
Containment
Residential Tank Test
STAGE II TESTINGUST SYSTEM TESTING OTHER ACTIVITIES
Other ActivitiesOther Stage II