Loading...
HomeMy WebLinkAboutDERR-2024-004890 7400 Skyline Drive East, Suite A • Columbus, OH 43235 • (614) 923-0154 • Fax: (614) 923-0111 www.ustankalliance.com March 12, 2024 Kim Viehweg State of Utah Dept. of Environmental Quality Division of Environmental Response & Remediation Underground Storage Tank Compliance Section 195 North 1950 West Salt Lake City, Utah 84116 kviehweg@utah.gov Dear Regulator: Please find the attached copies of recent UST test results for the following locations: Site # Address Date of Test Test (s) performed Pilot # 0743 Facility # 2000678 County: Juab 1597 S. Main Street Nephi, UT 84648 3/4/2024 COMPLIANCE – Overfill Prevention Device Operability Inspection. Official Test Report(s) Included If there has been a change in personnel, address or you do not require test reports to be sent, or if you would like for the reports to be emailed please let us know. Should you have any questions or require additional information at this time, please do not hesitate to call (614)923-0154. Thank you, Sue Pelphrey Special Projects Admin. Assist. US Tank Alliance, Inc. spelphrey@ustankalliance.com SERVICE ORDER SUMMARY US TANK ALLIANCE, INC. 7400 Skyline Drive E., Suite A Columbus, OH 43235 Phone:(614) 923-0154 Fax:(614) 923-0111 Invoice #:0407540 Service Order #0407540 Test Date:3/4/2024 Customer: Pilot Travel Centers, LLC 5508 Lonas Road Attention: Environmental Department Knoxville, TN Attn: Joey Cupp Customer PO #: Location: Pilot # 0743 1597 S. Main Street Facility ID 2000678 Nephi, UT Dispatched For: COMPLIANCE - Overfill Prevention Device Operability Inspection. Notes/Comments: The DSL-W, DSL-Center, DSL-E, RUL-W, RUL-E & PUL Overfill Prevention Device Operability Inspections Passed. Test Technician: Tested by: Precision Testing Technologies, Inc. Tech: Saxon Usher UT-0420. 37909 84648-2014 Customer Phone:(865) 588-7488 ext.Facility Phone:(435) 623-2400 ext. Attn: Manager Other: COMPLIANCETest Purpose: Reviewed By: Tank Line/LD/Impacts ATG Certification Cath. Protect.CP Survey Pressure Decay Air-to-Liquid Blockage PV Vent Cap Healy GPM / Flow Rate Helium Pinpoint Test Containment Residential Tank Test STAGE II TESTINGUST SYSTEM TESTING OTHER ACTIVITIES Other ActivitiesOther Stage II