HomeMy WebLinkAboutDERR-2024-004870Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name J WADE BECK
Address PO BOX 100
FOUNTAIN GREEN, UT 84632
Contact J WADE BECK
Phone
Email becksautoservice@gmail.com
TANK LOCATION
Name BECKS AUTO SERVICE LLC
Address 83 S STATE
FOUNTAIN GREEN, UT 84632
A Operator J. WADE BECK
Phone (435) 445-3454
B Operator SAME
Phone SAME
Facility ID: 2000019 Inspection Date: 03/07/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gas/Diesel Yes Steel Flex in Sump Sept. 3,
1998
Sept. 3,
1998
Yes No None None
2 - 3/4 Gas/Diesel Yes Steel Flex in Sump Sept. 3,
1998
Sept. 3,
1998
Yes No None None
TANK DETAILS
Tank ID/Alt ID 6 / 6
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Sept. 3, 1998 / 10000 / West
Substance Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1001 with SCALD
LTT Test Nov. 10, 2023
LLD Test Nov. 10, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 7 / 7A
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Sept. 3, 1998 / 6000 / Northeast
Substance Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1001 with SCALD
LTT Test Nov. 10, 2023
LLD Test Nov. 10, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-03-07 Page 1 of 6
Tank ID/Alt ID 8 / 7B
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Sept. 3, 1998 / 4000 / Southeast
Substance Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1001 with SCALD
LTT Test Nov. 10, 2023
LLD Test Nov. 10, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-03-07 Page 2 of 6
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 6 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 6 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 6 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 6 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 6 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 7A Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2024-03-07 Page 3 of 6
Tank 7A Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 7A ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 7A ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 7B Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 7A Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 7A Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 7B Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 7B Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 7B Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-03-07 Page 4 of 6
Tank 7B ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 7B ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24
Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 7 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 8 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-03-07 Page 5 of 6
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record Created:March 7, 2024, 2:55 p.m.
Inspection Date:March 7, 2024
2024-03-07 Page 6 of 6