Loading...
HomeMy WebLinkAboutDERR-2024-012854 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 SPILL BUCKET INTEGRITY TESTING HYDROSTATIC TEST METHOD SINGLE- AND DOUBLE-WALLED VACUUM TEST METHOD Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4001798 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24 This procedure is to test the leak integrity of single- and double-walled spill buckets. See PEI/RP1200 Section 6.2 for hydrostatic test method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. Tank Number 1 2 Product Stored RUL DL Spill Bucket Capacity 5-Gallon 5-Gallon Manufacturer OPW OPW Construction ☐Double-walled ☒Single-walled ☐Double-walled ☒Single-walled ☐Double-walled ☐Single-walled ☐Double-walled ☐Single-walled Test Type ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled Spill Bucket Type ☒Product ☐Vapor ☒Product ☐Vapor ☐Product ☐Vapor ☐Product ☐Vapor Liquid and debris remove from spill bucket?* ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No Visual Inspection (no cracks, loose parts or separation of the bucket from the fill pipe.) ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No Tank Riser cap included in test? ☒Yes ☐No ☐NA ☒Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Drain valve included in test? ☐Yes ☐No ☒NA ☐Yes ☐No ☒NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Starting Level 13 9/16” 13 1/8” Test Start Time 10:39 10:39 Ending Level 13 9/16” 13 1/8” Test End Time 11:39 11:39 Test Period 1 Hour 1 Hour Level Change 0” 0” Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only: Maintain at least 26 inches water column; Vacuum double-walled: maintain at least 12 inches water column. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *All liquids and debris must be disposed of properly Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4001798 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24 This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures. Product Grade RUL DSL Tank Number 1 2 Tank Volume, gallons 543 966 Tank Diameter, inches 47.63 47.75 Overfill Prevention Device Brand OPW OPW Type ☒ Automatic Shutoff Device ☐ Ball Float Valve ☒ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Float moves freely without binding and poppet moves into flow path? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Bypass valve in the drop tube open and free of blockage (if present)? ☒Yes ☐No ☐Not Present ☒Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present 5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Ball float pipe proper length to restrict flow to 90% capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. **If a ball float valve is found to fail the inspection, another method of overfill must be used. ***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 CONTAINMENT SUMP INTEGRITY TESTING HYDROSTATIC TESTING METHOD Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4001798 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24 This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the inspection procedure. Containment Sump ID RUL STP DSL STP UDC Containment Sump Material Poly Poly Poly Liquid and debris removed from sump?* ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No Visual Inspection (No cracks, loose parts or separation of the containment sump.) ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No Containment Sump Depth 21” 21” 28” Height From Bottom to Top of Highest Penetration 10” 7” 6” Starting Water Level 14 1/8” 10 13/16” 10 3/4” Test Start Time 10:39 10:39 10:39 Ending Water Level 14 1/8” 10 13/16” 10 3/4” Test End Time 11:39 11:39 11:39 Test Period (Minimum test time: 1 hour) 1 Hour 1 Hour 1 Hour Water Level change 0” 0” 0” Pass/fail Criteria: Must pass visual inspection. Water level drop of less than 1/8 inch. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail Comments: *All Liquids and debris must be disposed of properly. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 PIPING SECONDARY CONTAINMENT INTEGRITY TESTING Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4001798 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24 This procedure is to test the integrity of the interstitial space of double-walled piping. See PEI/RP1200 Section 5 for the test procedure. Tank Number 1 2 Piping Run Only Only Piping Material Flex Flex Product Stored RUL DSL Test Start Time 10:39 10:39 Initial Test Pressure, psig (test procedure specifies 5 psig.) 5 5 Test End Time 11:39 11:39 Final Test Pressure, psig 5 5 Pressure Change (No reduction in pressure allowed for pass.) 0 psi 0 psi Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature