HomeMy WebLinkAboutDERR-2024-012854 WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
SPILL BUCKET INTEGRITY TESTING HYDROSTATIC TEST METHOD
SINGLE- AND DOUBLE-WALLED VACUUM TEST METHOD
Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities
Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115
Facility I.D.#: 4001798 Phone #: 801-535-6904
Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24
This procedure is to test the leak integrity of single- and double-walled spill buckets. See PEI/RP1200 Section 6.2 for hydrostatic test
method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method.
Tank Number 1 2
Product Stored RUL DL
Spill Bucket
Capacity 5-Gallon 5-Gallon
Manufacturer OPW OPW
Construction ☐Double-walled
☒Single-walled
☐Double-walled
☒Single-walled
☐Double-walled
☐Single-walled
☐Double-walled
☐Single-walled
Test Type
☒Hydrostatic
☐Vacuum
☐Double-walled
☐Single-walled
☒Hydrostatic
☐Vacuum
☐Double-walled
☐Single-walled
☐Hydrostatic
☐Vacuum
☐Double-walled
☐Single-walled
☐Hydrostatic
☐Vacuum
☐Double-walled
☐Single-walled
Spill Bucket Type ☒Product
☐Vapor
☒Product
☐Vapor
☐Product
☐Vapor
☐Product
☐Vapor
Liquid and debris remove from spill
bucket?* ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
Visual Inspection (no cracks, loose
parts or separation of the bucket from
the fill pipe.)
☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
Tank Riser cap included in test? ☒Yes ☐No
☐NA
☒Yes ☐No
☐NA
☐Yes ☐No
☐NA
☐Yes ☐No
☐NA
Drain valve included in test? ☐Yes ☐No
☒NA
☐Yes ☐No
☒NA
☐Yes ☐No
☐NA
☐Yes ☐No
☐NA
Starting Level 13 9/16” 13 1/8”
Test Start Time 10:39 10:39
Ending Level 13 9/16” 13 1/8”
Test End Time 11:39 11:39
Test Period 1 Hour 1 Hour
Level Change 0” 0”
Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only: Maintain at least 26 inches water
column; Vacuum double-walled: maintain at least 12 inches water column.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments:
*All liquids and debris must be disposed of properly
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
UST OVERFILL EQUIPMENT INSPECTION
AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE
Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities
Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115
Facility I.D.#: 4001798 Phone #: 801-535-6904
Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24
This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures.
Product Grade RUL DSL
Tank Number 1 2
Tank Volume, gallons 543 966
Tank Diameter, inches 47.63 47.75
Overfill Prevention Device Brand OPW OPW
Type ☒ Automatic
Shutoff Device
☐ Ball Float
Valve
☒ Automatic
Shutoff Device
☐ Ball Float
Valve
☐ Automatic
Shutoff Device
☐ Ball Float
Valve
☐ Automatic
Shutoff Device
☐ Ball Float
Valve
AUTOMATIC SHUTOFF DEVICE INSPECTION
1. Drop tube removed from tank? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
3. Float moves freely without binding and poppet moves
into flow path? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
4. Bypass valve in the drop tube open and free of
blockage (if present)?
☒Yes ☐No
☐Not Present
☒Yes ☐No
☐Not Present
☐Yes ☐No
☐Not Present
☐Yes ☐No
☐Not Present
5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" to any item in Lines 1-5 indicates a test failure.
BALL FLOAT VALVE INSPECTION**
1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
5. Ball float pipe proper length to restrict flow to 90%
capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" to any item in Lines 1-5 indicates a test failure.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments:
*Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity.
**If a ball float valve is found to fail the inspection, another method of overfill must be used.
***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
CONTAINMENT SUMP INTEGRITY TESTING
HYDROSTATIC TESTING METHOD
Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities
Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115
Facility I.D.#: 4001798 Phone #: 801-535-6904
Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24
This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the inspection procedure.
Containment Sump ID RUL STP DSL STP UDC
Containment Sump Material Poly Poly Poly
Liquid and debris removed from sump?* ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
Visual Inspection (No cracks, loose parts or separation of
the containment sump.) ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
Containment Sump Depth 21” 21” 28”
Height From Bottom to Top of Highest Penetration 10” 7” 6”
Starting Water Level 14 1/8” 10 13/16” 10 3/4”
Test Start Time 10:39 10:39 10:39
Ending Water Level 14 1/8” 10 13/16” 10 3/4”
Test End Time 11:39 11:39 11:39
Test Period (Minimum test time: 1 hour) 1 Hour 1 Hour 1 Hour
Water Level change 0” 0” 0”
Pass/fail Criteria: Must pass visual inspection. Water level drop of less than 1/8 inch.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail
Comments:
*All Liquids and debris must be disposed of properly.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
PIPING SECONDARY CONTAINMENT INTEGRITY TESTING
Facility Name: SLC Fire Dept. Sta. #9 Owner: Salt Lake Public Utilities
Address: 5822 West Amelia Earhart Drive Address: 1530 West Temple
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84115
Facility I.D.#: 4001798 Phone #: 801-535-6904
Testing Company: Westech Phone #: 801-266-2545 Date: 11/21/24
This procedure is to test the integrity of the interstitial space of double-walled piping. See PEI/RP1200 Section 5 for the test procedure.
Tank Number 1 2
Piping Run Only Only
Piping Material Flex Flex
Product Stored RUL DSL
Test Start Time 10:39 10:39
Initial Test Pressure, psig (test procedure specifies 5 psig.) 5 5
Test End Time 11:39 11:39
Final Test Pressure, psig 5 5
Pressure Change (No reduction in pressure allowed for
pass.) 0 psi 0 psi
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature