Loading...
HomeMy WebLinkAboutDDW-2024-006525COTTONWOOD MUTUAL WATER COMPANY 400,000 GALLON REINFORCED CONCRETE WATER STORAGE UPPER TANK MARCH 2024 CO V E R S H E E T Sheet Index COVER SHEET G-1 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y PD S T I G E R S ERE G JASON BRADFORD A OET F T I NEER A HTU S NO. 5148332 EFO SR E N L O N A I 40 0 , 0 0 0 G A L L O N U P P E R T A N K GENERAL NOTES G-2 GE N E R A L N O T E S · · · BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K ..\ R E F E R E N C E \ P h o t o \ 2 0 0 4 A e r i a l s \ M I D P o r t i o n . j p g ER O S I O N C O N T R O L P L A N EROSION CONTROL PLAN G-3 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K CO B B L E C R E E K RE S E R V O I R SI T E P L A N SITE PLAN C-1 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K PI P E P R O F I L E S A N D T A N K S E C T I O N S TANK SECTIONS C-2 B OVERFLOW LINE PROFILE AND TANK SECTION A TRANSMISSION LINE PROFILE AND TANK SECTION BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K ..\ R E F E R E N C E \ P h o t o \ 2 0 0 4 A e r i a l s \ M I D P o r t i o n . j p g AC C E S S R O A D P L A N ACCESS ROAD PLAN C-3 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K CO B B L E C R E E K RE S E R V O I R AC C E S S R O A D P R O F I L E ACCESS ROAD PROFILE C-4 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K ACCESS ROAD PROFILE TYPICAL ACCESS ROAD CROSS SECTION 3 - 1 Floor Plan C Tank Piping Elevation 5 Tank Piping Plan 2 Floor Joint Detail 3 Wall Vertical Joint Detail BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K TA N K F L O O R P L A N & P I P I N G D E T A I L S FLOOR PLAN & SECTIONS T-1 4 9" Waterstop Detail TANKSUPPORT BRACKET DETAIL N.T.S. D Wall Section E Pedestal Column Footing F Section @ Center of Tank Column Section BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K TA N K S T R U C T U R A L S E C T I O N S STRUCTURAL SECTIONS T-2 TANK 6 Ring Bar Splices Staggering of 7 Roof Plan 8 Drop Panel Detail 10 Roof-Wall Detail 9 Roof Slab Construction Joint BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K TA N K R O O F D E S I G N & S E C T I O N S ROOF DESIGN & SECTIONS T-3 TANK 1'-4" - H 2'-0" 12" (TYP) 1'-9" CL INTERIOR LADDER, ROOF HATCH, AND VENT NOTES: 3"Ø SCH 40 PIPE TYP L 4" x 4" x 1/4" x 36" LONG 4'-0" 25" 6" GRATING 1 1/2" - L 8"6'-0" - K 1'-6" ALIGN LADDER RUNG WITH OVERFLOW ELEVATION (5525.0') AND PAINT RUNG BLUE WITH NSF APPROVED PAINT AND THEN SPACE OTHER RUNGS @ 12" O.C. H Ladder Rung Not to Scale 13 Interior Ladder and 4' x 6' Hatch Not to Scale 4' x 6' EJ WLS1 ROOF HATCH (OR EQUAL) MODIFY FOR NO PENETRATIONS, ELIMINATE HANDLE AND REPLACE w/ CONCEALED PADLOCK HASP ON THE SIDE 1 2 3 4 5 6 7 8 9 10 Anchor Ladder to Wall at 5' Max. Spacing SAF-T-CLIMB RAIL ALL MATERIAL FOR PIPE SIDERAILS, RUNGS, BRACKETS, SAF-T-CLIMB AND BASE PLATES TO BE 6061-T6 ALUMINUM. ROOF HATCH GRATING TO BE FIBERGLASS OR 6061-T6 ALUMINUM. LADDER RUNGS TO BE SOLID RODS. ALL WELDS TO BE 1/4" MINIMUM. ROOF HATCHES TO BE MANUFACTURED OF ALUMINUM. ALL MATERIAL IN CONTACT WITH CONCRETE SHALL BE COATED WITH A HEAVY BITUMASTIC COATING OR EPOXY PAINT. USE SS 316 FOR ALL BOLTS UNLESS NOTED OTHERWISE. WHERE SS BOLTS ARE IN CONTACT WITH DISSIMILAR METALS, USE INSULATING SLEEVES AND PHENOLIC WASHERS TO ELECTRICALLY ISOLATE THE BOLTS. THE CONTRACTOR SHALL ADD A 1-INCH CONDUIT BETWEEN THE PLC PANEL AND THE HATCH. CONDUIT WITHIN THE TANK SHALL BE PVC COATED GRS. CONDUIT SHALL PENETRATE THE HATCH CURB WALL WITH THE END ACCESSIBLE FROM THE HATCH OPENING. FLEX CONDUIT MAY BE USED FROM THE END OF THE CONDUIT TO THE SWITCH. DORSETT CONTROLS TO PROVIDE SCADA/INSTRUMENTATION FOR TANK INCLUDING FURNISH AND INSTALL HATCH ALARM, PRESSURE TRANSDUCER, SOLAR PANEL AND PLC. CONTRACTOR TO FURNISH & INSTALL CONDUIT FROM NEMA BOX TO PLC. DORSETT CONTROLS TO PROVIDE SCADA PROGRAMMING AS DIRECTED BY CMWC. ERIC TURNER, DORSETT CONTROLS, 855-387-2232 EXT 3301. 1"Ø BAR, EXTEND BAR 1" INTO 3"Ø PIPES 24 - #4 BARS WITH 6" HOOK AT 12" OC WITH 6 - #4 PERIMETER BARS G Ladder Side View Not to Scale 3'-0" 1/2"Ø SS EXP BOLT (TYP) 12" (TYP) 4'-0" 3'-0" 1/2"Ø SS EXP BOLT (TYP) 6" 2" 2" 7'-4" 5' - 4 " 4 1/2" 12" 2" 8"4'-0"8" 5'-4" L4x4x1/4 (TYP)7" 1'-6" 2" K Section Not to Scale J Section Not to Scale L Section (Roof Hatch Not Shown)Not to Scale 6" PVC WATERSTOP ALL AROUND L6x4x1/2 x 5" LONG (TYP) SEE SECTION H FOR LADDER DETAILS 1/4" SS WIRE ROPE W/HEAVY DUTY HOOK 3'-0" x 3'-11", 100 PSF GRATING, BOLT TO 2 - 3'-0" LONG L4x4x1/4, USING 3 - 1/2"Ø SS BOLTS AT 12" OC PER ANGLE 8" CURB (ALL AROUND) Hatch Hinge - H 1" PVC TO SCADA PANEL PRESSURE TRANSDUCER LOCATED 6" ABOVE FLOOR (INSTALLED BY OTHERS) (2)WALL SLEEVES INSTALLED DURING POUR W/ LINKSEAL 1'-6" PVC COATED GRS CONDUIT INTRUSION ALARM SWITCH (INSTALLED BY OTHERS) PROVIDE 14" X 14" X 6" DEEP NEMA 4 BOX MOUNTED TO TANK WITH UNISTRUT 6" X 6" CONDUIT PULL BOX UNISTRUT SUPPORT HOLDING PVC AWAY FROM WALL 2" PVC COATED GRS CONDUIT ATTACHED TO WALL DRILL (4) 3/8" HOLES EVERY 8" IN PVC PIPE 3' - 6 " MI N . 10 " 180° BEND 14" 14" 6" SEAL RING ALL AROUND 6" STEEL PIPE ROOF REINFORCING NOT SHOWN FOR CLARITY SEE TANK DESIGN PLANS NOTE: HOT DIP GALVINIZE ALL PARTS EXCEPT SCREEN AND BOLTS AFTER WELDING COMPLETED. 6" RAISED FACE FLANGE TOP AND BOTTOM TO HOLD SCREEN STAINLESS STEEL BOLTS SIZE TO FIT FLANGE 1/4" SCREEN AND #14 WIRE MESH STAINLESS STEEL WIRE SCREEN 11 Roof Vent Not to Scale 30" DIA. CONCRETE CAP 18 " 12" 4" PERFORATED DRAIN PIPE ADS SERIES N-12 OR EQUAL 3/4" WASHED ROCK (18" MIN BELOW FOOTING PER GEOTECHNICAL REPORT)30 MIL PVC LINER (LOCATED 6" BELOW FOOTING) 10 OUNCE NON-WOVEN GEOTEXTILE FABRIC 4" PVC CLEANOUT BROUGHT TO THE SURFACE AND CAPPED 12"12" 6" BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K TA N K D E T A I L S TANK DETAILS D-1 3.6.2024 12 Foundation Drain Detail NTS TA N K V A L V E V A U L T TANK VALVE VAULT D-2 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K 14 Valve Vault Plan- M Valve Vault Section- 15 AIR-VAC ASSEMBLY N.T.S. FL O W M E T E R A N D D R A I N V A L V E M A N H O L E S FLOW METER MANHOLE D-3 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K 16 Flow Meter Manhole- N Flow Meter Section- SC A D A S I T E P L A N SCADA SITE PLAN S-1 BT E n g i n e e r i n g FOR: CONTACT: NO. PROJECT NO.: DATE DATE: DRAWN BY:CHECKED BY: PROJECT MANAGER: REVISION BY JB T. TIMOTHY TT 007.23.001 MARCH 2024 - - COTTONWOOD MUTUAL WATER CO. - - CO T T O N W O O D M U T U A L W A T E R C O M P A N Y 40 0 , 0 0 0 G A L L O N U P P E R T A N K