HomeMy WebLinkAboutDERR-2024-004831Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name LOVES COUNTRY STORES
Address PO BOX 26210
OKLAHOMA CITY, OK 73126
Contact LOVES COUNTRY STORES
Phone
Email chris.weldon@loves.com
TANK LOCATION
Name LOVE'S TRAVEL STOP #581
Address 1915 S STATE STREET
SALINA, UT 84654
A Operator Zach Moore
Phone (405) 242-2455
B Operator SAME
Phone SAME
Facility ID: 2000749 Inspection Date: 03/04/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
2 - 3/4 Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
3 - 5/6 Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
4 - 7/8 Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
5 - 9/10 Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
6 -
11/12
Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
7 -
13/14
Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
8 -
15/16
Gas/Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
9 - 17
Main
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
10 -
18M/17S
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
11 -
19M/18S
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
12 -
20M/19S
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
13 -
21M/20S
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
14 -
22M/21S
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes Yes March
11,
2022
None
15 - 22
Sat
Diesel Yes Steel Flex in Sump Aug.
22,
2014
Aug.
22,
2014
Yes No March
11,
2022
None
TANK DETAILS
2024-03-04 Page 1 of 14
Tank ID/Alt ID 2 / 2
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 20000 / East
Center
Substance
Stored Diesel / B99 Biodiesel
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Siphon Bar / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 3 / 3
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 20000 / East
Center
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG /
LTT Test None
LLD Test Oct. 9, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 4
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 20000 / Center
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Siphon Bar / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
2024-03-04 Page 2 of 14
Tank ID/Alt ID 5 / 5
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 20000 / West
Center
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Oct. 9, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 6 / 6A
E-Gen/AST No / No
Siphon/Compart Yes / Yes
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 12000 / West
Center
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Siphon Bar / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Overfill alarm / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 7 / 6B
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 8000 / West
Center
Substance
Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Oct. 9, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Overfill alarm / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
2024-03-04 Page 3 of 14
Tank ID/Alt ID 8 / 7
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 5, 2014 / 20000 / West
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Oct. 9, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Overfill alarm / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-03-04 Page 4 of 14
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 2 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 2 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
2024-03-04 Page 5 of 14
Tank 3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 3 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 4 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 3 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 3 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
2024-03-04 Page 6 of 14
Tank 4 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 4 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
Tank 5 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 4 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 5 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 5 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-03-04 Page 7 of 14
Tank 5 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 5 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
Tank 6A Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 6A Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 5 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6A Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 6A Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 6A ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 6A ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
2024-03-04 Page 8 of 14
Tank 6A Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6B Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 6B Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 6B Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 7 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 7 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 7 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6B Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 6B ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 6B ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
2024-03-04 Page 9 of 14
Tank 7 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 7 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 7 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
DISPENSER RESPONSES
2024-03-04 Page 10 of 14
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 7/8
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 11/12
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 15/16
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 9/10
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 13/14
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-03-04 Page 11 of 14
Dispenser 18M/17S
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 20M/19S
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 22M/21S
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 17 Main
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 19M/18S
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 21M/20S
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 22 Sat
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-03-04 Page 12 of 14
MONTHLY LEAK DETECTION MONITORING
Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 7 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 8 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-03-04 Page 13 of 14
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record
Created:
March 4, 2024, 11:54
a.m.
Inspection
Date:March 4, 2024
2024-03-04 Page 14 of 14