Status Update - Former ABF Freight Site LUST Corrective Action Program
<DavidWilson.Wilson@tetratech.com>
to me, Curt, carl.duke, Ma hew, Aaron
Wilson, DavidWilson
Hello Liberty –
As we discussed by phone yesterday, I am providing this email follow-up and status update regarding Larry H. Miller’s (CTP D
former ABF Freight LUST Site (Site).
During 2024, Tetra Tech has supported CTP DEV by performing routine operation and maintenance of the existing remediatio
northwest corner of the site. During early October 2024, the remaining four USTs that were operated by ABF Freight were pe
DERR oversight by DeAnn Rasmussen, and the tanks were observed to have released diesel fuel based on visual observatio
the property has been shut off in anticipation of demolition activities, and as such – the existing remedial system is no longer
Because these four USTs have PST Fund insurance coverage and the original Diesel LUST release does not, CTP DEV and
(PST RA Branch), plus Mike Pecorelli and his assigned project manager (PST EAP Branch), to develop a wholistic approach
concurrently. The following next steps are anticipated as part of this work in accordance with the LUST program regulations:
1. Spackman Enterprises will submit to DERR the UST Closure Report with the laboratory results for the recent four U
2. CTP DEV and Tetra Tech would like to meet with DERR’s assigned Project Managers, Branch Managers, and Morgan
approach for correc ve ac on.
3. Tetra Tech will submit a revised Correc ve Ac on Plan (CAP) presen ng the approach for advancing overall Site rem
4. Tetra Tech is coordina ng with subcontractors to remove free liquids from tanks, piping, and oil-water separators,
corner of the Site prior to site demoli on.
5. CTP DEV and its contractor will demolish above-ground structures and floor slabs/founda ons to enable access fo
6. CTP DEV will retain (a) remedia on contractor(s) to implement the program presented in the CAP.
7. Tetra Tech will support CTP DEV with environmental oversight and technical direc on during CAP implementa on
comple on of the work to pursue LUST site closure for both releases.
Mail
Chat
Meet