Loading...
HomeMy WebLinkAboutDRC-2024-007630November 21, 2024 CD-2024-238 Mr. Doug Hansen Director Division of Waste Management and Radiation Control 195 North 1950 West Salt Lake City, UT 84114-4880 Subject: EPA ID Number UTD982598898 Radioactive Material License UT2300249 Follow up to Potential Discrepancy with Shipment 1072-07-0875 Dear Mr. Hansen, In a letter dated November 15, 2024 (CD-2024-234), EnergySolutions notified the Director of the Division of Waste Management and Radiation Control of a potential discrepancy from shipment 1072-07-0875; Bates Number L140077 (GSAP 2011011105). As described previously; while performing the Radiological Acceptance Survey on November 14, 2024, dose rates that exceed the limits from Department of Transportation (DOT) 49 CFR Part 173.441, Radiation level limitations and exclusive use provisions, and Nuclear Regulatory Commission (NRC) 10 CFR 71.47, External radiation standards for all packages, were obtained. Shipment 1072-07-0875, consisting of Demolition Debris from the Omaha Public Power District (OPPD) Fort Calhoun Nuclear Generating Station (FCS) Decommissioning Project destined for direct disposal at LLRW, was moved into the Restricted Area and the generator notified. The Radiological Acceptance Survey from Railcar FURX322364 (see attached) performed in the field yielded results with the highest contact dose rate at 765 mR/hr with instrument model L-3078 (serial number 25023333) and a confirmational contact dose rate at 744 mR/hr was taken with model L-78 (serial number 234101), where DOT limits in 49 CFR 173.441 and NRC limits in 10 CFR71.47 prohibit dose rates in exceedance of 200 m/R/hr at any point on the external surface of the package. Railcar FURX322364 was managed at Clive in the Rotary Facility on November 15, 2024. A Radiological Survey (see attached) was performed on the dumped material to find that the high dose rates were due to a small piece of concrete/rubble with contact dose rates as high as 986 mR/hr contact (see attached). It is believed that this small piece was shielded at the time of the DOT-compliant departure survey. Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 2 As part of immediate corrective actions associated with waste stream 1072-07, on November 14, 2024, OPPD suspended both the loading of railcars and all future shipments, until objective evidence from corrective actions is established within their Corrective Action Program. However, prior to issuing the stop shipment order for Railcar FURX322364, the following 12 additional railcars containing waste from 1072-07 were already in transit and will arrive at the Clive facility prior to the implementation of any corrective actions: Expected Arrival Railcar Number Shipment number 11/27/2024 FURX322336 1072-07-0893 11/27/2024 FURX322504 1072-07-0892 11/27/2024 FURX322355 1072-07-0891 11/27/2024 FURX322519 1072-07-0890 11/27/2024 FURX322402 1072-07-0889 11/27/2024 FURX322360 1072-07-0888 11/27/2024 FURX322540 1072-07-0887 11/27/2024 FURX322590 1072-07-0886 11/27/2024 FURX322372 1072-07-0885 11/27/2024 FURX322518 1072-07-0884 11/27/2024 FURX322403 1072-07-0883 11/27/2024 FURX322585 1072-07-0882 Since these railcars underwent routine comprehensive external surveys and inspections prior to their dispatch from OPPD, it is unlikely that load shifting similar to what was suspected with Railcar FURX322364 will result in excessive external dose rates. Nevertheless, these railcars will be thoroughly inspected and undergo Radiological Surveys upon arrival at the Clive facility to ensure compliance with DOT requirements and Clive’s Incoming Shipment Procedures. In addition to the immediate corrective actions outlined above, OPPD has developed a detailed plan to address both short-term and ongoing actions, as outlined in the “Fort Calhoun Waste Loading Operations Action Plan OPPD CR-2024-00198” Memo to file (see attached). Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 3 Condition Report CR-2024-1090 has been generated to track actions associated with this issue. Please consider this the follow-up written notification (required in Radioactive Materials License UT2300249, Condition 68) for this discrepancy. Should there be any questions regarding this notification, please contact me at 801-649- 2043. Sincerely, Steve D. Gurr Environmental Engineer and Manager I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 5 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 6 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 7 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 8 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 9 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 10 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 11 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 12 Mr. Doug Hansen November 21, 2024 CD-2024-238 Page 13