Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2024-007468
Deq submit <dwmrcsubmit@utah.gov> Fwd: 2024 ES CAW PH6 Cover Sch Update 11.06.24.pdf 1 message LLRW DWMRC <llrw@utah.gov>Thu, Nov 7, 2024 at 6:05 AM To: Deq submit <dwmrcsubmit@utah.gov> DRC ---------- Forwarded message --------- From: Shauna L. Watkins <slwatkins@energysolutions.com> Date: Thu, Nov 7, 2024 at 5:36 AM Subject: 2024 ES CAW PH6 Cover Sch Update 11.06.24.pdf To: carlo Romano (cromano@utah.gov) <cromano@utah.gov>, LLrw@utah.gov <LLrw@utah.gov> Cc: James M. Cason <jmcason@energysolutions.com>, Todd L. Stewart <tlstewart@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com> Please find the PDF attached of the schedule for Phase 6. SHAUNA WATKINS Quality Assurance Specialist ENERGYSOLUTIONS LLC 2235 S Saltbush Rd Grantsville, Ut 84029 O: 801-649-2072 C: 435-882-7841 slwatkins@energysolutions.com 2024 ES CAW PH6 Cover Sch Update 11.06.24.pdf 86K 11/7/24, 3:39 PM State of Utah Mail - Fwd: 2024 ES CAW PH6 Cover Sch Update 11.06.24.pdf https://mail.google.com/mail/b/AEoRXRQVbZYBW4bJ239iohMPJJr30jp_WbpIyqof_-ityjRQxreM/u/0/?ik=adf9d5e615&view=pt&search=all&permthid=t…1/1 Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % JUL 2024 AUG SEP OCT NOV DEC Project Duration Summary 100 Total Working Days 59 *3 *20AUG24 A 08NOV24 95 110 Total Calendar Days 81 *3 *20AUG24 A 08NOV24 96 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 86 *0 *15JUL24 A 08OCT24 A 100 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 0 27SEP24 A 08OCT24 A 100 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 21 *1 *09OCT24 A 06NOV24 95 410 Type B Filter Zone Placement & Grading 6 0 09OCT24 A 11OCT24 A 100 420 Sacrificial Soil Placement & Grading 7 0 10OCT24 A 17OCT24 A 100 430 Type A Filter Zone Placement 7 0 17OCT24 A 23OCT24 A 100 440 Type B Rip Rap Placement & Grading 7 0 24OCT24 A 29OCT24 A 100 450 Type A Rip Rap Placement 6 0 30OCT24 A 04NOV24 A 100 460 Type A & Type B Rip Rap Tie-in and Access Way 4 1 04NOV24 A 06NOV24 80 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *1 *05NOV24 A 07NOV24 67 510 Provide and Place 8 oz. Geotextile / Sandbags 3 1 05NOV24 A 07NOV24 67 520 Inspection / Haul Road W/30-30 Combi Grid 4 1 05NOV24 A 07NOV24 75 Completion & Certification 700 Project Cleanup & Demobilization 2 1 06NOV24 A 08NOV24 50 710 Project Completed & Accepted 0 0 08NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early barProgress barCritical bar Summary bar Progress point Critical pointSummary pointStart milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 06NOV24 D.Cummings SM DC 30OCT24 D.Cummings KC DC 23OCT24 D.Cummings SM DC 14OCT24 D.Cummings SM DC Start date 20JUN24 Finish date 08NOV24 Data date 06NOV24 Run date 06NOV24 Page number 1A © Primavera Systems, Inc.