Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2024-007427
Deq submit <dwmrcsubmit@utah.gov> Fwd: 2024 ES CAW PH6 Cover Sch Update 10.30.24.pdf 1 message LLRW DWMRC <llrw@utah.gov>Mon, Nov 4, 2024 at 6:25 AM To: Deq submit <dwmrcsubmit@utah.gov> DRC ---------- Forwarded message --------- From: Shauna L. Watkins <slwatkins@energysolutions.com> Date: Thu, Oct 31, 2024 at 5:47 AM Subject: 2024 ES CAW PH6 Cover Sch Update 10.30.24.pdf To: carlo Romano (cromano@utah.gov) <cromano@utah.gov>, LLrw@utah.gov <LLrw@utah.gov> Cc: Dave Booth <dbooth@energysolutions.com>, James M. Cason <jmcason@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com>, Todd L. Stewart <tlstewart@energysolutions.com> Please find the PDF attached. UPDATED schedule. SHAUNA WATKINS Quality Assurance Specialist ENERGYSOLUTIONS LLC 2235 S Saltbush Rd Grantsville, Ut 84029 O: 801-649-2072 C: 435-882-7841 slwatkins@energysolutions.com Download the free Adobe Acrobat Reader to view and comment on this PDF. https://www.adobe.com/go/reader_download --------- Sent From Adobe Acrobat Reader 2024 ES CAW PH6 Cover Sch Update 10.30.24.pdf 85K 11/4/24, 3:30 PM State of Utah Mail - Fwd: 2024 ES CAW PH6 Cover Sch Update 10.30.24.pdf https://mail.google.com/mail/b/AEoRXRRPubMuWfYXwAdft_yUAbo8XtDEAmEdd-67zpOzDMle4S9B/u/0/?ik=adf9d5e615&view=pt&search=all&permt…1/1 Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % JUL 2024 AUG 2025 SEP OCT NOV DEC JAN Project Duration Summary 100 Total Working Days 64 *13 *20AUG24 A 15NOV24 80 110 Total Calendar Days 88 *17 *20AUG24 A 15NOV24 81 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 86 *0 *15JUL24 A 08OCT24 A 100 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 0 27SEP24 A 08OCT24 A 100 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 23 *8 *09OCT24 A 08NOV24 65 410 Type B Filter Zone Placement & Grading 6 0 09OCT24 A 11OCT24 A 100 420 Sacrificial Soil Placement & Grading 7 0 10OCT24 A 17OCT24 A 100 430 Type A Filter Zone Placement 7 0 17OCT24 A 23OCT24 A 100 440 Type B Rip Rap Placement & Grading 7 1 24OCT24 A 30OCT24 86 450 Type A Rip Rap Placement 6 6 01NOV24 08NOV24 0 460 Type A & Type B Rip Rap Tie-in and Access Way 4 4 05NOV24 08NOV24 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *3 *11NOV24 13NOV24 0 510 Provide and Place 8 oz. Geotextile / Sandbags 3 3 11NOV24 13NOV24 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 08NOV24 13NOV24 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 14NOV24 15NOV24 0 710 Project Completed & Accepted 0 0 15NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early barProgress barCritical bar Summary bar Progress point Critical pointSummary pointStart milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 30OCT24 D.Cummings KC DC 23OCT24 D.Cummings SM DC 14OCT24 D.Cummings SM DC 10OCT24 D.Cummings SM DC Start date 20JUN24 Finish date 15NOV24 Data date 30OCT24 Run date 30OCT24 Page number 1A © Primavera Systems, Inc.