Loading...
HomeMy WebLinkAboutDAQ-2024-011931FGenpak TO: Executive Secretary, Utah Air Quatity Board From: Genpak, LLC RE: Monitoring Report for Permit #2100036004 Date: 10114/2024 ln accordance with Operating Permit provision 1.S.2.a, and Utah Administratlve Code (UAC) R307-415-6a(3XcXi), the fol.l,owing monitoring report is summitted. This report covers the period ot: 0410112024 to 10/01 12024 For the indicated reporting period: o 05/02,05,0712024 RTO report temperatures tess than 1 ,260 degrees due to a ftame faiture. Ftame faited for 18 minutes; 25 minutes; and 24 minutes; due to the cootdown faited to open. Damper changed on 5lBl2O24 o 08107 /2024 RTO report temperatures less than 1 ,260 degrees due to a microburst storm the caused the ftame to fail.. ln accordance with Operating Permit provision l.K. and UAC R307-415-5d and based on information and betief formed after reasonabte inquiry, I certify that the statements and information in this document are true, accurate and comptete. Eric Scott, Ptant Manager 2791 W UT HWY 56 Cedar City, UT 84720 435-865-7025 REVIEWED Initials JBR Date 10/22/24 with dev rpt Comp Status Meets File # 11767 Blue 2