HomeMy WebLinkAboutDAQ-2024-011928Central Valley Water
Recla mation
Fa cility
September 16,2024
DEPAIITMENT OF
ENVIHONMENTAL OUALITY
sEP 2 3 2024
DIVISION OF AIR OUALITY
Mr. Bryce Bird, Director
Division of Air Quality
Utah Department of Environmental Quality
P.O. Box 144820
Salt Lake city, Utah 84114-4820
Subject: Six-month Monitoring Report for Central Valley WRF
(Permit # 3500191001)
Dear Mr. Bird:
In accordance with Title V Operating Permit provision I.S.2.a, and Utah Administrative Code
(UAC) R307-415-6a(3)(c)(i), we respectfully submit the attached six-month monitoring report
for the period ending 91112024.
Should you have any questions or comments please feel free to contact Bryan Mansell of my
office.
Sincerely,
CENTRAL VALLEY WATER RECLAMATION FACILITY&z//L-'
Phillip Heck, Ph.D., P.E.
General Manager
Cc: I-larold Burge, Utah Division of Air Quality
Joseph Randolph, Utah Division of Air Quality
Brandon Heidelberger, CVWRF Assistant General Manager
Bryan Mansell, CVWRI' Chief Engineer
Sharon Burton, CVWRF Plant Superintendent
Zack VanWorrner, CVWRF Cogen Supervisor
Attachments:
Six-Month Monitoring Report for Period: 31112024 to 91112024
Board Members
Debra Armstrong, Chair
Don Russell, Vice Chair
Kim Galbraith
Brett Hales
Cheryle Hatch
l,eAnne Huff
Keith l-ord
General Manager
Phillip Heck, Ph.D., P.E.
800 west central valley Road, Salt Lake city, uT 841 19-3379 . (801 ) 973-9100 . (801) 973-9280
REVIEWED
Initials JBR Date 11/17/24
Comp Status Meets
File # 10414 Blue 2
Six- 14 ont h M onit or ing Re port
cl'ryRF Permit #3500 I 9 I 00 I
September 16,2021
Page I of 2
SIX-MONTH MONITORING REPORT
Central Valley Water Reclamation Facility l-.- UTAiJ n'+,^'"i1\/F
Permit No. 3500191001 I Frr'jv!]39r\'MqNrAL ouALlrY
To: Director, Utah Air Quality Board
FROM: Central Valley Water Reclamation Facility
RE: Six-Month Monitoring Report for Permit No. 3500191001
DATE: September 16,2024
In accordance with Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC)
R3 07-4 I 5-6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from March 1 ,2024 to Septemb er 1,2024
For the indicated reporting period:
X There were no deviations from any permit requirements.
tr Attached is a list of the permit requirements for which there were deviations. The
list includes the information required by Operating Permit provision I.S.2.a and
UAC R307-a I s-6a(3)(c)(i).
n In lieu of attaching the above list, deviation reports submitted in accordance with
permit provision I.S.2.c and UAC R307-415-6a(3)(c)(ii) are referenced below.
Date of deviation report Permit condition for which deviation was reported
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on
information and belief formed after reasonable inquiry, I certiff that the statements and
information in this document are true, accurate, and complete.
'//te lzuz't
Date I
Phillip Heck, Ph.D., P.E.
General Manager
DI\/ISION OF AIR QLIALITY
Signature of nsible Official
Six-Month Monitoring Report
cvwRF Permit #3500 I 9 I 00 I
September 16,2024
Page 2 of2
Attachment 1, Deviation List
Date of deviation Permit condition for
which deviation
occurred
Probable cause of
deviation
Corrective actions
and preventative
measures taken