Loading...
HomeMy WebLinkAboutDERR-2024-012736 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 PRODUCT PIPING INTEGRITY TESTING Facility Name: Salt Lake City Cemetery Owner: Salt Lake Public Utilities Address: 200 North N Street Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84103 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4000842 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 10/21/24 This procedure is to test the integrity of product piping. Tests were performed with Petro-Tite line tester. Tank Number 1 2 Product Stored RUL DSL Piping Run Only Only Piping Type FRP FRP Test Pressure (PSI) 50 50 Test Duration (minutes) 30 30 Leak Rate (GPH) 0.002 0.002 Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature RUL DSL RULDSL WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 MECHANICAL AND ELECTRONIC LINE LEAK DETECTOR PERFORMANCE TESTS Facility Name: Salt Lake City Cemetery Owner: Salt Lake Public Utilities Address: 200 North N Street Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84103 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4000842 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 10/21/24 This data sheet can be used to test the mechanical line leak detector (MLLD) and electronic line leak detector (ELLD) with submersible turbine pump (STP) systems. See PEI/RP 1200 Sections 9.1 and 9.2 for test procedures. Line Number 1 2 Product Stored RUL DSL Leak Detector Manufacturer Red Jacket Red Jacket Leak Detector Model PLLD PLLD Type Of leak Detector ☐MLLD ☒ELLD ☐MLLD ☒ELLD ☐MLLD ☐ELLD ☐MLLD ☐ELLD MLLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG) STP full operating pressure Check valve holding pressure Line resiliency (ml) (line bleedback volume as measured from check valve holding pressure to 0 psig) Step through time in seconds (time the MLLD hesitates at metering pressure before going to full operating pressure as measured from 0 sig with no leak induced on the line) Metering pressure (STP pressure when simulated leak rate 3 gph at 10 psig) Opening time in seconds (the time the MLLD opens to allow full pressure after simulated leak is stopped) Does the STP pressure remain at or below the metering pressure for at least 60 seconds when the simulated leak is induced? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Does the leak detector reset (trip) when the line pressure is bled off to zero psig? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Does STP properly clycle on/off under normal fuel system operating conditions? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" answer to any of the above questions indicates that the MLLD fails the test. ELLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG) STP full operating pressure 31 29 How many test cycles are observed before alarm/shutdown occurs? 1 1 Does the simulated leak cause on alarm? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" answer to the above question indicates that the ELLD fails the test. Does the simulated leak cause an STP shutdown? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 AUTOMATIC TANK GAUGE OPERATION INSPECTION Facility Name: Salt Lake City Cemetery Owner: Salt Lake Public Utilities Address: 200 North N Street Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84103 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4000842 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 10/21/24 This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection procedure. This procedure is applicable to tank monitor stems that touch the bottom of the tank when in place. Tank Number 1 2 Product Stored RUL DSL ATG Brand and Model TLS-350 TLS-350 1. Tank Volume, gallons 6,215 6,215 2. Tank Diameter, inches 90.75 90.75 3. After removing the ATG from the tank, it has been inspected and any damaged or missing parts replaced? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Float moves freely on the stem without binding? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Fuel float level agree with the value programmed into the console? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 6. Water float level agree with the value programmed into the console? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 7. Inch level from the bottom of the stem when 90% alarm is triggered? 76.5 76.5 8. Inch level at which the overfill alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No 9. Inch level from the bottom when the water float first triggers an alarm? 1 1 10. Inch level at which the water float alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No If any answers in Lines 3, 4, 5, or 6 are "No" the system has failed the test. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Battery OK Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 LIQUID SENSER FUNCTIONALITY TESTING Facility Name: Salt Lake City Cemetery Owner: Salt Lake Public Utilities Address: 200 North N Street Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84103 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4000842 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 10/21/24 This procedure is to determine whether liquid sensors, located in the interstitial spaces of the UST systems, are able to det ect the presence of water and fuel. See PEI/RP1200, Section 8.3 for the test procedure. Sensor Location L-1 INT L-2 INT L-3 STP L-4 STP L-5 UDC Product Stored DSL RUL DSL RUL RUL/DSL Type of Sensor ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating Test Liquid ☐ Water ☐ Product ☐ Water ☐ Product ☒ Water ☐ Product ☒ Water ☐ Product ☒ Water ☐ Product ☐ Water ☐ Product ☐ Water ☐ Product Is the ATG Console clear of any active or recurring warnings or alarms regarding the leak sensor? If the sensor is in alarm and functioning, indicate why. ☐ Yes ☐ No ☐ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Is sensor alarm circuit operational? ☐ Yes ☐ No ☐ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Has sensor been inspected and in good operating condition? ☐ Yes ☐ No ☐ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No When placed in test liquid, does the sensor trigger an alarm? ☐ Yes ☐ No ☐ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No When alarm is trigger, is the sensor identified on the ATG console? ☐ Yes ☐ No ☐ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Any “No” answers indicate the sensor fails the test. Test Results: ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Comments: Unable to remove interstitial sensors. Tester’s Name: Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 PRESSURE/VACUUM VENT CAP LEAK RATES AND OPENING PRESSURES Facility Name: Salt Lake City Cemetery Owner: Salt Lake Public Utilities Address: 200 North N Street Address: 1530 West Temple City, State, Zip: Salt Lake City, Utah 84103 City, State, Zip: Salt Lake City, Utah 84115 Facility I.D.#: 4000842 Phone #: 801-535-6904 Testing Company: Westech Phone #: 801-266-2545 Date: 10/21/24 This procedure is to determine pressure/vent cap specifications. See 40 CFR 63 CCCCCC for the inspection procedure. Tank Number 1 Product Grade RUL PV Manufacturer OPW Model Number 623V PRESSURE TEST Passing 2” Leak Rate (CFH) <0.05 Measured 2” Leak Rate (CFH) New Cap Passing Positive Opening Pressure (Inches WC) 2.5 – 6.0 Measured Positive Opening Pressure (Inches WC) New Cap VACUUM TEST Passing -4” Leak Rate (CFH) <0.21 Measured -4” Leak Rate (CFH) New Cap Passing Negative Opening Pressure (Inched WC) 6.0 – 10.0 Measured Negative Opening Pressure (Inched WC) New Cap Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: New pressure/vacuum cap installed on 10/21/24. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature