Loading...
HomeMy WebLinkAboutDDW-2024-014135 November 26, 2024 Ivan Merrell Vernal City Water System 78 North 500 East Vernal, Utah 84078 Dear Ivan Merrell: Subject: Public Drinking Water Requirements for Vernal City Water System, UTAH24012 According to the Division of Drinking Water’s records, Vernal City Water System is a Community water system that now serves a population of about 10,000 people. This population change results in the following changes to your systems sampling requirements as follows: Lead and Copper This population change brings the total number of Lead and Copper samples required to 20 every three years. The next samples must be collected during June 1, 2024 - September 30, 2024. For any questions regarding the Lead and Copper rule, contact Dylan Martinez at (385) 278-3807 or dylanmartinez@utah.gov. The updated monitoring requirements for Lead and Copper are included in the attached monitoring schedule. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Ivan Merrell Page 2 of 2 A current monitoring schedule for your system has been enclosed. If this letter is in error please contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts in maintaining a safe drinking water system. Sincerely, Mark Berger Monitoring and Standards Section Manager Enclosure: Monitoring Schedule cc: Ivan Merrell, imerrell@vernalcity.org Joseph Hadlock, TriCounty Health Department Nathan Hall, P.E. Dylan Martinez Contacts Type: Administrative Contact Name: IVAN MERRELL Office: 435-789-2255 Emergency: Email: imerrell@vernalcity.org Site Information Legal Contact: VERNAL Address: 78 North 500 East , VERNAL, UT 84078 Phone: 435-789-2255 County: UINTAH COUNTY System Type: Community Certification Required: D3 Total Population: 10000 Local Health District: Tri-County Health Department Site Updates Last Inventory Update: 11/05/2024 Last Surveyor Update: 10/31/2024 Surveyor: JOE HADLOCK Operating Period: 1/1 - 12/31 Last IPS Update: 11/26/2024 01:10:00 Political Districts Legislative District Map Water Usage Information per ERC Standard as of: 07/26/2022 Peak Day Demand per ERC (gal/day/ERC): 1691.0 Average Annual Demand per ERC (gal/ERC): 305576.0 Equalization Storage per ERC (gal/ERC): 834.0 Total Ips Points: 0 Public Water System Water Monitoring ReportDEQ | Drinking Water Vernal City Water System PWS ID: UTAH24012 Rating: Approved 05/07/1987 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 10 Routine Monthly 05/01/2013 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 4 Routine Quarterly UTAH24012 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MR003 345 N 1250 W 08/21/2024 10/01/2024-12/31/2024 MD005 242 W 775 S 08/21/2024 10/01/2024-12/31/2024 MR002 78 N 500 E 08/21/2024 10/01/2024-12/31/2024 MD001 1500 N 1500 W 08/21/2024 10/01/2024-12/31/2024 Sample during the following months: November, February, May, August OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 20 Routine 3 Years 09/2022 06/01/2025-09/30/2025 ASBESTOS DS001 1 Routine 9 Years 04/2018 01/01/2020 - 12/31/2028 https://waterlink.utah.gov/reports.html?systemId=1601 1/2 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH24012 DISTRIBUTION SYSTEM 12 Routine Monthly -- MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Lead Consumer Notice SUBMIT LCN CERTIFICATE 06/01/2022 12/29/2022 Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 07/29/2022 07/29/2025 Operational Evaluation Level SUBMIT OEL REPORT 07/15/2024 08/15/2024 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2025 07/01/2025 CCR SCHEDULES Submit CCR Certification Letter 01/01/2025 10/01/2025 https://waterlink.utah.gov/reports.html?systemId=1601 2/2