HomeMy WebLinkAboutDDW-2024-014135 November 26, 2024
Ivan Merrell
Vernal City Water System
78 North 500 East
Vernal, Utah 84078
Dear Ivan Merrell:
Subject: Public Drinking Water Requirements for Vernal City Water System, UTAH24012
According to the Division of Drinking Water’s records, Vernal City Water System is a
Community water system that now serves a population of about 10,000 people.
This population change results in the following changes to your systems sampling requirements
as follows:
Lead and Copper
This population change brings the total number of Lead and Copper samples required to 20 every
three years. The next samples must be collected during June 1, 2024 - September 30, 2024. For
any questions regarding the Lead and Copper rule, contact Dylan Martinez at (385) 278-3807 or
dylanmartinez@utah.gov. The updated monitoring requirements for Lead and Copper are
included in the attached monitoring schedule.
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284
www.deq.utah.gov
Ivan Merrell
Page 2 of 2
A current monitoring schedule for your system has been enclosed. If this letter is in error please
contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts
in maintaining a safe drinking water system.
Sincerely,
Mark Berger
Monitoring and Standards Section Manager
Enclosure: Monitoring Schedule
cc: Ivan Merrell, imerrell@vernalcity.org
Joseph Hadlock, TriCounty Health Department
Nathan Hall, P.E.
Dylan Martinez
Contacts
Type: Administrative Contact
Name: IVAN MERRELL
Office: 435-789-2255
Emergency:
Email:
imerrell@vernalcity.org
Site Information
Legal Contact: VERNAL
Address: 78 North 500 East ,
VERNAL, UT 84078
Phone: 435-789-2255
County: UINTAH COUNTY
System Type: Community
Certification Required: D3
Total Population: 10000
Local Health District: Tri-County
Health Department
Site Updates
Last Inventory Update: 11/05/2024
Last Surveyor Update: 10/31/2024
Surveyor: JOE HADLOCK
Operating Period: 1/1 - 12/31
Last IPS Update: 11/26/2024 01:10:00
Political Districts
Legislative District Map
Water Usage Information per ERC
Standard as of: 07/26/2022
Peak Day Demand per ERC
(gal/day/ERC): 1691.0
Average Annual Demand per ERC
(gal/ERC): 305576.0
Equalization Storage per ERC
(gal/ERC): 834.0
Total Ips Points: 0
Public Water System Water Monitoring ReportDEQ | Drinking Water
Vernal City Water System PWS ID: UTAH24012 Rating: Approved 05/07/1987 Status: Active
BACTERIOLOGICAL MONITORING
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
10 Routine Monthly 05/01/2013 COLIFORM (TCR)
DISINFECTION BYPRODUCT STAGE 2 MONITORING
Sample Count Type Frequency Sample Label
4 Routine Quarterly UTAH24012 DS001 Sample ID below
Sample ID Site Last Sampled Next Sample Due
MR003 345 N 1250 W 08/21/2024 10/01/2024-12/31/2024
MD005 242 W 775 S 08/21/2024 10/01/2024-12/31/2024
MR002 78 N 500 E 08/21/2024 10/01/2024-12/31/2024
MD001 1500 N 1500 W 08/21/2024 10/01/2024-12/31/2024
Sample during the following months: November, February, May, August
OTHER DISTRIBUTION MONITORING
Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 20 Routine 3 Years 09/2022 06/01/2025-09/30/2025
ASBESTOS DS001 1 Routine 9 Years 04/2018 01/01/2020 - 12/31/2028
https://waterlink.utah.gov/reports.html?systemId=1601 1/2
CHLORINE RESIDUAL MONITORING
ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due
DS001 UTAH24012 DISTRIBUTION SYSTEM 12 Routine Monthly --
MONITORING REQUIREMENTS BY FACILITY
ID Name Facility Details
GROUPED SOURCE SAMPLING STATIONS
Sample Group ID Sample Group Facility Details
OPEN COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
Lead Consumer Notice SUBMIT LCN CERTIFICATE 06/01/2022 12/29/2022
Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 07/29/2022 07/29/2025
Operational Evaluation Level SUBMIT OEL REPORT 07/15/2024 08/15/2024
CCR SCHEDULES Submit Consumer Confidence Report 01/01/2025 07/01/2025
CCR SCHEDULES Submit CCR Certification Letter 01/01/2025 10/01/2025
https://waterlink.utah.gov/reports.html?systemId=1601 2/2