Loading...
HomeMy WebLinkAboutDDW-2024-014132 November 11, 2024 Ryan Taylor Daniel Municipal Water 2175 W 3000 S Ste 200 Heber, Utah 84032 Dear Ryan Taylor: Subject: Correction to Letter Dated November 11, 2024, UTAH26005 On November 11, 2024, I sent you a letter outlining new requirements for your public water system based on an increase of population. After sending that letter, we discovered that the population we had in our database was incorrect; therefore, we are withdrawing that letter. The population for your system has been updated to 559, which reflects what was reported from your most recent Sanitary Survey conducted by Leslie Freeman on September 5, 2024. This population correction results in the following systems sampling and operator certification requirements: Bacteriological Sampling The total number of bacteriological samples this system is now required to take is one each month. It is still your responsibility to send a copy of all results to our office by the 10th of the following month. In the event of a coliform positive result, you are required to take three repeat samples and a triggered source E.coli sample for each ground water source in service at the time of the original positive sample. The system is required to submit an updated written sample site plan that identifies sampling sites and sample collection schedules that are representative of water throughout the distribution system. For any questions regarding the Total Coliform rule or Groundwater rule, contact Sitara Federico at (385) 515-1459 or sfederico@utah.gov. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Ryan Taylor Page 2 of 3 Disinfection Byproducts (DBPs) Sampling The water system’s Disinfection Byproducts (DBP) sampling requirement has not changed from what was described in the November 11 letter. The system is required to collect one (1) DBP sample every year. Each sample must be a dual sample set of total trihalomethanes (TTHMs) and haloacetic acids (HAA5). The next set of DBP samples must be collected during the July 1 - September 30, 2025, monitoring period . For any questions regarding the DBP rule contact Luke Treutel at (385) 258-6084 or ltreutel@utah.gov. Lead and Copper The water system’s Lead and Copper sampling requirement has not changed from what was described in the previous letter. This population change brings the total number of Lead and Copper samples required to ten every three years. The next samples must be collected during June 1, 2025 - September 30, 2025. For any questions regarding the Lead and Copper rule, contact Dylan Martinez at (385) 278-3807 or dylanmartinez@utah.gov. The updated monitoring requirements for Lead and Copper are included in the attached monitoring schedule. Operator Certification Requirements The system is classified as a Community water system that serves a population of 559 persons. This requires a certified Distribution Grade I (D1) Direct Responsible Charge Operator (DRC) to operate the system. According to our records, the system does not have an operator certified at the level of the system registered as a Direct Responsible Charge (DRC). If the population or the complexity of the water system changes, a higher level of certification may be required. The system has until October 1, 2025 , to come into compliance with the R309-300 Certification Rules for Water Supply Operators. We have updated the System’s operator certification requirements in the Division’s Improvement Priority System (IPS). Failure to comply would be a significant deficiency and subject to demerit points. Visit ddwopcert.utah.gov for more information regarding the R309-300 Certification Rules for Water Supply Operators, how to become a certified operator, or to post a job position for operators. For questions, contact Dawnie Jacobo at 385-272-5038 or ddwopcert@utah.gov Ryan Taylor Page 3 of 3 A current monitoring schedule for your system has been enclosed. If this letter is in error, please contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts in maintaining a safe drinking water system. Sincerely, Mark Berger Monitoring and Standards Section Manager Enclosure: Monitoring Schedule Revised Total Coliform Rule (RTCR) Sample Site Plan cc: Ryan Taylor, rtaylor@ardurra.com Tracy Richardson, Wasatch County Health Department Sitara Federico Luke Treutel Dylan Martinez Dawnie Jacobo Contacts Type: Administrative Contact Name: RYAN TAYLOR Office: 435-315-3168 Emergency: Email: rtaylor@ardurra.com Site Information Legal Contact: TURNER, CHIP Address: 2175 W 3000 S Ste 200 , HEBER, UT 84032 Phone: 435-654-5062 County: WASATCH COUNTY System Type: Community Certification Required: D1 Total Population: 559 Local Health District: Wasatch County Health Dept Site Updates Last Inventory Update: 11/15/2024 Last Surveyor Update: 09/05/2024 Surveyor: LESLIE FREEMAN Operating Period: 1/1 - 12/31 Last IPS Update: 11/21/2024 01:10:00 Political Districts Legislative District Map Water Usage Information per ERC Standard as of: 10/25/2022 Peak Day Demand per ERC (gal/day/ERC): 1397.0 Average Annual Demand per ERC (gal/ERC): 346968.0 Equalization Storage per ERC (gal/ERC): 951.0 Total Ips Points: 60 Public Water System Water Monitoring ReportDEQ | Drinking Water Daniel Municipal Water PWS ID: UTAH26005 Rating: Approved 05/21/2007 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 1 Routine Monthly 02/01/2013 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 1 Routine Yearly UTAH26005 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MR001 2567 S DANIEL RD 12/20/2021 07/01/2025-09/30/2025 OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 10 Routine 3 Years 08/2012 06/01/2025-09/30/2025 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH26005 DISTRIBUTION SYSTEM 12 Routine Monthly -- https://waterlink.utah.gov/reports.html?systemId=511 1/3 MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details SS284 SAMPLING STATION - 01, 02 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 12/22/2022 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 01/30/2024 01/01/2025 - 12/31/2025 PESTICIDES 1 Routine 3 Years 12/22/2022 01/01/2023 - 12/31/2025 RADS - COMPLIANCE 1 Routine 9 Years 04/11/2019 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 3 Years 12/22/2022 01/01/2023 - 12/31/2025 VOLATILE ORGANICS 1 Routine 3 Years 11/09/2020 01/01/2023 - 12/31/2025 SSG01 GWR GROUP SAMPLING STATION Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due E. COLI 1 Routine Monthly 04/17/2023 05/01/2023 - 05/31/2023 WS003 DANIEL WELL #1 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 12/20/2022 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 10/22/2024 01/01/2025 - 12/31/2025 PESTICIDES 1 Routine 3 Years 12/20/2022 01/01/2023 - 12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 12/20/2022 01/01/2023 - 12/31/2025 SULFATE,SODIUM,TDS 1 Routine 3 Years 12/20/2022 01/01/2023 - 12/31/2025 VOLATILE ORGANICS 1 Routine Quarterly 10/22/2024 01/01/2025 - 03/31/2025 GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details 8284.0 UTAH SAMPLING STATION SS284 View Details https://waterlink.utah.gov/reports.html?systemId=511 2/3 OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due ENGINEERING ACTIVITY TYPES ENGINEERING REVIEW- CONDUCT AND SUBMIT MIN 05/04/2020 06/30/2021 ENGINEERING ACTIVITY TYPES ENGINEERING REVIEW- CONDUCT AND SUBMIT MIN 05/04/2020 06/30/2021 Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 10/27/2022 10/27/2025 SOURCE PROTECTION SOURCE PROTECTION PLAN- SUBMIT MIN 10/19/2023 01/17/2024 Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 OPERATOR CERTIFICATION GWR CORRECT DEFICIENCY 120 DAYS SIG 10/01/2024 10/01/2025 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2025 07/01/2025 CCR SCHEDULES Submit CCR Certification Letter 01/01/2025 10/01/2025 https://waterlink.utah.gov/reports.html?systemId=511 3/3